ANALISA HARGA SATUAN KODE

PROPELERING PENETRASI MAKADAM


( MENGGUNAKAN BURUH ) K. 637a

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : PERIODE :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Semprotkan aspal tack coat 0,5 l/m3 1. Menggunakan tenaga manusia
2. Hampar split 3-5 cm, rata-2 16 m2/m3 2. Batu pecah dikirim ketempat buruhan oleh levelansir
3. Hampar agregat 2-3 cm, 60 m2/m3 3. Tebal perkerasan total 7 cm
4. Padatkan masing-2 lapis batu 4. Hasil kerja 2000 m2/minggu (6 hari)
5. Semprotkan aspal 3,7 l/m3
6. Tabur agregat 1-2 cm, 70 m2/m3
7. Semprot aspal 1,5 l/m2
8. Tabur Bt pch 0,5-1 cm pada 90 m2/m3

TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 2.00 3.00 L03 6.00 - -


E Operator terlatih 2.00 3.00 L04 6.00 100,000.00 600,000.00
K Buruh tak terlatih 66.00 3.00 L101 198.00 80,000.00 15,840,000.00
E Buruh terlatih 2.00 3.00 L104 6.00 85,000.00 510,000.00
R Supir 1.00 3.00 L06 3.00 105,000.00 315,000.00
J
A
BURUH 17,265,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Batu pecah mesin 3-5 cm m3 - 62.00 295,000.00 18,290,000.00


A Batu pecah mesin 2-3 cm m3 - 16.60 295,000.00 4,897,000.00
T Batu pecah mesin 1-2 cm m3 - 14.20 305,000.00 4,331,000.00
E Batu pecah mesin 0,5-1 cm m3 - 11.10 282,000.00 3,130,200.00
R Abu batu m3 - 1.00 325,000.00 325,000.00
I Aspal kg M10a 5,500.00 12,350.00 67,925,000.00
A Kayu Bakar m3 M10b 14.00 220,000.00 3,080,000.00
L Alat bantu set - 8.00 50,000.00 400,000.00

MATERIAL 102,378,200.00

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P Three Wheel Roller 6-8 T 1.00 3.00 E16 24.00 249,958.00 5,998,992.11
E
R
A
L
A
T
A
N
PERALATAN 5,998,992.11

TOTAL (Rp.) 125,642,192.11

OVERHEAD & PROFIT (maksimal 15%) 15% 18,846,328.82


JUMLAH 144,488,520.93

VOLUME/QUANTITY : 70.00 m3 Harga Satuan Rp. 2,064,121.73 per m3

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 1 dari 74 Halaman
ANALISA HARGA SATUAN KODE
MEMPRODUKSI CAMPURAN LATASIR
( MENGGUNAKAN ALAT ) K. 020

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : PERIODE :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Semua matrial dikirim oleh Suplair ke AMP 1. LATASIR dihasilkan dari AMP produksi 100 Tone/hari
2. Wheel loader menjaga bin selalu penuh 2. Aspal dipanaskan agar tersedia pada waktunya
3. Produksi mesin 100 Tone/hari 3. Hasil produksi termasuk pengangkutan sampai 40 km
4. Hasil produksi diangkut dengan Dump Truck ke ke tempat buruhan
lokasi penghamparan 4. Hasil dimuat dalam Dump truck Kap 5 Tone dan dikirim
ke tempat buruhan
5. Rata-rata umur alat bantu sebulan/orang set
6. Sesuai spesifikasi BM No.12/PT/B/1983

TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 1.00 1.00 L03 1.00 - -


E Mekanik terlatih 1.00 1.00 L08 1.00 105,000.00 105,000.00
K Operator terlatih 2.00 1.00 L04 2.00 100,000.00 200,000.00
E Supir 14.00 1.00 L06 14.00 105,000.00 1,470,000.00
R Buruh tak terlatih 4.00 1.00 L101 4.00 80,000.00 320,000.00
J Buruh semi terlatih 5.00 1.00 L103 5.00 80,000.00 400,000.00
A
BURUH 2,495,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Pasir beton (Pasir Halus (untuk HRS)) m3 M01b 45.00 390,000.00 17,550,000.00
A Aspal curah kg M10 9,000.00 11,500.00 103,500,000.00
T Alat bantu set - 1.00 50,000.00 50,000.00
E
R
I
A
L

MATERIAL 121,100,000.00

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P Loader Wheled 115 Hp 1.00 1.00 E15 8.00 650,066.17 5,200,529.37


E Asph MIxing Plant 60 T 294 HP 1.00 1.00 E01 2.00 7,370,265.77 14,740,531.53
R Dump truck 3.5 Tone 145 HP 5.00 1.00 E08 40.00 351,479.99 14,059,199.56
A
L
A
T
A
N
PERALATAN 34,000,260.46

TOTAL (Rp.) 157,595,260.46

OVERHEAD & PROFIT (maksimal 15%) 15% 23,639,289.07


JUMLAH 181,234,549.53

VOLUME/QUANTITY : 100.00 tone Harga Satuan Rp. 1,812,345.50 per tonne

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 2 dari 74 Halaman
ANALISA HARGA SATUAN KODE
LAPIS PENETRASI MAKADAM 5 CM ( LAPEN )
( MENGGUNAKAN BURUH ) K. 618a

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : PERIODE :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Semprotkan aspal tack coat 0,8 l/m3 1. Menggunakan tenaga buruh
2. Hamparkan dengan agregat pokok 3-5;25 m2/m3 2. Harga matrial(agregat pokok,agregat pengunci,agregat penutup,
dan dipadatkan aspal adalah harga dilokasi proyek
3. Hamparkan split 2-3;45 m2/m3 dan padatkan 3. Volume aspal cair untuk tack coat/prime coat 0,8 l/m2
4. Semprotkan aspal (2,5 kg/m2) 4. Tebal lapisan penetrasi 5 cm
5. Hamparkan agregat pengunci 1-2;90 m2/m3 5. Agregat dikirim sampai tempat buruhan oleh levelansir
6. Semprotkan aspal 1,5 kg/m2 digilas
7. Taburkan batu pecah 0,5-1 cm rata-2 400 m2/m3

TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 2.00 3.00 L03 6.00 - -


E Operator terlatih 2.00 3.00 L04 6.00 100,000.00 600,000.00
K Buruh tak terampil 66.00 3.00 L101 198.00 80,000.00 15,840,000.00
E Buruh terampil 2.00 3.00 L104 6.00 85,000.00 510,000.00
R Supir 1.00 3.00 L06 3.00 105,000.00 315,000.00
J
A
BURUH 17,265,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Batu pecah 3-5 cm m3 - 52.50 295,000.00 15,487,500.00


A Batu pecah 2-3 cm m3 - 30.60 295,000.00 9,027,000.00
T Batu pecah 1-2 cm m3 - 10.57 305,000.00 3,223,850.00
E Batu pecah 0,5 - 1 cm m3 - 9.14 282,000.00 2,577,480.00
R Abu batu m3 - 1.22 325,000.00 396,500.00
I Aspal kg M10a 6,270.00 12,350.00 77,434,500.00
A Kayu Bakar m3 M10b 14.00 220,000.00 3,080,000.00
L Alat bantu set - 8.00 50,000.00 400,000.00

MATERIAL 111,626,830.00

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P Three Wheel Roller 6-8 T 1.00 3.00 E16 24.00 249,958.00 5,998,992.11
E
R
A
L
A
T
A
N
PERALATAN 5,998,992.11

TOTAL (Rp.) 134,890,822.11

OVERHEAD & PROFIT (maksimal 15%) 15% 20,233,623.32


JUMLAH 155,124,445.43

VOLUME/QUANTITY : 1,400.00 m2 Harga Satuan Rp. 110,803.18 per m2

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 3 dari 74 Halaman
ANALISA HARGA SATUAN KODE
LABURAN ASPAL SATU LAPIS ( BURTU )
( MENGGUNAKAN BURUH ) K. 615a

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : PERIODE :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Bersihkan permukaan aspal dari matrial lepas 1. Hasil kerja 600 m2/hari
2. Semprotkan primer aspal cair MC "0" 2. Agregat ukuran halus hasil saringan 20 mm dari
3. Lapisi permukaan aspal dengan bitumen dan taburkan mesin pemecah batu ditimbun ditempat buruhan oleh levelansir
split serta digilas 3. Permukaan yang dilabur telah selesai digilas dan terikat dengan binder
4. Laburan permukaan menggunakan aspal "MC" 1.0 liter/m2
5. Menggunakan minyak residu = 1,60 liter/m2
6. Agregat halus 1,2 cm disebar

TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 1.00 3.00 L03 3.00 - -


E Operator terlatih 1.00 3.00 L04 3.00 100,000.00 300,000.00
K Supir 2.00 3.00 L06 6.00 -- --
E Buruh tak terlatih 15.00 3.00 L101 45.00 80,000.00 3,600,000.00
R Buruh semi terlatih 2.00 3.00 L103 6.00 80,000.00 480,000.00
J Buruh terlatih 2.00 3.00 L104 6.00 85,000.00 510,000.00
A
BURUH 4,890,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Aspal kg M10a 3,745.00 12,350.00 46,250,750.00


A Kayu Bakar m3 M10b 14.00 220,000.00 3,080,000.00
T Batu pecah tersaring m3 - 36.00 423,000.00 15,228,000.00
E Alat bantu set - 1.50 50,000.00 75,000.00
R
I
A
L

MATERIAL 64,633,750.00

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P Peralatan traktor dll 1.00 3.00 - 24.00 -- --


E Three Wheel Roller 6-8 T 1.00 3.00 E16 24.00 249,958.00 5,998,992.11
R Asphal Spayer Towed 350 L 7 HP 1.00 3.00 - 24.00 -- --
A Dump truck 3,50 Tonne 2.00 3.00 - 48.00 -- --
L Wheel Tracktor 60 HP 1.00 3.00 - 24.00 -- --
A Chipspreader 2.00 3.00 - 48.00 -- --
T
A
N
PERALATAN 5,998,992.11

TOTAL (Rp.) 75,522,742.11

OVERHEAD & PROFIT (maksimal 15%) 15% 11,328,411.32


JUMLAH 86,851,153.43

VOLUME/QUANTITY : 1,800.00 M2 Harga Satuan Rp. 48,250.64 per M2

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 4 dari 74 Halaman
ANALISA HARGA SATUAN KODE
LABURAN ASPAL DUA LAPIS ( BURDA )
( MENGGUNAKAN BURUH ) K. 617a

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : PERIODE :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Permukaan harus rata kering dan bersih 1. Kapasitas 450 m2/hari
2. Untuk permukaan jalan yang tak beraspal perlu 2. Agregat ukuran 1 - 2 cm dari pemecah batu ditimbun dilokasi buruhan
prime coat 0,7 liter/m2 oleh levelansir
3. Menebarkan agregat/batu pecah 1,20 cm dengan 3. Permukaan yang diaspal harus sudah dipadatkan diadakan
gradasi seragam dua lapis dibinding disiram primer aspal cair 1 liter /m2
4. Pemadatan dengan mesin gilas roda baja 4. Bitumen residu yang dipakai : lapis 1 sebanyak 1,60 liter/m2
: lapis 2 sebanyak 1,30 liter/m2
TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 1.00 4.00 L03 4.00 - -


E Operator terlatih 2.00 4.00 L04 8.00 100,000.00 800,000.00
K Supir 2.00 4.00 L06 8.00 -- --
E Buruh tak terlatih 15.00 4.00 L101 60.00 80,000.00 4,800,000.00
R Buruh terlatih 2.00 4.00 L104 8.00 85,000.00 680,000.00
J Buruh semi terlatih 2.00 4.00 L103 8.00 80,000.00 640,000.00
A
BURUH 6,920,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Batu pecah tersaring m3 - 54.00 423,000.00 22,842,000.00


A Aspal kg M10a 6,085.00 12,350.00 75,149,750.00
T Kayu Bakar m3 M10b 14.00 220,000.00 3,080,000.00
E Alat bantu set M170 2.50 50,000.00 125,000.00
R
I
A
L
MATERIAL 101,196,750.00

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P Peralatan traktor dll 1.00 3.00 E401 24.00 -- --


E Three Wheel Roller 6-8 T 1.00 3.00 E080 24.00 249,958.00 5,998,992.11
R Aspal Spayer Towed 350 L 7 HP 1.00 3.00 E153 24.00 -- --
A Dump truck 3,50 Tone 1.00 3.00 E211 24.00 -- --
L Wheel Tracktor 60 HP 1.00 3.00 E053 24.00 -- --
A Chipspreader 2.00 3.00 E130 48.00 -- --
T
A
N
PERALATAN 5,998,992.11

TOTAL (Rp.) 114,115,742.11

OVERHEAD & PROFIT (maksimal 15%) 15% 17,117,361.32


JUMLAH 131,233,103.43

VOLUME/QUANTITY : 1,800.00 M2 Harga Satuan Rp. 72,907.28 per M2

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 5 dari 74 Halaman
ANALISA HARGA SATUAN KODE
KONSTRUKSI LAPIS PONDASI BAWAH ( LPB ) TELFORD
( MENGGUNAKAN BURUH ) K. 516

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : PERIODE :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Matrial disiapkan dilokasi buruhan 1. Menggunakan tenaga manusia 400 m2 per/hari
2. Menghampar pasir setebal 5 cm 2. Matrial -matrial dikirim ke tempat buruhan oleh levelansir
3. Batu pecah berukuran 15 - 20 cm 3. Batu sudah dipecah
4. Batu pecah yang lebih kecil mengisi rongga diatasnya 4. Tanah dasar sudah disiapkan
sehingga rata kemudian dipadatkan/digilas dengan 5. Dipadatkan sampai tebal 20 cm
mesin gilas

TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 3.00 1.00 L03 3.00 - -


E Operator terlatih 1.00 1.00 L04 1.00 100,000.00 100,000.00
K Buruh tak terlatih 99.00 1.00 L101 99.00 80,000.00 7,920,000.00
E
R
J
A

BURUH 8,020,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Batu belah uk. 15 - 20 cm m3 M06 50.00 295,000.00 14,750,000.00


A Batu pecah tangan uk. 5 - 7 cm m3 - 20.00 285,000.00 5,700,000.00
T Pasir urug m3 M44 30.00 160,000.00 4,800,000.00
E Alat bantu set - 4.00 50,000.00 200,000.00
R
I
A
L

MATERIAL 25,450,000.00

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P Three Wheel Roller 6-8 T 1.00 1.00 E16 8.00 249,958.00 1,999,664.04
E
R
A
L
A
T
A
N
PERALATAN 1,999,664.04

TOTAL (Rp.) 35,469,664.04


OVERHEAD & PROFIT (maksimal 15%) 15% 5,320,449.61
JUMLAH 40,790,113.64

VOLUME/QUANTITY : 80.00 M3 Harga Satuan Rp. 509,876.42 m3

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 6 dari 74 Halaman
ANALISA HARGA SATUAN KODE
MEMBUAT CAMPURAN, MENGHAMPAR DAN PEMADATAN LATASIR 2 CM (SANDSHEET MANUAL)
( MENGGUNAKAN BURUH ) K. 621b

