Anda di halaman 1dari 1

EL.

BH.04
129.0
0
U

BH.03

EL.+
129.0
0
EL.+
111.5
0

EL.+
112.5
0

EL.+
124.0
0

BH.02

BH.01
EL.+
129.0
0

00
138.
EL.+

00
143.
EL.+

00
138.
EL.+
00
138.
EL.+

00
138.
EL.+
00
143.
EL.+
00
138.
EL.+

00
138.
EL.+
BO.4
EL.+
143
.00
EL.+
132
.50

EL.+161.00
EL.+
126
.50

EL.+
127
.50
EL.+
132

EL.+
.50

138
BO.3

.00

EL.+156.00
EL.+156.00
BO.1
BO.2
EL.+
143
.00

EL.+151.00
EL.+151.00

EL.+161.00

BH.5
EL.+161.00
EL.+151.50

Irrigation Intake
EL.+146.50

EL.+145.00

EL.+146.50

BH.4
BH.2
EL.+145.00
EL.+146.50
EL.+143.00

BH.3
EL.+151.50

EL.+161.00
LAYOUT INSPEKTION ROAD
SCALE 1 : 5000

Propinsi :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SULAWESI TENGAH
DIREKTORAT JENDERAL SUMBER DAYA AIR
SNVT PELAKSANAAN JARINGAN SUMBER AIR PPK SUNGAI DAN PANTAI III
WS. PALU - LARIANG, WS. PARIGI - POSO, WS. KALUKU - KARAMA
Jl. Abdul Rachman Saleh No.230 Palu 94114 Phone/Fax (0451) 482147 Pekerjaan :
Gambar MC1:
Layout PROJECT RIVER IMPROVEMENT AND SEDIMENT
CONTROL IN BANGGA RIVER
Tanggul / Inspection Road

Project Manager Ir. Anang Widodo


Kabupaten : Sigi
Dibuat Nomor Lembar : 01
Direktur Jeffry E. Letsoin Nomor Register :
0 50 100 150 200 250 m PT. SELARAS MANDIRI SEJAHTERA

Pengawas Lapangan Makmur Bamojai Tanggal :


SCALE 1 : 5000
Disetujui Pelaksana Teknis Muh. Fadhlurrahman .H No. Kontrak Tanggal

No. PPK.Sungai & Pantai III Harianto, ST, M.Sp HK.0201/


Tgl. Yang direvisi Oleh Direnc. Diset. PPK-SDPIII-PJSA.ST-BWS13/02 02 SEPTEMBER 2020
Rev.
Disahkan Ka. SNVT PJSA Radia Zulfikar, ST., M.T.

Anda mungkin juga menyukai