BOQ Sementara Edit
BOQ Sementara Edit
JUMLAH
PPN 10%
JUMLAH TOTAL HARGA PEKERJAAN
DIBULATKAN
Terbilang:
PT/CV/Firma/Koperasi
NON MERKURI
HARGA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
PT/CV/Firma/Koperasi
[nama lengkap]
[jabatan]
INSTALASI PERALATAN PENGOLAH EMAS BEBAS MERKURI
B PEKERJAAN ELEKTRIKAL
Panel Utama Switch Power
1 MCCB 3 Pole x 63A NSX100N Schneider Unit 3
2 Kontaktor 220V 63A + Auxiliary NO+NC Schneider Unit 3
3 Selector Switch on/off Unit 1
4 Pilot Lamp 22mm 220V hijau Unit 2
5 Panel Box (60 x 80 x 25)cm + Paket 1
Jaringan Distribusi
1 Kabel NYYHY 4 x 6 mm^2 (Genset ke Panel Utama Switch Power) Meter 60
2 Cable Wrap Flex Tube Split Meter 30
Panel Utama 1
1 MCCB 3 Pole x 63A NSX100N Schneider Unit 1
2 MCB 3 Pole x 16 A Schneider Unit 5
3 Amperemeter Analog + CT 100/5A 72x72mm Unit 3
4 Voltmeter Analog 0-500V 72x72mm Unit 1
5 Selector Switch Volt 3 phase Unit 1
6 Frequency Meter (HZ Meter) 72x72mm Unit 1
7 Pilot Lamp 22mm 220V (Merah Kuning Hijau) Unit 3
8 Panel Box (60 x 80 x 25)cm + Assesoris + Perakitan Paket 1
9 Kabel control, skun, Assesoris pemasangan panel pada tiang Paket 1
Jaringan Distribusi
1 Kabel NYYHY 4 x 4 mm^2 (Panel Utama ke Panel Unit 1) Meter 100
2 Cable Wrap Flex Tube Split Meter 110
Panel Utama 2
1 MCCB 3 Pole x 63A NSX100N Schneider Unit 1
2 MCB 3 Pole x 16 A Schneider Unit 8
3 Amperemeter Analog + CT 100/5 72x72mm Unit 3
4 Voltmeter Analog 0-500V 72x72mm Unit 1
5 Selector Switch Volt 3 phase Unit 1
6 Frequency Meter (HZ Meter) 45-50Hz 72x72mm Unit 1
7 Pilot Lamp 22mm 220V (Merah Kuning Hijau) Unit 3
8 Panel Box (60 x 80 x 25)cm + Assesoris + Perakitan Paket 1
9 Kabel control, skun, Assesoris pemasangan panel pada tiang Paket 1
Jaringan Distribusi
1 Kabel NYYHY 4 x 4 mm^2 (Panel Utama ke Panel Unit 2) Meter 160
2 Cable Wrap Flex Tube Split Meter 130
Penerangan
1 Lampu LED 25 Watt, fitting, dan saklar Paket 4
2 Kabel NYM 2 x 1,5 meter 50
Assesoris + Perakitan
1 Terminal IN100 Unit 16
JUMLAH B
JUMLAH A + B + C + D
PT/CV/Firma/Koperasi
MAS BEBAS MERKURI
ON MERKURI
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
JUMLAH A Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
JUMLAH B Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
JUMLAH C Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
JUMLAH D Rp -
JUMLAH A + B + C + D Rp -
PT/CV/Firma/Koperasi
[nama lengkap]
[jabatan]
COMMISSIONING DAN PELATIHAN FASILITAS PENGOLAH EMAS BEBAS MERKURI
4 Boraks 1 5 1 kg 5
JUMLAH TOTAL
PT/CV/Firma/Koperasi
NGOLAH EMAS BEBAS MERKURI
AS NON MERKURI
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp -
JUMLAH TOTAL Rp -
PT/CV/Firma/Koperasi
[nama lengkap]
[jabatan]
ANALISA HARGA SATUAN
A PEKERJAAN TANAH
Pembersihan Lahan
A TENAGA
Pekerja L.01 Oh 0.100 -
Mandor L.04 Oh 0.050 -
JUMLAH -
B BAHAN
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Pengukuran dan Pemasangan Bouwplank
A TENAGA
Pekerja L.01 Oh 0.100 -
Tukang L.02 Oh 0.100 -
Kepala Tukang L.03 Oh 0.010 -
Mandor L.04 Oh 0.005 -
JUMLAH -
B BAHAN
Kayu Balok 5/7
