PEMBANGUNAN GEDUNG POLIKLINIK, RAWAT INAP, IBS CENTRE DAN RUANG INTENSIFCARE
###
TAHUN ANGGARAN 2022
D. BAHAN KAYU
1 Dolken kayu dia. 8-10/400 cm btg
2 Bambu dia 5-7 cm btg
3 Kayu albasia papan 2/30 m³
4 Kayu 5/7 kelas II m³
5 Kayu Kelas III m³
6 Balok Kayu Kelas II. m³
7 Plywood 9 mm lbr
8 Kayu Kamper Papan 3x30X400 m³
9 Triplek 4mm lbr
10 Hpl lbr
11 Ezing m
12 Teak wood 4 mm lbr
13 Multiplek 9 mm lbr
14 Multiplek 18 mm lbr
15 Melaminto lbr
16 Penjaga jarak bekisting/Spacer bh
17 Plat Alumunium t = 0.5mm lbr
18 List Kayu uk 1 cm x 1cm m
F. SANITAIR
1 Kloset duduk setara Toto bh
2 Kloset jongkok Setara Toto bh
3 Wastafel Setara Toto set
4 Jet washer bh
5 Kran dinding bh
6 Kaca cermin bh
7 Soap holder bh
8 Tisue holder bh
9 Urinal setara Toto bh
10 Floor drain stainless steel bh
11 Slofsink setara toto set
12 Partisi Urinal setara Toto bh
13 Bak Zink satu lubang set
14 Water Drain set
15 Kran Zink bh
G. BAHAN FINISHING
1 Plamur (1 pail = @ 20 kg) kg
2 Cat Dasar kg
3 Cat tembok (interior) kg
4 Cat tembok (exterior) kg
5 Residu ltr
6 Dempul kg
7 Meni Besi kg
Upah dan Bahan - page 2 of 71
8 Cat kayu/Besi kg
9 Thinner ltr
10 Cat Polyurethane kg
11 Cat weathershield kg
12 Roll Cat bh
13 Amplas m
14 Kwas 3" bh
15 Kape bh
16 Lem Kuning kg
17 Lem Kayu kg
I. BAHAN ATAP
1 Main Truss/ Kaso Metal C- 75.75, tebal 0.75 mm
2 Reng Baja Ringan tebal 0.45 mm R.33.0.45
3 Self Drilling Screw dia 6 x 20 mm
4 Self Drilling Screw dia 4 x 16 mm
5 Skrup Dynabolt dia 12 x 120 mm
6 Kawat Seling m
J. LAIN - LAIN
1 Air ltr
2 Paku kg
3 Minyak bekisiting ltr
4 Paku biasa kg
5 Besi strip kg
6 Seng Gelombang lbr
7 Seng plat m
8 Besi Hollow 40 x 40 m
9 Jendela nako bh
10 Kaca polos m²
11 Kunci tanam bh
12 Mur 25 mm bh
13 Lem/adhesive ltr
14 Sealtape bh
15 Ijuk kg
16 Ijuk m
17 Jalusi Kayu ls
18 Dump truck 3-4 ton jam
19 Paku beton ls
20 Sekrup m
21 Hollo besi Galvanis 4x4x1 m
NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
PEKERJAAN PERSIAPAN
A.2.2.1.2. 1 m¹ Pagar sementara dari seng gelombang tinggi 2 meter Rp -
Bahan:
1 Dolken kayu dia. 8-10/400 cm btg 1.2500 Rp - Rp -
2 Semen kg 2.5000 Rp - Rp -
3 Seng Gelombang lbr 1.2000 Rp - Rp -
4 Pasir beton m³ 0.0050 Rp - Rp -
5 Koral beton m³ 0.0090 Rp - Rp -
6 Kayu 5/7 m³ 0.0720 Rp - Rp -
7 Paku biasa 2" 5" kg 0.0600 Rp - Rp -
8 Meni Besi ltr 0.4500 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.1000 Rp - Rp -
2 Tukang kayu L.02 oh 0.1500 Rp - Rp -
3 Kepala tukang L.03 oh 0.0200 Rp - Rp -
4 Mandor L.04 oh 0.0200 Rp - Rp -
Jumlah Rp -
Profit 10% Rp -
Jumlah harga persatuan pekerjaan Rp -
A.2.2.1.4. 1 m¹ Pengukuran dan pemasangan bowplank Rp -