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Suplier mengirim matrial sampai bin spreader 1. Menggunakan tenaga buruh 400 m2/hari
2. Matrial dihampar dengan spreader dan dipadatkan 2. Pasir aspal dikirim oleh levelansier ketempat buruhan
dengan mesin gilas roda baja 3. Rata - rata tebal lapisan padat berkisar antara 1,5 cm s/d 2 cm

TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 1.00 1.00 L03 1.00 - -


E Operator terlatih 1.00 1.00 L04 1.00 100,000.00 100,000.00
K Buruh tak terlatih 25.00 1.00 L101 25.00 80,000.00 2,000,000.00
E Buruh semi terlatih 10.00 1.00 L103 10.00 80,000.00 800,000.00
R
J
A
BURUH 2,900,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Aspal untuk campuran kg M10a 1,371.40 12,350.00 16,936,790.00


A Batu pecah mesin 0.5 m3 - 6.86 282,000.00 1,934,520.00
T Abu batu (filler) m3 - 1.57 325,000.00 510,250.00
E Aspal untuk prime coat kg M10a 100.57 12,350.00 1,242,039.50
R Kayu bakar m3 M10b 14.00 220,000.00 3,080,000.00
I Alat bantu set - 1.00 50,000.00 50,000.00
A
L

MATERIAL 23,753,599.50

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P Three Wheel Roller 6-8 T 1.00 1.00 E16 8.00 249,958.00 1,999,664.04
E Aspal Sprayer Towed 350 L 7 HP 1.00 1.00 - 8.00 -- --
R
A
L
A
T
A
N
PERALATAN 1,999,664.04

TOTAL (Rp.) 28,653,263.54

OVERHEAD & PROFIT (maksimal 15%) 15% 4,297,989.53


JUMLAH 32,951,253.07

VOLUME/QUANTITY : 400.00 M2 Harga Satuan Rp. 82,378.13 per M2

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 7 dari 74 Halaman
ANALISA HARGA SATUAN KODE
MENGHAMPAR DAN MEMADATKAN LATASIR 2 CM (SANDSHEET AMP)
( MENGGUNAKAN BURUH ) K. 621c

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Suplier mengirim matrial sampai bin spreader 1. Menggunakan tenaga buruh 400 m2/hari
2. Matrial dihampar dengan spreader dan dipadatkan 2. Pasir aspal dikirim oleh levelansier ketempat buruhan
dengan mesin gilas roda baja 3. Rata - rata tebal lapisan padat berkisar antara 1,5 cm s/d 2 cm

TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 1.00 8.00 L03 8.00 - -


E Operator terlatih 1.00 8.00 L04 8.00 100,000.00 800,000.00
K Buruh tak terlatih 17.00 8.00 L101 136.00 80,000.00 10,880,000.00
E Buruh semi terlatih 8.00 8.00 L103 64.00 80,000.00 5,120,000.00
R
J
A
BURUH 16,800,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Campuran Latasir Tone K020 200.00 1,812,345.50 362,469,100.00


A Aspal curah kg M10 1,320.00 11,500.00 15,180,000.00
T Kayu bakar m3 M10b 14.00 220,000.00 3,080,000.00
E Alat bantu set - 1.00 50,000.00 50,000.00
R
I
A
L

MATERIAL 380,779,100.00

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P Peralatan traktor dll 1.00 3.00 - 24.00 -- --


E Three Wheel Roller 6-8 T 1.00 3.00 E16 24.00 249,958.00 5,998,992.11
R Aspal sprayer Towed 350 L 7 HP 1.00 3.00 - 24.00 -- --
A Dump truck 3,50 Tone 1.00 3.00 E08 24.00 351,479.99 8,435,519.74
L Wheel Tracktor 60 HP 1.00 3.00 - 24.00 -- --
A Chipspreader 1.00 3.00 - 24.00 -- --
T
A
N
PERALATAN 14,434,511.85

TOTAL (Rp.) 412,013,611.85

OVERHEAD & PROFIT (maksimal 15%) 15% 61,802,041.78


JUMLAH 473,815,653.63

VOLUME/QUANTITY : 5,250.00 M2 Harga Satuan Rp. 90,250.60 per M2

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 8 dari 74 Halaman
ANALISA HARGA SATUAN KODE
PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA
( MENGGUNAKAN BURUH ) K. 210

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Mengupas dan membuang semak - semak dengan 1. Menngunakan tenaga manusia (9 m x 100 m/hari
tenaga manusia pada DMJ (Daerah milik jalan ) 2. Hasil kerja 25 m2/orang hari
3. Menggunakan alat bantu rata-rata 1 bulan orang
4. Bakarlah sampah ditempat buruhan

TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 1.00 1.00 L03 1.00 - -


E Buruh tak terlatih 36.00 1.00 L101 36.00 80,000.00 2,880,000.00
K
E
R
J
A

BURUH 2,880,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Alat bantu set - 1.50 50,000.00 75,000.00


A
T
E
R
I
A
L
MATERIAL 75,000.00

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P
E
R
A
L
A
T
A
N
PERALATAN -

TOTAL (Rp.) 2,955,000.00

OVERHEAD & PROFIT (maksimal 15%) 15% 443,250.00


JUMLAH 3,398,250.00

VOLUME/QUANTITY : 900.00 m2 Harga Satuan Rp. 3,775.83 m2

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 9 dari 74 Halaman
ANALISA HARGA SATUAN KODE
PELAPISAN PRIME COAT
( MENGGUNAKAN BURUH ) K. T04

PROVINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH : TANGGAL :


JAWA TENGAH (33) TEGAL (28) - -

URAIAN : ANGGAPAN/ASUMSI :
1. Permukaan yang akan diprime coat sudah dipadatkan terlebih dahulu
2. Semprotkan campuran prime coat 2 lt/m2
3. Biarkan permukaan yang sudah diprime coat minimal 24 jam, dan dijaga
jangan dilewati kendaraan atau kena hujan

TOTAL
U P A H (Rp. /
PEKERJA VOL HARI KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
hari / orang)
(org.hari)

P Mandor 1.00 1.00 L03 1.00 - -


E Operator 1.00 1.00 L04 1.00 100,000.00 100,000.00
K Buruh semi terlatih 4.00 1.00 L103 4.00 80,000.00 320,000.00
E Buruh tak terlatih 2.00 1.00 L 101 2.00 80,000.00 160,000.00
R
J
A
BURUH 580,000.00
TOTAL
HARGA
MATERIAL SATUAN KODE VOL. B I A Y A (Rp.) SUB TOTAL (Rp.)
(Rp./unit)
(org.hari)

M Aspal curah Kg M10 640.00 11,500.00 7,360,000.00


A Minyak aspal Lt M11 320.00 9,600.00 3,072,000.00
T Kayu Bakar m3 M10b 2.50 220,000.00 550,000.00
E Alat bantu Set - 2.00 50,000.00 100,000.00
R
I
A
L

MATERIAL 11,082,000.00

HARI JAM B I A Y A (Rp. /


PERALATAN JUMLAH KODE B I A Y A (Rp.) SUB TOTAL (Rp.)
KERJA KERJA jam )

P Asphalt Sprayer 1.00 1.00 E03 8.00 -- --


E
R
A
L
A
T
A
N
PERALATAN -

TOTAL (Rp.) 11,662,000.00

OVERHEAD & PROFIT (maksimal 15%) 15% 1,749,300.00


JUMLAH 13,411,300.00

VOLUME/QUANTITY : 800.00 m2 Harga Satuan Rp. 16,764.13 m2

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN JALAN Halaman 10 dari 74 Halaman
DAFTAR HARGA SATUAN PERALATAN

BIAYA SEWA ALAT/JAM


No. URAIAN KODE HP KAP.
di luar PPN (Rp.)

1 ASPHALT MIXING PLANT E01 294.00 60.00 T/Jam 7,370,265.77


2 ASPHALT FINISHER E02 72.40 10.00 Ton 1,248,008.33
3 ASPHALT SPRAYER E03 4.00 850.00 Liter 69,604.80
4 BULLDOZER 100-150 HP E04 155.00 - - 536,822.37
5 COMPRESSOR 4000-6500 L\M E05 60.00 5,000.00 CPM/(L/m) 209,167.26
6 CONCRETE MIXER 0.3-0.6 M3 E06 20.00 300.00 Liter 83,759.29
7 CRANE 10-15 TON E07 138.00 15.00 Ton 495,873.61
8 DUMP TRUCK 3.5 TON E08 100.00 3.50 Ton 351,479.99
9 DUMP TRUCK 10 TON E09 190.00 10.00 Ton 476,116.23
10 EXCAVATOR 80-140 HP E10 133.00 0.93 M3 642,865.02
11 FLAT BED TRUCK 3-4 M3 E11 190.00 10.00 ton 490,803.56
12 GENERATOR SET E12 180.00 135.00 KVA 501,208.00
13 MOTOR GRADER >100 HP E13 135.00 10,800.00 - 891,372.51
14 TRACK LOADER 75-100 HP E14 70.00 0.80 M3 324,847.86
15 WHEEL LOADER 1.0-1.6 M3 E15 96.00 1.50 M3 650,066.17
16 THREE WHEEL ROLLER 6-8 T E16 55.00 8.00 Ton 249,958.00
17 TANDEM ROLLER 6-8 T. E17 82.00 8.10 Ton 360,717.72
18 TIRE ROLLER 8-10 T. E18 100.50 9.00 Ton 593,809.06
19 VIBRATORY ROLLER 5-8 T. E19 82.00 7.05 Ton 349,419.78
20 CONCRETE VIBRATOR E20 5.50 25.00 - 46,845.58
21 STONE CRUSHER E21 220.00 60.00 T/Jam 927,455.70
22 WATER PUMP 70-100 mm E22 6.00 - - 39,929.58
23 WATER TANKER 3000-4500 L. E23 100.00 4,000.00 Liter 328,432.18
24 PEDESTRIAN ROLLER E24 8.80 835.00 Ton 87,346.82
25 TAMPER RAMMER E25 4.70 121.00 Ton 46,435.85
26 JACK HAMMER E26 - 1,330.00 - 28,914.12
27 FULVI MIXER E27 345.00 2,005.00 - 971,902.72
28 CONCRETE PUMP E28 100.00 8.00 M3 543,288.55
29 TRAILER 20 TON E29 175.00 20.00 Ton 515,051.23
30 PILE DRIVER + HAMMER E30 25.00 2.50 Ton 189,658.00
31 WELDING SET E32 40.00 250.00 Amp 110,217.95
32 BORE PILE MACHINE E33 150.00 2,000.00 Meter 1,117,578.53
33 ASPHALT LIQUID MIXER E34 5.00 1,000.00 Liter 40,216.75
34 TRONTON E35 150.00 15.00 Ton 543,826.97
35 COLD MILLING E36 248.00 1,000.00 m 1,044,875.22
36 ROCK DRILL BREAKER E37 3.00 - - 56,710.71
37 COLD RECYCLER E38 900.00 2,200.00 M 1,858,285.71
38 HOT RECYCLER E39 400.00 3.00 M 853,285.71
39 AGGREGAT (CHIP) SPREADER E40 115.00 3.50 M 333,910.71
40 ASPHALT DISTRIBUTOR E41 115.00 4,000.00 Liter 369,689.47
41 SLIP FORM PAVER E42 105.00 2.50 M 260,335.71
42 CONCRETE PAN MIXER E43 134.00 600.00 Liter 435,731.83
43 CONCRETE BREAKER E44 290.00 20.00 m3/jam 632,185.71
44 ASPAHLT TANKER E45 190.00 4,000.00 liter 450,328.57
45 CEMENT TANKER E46 190.00 4,000.00 liter 408,328.57
46 CONDRETE MIXER (350) E47 20.00 350.00 liter 72,126.61
47 VIBRATING RAMMER E48 4.20 80.00 KG 36,823.57
48 TRUK MIXER (AGITATOR) E49 220.00 5.00 M3 694,587.44
49 BORE PILE MACHINE E50 125.00 60.00 CM 335,803.57
50 CRANE ON TRACK 75-100 TON E51 200.00 75.00 Ton 428,428.57
51 BLENDING EQUIPMENT E52 50.00 30.00 Ton 228,835.52
52 ASPHALT LIQUID MIXER E34a 40.00 20,000.00 Liter 110,566.75
53 BAR BENDER E53 3.00 - 22,425.00
54 BAR CUTTER E54 3.00 - 22,425.00
55 BREAKER E55 80.00 3.00 m3/jam 187,228.57
56 GROUTING PUMP E56 100.00 15.00 Ton 227,428.57
57 JACK HIDROLIC E57 3.00 150.00 Ton 32,458.57
58 MESIN LAS E58 3.00 0.17 Ton 33,853.57
59 PILE DRIVER LEADER, 75 kw E59 70.00 75.00 kw 167,128.57
60 PILE HAMMER E60 10.00 - 51,178.57
61 PILE HAMMER, 2,5 Ton E61 1.00 2.50 Ton 28,438.57
62 STRESSING JACK E62 89.00 15.00 Ton 205,318.57
63 WELDING MACHINE, 300 A E63 5.00 - 36,478.57

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PERALATAN Halaman 11 dari 74 Halaman
BIAYA SEWA ALAT/JAM
No. URAIAN KODE HP KAP.
di luar PPN (Rp.)

64 CHAINSAW E64 2 ltr 32,783.94


65 TRIPOD/TACKEL & HANDLE CRANE 2 T 2.00 Ton 12,500.00
66 Pipe Support 187.5

Slawi,10 Desember 2020

Menyetujui : Disusun Oleh :


Kepala Bidang Bangunan Gedung Konsultan Penyusun AHSP
Dinas Perkimtaru Kabupaten Tegal CV. Lemlit Global Riset
Selaku Pejabat Pembuat Komitmen

TTD TTD

KARDI, S.IP, MM TEGUH HARIS SANTOSO.ST.MT


NIP. 197208241994031004 DIREKTUR

Mengetahui :
Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

TTD

M. BUDI EKO S, ST,. MM


NIP. 19770201 200312 1 003

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PERALATAN Halaman 12 dari 74 Halaman
DAFTAR HARGA SATUAN UPAH / TENAGA

NO. URAIAN SATUAN HARGA SATUAN (Rp.)

