Anda di halaman 1dari 5

BM 04

H1.0+250 X = 688786.505
Y = 9322884.564
UT Z = 4.039
AR
A
0 10 20 30 40 50 m

SKALA PETA = 1 : 1.000

KETERANGAN :

GARIS KONTUR

SUNGAI
H1.0+225
JALAN

D.0+225
D.0+150
D.0+125
D.0+100

D.0+175
BENCH MARK (BM)

D.0+287.80
D.0+075

D.0+275

D.0+300
D.0+200

D.0+250
D.0+050
D.0+025
D.0+000
CP 04
CONTROL POINT (CP) X = 688807.217
H1.0+200 Y = 9322889.201
ARAH ALIRAN Z = 3.636

5.00

4.00
JEMBATAN +3.638

3.00

2.00

1.00
+0.783

+0.123
0.00
0 10 20 30 40 50 m

SKALA HORIZONTAL = 1 : 1.000 -1.00

0.0 1.0 2.0 3.0 4.0 5.0 m


-2.00
SKALA VERTIKAL = 1 : 100

DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE

NOMOR PROFIL
D.0+000 D.0+025 D.0+050 D.0+075 D.0+100 D.0+125 D.0+150 D.0+175 D.0+200 D.0+225 D.0+250 D.0+275 D.0+300
PROFILE NUMBER

JARAK PROFIL
100

125

150

175

200

225

250

275

300
25

50

75

25 25 25 25 25 25 25 25 25 25 25 25 25
0

ACCUMULATED DISTANCE
3.504

3.458

2.787

3.036

2.808

3.046

2.917

3.023

3.168

2.616

2.763

2.720

2.650
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
3.545

3.200

3.883

3.224

3.088

2.898

2.486

2.875

2.934

3.120

4.160

4.251

4.050
ELEVASI TANGGUL KANAN
EXISTING

RIGHT BANK LEVEL


0.670

0.637

0.641

0.516

0.286

0.415

0.183

0.309

0.264

0.146

0.142

0.120

0.010
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE

ELEVASI TANAH ASLI PADA AS SALURAN


GROUND LEVEL IN CENTER LINE

JUDUL GAMBAR : KONSULTAN MK KONTRAKTOR PELAKSANA


DINAS SUMBER DAYA AIR DKI JAKARTA
KONTRAKTOR
PELAKSANA DISETUJUI DIPERIKSA DIAJUKAN
PEJABAT PEMBUAT KOMITMEN (PPK)
NINDYA KARYA - METTANA, KSO.
PETA SITUASI DAN LONG SECTION
PEMERINTAH PROVINSI DKI JAKARTA
D.0+000 s/d D.0+300
DINAS SUMBER DAYA AIR
KONSULTAN MK PROYEK PEMBANGUNAN SISTEM POLDER KAMAL
TUAH AGUNG (POMPA DAN PINTU AIR SERTA KELENGKAPANNYA)
CIKO TRICANESCORO, ST., M.Sc B. ADHI PRIYAMBODHO, ST., MT. AGUS SETYA
LSADA SERVO CONS CIRIAJASA E.C NIP.197209232006041010 TEAM LEADER PROJECT MANAGER
ANUGRAH TANGGAL : 13 DESEMBER 2021
UT
AR
A
0 10 20 30 40 50 m

SKALA PETA = 1 : 1.000

KETERANGAN :

GARIS KONTUR

SUNGAI
I.1+059.42
JALAN

D.0+287.80
BENCH MARK (BM)

D.0+300

D.0+600
I.1+050

D.0+575
D.0+325

D.0+350

D.0+375

D.0+400

D.0+425

D.0+551.53
D.0+450

D.0+475

D.0+550
CONTROL POINT (CP)

D.0+500

D.0+525
ARAH ALIRAN

5.00

4.00

3.00

2.00

1.00

+0.192
0.00
0 10 20 30 40 50 m

SKALA HORIZONTAL = 1 : 1.000 -1.00

0.0 1.0 2.0 3.0 4.0 5.0 m


-2.00
SKALA VERTIKAL = 1 : 100

DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE

NOMOR PROFIL
D.0+300 D.0+325 D.0+350 D.0+375 D.0+400 D.0+425 D.0+450 D.0+475 D.0+500 D.0+525 D.0+550 D.0+575 D.0+600
PROFILE NUMBER