Bahan:
1 Kayu Balok 5/7 m³ 0.0120 Rp - Rp -
2 Paku 2" - 3" kg 0.0200 Rp - Rp -
3 Kayu papan 3/20 m³ 0.0070 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.1000 Rp - Rp -
2 Tukang kayu L.02 oh 0.1000 Rp - Rp -
3 Kepala tukang L.03 oh 0.0100 Rp - Rp -
4 Mandor L.04 oh 0.0050 Rp - Rp -
Jumlah Rp -
Profit 10% Rp -
Jumlah harga persatuan pekerjaan Rp -
A.2.2.1.5. 1 m² Pembuatan Kantor sementara lantai plesteran Rp -
Bahan:
1 Dolken btg 1.2500 Rp - Rp -
2 Kayu m³ 0.1800 Rp - Rp -
3 Paku biasa kg 0.0800 Rp - Rp -
4 Besi strip kg 1.1000 Rp - Rp -
5 semen kg 35.0000 Rp - Rp -
6 Pasir pasang m³ 0.1500 Rp - Rp -
7 Pasir beton m³ 0.1000 Rp - Rp -
8 Koral beton m³ 0.1500 Rp - Rp -
9 Bata merah bh 30.0000 Rp - Rp -
10 Seng plat lbr 0.2500 Rp - Rp -
11 Jendela nako bh 0.2000 Rp - Rp -
12 Kaca Polos m² 0.0800 Rp - Rp -
13 Kunci tanam bh 0.1500 Rp - Rp -
14 Plywood 4 mm lbr 0.0600 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 2.0000 Rp - Rp -
2 Tukang kayu L.02 oh 2.0000 Rp - Rp -
3 Tukang batu L.02 oh 1.0000 Rp - Rp -
4 Kepala tukang L.03 oh 0.3000 Rp - Rp -
5 Mandor L.04 oh 0.0500 Rp - Rp -
Jumlah Rp -
Profit 10% Rp -
Jumlah harga persatuan pekerjaan Rp -
A.2.2.1.7. 1 m² Pembuatan Gudang Semen dan Peralatan Rp -
Bahan:
1 Dolken btg 1.7000 Rp - Rp -
2 Kayu m³ 0.2100 Rp - Rp -
3 Paku biasa kg 0.3000 Rp - Rp -
4 semen kg 10.5000 Rp - Rp -
5 Pasir beton m³ 0.0300 Rp - Rp -
6 Koral beton m³ 0.0500 Rp - Rp -
7 Seng gelombang lbr 1.5000 Rp - Rp -
8 Seng plat lbr 0.2500 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 1.0000 Rp - Rp -
2 Tukang kayu L.02 oh 2.0000 Rp - Rp -
3 Kepala tukang L.03 oh 0.2000 Rp - Rp -
HARGA SATUAN
NO. URAIAN PEKERJAAN
TERPASANG
PEKERJAAN PERSIAPAN
A.2.2.1.2. 1 m¹ Pagar sementara dari seng gelombang tinggi 2 meter Rp -
A.2.2.1.4. 1 m¹ Pengukuran dan pemasangan bowplank Rp -
A.2.2.1.5. 1 m² Pembuatan Kantor sementara lantai plesteran Rp -
A.2.2.1.7. 1 m² Pembuatan Gudang Semen dan Peralatan Rp -
A.2.2.1.8. 1 m² Pembuatan Bedeng Pekerja Rp -
A.2.2.1.9. 1 m² Pekerjaan Pembersihan Lapangan dan Peralatan Rp -
A.2.2.1.10. 1 m² Pembuatan Steger/Perancah dari kayu dolken Rp -
PEKERJAAN TANAH
A.2.3.1.1. 1 m³ Mengali tanah biasa sedalam 1 meter Rp -
A.2.3.1.2. 1 m³ Mengali tanah biasa sedalam 2 meter Rp -
A.2.3.1.3. 1 m³ Mengali tanah biasa sedalam 3 meter Rp -
A.2.3.1.8. 1 m³ Pembuangan Tanah Sejauh 30 Meter Rp -
A.2.3.1.9. 1 m³ Pengurugan kembali galian tanah Rp -
A.2.3.1.10. 1 m³ Pemadatan tanah (per 20 cm ) Rp -
A.2.3.1.11. 1 m³ Pengurugan Dengan Pasir Urug Rp -
A.2.3.1.14. 1 m³ Pengurugan Dengan Sirtu Padat Rp -
PEKERJAAN STRUKTUR
