M Alat bantu (set @ 3 alat) 4.00 set M.170 4.00 66,450.00 265,800.00
A Batu belah 15 / 20 cm 50.00 m3 M.94 50.00 180,000.00 9,000,000.00
T Batu pecah 5 - 7 cm 20.00 m3 M.95 20.00 190,000.00 3,800,000.00
E Pasir Urug 30.00 m3 M.44 30.00 95,200.00 2,856,000.00
R
I
A
L
M Alat bantu (set @ 3 alat) 3.00 set M.170 3.00 66,450.00 199,350.00
A Kayu perancah 3.00 m3 M.19 3.00 2,961,000.00 8,883,000.00
T Paku 20.00 kg M.18 20.00 15,550.00 311,000.00
E
R
I
A
L
P
E
R
A
L
A
T
A
N
M Alat bantu ( set @ 3 alat ) 0.60 Set M. 170 0.60 66,450.00 39,870.00
A Pasir beton 3.22 m3 M. 01a 3.22 200,000.00 644,000.00
T Semen / PC ( 50 Kg/zak ) 44.52 zak M.12 44.52 68,000.00 3,027,360.00
E Batu pecah 2 - 3 4.49 m3 M.93 4.49 197,150.00 885,203.50
R
I
A
L
MINGGU KE-
NO. MATA
URAIAN BOBOT % KET
PEMBAYARAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
DIVISI 1. UMUM
1.2 Mobilisasi 0.257 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 0.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1.19 Keselamatan dan Kesehatan Kerja;
1. Penyiapan RKK 0.032 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
2. Sosialisasi, promosi, dan pelatihan 0.039 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
3. Alat Pelindung Kerja dan Alat Pelindung Diri 0.096 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
4. Asuransi dan perizinan 0.225 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
5. Personel Keselamatan Konstruksi 0.129 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
6. Fasilitas sarana, prasarana, dan alat kesehatan 0.064 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
7. Rambu-rambu yang diperlukan 0.045 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
8. Kegiatan dan peralatan terkait dengan pengendalian Risi 0.096 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.2.(1a) Timbunan Biasa Dari Sumber Galian 1.235 0.309 0.309 0.309 0.309
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A 12.509 1.251 1.251 1.251 1.251 1.251 1.251 1.251 1.251 1.251 1.251
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair 2.023 0.169 0.169 0.169 0.169 0.169 0.169 0.169 0.169 0.169 0.169 0.169 0.169
6.1 (2a) Lapis Perekat - Aspal Cair 1.227 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102
6.3 (5a) Laston Lapis Aus (AC-WC) 71.854 5.988 5.988 5.988 5.988 5.988 5.988 5.988 5.988 5.988 5.988 5.988 5.988
6.3 (8) Bahan anti pengelupasan 0.619 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056
6.7 (1) Lapis Penetrasi Macadam 7.938 0.992 0.992 0.992 0.992 0.992 0.992 0.992 0.992
DIVISI 7. STRUKTUR
7.9 (1) Pasangan Batu 1.605 0.535 0.535 0.535
BOBOT PRESTASI PEKERJAAN (%) 100.000 0.062 1.622 1.622 1.622 2.614 8.564 8.620 9.155 9.155 9.155 8.620 7.369 6.377 6.377 6.377 6.377 6.315
REALISASI BOBOT PRESTASI PEKERJAAN (%) 0.062 1.684 3.305 4.927 7.541 16.104 24.724 33.879 43.034 52.189 60.809 68.178 74.555 80.931 87.308 93.685 100.000
JUMLAH HARGA
NO. DIVISI URAIAN PEKERJAAN
(RUPIAH)
DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 4,000,000.00 4,000,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000.00 100,000.00
1.19 Keselamatan dan Kesehatan Kerja;
1. Penyiapan RKK Ls 1.00 500,000.00 500,000.00
2. Sosialisasi, promosi, dan pelatihan Ls 1.00 600,000.00 600,000.00
3. Alat Pelindung Kerja dan Alat Pelindung Diri Ls 1.00 1,500,000.00 1,500,000.00
4. Asuransi dan perizinan Ls 1.00 3,500,000.00 3,500,000.00
5. Personel Keselamatan Konstruksi Ls 1.00 2,000,000.00 2,000,000.00
6. Fasilitas sarana, prasarana, dan alat kesehatan Ls 1.00 1,000,000.00 1,000,000.00
