Anda di halaman 1dari 4

REKAPITULASI BIAYA

PEKERJAAN PEMBUATAN PONDASI SELLAR SERTA SARANA PENUNJANG LAINNYA, PENYEDIAAN ALAT BERAT DAN
JASA PENUNJANG LAINNYA UNTUK PEMBORAN 2 (DUA) SUMUR EKSPLORASI
DAERAH SUMATRA - 5
NO.
I

II

III

IV

URAIAN PEKERJAAN
PEKERJAAN PEMBUATAN PONDASI SELLAR DAN SARANA PENUNJANG PEMBORAN
TOTAL I
DIBULATKAN
PEKERJAAN TANAH DAN PERKERASAN
TOTAL II
DIBULATKAN
PEKERJAAN KONSTRUKSI
TOTAL III
DIBULATKAN
PEKERJAAN PERAWATAN LOKASI SELAMA PEMBORAN
TOTAL IV
DIBULATKAN
PEKERJAAN GENERAL SERVICES
TOTAL V
DIBULATKAN
TOTAL GENERAL
: TOTAL I + TOTAL II + TOTAL III + TOTAL IV + TOTAL V

JUMLAH
#REF!

Rp

13,330,584,981.00

Rp

1,345,690,000.00

Rp

3,847,353,000.00

Rp

8,656,160,000.00

#REF!

No. Proyek
:
Nama Proyek : Penyiapan 9 (Sembilan) Lokasi Pemboran UBEP Tanjung
Lokasi
: Wilayah Kuasa Penambangan (WKP) UBEP Tanjung

NO.

URAIAN PEKERJAAN

I.
1
2
3
4
5

PEKERJAAN PERSIAPAN
Spot Charter 4WD Double Cab (Station Wagon YoM min 2010
Alat Pelindung Diri
Mobilisasi dan demobilisasi alat-alat berat
Tim Survey Topografi
Moving

II
1
a
b
c
d
e
f

g
h
i
j

PEKERJAAN JALAN MASUK DAN LAPANGAN LOKASI


Pekerjaan Tanah
Land Clearing
Striping and Grubing
Menggali Tanah (Cutting)
Galian Mud Pit
Menggusur dan mendorong tanah timbunan (Filling)
Pengangkutan tanah timbunan menggunakan Dump Truck 14 m3 6x4
Jarak 0-2.5 km
Jarak 2.5-5 km
Jarak 5-7.5 km
Jarak 7.5-10 km
Jarak 10-12.5 km
Jarak 12.5-15 km
Jarak 15-17.5 km
Jarak 17.5-20 km
Jarak 20-22.5 km
Jarak 22.5-25 km
Jarak 22.5-27.5 km
Pengadaan tanah timbunan berkualitas baik
Pemadatan tanah lokasi
Perataan tanah/ Grading area perkerasan
Penggalian parit keliling

2
a

RINCIAN ANGGARAN BIAYA (RAB)


HARGA SATUAN
UPAH
BAHAN

VOLUME

JUMLAH HARGA
BAHAN

UPAH

ALAT

Ha
Ea
Ea
Lokasi
Lokasi

666,667
90,000,000
120,000,000
25,000,000
45,000,000

270,000,000
90,000,000
840,000,000
225,000,000
405,000,000

m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3

12,000
15,000
17,500
22,500
27,500
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
55,000
60,000
75,000
17,500
19,000
17,500

1,663,200,000
2,079,000,000
2,425,500,000
303,750,000
3,811,500,000
88,200,000
132,300,000
176,400,000
220,500,000
264,600,000
308,700,000
352,800,000
396,900,000
441,000,000
485,100,000
529,200,000
5,400,000,000
4,851,000,000
5,266,800,000
50,400,000

Soil Improvement
Instalasi Geogrid

90,000.00 m2

1,500

15,000

135,000,000

1,350,000,000

3
a
b
c

Pekerjaan Perkerasan
Perkerasan dengan menggunakan sirtu
Perkerasan dengan menggunakan batu gunung 5/7
Perkerasan dengan menggunakan batu gunung 15/20

