1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi (Lampiran PerMen PUPR No : 28/PRT/M/2016, Hal : 600)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 #REF! #REF!
Tukang Kayu L.02 OH 0.260 #REF! #REF!
Kepala Tukang L.03 OH 0.026 #REF! #REF!
Mandor L.04 OH 0.026 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Kayu Kelas III M3 0.040 #REF! #REF!
Paku 5 - 10 cm Kg 0.300 #REF! #REF!
Minyak Bekisting Liter 0.100 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) #REF!


E Overhead & Profit (10 % x D) #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

B.05 1 m3 Beton Mutu f’c=14,5 MPa (K175), slump (12±2) cm, w/c = 0,66
B.05.B Menggunakan Molen (Lampiran PerMen PUPR No : 28/PRT/M/2016, Hal : 247)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.323 #REF! #REF!
Tukang Kayu L.02 OH 0.189 #REF! #REF!
Kepala Tukang L.03 OH 0.019 #REF! #REF!
Mandor L.04 OH 0.132 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
PC/Portland Cement M.15 Kg 326 #REF! #REF!
PB/Pasir Beton M.14.a Kg 760 #REF! #REF!
Kr/Krikil M.12 Kg 1029 #REF! #REF!
Air M.02 Liter 215
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Molen kapasitas 0,3 m3 E.29.b Jam 0.25 #REF! #REF!
JUMLAH HARGA ALAT #REF!

D Jumlah (A+B+C) #REF!


E Overhead & Profit (10 % x D) #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
ITEM PEMBAYARAN NO. : 3.2.(1a).(1) (Turunan) Analisa EI-321
JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan (padat ke asli) Fv 1.10 -
6 Tebal hamparan padat t 0.40 M
7 Berat volume bahan (lepas) D 1.20 Ton/M3
8 Faktor Kehilangan Bahan Fh 5.30 %

II. URUTAN KERJA


1 Excavator menggali dan memuat ke dalam dump truck
2 Dump Truck mengangkut ke lapangan dengan jarak
dari sumber galian ke lokasi pekerjaan L 10.00 Km
3 Material diratakan dengan menggunakan tenaga manual menggunakan alat bantu
4 Material dipadatkan menggunakan alat pemadat manual

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan timbunan = 1 x Fv + Fh (M08) 1.15 M3

2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.05 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi asli ke padat Fv1 0.90
Waktu sklus Ts1
- Menggali, memuat T1 0.32 menit
- Lain lain T2 0.10 menit
Waktu Siklus = T1 x Fv Ts1 0.42 menit

Kapasitas Produksi / Jam = V x Fb x Fa xFv1x 60 Q1 104.21 M3 kondisi padat


Ts1

Koefisien alat / M3 = 1 : Q1 (E10) 0.0096 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.83 -
Faktor Konversi asli ke lepas Fv2 1.25
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktusiklus : Ts2
- Waktu muat = = (V x 60)/(D x Fk x Q1) T1 1.53 menit
- Waktu tempuh isi = (L : v1) x 60 T2 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 20.00 menit
- Lain-lain T4 2.00 menit
Ts2 53.53 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 2.17 M3


D x Fv2 x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.4606 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(1a).(1) Analisa EI-321
JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.c. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah
- Penumbuk = 3 buah

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 104.21 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 729.45 M3
Kebutuhan tenaga :
- Pekerja P 6.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0576 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0096 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.2.(1a).(1) Analisa EI-321
JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. #REF! / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : #REF! M3
Analisa EI-321

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : #REF!
:
PROP / KAB / KODYA : #REF!
ITEM PEMBAYARAN NO. : 3.2.(1a).(1) PERKIRAAN VOL. PEK. : #REF!
JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian TOTAL HARGA (Rp.) : #REF!
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0576 #REF! #REF!


2. Mandor (L02) Jam 0.0096 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Bahan timbunan (M08) M3 1.1530 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN
1. Excavator (E15) Jam 0.0096 #REF! #REF!
2. Dump Truck (E08) Jam 0.4606 #REF! #REF!
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 10 % x C #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 6.1 (2)(a) Analisa EI-612a
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN : Liter URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata AMP ke lokasi pekerjaan L #REF! KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 6.5 %
6 Komposisi campuran (Spesifikasi) :
- Aspal Pen 60 atau Pen 80 As 80 % terhadap volume
- Kerosene K 20 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Kerosene D2 0.805 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan

II. URUTAN KERJA


1 Aspal dan Minyak Flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
3 Campuran aspal cair disemprotkan dengan Asphalt
Distributor ke atas permukaan yang akan dilapis.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter + Fh ) PC 1.07 liter

1.a. Aspal = As x PC x D1 (M10) 0.8776 Kg


1.b. Kerosene = K x PC (M11) 0.2130 liter

2. ALAT
2.a. ASPHALT SPRAYER (E41)
Lebar penyemprotan b 4.00 M
Kecepatan penyemprotan v 30.00 M/menit asumsi
Kapasitas pompa aspal pas 100 liter Panduan
Faktor effesiensi kerja Fa 0.83 Baik

Kap. Prod. / jam = pas x Fa x 60 Q1 4,980.00 liter

Koefisien Alat / Ltr = 1 : Q1 (E41) 0.00020 Jam

2.b. AIR COMPRESSOR (E05)

Kap. Prod. / jam = Asphalt Distributor Q2 4,980.00 liter

Koefisien Alat / Ltr = 1 : Q2 (E05) 0.0002 Jam

3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q4 4,980.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 34,860.00 liter
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / liter :


- Pekerja = (Tk x P) : Qt (L01) 0.0010 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0002 Jam

Berlanjut ke hal. berikut.

ITEM PEMBAYARAN NO. 6.1 (2)(a) Analisa EI-612a


JENIS PEKERJAAN Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN Liter URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.
5. ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. #REF! / liter.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : #REF! Liter
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : #REF!
:
PROP / KAB / KODYA : #REF!
ITEM PEMBAYARAN NO. : 6.1 (2)(a) PERKIRAAN VOL. PEK. : #REF!
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair TOTAL HARGA (Rp.) : #REF!
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0010 #REF! #REF!


2. Mandor (L03) Jam 0.0002 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Aspal (M10) Kg 0.8776 #REF! #REF!


2. Kerosene (M11) liter 0.2130 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN

1. Asp. Sprayer E03 Jam 0.00020 #REF! #REF!


2. Compressor E05 Jam 0.00020 #REF! #REF!

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 10.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 6.3 (2) Analisa EI-632
JENIS PEKERJAAN : Latasir Kelas B (SS-B)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Quary/AMP ke lokasi pekerjaan L #REF! KM
5 Tebal Lapis Latasir padat t 0.030 M Tabel 6.3.1 (2)
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 6.50 %
- Aspal Fh2 5.30 %
8 Berat isi Agregat (padat) Bip 1.380 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.255 ton/m3
10 Komposisi campuran SS Kelas B
- Pasir Kasar M01a PK 54.73 % Gradasi harus -
- Pasir Halus M01c PH 31.44 % memenuhi -
- Semen FF 6.99 % Spesifikasi
- Asphalt As 6.84 %
11 Berat Isi bahan :
- Latasir (SS) Kelas B D1 2.22 ton / M3
- Pasir Kasar D2 1.316 ton / M3
- Pasir Halus D3 1.151 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.01 km

II. URUTAN KERJA


1 Wheel Loader memuat Agregat ke dalam
Cold Bin AMP
2 Agregat dan aspal dicampur dan dipanaskan
dengan AMP untuk dimuat langsung ke dalam
Dump Truck dan diangkut kelokasi pekerjaan
3 Campuran panas Latasir dihampar dengan alat bantu
dan dipadatkan dengan Tandem Roller
4 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparaan dengan menggunakan
Alat Bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Pasir Kasar = (PK x (D1 x tM3) x Fh1) : D2 (M01d) 0.1800 M3
1.b. Pasir Halus = (PH x (D1 x tM3) x Fh1) : D3 (M01c) 0.1182 M3
1.c. Semen = (1000 x FF) (M05) 69.9000 Kg
1.d. Aspal = (1000 x As)-( (1000 x As) x Fh2) (M10) 64.7748 Kg

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 20.00 km/jam panduan
- Kecepatan kembali rata rata Vr 25.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.03 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.02 menit
- Lain - lain (waktu pasti) T3 0.70 menit
Ts1 0.75 menit

Kap. Prod. / jam = V x Fb x Fa x 60 x Bip Q1 123.05 ton


Ts1

Koefisien Alat / ton = 1 : Q1 (E15) 0.0081 Jam

Berlanjut ke hal. berikut.

ITEM PEMBAYARAN NO. : 6.3 (2) Analisa EI-632


JENIS PEKERJAAN : Latasir Kelas B (SS-B)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. ASPHALT MIXING PLANT (AMP) (E01)


Kapasitas produksi V 60.00 ton / Jam
Faktor Efisiensi alat Fa 0.83 -
Kap.Prod. / jam = V x Fa Q2 49.80 ton

Koefisien Alat / ton = 1 : Q2 (E01) 0.0201 Jam

2.c. GENERATOR SET ( GENSET ) (E12)


Kap.Prod. / Jam = SAMA DENGAN AMP Q2 49.80 ton
Koefisien Alat / ton = 1 : Q2 (E12) 0.0201 Jam

2.d. DUMP TRUCK (DT) (E08)


Kapasitas bak V 3.50 ton panduan
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM / Jam
Kecepatan rata-rata kosong v2 30.00 KM / Jam
Kapasitas AMP / batch Q2b 1.00 ton
Waktu menyiapkan 1 batch Latasir Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi Bak = (V : Q2b) x Tb T1 3.50 menit
- Angkut = (L : v1) x 60 menit T2 #REF! menit
- Tunggu + dump + Putar T3 15.00 menit
- Kembali = (L : v2) x 60 menit T4 #REF! menit
Ts2 #REF! menit

Kap.Prod. / jam = V x Fa x 60 Q4 #REF! M2


D1 x t x Ts2

Koefisien Alat / ton = 1 : Q4 (E09) #REF! Jam

2.e TANDEM ROLLER (E17)


Kecepatan rata-rata alat v 1.50 Km / Jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 6.00 lintasan
Jumlah lajur lintasan N 5.00
Lebar overlap bo 0.30 m
Faktor Efisiensi alat Fa 0.83 -

Kap. Prod./jam = (v x 1000) x (N(b-bo)+bo) x Fa x t x D1 x (Bip/Bil) Q6 72.94 ton


n
Koefisien Alat / ton = 1 : Q6 (E17) 0.0137 Jam

Berlanjut ke hal. berikut.

ITEM PEMBAYARAN NO. : 6.3 (2) Analisa EI-632


JENIS PEKERJAAN : Latasir Kelas B (SS-B)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.h. ALAT BANTU


diperlukan : Lump Sum
- Kereta dorong = 5 Buah
- Sekop = 6 Buah
- Garpu = 2 buah
- Tongkat Kontrol ketebalan hanparan

3. TENAGA
Produksi menentukan : AMP Q2 49.80 M2
Produksi Latasir / hari = Tk x Q5 Qt 348.60 M2
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.1406 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0201 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. #REF! / M2.


6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : #REF! M2
Analisa EI-632
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK
NAMA PAKET #REF!

PROP / KAB / KODYA #REF!


ITEM PEMBAYARAN NO. : 6.3 (2) PERKIRAAN VOL. PEK. : #REF!
JENIS PEKERJAAN : Latasir Kelas B (SS-B) TOTAL HARGA (Rp.) : #REF!
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : #REF!

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1406 #REF! #REF!


2. Mandor (L03) Jam 0.0201 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Pasir Kasar (M01a) M3 0.1800 #REF! #REF!


2. Pasir Halus (M01c) M3 0.1182 #REF! #REF!
3 Semen (M05) Kg 69.9000 #REF! #REF!
4 Aspal (M10) Kg 64.7748 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN
1. Wheel Loader E15 Jam 0.0081 #REF! #REF!
2. AMP E01 Jam 0.0201 #REF! #REF!
3. Genset E12 Jam 0.0201 #REF! #REF!
4. Dump Truck E08 Jam #REF! #REF! #REF!

