• NAMA : Dr. SH. MANULLANG SpB (K), FICS. • PIAGAM PENGHARGAAN : DOKTER PUSKESMAS TELADAN
1986.
• N.I.P. : 195301051982021001.
• RIWAYAT PEKERJAAN / JABATAN :
• PANGKAT : PNS Gol. IV-E. - Ka. PUSKESMAS OLAK KEMANG-JAMBI : 1981 – 1986
- Ka. SMF BEDAH RSUD PANGKALPINANG : 1990 – 1996
• TEMPAT/Tgl. Lahir : BAGANSIAPIAPI, 5 Jan.1953. - Ka. SMF BEDAH RSUD Tarakan : 2002 – 2013.
- Ka. Panitia Infeksi Nosokomial RSUD Tarakan
• ALAMAT : KAPLING POLRI Blok F-8 no.1590 1996-2008
JELAMBAR-GROGOL - Ka. IGD RSUD Tarakan : 1996 - 2002
JAKARTA BARAT – 11460 - Ka. TIM PATIENT SAFETY RSUD Tarakan : 2008-2013.
Telp. (021) 5673304 HP : 0816 881714.
SAAT INI :
e-mail : - manullangsh@yahoo.com - ANGGOTA TIM PPI PUSAT KEMENKES RI : 2011-skrg
- manullangsh@gmail.com - ANGGOTA POKJA PPI TB KEMENKES RI : 2012-skrg
- ANGGOTA PANEL-AHLI HIV/AIDS/IMS KEMENKES RI
* PROFESI : 2013-skrg.
- INFECTION CONTROL CONSULTANT - KONSULTAN PATIENT SAFETY RSUD TARAKAN 2013 -
- PATIENT SAFETY CONSULTANT - DIREKTUR PENUNJANG DAN PELAYANAN MEDIK RSU
- TRAUMATOLOGY CONSULTANT UKI 2014 -
- GENERAL SURGEON • ORGANISASI :
• PENDIDIKAN : - IDI Jakarta Barat : ANGGOTA
- DOKTER UMUM : FK UKI Jakarta (1979 ). - IKABI-JAYA : WAKIL KETUA
- SPESIALIS BEDAH : FK UI Jakarta (1990). - PERHUKI : ANGGOTA
- KONSULTAN TRAUMA : ICS-IGSS (2009 ). - PERDALIN JAYA : WAKIL KETUA
- PERDALIN PUSAT : KETUA BIDANG DIKLAT
* INTERNATIONAL - COURSE : - IFIC (International Federation of Infection Control) :
- INFECTION CONTROL COURSE - Singapore ANGGOTA
(2004) - APSIC (Asia Pasifik Society of Infection Control) :
- PATIENT SAFETY COURSE - Busan-Korea ANGGOTA
(2008) - ICAS (Infection Control Association-Singapore) :
- INFECTION CONTROL ADVANCED COURSE - ANGGOTA
Singapore (2008)
- PATIENT SAFETY COURSE - Melbourne (2011)
- INFECTION CONTROL ADVANCED COURSE
Shanghai - China (2013).
PELATIHAN PPI
RSI YATOFA
LOMBOK TENGAH, 10 DES 2016
manullangsh@yahoo.com
PENGERTIAN
manullangsh@yahoo.com
CONTOH SEDERHANA
Risk ass. :
1. HCW TERPAJAN DARAH PASIEN (EXPOSURE).
2. PASIEN TERTULAR INFEKSI DARI ALAT
TIDAK STERIL ATAU TINDAKAN TIDAK ASEPTIK
Risk manajemen :
1. HCW GUNAKAN SARUNG TANGAN
DAN LAKUKAN HH.
2. ALAT STERIL DAN TEHNIK ASEPTIK.
manullangsh@yahoo.com
CONTOH SEDERHANA
manullangsh@yahoo.com
• RISIKO KLINIS : Semua isu yang dapat berdampak terhadap
pencapaian HASIL yang BERMUTU, AMAN dan
EFEKTIF DARI PELAYANAN PASIEN
manullangsh@yahoo.com
JENIS RISIKO DAN TINGKAT RISIKO
BERBEDA DI SETIAP TEMPAT
PELAYANAN (IGD, ICU, IBS, RAWAT
INAP DLL) DAN JENIS KEGIATAN
manullangsh@yahoo.com
MANAJEMEN RISIKO
manullangsh@yahoo.com
• “RISK MANAGEMENT” (RM) MERUPAKAN DASAR
UNTUK PENCEGAHAN DAN MENGURANGI
KERUGIAN/BAHAYA YANG TERJADI.
manullangsh@yahoo.com
JALAN TERBAIK MENGATASI RISIKO
ADALAH HINDARI !!
BILA TIDAK BISA KELOLA !!