1 Pekerja OH 85,000.00
2 Mandor OH
3 Tukang Kayu OH 100,000.00
4 Kepala Tukang Kayu OH
5 Tukang Batu OH 100,000.00
6 Kepala Tukang Batu OH
7 Tukang Besi OH 100,000.00
8 Kepala Tukang Besi OH
9 Tukang Cat OH 100,000.00
10 Kepala Tukang Cat OH
11 Tukang Plitur OH 100,000.00
12 Tukang Jalan OH 100,000.00
13 Tukang Gali OH 92,500.00
14 Tukang Masak Aspal OH 100,000.00
15 Tukang Ledeng OH 100,000.00
16 Tukang Listrik OH 100,000.00
17 Kepala Tukang Listrik OH
18 Tukang Vibrator OH 100,000.00
19 Tukang Erection OH 100,000.00
20 Tukang Las OH 100,000.00
21 Kepala Tukang Cat OH
22 Masinis OH
23 Pembatu Masinis/ Pembantu Operator OH 80,000.00
24 Penjaga Malam OH 75,000.00
25 Operator Terlatih OH 100,000.00
26 Buruh Tak Terlatih OH 80,000.00
27 Buruh Terampil OH 85,000.00
28 Buruh Semi Terampil OH 80,000.00
29 Mekanik OH 105,000.00
30 Sopir OH 105,000.00
31 Pembantu Sopir OH 75,000.00

Slawi,10 Desember 2020

Menyetujui : Disusun Oleh :


Kepala Bidang Bangunan Gedung Konsultan Penyusun AHSP
Dinas Perkimtaru Kabupaten Tegal CV. Lemlit Global Riset
Selaku Pejabat Pembuat Komitmen

TTD TTD

KARDI, S.IP, MM TEGUH HARIS SANTOSO.ST.MT


NIP. 197208241994031004 DIREKTUR

Mengetahui :
Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

TTD

M. BUDI EKO S, ST,. MM


NIP. 19770201 200312 1 003

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN UPAH Halaman 13 dari 74 Halaman
DAFTAR HARGA SATUAN BAHAN BANGUNAN
Wilayah Bawah ; Kec. Slawi, Dukuhwaru, Lebaksiu, Talang, Adiwerna, Pangkah (Kecuali Dermasuci), Tarub,
Dukuhturi, Pagerbarang, Kedungbanteng, Kramat, Suradadi, Warurejo, Balapulang (bawah), Margasari

HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

I BAHAN DASAR
1 BATU KALI
Batu Bulat Utuh m3 275,000.00
Batu Bulat Belah m3 295,000.00
Batu Pecah ukuran 10/15 cm m3 285,000.00
Batu Pecah ukuran 5/7 cm m3 285,000.00
Batu Pecah ukuran 3/5 cm m3 295,000.00
Sirtu sodong m3 185,000.00
2 KERIKIL
Kerikil Timbun m3 170,000.00
Sawur / Koral m3 175,000.00
Batu Split Pecah Mesin (0,5-<1 cm) (Screening) m3 282,000.00
Batu Split Pecah Mesin (0,5-<1 cm) (Screening) / Berat Jenis = 1450 kg 100.00
Batu Split Pecah Mesin (1-2cm) m3 305,000.00
Batu Split Pecah Mesin (2-3 cm) m3 295,000.00
Batu Split Pecah Mesin (2-3 cm) / Berat Jenis = 1450 kg 200.00
Batu Split Pecah Mesin (3-5 cm) m3 295,000.00
Batu Pecah dg tangan (5-7 cm) m3 295,000.00
Abu batu m3 325,000.00
Abu batu / Berat Jenis = 1602 kg 200.00
Kerikil Biasa m3 170,000.00
Tras Giling m3 285,000.00
Batu kerikil pecah tersaring m3 423,000.00
3 BATU BATA
Batu Bata 3 x 11 x 22 (20) bh 1,050.00
Batu Bata 5 x 11 x 22 (20) bh 1,150.00
Bata ringan / Hebel (10 x 20 x 60) m3 680,000.00
Bata ringan / Hebel (10 x 20 x 60) bh 10,000.00
Bata ringan / Hebel (7,5 x 20 x 60) m3 585,000.00
Bata ringan / Hebel (7,5 x 20 x 60) bh 7,800.00
Batako Berlubang Hollow Blok HB-20 bh 3,900.00
Batako Berlubang Hollow Blok HB-15 bh 3,700.00
Batako Berlubang Hollow Blok HB-10 bh 1,200.00
Batu bata expose 4,5x11x22 bh 2,700.00
Bata Terakota 20x5x2 bh 3,500.00
4 PASIR
Pasir Urug m3 160,000.00
Pasir Pasang m3 285,000.00
Pasir Beton m3 390,000.00
Pasir Beton / Berat Jenis = 1400 kg 200.00
Pasir Halus (untuk HRS) m3 390,000.00
Pasir Batu (Sirtu) m3 150,000.00
5 TANAH
Tanah Padas m3 80,000.00
Tanah Liat m3 80,000.00
Tanah Urug pilihan m3 100,000.00
Tanah Humus (untuk tanaman) m3 170,000.00
Batu kapur/ Limestone m3 100,000.00
Tanah batu (nahtu) m3 125,000.00
6 KAPUR
Kapur Pasang m3 200,000.00
Kapur Semen Merah kg 125.00
Kapur Semen Merah m3 175,000.00
7 PORTLAND CEMENT
Portland Cement (PC) 50 kg zak 56,000.00
Portland Cement (PC) 50 kg kg 1,120.00
Semen Putih 40 kg zak 93,600.00
Semen Putih 50 kg zak 82,142.00
Semen warna (40 kg) zak 95,000.00
Semen warna kg 2,375.00
Mortar Perekat Hebel (40 kg) MU-382 zak 85,000.00
Mortar Perekat Hebel (40 kg) MU-382 kg 2,125.00
Mortar Plesteran Hebel (40 kg) MU-202 zak 108,000.00
Mortar Plesteran Hebel (40 kg) MU-202 kg 2,700.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 14 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Semen Grouting MU (40 kg) MU-800 zak 157,000.00


Semen Grouting MU (40 kg) MU-800 kg 3,900.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 15 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Semen Grouting (40 kg) SIKA-215 zak 98,000.00


Semen Grouting (40 kg) SIKA-215 kg 2,450.00
Semen MU-250 (Acian bata ringan) 40 kg/zak zak 85,000.00
Semen MU-250 (Acian bata ringan) 40 kg/zak kg 2,125.00
Semen instan perekat material lantai zak 90,000.00
Semen instan perekat material dinding zak 210,000.00
Semen instan nat lantai & dinding kg 15,125.00
Floor hardener instan kg 25,000.00
Gypsump powder kg 3,065.00
II BAHAN PENUTUP ATAP
1 SIRAP
SIRAP (100 lbr) pak 180,000.00
SIRAP Uk. 60x60 cm (Harflex) lbr 40,000.00
NOk SIRAP Uk. 40 x 120 cm bh 55,000.00
NOk SIRAP m1 45,800.00
2 GENTENG BETON
Genteng Beton Warna standard isi 10/m2 42x33 cm (Triple S Multiline) bh 6,000.00
Genteng Beton Warna Special isi 10/m2 42x33 cm bh 9,500.00
Genteng Beton Warna Khusus isi 10/m2 42x33 cm bh 9,500.00
Kerpus Beton Warna Standard isi 3,3/m 35x27 cm bh 7,000.00
Kerpus Beton Warna Special isi 3,3/m 35x27 cm bh 7,000.00
Kerpus Beton Warna Khusus isi 3,3/m 35x27 cm bh 7,000.00
3 GENTENG TANAH LIAT
Nok kerpus Kodok isi 4/m 30x22 cm bh 4,712.00
Nok kerpus Kodok Glasur isi 4/m 30x22 cm bh 7,000.00
Nok kerpus plentong super isi 4/m 30x22 cm bh 6,000.00
Bubungan Genteng keramik "KIA" isi 4/m 29,5x21 cm bh 10,700.00
Bubungan Genteng Morando isi 4/m 29,3x24 cm bh 8,000.00
Bubungan Genteng Morando Glazur isi 4/m 29,3x24 cm bh 10,000.00
Bubungan genteng pres jtw isi 4/m 29,3x24 cm bh 5,500.00
Bubungan genteng pres kebumen isi 4/m 29,3x24 cm bh 5,400.00
Nok Genteng Metal polos bh 25,500.00
Nok Genteng Metal pasir bh 22,777.00
Nok Genteng galvalum m' 27,000.00
Genteng Kodok isi 24/m2 27,5x20,5 cm bh 2,500.00
Genteng Kodok Glasur isi 24/m2 27,5x20,5 cm bh 4,400.00
Genteng Vlaam/Plentong isi 25/m2 29x20,5 cm bh 2,100.00
Genteng Plentong super besar 18 bh/m2 bh 4,000.00
Genteng Keramik Glazur KIA isi 15/m2 Uk.31x31 cm bh 9,000.00
Genteng Keramik Glazur KIA isi 14/m2 warna tua bh 8,500.00
Genteng Morando Natural isi 18/m2 oven 33x25 cm bh 2,800.00
Genteng Morando Glazur isi 18/m2 33x25 cm bh 3,150.00
Genteng Pres Jatiwangi isi 25/m2 29x20,5 cm bh 2,000.00
Genteng Pres Kebumen isi 25/m2 29x20,5 cm bh 2,240.00
Genteng metal type 2x4 82x75x0,35 (polos) Lb 31,000.00
Genteng metal type 2x4 82x75x0,35 (berpasir) Lb 35,571.00
Genteng bekas (pres) bh 1,200.00
Penutup atap genteng Metal MULTIROOF bh 26,500.00
Penutup atap genteng Metal SAKURA ROOF bh 25,000.00
4 GENTENG KACA
Genteng kaca Vlaam tebal 8 mm isi 25/m2 29x20,5 cm bh 11,100.00
Genteng kaca Vlaam tebal 10 mm isi 25/m2 29x20,5 cm bh 14,666.00
Genteng kaca Kodok tebal 8 mm isi 24/m2 27,5x20,5 cm bh 16,200.00
Genteng kaca Kodok tebal 10 mm isi 24/m2 27,5x20,5 cm bh 21,000.00
5 ASBES GELOMBANG
Asbes gelombang besar
Bubungan asbes gelombang besar m1 30,000.00
Asbes gelombang besar 200 cm X 102 cm X 5 mm Lbr 58,850.00
Asbes gelombang besar 225 cm X 102 cm X 5 mm Lbr 77,250.00
Asbes gelombang besar 250 cm X 102 cm X 5 mm Lbr 90,500.00
Asbes gelombang besar 200 cm X 102 cm X 6 mm Lbr 83,000.00
Asbes gelombang besar 225 cm X 102 cm X 6 mm Lbr 90,000.00
Asbes gelombang besar 250 cm X 102 cm X 6 mm Lbr 104,000.00
Asbes Gelombang Kecil
Bubungan asbes gelombang kecil m1 40,000.00
Asbes Gelombang Kecil 150 cm X 105 cm X 4 mm Lbr 30,571.00
Asbes Gelombang Kecil 180 cm X 105 cm X 4 mm Lbr 34,647.00
Asbes Gelombang Kecil 210 cm X 105 cm X 4 mm Lbr 39,147.00
Asbes Gelombang Kecil 240 cm X 105 cm X 4 mm Lbr 43,933.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 16 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Asbes Gelombang Kecil 270 cm X 105 cm X 4 mm Lbr 50,000.00


Asbes Gelombang Kecil 300 cm X 105 cm X 4 mm Lbr 58,800.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 17 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Atap bitumen Onduline Classic : 95 cm x 200cm x 0.3mm Lbr 168,000.00


Atap bitumen Onduline Tile : 97 cm x 200 cm x 0.3mm Lbr 165,000.00
Atap bitumen type Onduvilla: 40cm x 106 cm x 0,3mm Lbr 55,000.00
Atap bitumen type Bardoline : 34cm x 106 cm x 0,34mm pack 510,000.00
Unnderlayer Ondutis roll 1,584,000.00
Nok / Ridge Onduline Lbr 90,000.00
Ridge Bardoline Uk. 106 x 34 x 0.34 cm pack 642,750.00
Penutup Atap Galvalum merdalka m2 34,600.00
Penutup Atap Galvalum kencana m2 33,500.00
Bubungan Atap Galvalum Taso m1 30,000.00
Bubungan Atap Galvalum kencana m1 30,000
6 ALDERON
alderon Doff (White, Blue) Tb. 10 mm Lebar 922mm T.
Lbr 160,000
40 mm
TC / Translucent (White, Blue) Tb. 10 mm Lebar 922mm
Lbr 210,000
T. 40 mm
Nok ID 860 (White,Blue) BH 120,000
Roofseal set ID 860 @20 pcs/pack (White, Blue) tinggi 75
Pcs 40,000
mm
IDH 860 Tb. 10 mm Lebar 960 mm T.45 mm DOFF (WHITE, BLUE) Lbr 160,000
IDH 860 Tb. 10 mm Lebar 960 mm T.45 mm TC/translucent (WHITE, BLUE) Lbr 210,000
NOK IDH 860 DOFF (WHITE, BLUE) BH 140,000
Roofseal set IDH 860 @20 pcs/pack Doff (White, Blue)
pcs 50,000
tinggi 100 mm
ID 830 A.S.A Tb. 10 mm Lebar 892 mm T. 830 mm RED, BLUE, GREY Lbr 180,000
NOK ID 830 A.S.A RED, BLUE, GREY BH 135,000
Roofseal st ID 830 @20 pcs/pack tinggi 75 mm RED, BLUE, GREY Pcs 40,000
RS Greca Tb. 1.45 mm Lebar 760 mm T.17 mm DOFF(GREY) Lbr 70,000
RS Roma Tb. 1.45 mm Lebar 860 mm T.17 mm DOFF(GREY) Lbr 70,000
RS Trimdeck Tb. 1.45 mm Lebar 830 mm T.29 mm DOFF(GREY) Lbr 70,000
NOK RS Roma GREY BH 120,000
Roofseal set RS @50 pcs/pack tinggi 55 mm GREY Pcs 65,000.00
6 NOK
. Kerpus Genteng bh 25,000.00
. Stel Besar bh 72,000.00
. Paten Besar bh 45,000.00
Nokstel gelombang harflex
. Nok Stel Besar bh 44,000.00
. Patent Besar bh 42,300.00
. Plat besar bh 82,800.00
7 ASBES PLAT
. 100cm X 100 cm X 4 mm bh 16,000.00
. 100cm X 100 cm X 5 mm bh 17,000.00
. 50 cm X 200 cm X 3 mm bh 14,800.00
. 40 cm X 200 cm X 3 mm bh 13,500.00
FIBER PLAT uk. 100cm x 100cm x 4mm lbr 20,000.00
Untuk Plafond uk. 120cm x 240cm x 4mm lbr 55,000.00
uk. 122cm x 244cm x 4mm lbr 85,200.00
GRC BOARD uk.122cm x 244cm x 5mm lbr 112,000.00
uk.122cm x 244cm x 6mm lbr 135,000.00
uk.122cm x 244cm x 8mm lbr 201,500.00
uk.122cm x 244cm x 10mm lbr 260,000.00
8 FIBER GLASS (JABES)
180 X 92 cm bh 62,500.00
200 X 92 cm bh 102,500.00
250 X 92 cm bh 121,000.00
180 X 105 cm bh 149,000.00
9 SENG PLAT
BJLS 0,20 lebar 55 cm m2 21,166.00
BJLS 0,20 lebar 55 cm m' 22,800.00
BJLS 0,30 lebar 55 cm m2 49,600.00
BJLS 0,30 lebar 55 cm m' 51,000.00
BJLS 0,30 lebar 90 cm m' 34,833.00
BJLS 0,20 lebar 90 cm m' 32,200.00
9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr 49,444.00
BJLS 0,20 panjang 180 cm lbr 49,666.00
BJLS 0,30 panjang 180 cm lbr 66,333.00
BJLS 0,40 panjang 180 cm lbr 65,000.00
Seng bekas (laik pakai) lbr 24,200.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 18 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Seng bekas (belum laik pakai) lbr 18,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 19 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