A.3.2.1.3. 1 m³ Membuat Pondasi Batu Belah Campuran 1 SP : 5 PP Rp -
A.3.2.1.9. 1 m³ Membuat Pondasi Batu Kosong (Anstamping) Rp -
A.4.1.1.4. 1 m³ Membuat Lantai Kerja Beton Mutu f'c = 7.4 MPa Rp -
A.4.1.1.8. 1 m³ Membuat Lantai Kerja Beton Mutu f'c = 21.7 MPa (K250) Rp -
A.4.1.1.17. 1 kg Pembesian 10 kg dengan besi polos atau ulir Rp -
A.4.2.1.1. 1 kg Memasang besi kontruksi Rp -
A.4.1.2.1. 1 m² Membuat Lahan Produksi t=8cm (Screed Lantai) Rp -
A.4.1.1.20. 1 m² Memasang bekisting untuk Pondasi (2x pakai) Rp -
A.4.1.1.21. 1 m² Memasang bekisting untuk Sloof (2x pakai) Rp -
A.4.1.1.22. 1 m² Memasang bekisting untuk Kolom (2X pakai) Rp -
A.4.1.1.23. 1 m² Memasang bekisting untuk Balok (2x pakai) Rp -
A.4.1.1.24. 1 m² Memasang bekisting untuk Lantai (2x pakai) Rp -
A.4.1.1.25. 1 m² Memasang bekisting untuk Dinding (2x Pakai) Rp -
A.4.1.1.26. 1 m² Memasang bekisting untuk Tangga (2x Pakai) Rp -
A.4.1.1.35. 1 m¹ Membuat Kolom Praktis Beton Bertulang ( 11/11 ) cm Rp -
A.4.1.1.36. 1 m¹ Membuat Ring Balok Beton Bertulang ( 10/15 ) cm Rp -
B.13.a2 1 m³ Pekerjaan Beton Mutu f'c = 25 MPa (K300) Rp -
B.13.a3 1 m³ Pekerjaan Beton Mutu f'c = 29,05 MPa (K350) Rp -
B.27.a. 1 m² Pekerjaan Bongkaran Bekisting biasa Rp -
A.B.1 1 m³ Membuat Plat Beton Bertulang ( 150 kg Besi + Bekisting ) Rp -
PEKERJAAN PASANGAN DINDING
A.4.4.1.8. 1 m² Memasang dinding bata merah (5x11x22) cm tebal 1/2 bata campuran 1SP:5PP Rp -
A.4.4.1.10. 1 m² Memasang dinding bata ringan t=10 cm dengan mortar siap pakai Rp -
A.4.4.2.3. 1 m² Membuat plesteran 1 PC: 3 PP, tebal. 15 mm Rp -
A.4.4.2.5. 1 m² Membuat plesteran mortar siap pakai Rp -
A.4.4.2.20. 1 m' Pek. Opening Pintu dan Jendela/plester skoning Rp -
A.4.4.2.27. 1 m² Membuat acian semen mortar siap pakai Rp -
A.Ar.PD.01 1 m¹ Memasang homogenius tile 10 x 60 cm cutting size Rp -
A.Ar.PD.02 1 m¹ Memasang Plint Vynil Rp -
A.Ar.PD.03 1 m² Memasang Dinding Keramik 30/60 Rp -
A.Ar.PD.05 1 m Membuat benang sudut/nat Rp -
PEKERJAAN PELAPIS LANTAI
A.4.4.3.36. 1 m² Memasang lantai keramik 30 x 30 cm Rp -
A.Ar.PL.01 1 m² Memasang lantai keramik 40 x 40 cm Rp -
A.Ar.PL.02 1 m² Memasang lantai homogeneous tile 60x60 cm Unpolished Rp -
A.Ar.PL.03 1 m² Memasang lantai homogeneous tile 60x60 cm Polished Rp -
A.Ar.PL.04 1 m² Memasang lantai vynil Rp -
A.Ar.PL.06 1 m Memasang Step Nosing Granit 3x60cm Rp -
3 Pekerjaan Galian
a Pekerjaan Galian PC
PC1 1.1 1.1 1.05 4
PC2 2.6 1.1 1.05 4
PC3 1.25 4
PC4 2.6 2.6 1.25 6
PC5 2.8 2.8 1.25 18
PC Lift 4.15 3.3 2.1 1
7 Pekerjaan PC
a Pekerjaan Pengecoran PC
PC1 1 1 0.4 4
PC2 2.5 1 0.4 4
PC3 0.6 4
PC4 2.5 2.5 0.6 6
PC5 2.7 2.7 0.6 18