JARAK PROFIL
300

325

350

375

400

425

450

475

500

525

550

575

600
25 25 25 25 25 25 25 25 25 25 25 25 25 25
ACCUMULATED DISTANCE
2.650

2.636

2.974

2.728

2.603

2.667

2.597

2.600

2.974

2.680

2.385

1.761

2.300
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
4.050

3.011

4.135

2.866

2.853

2.887

4.747

2.895

2.751

3.708

3.647

2.592

2.368
ELEVASI TANGGUL KANAN
EXISTING

RIGHT BANK LEVEL


0.010

0.051

0.084

0.037

0.030

0.023

0.300

0.288

0.017

1.226

0.399

0.020

0.085
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE

ELEVASI TANAH ASLI PADA AS SALURAN


GROUND LEVEL IN CENTER LINE

JUDUL GAMBAR : KONSULTAN MK KONTRAKTOR PELAKSANA


DINAS SUMBER DAYA AIR DKI JAKARTA
KONTRAKTOR
PELAKSANA DISETUJUI DIPERIKSA DIAJUKAN
PEJABAT PEMBUAT KOMITMEN (PPK)
NINDYA KARYA - METTANA, KSO.
PETA SITUASI DAN LONG SECTION
PEMERINTAH PROVINSI DKI JAKARTA
D.0+300 s/d D.0+600
DINAS SUMBER DAYA AIR
KONSULTAN MK PROYEK PEMBANGUNAN SISTEM POLDER KAMAL
TUAH AGUNG (POMPA DAN PINTU AIR SERTA KELENGKAPANNYA)
CIKO TRICANESCORO, ST., M.Sc B. ADHI PRIYAMBODHO, ST., MT. AGUS SETYA
LSADA SERVO CONS CIRIAJASA E.C NIP.197209232006041010 TEAM LEADER PROJECT MANAGER
ANUGRAH TANGGAL : 13 DESEMBER 2021
UT
AR
A
0 10 20 30 40 50 m

SKALA PETA = 1 : 1.000

KETERANGAN :

GARIS KONTUR

SUNGAI

JALAN I.1+059.42

D.0+775

D.0+800

D.0+825
D.0+750
D.0+725

D.0+850
D.0+700

D.0+875
D.0+675
BENCH MARK (BM)

D.0+650

D.0+900
D.0+625
D.0+600
I.1+050

CONTROL POINT (CP)

ARAH ALIRAN

5.00

4.00

3.00
JEMBATAN
+2.356

2.00

1.00

0.00
0 10 20 30 40 50 m

SKALA HORIZONTAL = 1 : 1.000 -1.00

0.0 1.0 2.0 3.0 4.0 5.0 m


-2.00
SKALA VERTIKAL = 1 : 100

DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE

NOMOR PROFIL
D.0+600 D.0+625 D.0+650 D.0+675 D.0+700 D.0+725 D.0+750 D.0+775 D.0+800 D.0+825 D.0+850 D.0+875 D.0+900
PROFILE NUMBER

JARAK PROFIL
600

625

650

675

700

725

750

775

800

825

850

875

900
25 25 25 25 25 25 25 25 25 25 25 25 25 25
ACCUMULATED DISTANCE
2.300

2.246

2.225

2.389

2.472

2.290

2.268

2.481

1.824

1.557

1.863

1.685

1.583
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
2.368

2.466

2.464

2.309

2.300

3.429

2.256

2.270

1.855

1.450

1.373

1.712

2.097
ELEVASI TANGGUL KANAN
EXISTING

RIGHT BANK LEVEL


0.085

0.034

0.814

0.624

0.591

0.313

0.846

0.237

0.172

0.197

0.155

0.285

0.182
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE

ELEVASI TANAH ASLI PADA AS SALURAN


GROUND LEVEL IN CENTER LINE

JUDUL GAMBAR : KONSULTAN MK KONTRAKTOR PELAKSANA


DINAS SUMBER DAYA AIR DKI JAKARTA
KONTRAKTOR
PELAKSANA DISETUJUI DIPERIKSA DIAJUKAN
PEJABAT PEMBUAT KOMITMEN (PPK)
NINDYA KARYA - METTANA, KSO.
PETA SITUASI DAN LONG SECTION
PEMERINTAH PROVINSI DKI JAKARTA
D.0+600 s/d D.0+900
DINAS SUMBER DAYA AIR
KONSULTAN MK PROYEK PEMBANGUNAN SISTEM POLDER KAMAL
TUAH AGUNG (POMPA DAN PINTU AIR SERTA KELENGKAPANNYA)
CIKO TRICANESCORO, ST., M.Sc B. ADHI PRIYAMBODHO, ST., MT. AGUS SETYA
LSADA SERVO CONS CIRIAJASA E.C NIP.197209232006041010 TEAM LEADER PROJECT MANAGER
ANUGRAH TANGGAL : 13 DESEMBER 2021
UT
AR
A
0 10 20 30 40 50 m

SKALA PETA = 1 : 1.000

KETERANGAN :

GARIS KONTUR

SUNGAI

JALAN

D.1+000

D.1+025

D.1+050
D.0+975
D.0+950

D.1+075

D.1+100

D.1+125
D.0+925

D.1+150
BENCH MARK (BM)

D.0+900

D.1+175

D.1+200
CONTROL POINT (CP)

ARAH ALIRAN

5.00

4.00

3.00
JEMBATAN
+2.356 JEMBATAN +2.382

2.00

1.00

0.00
0 10 20 30 40 50 m

SKALA HORIZONTAL = 1 : 1.000 -1.00

0.0 1.0 2.0 3.0 4.0 5.0 m


-2.00
SKALA VERTIKAL = 1 : 100

DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE

NOMOR PROFIL
D.0+900 D.0+925 D.0+950 D.0+975 D.1+000 D.1+025 D.1+050 D.1+075 D.1+100 D.1+125 D.1+150 D.1+175 D.1+200
PROFILE NUMBER
1000