7. Rambu-rambu yang diperlukan Ls 1.00 700,000.00 700,000.00
8. Kegiatan dan peralatan terkait dengan penge Ls 1.00 1,500,000.00 1,500,000.00
Jumlah Harga Pekerjaan Devisi 1 ( masuk dalam Rekapitulasi Perkiraan Harga Pekerjaan ) 15,400,000.00
Jumlah Harga Pekerjaan Devisi 3 ( masuk dalam Rekapitulasi Perkiraan Harga Pekerjaan ) 19,210,648.57
Jumlah Harga Pekerjaan Devisi 5 ( masuk dalam Rekapitulasi Perkiraan Harga Pekerjaan ) 194,506,794.59
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair Liter 2,304.00 13,654.10 31,459,052.28
6.1 (2a) Lapis Perekat - Aspal Cair Liter 1,248.75 15,273.59 19,072,899.20
6.3 (5a) Laston Lapis Aus (AC-WC) Ton 752.45 1,484,898.57 1,117,311,926.70
6.3 (8) Bahan anti pengelupasan Kg 130.95 73,543.99 9,630,585.06
6.7 (1) Lapis Penetrasi Macadam M3 64.74 1,906,518.08 123,427,980.48
Jumlah Harga Pekerjaan Devisi 6 ( masuk dalam Rekapitulasi Perkiraan Harga Pekerjaan ) 1,300,902,443.72
DIVISI 7. STRUKTUR
7.9 (1) Pasangan Batu M3 30.45 819,802.00 24,962,970.81
Jumlah Harga Pekerjaan Devisi 7 ( masuk dalam Rekapitulasi Perkiraan Harga Pekerjaan ) 24,962,970.81
256568.4
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
DIVISI 1 - UMUM
1 Mobilisasi 1.00 Ls 10,000,000.00 10,000,000.00
DIVISI 2 - DRAINASE
1 Galian untuk Selokan Drainase dan Saluran Air EI - 21 000.00 M3 32,350.52 000.00
2 Pasangan Batu dengan Mortar EI - 22 000.00 M3 2,108,519.45 000.00
3 Pasang Gorong - Gorong, diameter 40 cm K - 120 000.00 M1 #REF! #REF!
4 Pasang Gorong - Gorong, diameter 60 cm K - 121 000.00 M1 #REF! #REF!
5 Pasang Gorong - Gorong, diameter 80 cm K - 123 000.00 M1 #REF! #REF!
6 Pasang Gorong - Gorong, diameter 100 cm K - 125 000.00 M1 #REF! #REF!
DIVISI 7 - STRUKTUR
1 Beton mutu sedang dengan fc’=30 MPa (K-350) EI - 715 000.00 M3 1,376,708.21 000.00
2 Beton mutu sedang dengan fc’=25 MPa (K-300) EI - 716 000.00 M3 000.00 000.00
3 Beton Struktur mutu sedang (K-225) K.725.1 412.50 M3 #REF! #REF!
4 Begesting K-710 55.00 M2 #REF! #REF!
5 Beton mutu rendah dengan fc’= 15 MPa (K-175) EI - 718 000.00 M3 38,014,408.70 000.00
6 Beton Siklop fc’=15 MPa (K-175) EI - 719 000.00 M3 908,877.85 000.00
7 Beton mutu rendah dengan fc’= 10 MPa (K-125) EI - 7110 000.00 M3 47,880,053.57 000.00
8 Baja Tulangan BJ 24 Polos EI - 731 000.00 Kg 15,925.60 000.00
9 Baja Tulangan BJ 32 Ulir EI - 733 000.00 Kg 16,096.47 000.00
10 Baja Tulangan BJ 39 Ulir EI - 734 000.00 Kg 2,709.97 000.00
11 Baja Tulangan BJ 42 Ulir EI - 735 000.00 Kg 000.00 000.00
12 Penyediaan dan Pemasangan Baja Struktur BJ 50 EI - 744 000.00 Kg 3,317.69 000.00
13 Pasangan Batu EI - 79 281.87 M3 819,802.00 231,077,588.95
#REF! %
DIVISI 1 - UMUM
1 Mobilisasi 1.00 Ls 10,000,000.00 10,000,000.00
DIVISI 2 - DRAINASE
DIVISI 7 - STRUKTUR
REKAPITULASI
DIVISI 1 - UMUM 10,000,000.00
DIVISI 2 - DRAINASE #REF!
DIVISI 3 - PEKERJAAN TANAH #REF!
DIVISI 4 - PELEBARAN PERKERASAN DAN BAHU JALAN 000.00
DIVISI 5 - PERKERASAN BERBUTIR #REF!
DIVISI 6 - PERKERASAN ASPAL #REF!
DIVISI 7 - STRUKTUR #REF!
(A) Jumlah Harga Pekerjaan #REF!
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) #REF!
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) #REF!
PEMBULATAN #REF!
Terbilang : Satu Miliar Empat Ratus Enam Puluh Lima Juta Delapan Ratus Empat Puluh Ribu Rupiah
#REF! %
BOBOT MINGGU KE -
URAIAN PEKERJAAN
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
DIVISI 1 - UMUM #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
DIVISI 2 - DRAINASE #REF!
DIVISI 3 - PEKERJAAN TANAH #REF! #REF! #REF! #REF!
DIVISI 4 - PELEBARAN PERKERASAN DAN BAHU JALAN #REF!