5 Tandem Roller E17 Jam 0.0137 #REF! #REF!

7 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 10.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 6.6.(1) Analisa EI-661
JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal rata2 Lapen t 0.070 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan - Agregat Fh1 1.05 -
Fator kehilangan - Aspal Fh2 1.03 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2 Tabel 6.6.3.
- Agregat Pengunci Ap1 25.00 Kg/M2 Tabel 6.6.3.
- Agregat Penutup Ap2 14.00 Kg/M2 Tabel 6.6.3.
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2 Tabel 6.6.3.
- Paska Agregat Pengunci As2 1.50 Kg/M2 Tabel 6.6.3.
As 95.71 Kg/M3
9 Berat isi bahan :
- Agregat D1 1.42 ton / M3
- Aspal D2 1.03 ton / M3

II. URUTAN KERJA


1Permukaan dasar dibersihkan dan disemprot aspal cair
bilamana diperlukan
2 Agregat kasar dimuat ke dalam Dump Truck
menggunakan Wheel Loader (di Base Camp)
3 Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
4 Aspal disemprotkan di atas agregat kasar yang telah
diratakan menggunakan Aspal Sprayer (merata)
5 Agregat Pengunci ditebarkan dan dipadatkan dengan
cara yang sama dengan pemadatan agregat kasar
disusul dengan penebaran agregat penutup.
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4049 M3
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M04) 0.2641 M3
1.c. Agregat Penutup = {(Ap2/1000 : t M3) x Fh1} : D1 (M04) 0.1479 M3
1.d. Aspal = {((As1+As2) : t M3) x Fh2} (M10) 98.59 Kg

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1 0.45 lihat tabel
V - Loading

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 141.10 M3


Ts1

Koefisien Alat/M3 = 1 : Q1 (E15) 0.0071 Jam

Berlanjut ke halaman berikut

ITEM PEMBAYARAN NO. : 6.6.(1) Analisa EI-661


JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. DUMP TRUCK (DT) (E09)


Kapasitas bak V 10.00 ton
Faktor Efisiensi alat Fa 0.80 -
Kecepatan rata-rata bermuatan v1 20.00 KM / Jam
Kecepatan rata-rata kosong v2 30.00 KM / Jam
Waktu Siklus Ts2
- Mengisi Bak = (V x 60)/(D1 x Q1) T1 2.99 menit
- Angkut = (L : v1) x 60 menit T2 26.18 menit
- Tunggu + dump + Putar T3 15.00 menit
- Kembali = (L : v2) x 60 menit T4 17.45 menit
Ts2 61.62 menit

Kap.Prod. / jam = V x Fa x 60 Q2 5.49 M3


Ts2 x D1

Koefisien Alat / M3 = 1 : Q2 = 1 : Q2 (E09) 0.1823 Jam

2.c. THREE WHEEL ROLLER (E16)


Kecepatan rata-rata alat v 2.50 Km / Jam
Lebar efektif pemadatan b 1.90 M
Jumlah lintasan n 12.00 lintasan 2 fase @ 6 lintas
Lajur lintasan N 1.00
Lebar Overlap bo 0.30 M
Faktor Efisiensi alat Fa 0.83 -
Apabila N <= 1
Kap. Prod. / jam = (v x 1000) x b x t x Fa Q3 22.9979166666667 M3
n
Apabila N > 1
Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q3 0.0000
n

Koefisien Alat / M3 = 1 : Q3 (E16) 0.0435 Jam

2.d. ASPHALT SPRAYER (E03)


Kapasitas tangki V 850.00 liter
Faktor efisiensi kerja Fa 0.80 -
Kapasitas pompa Aspal Pa 55 liter/menit

Kap. Prod. / jam = Pa x Fa x 60 Q1 2.64 liter


1000
Koefisien Alat / M3 = 1 : Q4 (E03) 0.3788 Jam

2.e. ALAT BANTU


diperlukan setiap : 75.00 M3 pekerjaan Lump Sum
- Kereta dorong = 3 buah
- Sekop = 5 buah
- Sapu = 5 buah
- Sikat = 3 buah
- Karung = 5 buah
- Cerek Aspal = 3 buah
- Kaleng Aspal = 3 buah

3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 141.10 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang

Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1417 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0142 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke halaman berikut

ITEM PEMBAYARAN NO. : 6.6.(1) Analisa EI-661


JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,107,484.67 / M3.


6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 1.00 M3
Analisa EI-661

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.6.(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam TOTAL HARGA : 1,107,484.67
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.07

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417 4,657.31 660.14


2. Mandor (L03) Jam 0.0142 7,281.29 103.21

JUMLAH HARGA TENAGA 763.35

B. BAHAN

1. Agregat Kasar (M03) M3 1.6690 150,301.42 250,855.18


2. Agregat Halus (M04) M3 0.1479 162,952.13 24,098.55
3 Aspal (M10) Kg 98.5857 6,400.00 630,948.57

JUMLAH HARGA BAHAN 905,902.31

C. PERALATAN

1. Wheel Loader E15 Jam 0.0071 262,099.45 1,857.54


2. Dump Truck E09 Jam 0.1823 242,689.55 44,240.18
3. 3-Wheel Roller E16 Jam 0.0435 75,856.28 3,298.40
4. Asp. Sprayer E03 Jam 0.3788 18,396.47 6,968.36
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 56,364.48

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 963,030.15


E. OVERHEAD & PROFIT 15.0 % x D 144,454.52
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,107,484.67
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR HARGA SATUAN UPAH

HARGA SATUAN
NO URAIAN KODE SATUAN Harga Tengah KETERANGAN
Per HARI (Rp.) Per JAM (Rp.)
1 2 3 4 5 6 7

Harga Upah
1 Pekerja M01 Hari / Orang 90,000.00 - 120,000.00 12,800.00 - 17,100.00 105,000.00 belum termasuk
PPN
2 Tukang M02 Hari / Orang 100,000.00 - 130,000.00 14,200.00 - 18,500.00 115,000.00

3 Mandor M03 Hari / Orang 110,000.00 - 130,000.00 15,700.00 - 18,500.00 120,000.00

4 Kepala Tukang M04 Hari / Orang 110,000.00 - 167,000.00 15,700.00 - 23,800.00 138,500.00

5 Operator Terlatih M05 Hari / Orang 100,000.00 - 167,000.00 14,200.00 - 23,800.00 133,500.00

6 Pembantu Operator M06 Hari / Orang 90,000.00 - 102,000.00 12,800.00 - 14,500.00 96,000.00

7 Mekanik M07 Hari / Orang 100,000.00 - 157,000.00 14,200.00 - 22,400.00 128,500.00

8 Pembantu Mekanik M08 Hari / Orang 90,000.00 - 102,000.00 12,800.00 - 14,500.00 96,000.00

9 Sopir/ Driver M09 Hari / Orang 100,000.00 - 250,000.00 14,200.00 - 35,700.00 175,000.00

10 Pembantu Sopir/ Kernet M10 Hari / Orang 90,000.00 - 102,000.00 12,800.00 - 14,500.00 96,000.00

11 Tenaga Ahli M11 Hari / Orang 550,000.00 - 739,000.00 78,500.00 - 105,500.00 644,500.00

Ditetapkan di Ngabang
pada tanggal 2018

Kepala Dinas Pekerjaan Umum dan Penataaan Ruang

Kabupaten Landak,

Erani, ST. MT
Pembina TK. I
NIP. 19721212 200003 1 006
DAFTAR HARGA SATUAN BAHAN

HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
I BAHAN PENGISI -0.02
1 Aspal Dingin (Cut Back) @ 154 Kg/Drum M 1 Drum 2,450,000.00 - 2,548,000.00 2,499,000.00
2 Aspal Dingin (Cut Back) M 2 Kg 13,200.00 - 14,200.00 13,700.00
3 Aspal Buton (CPHMA) M 3 Ton 1,882,600.00 - 1,920,800.00 1,901,700.00
4 Aspal Emulsi M 4 Kg 14,500.00 - 15,500.00 15,000.00
5 Aspal Keras (AC) Pen 60/70 Net.Wet 154 M 5 Drum 1,764,000.00 - 2,058,000.00 1,911,000.00
6 Aspal Keras (AC) Pen 60/70 Net.Wet 154 M 6 Kg 11,500.00 - 13,400.00 12,450.00
7 Aspal Modifikasi @ 200 Kg/Drum M 7 Drum 2,891,000.00 - 3,087,000.00 2,989,000.00
8 Aspal Modifikasi M 8 Kg 14,500.00 - 15,500.00 15,000.00
9 Bata Tanah Merah M 9 Buah 1,500.00 - 1,700.00 1,600.00
10 Batako 7cm x 15cm x30cm (press) M 10 Buah 1,200.00 - 1,800.00 1,500.00
11 Batako 7cm x 15cm x30cm M 11 Buah 1,000.00 - 1,500.00 1,250.00
12 Batako 9cm x 20cm x40cm (press) M 12 Buah 2,200.00 - 3,000.00 2,600.00
13 Batako 9cm x 20cm x40cm M 13 Buah 2,000.00 - 2,800.00 2,400.00
14 Batako Kerawang ( 0.20 x 0.20 x 0.07 ) M 14 Buah 9,800.00 - 11,800.00 10,800.00
15 Batu Kong M 15 M³ 147,000.00 - 166,600.00 156,800.00
16 Batu Sungai / Batu Kali M 16 M³ 245,000.00 - 264,600.00 254,800.00
17 Batu Belah Biasa ( Uk. 20/25 cm ) M 17 M³ 294,000.00 - 323,400.00 308,700.00
18 Batu Pecah (mesin) 0,5 - 1 cm M 18 M3 392,000.00 - 441,000.00 416,500.00
19 Batu Pecah (mesin) 1 - 2 cm M 19 M3 392,000.00 - 441,000.00 416,500.00
20 Batu Pecah (mesin) 2 - 3 cm M 20 M3 392,000.00 - 441,000.00 416,500.00
21 Batu Pecah (mesin) 3 - 5 cm M 21 M3 392,000.00 - 441,000.00 416,500.00
22 Batu Pecah 5 - 7 cm M 22 M3 294,000.00 - 323,400.00 308,700.00
23 Batu Belah Biasa ( Uk. 10/15 cm ) M 23 M3 294,000.00 - 323,400.00 308,700.00
24 Batu Belah Biasa ( Uk. 15/20 cm ) M 24 M³ 294,000.00 - 323,400.00 308,700.00
25 Debu Batu (Stone Dust) M 25 M3 343,000.00 - 441,000.00 392,000.00
26 Batu Kapur M 26 Kotak 19,600.00 - 24,500.00 22,050.00
27 Kerikil Sungai M 27 M3 294,000.00 - 313,600.00 303,800.00
28 Pasir Berbatu (Sirtu) M 28 M3 147,000.00 - 196,000.00 171,500.00
29 Pasir Urug M 29 M3 49,000.00 - 73,500.00 61,250.00
30 Pasir Pasang / Pasir Beton M 30 M³ 73,500.00 - 117,600.00 95,550.00
31 Paving Block (persegi panjang 21x10,5cm) M 31 Buah 2,000.00 - 2,600.00 2,300.00
32 Glass Block M 32 Buah 24,500.00 - 29,400.00 26,950.00
33 Semen PC (50 Kg) M 33 Zak 73,500.00 - 93,100.00 83,300.00
34 Semen PC (40 Kg) M 34 Zak 65,700.00 - 75,500.00 70,600.00
35 Semen Putih (40 Kg) M 35 Zak 137,200.00 - 156,800.00 147,000.00
36 Oker M 36 Bungkus 19,600.00 - 23,600.00 21,600.00
37 Tanah Biasa M 37 M3 68,600.00 - 98,000.00 83,300.00
38 Tanah Pilihan M 38 M3 98,000.00 - 147,000.00 122,500.00
39 LPA M 39 Bh 392,000.00 - 441,000.00 416,500.00
40 LPB M 40 Bh 392,000.00 - 431,200.00 411,600.00
41 Batu Koral Putih / Batu Taman M 41 Bh 1,274,000.00 - 1,470,000.00 1,372,000.00
42 Batu Alam M 42 Bh 245,000.00 - 441,000.00 343,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
II BAHAN ATAP
1 Genteng Metal biasa uk. 0.025 x 88 x 88 cm M 43 Buah 60,000.00 - 65,000.00 62,500.00
2 Genteng Metal biasa uk. 0.03 x 88 x 88 cm M 44 Buah 64,700.00 - 68,600.00 66,650.00
3 Genteng Metal biasa uk. 44 x 88 cm M 45 Buah 32,000.00 - 37,000.00 34,500.00
4 Nok - C (Colour) M 46 Buah 37,300.00 - 41,200.00 39,250.00
5 Nok Genteng Keramik M 47 Buah 34,300.00 - 35,300.00 34,800.00
6 Nok Genteng Keramik Glasur M 48 Buah 39,200.00 - 39,700.00 39,450.00
7 Seng Gelombang BJLS 0,20 mm M 49 Lembar 48,500.00 - 52,500.00 50,500.00
8 Seng Gelombang BJLS 0,30 mm M 50 Lembar 66,700.00 - 71,600.00 69,150.00
9 Seng Polos Bjls 0,30 mm M 51 Lbr 53,900.00 - 63,700.00 58,800.00
10 Seng Polos BJLS 0,20 mm M 52 Lembar 40,000.00 - 45,000.00 42,500.00
11 Genteng Semen ( 0.37 x 0.29 m ) M 53 Buah 4,000.00 - 4,500.00 4,250.00
12 Genteng Tanah / Kodok (0.22 x 0.28 m) M 54 Buah 2,900.00 - 3,500.00 3,200.00
13 Genteng Keramik M 55 Buah 3,300.00 - 4,000.00 3,650.00
14 Genteng Keramik Glazur M 56 Buah 10,300.00 - 11,800.00 11,050.00
15 Atap Fibre Glass Gelombang M 57 Lembar 78,400.00 - 88,200.00 83,300.00
16 Papan Perabung 11/13 Kayu Kelas II p=4 m M 58 Pasang 34,300.00 - 44,100.00 39,200.00
17 Plastik Gelombang M 59 Keping 73,500.00 - 83,300.00 78,400.00
18 Papan Listplank Ketam M 60 Keping 47,100.00 - 56,900.00 52,000.00
19 Papan Ram M 61 Keping 44,100.00 - 53,900.00 49,000.00
20 Talang PVC A/ W p=4 m M 62 Buah 98,000.00 - 117,600.00 107,800.00
21 Atap Sirap Belian (L=6-8 cm ; P= ± 50 cm) M 63 Keping 6,900.00 - 7,400.00 7,150.00
22 Zincalume Gelombang Persegi 0.35 (polos) M 64 M² 80,000.00 - 90,000.00 85,000.00
23 Zincalume Gelombang Persegi 0.30 (polos) M 65 M² 46,100.00 - 55,900.00 51,000.00
24 Zincalume Gelombang Persegi 0.40(color) M 66 M² 95,000.00 - 105,000.00 100,000.00
25 Zincalume Gelombang Persegi 0.35 (color) M 67 M² 119,600.00 - 122,100.00 120,850.00