DENGAN PROSEDUR TEPAT DAN
BENAR UNTUK MENURUNKAN
TINGKAT RISIKO.
manullangsh@yahoo.com
PROSES MANAJEMEN RISIKO
IDENTIFIKASI RISIKO
ASESMEN RISIKO
EVALUASI RISIKO
KELOLA RISIKO
RISK REGISTER
manullangsh@yahoo.com
12
ACHS : Risk Management & Quality Improvement Handbook, 2013
MEMBANGUN KONTEKS :
- FAKTOR YANG MENDUKUNG DAN YANG MENGHAMBAT
- TENTUKAN TUJUAN DAN SASARAN
- STRUKTUR ORGANISASI MANAJEMEN RISIKO
IDENTIFIKASI RISIKO :
-Apa yang bisa terjadi
-Bagaimana kejadiannya
-Mengapa hal itu bisa terjadi
-Kapan hal itu bisa terjadi
-Dimana hal itu bisa terjadi
-Siapa yang bisa tertimpa kejadian tersebut
ANALISA RISIKO
-Dampak & probabilitas
- Siapa yang terlibat
-Tingkat risiko
KOMUNIKASI -Kendali yang sudah ada dan yang diperlukan
MONITOR
DAN AUDIT
EVALUASI RISIKO
KONSULTASI -Bandingkan tingkat risiko dg ktriteria REVIEW
-analisa untung rugi
-Risiko diterima atau tidak
PENGELOLAAN RISIKO
- Tetapkan alternatif / pilihan
- analisa untung rugi
manullangsh@yahoo.com - pilih tindakan yeng paling sesuai
- perencanaan tindakan & implementasi
IDENTIFIKASI MEMBUTUHKAN
INSTRUMEN :
1. LAPORAN INSIDEN
2. KELUHAN DAN LITIGASI
3. RIWAYAT RISIKO
4. SURVEILEN
manullangsh@yahoo.com
Risk Matrix
Risk =
Probability (of the Event) X Consequence
(Impact, Dampak)
manullangsh@yahoo.com
PROBABILITY / LIKELIHOOD
Level DESKRIPSI
1 0–5% – extremely unlikely or virtually impossible
Very low HAMPIR TIDAK MUNGKIN TERJADI
manullangsh@yahoo.com
SKOR DAMPAK
1 2 3 4 5
INSIGNIFICANT MINOR MODERATE MAJOR CATASTROPHIC
CEDERA Tidak ada cedera Dapat diatasi Berkurangnya Cedera luas Kematian
PASIEN dengan fungsi motorik / Kehilangan
pertolongan sensorik fungsi utama
pertama Setiap kasus permanent
yang
memperpanjang
perawatan
PELAYANAN TERHENTI LEBIH TERHENTI LEBIH TERHENTI TERHENTI LEBIH TERHENTI
/OPERASIO DARI 1 JAM DARI 8 JAM LEBIH DARI 1 DARI 1 MINGGU PERMANEN
NAL HARI
ACTION :
Can be manage Clinical Manager / Lead Detailed review & Immediate review
by procedure Clinician should assess urgent treatment & action required
the consequences should be at Board level.
Accept risk againts cost of treating undertaken by senior Director must be
the risk management informed
PPI RENOVASI R.S.
“CONSTRUCTION RELATED
NOSOCOMIAL INFECTION”
manullangsh@yahoo.com
ASPERGILLUS FUMIGATUS
• PENYEBAB TERSERING
ASPERGILLOSIS:
- INVASIVE
- NON INVASIVE
• > 50% INVASIVE
ASPERGILLOSIS
• MAMPU BERKEMBANG
SAMPAI S: 550 C
• TERDAPAT DIMANA
MANA (LEMBAB)
manullangsh@yahoo.com
• INVASIVE ASPERGILLOSIS
- DIAGNOSIS SULIT
- MORTALITAS > 50 %
manullangsh@yahoo.com
III. PASIEN “HIGH RISK”
• PASIEN TRANSPLANTASI
• PASIEN DI BANGSAL HEMATOLOGI DAN
ONKOLOGI NEUTROPENIA
• PASIEN DGN PENGOBATAN CORTICOSTEROID
• PASIEN “IMMUNOCOMPROMISED” LAINNYA
( DM, ODHA DLL )
manullangsh@yahoo.com
PENCEGAHAN
• 1. “PRE-CONSTRUCTION “
( SEBELUM KEGIATAN DIMULAI)
- KONSULTASI KPD KOMITE PPIRS
- IDENTIFIKASI KEMUNGKINAN KERUSAKAN
SALURAN PIPA AIR ATAU SISTEM A.C
- IDENTIFIKASI DAN PETA PASIEN
“HIGH RISK (“MAPPING”)
- PELATIHAN PEKERJA
- TENTUKAN ALUR GERAKAN PEKERJA
manullangsh@yahoo.com
PENCEGAHAN
2. “CONSTRUCTION” ( SAAT KEGIATAN)
• AWASI ALUR PASIEN, K/P GUNAKAN N.95
KEPADA PASIEN
• TUTUP RAPAT PINTU DAN JENDELA ,
TAMBAHKAN “SEAL”
• “BARRIER” DEBU
• TEK NEGATIF AREA KERJA
• HEPA FILTER DI BANGSAL PASIEN “HIGH RISK”
manullangsh@yahoo.com
PENCEGAHAN
2. “CONSTRUCTION” ( SAAT KEGIATAN)
• AWASI KEGIATAN DGN KETAT
- ALUR MATERIAL DAN BAHAN SISA/SAMPAH
- KEPATUHAN PEKERJA
- RISIKO KONTAMINASI PIPA AIR ATAU SISTEM
A.C
manullangsh@yahoo.com
PENCEGAHAN
3. “POST CONSTRUCTION” ( PASCA KEGIATAN)
• - AREA HARUS BERSIH DAN BEBAS DEBU
• - KOMITE PPIRS MENILAI AREA SEBELUM
DIGUNAKAN
• - KALAU PERLU LAKUKAN “ AIR SAMPLING”
DAN “KULTUR LINGKUNGAN”
manullangsh@yahoo.com
EVALUASI RISIKO
PENGKAJIAN :
• APAKAH TINGKAT RISIKO YANG TERJADI DAPAT
DITERIMA
• APAKAH RISIKO CUKUP RENDAH SEHINGGA TIDAK
DIANGGAP MASALAH
• APA YANG BISA DILAKUKAN UNTUK MENGURANGI RISIKO
• APAKAH LANGKAH-LANGKAH YANG TELAH DIAMBIL BISA
MENGURANGI ATAU MEREDAKAN RISIKO? BAGAIMANA
MENERAPKANNYA?