PC Lift 4.05 3.2 0.5 1
b Pekerjaan Bekisting PC
PC1 1 1 0.4 4
PC2 2.5 1 0.4 4
PC3 0.6 4
PC4 2.5 2.5 0.6 6
PC5 2.7 2.7 0.6 18
PC Lift 4.05 3.2 0.5 1
7 Pekerjaan Sloof
a Pekerjaan Pengecoran Sloof
SL1 Grid H 17.45 0.35 0.7 1
Grid G 17.45 0.35 0.7 1
Grid F 17.45 0.35 0.7 1
Grid E 17.45 0.35 0.7 1
Grid D 17.45 0.35 0.7 1
Grid C 17.45 0.35 0.7 1
Grid B 17.45 0.35 0.7 1
Grid A 17.45 0.35 0.7 1
8 Pekerjaan Pitlift
a Pekerjaan Pengecoran 1.5 0.2 1.6 2
2.35 0.2 1.6 2
b Pekerjaan Bekisting 1.5 0.2 1.6 2
2.35 0.2 1.6 2
B Pekerjaan Lantai 1
1 Pekerjaan Plat Lantai
a Pek. Pengecoran
49 19.32 0.1 1
Kolom K1 0.6 0.6 0.1 22
Kolom K2 0.2 0.2 0.1 5
Pitlif 3.55 2.7 0.1 1
b Pek. Bekisting
Grid Horizonal A 19 0.12 1
Grid Horizontal H 19 0.12 1
Grid Vertikal 1 48.5 0.12 1
Grid Vertikal 4 48.5 0.12 1
2 Pekerjaan Kolom K1
Pengecoran Kolom Grid H 0.6 0.6 5.48 4
Grid G 0.6 0.6 5.48 2
Grid F 0.6 0.6 4.78 2
Grid E 0.6 0.6 4.78 2
Grid D 0.6 0.6 4.78 2
Grid C 0.6 0.6 4.78 2
Grid B 0.6 0.6 4.78 2
Grid A 0.6 0.6 4.78 4
3 Pekerjaan Kolom K2
Pengecoran Kolom 0.2 0.2 4.08 4
4 Pekerjaan Kolom KL
Pengecoran Kolom 0.9 0.3 4.08 4
5 Pekerjaan Kolom K4
Pengecoran Kolom 0.6 0.3 4.78 4
6 Pekerjaan Tangga
Pengecoran Tangga
Plat Tangga 1 4 1.475 0.15 1
Plat Tangga 2 4.2 1.6 0.15 1
Anak Tangga 1 1.475 0.3 0.17 11
Anak Tangga 2 1.6 0.3 0.17 11
Bordes 5.775 1.175 0.15 1
Bekisting Kolom
Plat Tangga 1 4 1.475 0.15 1
Plat Tangga 2 4.2 1.6 0.15 1
Anak Tangga 1 1.475 0.3 0.17 11
Anak Tangga 2 1.6 0.3 0.17 11
Bordes 5.775 1.175 0.15 1
5 Pekerjaan Kolom K3
Pengecoran Kolom 0.2 0.2 4.27 4
6 Pekerjaan Kolom KL
Pengecoran Kolom 0.9 0.3 4.42 4
Bekisting Kolom 0.9 0.3 4.42 4
7 Pekerjaan Kolom K4
Pengecoran Kolom 0.6 0.3 4.27 4
Balok
3 Pekerjaan Kolom K1
Pengecoran Kolom Grid H 0.6 0.6 4.76 4
Grid G 0.6 0.6 4.76 2
Grid F 0.6 0.6 4.76 2
Grid E 0.6 0.6 4.76 2
Grid D 0.6 0.6 4.76 2
Grid C 0.6 0.6 4.76 2
Grid B 0.6 0.6 4.76 2
Grid A 0.6 0.6 4.76 4
5 Pekerjaan Kolom K3
Pengecoran Kolom 0.2 0.2 4.2 4
6 Pekerjaan Kolom KL
Pengecoran Kolom 0.9 0.3 4.76 4
7 Pekerjaan Kolom K4
Pengecoran Kolom 0.6 0.3 4.2 4
Balok
3 Pekerjaan Kolom K1
Pengecoran Kolom Grid H 0.6 0.6 4.08 4
Grid G 0.6 0.6 4.08 2
Grid F 0.6 0.6 4.08 2
Grid E 0.6 0.6 4.08 2
Grid D 0.6 0.6 4.08 2
Grid C 0.6 0.6 4.08 2
Grid B 0.6 0.6 4.08 2
Grid A 0.6 0.6 4.08 4
5 Pekerjaan Kolom K3
Pengecoran Kolom 0.2 0.2 3.5 4
6 Pekerjaan Kolom KL
Pengecoran Kolom 0.9 0.3 4.08 4
7 Pekerjaan Kolom K4
Pengecoran Kolom 0.6 0.3 3.5 4
Balok
1136
0.196 5.775
0.196 11.550
0.196 17.325
0.196 34.650
0.196 129.938
0.196 5.029
total 204.266
5.082
12.012
4.8125 24.063
50.700
176.400
28.760
total 297.016
2.327