9,450.00 m3
18,900.00 m3
23,625.00 m3

50,000
50,000
50,000

250,000
300,000
300,000

472,500,000
945,000,000
1,181,250,000

2,362,500,000
5,670,000,000
7,087,500,000

III
a
b

MEMBUAT FLARE PIT


Galian lubang flare pit
Menyusun, mendorong, membentuk tanggul dan dipadatkan

300.00 m3
180.00 m3

19,000
21,000

5,700,000
3,780,000

IV
1
2

PEMBUATAN TAPAK PEMBORAN DAN CELLAR (MULTIPURPOSE)


Menggali tanah untuk pondasi & kedudukan cellar
Pondasi tiang pancang
Pembuatan shoe tiang pancang eks pipa tubing 2-3.5", pemancangan dan
pemotongan
Mengecor lantai kerja dengan beton campuran 1:3:5
Pasang serta bongkar bekisting beton papan 2/20 dan perancah

72.00 m3

22,500

1,620,000

12.00 bh
141.30 m3
354.24 m2

1,500,000
700,000
160,000

18,000,000
98,910,000
56,678,400

59,400.00 kg
9.00 bh
792.00 m3

1,500
-

9,500
-

500,000
950,000

89,100,000
-

564,300,000
-

4,500,000
752,400,000

360.00 m2
270.00 m2
270.00 m2

75,000
110,000
25,000

27,000,000
29,700,000
6,750,000

200.00 m

1,250,000

250,000,000

150,000
150,000
150,000

2,822,850,000
52,210,638,400

17,034,300,000

10,800,000
9,000,000
1,800,000
32,353,488,400

a
3
4
5
6
7

Memotong, membentuk dan menyetel besi beton untuk pondasi dan sellar
Pekerjaan anchor beam dar C Beam sepanjang 9 m secara menerus
Mengecor beton campuran 1pc:2ps:3kr

V
1
2
3

PEMBUATAN PAGAR SENG


Pasang rangka lanan merah 5x10 cm
Pasang seng gelombang besar Bjls 20
Bongkar seng dan mobilisassi ke gudang pertamina

VI PAGAR KAWAT HARMONIKA TINGGI 1.8 M


Pagar kawat harmonika ketebalan 3mm dengan rangka besi serta bracing di setiap 8
1
m
VII
1
2
3

QUALITY CONTROL
CBR Test
Sand Cone Test
Uji Kuat Tekan Beton

405.00
1.00
7.00
9.00
9.00

ALAT

138,600.00
138,600.00
138,600.00
13,500.00
138,600.00
97,020.00
8,820.00
8,820.00
8,820.00
8,820.00
8,820.00
8,820.00
8,820.00
8,820.00
8,820.00
8,820.00
8,820.00
72,000.00
277,200.00
277,200.00
2,880.00

72.00 Sampel
60.00 Sampel
12.00 Sampel

SUBTOTAL
TOTAL

PIHAK PERTAMA
USER

KEU

PIHAK KEDUA

No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
25
27
29
31
33
35
37
39
41
43
45
47
49

50
51
52
53
54
55
56
57
58

BAHAN
Item
Balok Kayu Meranti Batu 5/7
Batu 5/7
Besi Beton (polos/ulir)
Conductor pipe 13.38"
Gorong-2 Beton Dia 50 cm
Kawat Beton
Kayu gergajian kelas III, balok
Kayu gergajian kelas III, papan
Kayu Pinus/Kayu Rawa
Koral Beton (maksimum 30 mm)
Minyak Bekisting
Tripleks 12 mm
Paku 5 cm - 10 cm
Paku 5 cm - 12 cm
Paku berbagai ukuran (2" - 5")
Pasir Beton (PB)
Perlengkapan PVC
Pipa PVC
Pipe 4"
Portland Cement (PC)
Sirtu
Tanah
Terpal
Solar
Arang Batok Kelapa
Arang Kayu
Asbes Gelombang
Base Course
Bata Merah
Batu Belah 15/20
Batu Kali
Batu Kerikil/Krokos
Baut 12 mm
Baut 16 mm
Besi Baja
Besi Beton
Besi dia 12
Besi dia 13
Besi dia 19
Besi dia 8
Besi Galvanis dia 2"
Besi Kanal
Beton K-100
Beton K-250
Beton Rabat 1:3:5
Cat Meni (Zinchromite)
Corrugated Steel dia 4050x3mm
Elbow PVC dia 6"
Gorong-gorong dia 2100x3 mm