III. BAHAN KAYU


1 JATI PERUM PERHUTANI
Papan m3 11,000,000.00
Balok/pesagen m3 10,800,000.00
2 KAMPER
Papan m3 7,300,000.00
Balok/pesagen m3 6,800,000.00
3 KRUING
Papan m3 6,550,000.00
Balok/pesagen m3 6,050,000.00
Kayu Kruing 5/7 m3 4,900,000.00
Kayu Kruing 4/6 m3 4,900,000.00
Kayu Kruing 3/5 m3 4,900,000.00
Kayu Kruing 3/4 m3 4,800,000.00
Kayu Kruing 2/3 m3 4,800,000.00
4 MERANTI
Papan m3 5,050,000.00
Balok/pesagen m3 4,550,000.00
Kayu Meranti 5/7 m3 3,700,000.00
Kayu Meranti 4/6 m3 4,050,000.00
Kayu Meranti 3/5 m3 4,050,000.00
Kayu Meranti 2/3 m3 4,050,000.00
5 LANAN
Papan m3 2,250,000.00
Balok/pesagen m3 1,900,000.00
6 BENGKIRAI
Papan m3 9,800,000.00
Balok/pesagen m3 8,800,000.00
Kayu Bengkir 5/7 cm m3 6,600,000.00
Kayu Bengkir 4/6 cm m3 6,550,000.00
Kayu Bengkir 3/4 cm m3 6,550,000.00
Kayu Bengkir 2/ 3 cm m3 6,550,000.00
7 DOLKEN
Sedang 8 x 10 x 400 cm bt 25,000.00
Kecil 6 x 7 x 400 cm bt 16,000.00
Besar 10 x 12 x 400 cm bt 35,000.00
Kayu cetakan m3 2,200,000.00
Bambu btg 17,500.00
Papan cetak pinus m3 2,800,000.00
8 KEMPAS
Papan m3 6,250,000.00
Balok/pesagen m3 5,750,000.00
Kayu Kempas 5/7 m3 4,400,000.00
Kayu Kempas 4/6 m3 4,500,000.00
Kayu Kempas 3/5 m3 4,500,000.00
Kayu Kempas 3/4 m3 4,500,000.00
Kayu Kempas 2/3 m3 4,500,000.00
9 LOKAL
Papan m3 2,350,000.00
Balok/pesagen m3 2,350,000.00
Kayu Lokal 5/7 m3 2,200,000.00
Kayu Lokal 4/6 m3 2,200,000.00
Kayu Lokal 2/3 m3 2,672,200.00
Kayu Ukuran 8/12 (jenis lokal) m3 2,750,000.00
Kayu Ukuran 5/7 (jenis lokal) kaso btg 39,000.00
Kayu Ukuran 2/3 (jenis lokal) meranti m3 3,250,000.00
Kayu Ukuran 4/6 (jenis lokal) kaso btg 32,500.00
Kusen Pintu Kayu Lokal jati set 1,500,000.00
Kusen jendela Kayu Lokal jati set 1,080,000.00
IV . BAHAN PENUTUP DINDING/LANTAI
1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2 48,000.00
PC polos 30 X 30 cm bh 6,000.00
20 X 20 cm m2 160,000.00
20 X 20 cm bh 6,000.00
PC warna 30 X 30 cm m2 150,000.00
30 X 30 cm bh 11,000.00
20 X 20 cm m2 235,000.00
20 X 20 cm bh 11,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 20 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Teraso 30 X 30 cm m2 65,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 21 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

2 TEGEL PLINT
PC warna 10 X 20 cm bh 8,500.00
PC abu-abu 15 x 20 bh 8,500.00
3 UBIN PORSELIN
Lokal 11 X 11 putih dos 42,000.00
11 X 11 putih bh 1,680.00
11 X 11 warna dos 46,000.00
Lokal 15 X 15 putih dos 51,000.00
15 X 15 warna dos 51,000.00
4 MOZAIK PORSELIN
10 X 20 cm m2 56,000.00
15 X 15 cm m2 56,000.00
20 X 20 cm m2 57,000.00
20 X 25 cm m2 57,000.00
5 KERAMIK
Keramik 20/25, putih M2 50,000.00
Keramik 20/25, warna M2 52,000.00
Keramik 20/25, warna (bisa untuk dinding) buah 2,625.00
Keramik 25/40, warna (bisa untuk dinding) M2 58,700.00
Keramik 20/20, anti slip ( u/.lantai Km/wc) M2 58,333.00
Keramik 20/20, anti slip ( u/.lantai Km/wc) buah 2,500.00
Keramik 20/20, warna M2 55,000.00
Keramik 20/20, warna (bisa untuk dinding) buah 2,250.00
Keramik 20/25, warna (bisa untuk dinding) M2 52,500.00
Keramik 20/25, warna (bisa untuk dinding) buah 2,625.00
Keramik 25/40, warna (bisa untuk dinding) m2 65,000.00
Keramik 25/40, warna (bisa untuk dinding) buah 3,250.00
Keramik 25/25 warna m2 65,000.00
Keramik 25/25 warna buah 4,062.00
Keramik 25/25, (anti slip) M2 59,833.00
Keramik 25/25, (anti slip) buah 3,700.00
Plint Keramik 10/20, warna M2 51,000.00
Plint Keramik 10/20, warna buah 1,100.00
Plint Keramik 10/30, warna m2 75,000.00
Plint Keramik 10/30, warna buah 2,272.00
Plint Keramik 10/40, warna M2 80,000.00
Plint Keramik 10/40, warna buah 3,200.00
Keramik 30/30 (putih polos) M2 43,444.00
Keramik 30/30 (putih polos) buah 4,400.00
Keramik 30/30, warna M2 47,000.00
Keramik 30/30, anti selip M2 65,000.00
Keramik 40/40, (putih polos) M2 46,500.00
Keramik 40/40, (putih polos) buah 6,500.00
Keramik 40/40, warna M2 49,461.00
Keramik 40/40, warna buah 7,000.00
Keramik 40/40, Anti Slip M2 67,500.00
Homogeneous Tile dinding 30/60 (NIRO) M2 180,000.00
Homogeneous Tile dinding 30/60 (NIRO) bh 30,000.00
Homogeneous Tile dinding 40/60 M2 300,000.00
Homogeneous Tile dinding 40/60 bh 75,000.00
Keramik Uk. 5 x 20 cm Plint Bh 10,000.00
Keramik Uk. 10 x 20 cm Plint Bh 9,000.00
Keramik Uk. 10 x 30 cm Plint Bh 16,500.00
Keramik Uk. 10 x 40 cm Plint Bh 17,000.00
Keramik lis Uk. 7 x 20 Bh 6,000.00
Keramik lis Uk. 7 x 30 Bh 11,000.00
Keramik lis Uk. 13 x 40 Bh 7,875.00
Keramik kuku macan M' 7,500.00
Parquet Jati m2 185,000.00
lantai karpet vinyl (korea) m2 21,600.00
Batu Paras uk. 10x20 cm m2 120,000.00
Batu Tempel Hitam 10x20 m2 90,000.00
Batu Tempel Hitam 20x20 m2 110,000.00
Batu Tempel Hitam 15x30 m2 110,000.00
Batu Tempel Hitam 20x40 m2 120,000.00
Batu Tempel Hitam 30x60 m2 150,000.00
Batu Tempel Hitam 30x30 m2 125,000.00
Batu Tempel Hitam 40x40 m2 150,000.00
Batu Andesit 20x40 m2 115,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 22 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Batu Candi 10x20 m2 85,000.00


Batu Candi 15x30 m2 90,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 23 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Batu Candi 20x20 m2 90,000.00


Batu Candi 30x30 m2 110,000.00
Batu Candi 20x40 m2 110,000.00
Homogeneous Tile Uk. 40 x 40 cm M2 169,300.00
Homogeneous Tile Uk. 40 x 40 cm 6bh / duz buah 28,249.00
Homogeneous Tile Uk. 30 x 30 cm M2 125,000.00
Homogeneous Tile Uk. 30 x 30 cm buah 11,399.00
Homogeneous tile uk. 60 x 60 cm Polish ( NIRO) duz 173,250.00
Homogeneous tile uk. 60 x 60 cm Polish ( NIRO) 3bh / duz buah 57,700.00
Homogeneous tile uk. 60 x 60 cm Unpolish (NIRO) duz 202,971.00
Homogeneous tile uk. 60 x 60 cm Unpolish (NIRO) 3bh / duz buah 67,600.00
Plint Granit 10 x 30 cm buah 3,850.00
Plint Granit 10 x 40 cm buah 12,000.00
Plint Granit 10 x 60 cm buah 17,500.00
Hospital plint granite 10x30 cm buah 42,500.00
Hospital plint PVC 5x30x5 r7 cm buah 40,000.00
Marmer m2 850,000.00
Batu Koral sikat 1-2 cm (putih) Kg 3,500.00
Batu Koral sikat 3-5 cm (putih) Kg 5,000.00
Batu Koral sikat 1-2 cm (warna) Kg 4,500.00
Batu Koral sikat 3-5 cm (warna) Kg 6,000.00
V BAHAN CETAK
1 BUIS BETON
Buis beton Ø 10 cm - 100 cm bh 30,000.00
Buis beton Ø 20 cm - 100 cm bh 50,000.00
Buis beton Ø 30 cm - 100 cm bh 65,000.00
Buis beton Ø 50 cm - 100 cm bh 150,000.00
Buis beton Ø 60 cm - 100 cm bh 175,000.00
Buis beton Ø 70 cm - 100 cm bh 170,000.00
Buis beton U 10 cm - 100 cm bh 30,000.00
Buis beton U 15 cm - 100 cm bh 40,000.00
Buis beton U 20 cm - 100 cm bh 50,000.00
Buis beton U 30 cm - 100 cm bh 60,000.00
2 LUBANG ANGIN (ROSTER) PC + PASIR
Lubang angin (roster) Pc+pasir ukuran 10 X 20 cm bh 6,500.00
Lubang angin (roster) Pc+pasir ukuran 20 X 20 cm bh 7,500.00
Lubang angin (roster) Pc+pasir ukuran 25 X 25 cm bh 7,600.00
Lubang angin (roster) Pc+pasir ukuran 12 X 11 X 24 cm bh 7,800.00
Lubang angin (roster) Pc+pasir ukuran 30 X 30 cm bh 7,800.00
Lubang angin (roster) Pc+pasir ukuran 15 X 25 cm bh 7,900.00
Lubang angin (roster) Pc+pasir ukuran 15 X 30 cm bh 8,000.00
Roster bata bh 5,000.00
Glass Block bh 31,000.00
3 PAVING BLOCK (ALDAS)
Paving block Persegi (model bata) tbl. 6 cm K-225 ( ALDAS) pcs 101,750.00
Paving block Persegi (model bata) tbl. 8 cm K-225 (ALDAS) pcs 137,500.00
Paving block Segi enam (hexagonal) tbl. 6 cm K-225 (ALDAS) m2 113,850.00
Paving block Persegi (model bata) tbl. 6 cm warna K-225 (ALDAS) m2 101,750.00
Paving block Persegi (model bata) tbl. 8 cm warna K-225 (ALDAS) m2 137,500.00
Paving block Segi enam (hexagonal) tbl. 6 cm warna K-225 (ALDAS) m2 101,750.00
Paving block Persegi (model bata) tbl. 6 cm warna K-250 (ALDAS) m2 92,500.00
Paving block Persegi (model bata) tbl. 8 cm warna K-300 (ALDAS) m2 141,900.00
Diffabel kuning 6 cm K 300 m2 394,240.00
Diffabel kuning 6 cm K 300 bh 50,160.00
Kanstin beton uk. 10x20x50 K-200 (ALDAS) pcs 20,350.00
Kanstin beton uk. 8/10x22x33 K-200 (ALDAS) pcs 17,050.00
Kanstin beton uk. 10/15x25x50 K-200 (ALDAS) pcs 35,200.00
Kanstin beton uk. 15/20x30x50 K-200 (ALDAS) pcs 57,200.00
Kanstin beton uk. 15/20x30x50 K-300 (ALDAS) pcs 59,950.00
4 PAVING BLOCK (ABC)
Paving Natural Persegi (model bata) 6 cm K 175 m2 75,000.00
Paving Natural Persegi (model bata) 6 cm K 175 Warna Kuning m2 93,000.00
Paving Natural Persegi (model bata) 6 cm K 225 m2 79,000.00
Paving Natural Persegi (model bata) 6 cm K 300 m2 83,000.00
Paving Natural Persegi (model bata) 8 cm K 175 m2 95,000.00
Paving Natural Persegi (model bata) 8 cm K 175 Warna Kuning m2 113,000.00
Paving Natural 8 cm K 225 m2 100,000.00
Paving Natural 8 cm K 300 m2 107,000.00
Diffabel kuning 6 cm K 300 pcs 22,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 24 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Kanstin beton uk. 10x20x50 (ABC) pcs 14,000.00


Kanstin beton uk. 8/10x25x50 (ABC) pcs 23,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 25 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Kanstin beton uk. 10/15x30x50 (ABC) pcs 28,000.00


