PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.1.(5)
JENIS PEKERJAAN : Urugan sirtu dipadatkan
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) E15 jam 0.0087 440,724.26 3,834.35
2. Dump Truck (E09) E09 jam 0.1329 349,111.30 46,409.01
3. Motor Grader (E13) E13 jam 0.0013 369,981.05 472.20
4. Vibratory Roller (E19a) E19a jam 0.0130 345,796.45 4,489.46
5 Alat Bantu Ls 1.0000 0.00 0.00