2.291
1.306
1.306
1.306
1.306
1.306
3.307
5.535
5.787
5.787
5.787
4.618
3.814
0.895
0.700
0.895
0.895
0.895
0.895
total 50.958
Totak Pekerjaan Galian 347.974
18.9475 86.763
63.3818 81.117
18.9475 86.763
18.9475 86.763
18.9475 86.763
14.84 68.138
12.3225 0.000
total 496.308
0.200
0.500
4.8125 0.963
1.875
6.561
0.648
total 10.747
0.305
0.305
0.305
0.305
0.305
0.305
0.305
0.305
0.669
0.669
0.669
0.669
0.513
0.513
0.149
0.146
0.149
0.149
0.149
0.149
total 7.039
Totak Pekerjaan Urpas 17.785
0.200
0.500
4.8125 0.963
1.875
6.561
0.648
total 10.747
0.305
0.305
0.305
0.305
0.305
0.305
0.305
0.305
0.669
0.669
0.669
0.669
0.513
0.513
0.149
0.146
0.149
0.149
0.149
0.149
total 7.039
Totak Pekerjaan Lantai Kerja 17.785
1.600
4.000
4.6 11.040
22.500
78.732
6.480
6.4
11.2
8.7 20.88
36
116.64
7.25
4.275
4.275
4.275
4.275
4.275
4.275
4.275
4.275
total 34.202
8.032
8.032
8.032
8.032
total 32.130
4.618
4.618
total 9.236
0.895
0.877
0.895
0.895
0.895
0.895
total 5.353
24.43
24.43
24.43
24.43
24.43
24.43
24.43
24.43
total 195.440
53.55
53.55
53.55
53.55
total 214.200
36.945
36.945
total 73.890
8.952
8.766
8.952
8.952
8.952
8.952
total 53.526
0.960
1.504
total 2.464
9.6
15.04
total 24.640
18.9475 96.563
0.792
0.02
0.9585
total 94.792
2.28
2.28
5.82
5.82
total 16.200
7.891
3.946
3.442
3.442
3.442
3.442
3.442
6.883
total 35.928
52.608
26.304
22.944
22.944
22.944
22.944
22.944
45.888
total 239.520
0.000
3.946
3.442
3.442
3.442
3.442
3.442
0.000
total 21.154
0
26.304
22.944
22.944
22.944
22.944
22.944
0
total 141.024
0.653
total 0.653
13.056
total 13.056
4.406
total 4.406
39.168
total 39.168
3.442
total 3.442
29.376
total 29.376
0.885
1.008
0.0255 0.414
0.0255 0.449
1.018
total 3.773
7.1
7.98
3.31925
3.553
8.870625
total 30.823
930.32 136.639
18.4725 2.073
1.134
0.03
3.90264
0.36252
143.485
total 805.308 133.283
6.365
3.182
3.182
3.182
3.182
3.182
3.182
6.365
total 31.824
42.432
21.216
21.216
21.216
21.216
21.216
21.216
42.432
total 212.160
0.000
3.182
3.182
3.182
3.182
3.182
3.182
0.000
total 19.094
0
21.216
21.216
21.216
21.216
21.216
21.216
0
total 127.296
0.683
total 0.683
13.664
total 13.664
4.774
total 4.774
42.432
total 42.432
3.074
total 3.074
30.744
total 30.744
40.295 6.775
140.6064 23.208
34.32 5.400
13.6 2.000
15.848 2.560
13.6 2.000
total 182.87195 41.943
75.39745
total 107.475 41.943
25.085 3.330 6.055
21.677 2.878 5.2325
21.677 2.878 5.2325
21.677 2.878 5.2325
21.677 2.878 5.2325
21.677 2.878 5.2325
21.677 2.878 5.2325
total 155.150 20.597
0.000 0.000 0
2.880 0.324 0.72
2.880 0.324 0.72
2.880 0.324 0.72
2.880 0.324 0.72
2.880 0.324 0.72
2.880 0.324 0.72
47.880 5.386 11.97