Kanstin beton uk. 15/20x30x50 (ABC) pcs 35,000.00
5 STANDARD GRASS BLOCK ABU-ABU bh 12,136.00
VI . BAHAN BESI
1 BESI BETON
Besi beton polos kg 7,600.00
Besi beton prestress kg 7,818.00
Besi beton ulir kg 7,818.00
2 BESI PLAT
Besi Strip uk. 3 mm x 3 cm x 6 m kg 15,000.00
Besi Strip uk. 3 mm x 3 cm x 6 m m' 5,500.00
3 BESI PROFIL
Besi Profil kg 15,000.00
Besi Baja IWF kg 15,000.00
a BAJA RINGAN GALVALUME type CT 75
lebar : 7,5cm tebal : 1mm panj : 6 m (berat SNI 6,8 kg/ btg) GIGA STEEL btg 190,000.00
lebar : 7,5cm tebal : 1mm panj : 6 m (berat SNI 6,8 kg/ btg) GIGA STEEL kg 27,941.00
lebar : 7,5cm tebal : 0.75mm panj : 6 m (berat SNI 5,1 kg/ btg) GIGA STEEL btg 183,000.00
lebar : 7,5cm tebal : 0.75mm panj : 6 m (berat SNI 5,1 kg/ btg) GIGA STEEL kg 35,800.00
lebar : 7,5cm tebal : 0,65mm panj : 6 m (berat SNI 4,3 kg/ btg) GIGA STEEL btg 170,000.00
lebar : 7,5cm tebal : 0,65mm panj : 6 m (berat SNI 4,3 kg/ btg) GIGA STEEL kg 39,500.00
Baja Ringan atap pelana Z95, CN75 dan CN65 tebal 0.75 mm, Baja Ringan B32 -
GIGA STEEL m2 155,040.00
0,45 mm (SNI) bentang 5-7 meter
Baja Ringan atap pelana Z95, CN75 dan CN65 tebal 0.75 mm, Baja Ringan B32 -
GIGA STEEL m2 163,200.00
0,45 mm (SNI) bentang 7-10 meter
Baja Ringan atap pelana Z95, CN75 dan CN65 tebal 0.75 mm, Baja Ringan B32 -
GIGA STEEL m2 179,520.00
0,45 mm (SNI) bentang 10-14 meter
Baja Ringan atap limasan Z95, CN75 dan CN65 tebal 0.75 mm, Baja Ringan B32 -
GIGA STEEL m2 160,752.00
0,45 mm (SNI) bentang 5-7 meter
Baja Ringan atap limasan Z95, CN75 dan CN65 tebal 0.75 mm, Baja Ringan B32 -
GIGA STEEL m2 169,728.00
0,45 mm (SNI) bentang 7-10 meter
Baja Ringan atap limasan Z95, CN75 dan CN65 tebal 0.75 mm, Baja Ringan B32 -
GIGA STEEL m2 183,600.00
0,45 mm (SNI) bentang 10-14 meter
Baja Ringan atap Mono Z95, CN75 dan CN65 tebal 0.75 mm, Baja Ringan B32 -
GIGA STEEL m2 171,360.00
0,45 mm (SNI) bentang 5-7 meter
Baja Ringan atap Mono Z95, CN75 dan CN65 tebal 0.75 mm, Baja Ringan B32 -
GIGA STEEL m2 175,440.00
0,45 mm (SNI) bentang 7-10 meter
Baja Ringan atap Mono Z95, CN75 dan CN65 tebal 0.75 mm, Baja Ringan B32 -
GIGA STEEL m2 193,392.00
0,45 mm (SNI) bentang 10-14 meter
b type RT 12 tinggi : 3,5 cm, tebal panj : 6 m btg 62,500.00
type RT 10 tinggi : 3,0 cm, tebal panj : 6 m btg 55,000.00
c HOLLOW GALVANIS LIPAT
Hollow galvanis uk.2/4 cm; tebal : 0,3 mm panj : 4 m btg 25,000.00
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm panj : 4 m btg 37,000.00
Hollow galvanis uk.2/4 cm; tebal : 0,3 mm m' 15,000.00
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm m' 21,000.00
Besi Hollow 4x 4 cm, tbl. 2mm panj : 6 m m' 31,500.00
Besi Hollow 2x 4 cm, tbl. 2mm panj : 6 m m' 23,000.00
Besi Hollow Panjang 4 m (Semua ukuran) kg 13,650.00
Spandex tbl. 0,3 mm m2 40,000.00
Scaffolding Lengkap (Mainframe, cross brace, joint pin, cat walk) set 5,000.00
Bondex tbl. 0,75 mm m2 105,000.00
4 JARING - JARING BAJA (RAM-RAMAN)
Jaring-jaring baja (ram-raman) Diameter 4 - 15 kg 28,500.00
Jaring-jaring baja (ram-raman) Diameter 6 - 15 kg 28,500.00
Wiremesh M.6 uk. 5,4 m x 2,1 m m2 27,513.23
Wiremesh M.8 uk. 5,4 m x 2,1 m m2 48,941.80
Wiremesh M.10 uk. 5,4 m x 2,1 m m2 78,306.88
5 BESI SIKU
Besi siku L 40 X 40 X 4 panj : 6 m btg 137,500.00
Besi siku L 50 X 50 X 5 panj : 6 m btg 220,000.00
Besi siku L 60 X 60 X 6 btg 360,000.00
Besi List Kaca 1 x 1 cm m' 100,000.00
6 KAWAT
- Ikat beton/bendrat kg 20,000.00
- Harmonika 12 X 45 mm m2 22,000.00
- Harmonika 12 X 24 mm m2 22,500.00
- Harmonika 14 X 30 mm m2 23,000.00
- Harmonika 14 X 35 mm m2 20,000.00
- Kawat Nyamuk Nylon m2 10,000.00
- Kawat Kasa m2 13,000.00
- Saringan pasir m2 15,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 26 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

- Kawat loket m2 13,000.00


- Kawat duri rol 80,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 27 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

- Kawat duri m' 1,333.00


- Kawat bronjong kg 25,000.00
- Kawat bronjong pabrikasi (2x1x0,5 m) bh 360,000.00
- Kawat las doz 65,000.00
7 BAHAN ALUMINIUM
Kusen Aluminium uk. 3" Silver YKK m' 140,000.00
Kusen aluminium uk. 3" Brown YKK m' 143,000.00
Kusen aluminium uk. 3" White YKK m' 145,000.00
Kusen Aluminium uk. 4" Silver YKK m' 165,000.00
Kusen aluminium uk. 4" Brown YKK m' 175,000.00
Kusen aluminium uk. 4" White YKK m' 185,000.00
Profil Daun Pintu Aluminium Uk. 2,5" silver YKK m' 110,000.00
Profil Daun Pintu Aluminium Uk. 2,5" Brown YKK m' 120,000.00
Profil Daun Pintu Aluminium Uk. 2,5" White YKK m' 130,000.00
Allumunium Strip m' 28,000.00
Profil alumunium Tee m' 6,250.00
VII . BAHAN PIPA
1 Pipa PVC
Pipa PVC AW ½" (Rucika) panjang 4 m btg 28,000
Pipa PVC AW ½" (Rucika) m' 7,000
Pipa PVC type AW ¾" (Rucika) panjang 4 m btg 36,000
Pipa PVC type AW ¾" (Rucika) m' 9,000
Pipa PVC type AW 1" (Rucika) panjang 4 m btg 58,800
Pipa PVC type AW 1" (Rucika) m' 14,700
Pipa PVC type AW 1 ½" (Rucika) panjang 4 m btg 140,800
Pipa PVC type AW 1 ½" (Rucika) m' 35,200
Pipa PVC type AW 2" (Rucika) panjang 4 m btg 222,600
Pipa PVC type AW 2" (Rucika) m' 55,650
Pipa PVC type AW 2 ½" " (Rucika) panjang 4 m btg 310,800
Pipa PVC type AW 2 ½" " (Rucika) m' 77,700
Pipa PVC type AW 3" (Rucika) panjang 4 m btg 450,600
Pipa PVC type AW 3" (Rucika) m' 112,650
Pipa PVC type AW 4" (Rucika) panjang 4 m btg 667,800
Pipa PVC type AW 4" (Rucika) m' 166,950
Pipa PVC type AW 6" (Rucika) panjang 4 m btg 1,417,600
Pipa PVC type AW 6" (Rucika) m' 354,400
Pipa PVC type AW 8" (Rucika) panjang 4 m btg 2,209,400
Pipa PVC type AW 8" (Rucika) m' 552,350
Pipa PVC type AW 10" (Rucika) panjang 4 m btg 3,443,000
Pipa PVC type AW 10" (Rucika) m' 860,750
Pipa PVC type AW 12" (Rucika) panjang 4 m btg 5,464,200
2 PIPA GALVANISHED IRON (Medium A)
Pipa Medium Galvanis 0,50" panjang 6 m btg 125,000
Pipa Medium Galvanis 0,50" m' 20,800
Pipa Medium Galvanis 0,75" panjang 6 m btg 207,000
Pipa Medium Galvanis 0,75" m' 34,500
Pipa Medium Galvanis 1" panjang 6 m btg 205,000
Pipa Medium Galvanis 1" m' 34,100
Pipa Medium Galvanis 1,25" panjang 6 m btg 414,000
Pipa Medium Galvanis 1,25" m' 69,000
Pipa Medium Galvanis 2" panjang 6 m btg 650,000
Pipa Medium Galvanis 2" m' 108,333
Pipa Medium Galvanis 2,50" panjang 6 m btg 828,000
Pipa Medium Galvanis 2,50" m' 138,000
Pipa Medium Galvanis 3" panjang 6 m btg 1,072,000
Pipa Medium Galvanis 3" m' 178,600
Pipa Medium Galvanis 4" panjang 6 m btg 1,708,000
Pipa Medium Galvanis 4" m' 284,600
Pipa Medium Galvanis 5" panjang 6 m btg 2,073,500
Pipa Medium Galvanis 5" m' 345,500.00
Pipa Medium Galvanis 6" panjang 6 m m' 412,100.00
Pipa Medium Galvanis 8" panjang 6 m m' 515,500.00
Pipa Medium Galvanis 10" panjang 6 m m' 1,200,000.00
Pipa Medium Galvanis 12" panjang 6 m m' 1,450,000.00
Pipa Medium Galvanis 16" panjang 6 m m' 2,150,000.00
3 PIPA AIR BERSIH
PIPA PVC
Pipa PVC SNI (S 12,5) DN 100 mm (Ø 4") Solvent Cement Joint (SCJ); P = 6m m' 60,500.00
Pipa PVC SNI (S 12,5) DN 100 mm (Ø 4") Rubber Ring Joint (RRJ); P = 6m m' 63,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 28 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Pipa PVC SNI (S 12,5) DN 150 mm (Ø 6") Solvent Cement Joint (SCJ); P = 6m m' 129,400.00
Pipa PVC SNI (S 12,5) DN 150 mm (Ø 6") Rubber Ring Joint (RRJ); P = 6m m' 133,300.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 29 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Pipa PVC SNI (S 12,5) DN 200 mm (Ø 8") Rubber Ring Joint (RRJ); P = 6m m' 211,800.00
Pipa PVC SNI (S 12,5) DN 250 mm (Ø 8") Rubber Ring Joint (RRJ); P = 6m m' 336,600.00
Pipa PVC SNI (S 10) DN 100 mm (Ø 4") Solvent Cement Joint (SCJ); P = 6m m' 59,000.00
Pipa PVC SNI (S 10) DN 100 mm (Ø 4") Rubber Ring Joint (RRJ); P = 6m m' 77,800.00
Pipa PVC SNI (S 10) DN 150 mm (Ø 6") Solvent Cement Joint (SCJ); P = 6m m' 128,000.00
Pipa PVC SNI (S 10) DN 150 mm (Ø 6") Rubber Ring Joint (RRJ); P = 6m m' 162,900.00
Pipa PVC SNI (S 10) DN 200 mm (Ø 8") Rubber Ring Joint (RRJ); P = 6m m' 199,400.00
Pipa PVC SNI (S 10) DN 250 mm (Ø 10") Rubber Ring Joint (RRJ); P = 6m m' 583,900.00
Pipa PVC SNI (S 10) DN 315 mm (Ø 12") Rubber Ring Joint (RRJ); P = 6m m' 930,000.00
Pipa PVC SNI (S 10) DN 400 mm (Ø 16") Rubber Ring Joint (RRJ); P = 6m m' 1,510,700.00
PIPA HDPE/High Density Polyethylene SDR 17 (PN 10)
Pipa HDPE (Ø 1") m' 11,411.00
Pipa HDPE (Ø 1 1/2") m' 26,667.00
Pipa HDPE DN 50 mm (Ø 2") m' 42,000.00
Pipa HDPE DN 75 mm (Ø 3") m' 86,066.00
Pipa HDPE DN 100 mm (Ø 4") m' 128,168.00
Pipa HDPE DN 125 mm (Ø 5") m' 146,350.00
Pipa HDPE DN 150 mm (Ø 6") m' 267,928.00
Pipa HDPE DN 200 mm (Ø 8") m' 418,618.00
Pipa HDPE DN 250 mm (Ø 10") m' 650,630.00
Pipa HDPE DN 315 mm (Ø 12") m' 925,550.00
Pipa HDPE DN 400 mm (Ø 16") m' 1,488,600.00
PIPA PVC SEWAGE
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas A; MOF m' 20,225.00
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas B; MOF m' 34,616.00
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas A; MOF m' 27,741.00
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas B; MOF m' 43,600.00
Pipa PVC Sewage Ø 2" ; Outside 63 mm panjang 6 m; kelas A; MOF m' 32,908.00
Pipa PVC Sewage Ø 2" ; Outside 63 mm panjang 6 m; kelas A; RR m' 33,891.00
Pipa PVC Sewage Ø 2" ; Outside 63 mm panjang 6 m; kelas B; MOF m' 55,766.00
Pipa PVC Sewage Ø 2" ; Outside 63 mm panjang 6 m; kelas B; RR m' 56,691.00
Pipa PVC Sewage Ø 2 1/2" ; Outside 75 mm panjang 6 m; kelas A; MOF m' 45,983.00
Pipa PVC Sewage Ø 2 1/2" ; Outside 75 mm panjang 6 m; kelas A; RR m' 47,166.00
Pipa PVC Sewage Ø 2 1/2" ; Outside 75 mm panjang 6 m; kelas B; MOF m' 65,333.00
Pipa PVC Sewage Ø 2 1/2" ; Outside 75 mm panjang 6 m; kelas B; RR m' 66,650.00
Pipa PVC Sewage Ø 3" ; Outside 90 mm panjang 6 m; kelas A; MOF m' 34,900.00
Pipa PVC Sewage Ø 3" ; Outside 90 mm panjang 6 m; kelas A; RR m' 57,283.00
Pipa PVC Sewage Ø 3" ; Outside 90 mm panjang 6 m; kelas B; MOF m' 62,800.00
Pipa PVC Sewage Ø 3" ; Outside 90 mm panjang 6 m; kelas B; RR m' 85,558.00
Pipa PVC Sewage Ø 4" ; Outside 110 mm panjang 6 m; kelas A; MOF m' 79,266.00
Pipa PVC Sewage Ø 4" ; Outside 110 mm panjang 6 m; kelas A; RR m' 81,450.00
Pipa PVC Sewage Ø 4" ; Outside 110 mm panjang 6 m; kelas B; MOF m' 68,800.00
Pipa PVC Sewage Ø 4" ; Outside 110 mm panjang 6 m; kelas B; RR m' 105,783.00
Pipa PVC Sewage Ø 6" ; Outside 160 mm panjang 6 m; kelas A; MOF m' 163,283.00
Pipa PVC Sewage Ø 6" ; Outside 160 mm panjang 6 m; kelas A; RR m' 167,058.00
Pipa PVC Sewage Ø 6" ; Outside 160 mm panjang 6 m; kelas B; MOF m' 133,200.00
Pipa PVC Sewage Ø 6" ; Outside 160 mm panjang 6 m; kelas B; RR m' 183,575.00
Pipa PVC Sewage Ø 8" ; Outside 200 mm panjang 6 m; kelas A; MOF m' 247,500.00
Pipa PVC Sewage Ø 8" ; Outside 200 mm panjang 6 m; kelas A; RR m' 254,633.00
Pipa PVC Sewage Ø 8" ; Outside 200 mm panjang 6 m; kelas B; MOF m' 203,900.00
Pipa PVC Sewage Ø 8" ; Outside 200 mm panjang 6 m; kelas B; RR m' 316,391.00
Pipa PVC Sewage Ø 10" ; Outside 250 mm panjang 6 m; kelas A; MOF m' 414,741.00
Pipa PVC Sewage Ø 10" ; Outside 250 mm panjang 6 m; kelas A; RR m' 426,025.00
Pipa PVC Sewage Ø 10" ; Outside 250 mm panjang 6 m; kelas B; MOF m' 324,100.00
Pipa PVC Sewage Ø 10" ; Outside 250 mm panjang 6 m; kelas B; RR m' 533,100.00
ASESORIS PIPA
GATE VALVE
Gate Valve All Flange DN 75 mm bh 1,110,000.00
Gate Valve All Flange DN 100 mm bh 1,440,000.00
Gate Valve All Flange DN 150 mm bh 3,050,000.00
Gate Valve All Flange DN 200 mm bh 4,800,000.00
Gate Valve All Flange DN 250 mm bh 6,500,000.00
FLANGE SOCKET PVC
Flange All Socket PVC DN 100 mm Rubber Ring Joint (RRJ) bh 115,000.00
Flange All Socket PVC DN 150 mm Rubber Ring Joint (RRJ) bh 177,000.00
Flange All Socket PVC DN 200 mm Rubber Ring Joint (RRJ) bh 306,000.00
Flange All Socket PVC DN 250 mm Rubber Ring Joint (RRJ) bh 842,000.00
TEE HDPE (PE 100)
Tee HDPE DN 150 x 100 mm Las bh 738,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 30 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Tee HDPE DN 150 x 150 mm Las bh 670,000.00