III BAHAN KAYU


1 Kayu Bulat/ Dolken 8-10 cm P = 4 m M 68 Batang 12,000.00 - 18,000.00 15,000.00
2 Kayu Bulat/ Dolken 5-7 cm P = 4 m M 69 Batang 8,000.00 - 23,000.00 15,500.00
3 Kayu Bulat/ Dolken 12 cm P = 12 m M 70 Batang 98,000.00 - 100,000.00 99,000.00
4 Kayu Balok Kls I Ketam M 71 M3 4,027,800.00 - 9,040,500.00 6,534,150.00
5 Kayu Balok Kls I Tidak Ketam M 72 M3 3,626,000.00 - 3,699,500.00 3,662,750.00
6 Kayu Balok Kls II Ketam M 73 M3 3,028,200.00 - 5,324,400.00 4,176,300.00
7 Kayu Balok Kls II Tidak Ketam M 74 M3 2,822,400.00 - 2,877,300.00 2,849,850.00
8 Kayu Simpiran M 75 M3 205,800.00 - 208,800.00 207,300.00
9 Kayu Bakar M 76 M3 117,600.00 - 120,600.00 119,100.00
10 Papan Belian/ Ulin Ketam M 77 M3 8,820,000.00 - 9,002,300.00 8,911,150.00
11 Papan Belian/ Ulin Tidak Ketam M 78 M3 7,889,000.00 - 8,028,200.00 7,958,600.00
12 Papan Kayu Klas I Ketam M 79 M3 4,728,500.00 - 4,821,600.00 4,775,050.00
13 Papan Kayu Klas I Tidak Ketam M 80 M3 4,249,300.00 - 4,333,600.00 4,291,450.00
14 Papan Kayu Klas II Ketam M 81 M3 3,269,300.00 - 3,334,000.00 3,301,650.00
15 Papan Kayu Klas II Tidak Ketam M 82 M3 2,791,100.00 - 2,846,900.00 2,819,000.00
16 Ky. Belian tdk ketam Uk. 7/7 - (3,6-4) M M 83 Batang 240,000.00 - 210,000.00 225,000.00
17 Ky. Belian tdk ketam Uk. 8/8 -(3,6-4) M M 84 Batang 280,000.00 - 340,000.00 310,000.00
18 Ky. Belian tdk ketam Uk. 10/10 - (3,6-4) M M 85 Batang 294,000.00 - 313,600.00 303,800.00
19 Ky. Belian tdk ketam Uk. 12/12 - (3,6-4) M M 86 Batang 441,000.00 - 470,400.00 455,700.00
20 Ky. Belian tdk ketam Uk. 15/15 - (3,6-4) M M 87 Batang 1,124,100.00 - 1,249,500.00 1,186,800.00
21 Kayu Klas III M 88 M3 3,008,600.00 - 3,136,000.00 3,072,300.00
22 Kayu Kelas II 5/7 M 89 Batang 28,000.00 - 33,000.00 30,500.00
23 Kayu Kelas II 4/6 M 90 Batang 20,000.00 - 25,000.00 22,500.00
24 Kayu Kelas II 3/5 M 91 Batang 65,000.00 - 70,000.00 67,500.00
25 Kayu Kelas II 7/7 M 92 Batang 70,000.00 - 75,000.00 72,500.00
26 Kayu Kelas II 8/8 M 93 Batang 60,000.00 - 65,000.00 62,500.00
27 Kayu Kelas II 8/12 M 94 Batang 85,000.00 - 90,000.00 87,500.00
HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9

IV BAHAN LANTAI
1 Keramik Uk. 20cm x 20cm ( BerTekstur) M 95 Kotak / M2 80,000.00 - 90,000.00 85,000.00
2 Keramik Uk. 20cm x 20cm ( Polos ) M 96 Kotak / M2 65,000.00 - 75,000.00 70,000.00
3 Keramik Uk. 30cm x 30cm (BerTekstur) M 97 Kotak / M2 66,700.00 - 76,500.00 71,600.00
4 Keramik Uk. 30cm x 30cm (Polos) M 98 Kotak / M2 56,900.00 - 66,700.00 61,800.00
5 Keramik Uk. 40cm x 40cm (BerTekstur) M 99 Kotak / M2 73,500.00 - 83,300.00 78,400.00
6 Keramik Uk. 40cm x 40cm (Polos) M 100 Kotak / M2 58,800.00 - 68,600.00 63,700.00
7 Keramik Uk. 60cm x 60cm (Polos) M 101 Kotak 127,400.00 - 147,000.00 137,200.00
8 Keramik Dinding 20 cm x 25 cm) M 102 Kotak / M2 63,700.00 - 73,500.00 68,600.00
9 Keramik Uk. 25cm x 40cm M 103 Kotak / M2 73,500.00 - 83,300.00 78,400.00
10 Granit 40 x 40 cm ex Essenza Unpolished M 104 M² 281,300.00 - 289,100.00 285,200.00
11 Granite Tile 40/40 M 105 M² 147,000.00 - 245,000.00 196,000.00
12 Granite Tile 60/ 60 M 106 Kotak 392,000.00 - 490,000.00 441,000.00
13 Plint Keramik 10/30 cm M 107 Buah 18,700.00 - 22,600.00 20,650.00
14 Plint Granitetile 10/40 M 108 Buah 69,600.00 - 73,500.00 71,550.00
15 Porselin Sudut/ Siku, p = 10 cm M 109 Buah 1,800.00 - 3,000.00 2,400.00
16 Porselin Lis Dinding Hias (Lis Telo) uk. 7 x 20 cm M 110 Buah 5,900.00 - 9,800.00 7,850.00
17 Rubber Flooring M 111 M² 637,000.00 - 686,000.00 661,500.00
18 Flooring Kayu M 112 M² 490,000.00 - 539,000.00 514,500.00
19 Matras/Karpet (setara Evamat) Uk 30 x 30 M 113 M² 147,000.00 - 196,000.00 171,500.00

V BAHAN BESI DAN ALUMINIUM


1 Baja Pipa M 114 M' 20,600.00 - 23,600.00 22,100.00
2 Baja Struktur, titik leleh 2500 kg/cm2 M 115 Kg 20,100.00 - 22,600.00 21,350.00
3 Baja Struktur, titik leleh 2800 kg/cm2 M 116 Kg 20,600.00 - 23,600.00 22,100.00
4 Baja Struktur, titik leleh 3500 kg/cm2 M 117 Kg 22,100.00 - 24,500.00 23,300.00
5 Baja Tulangan U24 Polos M 118 Kg 13,800.00 - 15,700.00 14,750.00
6 Baja Tulangan U32 Polos M 119 Kg 13,800.00 - 15,700.00 14,750.00
7 Baja Tulangan U32 Ulir M 120 Kg 14,300.00 - 16,200.00 15,250.00
8 Besi Siku L.70.70.2 P 6 M M 121 Batang 505,700.00 - 539,000.00 522,350.00
9 wiremesh (roll, 2,1 x 5,4 M) M4 M 122 roll 12,800.00 - 15,700.00 14,250.00
10 wiremesh (roll, 2,1 x 5,4 M) M5 M 123 roll 12,800.00 - 15,700.00 14,250.00
11 wiremesh (roll, 2,1 x 5,4 M) M6 M 124 roll 12,800.00 - 15,700.00 14,250.00
12 wiremesh (roll, 2,1 x 5,4 M) M7 M 125 roll 12,800.00 - 15,700.00 14,250.00
13 Expansion Joint tipe Rubber 1 (Celah 21-41 mm) M 126 M' 27,000.00 - 28,500.00 27,750.00
14 Expansion Joint tipe Rubber 2 (Celah 32-62 mm) M 127 M' 36,300.00 - 38,300.00 37,300.00
15 Expansion Joint tipe Rubber 3 (42-82 mm) M 128 M' 46,100.00 - 48,600.00 47,350.00
16 Expansion Joint tipe Torma M 129 M' 72,600.00 - 76,000.00 74,300.00
17 Kabel Baja 1" M 130 M' 98,000.00 - 117,600.00 107,800.00
18 Kabel Baja 3/4" M 131 M' 73,500.00 - 88,200.00 80,850.00
19 Kabel Baja 1/2" M 132 M' 58,800.00 - 73,500.00 66,150.00
20 Besi Plat Rata M 133 Kg 16,200.00 - 18,700.00 17,450.00
21 Besi Tempa M 134 M2 382,200.00 - 401,800.00 392,000.00
22 Kawat Ayam M 135 Roll 139,200.00 - 146,100.00 142,650.00
23 Kawat Ikat Beton (bendrat) M 136 Kg 23,600.00 - 24,500.00 24,050.00
24 kawat Bronjong (pabrikasi) 2,0 x 1,0 x 0,5 dia. 2,7 mm M 137 Unit 436,600.00 - 458,700.00 447,650.00
25 Kawat Bronjong (Pabrikasi) 2,0 x 1,0 x 0,5 dia. 3,0 mm M 138 Unit 509,600.00 - 587,600.00 548,600.00
26 Kawat Galvanis M 139 Kg 24,500.00 - 29,400.00 26,950.00
27 Kawat Harmonika M 140 M2 27,000.00 - 28,500.00 27,750.00
28 Kawat Las M 141 Kg 29,400.00 - 39,200.00 34,300.00
29 Kawat Saringan Pasir Uk. 55 M 142 Roll 132,300.00 - 142,100.00 137,200.00
30 Kawat Simpai Roll M 143 Roll 274,400.00 - 303,800.00 289,100.00
HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
31 Paku Belian M 144 Kg 17,000.00 - 20,000.00 18,500.00
32 Paku Biasa ( 1/2'', 1'', 1,5'', 2'' ) M 145 Kg 30,000.00 - 33,000.00 31,500.00
33 Paku Seng M 146 Kg 34,300.00 - 36,300.00 35,300.00
34 Perletakan Elastromerik Uk. 30x30x5 cm (serv load 40 t) M 147 Buah 980,000.00 - 1,470,000.00 1,225,000.00
35 Perletakan Elastromerik Uk. 35x35x5 cm (serv load 40 t) M 148 Buah 1,176,000.00 - 1,666,000.00 1,421,000.00
36 Perletakan Elastromerik Uk. 40x40x5 cm (serv load 40 t) M 149 Buah 1,470,000.00 - 1,960,000.00 1,715,000.00
37 Perletakan Logam M 150 Buah 2,291,300.00 - 2,337,300.00 2,314,300.00
38 Plat Rambu M 151 Buah 512,100.00 - 522,400.00 517,250.00
39 Rel Pengaman (Guard Rail) M 152 M' 461,100.00 - 488,100.00 474,600.00

40 Web/Truss C81 tebal 1 mm (Zincalum) M 153 M' 138,200.00 - 141,200.00 139,700.00


41 Web/Truss C81 tebal 0,75 mm (Zincalum) M 154 M' 94,100.00 - 96,100.00 95,100.00

42 Web/Truss C75 tebal 0,75 mm (Zincalum) M 155 M' 92,200.00 - 94,100.00 93,150.00
43 Web/Truss C75 tebal 0,65 mm (Zincalum) M 156 M' 88,200.00 - 90,200.00 89,200.00

44 Batten/Reng Kecil U4.3 tebal 0,5 mmtebal 0,45 mm (Zincalum) M 157 M' 53,900.00 - 54,900.00 54,400.00
45 Web/Truss C81 tebal 1 mm (Galvanized) M 158 M' 122,500.00 - 125,000.00 123,750.00
46 Web/Truss C81 tebal 0,75 mm (Galvanized) M 159 M' 91,200.00 - 93,100.00 92,150.00

47 Web/Truss C75 tebal 0,75 mm (Galvanized) M 160 M' 92,200.00 - 94,100.00 93,150.00
48 Web/Truss C75 tebal 0,65 mm (Galvanized) M 161 M' 83,300.00 - 85,300.00 84,300.00

49 Batten/Reng Kecil U4.3 tebal 0,5 mmtebal 0,45 mm (Galvanized) M 162 M' 47,100.00 - 48,100.00 47,600.00
50 Talang/Gutter tebal 0,5 mm M 163 M' 42,200.00 - 43,200.00 42,700.00

