Peta Situasi Dan Long Section Saluran D
Peta Situasi Dan Long Section Saluran D
H1.0+250 X = 688786.505
Y = 9322884.564
UT Z = 4.039
AR
A
0 10 20 30 40 50 m
KETERANGAN :
GARIS KONTUR
SUNGAI
H1.0+225
JALAN
D.0+225
D.0+150
D.0+125
D.0+100
D.0+175
BENCH MARK (BM)
D.0+287.80
D.0+075
D.0+275
D.0+300
D.0+200
D.0+250
D.0+050
D.0+025
D.0+000
CP 04
CONTROL POINT (CP) X = 688807.217
H1.0+200 Y = 9322889.201
ARAH ALIRAN Z = 3.636
5.00
4.00
JEMBATAN +3.638
3.00
2.00
1.00
+0.783
+0.123
0.00
0 10 20 30 40 50 m
DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE
NOMOR PROFIL
D.0+000 D.0+025 D.0+050 D.0+075 D.0+100 D.0+125 D.0+150 D.0+175 D.0+200 D.0+225 D.0+250 D.0+275 D.0+300
PROFILE NUMBER
JARAK PROFIL
100
125
150
175
200
225
250
275
300
25
50
75
25 25 25 25 25 25 25 25 25 25 25 25 25
0
ACCUMULATED DISTANCE
3.504
3.458
2.787
3.036
2.808
3.046
2.917
3.023
3.168
2.616
2.763
2.720
2.650
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
3.545
3.200
3.883
3.224
3.088
2.898
2.486
2.875
2.934
3.120
4.160
4.251
4.050
ELEVASI TANGGUL KANAN
EXISTING
0.637
0.641
0.516
0.286
0.415
0.183
0.309
0.264
0.146
0.142
0.120
0.010
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE
KETERANGAN :
GARIS KONTUR
SUNGAI
I.1+059.42
JALAN
D.0+287.80
BENCH MARK (BM)
D.0+300
D.0+600
I.1+050
D.0+575
D.0+325
D.0+350
D.0+375
D.0+400
D.0+425
D.0+551.53
D.0+450
D.0+475
D.0+550
CONTROL POINT (CP)
D.0+500
D.0+525
ARAH ALIRAN
5.00
4.00
3.00
2.00
1.00
+0.192
0.00
0 10 20 30 40 50 m
DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE
NOMOR PROFIL
D.0+300 D.0+325 D.0+350 D.0+375 D.0+400 D.0+425 D.0+450 D.0+475 D.0+500 D.0+525 D.0+550 D.0+575 D.0+600
PROFILE NUMBER
JARAK PROFIL
300
325
350
375
400
425
450
475
500
525
550
575
600
25 25 25 25 25 25 25 25 25 25 25 25 25 25
ACCUMULATED DISTANCE
2.650
2.636
2.974
2.728
2.603
2.667
2.597
2.600
2.974
2.680
2.385
1.761
2.300
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
4.050
3.011
4.135
2.866
2.853
2.887
4.747
2.895
2.751
3.708
3.647
2.592
2.368
ELEVASI TANGGUL KANAN
EXISTING
0.051
0.084
0.037
0.030
0.023
0.300
0.288
0.017
1.226
0.399
0.020
0.085
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE
KETERANGAN :
GARIS KONTUR
SUNGAI
JALAN I.1+059.42
D.0+775
D.0+800
D.0+825
D.0+750
D.0+725
D.0+850
D.0+700
D.0+875
D.0+675
BENCH MARK (BM)
D.0+650
D.0+900
D.0+625
D.0+600
I.1+050
ARAH ALIRAN
5.00
4.00
3.00
JEMBATAN
+2.356
2.00
1.00
0.00
0 10 20 30 40 50 m
DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE
NOMOR PROFIL
D.0+600 D.0+625 D.0+650 D.0+675 D.0+700 D.0+725 D.0+750 D.0+775 D.0+800 D.0+825 D.0+850 D.0+875 D.0+900
PROFILE NUMBER
JARAK PROFIL
600
625
650
675
700
725
750
775
800
825
850
875
900
25 25 25 25 25 25 25 25 25 25 25 25 25 25
ACCUMULATED DISTANCE
2.300
2.246
2.225
2.389
2.472
2.290
2.268
2.481
1.824
1.557
1.863
1.685
1.583
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
2.368
2.466
2.464
2.309
2.300
3.429
2.256
2.270
1.855
1.450
1.373
1.712
2.097
ELEVASI TANGGUL KANAN
EXISTING
0.034
0.814
0.624
0.591
0.313
0.846
0.237
0.172
0.197
0.155
0.285
0.182
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE
KETERANGAN :
GARIS KONTUR
SUNGAI
JALAN
D.1+000
D.1+025
D.1+050
D.0+975
D.0+950
D.1+075
D.1+100
D.1+125
D.0+925
D.1+150
BENCH MARK (BM)
D.0+900
D.1+175
D.1+200
CONTROL POINT (CP)
ARAH ALIRAN
5.00
4.00
3.00
JEMBATAN
+2.356 JEMBATAN +2.382
2.00
1.00
0.00
0 10 20 30 40 50 m
DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE
NOMOR PROFIL
D.0+900 D.0+925 D.0+950 D.0+975 D.1+000 D.1+025 D.1+050 D.1+075 D.1+100 D.1+125 D.1+150 D.1+175 D.1+200
PROFILE NUMBER
1000
1025
1050
1075
1100
1125
1150
1175
1200
JARAK PROFIL
900
925
950
975
25 25 25 25 25 25 25 25 25 25 25 25 25 25
ACCUMULATED DISTANCE
1.583
1.508
1.758
1.626
1.643
1.474
1.820
1.736
1.313
1.425
1.367
1.443
1.725
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
2.097
1.773
1.927
1.564
1.631
1.500
1.595
1.654
1.577
1.409
1.401
1.305
1.634
ELEVASI TANGGUL KANAN
EXISTING
0.465
0.568
0.578
0.486
0.594
0.287
0.283
0.332
0.392
0.561
0.409
0.460
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE
B.3+080
KETERANGAN :
GARIS KONTUR
SUNGAI B.3+100
D.1+
JALAN
D.1+
303
300
BENCH MARK (BM)
.6
D.1+20
D.1+
9
D.1+250
275
D.1+225
CONTROL POINT (CP) B.3+120
0
ARAH ALIRAN
5.00
4.00
3.00
JEMBATAN +2.382
2.00
1.00
0.00
0 10 20 30 40 50 m
DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE
D.1+303.69
D.1+300
NOMOR PROFIL
D.1+200 D.1+225 D.1+250 D.1+275
PROFILE NUMBER
1303.69
1200
1225
1250
1275
1300
JARAK PROFIL
25 25 25 25 25
ACCUMULATED DISTANCE
1.725
1.613
1.650
1.401
1.414
1.337
1.682
1.711
1.629
1.573
1.542
0.454
0.324
0.267
0.358
0.394