Tee HDPE DN 200 x 150 mm Las bh 704,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 31 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Tee HDPE DN 200 x 200 mm Las bh 1,100,000.00


Tee HDPE DN 250 x 150 mm Las bh 1,833,000.00
Tee HDPE DN 250 x 200 mm Las bh 2,420,000.00
Tee HDPE DN 250 x 250 mm Las bh 1,855,000.00
ALL FLANGE TEE
All Flange Tee GIDN 100 x 100 mm (4x4) bh 379,000.00
All Flange Tee GIDN 150 x 100 mm (6x4) bh 888,000.00
All Flange Tee GIDN 150 x 150 mm (6x6) bh 888,000.00
All Flange Tee GIDN 200 x 150 mm (8x6) bh 910,000.00
All Flange Tee GIDN 200 x 200 mm (8x8) bh 1,413,000.00
All Flange Tee GIDN 250 x 150 mm (10x6) bh 2,690,000.00
All Flange Tee GIDN 250 x 200 mm (10x8) bh 2,690,000.00
All Flange Tee GIDN 250 x 250 mm (10x10) bh 2,690,000.00
BEND
BEND ALL FLANGE
Bend All Flange DN 100 mm x 45º CI/ Cast Iron bh 349,000.00
Bend All Flange DN 100 mm x 90º CI/ Cast Iron bh 386,400.00
Bend All Flange DN 150 mm x 45º CI/ Cast Iron bh 538,300.00
Bend All Flange DN 150 mm x 90º CI/ Cast Iron bh 587,000.00
Bend All Flange DN 200 mm x 45º CI/ Cast Iron bh 821,400.00
Bend All Flange DN 200 mm x 90º CI/ Cast Iron bh 905,000.00
Bend All Flange DN 250 mm x 45º CI/ Cast Iron bh 1,182,600.00
Bend All Flange DN 250 mm x 90º CI/ Cast Iron bh 1,205,000.00
BEND PE-100
BEND PE-100 DN 150 mm x 22,5º Las bh -
BEND PE-101 DN 150 mm x 45º Las bh 540,000.00
BEND PE-102 DN 150 mm x 90º Las bh 680,000.00
BEND PE-100 DN 200 mm x 22,5º Las bh -
BEND PE-101 DN 200 mm x 45º Las bh 920,000.00
BEND PE-102 DN 200 mm x 90º Las bh 970,000.00
BEND PE-100 DN 250 mm x 22,5º Las bh -
BEND PE-101 DN 250 mm x 45º Las bh 1,420,000.00
BEND PE-102 DN 250 mm x 90º Las bh 1,695,000.00
BEND ALL SOCKET PVC
Bend All Socket PVC DN 100 mm x 90º Rubber Ring Joint (RRJ) bh 248,000.00
Bend All Socket PVC DN 150 mm x 90º Rubber Ring Joint (RRJ) bh 500,000.00
Bend All Socket PVC DN 200 mm x 90º Rubber Ring Joint (RRJ) bh 920,000.00
LAS FLANGE (steel)
Las Flange DN 50 mm (Ø 2") Flange + Packing bh 53,500.00
Las Flange DN 75 mm (Ø 3") Flange + Packing bh 75,000.00
Las Flange DN 100 mm (Ø 4") Flange + Packing bh 126,000.00
Las Flange DN 150 mm (Ø 6") Flange + Packing bh 137,500.00
Las Flange DN 200 mm (Ø 8") Flange + Packing bh 246,000.00
Las Flange DN 250 mm (Ø 10") Flange + Packing bh 295,000.00
FLANGE SPIGOT
Flange Spigot DN 150 mm (Ø 6") CI/ Cast Iron bh 344,500.00
Flange Spigot DN 200 mm (Ø 8") CI/ Cast Iron bh 508,500.00
Flange Spigot DN 250 mm (Ø 10") CI/ Cast Iron bh 803,000.00
DOUBLE AIR VALVE
Air Valve DN 250 mm (Ø 10") single bh 735,000.00
STUB END
Stub End PE DN 150 mm (Ø 6") bh 318,000.00
Stub End PE DN 200 mm (Ø 8") bh 686,500.00
Stub End PE DN 250 mm (Ø 10") bh 927,500.00
STUB END FLANGE
Stub End Flange DN 100 mm (Ø 4") Stub End + Flange las bh 380,500.00
Stub End Flange DN 150 mm (Ø 6") Stub End + Flange las bh 613,000.00
Stub End Flange DN 200 mm (Ø 8") Stub End + Flange las bh 1,086,500.00
Stub End Flange DN 250 mm (Ø 10") Stub End + Flange las bh 1,542,500.00
WALL PIPE
Wall Pipe All Flange DN 100 mm (Ø 4") bh 242,700.00
Wall Pipe All Flange DN 150 mm (Ø 6") bh 650,000.00
Wall Pipe All Flange DN 200 mm (Ø 8") bh 710,000.00
Wall Pipe All Flange DN 250 mm (Ø 10") bh 850,000.00
STREET BOX
Street Box DN 100 mm (Ø 4") bh 254,000.00
DOP PVC
Dop PVC DN 100 mm (Ø 4") Rubber Ring Joint (RRJ) bh 132,800.00
Dop PVC DN 150 mm (Ø 6") Rubber Ring Joint (RRJ) bh 254,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 32 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

FLANGE STEEL
Flange Steel DN 150 mm (Ø 6") bh 448,000.00
Flange Steel DN 200 mm (Ø 8") bh 4,038,000.00
Flange Steel DN 250 mm (Ø 10") bh 6,878,000.00
METER INDUK
Meter Induk DN 200 mm (Ø 8") bh 4,038,000.00
Meter Induk DN 250 mm (Ø 10") bh 11,150,000.00
GIBOULT JOINT
Giboult Joint DN 200 mm (Ø 8") bh 741,800.00
Giboult Joint DN 250 mm (Ø 10") bh 1,028,400.00
VIII . BAHAN LANGIT - LANGIT
1 ACOUSTIC BOARD
Acoustic Board uk. 30 X 30 cm lbr 19,000.00
Acoustic Board uk. 30 X 60 cm lbr 35,000.00
Acoustic Board uk. 60 X 120 cm lbr 146,000.00
List Kayu Profil Uk. 120x4x2 m' 8,000.00
2 SOFT BOARD-uk 4'X 8'
Gypsum board uk. 1,2 x 2,4 tebal 9 mm lbr 56,375.00
Gypsum board uk. 1,2 x 2,4 tebal 9 mm (Lapis allumunium foil) lbr 77,000.00
GRC board uk. 1,2 x 2,4 tebal 4 mm lbr 50,000.00
Kalsi board uk. 1,2 x 2,4 tebal 3 mm lbr 60,000.00
Lis gypsum 10 cm 1 meter m' 11,000.00
Lis kayu 2/4 m' 5,400.00
3 HARD BOARD-uk. 4'X 8' lbr 68,000.00
GYPROC uk.120cmx240cmx9mm lbr 65,000.00
4 PLY WOOD
Teak wood
Teakwood uk. 90 X 210 cm tbl = 3 mm lbr 134,000
Teakwood uk. 120 X 240 cm tbl =3 mm lbr 174,000
Teakwood uk. 90 X 210 cm tbl =4 mm lbr 160,000
Teakwood uk. 90 X 210 cm tbl = 9 mm lbr 155,000
Teakwood uk. 90 X 210 cm tbl =12 mm lbr 185,000
Teakwood uk. 90 X 210 cm tbl =15 mm lbr 245,000
Teakwood uk. 90 X 210 cm tbl =18 mm lbr 290,000
Tripleks
Triplek 1.2 x 2.4 m tbl = 3 mm lbr 49,687.50
Triplek 1.2 x 2.4 m tbl = 4 mm lbr 62,928.00
Triplek 1.2 x 2.4 m tbl = 6 mm lbr 77,266.00
Triplek 1.2 x 2.4 m tbl = 9 mm lbr 118,357.00
Triplek 0.9 x 2.1 m uk pintu tbl 4 mm lbr 82,500.00
Triplek 0.9 x 2.1 m uk pintu tbl 3 mm lbr 42,500.00
Phenol film 12 mm lbr 142,500.00
Multipleks
Multipleks uk.120 X 240 cm tbl= 9 mm lbr 96,333.00
Multipleks uk.120 X 240 tbl= 12 mm lbr 169,750.00
Multipleks uk.120 X 240 tbl= 15 mm lbr 224,250.00
Multipleks uk.120 X 240 tbl= 18 mm lbr 241,250.00
Formika (pelapis tripleks) ukuran pintu lbr 56,000.00
Eternit (GRC) 1mx1m2 tebal 4mm m2 18,062.50
Eternit (safleks) 1mx1m2 tebal 5mm m2 17,000.00
IX . B A H A N F I N I S H I N G
1 CAT KAYU
Menie kayu kg 31,966.00
Dempul/plamur kayu kg 24,958.00
Ambril/amplas lbr 6,692.00
Batu Apung kg 27,000.00
Cat dasar kayu (Bioduco) kg 36,461.00
Cat penutup kayu (maxi) kg 60,000.00
Cat kayu ex. Emco kg 61,000.00
Cat kayu (nippon paint) kg 62,000.00
Cat kayu (Deculux) kg 10,000.00
Cat genteng (Avian Paint) 4 Kg 100,000.00
Cat genteng (Dulux Wathershield Roof Paint) 2,5 lt 185,000.00
Cat genteng (Jotun Jotaroof) 2,5 lt 225,000.00
Koas/ kuas bh 12,800.00
Sirlak (bahan politur) ons 11,700.00
Spiritus ltr 12,866.00
Melamic ltr 60,000.00
Politur jadi ltr 58,730.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 33 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

2 CAT TEMBOK
Kalkarium kg 7,000.00
Kapur sirih kg 5,400.00
Plamur tembok kg 30,500.00
Cat tembok dasar (Dulux) kg 28,250.00
Cat Tembok kg 39,200.00
Cat Tembok (Sintex) 5 kg 110,000.00
Cat Tembok (Danabride) 5 kg 136,000.00
Cat Tembok (Catylac interior) kg 28,800.00
Cat Tembok ( Catylac exterior) 5 kg 180,000.00
Cat Tembok (Mowilex) 2,50 kg 280,000.00
Cat Tembok (Jotun interior) 5 kg 350,000.00
Cat Tembok (Jotun exterior) 5 kg 400,000.00
Cat Tembok (Dulux interior) 2,5 Kg 206,000.00
Cat Tembok (Dulux exterior) 2,5 Kg 268,000.00
Cat Waterproofing (No Drop) 1 kg 49,800.00
Cat Waterproofing ( Aquaproof) 1 kg 50,000.00
Cat Waterproofing (Dulux Aquashield) 1 kg 112,000.00
3 CAT BESI
Menie besi kg 38,400.00
Cat besi mengkilat kg 66,400.00
Cat kg 51,400.00
Thinner A ltr 17,300.00
Minyak cat ltr 23,600.00
Thinner Super ltr 21,100.00
Residu (teer/aspal) ltr 3,600.00
Vernis kg 45,000.00
Vernis batu alam kg 55,700.00
Lem Aica Aibon/ lem kuning kg 54,600.00
Minyak Beton & bekisting ltr 48,000.00
Minyak aspal/ Kerosen / Minyak Tanah ltr 9,600.00
Air ltr 50.00
Air m3 50,000.00
Sealent tube 28,400.00
Soda api kg 32,800.00
Sabun kg 13,000.00
wallpaper m' 25,000.00
HPL putih lbr 115,000.00
HPL polos lbr 130,000.00
HPL motif/tekture lbr 235,000.00
Wood Filler Propan kg 45,000.00
Wood stain propan ltr 85,000.00
sending sealer impra ltr 65,000.00
X . BAHAN KACA
Kaca polos/ bening tebal 3 mm m2 117,500.00
Kaca polos/ bening tebal 5 mm m2 120,000.00
Kaca Es/ Buram tebal 3 mm m2 85,000.00
Kaca Es/ Buram tebal 5 mm m2 95,000.00
Kaca ray band 3mm m2 100,000.00
Kaca ray band 5mm m2 140,000.00
Cermin tebal 5 mm m2 50,000.00
Kaca Bening Tebal 8 mm m2 150,000.00
Kaca Bening Tebal 10 mm m2 210,000.00
Kaca Tempered Flat tebal 12 mm m2 585,000.00
kaca patri m2 150,000.00
Profil kaca m' 6,500.00
XI . BAHAN INSTALASI LISTRIK
1 KABEL LISTRIK
NYA : 1 X 1 1/2 mm2 m' 3,300.00
SPLN LMK 1 X 2 1/2 mm2 m' 3,800.00
. 1X4 mm2 m' 6,000.00
1X6 mm2 m' 8,600.00
NYY : 2 X 1 1/2 mm2 m' 9,000.00
PRIMA 2 X 2 1/2 mm2 m' 15,500.00
. 2X4 mm2 m' 27,500.00
2X6 mm2 m' 36,000.00
3 X 1 1/2 mm2 m' 13,500.00
3 X 2 1/2 mm2 m' 21,000.00
3X4 mm2 m' 36,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 34 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

3X6 mm2 m' 51,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 35 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

