Anda di halaman 1dari 12

LAPORAN KERJA

– KERJA
PENYENGGARAA
N ELEKTRIK

FEBRUARI 2022
JADUAL
PELAKSANAAN K
ERJA
UNJURAN PEMBAY
ARAN
KERJA-KERJA
YANG TELAH
DILAKSANAKAN
AKTIVITI PENYELENGGARAAN
ITEM B(1) – JANAKUASA TUNGGU SEDIA (GENSET 3)

11/2/2019
25/1/2022 25/1/2022
8.30 AM 25/1/2022

Keterangan : Kerja-kerja Major Servis (Top Overhaul) adalah termasuk


penggantian alatganti seperti Diesel Fuel Filter, Oil Fuel Filter, Air
Filter, Fan Belt, Hose Radiator, Coolant, Engine Oil, Flush
Radiator, Oil Seal, Gasket dan lain-lain
AKTIVITI PENYELENGGARAAN
ITEM B(1) – JANAKUASA TUNGGU SEDIA (GENSET 3)

11/2/2019
15/2/2022 15/2/2022
8.30 AM 15/2/2022

Keterangan : Kerja-kerja Major Servis (Top Overhaul) adalah termasuk


penggantian alatganti seperti Diesel Fuel Filter, Oil Fuel Filter, Air
Filter, Fan Belt, Hose Radiator, Coolant, Engine Oil, Flush
Radiator, Oil Seal, Gasket dan lain-lain
AKTIVITI PENYELENGGARAAN
ITEM B(3) – DISPLAY CONTROLLER

11/2/2019
15/2/2022 15/2/2022
8.30 AM 15/2/2022

Keterangan : Membekal dan memasang peranti panel (Display Controller) di


AMF Board
AKTIVITI PENYELENGGARAAN
ITEM B(4) – PEMBAIKAN LAMPU DI PARKING LOT TERTUTUP

10/2/2022 10/2/2022 10/2/2022

Keterangan : Memasang lampu 150 Watt LED High Bay.


AKTIVITI PENYELENGGARAAN
ITEM B(5) – CAPASITOR BANK

11/2/2019
27/1/2022 27/1/2022
8.30 AM 27/1/2022

Keterangan : Memasang capasitor bank 525V AC 50 hz. di MSB 1 dan MSB


2.
AKTIVITI PENYELENGGARAAN
ITEM B(5) – POWER FACTOR REGULATOR

27/1/2022 27/1/2022 28/1/2022

Keterangan : Memasang Power Factor Regulator LCD 12 step.