Anda di halaman 1dari 1

Analisa LI-832 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : .. : : 8.9.(1) SK PERKIRAAN VOL. PEK. : : Rumput Vetiver (VS) TOTAL HARGA (Rp.) : : M' % THD. BIAYA PROYEK :

0.00 0.00 0.00

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2. 3.

TENAGA Pekerja Tukang Mandor (L01) (L02) (L03) jam jam jam 0.2100 0.0000 0.0350 4,657.31 7,281.29 978.04 0.00 254.85

JUMLAH HARGA TENAGA

1,232.88

B. 1. 2 3

BAHAN Rumput Tanah Liat Pupuk M32 M2 m3 kg 3.3000 0.0330 0.1250 300.00 20,000.00 2,000.00 990.00 660.00 250.00

JUMLAH HARGA BAHAN C. 1. 2 PERALATAN Water Tank Truk Alat Bantu jam Ls 0.0308 1.0000 131,467.37 0.00

1,900.00

4,053.58 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

4,053.58

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 7,186.46 OVERHEAD & PROFIT 15.0 % x D 1,077.97 HARGA SATUAN PEKERJAAN ( D + E ) 8,264.43 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

File : 215553094.xls.ms_office

Anda mungkin juga menyukai