NYM : 2 X 1 1/2 mm2 m' 7,500.00


PRIMA 2 X 2 1/2 mm2 m' 11,000.00
. 2X4 mm2 m' 23,000.00
3 X 1 1/2 mm2 m' 14,000.00
3 X 2 1/2 mm2 m' 22,000.00
3X4 mm2 m' 32,000.00
3X6 mm2 m' 45,000.00
2 SAKLAR
Out bauw . Seri (double) ex. Panasonic bh 14,000.00
. Engkel (tunggal) ex. Panasonic bh 10,000.00
In bauw . Seri (double) ex. Panasonic bh 21,000.00
. Engkel (tunggal) ex. Panasonic bh 13,500.00
3 FUSE BOX (SEKERING KASA)
1 group bh 130,000.00
2 group bh 230,000.00
3 group bh 320,000.00
MCB 4 A LEGRAN bh 32,000.00
MCB 6 A LEGRAN bh 32,000.00
4 STEKER -
Biasa bh 2,500.00
Arde bh 10,000.00
T Biasa bh 5,000.00
T dengan Arde bh 15,000.00
5 FITING
Flaon bh 10,000.00
Gantung bh 4,000.00
Kap bh 19,200.00
Kombinasi bh 5,000.00
6 STOP KONTAK
Arde Outbow putih bh 10,000.00
Arde Outbow hitam bh 5,000.00
Arde Inbouw bh 20,000.00
Arde Putar bh 35,000.00
7 LAIN - LAIN
Outlet TV ex. Broco bh 35,000.00
Outlet Telephone ex. Broco bh 50,000.00
Down light / PLC 13 watt ex. Philips bh 33,000.00
Fitting Plafond ex. Panasonic bh 10,000.00
RM 2x TL LED 18 watt ex. Philips bh 270,000.00
RM 2x TL LED 36 watt ex. Philips bh 370,000.00
Pipa listrik 5/8 btg 7,000.00
elbow bh 500.00
Lasdop bh 210.00
klem bh 200.00
mangkok dus bh 700.00
XII . ALAT-ALAT PENGUNCI & PENGGANTUNG
1 KUNCI TANAM
Union : 1 X slag bh 80,000.00
2 X slag bh 120,000.00
Yale : 1 X slag bh 85,000.00
2 X slag bh 130,000.00
Kuda : 1 X slag bh 60,000.00
2 X slag bh 70,000.00
2 ENGSEL DAN GERENDEL
Engsel Angin Koboi bh 45,000.00
Engsel Kupu-kupu biasa bh 8,300.00
Engsel Jendela Kuning bh 15,100.00
Engsel Pintu Kuning bh 18,800.00
Engsel Pintu biasa Uk. 3'' (KICA) bh 15,800.00
kunci selot bh 116,400.00
Kunci silinder bh 95,200.00
Nylon kupu-kupu bh 75,000.00
Espagnolet bh 9,000.00
Grendel Tanam bh 48,600.00
Grendel biasa bh 7,600.00
Gerendel jendela kuning bh 7,600.00
Gerendel jendela biasa bh 5,700.00
Kait Angin bh 13,600.00
Door Stop MDS 889 SN DEKSON bh 50,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 36 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Door Closer 300 DEKSON bh 219,300.00


Rel pintu dorong Type J3 Uk. 1,8 m DEKSON bh 250,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 37 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Rel pintu dorong Type J3 Uk. 2,4 m HENDERSON bh 395,000.00


Naco per Daun bh 41,000.00
Rolling door Besi m2 325,000.00
Rolling door Almunium m2 275,000.00
Awning Almunium m2 225,000.00
Pintu Lipat Besi tebal 0,23 mm m2 650,000.00
Sunscreen Allumunim m2 650,000.00
PAGAR BRC. 90 x 240 /lb 210,000.00
PAGAR BRC. 120 A2 /lb 280,000.00
Allumunium Foil Tb. 4mm, Lapisan atas bawah m2 9,000.00
Handle pintu Stainless 500 mm bh 210,000.00
Patch fitting 1 set 1,500,000.00
Rambuncis bh 17,000.00
Engsel Casement 8" bh 35,000.00
Engsel Casement 10" bh 35,000.00
Engsel Casement 12" bh 45,000.00
Engsel Casement 16" bh 55,000.00
XIII . BAHAN SANITAIR
KLOSET DUDUK TOTO bh 1,557,200.00
KLOSET JONGKOK TOTO bh 261,875.00
WASTAFEL PEDESTAL bh 124,857.14
WASTAFEL MEJA OVAL bh 225,000.00
WASTAFEL GANTUNG BULAT TOTO bh 570,000.00
WASTAFEL GANTUNG SUDUT bh 310,000.00
WASTAFEL GANTUNG SUDUT KECIL bh 275,000.00
WASTAFEL BAK CUCI bh 160,000.00
Bak cuci stainless steel (96x43) cm bh 150,000.00
Bak mandi fiber glass, vol 220 ltr sudut (ALCO) bh 565,000.00
TEMPAT SABUN GANTUNG bh 35,200.00
TEMPAT SABUN TANAM bh 35,000.00
Kran Air 1/2" bh 28,000.00
Kran Air 3/4" bh 26,000.00
Seal tape ONDA bh 3,642.00
Floor drain Stainless bh 70,000.00
urionir TOTO bh 1,087,500.00
Bak tandon air fiber isi 500 Ltr PENGUIN bh 888,750.00
Bak tandon air fiber isi 1000 Ltr PENGUIN bh 1,605,555.00
Pelampung Otomatis bh 77,857.00
Bathube size PxLxT : 170x75x39.5cm TOTO bh 3,700,000.00
Roof Drain Metal bh 65,000.00
XIV . ALAT PENGIKAT KAYU
PAKU - (reng, usuk, plafond) kg 16,117.00
PAKU - payung kg 30,066.00
PAKU - sekrup kg 42,800.00
PAKU - beton kg 41,666.67
PAKU - asbes kg 31,321.43
PAKU - 12 cm kg 16,000.00
PAKU - eternit kg 22,176.47
PAKU - Ramset bh 2,100.00
Paku sekrup Onduline bh 1,200.00
Paku 1/2-1 bh 300.00
MUR BAUT (kuda-kuda) kg 24,875.00
ANGKUR BAUT bh 17,375.00
LEM KAYU kg 18,100.00
Lem khusus wallpapaer kg 30,000.00
Tali Ijuk kg 17,000.00
Ijuk kg 10,000.00
Skrup Fixer bh 2,100.00
Dinabolt Ø 12 mm (10 s/d 15 cm) bh 4,062.50
XV . POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh 425,000.00
2 POMPA AIR LISTRIK
Sanyo 100 watt bh 482,900.00
Fuji 250 watt bh 1,500,000.00
Shimizu . 100 watt bh 601,285.71
. 90 watt bh 400,000.00
Dab . 125 watt bh 294,000.00
. 175 watt bh 450,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 38 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Mesin Jetpump Kap . 250 watt bh 2,075,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 39 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

XVI. L A I N - L A I N
Venetions Blinds atau Vertical Blinds (tirai) m2 50,000.00
ASPAL
Aspal curah kg 11,500.00
Aspal drum kg 12,350.00
Sand Sheet AMP ton 1,378,333.33
Kayu bakar m3 220,000.00
Formite/Penjaga jarak / Spacer (alat bantu) Ls 2,000.00
Alat Bantu (BPJK) set 50,000.00
Solar (Industri) ltr 10,500.00
Premium (Industri) ltr 7,800.00
Pelumas / olie ltr 30,000.00
Beton K-125 produk ready mix m3 893,200.00
Beton K-175 produk ready mix m3 921,800.00
Beton K-250 produk ready mix m3 1,003,200.00
Beton K-300 produk ready mix m3 1,038,400.00
Beton K-350 produk ready mix m3 1,097,800.00
Beton fs 45 produk Ready Mix m3 1,157,200.00
Joint Sealent Kg 68,750.00
Polytene (plastik cor) Kg 30,000.00
Curing Compound Ltr 38,500.00
Epoxy Bahan Penutup (sealant) Kg 68,750.00
U-DITCH (BABN)
U 400 x 600 x 1200 mm, K. 350 bh 506,000.00
U 400 x 600 x 1200 mm, K. 350 M' 421,600.00
U 500 x 500 x 1200 mm, K. 350 bh 521,000.00
U 500 x 500 x 1200 mm, K. 350 M' 434,100.00
U 500 x 600 x 1200 mm, K. 350 bh 531,000.00
U 500 x 600 x 1200 mm, K. 350 M' 442,500.00
U 800 x 800 x 1200 mm, K. 350 bh 943,000.00
U 800 x 800 x 1200 mm, K. 350 M' 785,833.33
CU-400 x 600 bh 140,000.00
CU-400 x 600 M' 233,333.33
CU-500 x 500 bh 189,000.00
CU-500 x 500 M' 315,000.00
CU-500 x 600 bh 252,000.00
CU-500 x 600 M' 420,000.00
CU-800 x 800 bh 345,000.00
CU-800 x 800 M' 575,000.00
U-DITCH (JKS PRECAST)
U 300 x 300 x 1200 mm, K. 350 M' 303,780.00
U 300 x 400 x 1200 mm, K. 350 M' 360,250.00
U 300 x 500 x 1200 mm, K. 350 M' 414,450.00
TU- 30HD K. 350 M' 204,000.00
U 400 x 400 x 1200 mm , K. 350 M' 448,150.00
U 400 x 500 x 1200 mm , K. 350 M' 507,750.00
U 400 x 600 x 1200 mm , K. 350 M' 567,350.00
TU- 40HD, K. 350 M' 315,000.00
U 500 x 500 x 1200 mm, K. 350 M' 579,700.00
U 500 x 600 x 1200 mm, K. 350 M' 644,700.00
U 500 x 700 x 1200 mm, K. 350 M' 710,000.00
TU- 50HD, K. 350 M' 460,000.00
U 600 x 600 x 1200 mm . K. 350 M' 762,000.00
U 600 x 700 x 1200 mm . K. 350 M' 832,500.00
U 600 x 800 x 1200 mm . K. 350 M' 915,000.00
TU- 60HD, K. 350 M' 535,000.00
U 800 x 800 x 1200 mm . K. 350 M' 1,101,100.00
U 800 x 1000 x 1200 mm . K. 350 M' 1,276,000.00
TU- 80HD, K. 350 M' 865,000.00
U 1000 x 1000 x 1200 mm . K. 350 M' 1,566,500.00
TU- 100HD, K. 350 M' 1,045,000.00
U 1200 x 1200 x 1200 mm . K. 350 M' 2,021,000.00
TU- 120HD, K. 350 M' 1,231,000.00
BOX CULVERT
Box Culvert 500 x 500 x 1000mm, K.350 Tbl. 10 cm BABN Unit 1,310,000.00
Box Culvert 600 x 600 x 1000mm, K.350 Tbl. 10 cm BABN Unit 1,420,000.00
Box Culvert 800 x 800 x 1000mm, K.350 Tbl. 10 cm BABN Unit 1,530,000.00
Box Culvert 600 x 600 x 1200mm, K.350 Tbl. 10 cm BABN Unit 2,310,000.00
Box Culvert 1000 x 1000 x 1000mm, K.350 Tbl. 15 cm BABN Unit 2,410,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 40 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Box Culvert 800 x 800 x 1200mm, K.350 Unit 3,650,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 41 dari 74 Halaman
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Box Culvert 600 x 600 x 1000mm, K.350 JKS PRECAST Unit 1,430,000.00
Box Culvert 1000 x 1000 x 1000mm, K.350 JKS PRECAST Unit 3,927,635.00
Box Culvert 1200 x 1200 x 1000mm, K.350 Unit 4,229,000.00
Box Culvert 1200 x 1500 x 1500mm, K.350 Unit 6,215,000.00
Panel Beton Bertulang uk 2400 x 400 Lbr 110,000.00
Panel Beton Bertulang uk 2400 x 400 Lbr 165,000.00
Kolom Beton Bertulang uk 225 x 18 x 17 cm tebal 5 cm (Tinggi 1,6 m) Btg 245,500.00
Kolom Beton Bertulang uk 280 x 18 x 17 cm tebal 5 cm (Tinggi 2,0 m) Btg 298,600.00
Kolom Beton Bertulang uk 320 x 18 x 17 cm tebal 5 cm (Tinggi 2,4 m) Btg 336,600.00
Kolom Beton Bertulang uk 370 x 18 x 17 cm tebal 5 cm (Tinggi 2,8 m) Btg 384,000.00
Kolom Beton Bertulang uk 425 x 18 x 17 cm tebal 5 cm (Tinggi 3,2 m) Btg 436,200.00
Kolom Beton Bertulang uk 225 x 18 x 17 cm tebal 8 cm (Tinggi 1,6 m) Btg 267,500.00
Kolom Beton Bertulang uk 280 x 18 x 17 cm tebal 8 cm (Tinggi 2,0 m) Btg 320,600.00
Kolom Beton Bertulang uk 320 x 18 x 17 cm tebal 8 cm (Tinggi 2,4 m) Btg 358,600.00
Kolom Beton Bertulang uk 370 x 18 x 17 cm tebal 8 cm (Tinggi 2,8 m) Btg 406,000.00
Kolom Beton Bertulang uk 425 x 18 x 17 cm tebal 8 cm (Tinggi 3,2 m) Btg 458,200.00
Panel Beton
Kolom Beton 160 x200 x 300 BABN pcs 244,800.00
Kolom Beton 160 x200 x 350 BABN pcs 285,600.00
Kolom Beton 160 x200 x 400 BABN pcs 326,400.00
ALUMUNIUM COMPOSIT / ACP
ACP Perpotated PVDF 4 mm terpasang (SEVEN) m2 970,000.00
ACP PVDF 4 mm polos (terpasang) (SEVEN) m2 750,000.00
ACP PE 4 mm (SEVEN) m2 500,000.00
ACP PE 3 mm (MARKS) m2 300,000.00
TANAMAN
Jenis Peneduh
Ketapang kencana (tinggi 1 m) bh 86,000.00
Pohon pulai (tinggi 1 m) bh 37,500.00
Bambu kuning (isi 3-5 btg) bh 61,000.00
Pohon Tabebuia ungu (tinggi 30 cm) bh 83,000.00
Jenis Perdu
Tanaman cincau hijau (tinggi 50 cm) bh 15,000.00
Krokot merat bh 6,800.00
Cemara laut (tinggi 30 cm) bh 43,000.00
Rombusa mini hijau bh 24,000.00
Sri gading kuning bh 20,000.00
Pucuk merah (tinggi 30 cm) bh 43,000.00
Rumput gajah mini m2 35,000.00
Cendrawasih bh 15,000.00

Slawi,10 Desember 2020

Menyetujui : Disusun Oleh :


Kepala Bidang Bangunan Gedung Konsultan Penyusun AHSP
Dinas Perkimtaru Kabupaten Tegal CV. Lemlit Global Riset
Selaku Pejabat Pembuat Komitmen

TTD TTD

KARDI, S.IP, MM TEGUH HARIS SANTOSO.ST.MT


NIP. 197208241994031004 DIREKTUR

Mengetahui :
Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

TTD

M. BUDI EKO S, ST,. MM


NIP. 19770201 200312 1 003

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN BAHAN Halaman 42 dari 74 Halaman
DAFTAR HARGA SATUAN PEKERJAAN
Wilayah Bawah ; Kec. Slawi, Dukuhwaru, Lebaksiu, Talang, Adiwerna, Pangkah (Kecuali Dermasuci), Tarub,
Dukuhturi, Pagerbarang, Kedungbanteng, Kramat, Suradadi, Warurejo, Balapulang (bawah), Margasari