51 Dynabolt M10x80 M 164 bh 19,600.00 - 20,600.00 20,100.00


52 Selfdrilling Screw 10-16x16 (HWFS) M 165 bh 1,500.00 - 1,600.00 1,550.00
53 Selfdrilling Screw 12-14x20 (HWFS) M 166 bh 1,400.00 - 1,500.00 1,450.00
54 Kusen Almunium M 167 M' 112,700.00 - 117,600.00 115,150.00
55 Rangka Jendela Almunium M 168 M' 122,500.00 - 127,400.00 124,950.00
56 Rangka Pintu Almunium M 169 M' 161,700.00 - 166,600.00 164,150.00
57 Kusen & Pintu PVC Toilet M 170 Unit 300,000.00 - 330,000.00 315,000.00
58 Engsel M 171 Kotak 15,000.00 - 30,000.00 22,500.00
59 Handle Pintu M 172 Kotak 245,000.00 - 294,000.00 269,500.00
60 Selinder M 173 bh 34,300.00 - 39,200.00 36,750.00
61 Door Stoper M 174 bh 73,500.00 - 78,400.00 75,950.00
62 Door Closer M 175 bh 39,200.00 - 44,100.00 41,650.00
63 Slot Tanam M 176 bh 7,000.00 - 15,000.00 11,000.00
64 Baut Baja CNP 1" M 177 bh 34,300.00 - 39,200.00 36,750.00
65 Baut Baja CNP 1/2" M 178 bh 24,500.00 - 26,500.00 25,500.00
66 Baut Baja 12 mm M 179 bh 7,000.00 - 10,000.00 8,500.00
67 Baut Baja 14 mm M 180 bh 9,000.00 - 12,000.00 10,500.00
68 Baut Baja 16 mm M 181 bh 19,600.00 - 24,500.00 22,050.00
69 Baut U M 182 bh 26,500.00 - 34,300.00 30,400.00
70 Baut Aligner (Pengencang Kabel) M 183 bh 49,000.00 - 73,500.00 61,250.00
HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
VI BAHAN PIPA
1 Pipa GIP Medium B dia. 15 mm (1/2") M 184 M' 38,300.00 - 39,100.00 38,700.00
2 Pipa GIP Medium B dia. 20 mm (3/4") M 185 M' 49,000.00 - 50,000.00 49,500.00
3 Pipa GIP Medium B dia. 40 mm (1.5") M 186 M' 76,000.00 - 77,500.00 76,750.00
4 Pipa GIP Medium B dia. 25 mm (1") M 187 M' 110,800.00 - 113,700.00 112,250.00
5 Pipa GIP Medium B dia. 50 mm (2") M 188 M' 154,900.00 - 158,800.00 156,850.00
6 Pipa GIP Medium B dia. 65 mm (2.5") M 189 M' 197,500.00 - 201,400.00 199,450.00
7 Pipa GIP Medium B dia. 75 mm (3") M 190 M' 230,300.00 - 235,200.00 232,750.00
8 Pipa GIP Medium B dia. 100 mm (4") M 191 M' 285,200.00 - 291,100.00 288,150.00
9 Pipa GIP Medium B dia. 150 mm (6") M 192 M' 578,700.00 - 591,000.00 584,850.00
10 Pipa GIP Medium B dia. 200 mm (8") M 193 M' 851,200.00 - 868,300.00 859,750.00
11 Pipa GIP Medium B dia. 250 mm (10") M 194 M' 1,057,500.00 - 1,078,000.00 1,067,750.00
12 Pipa PVC dia 6 " Type A/ W M 195 M' 174,195.00 - 202,635.00 188,415.00
13 Pipa PVC dia 4 " Type A/ W M 196 M' 93,158.80 - 108,368.40 100,763.60
14 Pipa PVC dia 3 " Type A/ W M 197 M' 56,962.50 - 66,262.50 61,612.50
15 Pipa PVC dia 2 " Type A/ W M 198 M' 27,224.40 - 31,669.20 29,446.80
16 Pipa PVC dia 1 " Type A/ W M 199 M' 12,279.40 - 14,284.20 13,281.80
17 Pipa PVC dia 3/4 " Type A/ W M 200 M' 8,967.00 - 10,431.00 9,699.00
18 Pipa PVC dia 1/2 " Type A/ W M 201 M' 7,840.00 - 9,120.00 8,480.00
19 Pipa PVC SNI 50 mm (2") RRJ S-12,5 M 202 M' 43,120.00 - 50,160.00 46,640.00
20 Pipa PVC SNI 75 mm (3") RRJ S-12,5 M 203 M' 88,200.00 - 102,600.00 95,400.00
21 Pipa PVC SNI 100 mm (4") RRJ S-12,5 M 204 M' 127,400.00 - 148,200.00 137,800.00
22 Pipa PVC SNI 150 mm (6") RRJ S-12,5 M 205 M' 273,420.00 - 318,060.00 295,740.00
23 Pipa PVC SNI 200 mm (8") RRJ S-12,5 M 206 M' 428,260.00 - 498,180.00 463,220.00
24 Pipa PVC SNI 250 mm (10") RRJ S-12,5 M 207 M' 682,080.00 - 793,440.00 737,760.00
25 Pipa PVC SNI 300 mm (12") RRJ S-12,5 M 208 M' 1,029,000.00 - 1,186,500.00 1,107,750.00
26 Tangki Air 500 Liter M 209 Buah 588,000.00 - 686,000.00 637,000.00
27 Tangki Air 1000 Liter M 210 Buah - - - -
28 Pelampung Otomatis M 211 Buah 58,800.00 - 68,600.00 63,700.00
29 Roof Drain Metal M 212 Buah 79,400.00 - 88,200.00 83,800.00
30 Mesin Jet Pump Kap.250 Watt M 213 Unit 2,744,000.00 - 2,940,000.00 2,842,000.00
31 Mesin Pompa Tekan Kap. 150 watt M 214 Unit 736,000.00 - 784,000.00 760,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
VII BAHAN PENGUNCI DAN PENGGANTUNG
1 Engsel Kupu-kupu 3' M 215 Set 16,000.00 - 20,000.00 18,000.00

2 Engsel Kupu-kupu 4' M 216 Set 20,000.00 - 25,000.00 22,500.00


3 Filler/ Bahan Pengisi M 217 Kg 9,800.00 - 10,300.00 10,050.00
4 Gerendel / Slot 2" M 218 Buah 6,900.00 - 11,800.00 9,350.00

5 Kaca Bening 3 mm M 219 M2 125,500.00 - 128,400.00 126,950.00


6 Kaca Bening 5 mm M 220 M2 171,100.00 - 175,500.00 173,300.00

7 Kaca Rayban 5 mm M 221 M2 188,200.00 - 192,100.00 190,150.00


8 Kait Angin M 222 Buah 6,500.00 - 10,000.00 8,250.00

9 Kunci Pintu 2 Slag ( Kuningan ) M 223 Buah 165,000.00 - 198,000.00 181,500.00


10 Kunci Tanam Besar ( Kuningan ) M 224 Buah 147,000.00 - 166,600.00 156,800.00
11 Kunci Tanam Kecil M 225 Buah 65,000.00 - 85,000.00 75,000.00

12 Les Karet M 226 M' 6,900.00 - 7,400.00 7,150.00


13 Pegangan Pintu M 227 Buah 166,600.00 - 196,000.00 181,300.00

14 Paku triplek M 228 Kotak 14,700.00 - 21,600.00 18,150.00


15 Paku GRC M 229 Kotak 45,000.00 - 65,000.00 55,000.00

16 Paku Zincalum M 230 Kg 35,300.00 - 36,300.00 35,800.00


17 Paku Skrup M 231 Kotak 49,000.00 - 53,900.00 51,450.00
18 Paku 1 s/d 3 cm M 232 Kg 19,600.00 - 24,500.00 22,050.00

19 Paku 5 s/d 10 cm M 233 Kg 19,600.00 - 24,500.00 22,050.00


20 Paku 8 s/d 12 cm M 234 Kg 19,600.00 - 24,500.00 22,050.00

21 Door Auto closser M 235 Buah 176,400.00 - 245,000.00 210,700.00

VIII BAHAN PLAFOND


1 Gypsum Board t = 9mm M 236 Lbr 73,500.00 - 83,300.00 78,400.00
2 Poliwood 122cm x 244cm M 237 Lembar 76,500.00 - 86,300.00 81,400.00

3 Renglat M 238 Batang 15,700.00 - 16,700.00 16,200.00


4 GRC Board 120 x 240 x 4 M 239 Lembar 75,500.00 - 85,300.00 80,400.00

5 List Profil Kayu Kelas II M 240 Batang 34,300.00 - 39,200.00 36,750.00


6 Triplek t = 3 mm M 241 Lbr 53,900.00 - 63,700.00 58,800.00

7 Triplek t = 4 mm M 242 Lbr 83,300.00 - 98,000.00 90,650.00


8 Triplek t = 6 mm M 243 Lbr 107,800.00 - 117,600.00 112,700.00
9 Triplek t =9 mm M 244 Lbr 147,000.00 - 176,400.00 161,700.00
10 Triplex t = 12 mm M 245 Lbr 220,500.00 - 225,400.00 222,950.00
11 Teakwood t = 3 mm M 246 Lbr 151,000.00 - 153,900.00 152,450.00
12 Multiplex t = 3 mm M 247 Lbr 46,000.00 55,000.00 50,500.00
13 Multiplex t = 6 mm M 248 Lbr 110,000.00 - 150,000.00 130,000.00
14 Multiplex t = 9 mm M 249 Lbr 165,000.00 - 170,000.00 167,500.00
15 Multiplex t = 12 mm M 250 Lbr 220,000.00 - 260,000.00 240,000.00
16 List Profil 5 cm Gypsum M 251 M 27,500.00 - 30,400.00 28,950.00
17 Rangka Plafond Metal Furing M 252 M2 180,900.00 - 186,200.00 183,550.00
18 ACP (Aluminuim Komposit Panel) + Rangka M 253 M2 882,000.00 - 931,000.00 906,500.00

19 HPL M 254 Keping 245,000.00 - 343,000.00 294,000.00

20 Takun M 255 M2 49,000.00 - 73,500.00 61,250.00

21 Wlallpaper M 256 M2 73,500.00 - 98,000.00 85,750.00

22 Wlallpaper Costum M 257 M2 147,000.00 - 196,000.00 171,500.00


HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
IX BAHAN FINISHING / CAT - - -
1 Amplas Kayu M 258 Lembar 4,900.00 - 6,900.00 5,900.00
2 Amplas Besi M 259 Lembar 4,900.00 - 6,900.00 5,900.00
3 Cat Air biasa M 260 Kg 13,000.00 - 17,000.00 15,000.00
4 Cat Air mutu sedang M 261 Kg 13,800.00 - 16,200.00 15,000.00
5 Cat Galvanis M 262 Kg 58,800.00 - 60,800.00 59,800.00
6 Cat Jembatan/ Meni Besi M 263 Kg 58,800.00 - 63,700.00 61,250.00
7 Cat Marka Jalan M 264 Kg 44,100.00 - 46,100.00 45,100.00
8 Cat Melamic M 265 Kg 58,800.00 - 68,600.00 63,700.00
9 Cat Meni/ Dasar M 266 Kg 39,200.00 - 49,000.00 44,100.00
10 Cat Minyak/ Dop M 267 Kg 58,800.00 - 68,600.00 63,700.00
11 Cat Minyak/ Kilat M 268 Kg 58,800.00 - 68,600.00 63,700.00
12 Cat Pilox M 269 Kaleng 24,500.00 - 32,400.00 28,450.00
13 Dempul Kayu/ Wood Filler M 270 Kg 9,800.00 - 15,700.00 12,750.00
14 Dempul Tembok/ Wall Filler M 271 Kg 9,800.00 - 15,700.00 12,750.00
15 Plitur/ Vernish M 272 Kg 58,800.00 - 68,600.00 63,700.00
16 Thinner M 273 Liter 24,500.00 - 37,300.00 30,900.00
17 Cat kilat M 274 Kg 58,800.00 - 68,600.00 63,700.00
18 Cat tembok type weather shield M 275 Kg 26,500.00 - 35,300.00 30,900.00
19 Cat tembok type weather coat (acrylic) M 276 Kg 63,700.00 - 65,200.00 64,450.00
20 Cat Dasar Emulsion Setara Dulux M 277 Kg 65,700.00 - 67,200.00 66,450.00
21 Cat Akhir Emulsion setara Dulux M 278 Kg 131,400.00 - 134,300.00 132,850.00
22 Cat Akhir Weather Shield setara Dulux M 279 Kg 141,200.00 - 144,100.00 142,650.00
23 Cat Dasar Emulsion setara Mowilex M 280 Kg 51,000.00 - 53,900.00 52,450.00
24 Cat Akhir Emulsion setara Mowilex M 281 Kg 65,700.00 - 67,700.00 66,700.00
25 Cat Weather Shield setara Mowilex M 282 Kg 99,000.00 - 101,000.00 100,000.00
26 Cat Dasar Emulsion setara Vinilex M 283 Kg 32,400.00 - 33,400.00 32,900.00
27 Cat Akhir Emulsion setara Vinilex M 284 Kg 46,100.00 - 48,100.00 47,100.00
28 Cat Tembok Kw I (ex, Dulux, Warna Standar) M 285 Kg 24,500.00 - 26,500.00 25,500.00
29 Cat Tembok Kw 2 (ex, Vinilex, Warna Standar) M 286 Kg 9,800.00 - 14,700.00 12,250.00
30 Oker M 287 Kg 19,600.00 - 26,500.00 23,050.00
31 Lem Kayu M 288 Kg 17,700.00 - 27,500.00 22,600.00
32 Cat Kayu/Besi M 289 Kg 58,800.00 - 68,600.00 63,700.00
33 Plamir Kayu M 290 Kg 17,700.00 - 25,500.00 21,600.00
34 Meni Kayu M 291 Kg 58,800.00 - 66,700.00 62,750.00
35 Wood Filler M 292 Kg 41,200.00 - 43,200.00 42,200.00
36 Amplas Kayu M 293 Lembar 7,400.00 - 8,900.00 8,150.00
37 Kwas Cat M 294 Buah 34,300.00 - 39,200.00 36,750.00
38 Plamir Tembok M 295 Kg 9,800.00 - 14,700.00 12,250.00
39 Seal Tape M 296 Kg 2,000.00 - 4,900.00 3,450.00
40 Minyak Bekisting M 297 Liter 7,400.00 - 8,900.00 8,150.00
-
- -

X BAHAN KACA - - -
1 Kaca Polos, t = 3 mm M 298 M² 107,800.00 - 117,600.00 112,700.00
2 Kaca Polos, t = 5 mm M 299 M² 200,900.00 - 215,600.00 208,250.00
3 Kaca Polos, t = 8 mm M 300 M² 200,900.00 - 215,600.00 208,250.00
4 Kaca Rayben, t = 5 mm M 301 M² 196,000.00 - 205,800.00 200,900.00
5 Kaca Cermin t = 3mm M 302 M² 251,900.00 - 264,600.00 258,250.00
6 Kaca Es 3 mm M 303 M² 160,800.00 - 176,400.00 168,600.00
7 Kaca Es 5 mm M 304 M² 452,800.00 - 470,400.00 461,600.00
8 Kaca Buram, t = 5 mm M 305 M² 191,100.00 - 205,800.00 198,450.00
HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
XI BAHAN-BAHAN LAIN
1 Bak Cuci Aluminium ( 2 Tempat ) M 306 Buah 441,000.00 - 490,000.00 465,500.00

2 Bak Cuci Alumunium ( 1 Tempat ) M 307 Buah 245,000.00 - 294,000.00 269,500.00


3 Bunker Oil M 308 Buah 1,764,000.00 - 2,058,000.00 1,911,000.00
4 Gebalan Rumput M 309 M2 7,900.00 - 9,800.00 8,850.00

5 Gorong-Gorong Beton 100 cm tanpa Tulang M 310 M' 320,000.00 - 365,000.00 342,500.00
6 Gorong-Gorong Beton 80 cm tanpa Tulang M 311 M' 196,000.00 - 294,000.00 245,000.00