Paku 2"-3"
Kayu Papan 3/20
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Galian Tanah
A TENAGA
Pekerja L.01 Oh 0.750 -
Mandor L.04 Oh 0.025 -
JUMLAH -
B BAHAN
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Pemadatan Tanah
A TENAGA
Pekerja L.01 Oh 0.500 -
Mandor L.04 Oh 0.050 -
JUMLAH -
B BAHAN
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 0.300 -
Mandor L.04 Oh 0.010 -
JUMLAH -
B BAHAN
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
NO URAIAN KODE SAT. KOEF. HARGA SAT. JUMLAH HARGA
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.200 -
Tukang L.02 Oh 0.200 -
Kepala Tukang L.03 Oh 0.020 -
Mandor L.04 Oh 0.060 -
JUMLAH -
B BAHAN
Semen Portland Kg 230.000
Pasir Beton Kg 893.000
Kerikil (Maks 30mm) Kg 1,027.000
Air Liter 200.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Urugan Pasir
A TENAGA
Pekerja L.01 Oh 0.300 -
Mandor L.04 Oh 0.010 -
JUMLAH -
B BAHAN
Pasir Urug 1.200
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Beton Bertulang (200 kg besi)
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
NO URAIAN KODE SAT. KOEF. HARGA SAT. JUMLAH HARGA
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
NO URAIAN KODE SAT. KOEF. HARGA SAT. JUMLAH HARGA
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Balok Beton Bertulang 15 x 20 cm
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Balok Beton 15 x 20 cm
A TENAGA
Pekerja L.01 Oh 1.650 -
Tukang L.02 Oh 0.275 -
Kepala Tukang L.03 Oh 0.028 -
Mandor L.04 Oh 0.083 -
JUMLAH -
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil (Maks 30mm) Kg 1,029.000
Air Liter 215.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Jam 0.1050 -
Tukang L.02 Jam 0.0350 -
Mandor L.04 Jam 0.0350 -
JUMLAH -
B BAHAN
Baja Tulangan Kg 1.0481
Kawat Beton Kg 0.0025
JUMLAH
C PERALATAN
Alat Bantu Ls 1.000
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Pek. Struktur Atap Baja Double CNP 150 x 50 x 20 x 2.3
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 1.500 -
Tukang L.02 Oh 0.750 -
Kepala Tukang L.03 Oh 0.075 -
Mandor L.04 Oh 0.075 -
JUMLAH -
B BAHAN
Batu Belah m3 1.200
Semen Portland Kg 202.000
Pasir Pasang m3 0.485
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Atap spandek
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Nok Spandek
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Talang Air
NO URAIAN KODE SAT. KOEF. HARGA SAT. JUMLAH HARGA
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Atap Spandek
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Nok Spandek
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Atap Spandek
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
Nok Spandek
A TENAGA
Pekerja L.01 Oh 0.081 -
Tukang L.02 Oh 0.135 -
Kepala Tukang L.03 Oh 0.0135 -
Mandor L.04 Oh 0.004 -
JUMLAH -
B BAHAN
Pipa PVC 4" M 1.200
Perlengkapan % 35.000
JUMLAH
C PERALATAN
JUMLAH
D JUMLAH (A+B+C) -
E Overhead (15%) -
F HARGA SATUAN (D+E) -
PEKERJAAN BANGUNAN FASILITAS PENGOLAH EMAS BEBAS MERKURI
JUMLAH TOTAL Rp -
PT/CV/Firma/Koperasi
[nama lengkap]
[jabatan]