PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.1.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas A TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0,0073
2. Dump Truck (E09) jam 0,2617
3. Motor Grader (E13) jam 0,0009
4. Vibratory Roller (E19a) jam 0,0097
5 Alat Bantu Ls 1,0000