7 Gorong-Gorong Beton 60 cm tanpa Tulang M 312 M' 147,000.00 - 245,000.00 196,000.00


8 Gravel M 313 M3 294,000.00 - 441,000.00 367,500.00

9 Keran Air 1/2" Besi M 314 Buah 19,600.00 - 29,400.00 24,500.00


10 Keran Air 1/2" Plastik M 315 Buah 14,700.00 - 24,500.00 19,600.00
11 Kloset Duduk Porselin + Tangki M 316 Buah 1,960,000.00 - 2,352,000.00 2,156,000.00

12 Kloset Jongkok type CE 6 ex. Toto M 317 Buah 311,700.00 - 313,600.00 312,650.00
13 Kloset Jongkok Porselin M 318 Buah 350,000.00 - 390,000.00 370,000.00

14 Mata Kucing/ Paku Marka M 319 Buah 107,800.00 - 166,600.00 137,200.00


15 Minyak Premium/ bensin M 320 Liter 6,300.00 - 9,800.00 8,050.00

16 Minyak Pertalite M 321 Liter 7,500.00 - 11,100.00 9,300.00


17 Solar Subsidi M 322 Ltr 6,400.00 - 7,400.00 6,900.00
18 Solar Industri M 323 Ltr 8,400.00 - 9,400.00 8,900.00

19 Minyak Pelumas/ Oli M 324 Liter 48,100.00 - 58,800.00 53,450.00


20 Minyak Tanah M 325 Ltr 14,700.00 - 16,700.00 15,700.00

21 Minyak Tanah Non-Subsidi M 326 Ltr 15,700.00 - 19,600.00 17,650.00


22 Modifier M 327 Liter 2,500.00 - 3,500.00 3,000.00

23 Plastik Fiber M 328 M2 274,400.00 - 294,000.00 284,200.00


24 Soket Kran 1/2' M 329 Buah 4,500.00 - 5,400.00 4,950.00
25 Teer M 330 Kg 88,200.00 - 98,000.00 93,100.00

26 Bak Air Fibreglass M 331 Buah 371,500.00 - 411,600.00 391,550.00


27 Shower Spray M 332 Unit 210,700.00 - 294,000.00 252,350.00

28 Shower Set M 333 Unit 739,900.00 - 784,000.00 761,950.00


29 Floordrain M 334 Buah 29,400.00 - 39,200.00 34,300.00

30 Tempat Sabun M 335 Buah 58,800.00 - 68,600.00 63,700.00


31 Kran Zink M 336 Buah 303,800.00 - 343,000.00 323,400.00
32 Kitchenzink M 337 Unit 303,800.00 - 343,000.00 323,400.00

33 Kran Dinding M 338 Buah 66,700.00 - 78,400.00 72,550.00


34 Urinoir M 339 Unit 1,274,000.00 - 1,960,000.00 1,617,000.00

35 Washtaffel Keramik M 340 Bh 539,000.00 - 588,000.00 563,500.00


36 Washtaffel KIA ( Lengkap ) M 341 SET 977,600.00 - 107,800.00 542,700.00

37 Tangki Fiberglas kapasitas 1 kubik M 342 Unit 1,127,000.00 - 1,225,000.00 1,176,000.00


38 Tangki Fiberglas kapasitas 2 kubik M 343 Unit 2,058,000.00 - 2,205,000.00 2,131,500.00

39 Tangki Fiberglas kapasitas 3 kubik M 344 Unit 3,185,000.00 - 333,200.00 1,759,100.00


40 Tangki Fiberglas kapasitas 5 kubik M 345 Unit 5,096,000.00 - 5,194,000.00 5,145,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
-
41 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 M 346 M' 169,600.00 176,400.00 173,000.00
-
42 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 M 347 M' 233,300.00 245,000.00 239,150.00
-
43 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 30 x 30, K 300 M 348 M' 441,000.00 490,000.00 465,500.00
-
44 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 40 x 40, K 300 M 349 M' 641,900.00 686,000.00 663,950.00
-
45 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 M 350 M' 156,800.00 196,000.00 176,400.00
-
46 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 30 x 30 x 30, K 300 M 351 M' 161,700.00 196,000.00 178,850.00
-
47 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 M 352 M' 172,500.00 196,000.00 184,250.00
-
48 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 40 x 40 x 40, K 300 M 353 M' 245,000.00 245,000.00 245,000.00
-
49 Turap beton bertulang pre-cast K300, 15 x 60 cm M 354 M' 290,100.00 343,000.00 316,550.00

50 Kran air uk 1/2" M 355 Bh 35,300.00 - 39,200.00 37,250.00

51 Tulisan Akrilic M 356 CM2 9,800.00 - 117,600.00 63,700.00

52 Tulisan Akrilic + Lampu LED M 357 CM2 24,500.00 - 29,400.00 26,950.00

53 Tangki Air 500 Liter M 358 Buah 588,000.00 - 686,000.00 637,000.00

54 Tangki Air 1000 Liter M 359 Buah 931,000.00 - 1,176,000.00 1,053,500.00

55 Tangki Air 2000 Liter M 360 Buah 1,960,000.00 - 2,254,000.00 2,107,000.00

56 Tangki Air 1000 Liter M 361 Buah 931,000.00 - 1,176,000.00 1,053,500.00

57 Tangki Air Stainless 2 M3 M 362 Buah 3,430,000.00 - 3,920,000.00 3,675,000.00

58 Pelampung Otomatis M 363 Buah 58,800.00 - 68,600.00 63,700.00

XII ACCESSORIES PIPA


1 Repair Socket PVC RRJ dia. 10" M 364 Buah 1,164,240.00 - 1,342,440.00 1,253,340.00

2 Repair Socket PVC RRJ dia. 8" M 365 Buah 724,416.00 - 842,688.00 783,552.00

3 Repair Socket PVC RRJ dia. 6" M 366 Buah 452,760.00 - 526,680.00 489,720.00

4 Repair Socket PVC RRJ dia. 4" M 367 Buah 232,848.00 - 270,864.00 251,856.00

5 Repair Socket PVC RRJ dia. 3" M 368 Buah 155,232.00 - 180,576.00 167,904.00
6 Repair Socket PVC RRJ dia. 2" M 369 Buah 90,552.00 - 105,336.00 97,944.00
7 Tee GIP dia. 2" x 2 " M 370 Buah 72,765.00 - 84,645.00 78,705.00

8 Tee GIP dia. 3" x 2 " M 371 Buah 169,785.00 - 197,505.00 183,645.00

9 Tee GIP dia. 3" x 3 " M 372 Buah 161,700.00 - 188,100.00 174,900.00

10 Tee GIP dia. 4" x 2 " M 373 Buah 240,933.00 - 280,269.00 260,601.00

11 Tee GIP dia. 4" x 3 " M 374 Buah 240,933.00 - 280,269.00 260,601.00

12 Tee GIP dia. 4" x 4 " M 375 Buah 234,465.00 - 272,745.00 253,605.00

13 Tee GIP dia. 6" x 2 " M 376 Buah 411,600.00 - 478,800.00 445,200.00

14 Tee GIP dia. 6" x 3 " M 377 Buah 437,937.50 - 509,437.50 473,687.50

15 Tee GIP dia. 6" x 4 " M 378 Buah 441,000.00 - 513,000.00 477,000.00

16 Tee GIP dia. 6" x 6 " M 379 Buah 465,500.00 - 541,500.00 503,500.00

17 Stopkran dia. 4" M 380 Buah 1,279,900.00 - 1,372,000.00 1,325,950.00

18 Stopkran dia. 3" M 381 Buah 657,600.00 - 735,000.00 696,300.00

19 Stopkran dia. 2" M 382 Buah 238,200.00 - 294,000.00 266,100.00

20 Clampsaddle dia. 6" M 383 Buah 147,000.00 - 171,000.00 159,000.00

21 Clampsaddle dia. 4" M 384 Buah 83,300.00 - 96,900.00 90,100.00

22 Clampsaddle dia. 3" M 385 Buah 44,100.00 - 51,300.00 47,700.00

23 Clampsaddle dia. 2" M 386 Buah 34,300.00 - 39,900.00 37,100.00

24 Water Meter dia. 1/2" (ISO) M 387 Buah 220,500.00 - 256,500.00 238,500.00

25 All Flange Bend CI DN 10" x 90° M 388 Buah 1,504,300.00 - 1,617,000.00 1,560,650.00

26 All Flange Bend CI DN 8" x 90° M 389 Buah 1,072,200.00 - 1,176,000.00 1,124,100.00

27 All Flange Bend CI DN 6" x 90° M 390 Buah 789,900.00 - 882,000.00 835,950.00

28 All Flange Bend CI DN 4" x 90° M 391 Buah 553,700.00 - 637,000.00 595,350.00

29 All Flange Bend CI DN 3" x 90° M 392 Buah 388,600.00 - 441,000.00 414,800.00

30 All Flange Bend CI DN 3" x 45° M 393 Buah 389,600.00 - 441,000.00 415,300.00

31 All Flange Bend CI DN 2" x 90° M 394 Buah 311,700.00 - 323,400.00 317,550.00
HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
32 All Flange Bend CI DN 2" x 45° M 395 Buah 312,200.00 - 323,400.00 317,800.00

33 Giboult Joint 8" M 396 Buah 1,430,800.00 - 1,470,000.00 1,450,400.00

34 Giboult Joint 6" M 397 Buah 1,033,900.00 - 1,176,000.00 1,104,950.00

35 Giboult Joint 4" M 398 Buah 690,000.00 - 784,000.00 737,000.00

36 Giboult Joint 3" M 399 Buah 526,300.00 - 588,000.00 557,150.00

37 Giboult Joint 2" M 400 Buah 349,900.00 - 411,600.00 380,750.00

38 All Socket Tee PVC RRJ Ø 10" x 10" M 401 Buah 9,001,300.00 - 9,114,000.00 9,057,650.00

39 All Socket Tee PVC RRJ Ø 10" x 8" M 402 Buah 7,681,300.00 - 7,791,000.00 7,736,150.00

40 All Socket Tee PVC RRJ Ø 10" x 6" M 403 Buah 7,473,500.00 - 7,771,400.00 7,622,450.00

41 All Socket Tee PVC RRJ Ø 8" x 6" M 404 Buah 3,689,700.00 - 3,822,000.00 3,755,850.00

42 All Socket Tee PVC RRJ Ø 8" x 4" M 405 Buah 3,120,900.00 - 3,234,000.00 3,177,450.00

43 All Socket Tee PVC RRJ Ø 6" x 6" M 406 Buah 1,621,900.00 - 1,764,000.00 1,692,950.00

44 All Socket Tee PVC RRJ Ø 6" x 4" M 407 Buah 1,561,200.00 - 1,666,000.00 1,613,600.00

45 All Socket Tee PVC RRJ Ø 4" x 4" M 408 Buah 878,100.00 - 991,800.00 934,950.00

46 All Socket Tee PVC RRJ Ø 4" x 3" M 409 Buah 842,800.00 - 955,500.00 899,150.00

47 All Socket Tee PVC RRJ Ø 3" x 3" M 410 Buah 444,000.00 - 509,600.00 476,800.00

48 All Socket Tee PVC RRJØ 3" x 2" M 411 Buah 392,000.00 - 437,100.00 414,550.00

49 All Socket Tee PVC RRJ Ø 2" x 2" M 412 Buah 294,000.00 - 327,400.00 310,700.00

50 Gate valve all flange CI DN 10" M 413 Buah 13,097,700.00 - 13,230,000.00 13,163,850.00

51 Gate valve all flange CI DN 8" M 414 Buah 9,561,900.00 - 9,702,000.00 9,631,950.00

52 Gate valve all flange CI DN 6" M 415 Buah 5,478,200.00 - 5,586,000.00 5,532,100.00

53 Gate valve all flange CI DN 4" M 416 Buah 3,062,500.00 - 3,234,000.00 3,148,250.00

54 Gate valve all flange CI DN 3" M 417 Buah 2,131,500.00 - 2,254,000.00 2,192,750.00

55 Gate valve all flange CI DN 2" M 418 Buah 1,508,300.00 - 1,666,000.00 1,587,150.00

56 Kran air dia 3/4 " M 419 Buah 44,100.00 51,300.00 47,700.00

57 Kran air dia 1/2" M 420 Buah 35,280.00 41,040.00 38,160.00

58 Air Valve dia 1" M 421 Buah 830,100.00 - 862,400.00 846,250.00

59 Air Valve dia 2" M 422 Buah 1,127,000.00 1,299,500.00 1,213,250.00

60 Air Valve dia 3" M 423 Buah 2,244,200.00 - 2,352,000.00 2,298,100.00

61 Water meter DN 1/2" (SNI) M 424 Buah 388,100.00 - 446,400.00 417,250.00

62 Packing karet dia 10 " M 425 Buah 37,300.00 - 41,200.00 39,250.00

63 Packing karet dia 8 " M 426 Buah 38,220.00 ### 44,460.00 41,340.00

64 Packing karet dia 4" M 427 Buah 31,360.00 ### 36,480.00 33,920.00

65 Packing karet dia 3" M 428 Buah 25,480.00 ### 29,640.00 27,560.00

66 Packing karet dia 2" M 429 Buah 19,600.00 - 24,500.00 22,050.00

67 All Socket Bend PVC RRJ Ø 8" x 45° M 430 Buah 1,825,800.00 - 1,881,600.00 1,853,700.00

68 All Socket Bend PVC RRJ Ø 6" x 90° M 431 Buah 924,200.00 - 980,000.00 952,100.00

69 All Socket Bend PVC RRJ Ø 4" x 90° M 432 Buah 402,800.00 - 490,000.00 446,400.00

70 All Socket Bend PVC RRJ Ø 3" x 90° M 433 Buah 252,900.00 - 294,000.00 273,450.00

71 All Socket Bend PVCRRJ Ø 2" x 90° M 434 Buah 120,600.00 - 176,400.00 148,500.00

72 All Reducer PVC RRJ Ø 10" x 8" M 435 Buah 1,676,300.00 - 1,764,000.00 1,720,150.00

73 All Reducer PVCRRJ Ø 8" x 6" M 436 Buah 1,013,400.00 - 1,078,000.00 1,045,700.00

74 All Reducer PVC RRJ Ø 6" x 4" M 437 Buah 525,300.00 - 588,000.00 556,650.00

75 All Reducer PVC RRJ Ø 4" x 3" M 438 Buah 262,700.00 - 313,600.00 288,150.00

76 All Reducer PVC RRJ Ø 3" x 2" M 439 Buah 174,500.00 - 225,400.00 199,950.00

77 Flange Spigot dia 2" M 440 Buah 303,800.00 - 343,000.00 323,400.00

78 Flange Spigot dia 3" M 441 Buah 446,900.00 - 470,400.00 458,650.00

79 Flange Spigot dia 4" M 442 Buah 534,100.00 - 588,000.00 561,050.00

80 Flange Spigot dia 6" M 443 Buah 921,200.00 - 980,000.00 950,600.00

81 Flange Spigot dia 8" M 444 Buah 1,372,000.00 - 1,470,000.00 1,421,000.00

82 Flange Lass dia 2" M 445 Buah 149,000.00 - 196,000.00 172,500.00

83 Flange Lass dia 3" M 446 Buah 200,900.00 - 245,000.00 222,950.00

84 Flange Lass dia 4" M 447 Buah 224,500.00 - 264,600.00 244,550.00

85 Flange Lass dia 6" M 448 Buah 404,800.00 - 441,000.00 422,900.00

86 Flange Lass dia 8" M 449 Buah 547,900.00 - 588,000.00 567,950.00


HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
87 Flange Lass dia 10" M 450 Buah 666,400.00 - 705,600.00 686,000.00

