Struktur
3/25/13
3/25/13
3/25/13
3/25/13
C A B D
KETERANGAN : A = PENGAMATAN DESAIN B = PERHITUNGAN VOLUME C = SURVEY HARGA D = PENGAMBILAN DATA HARGA PEMERINTAH 3/25/13
3/25/13
Sumber Data
3/25/13
Kayu kelas III Rp. 360.000,00 Paku 5 cm - 12 cm 78.300,00 Minyak bekisting 30.000,00 Besi beton polos 7.087.500,00 Kawat beton 87.750,00 Semen Portland 456.960,00 Pasir beton Rp. 108.000,00 Kerikil Rp. 133.650,00
m3 Kg Liter Kg Kg Kg m3 m3 m3 x x x x x
x x x
Rp. Rp.
200.000,00 165.000,00
3/25/13
Rp. 1.950.000,00
SATUAN
1 2 3 4 5
Pekerja 45.000,00 Tukang Gali 45.000,00 Tukang Batu, Kayu, Besi 55.000,00 Tukang Las 50.000,00
6 Mandor 3/25/13
TERIMA KASIH
3/25/13