47.880 5.386 11.97
47.880 5.386 11.97
47.880 5.386 11.97
total 208.800 23.490
0.805 0.057 0.23
0.805 0.057 0.23
1.610 0.115 0.46
0.805 0.057 0.23
0.805 0.057 0.23
8.155 0.583 2.33
3.780 0.270 1.08
total 16.765 1.198
8.063 0.484 3.225
3.713 0.223 1.485
8.575 0.515 3.43
8.575 0.515 3.43
8.575 0.515 3.43
9.538 0.572 3.815
6.550 0.393 2.62
18.533 1.112 7.413
3.613 0.217 1.445
26.200 1.965
total 101.933 6.509
13.585 1.251 3.575
6.793 0.626 1.7875
13.585 1.251 3.575
13.585 1.251 3.575
13.585 1.251 3.575
10.735 0.989 2.825
4.180 0.385 1.1
4.180 0.385 1.1
4.180 0.385 1.1
4.180 0.385 1.1
13.490 1.243 3.55
4.180 0.385 1.1
total 106.258 9.787 152.6955
238.995 34.484
100.192 14.069
647.44 94.830
14.1375 1.748
1.134
0.03
3.90264
0.36252
152.6955
total 848.069 139.702
6.854
3.427
3.427
3.427
3.427
3.427
3.427
6.854
total 34.272
45.696
22.848
22.848
22.848
22.848
22.848
22.848
45.696
total 228.480
0.000
3.427
3.427
3.427
3.427
3.427
3.427
0.000
total 20.563
0
22.848
22.848
22.848
22.848
22.848
22.848
0
total 137.088
0.672
total 0.672
13.44
total 13.440
5.141
total 5.141
45.696
total 45.696
3.024
total 3.024
30.24
total 30.240
33.87 5.150
117.172 19.340
34.32 5.400
13.6 2.000
238.995 34.484
100.192 14.069
647.44 94.830
0 0.000
1.134
0.03
3.90264
0.36252
151.2905
total 835.337 137.953
5.875
2.938
2.938
2.938
2.938
2.938
2.938
5.875
total 29.376
39.168
19.584
19.584
19.584
19.584
19.584
19.584
39.168
total 195.840
0.000
2.938
2.938
2.938
2.938
2.938
2.938
0.000
total 17.626
0
19.584
19.584
19.584
19.584
19.584
19.584
0
total 117.504
0.560
total 0.560
11.2
total 11.200
4.406
total 4.406
39.168
total 39.168
2.520
total 2.520
25.2
total 25.200
24.540 3.181
21.233 2.752
total 45.773 5.934
0.000 0.000
1.980 0.216
0.000 0.000
4.895 0.534
4.895 0.534
4.895 0.534
4.895 0.534
total 21.560 2.352
0.000 0.000
1.660 0.083
1.660 0.083
total 3.319 0.166
3.336 0.294
3.889 0.343
42.177 3.722
3.523 0.311
3.523 0.311
7.053 0.622
total 63.502 5.603
1 0.000
11.421875 1.748
23.4344 3.868
11.44 1.800
23.4344 3.868
16.37 2.650
23.4344 3.868
11.44 1.800
23.4344 3.868
325.035 47.137
20.8915 2.444
636.832 93.260
139.563 19.631
67.85 9.462
0.216
0
3.90264
0
199.0491
total 991.122 167.816
3.989
26.592
Ukuran Kusen Pintu Dan Jendela
no type P T Total (M2) Total (m1)
pintu
1 P1 0.7 2.6 1.82 5.9
2 P2 0.9 2.6 2.34 6.1
3 P3 0.9 2.6 2.34 7.42
4 P4 1 2.6 2.6 6.2
5 P5 1.33 2.6 3.458 6.53
ACP P T L
- AREA DEPAN 8 22
- KANOPI 21 5.4
- SISI KANAN 301
BOX ACP 15*40 0.3 0.8 7.9
- SISI KIRI
- 2.3 11.3 1.6
- 0.65 13 1.6
TOTAL
122.4
204
204
21.6
102
21
50
138
204
138
51
TOTAL
178.2
113.4
301
23 43.608
5 207.92
3 40.56
884.688