88 Mur Baut 3/4"x 3" M 451 Buah 8,900.00 - 11,800.00 10,350.00


HARGA SATUAN
NO URAIAN KODE SATUAN (Rp.) HARGA TENGAH
MANDOR
1 2 3 4 9
89 Dop PVC RRJ 8" M 452 Buah 984,000.00 - 1,078,000.00 1,031,000.00

90 Dop PVC RRJ 6" M 453 Buah 592,900.00 - 686,000.00 639,450.00

91 Dop PVC RRJ 4" M 454 Buah 260,700.00 - 294,000.00 277,350.00

92 Dop PVC RRJ 3" M 455 Buah 155,900.00 - 196,000.00 175,950.00

93 Dop PVC RRJ 2" M 456 Buah 77,500.00 - 117,600.00 97,550.00

94 Reducer GIP d 3" x 2" M 457 Buah 83,300.00 - 96,900.00 90,100.00

95 Reducer GIP di 4" x 2 " M 458 Buah 142,100.00 - 165,300.00 153,700.00

96 Reducer GIP di 4" x 3 " M 459 Buah 191,100.00 - 222,300.00 206,700.00

97 Reducer GIP di 6" x 4 " M 460 Buah 264,600.00 - 307,800.00 286,200.00

98 Stop Kran Brass/Kuningan dia. 1/2" M 461 Buah 83,300.00 - 96,900.00 90,100.00

99 Double Nipple CI dia. 1/2" M 462 Buah 7,350.00 - 8,550.00 7,950.00

100 Elbow PVC AW dia. 1/2" M 463 Buah 2,940.00 - 3,420.00 3,180.00

101 Tee PVC AW dia. 1/2"x1/2" M 464 Buah 3,430.00 - 3,990.00 3,710.00

102 Knie Drat Dalam (KDD) PVC AW dia. 1/2" M 465 Buah 3,136.00 - 3,648.00 3,392.00

103 Socket Drat Luar (SDL) PVC AW dia. 1/2" M 466 Buah 3,430.00 - 3,990.00 3,710.00

104 Seal Tipe 10 m M 467 Buah 4,900.00 - 5,700.00 5,300.00

105 Box Meteran M 468 Buah 78,400.00 - 91,200.00 84,800.00

106 Mur Baut 5/8 x 3" M 469 Buah 6,370.00 - 7,410.00 6,890.00

107 Lem PVC M 470 Kaleng 78,400.00 - 91,200.00 84,800.00


108 Saringan Pipa PVC 8" M 471 Buah 1,470,000.00 - 1,695,000.00 1,582,500.00
109 Saringan Pipa PVC 6" M 472 Buah 1,225,000.00 - 1,412,500.00 1,318,750.00
110 Saringan Pipa PVC 4" M 473 Buah 980,000.00 - 1,130,000.00 1,055,000.00
111 Saringan Pipa PVC 3" M 474 Buah 833,000.00 - 969,000.00 901,000.00
112 Saringan Pipa PVC 2" M 475 Buah 490,000.00 - 570,000.00 530,000.00

XIII PERALATAN ELEKTRIKAL


1 Box panel PVC isi 4 MCB M 476 Buah 169,600.00 - 205,800.00 187,700.00
2 MCB 6 A M 477 Buah 34,300.00 - 49,000.00 41,650.00
3 MCB 4 A M 478 Buah 3,000.00 - 4,900.00 3,950.00
4 Kabel NYM 2 x 2,5 mm2 M 479 M' 11,300.00 - 13,800.00 12,550.00
5 Kabel NYM 3 x 2,5 mm2 M 480 M' 14,300.00 - 17,700.00 16,000.00
6 Kabel telephone 4 x 0.5 mm M 481 M' 25,500.00 - 29,400.00 27,450.00
7 Isolasi M 482 Buah 9,800.00 - 12,800.00 11,300.00
8 Saklar tunggal M 483 Buah 16,700.00 - 19,600.00 18,150.00
9 Saklar ganda M 484 Buah 20,600.00 - 23,600.00 22,100.00
10 Stop kontak M 485 Buah 22,600.00 - 25,500.00 24,050.00
11 Outlet TV M 486 Buah 50,000.00 - 53,900.00 51,950.00
12 Outlet Telephone M 487 Buah 50,000.00 - 53,900.00 51,950.00
13 Down light / PLC 13 W M 488 Buah 211,700.00 - 245,000.00 228,350.00
14 Fitting plafond + lampu SL M 489 Buah 94,100.00 - 98,000.00 96,050.00
15 Lampu TL 2 x 18 watt grille M 490 Buah 255,800.00 - 274,400.00 265,100.00
16 Lampu TL 2 x 36 watt grille M 491 Buah 378,300.00 - 392,000.00 385,150.00

Kepala Dinas Pekerjaan Umum dan Penataaan Ruang


Kabupaten Landak,

Erani, ST. MT
Pembina TK. I
NIP. 19721212 200003 1 006
ITEM PEMBAYARAN NO. : 6.6.(1) Analisa EI-661
JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan tenaga manual dan alat berat (cara semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Material diterima dilokasi pekerjaan
4 Kondisi existing jalan : sedang
5 Jarak rata-rata Quary/AMP ke lokasi pekerjaan L 15.00 KM
6 Tebal rata2 Lapen t 0.050 M Rencana
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Faktor kehilangan - Agregat Fh1 1.05 - Tabel A.3
Fator kehilangan - Aspal Fh2 1.02 - Tabel A.3
9 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 128.50 Kg/M2 Tabel 6.7.3.1
- Agregat Pengunci Ap1 25.00 Kg/M2 Tabel 6.7.3.1
- Agregat Penutup Ap2 14.00 Kg/M2 Tabel 6.7.3.1
- Aspal : - Paska Agregat Pokok As1 3.70 Kg/M2 Tabel 6.7.3.1
- Paska Agregat Pengunci As2 1.50 Kg/M2 Tabel 6.7.3.1
As 104.00 Kg/M3
10 Berat isi bahan :
- Agregat D1 1.41 ton / M3 Tabel A.2.a
- aspal D2 -

II. URUTAN KERJA


1 Permukaan dasar dibersihkan dan disemprot aspal cair
3 Agregat Pokok ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Whell
Roller (6-8 Ton) minimum 6 lintasan
4 Aspal disemprotkan di atas agregat kasar yang telah
diratakan menggunakan cara manual
5 Agregat Pengunci ditebarkan dan dipadatkan dengan
cara yang sama dengan pemadatan agregat pokok
disusul dengan penebaran agregat penutup.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Agregat Pokok = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.9138 M3
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M04) 0.3723 M3
1.c. Agregat Penutup = {(Ap2/1000 : t M3) x Fh1} : D1 (M04) 0.2085 M3
1.d. Aspal = {((As1+As2) : t M3) x Fh2} (M10) 106.08 Kg
1.e. Kayu
1 Bakar 150
m3 untuk : Kg
Aspal = (As1+As2)/150 - 0.035 M3

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. 6.6.(1) Analisa EI-661
JENIS PEKERJAAN Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2. ALAT
2.c. THREE WHEEL ROLLER (E16)
Kecepatan rata-rata alat v 1.50 Km / Jam
Lebar efektif pemadatan b 1.70 M
Jumlah lintasan n 6.00 lintasan
Lajur lintasan N 3.00
Lebar Overlap bo 0.30 M
Faktor Efisiensi alat Fa 0.83 -

Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q3 46.6875 M3


n

Koefisien Alat / M3 = 1 : Q3 (E16) 0.0214 Jam

2.e. ALAT BANTU


diperlukan setiap : 75.00 M3 pekerjaan Lump Sum
- Kereta dorong = 3 buah
- Sekop = 5 buah
- Sapu = 5 buah
- Sikat = 3 buah
- Karung = 5 buah
- Cerek Aspal = 3 buah
- Kaleng Aspal = 3 buah

3. TENAGA
Produksi menentukan (Three Wheel Roller) Q1 46.69 M3/Jam
Produksi Lapen / Hari = Q1 x Tk Qt 326.81 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.0643 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0214 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. 6.6.(1) Analisa EI-661
JENIS PEKERJAAN Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. #REF! / M3.

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 1.00 M3
Analisa EI-661

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :

PROP / KAB / KODYA :


ITEM PEMBAYARAN NO. : 6.6.(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam TOTAL HARGA : 1,107,484.67
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.07

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0643 #REF! #REF!


2. Mandor (L03) Jam 0.0214 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Agregat Pokok M3 1.9138 #REF! #REF!


2. Agregat Pengunci M3 0.3723 #REF! #REF!
3. Agregat Penutup M3 0.2085 #REF! #REF!
4 Aspal Kg 106.0800 #REF! #REF!
5 Kayu Bakar M3 0.035 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN

1 Tandem Roller Jam 0.1212 #REF! #REF!


2. Alat Bantu Ls 1.00 7,500.00 7,500.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : SKh-1.5.9 (1) PERKIRAAN VOL. PEK. : 0.00


JENIS PEKERJAAN : Perkerasan Telford TOTAL HARGA : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA KERJA

1. Pekerja Jam 2.5000 #REF! #REF!


2. Tukang Jam 0.8333 #REF! #REF!
3. Mandor Jam 0.8333 #REF! #REF!

Sub Jumlah #REF!

B. BAHAN

1. Batu Belah Uk. 20/25 cm M3 0.1915 #REF! #REF!


2. Batu Belah Uk. 10/15 cm M3 0.9574 #REF! #REF!
3. Batu Pecah Uk. 5/7 cm M3 0.3351 #REF! #REF!

Sub Jumlah #REF!

C. PERALATAN

1. Tandem Roller Jam 0.1212 #REF! #REF!


2. Alat bantu Ls 1.0000 7,500.00 7,500.00

Sub Jumlah #REF!


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!
E. OVERHEAD & PROFIT 15.00 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note :
1 SATUAN bisa didasarkan jam kerja untuk Tenaga dan Alat dan ukuran volume dan/atau ukuran berat untuk
Material. PERKIRAAN KUANTITAS adalah kuantitas masing-masing KOMPONEN untuk melengkapi satu
satuan pengukuran dari Mata Pembayarannya.
2 Komponen Peralatan sudah termasuk bahan bakar, pelumas dan operator.
3 HARGA SATUAN sudah termasuk pajak-pajak (kecuali PPn) dan bea, yang bisa dibayarkan di dalam
Kontrak

File : 612843410.xlsx
URAIAN ANALISA HARGA SATUAN

ITEM PEMBAYARAN NO. : SKh-1.5.9 (1)


JENIS PEKERJAAN : Perkerasan Telford
SATUAN PEMBAYARAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan tenaga manusia dan alat berat (cara semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Material diterima di lapangan
4 Tebal rata2 Telford t 0.15 M
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Faktor kehilangan material
- Batu Belah = Fh 1.06 -
7 Faktor Kembang Susut Material
- Batu Belah = Fk 1.40
7 Komposisi material Telford (spesifikasi) :
Batu Belah Uk. 20/25 cm = A1 12.90 % Tabel SKh - 1.5.9(4)
Batu Belah Uk. 10/15 cm = A2 64.52 % Tabel SKh - 1.5.9(4)
Batu Pecah Uk. 5/7 cm = A3 22.58 % Tabel SKh - 1.5.9(4)
A4 100.00 %

II. METHODE PELAKSANAAN


1 Permukaan tanah dasar dibersihkan dan diratakan secara manual
2 Batu Belah 20-25 cm dipasang sebagai batu tepi dan di susun berdiri
di atas permukaan tanah, kemudian batu belah 10/15 cm -
15/20 cm di pasang sebagai batu pokok yang disusun berdiri diantara batu
tepi sebelah kanan dan kiri.
4 Batu pecah Uk 5/7 cm di isikan di antara celah-celah Batu
Belah 10/15 cm - 20/25 cm , kemudian di padatkan dengan Three Whell Roller

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Batu Belah Uk. 20/25 cm = A1 x 1, M3 x Fk x Fh Ag1 0.1915 M3
Batu Belah Uk. 10/15 cm = A2 x 1, M3 x Fk x Fh Ag2 0.9574 M3
Batu Pecah Uk. 5/7 cm = A3 x 1, M3 x Fk x Fh Ag2 0.3351 M3
1.4840 M3

2. ALAT
2.a. THREE WHELL ROLLER
Kecepatan rata-rata alat v 1.50 Km / Jam
Lebar efektif pemadatan b 1.70 M
Jumlah lintasan n 6.00 lintasan
Faktor Efisiensi alat Fa 0.83 -

Kap. Prod. / jam = (v x 1000) x b x t x Fa Q1 52.91 M3


n

Koefisien Alat / M3 = 1 : Q1 0.0189 Jam

Bersambung

File : 612843410.xlsx
URAIAN ANALISA HARGA SATUAN

ITEM PEMBAYARAN NO. : SKh-1.5.9 (1)


JENIS PEKERJAAN : Perkerasan Telford
SATUAN PEMBAYARAN : M3
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. ALAT BANTU


diperlukan peralatan / group : Lump Sum
- gerobak dorong = 3 Buah
- cangkul = 3 Buah
- sekop = 2 Buah
- pongki = 2 Buah
- penggaruk = 2 Buah
- dll

3. TENAGA
Produksi yang menentukan : Three Well Roller Q1 52.91 M3/Jam
Produksi Tenaga Kerja / Jam 1.0 group Qtk 1.20 M3/Jam
Produksi Tenaga Kerja / hari = Tk x Qtk Qt 8.40 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt 2.5000 Jam
- Tukang = (Tk X T) / Qt 0.8333 Jam
- Mandor = (Tk x M) / Qt 0.8333 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. #REF! / M3.