manullangsh@yahoo.com
“TREAT THE RISKS”
PILIHAN :
• HINDARI RISIKO : PILIH PROSEDUR ALTERNATIF DENGAN
RISIKO LEBIH KECIL
• KURANGI RISIKO
• PINDAHKAN RISIKO : GANTI PELAKSANA PROSEDUR
YANG LEBIH BERPENGALAMAN.
• KUASAI DAN KELOLA RISIKO: GUNAKAN APD DAN
SAFETY DEVICES
manullangsh@yahoo.com
MONITORING DAN EVALUASI
MEMASTIKAN :
• RISIKO-RISIKO BARU TERIDENTIFIKASI
• VERIFIKASI ANALISIS RISIKO BERDASARKAN DATA YANG
BENAR
• “TREATMENT” RISIKO DILAKSANAKAN EFEKTIF
manullangsh@yahoo.com
C O N T O H I C R A R E N O V A S I
No :
Hal : ICRA Renovasi ISOLASI di IGD
Jakarta,
Kepada Yth:
……………………….
Direktur RSU ………
Di_
Tempat
Sehubungan dengan adanya renovasi / pembangunan Ruang Isolasi di IGD, bersama ini kami
menyampaikan hasil Kajian Risiko Pencegahan & Pengendalian Infeksi (ICRA) konstuksi dan
renovasi ruang Isolasi di IGD.
manullangsh@yahoo.com
Identifikasi tipe kegiatan renovasi/ kegiatan proyek konstruksi: tipe C
3 Tanggal kajian ……….
4 Petugas yang mengkaji ……….(IPCN)
5 Verifikasi ………..(Ka Komite PPI RS)
Katagori kegiatan Kegiatan yang menghasilkan debu sedang atau tingkat tinggi
Pemasangan kaca sebagai pembatas ruangan
Pengerokan, Pengamplasan & pengecatan seluruh lapisan dinding
Pemindahan posisi AC khusus di ruang isolasi IGD
TIPE C
Pembangunan wastafel pada ruang isolasi pasien
Pekerjaan saluran air & kabel listrik
Penambahan saluran udara dengan exhaust fan
Lokasi unit Unit sekitar Kel. 1/ rendah Kel. 2/ sedang Kel. 3/ sedang Kel. 4/ sedang
tinggi tinggi
R. ISOLASI Depan R Penerimaan - - - 1"
"
IGD Belakang R.Dr jaga - Radiologi -
Bank Darah
Kanan R.Rawat IGD - - -
Kiri Parkir - - -
Level Risiko
Aktifitas TIPE A TIPE B TIPE C TIPE D
Konstruksi
KELOMPOK 1 Kelas 1 Kelas II Kelas II Kelas III/ IV
KELOMPOK 2 Kelas 1 Kelas II Kelas II Kelas IV
KELOMPOK 3 Kelas 1 Kelas II Kelas III/ IV Kelas IV
KELOMPOK 4 Kelas II Kelas III/ IV Kelas II/ IV Kelas IV
manullangsh@yahoo.com
REKOMENDASI KOMITE PPI RS :
1. MENUTUP PINTU DEPAN DAN BELAKANG AREA YANG
DIRENOVASI.
manullangsh@yahoo.com
REKOMENDASI KOMITE PPI RS :
(LANJUTAN)
8. MEMPUNYAI WASTAFEL.
manullangsh@yahoo.com
8. Mempunyai wastafel kebersihan tangan
AREA PARKIR
koridor
E
D
B
C
RUANG ISOLASI
(F)