DIVISI 5 - PERKERASAN BERBUTIR #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
DIVISI 6 - PERKERASAN ASPAL #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
DIVISI 7 - STRUKTUR #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PRESTASI PEKERJAAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
KOMULATIF PRESTASI PEKERJAAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
116,036,000
PELAKSANAAN PEKERJAAN
TIME SCHEDULLE)
MINGGU KE -
% KETERANGAN
25 26
#REF! #REF! 100 Jangka waktu
pelaksanaan
75 180 hari
50
#REF! #REF!
25
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
Analisa EI-21
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0038 418,688.05 1,607.15
2. Dump Truck (E09) Jam 0.0457 331,655.74 15,169.61
A. TENAGA
B. BAHAN
0.00
C. PERALATAN
1. Excavator (E10) Jam 0.0440 418,688.05 18,415.23
2. Dump Truck (E09) Jam 0.0969 331,655.74 32,126.66
A. TENAGA
B. BAHAN
1. Bahan timbunan (M08) M3 1.2000 54,460.54 65,352.64
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0087 418,688.05 3,642.63
2. Dump Truck (E09) jam 0.0803 331,655.74 26,644.68
3. Motor Grader (E13) jam 0.0010 351,481.99 336.44
4. Vibratory Roller (E19a) jam 0.0097 328,506.63 3,198.74
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 jam 0.0071 418,688.05 2,972.69
2. Batching plant E80 jam 0.0502 178,317.01 8,951.51
3. Concrete truck mixer E49 jam 0.2954 455,547.44 134,568.71
7.
A. TENAGA
B. BAHAN
C. PERALATAN
1. Dump Truck (E09) jam 0.1329 250,000.00 33,225.00
2. Vibro Roller (E19) jam 0.0130 198,600.00 2,581.80
3 Wheel loader (E15) jam 0.0087 330,800.00 2,877.96
4 Motor grander (E13) jam 0.0013 288,400.00 374.92
7.
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 418,688.05 2,247.97
2. AMP E01 Jam 0.0201 6,977,805.89 140,116.58
3. Genset E12 Jam 0.0201 303,061.90 6,085.58
4. Dump Truck E09 Jam 0.5124 331,655.74 169,931.77
5. Asphalt Finisher E02 Jam 0.0169 847,397.07 14,341.34
6. Tandem Roller E17a Jam 0.0172 409,912.17 7,064.44
7 P. Tyre Roller E18 Jam 0.0114 402,080.48 4,567.61
8 Alat Bantu Ls 1.0000 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 418,688.05 2,247.97
2. AMP E01 Jam 0.0201 6,977,805.89 140,116.58
3. Genset E12 Jam 0.0201 303,061.90 6,085.58
4. Dump Truck E09 Jam 0.2033 331,655.74 67,433.64
5. Asphalt Finisher E02 Jam 0.0143 847,397.07 12,131.54
6. Tandem Roller E17 Jam 0.0146 409,912.17 5,975.91
7 P. Tyre Roller E18 Jam 0.0096 402,080.48 3,863.81
8 Alat Bantu Ls 1.0000 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 418,688.05 2,247.97
2. AMP E01 Jam 0.0201 6,977,805.89 140,116.58
3. Genset E12 Jam 0.0201 303,061.90 6,085.58
4. Dump Truck E09 Jam 0.3776 331,655.74 125,223.32
5. Asphalt Finisher E02 Jam 0.0126 847,397.07 10,708.63
6. Tandem Roller E17a Jam 0.0129 409,912.17 5,274.99
7 P. Tyre Roller E18 Jam 0.0085 402,080.48 3,410.62
8 Alat Bantu Ls 1.0000 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0071 418,688.05 2,967.31
2. Dump Truck 1 E09 Jam 0.1054 331,655.74 34,962.86
3. Dump Truck 2 E09 Jam 0.1063 331,655.74 35,251.28
4. Dump Truck 3 E09 Jam 0.1082 331,655.74 35,876.20
5. Tandem Roller E17 Jam 0.0467 371,236.97 17,351.13
6. Asphalt Distributor E41 Jam 0.0161 351,054.10 5,639.42
0.00
8 Alat Bantu Ls 1.0000 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Trailer Tronton 30 T; 2 (E35) jam 0.0006 378,569.56 217.92
2. Crane On Track (75-100 (E07) jam 0.0001 1,992,364.59 200.04
A. TENAGA
B. BAHAN
C. PERALATAN
1 crane On track E07 jam 0.0010 1,992,364.59 2,000.37
1. Alat Bantu Ls 1.0000 0.00 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1 Excavator 0,8 M3; 170 (E10) jam 0.3764 418,688.05 157,582.67
2 Crane On Truck (10-15) (E07) jam 0.0014 1,992,364.59 2,800.51
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
0.00
0.00
0.00
0.00
5 Alat bantu Ls 1.0000 0.00 0.00