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : Hari

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3

File : 612843410.xlsx
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E06
2. Tenaga Pw 8.0 HP
3. Kapasitas Cp 300.0 Liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200 Jam
c. Harga Alat B 13,250,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 1,325,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.55363 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 5,501.68 Rupiah
W

b. Asuransi, dll = 0.002 x B F 22.08 Rupiah


W

Biaya Pasti per Jam = (E+F) G 5,523.77 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H #REF! Rupiah


M.184
2. Pelumas = (2.5%-3%) x Pw x Mp I #REF! Rupiah M.185

Biaya bengkel (6.25% dan 8.75%) x B J 690 Rupiah M.064


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,932.29 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 7.07 % / Tahun
2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E03
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 1,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.38154 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E #REF! Rupiah
W

b. Asuransi, dll = 0.002 x B F #REF! Rupiah


W

Biaya Pasti per Jam = (E+F) G #REF! Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H #REF! Rupiah


M.184
2. Pelumas = (2.5%-3%) x Pw x Mp I #REF! Rupiah M.185

Biaya bengkel (6.25% dan 8.75%) x B J #REF! Rupiah M.064


W

3. Perawatan dan (12,5 % - 17,5 %) x B K #REF! Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 7.07 % / Tahun
2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 400-6500 L/M E05
2. Tenaga Pw 75.0 HP
3. Kapasitas Cp 5,000.0 (L/m)
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24435 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E #REF! Rupiah
W

b. Asuransi, dll = 0.002 x B F #REF! Rupiah


W

Biaya Pasti per Jam = (E+F) G #REF! Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H #REF! Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I #REF! Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J #REF! Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K #REF! Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 7.07 % / Tahun
2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0 - 1.6 M3 E15
2. Tenaga Pw 96.0 HP
3. Kapasitas Cp 1.6 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24435 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E #REF! Rupiah
W

b. Asuransi, dll = 0.002 x B F #REF! Rupiah


W

Biaya Pasti per Jam = (E+F) G #REF! Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H #REF! Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I #REF! Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J #REF! Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K #REF! Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 7.07 % / Tahun
2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT E01
2. Tenaga Pw 294.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.14284 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E #REF! Rupiah
W

b. Asuransi, dll = 0.002 x B F #REF! Rupiah


W

Biaya Pasti per Jam = (E+F) G #REF! Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H #REF! Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I #REF! Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J #REF! Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K #REF! Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 7.07 % / Tahun
2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E01
2. Tenaga Pw 15.0 KVA
3. Kapasitas Cp 120.0 L
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24435 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E #REF! Rupiah
W

b. Asuransi, dll = 0.002 x B F #REF! Rupiah


W

Biaya Pasti per Jam = (E+F) G #REF! Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H #REF! Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I #REF! Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J #REF! Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K #REF! Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 7.07 % / Tahun
2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3.5 TON E08
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 3.5 TON
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24435 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E #REF! Rupiah
W

b. Asuransi, dll = 0.002 x B F #REF! Rupiah


W

Biaya Pasti per Jam = (E+F) G #REF! Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H #REF! Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I #REF! Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J #REF! Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K #REF! Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 7.07 % / Tahun
2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T. E17
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 8.1 TON
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24435 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E #REF! Rupiah
W

b. Asuransi, dll = 0.002 x B F #REF! Rupiah


W

Biaya Pasti per Jam = (E+F) G #REF! Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H #REF! Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I #REF! Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J #REF! Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K #REF! Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 7.07 % / Tahun
2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP E10
2. Tenaga Pw 133.0 HP
3. Kapasitas Cp 0.93 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24435 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E #REF! Rupiah
W

b. Asuransi, dll = 0.002 x B F #REF! Rupiah


W

Biaya Pasti per Jam = (E+F) G #REF! Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H #REF! Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I #REF! Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J #REF! Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K #REF! Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L #REF! Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M #REF! Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 7.07 % / Tahun
2. Upah Operator / Sopir U1 #REF! Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 #REF! Rp./Jam
4. Bahan Bakar Bensin Mb #REF! Liter
5. Bahan Bakar Solar Ms #REF! Liter
6. Minyak Pelumas Mp #REF! Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
HARGA BIAYA SEWA
NO URAIAN KODE HP KAP. ALAT/JAM KET.
ALAT
(di luar PPN)
1 ASPHALT MIXING PLANT E01 125 30 T/Jam 1,428,000,000 2,506,660 Usia 5 th.
2 ASPHALT PAVER/FINISHER E02 51 10 Ton 2,165,550,000 381,310 Alat Baru
3 ASPHALT SPRAYER E03 4 850 Liter 351,080,000 92,500 Alat Baru
4 BULLDOZER 100-150 HP E04 155 5.5 M3 2,418,000,000 773,620 Alat Baru
5 AIRCOMPRESSOR E05 70 5000 Ltr/Mnt 616,070,000 259,810 Alat Baru
6 CONCRETE MIXER 0.3-0.6 M3 E06 20 350 Liter 25,410,000 68,480 Alat Baru
7 CRANE 10-15 TON E07 150 25 Ton 3,279,620,000 783,960 Alat Baru
8 DUMP TRUCK 3-4 M3 E08 100 3.5 Ton 362,100,000 224,800 Alat Baru
9 DUMP TRUCK E09 190 10 Ton 671,620,000 389,520 Alat Baru
10 EXCAVATOR 80-140 HP E10 133 0.93 M3 1,425,000,000 401,760 Alat Baru
11 FLAT BED TRUCK 3-4 M3 E11 100 10 M3 347,260,000 227,720 Alat Baru
12 GENERATOR SET E12 180 135 KVA 732,760,000 353,230 Alat Baru
13 GENERATOR ( silent ) E13 180 150 KVA 355,750,000 Alat Baru
14 GENERATOR ( open ) E14 180 150 KVA 309,202,300 Alat Baru
15 MOTOR GRADER >100 HP E15 135 2.6 M 2,085,000,000 446,910 Alat Baru
16 TRACK LOADER 75-100 HP E16 70 0.8 M3 504,024,763 203,760 Alat Baru
17 WHEEL LOADER 1.0-1.6 M3 E17 96 1.5 M3 1,250,000,000 490,590 Alat Baru
18 THREE WHEEL ROLLER 6-8 T E18 55 8 Ton 1,260,440,000 321,810 Alat Baru
19 TANDEM ROLLER 6-8 T. E19 82 8.1 Ton 815,000,000 227,840 Alat Baru
20 PNEUMATIC TIRED ROLLERS E20 100.5 9 Ton 1,227,470,000 375,160 Alat Baru
21 VIBRATORY ROLLER 5-8 T. E21 132 9.5 Ton 875,000,000 313,130 Alat Baru
22 CONCRETE VIBRATOR E22 10 3 20,000,000 58,860 Alat Baru
23 STONE CRUSHER E23 220 50 T/Jam 2,237,187,500 708,210 Alat Baru
24 WATER PUMP 70-100 mm E24 6 4.5 Ltr/Mnt 9,450,000 49,430 Alat Baru
25 WATER TANKER 250 L. E25 0 4000 Liter 3,500,000 43,000 Alat Baru
26 PEDESTRIAN ROLLER E26 8.8 0.83 Ton 242,055,000 84,730 Alat Baru
27 TAMPER E27 4.7 0.121 Ton 20,000,000 51,480 Alat Baru
28 JACK HAMMER E28 3 0.068 Ton 27,721,000 53,130 Alat Baru
29 FULVI MIXER E29 345 2.005 m 46,000,000 475,840 Alat Baru
30 CONCRETE PUMP E30 100 8 M3/jam 112,500,000 180,560 Alat Baru
31 TRAILER 20 TON E31 175 20 Ton 375,000,000 314,580 Alat Baru
32 PILE DRIVER + HAMMER E32 25 2.5 Ton 606,055,000 173,020 Alat Baru
33 CRANE ON TRACK 35 TON E33 125 35 Ton 500,000,000 271,740 Alat Baru
34 WELDING SET E34 40 250 Amp 54,967,000 97,820 Alat Baru
35 BORE PILE MACHINE E35 150 2000 Meter 2,250,000,000 574,120 Alat Baru
36 ASPHALT LIQUID MIXER E36 150 1000 Liter 1,071,428,571 510,600 Usia 2 th.
37 TRAILLER 15 TON E37 150 15 Ton 115,000,000 254,270 Alat Baru
38 ROCK DRILL BREAKER E38 131 1.31 Ton 27,721,250 78,100 Alat Baru
39 COLD MILLING E39 248 315 mm 2,646,243,000 331,450 Alat Baru
40 PONTON E40 Alat Baru
41 TAKBOOT E41 Alat Baru
42 TRUK MIXER (AGITATOR) E42 220 5 M3 Alat Baru
43 VIBRATING RAMMER E43 4.2 0.8 Ton Alat Baru
44 WATER TANKER TRUCK E44 100 4000 Liter Alat Baru
45 SPLIT FORM PAVER E45 105 2.5 Meter Alat Baru
46 TRONTON E46 150 15 Ton 322,254,000 568,113
47 COLD RECYCLER E47 900 2200 M 12,701,163,000 4,958,512
48 HOT RECYCLER E48 400 3M 3,675,600,000 1,796,606
49 AGGREGAT (CHIP) SPREADER E49 115 3.5 M 432,000,000 609,865
50 ASPHALT DISTRIBUTOR E50 115 4000 Liter 540,000,000 448,264
51 SLIP FORM PAVER E51 105 2.5 M 1,455,000,000 610,181
52 CONCRETE PAN MIXER E52 134 600 Liter 817,000,000 659,744
53 CONCRETE BREAKER E53 290 20 m3/jam 483,000,000 828,260
54 ASPAHLT TANKER E54 190 4000 liter 378,000,000 578,825
55 CEMENT TANKER E55 190 4000 liter 372,000,000 543,562
56 CONDRETE MIXER (350) E56 20 350 liter 46,000,000 100,439
57 BORE PILE MACHINE E57 125 60 CM 5,260,150,000 1,822,982
58 CRANE ON TRACK 75-100 TON E58 200 75 Ton 6,112,000,000 1,868,739
59 BLENDING EQUIPMENT E59 50 30 Ton 755,000,000 294,701
60 ASPHALT LIQUID MIXER E60 40 20000 Liter 188,600,000 175,230
61 BAR BENDER E61 3 00 100 32,217
62 BAR CUTTER E62 3 00 1 32,217
63 BREAKER E63 80 3 m3/jam 1 218,279
64 GROUTING PUMP E64 100 15 Ton 1 263,179
65 JACK HIDROLIC E65 3 150 Ton 1 45,414
66 MESIN LAS E66 3 0.17 Ton 100 46,914
67 PILE DRIVER LEADER, 75 kw E67 70 75 kw 1 195,829
68 PILE HAMMER E68 10 00 1 66,129
69 PILE HAMMER, 2,5 Ton E69 1 2.5 Ton 1 40,924
70 STRESSING JACK E70 89 15 Ton 1 238,484
71 WELDING MACHINE, 300 A E71 5 00 1 49,904
72 SONDIR (CPT) max 20 m / qc E72 150 kg/cm² 1,500,000
73 BOR MESIN max 40 m / N SPT E73 50 15,000,000
74 HAND BORING E74 600,000
75 DCP E75 300,000
HARGA BIAYA SEWA
NO URAIAN KODE HP KAP. ALAT/JAM KET.
ALAT
(di luar PPN)
76 SAND CONE E76 300,000

Ditetapkan di Ngabang
pada tanggal 2018
Kepala Dinas Pekerjaan Umum dan Penataaan Ruang
Kabupaten Landak,

Erani, ST. MT
Pembina TK. I
NIP. 19721212 200003 1 006
DATA PENDUKUNG KUANTITAS

SATUAN KERJA : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN PROVINSI KALIMANTAN BARAT
PROGRAM : PENGEMBANGAN KAWASAN PERMUKIMAN PERKOTAAN DAN PEDESAAN
KEGIATAN :
PENGEMBANGAN / PENINGKATAN INFRASTRUKTUR KAWASAN PERMUKIMAN PERKOTAAN

PEKERJAAN :
PENINGKATAN JALAN LINGKUNGAN JL. H. RAIS A. RAHMAN GG. PANTI JAYA KEL. SUNGAI JAWI

LOKASI : KOTA PONTIANAK


NILAI KONTRAK : Rp. 89.700.000,00
WAKTU PELAKSANAAN : 30 (TIGA PULUH) HARI KALENDER
SUMBER DANA : APBD PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN : 2020
ITEM : BACK UP DATA

Panjang Lebar Tebal (m) Volume Keterangan


No. Uraian
(m) (m) Kiri Kanan Total (m) (Sketsa Gambar)