1025

1050

1075

1100

1125

1150

1175

1200
JARAK PROFIL
900

925

950

975

25 25 25 25 25 25 25 25 25 25 25 25 25 25
ACCUMULATED DISTANCE
1.583

1.508

1.758

1.626

1.643

1.474

1.820

1.736

1.313

1.425

1.367

1.443

1.725
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
2.097

1.773

1.927

1.564

1.631

1.500

1.595

1.654

1.577

1.409

1.401

1.305

1.634
ELEVASI TANGGUL KANAN
EXISTING

RIGHT BANK LEVEL


0.182

0.465

0.568

0.578

0.486

0.594

0.287

0.283

0.332

0.392

0.561

0.409

0.460
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE

ELEVASI TANAH ASLI PADA AS SALURAN


GROUND LEVEL IN CENTER LINE

JUDUL GAMBAR : KONSULTAN MK KONTRAKTOR PELAKSANA


DINAS SUMBER DAYA AIR DKI JAKARTA
KONTRAKTOR
PELAKSANA DISETUJUI DIPERIKSA DIAJUKAN
PEJABAT PEMBUAT KOMITMEN (PPK)
NINDYA KARYA - METTANA, KSO.
PETA SITUASI DAN LONG SECTION
PEMERINTAH PROVINSI DKI JAKARTA
D.0+900 s/d D.1+200
DINAS SUMBER DAYA AIR
KONSULTAN MK PROYEK PEMBANGUNAN SISTEM POLDER KAMAL
TUAH AGUNG (POMPA DAN PINTU AIR SERTA KELENGKAPANNYA)
CIKO TRICANESCORO, ST., M.Sc B. ADHI PRIYAMBODHO, ST., MT. AGUS SETYA
LSADA SERVO CONS CIRIAJASA E.C NIP.197209232006041010 TEAM LEADER PROJECT MANAGER
ANUGRAH TANGGAL : 13 DESEMBER 2021
CP 08
X = 689675.398
Y = 9323665.538
UT B.3+060 Z = 1.943
A RA
0 10 20 30 40 50 m

SKALA PETA = 1 : 1.000

B.3+080

KETERANGAN :

GARIS KONTUR

SUNGAI B.3+100

D.1+
JALAN

D.1+

303
300
BENCH MARK (BM)

.6
D.1+20

D.1+

9
D.1+250

275
D.1+225
CONTROL POINT (CP) B.3+120

0
ARAH ALIRAN

5.00

4.00

3.00

JEMBATAN +2.382

2.00

1.00

0.00
0 10 20 30 40 50 m

SKALA HORIZONTAL = 1 : 1.000 -1.00

0.0 1.0 2.0 3.0 4.0 5.0 m


-2.00
SKALA VERTIKAL = 1 : 100

DATUM = -3.00
PATOK HEKTOMETER
HECTOMETER STONE

D.1+303.69
D.1+300
NOMOR PROFIL
D.1+200 D.1+225 D.1+250 D.1+275
PROFILE NUMBER

1303.69
1200

1225

1250

1275

1300

JARAK PROFIL
25 25 25 25 25
ACCUMULATED DISTANCE
1.725

1.613

1.650

1.401

1.414
1.337

ELEVASI TANGGUL KIRI


LEFT BANK LEVEL
1.634

1.682

1.711

1.629

1.573
1.542

ELEVASI TANGGUL KANAN


EXISTING

RIGHT BANK LEVEL


0.460

0.454

0.324

0.267

0.358
0.394

ELEVASI DASAR SALURAN PADA AS


BED LEVEL IN CENTER LINE

ELEVASI TANAH ASLI PADA AS SALURAN


GROUND LEVEL IN CENTER LINE

JUDUL GAMBAR : KONSULTAN MK KONTRAKTOR PELAKSANA


DINAS SUMBER DAYA AIR DKI JAKARTA
KONTRAKTOR
PELAKSANA DISETUJUI DIPERIKSA DIAJUKAN
PEJABAT PEMBUAT KOMITMEN (PPK)
NINDYA KARYA - METTANA, KSO.
PETA SITUASI DAN LONG SECTION
PEMERINTAH PROVINSI DKI JAKARTA
D.1+200 s/d D.1+303.52
DINAS SUMBER DAYA AIR
KONSULTAN MK PROYEK PEMBANGUNAN SISTEM POLDER KAMAL
TUAH AGUNG (POMPA DAN PINTU AIR SERTA KELENGKAPANNYA)
CIKO TRICANESCORO, ST., M.Sc B. ADHI PRIYAMBODHO, ST., MT. AGUS SETYA
LSADA SERVO CONS CIRIAJASA E.C NIP.197209232006041010 TEAM LEADER PROJECT MANAGER
ANUGRAH TANGGAL : 13 DESEMBER 2021