Sat
m
m3
kg
M'
m'
kg
m
m
m
m
liter
lbr
kg
kg
kg
m
Ls
Btg
m'
kg
m3
m3
m2
liter
kg
kg
lbr
m3
m2
m3
m3
m3
kg
kg
Btg
kg
m
m
m
m
Btg
Btg
m3
m3
Pcs
kg
m'
m

Harga
3,255,000.00
231,000.00
9,450.00
924,000.00
301,229.51
9,450.00
2,015,284.65
1,760,640.00
467,915.53
231,000.00
5,250.00
147,000.00
15,750.00
15,750.00
35,175.00
185,850.00
20,469.92
58,485.48
327,098.44
1,386.00
170,100.00
47,250.00
15,750.00
11,025.00
3,000.00
4,000.00
65,000.00
160,000.00
750.00
170,000.00
155,000.00
200,000.00
2,000.00
2,500.00
165,000.00
6,666.67
10,666.67
17,500.00
2,916.67
230,000.00
165,000.00
550,000.00
660,000.00
17,000.00
15,000.00
462,000.00
550,000.00

Bisa Jakarta
Harga-Original
3,255,000.00
231,000.00
9,450.00
924,000.00
301,229.51
9,450.00
2,015,284.65
1,760,640.00
467,915.53
231,000.00
5,250.00
147,000.00
15,750.00
15,750.00
35,175.00
185,850.00
20,469.92
58,485.48
327,098.44
1,386.00
170,100.00
47,250.00
15,750.00
11,025.00
3,000.00
4,000.00
65,000.00
160,000.00
750.00
170,000.00
155,000.00
200,000.00
2,000.00
2,500.00
165,000.00
6,666.67
10,666.67
17,500.00
2,916.67
230,000.00
165,000.00
550,000.00
660,000.00
17,000.00
15,000.00
462,000.00
550,000.00

59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
85
87
88
89
93
94

Gorong-gorong dia 8"


Karung pasir
Kawat Berduri
Kawat Harmonika
Kawat Kasa
Kayu 4/6
Kayu 6/10
Kayu Bulat dia 10-15 cm
Kertas A3 80 gr
Kertas A4 80 gr
Koral
Lem Pipa PVC
Pancang Pipa dia 8"
Papan 2/20
Papan Bekisting
Pasir
Pipa Besi Dia 3"
Pipa dia 2"
Pipa Minyak dia 4"
Pipa PVC dia 2"
Pipa PVC dia 6"
Pipa T
Plat Aluminium
Ring dia 10
Stiker Scoth Light
Tiang Besi dia 2"
Tiang Dolken
Tiang Pancang dia 30 cm
Pipa HDPE
Pipa SCH 40

m
kg
m'
m2
m'
m3
m3
Btg
rim
rim
m3
kg
m
m3
m3
m3
Btg
m
m
m'
m'
Pcs
m
Btg
lbr
Btg
Btg
m'
pcs
kg

550,000.00
600.00
63,000.00
45,000.00
50,000.00
3,300,000.00
3,500,000.00
12,000.00
55,000.00
35,000.00
231,000.00
20,000.00
550,000.00
3,500,000.00
2,800,000.00
185,850.00
1,200,000.00
195,500.00
235,000.00
195,500.00
235,000.00
455,000.00
275,000.00
800.00
25,000.00
40,000.00
10,000.00
4,750,000.00
2,000,000.00
9,500.00

550,000.00
600.00
63,000.00
45,000.00
50,000.00
3,300,000.00
3,500,000.00
12,000.00
55,000.00
35,000.00
231,000.00
20,000.00
550,000.00
3,500,000.00
2,800,000.00
185,850.00
1,200,000.00
195,500.00
235,000.00
195,500.00
235,000.00
455,000.00
275,000.00
800.00
25,000.00
40,000.00
10,000.00
4,750,000.00
2,000,000.00
9,500.00

Anda mungkin juga menyukai