1 0 ± 000 - 0 ± 025 25.00 3.72 0.023 0.017 0.02 92.88

2 0 ± 025 - 0 ± 050 25.00 3.70 0.025 0.021 0.0230 92.50

3 0 ± 050 - 0 ± 075 25.00 3.83 0.028 0.021 0.0245 95.63

4 0 ± 075 - 0 ± 100 25.00 3.88 0.023 0.028 0.0255 96.88

5 0 ± 100 - 0 ± 101,6 1.60 3.90 0.026 0.022 0.0240 6.24

6 0 ± 101,6 - 0 ± 114,6 13.00 5.85 0.210 0.025 0.1175 76.05

0 ± 114,6 0 ± 118,2 3.60 5.00 0.210 0.025 0.1175 18.00

7 0 ± 118,2 - 0 ± 125 6.80 6.05 0.020 0.025 0.0225 41.14

8 0 ± 125 - 0 ± 146,5 21.50 6.13 0.020 0.0255 0.0230 131.69

TOTAL 650.99

Diperiksa / Diketahui / Disetujui Dibuat Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. GLOBAL KHATULISTIWA KONSULTAN CV.PRIMA SEJAHTERA GROUP

(KURNIAWAN RUSNIAR, ST) (SUARMADJAT)


DATA PENDUKUNG DOKUMENTASI

SATUAN KERJA : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN PROVINSI KALIMANTAN BARAT
PROGRAM : PENGEMBANGAN KAWASAN PERMUKIMAN PERKOTAAN DAN PEDESAAN
KEGIATAN :
PENGEMBANGAN / PENINGKATAN INFRASTRUKTUR KAWASAN PERMUKIMAN PERKOTAAN

PEKERJAAN :
PENINGKATAN JALAN LINGKUNGAN JL. H. RAIS A. RAHMAN GG. PANTI JAYA KEL. SUNGAI JAWI

LOKASI : KOTA PONTIANAK


NILAI KONTRAK : Rp. 89.700.000,00
WAKTU PELAKSANAAN : 25 (DUA PULUH LIMA HARI) HARI KALENDER
SUMBER DANA : APBD PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN : 2020
ITEM : PAPAN NAMA PROYEK

Diperiksa / Diketahui / Disetujui Dibuat Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. GLOBAL KHATULISTIWA KONSULTAN CV.PRIMA SEJAHTERA GROUP

(KURNIAWAN RUSNIAR, ST) (SUARMADJAT)


DATA PENDUKUNG DOKUMENTASI

SATUAN KERJA : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN PROVINSI KALIMANTAN BARAT
PROGRAM : PENGEMBANGAN KAWASAN PERMUKIMAN PERKOTAAN DAN PEDESAAN
KEGIATAN :
PENGEMBANGAN / PENINGKATAN INFRASTRUKTUR KAWASAN PERMUKIMAN PERKOTAAN

PEKERJAAN :
PENINGKATAN JALAN LINGKUNGAN JL. H. RAIS A. RAHMAN GG. PANTI JAYA KEL. SUNGAI JAWI

LOKASI : KOTA PONTIANAK


NILAI KONTRAK : Rp. 89.700.000,00
WAKTU PELAKSANAAN : 25 (DUA PULUH LIMA HARI) HARI KALENDER
SUMBER DANA : APBD PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN : 2020
ITEM : PEKERJAAN STA 0 + 000 - STA 0 + 075

KONDISI 0 KONDISI 50 KONDISI 100

STA 0+000

STA 0+025

STA 0+050

STA 0+075
DATA PENDUKUNG DOKUMENTASI

SATUAN KERJA : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN PROVINSI KALIMANTAN BARAT
PROGRAM : PENGEMBANGAN KAWASAN PERMUKIMAN PERKOTAAN DAN PEDESAAN
KEGIATAN :
PENGEMBANGAN / PENINGKATAN INFRASTRUKTUR KAWASAN PERMUKIMAN PERKOTAAN

PEKERJAAN :
PENINGKATAN JALAN LINGKUNGAN JL. H. RAIS A. RAHMAN GG. PANTI JAYA KEL. SUNGAI JAWI

LOKASI : KOTA PONTIANAK


NILAI KONTRAK : Rp. 89.700.000,00
WAKTU PELAKSANAAN : 25 (DUA PULUH LIMA HARI) HARI KALENDER
SUMBER DANA : APBD PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN : 2020
ITEM : PEKERJAAN STA 0 + 100 - STA 0 + 175

KONDISI 0 KONDISI 50 KONDISI 100

STA 0+ 100

STA 0+125

STA 0+146,5

Diperiksa / Diketahui / Disetujui Dibuat Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. GLOBAL KHATULISTIWA KONSULTAN CV.PRIMA SEJAHTERA GROUP

(KURNIAWAN RUSNIAR, ST) (SUARMADJAT)


DATA PENDUKUNG DOKUMENTASI

SATUAN KERJA : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN PROVINSI KALIMANTAN BARAT
PROGRAM : PENGEMBANGAN KAWASAN PERMUKIMAN PERKOTAAN DAN PEDESAAN
KEGIATAN :
PENGEMBANGAN / PENINGKATAN INFRASTRUKTUR KAWASAN PERMUKIMAN PERKOTAAN

PEKERJAAN :
PENINGKATAN JALAN LINGKUNGAN JL. H. RAIS A. RAHMAN GG. PANTI JAYA KEL. SUNGAI JAWI

LOKASI : KOTA PONTIANAK


NILAI KONTRAK : Rp. 89.700.000,00
WAKTU PELAKSANAAN : 25 (DUA PULUH LIMA HARI) HARI KALENDER
SUMBER DANA : APBD PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN : 2020
ITEM : PEKERJAAN STA 0 + 000 - STA 0 + 075

KONDISI 0 KONDISI 100

STA 0+00 STA 0+00


L = 3,80 m L = 3,80 m

STA 0+025 STA 0+025


L = 3,6 m L = 3,6 m

STA 0+050 STA 0+050


L = 3,8 m L = 3,8 m

STA 0+075 STA 0+075


L = 3,8 m L = 3,8 m
DATA PENDUKUNG DOKUMENTASI

SATUAN KERJA : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN PROVINSI KALIMANTAN BARAT
PROGRAM : PENGEMBANGAN KAWASAN PERMUKIMAN PERKOTAAN DAN PEDESAAN
KEGIATAN :
PENGEMBANGAN / PENINGKATAN INFRASTRUKTUR KAWASAN PERMUKIMAN PERKOTAAN

PEKERJAAN :
PENINGKATAN JALAN LINGKUNGAN JL. H. RAIS A. RAHMAN GG. PANTI JAYA KEL. SUNGAI JAWI

LOKASI : KOTA PONTIANAK


NILAI KONTRAK : Rp. 89.700.000,00
WAKTU PELAKSANAAN : 25 (DUA PULUH LIMA HARI) HARI KALENDER
SUMBER DANA : APBD PROVINSI KALIMANTAN BARAT
TAHUN ANGGARAN : 2020
ITEM : PEKERJAAN STA 0 + 100 - 0 + 146,5

KONDISI 0 KONDISI 100

STA 0+ 100 STA 0+ 100


L = 3,80 m L = 3,80 m

STA 0 + 125 STA 0 + 125


L = 6,05 m L = 6,05 m

STA 0+146,5 STA 0+146,5


L = 6,20 m L = 6,20 m

Diperiksa / Diketahui / Disetujui Dibuat Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. GLOBAL KHATULISTIWA KONSULTAN CV.PRIMA SEJAHTERA GROUP

(KURNIAWAN RUSNIAR, ST) (SUARMADJAT)


PERHITUNGAN VOLUME

2 4 2
3 3

LAPIS PENETRASI MACADAM


POSISI Panjang
NO STATION (STA) Lebar Tinggi Volume
Ki-Ka m m m m3

1 0+000 - 0+025 Full 25 3 0.06 4.500


2 0+025 - 0+050 Full 25 3 0.06 4.500
3 0+050 - 0+075 Full 25 3 0.06 4.500
4 0+075 - 0+100 Full 25 3 0.06 4.500
5 0+100 - 0+125 Full 25 3 0.06 4.500
6 0+125 - 0+150 Full 25 3 0.06 4.500
7 0+150 - 0+175 Full 25 3 0.06 4.500
8 0+175 - 0+200 Full 25 3 0.06 4.500
9 0+200 - 0+225 Full 25 3 0.06 4.500
10 0+225 - 0+250 Full 25 3 0.06 4.500
11 0+250 - 0+275 Full 25 3 0.06 4.500
12 0+275 - 0+300 Full 25 3 0.06 4.500
13 0+300 - 0+325 Full 25 3 0.06 4.500
14 0+325 - 0+350 Full 25 3 0.06 4.500
15 0+350 - 0+375 Full 25 3 0.06 4.500
16 0+375 - 0+400 Full 25 3 0.06 4.500
17 0+400 - 0+425 Full 25 3 0.06 4.500
18 0+425 - 0+450 Full 25 3 0.06 4.500
19 0+450 - 0+475 Full 25 3 0.06 4.500
20 0+475 - 0+500 Full 25 3 0.06 4.500
21 0+500 - 0+525 Full 25 3 0.06 4.500
22 0+525 - 0+550 Full 25 3 0.06 4.500
23 0+550 - 0+575 Full 25 3 0.06 4.500
24 0+575 - 0+600 Full 25 3 0.06 4.500
25 0+600 - 0+625 Full 25 3 0.06 4.500
26 0+625 - 0+650 Full 25 3 0.06 4.500
27 0+650 - 0+675 Full 25 3 0.06 4.500
28 0+675 - 0+700 Full 25 3 0.06 4.500
29 0+700 - 0+725 Full 25 3 0.06 4.500
30 0+725 - 0+750 Full 25 3 0.06 4.500
31 0+750 - 0+775 Full 25 3 0.06 4.500
32 0+775 - 0+800 Full 25 3 0.06 4.500
33 0+800 - 0+825 Full 25 3 0.06 4.500
34 0+825 - 0+850 Full 25 3 0.06 4.500
35 0+850 - 0+873 Full 23 3 0.06 4.124
36 0+873 - 0+873 Full 3 0.06 0.000
37 0+873 - 0+873 Full 3 0.06 0.000
38 0+873 - 0+873 Full 3 0.06 0.000
39 0+873 - 0+873 Full 3 0.06 0.000
40 0+873 - 0+873 Full 3 0.06 0.000

873 157.12
TOTAL
M M3
PERHITUNGAN VOLUME

1 1=R
2 4 2 a
2=bK
3 3 a
3=Unt
Bsr
eut
4=U
t
ri
g
ona
u
nn
g
aP
na SAND SHEET LAPIS PEREKAT TIMBUNAN BAHU JALAN
POSISI Panjang s
NO STATION (STA) Lebar
ir Tebal Volume Lebar Koef. Volume Lebar Tinggi Sisi Volume
P
Ki-Ka m K
am m m Liter m m m3
sa
ni
rs
1 0+000 - 0+025 Full 25 2.5
ti 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
2 0+025 - 0+050 Full 25 2.5n 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
3 0+050 - 0+075 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
4 0+075 - 0+100 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
5 0+100 - 0+125 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
6 0+125 - 0+150 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
7 0+150 - 0+175 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
8 0+175 - 0+200 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
9 0+200 - 0+225 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
10 0+225 - 0+250 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
11 0+250 - 0+275 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
12 0+275 - 0+300 Full 25 2.5 0.04 2.50 2.5 0.35 21.88 0.5 0.25 2 3.125
13 0+300 - 0+325 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
14 0+325 - 0+350 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
15 0+350 - 0+375 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
16 0+375 - 0+400 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
17 0+400 - 0+425 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
18 0+425 - 0+450 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
19 0+450 - 0+475 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
20 0+475 - 0+500 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
21 0+500 - 0+525 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
22 0+525 - 0+550 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
23 0+550 - 0+575 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
24 0+575 - 0+600 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
25 0+600 - 0+625 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
26 0+625 - 0+650 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
27 0+650 - 0+675 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
28 0+675 - 0+700 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
29 0+700 - 0+725 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
30 0+725 - 0+750 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
31 0+750 - 0+775 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
32 0+775 - 0+800 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
33 0+800 - 0+825 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
34 0+825 - 0+850 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
35 0+850 - 0+875 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
36 0+875 - 0+900 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
37 0+900 - 0+925 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
38 0+925 - 0+950 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
39 0+950 - 0+975 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
40 0+975 - 1+000 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
41 1+000 - 1+025 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
42 1+025 - 1+050 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
43 1+050 - 1+075 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
44 1+075 - 1+100 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
45 1+100 - 1+125 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
46 1+125 - 1+150 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
47 1+150 - 1+175 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
48 1+175 - 1+200 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
49 1+200 - 1+225 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
50 1+225 - 1+250 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
51 1+250 - 1+275 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
52 1+275 - 1+300 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
53 1+300 - 1+325 Full 25 2.5 0.04 2.50 2.5 0.35 21.88
54 1+325 - 1+348 Full 23 2.5 0.04 2.31 2.5 0.35 20.22
55 1+348 - 1+348 Full 2.5 0.04 0.00 2.5 0.35 0.00
56 1+348 - 1+348 Full 2.5 0.04 0.00 2.5 0.35 0.00
57 1+348 - 1+348 Full 2.5 0.04 0.00 2.5 0.35 0.00
58 1+348 - 1+348 Full 2.5 0.04 0.00 2.5 0.35 0.00
59 1+348 - 1+348 Full 2.5 0.04 0.00 2.5 0.35 0.00
60 1+348 - 1+348 Full 2.5 0.04 0.00 2.5 0.35 0.00
61 1+348 - 1+348 Full
62 1+348 - 1+348 Full
63 1+348 - 1+348 Full
64 1+348 - 1+348 Full
65 1+348 - 1+348 Full
66 1+348 - 1+348 Full
67 1+348 - 1+348 Full
68 1+348 - 1+348 Full
69 1+348 - 1+348 Full
70 1+348 - 1+348 Full
71
101

1348 299.281 1179.597 37.500


TOTAL
Ton Liter M3