KODE
No. URAIAN PEKERJAAN SAT.
ANALISA

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 BG.2.2.1.1 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m'
2 A.2.2.1.5 Pembuatan Kantor Sementara dg Lantai Plesteran m2
3 A.2.2.1.7 Pembuatan Gudang Semen dan Peralatan m2
4 A.2.2.1.8 Pembuatan Bedeng Pekerja m2
5 A.2.2.1.9 Membersihkan Lapangan dan Perataan m2
6 A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu m2
7 BG.2.2.1.2 Membongkar Beton Bertulang m3
8 BG.2.2.1.3 Membongkar Dinding Tembok Bata Merah m3
9 BG.2.2.1.4 Pagar Kawat Jaring Galvanis Panjang 240 cm m2
10 A.2.2.1.16 Pemasangan Pagar Panel Beton Pracetak 5 x 50 x 240 cm m2
11 BG.2.2.1.5 Sewa Scaffolding Lengkap Set/ hari
12 BG.2.2.1.6 Membongkar Pasangan batu kali m3
13 BG.2.2.1.7 Membongkar / Kupasan Plesteran m2
14 BG.2.2.1.8 Membongkar Lantai m2
15 BG.2.2.1.9 Membongkar Penutup Atap m2
16 BG.2.2.1.10 Membongkar Rangka Atap (Reng, Usuk) m2
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m m3
2 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m m3
3 A.2.3.1.3 Menggali Tanah Biasa Sedalam 3 m m3
4 A.2.3.1.4 Menggali Tanah Keras Sedalam 1 m m3
5 A.2.3.1.5 Menggali Tanah Cadas Sedalam 1 m m3
6 A.2.3.1.6 Menggali Tanah Lumpur Sedalam 1 m m3
7 A.2.3.1.7 Mengerjakan Striping Tebing Setinggi 1 m m2
8 A.2.3.1.8 Membuang Tanah sejauh 30 m' m3
9 BG.2.3.1.1 Membuang Tanah sejauh 100 m' (Pendekatan Analisa menggunakan BOW.A.7) m3
10 BG.2.3.1.2 Membuang Tanah sejauh 200 m' (Pendekatan Analisa menggunakan BOW.A.7) m3
11 BG.2.3.1.3 Pengurugan Kembali Tanah Hasil Galian m3
12 A.2.3.1.11 Pengurugan dengan pasir urug m3
Pengurugan dengan Tanah urug Dipadatkan Menggunakan Alat (Water Tanker, Buldozer, Vibratory
13 BG.2.3.1.4 m3
Roller)

14 BG.2.3.1.5 Pengurugan dengan Tanah urug Dipadatkan Menggunakan Alat (Tamper Rammer/Stamper Kuda) m3

15 A.2.3.1.13 Pemasangan Lapisan Ijuk tebal 10 cm untuk Bidang Resapan m2


16 BG.2.3.1.6 Pengurugan dengan Sirtu m3

17 BG.2.3.1.7 Pengurugan dengan Sirtu Dipadatkan menggunakan alat (Water tanker, Bulldozer, Vibratory Roller) m3

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1 Pemasangan Pondasi Batu Belah 1SP : 3 PP m3
2 BG.3.2.1.1 Pemasangan Pondasi Batu Belah 1SP : 3 PP (Batu belah 60%,Blonos 40%) m3
3 A.3.2.1.3 Pemasangan Pondasi Batu Belah 1SP : 5 PP m3
4 BG.3.2.1.2 Pemasangan Pondasi Batu Belah 1SP : 5 PP (Batu belah 60%,Blonos 40%) m3
5 A.3.2.1.9 Pemasangan Batu Kosong/Anstamping m3
Pemasangan Pondasi Sumuran diameter 100 cm ( 60% Beton Campuran 1PC : 2PB : 3KR & 40% Batu
m3
6 BG.3.2.1.3 Belah)
7 BG.3.2.1.4 Pemasangan Kembali Pondasi Batu Belah Bekas Bongkaran 1SP : 3 PP m3
8 BG.3.2.1.5 Pemasangan Kembali Pondasi Batu Belah (bekas bongkaran) 1SP : 5 PP m3
IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.1 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3
2 A.4.1.1.2 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 m3
3 A.4.1.1.3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 m3
4 A.4.1.1.4 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3
5 A.4.1.1.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3
6 A.4.1.1.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3
7 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3
8 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3
9 A.4.1.1.9 Membuat Beton mutu f'c=24,0 MPa(K275),slum(12±2)cm,w/c=0,53 m3
10 A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 m3
11 A.4.1.1.11 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 m3
12 A.4.1.1.12 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3
13 BG.4.1.1.1 Menggelar Beton Ready Mix mutu (K250), slump (12±2)cm, w/c = 0,58 Min 6 m3 m3
14 BG.4.1.1.2 Menggelar Beton Ready Mix mutu (K300), slump (12±2)cm, w/c = 0,58 Min 6 m3 m3
15 BG.4.1.1.3 Menggelar Beton Ready Mix mutu (K350), slump (12±2)cm, w/c = 0,58 Min 6 m3 m3
16 BG.4.1.1.4 Menggelar Beton Ready Mix fs45, slump (Maks. 8 cm - Min 2,5 cm) Min 6 m3 m3

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 43 dari 74 Halaman
KODE
No. URAIAN PEKERJAAN SAT.
ANALISA

17 BG.4.1.1.5 Pembesian Dengan Besi Beton Polos Kg


18 BG.4.1.1.6 Pembesian Dengan Besi Beton Ulir Kg
19 BG.4.1.1.7 Memasang Jaring Kawat baja/Wire Mesh M6 m2
20 BG.4.1.1.8 Memasang Jaring Kawat baja/Wire Mesh M8 m2
21 BG.4.1.1.9 Memasang Jaring Kawat baja/Wire Mesh M10 m2
22 A.4.1.1.20 Memasang Bekisting untuk Pondasi m2
23 BG.4.1.1.10 Memasang Bekisting untuk Pondasi (papan kayu lokal) m2
24 A.4.1.1.21 Memasang Bekisting untuk Sloof m2
25 BG.4.1.1.11 Memasang Bekisting untuk Sloof (2x pakai) m2
26 BG.4.1.1.12 Memasang Bekisting untuk Sloof (Papan kayu lokal, 2x pakai) m2
27 A.4.1.1.22 Memasang Bekisting untuk Kolom m2
28 BG.4.1.1.13 Memasang Bekisting untuk Kolom m2
29 BG.4.1.1.14 Memasang Bekisting untuk Kolom (2x pakai) m2
30 BG.4.1.1.15 Memasang Bekisting untuk Kolom (ekspose) 2x pakai m2
31 BG.4.1.1.16 Memasang Bekisting untuk Kolom (Papan kayu lokal, 2x pakai) m2
32 BG.4.1.1.17 Memasang Bekisting untuk Kolom (ekspose) Papan kayu lokal 2x pakai m2
33 A.4.1.1.23 Memasang Bekisting untuk Balok m2
34 BG.4.1.1.18 Memasang Bekisting untuk Balok m2
35 BG.4.1.1.19 Memasang Bekisting untuk Balok (2x pakai) m2
36 BG.4.1.1.20 Memasang Bekisting untuk Balok (ekspose) 2x pakai m2
37 BG.4.1.1.21 Memasang Bekisting untuk Balok (papan kayu lokal, 2x pakai) m2
38 BG.4.1.1.22 Memasang Bekisting untuk Balok (ekspose) papan kayu lokal 2x pakai m2
39 A.4.1.1.24 Memasang Bekisting untuk Lantai m2
40 BG.4.1.1.23 Memasang Bekisting untuk Lantai (papan kayu lokal) m2
41 BG.4.1.1.24 Memasang Bekisting untuk Lantai (Bondek Tb. 0,75 mm) m2
42 A.4.1.1.25 Memasang Bekisting untuk Dinding m2
43 A.4.1.1.26 Memasang Bekisting untuk Tangga m2
44 BG.4.1.1.25 Memasang Bekisting Plat Beton (Tinggi Maks. 1 m ) m2
45 Hit.papan Memasang Bekisting Plat Beton (Tinggi Maks. 1 m ) m2
IV A A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
1 A.4.1.2.20 Bahan Grout Campuran m3
2 A.4.1.2.21 Bahan Grout Campuran (Tidak Campuran) m3
3 A.4.1.2.22 Upah Pekerjaan Gruot pada Joint Beton Pra Cetak ttk
4 A.4.1.2.23 Pemasangan Bekisting Joint Pra Cetak ttk
V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
1 BG.4.2.1.1 Pengadaan, Perakitan dan Pemasangan Besi Profil Kg
2 BG.4.2.1.2 Pemasangan Sunscreen Aluminium m2
3 BG.4.2.1.3 Pemasangan Kusen Pintu Aluminium (4" White YKK) m'
4 BG.4.2.1.4 Pemasangan Kusen Pintu Allumunium (4" Brown YKK) m'
5 BG.4.2.1.5 Pemasangan Kusen Pintu Allumunium (4" Silver YKK) m'
6 BG.4.2.1.6 Pemasangan Pintu Kaca Rangka Alumunium (silver YKK) m2
7 BG.4.2.1.7 Pemasangan Talang Datar / Jurai , Seng BJLS 20 Lebar 90 cm (Ukuran Papan) m'
8 A.4.2.1.20 Pemasangan rk. Besi Hollow 1 x 40.40.2mm; Modul 60x120 cm dinding partisi m2
9 BG.4.2.1.8 Pemasangan rk. Besi Hollow 1 x 36.36.0,3 mm; Modul 60x60 cm plafond m2
Pemasangan Atap Pelana bentang 5-7 meter Rangka Atap Baja Ringan profil Z75 (tebal 0.75),
10 BG.4.2.1.9 CN75 ( tebal 0.75 mm) dan profil CN65 (Tebal 0.75) , Baja Ringan B32 - 0,45 mm, jarak usuk 70 cm m2
jarak Reng 25 cm Merk Giga Steel

Pemasangan Atap Pelana bentang 7-10 meter Rangka Atap Baja Ringan profil Z75 (tebal 0.75),
11 BG.4.2.1.10 CN75 ( tebal 0.75 mm) dan profil CN65 (Tebal 0.75) , Baja Ringan B32 - 0,45 mm, jarak usuk 70 cm m2
jarak Reng 25 cm Merk Giga Steel

Pemasangan Atap Pelana bentang 10-14 meter Rangka Atap Baja Ringan profil Z75 (tebal 0.75),
12 BG.4.2.1.11 CN75 ( tebal 0.75 mm) dan profil CN65 (Tebal 0.75) , Baja Ringan B32 - 0,45 mm, jarak usuk 70 cm m2
jarak Reng 25 cm Merk Giga Steel

Pemasangan Atap Limasan bentang 5-7 meter Rangka Atap Baja Ringan profil Z75 (tebal 0.75),
13 BG.4.2.1.12 CN75 ( tebal 0.75 mm) dan profil CN65 (Tebal 0.75) , Baja Ringan B32 - 0,45 mm, jarak usuk 70 cm m2
jarak Reng 25 cm Merk Giga Steel

Pemasangan Atap Limasan bentang 7-10 meter Rangka Atap Baja Ringan profil Z75 (tebal 0.75),
14 BG.4.2.1.13 CN75 ( tebal 0.75 mm) dan profil CN65 (Tebal 0.75) , Baja Ringan B32 - 0,45 mm, jarak usuk 70 cm m2
jarak Reng 25 cm Merk Giga Steel

Pemasangan Atap Limasan bentang 10-14 meter Rangka Atap Baja Ringan profil Z75 (tebal 0.75),
15 BG.4.2.1.14 CN75 ( tebal 0.75 mm) dan profil CN65 (Tebal 0.75) , Baja Ringan B32 - 0,45 mm, jarak usuk 70 cm m2
jarak Reng 25 cm Merk Giga Steel

Pemasangan Atap Mono bentang 5-7 meter Rangka Atap Baja Ringan profil Z75 (tebal 0.75), CN75
16 BG.4.2.1.15 ( tebal 0.75 mm) dan profil CN65 (Tebal 0.75) , Baja Ringan B32 - 0,45 mm, jarak usuk 70 cm jarak m2
Reng 25 cm Merk Giga Steel

Pemasangan Atap Mono bentang 7-10 meter Rangka Atap Baja Ringan profil Z75 (tebal 0.75),
17 BG.4.2.1.16 CN75 ( tebal 0.75 mm) dan profil CN65 (Tebal 0.75) , Baja Ringan B32 - 0,45 mm, jarak usuk 70 cm m2
jarak Reng 25 cm Merk Giga Steel

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 44 dari 74 Halaman
KODE
No. URAIAN PEKERJAAN SAT.
ANALISA

Pemasangan Atap Mono bentang 10-14 meter Rangka Atap Baja Ringan profil Z75 (tebal 0.75),
18 BG.4.2.1.17 CN75 ( tebal 0.75 mm) dan profil CN65 (Tebal 0.75) , Baja Ringan B32 - 0,45 mm, jarak usuk 70 cm m2
jarak Reng 25 cm Merk Giga Steel

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 45 dari 74 Halaman
KODE
No. URAIAN PEKERJAAN SAT.
ANALISA

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm tbl 1 Bata Camp. 1SP : 3PP m2
2 A.4.4.1.4 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm tbl 1 Bata Camp. 1SP : 5PP m2
3 A.4.4.1.8 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm tbl 1/2 Bata Camp. 1SP:3PP m2
4 A.4.4.1.10 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm tbl 1/2 Bata Camp. 1SP:5PP m2
5 A.4.4.1.22 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 3PP m2
6 BG.4.4.1.1 Pemasangan Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai m2
VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.4.2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm m2
2 A.4.4.2.5 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm m2
3 A.4.4.2.20 Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm m'
4 A.4.4.2.23 Pemasangan Plesteran Ciprat 1Pc : 2 Pp m2
5 A.4.4.2.26 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp m2
6 A.4.4.2.27 Pemasangan Acian m2
7 BG.4.4.2.1 Pemasangan Plesteran dengan Mortar Siap Pakai (MSP) MU -202 Tb. 10 mm m2
8 BG.4.4.2.2 Pemasangan Acian dengan Mortar Siap Pakai (MSP) MU-250 Tb. 1,5 mm m2
VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING
1 BG.4.4.3.1 Pemasangan Homogeneous Tile Uk. 60 x 60 cm POLISHED (NIRO) m2
2 BG.4.4.3.2 Pemasangan Homogeneous Tile Uk. 60 x 60 cm UNPOLISHED (NIRO) m2
3 BG.4.4.3.3 Pemasangan Lantai Keramik 30 x 30 cm putih m2
4 BG.4.4.3.4 Pemasangan Lantai Keramik 40 x 40 cm, putih m2
5 BG.4.4.3.5 Pemasangan Lantai Keramik 40 x 40 cm, warna m2
6 BG.4.4.3.6 Pemasangan Lantai Keramik 20 x 20 cm warna m2
7 BG.4.4.3.7 Pemasangan Lantai Keramik 20 x 20 cm anti selip m2
8 BG.4.4.3.8 Pemasangan Lantai Keramik 25 x 25 cm warna m2
9 BG.4.4.3.9 Pemasangan Lantai Keramik 25 x 25 cm anti selip m2
10 A.4.4.3.39 Pemasangan Plint Keramik Ukuran 10x20 cm m'
11 BG.4.4.3.10 Pemasangan Plint Keramik Ukuran 10x30 cm warna m'
12 BG.4.4.3.11 Pemasangan Plint Keramik Ukuran 10x40 cm warna m'
13 A.4.4.3.54 Pemasangan Dinding Keramik 20x20 cm m2
14 BG.4.4.3.12 Pemasangan Dinding Keramik 20x25cm,warna m2
15 BG.4.4.3.13 Pemasangan Dinding Keramik 25x40 cm,warna m2
16 BG.4.4.3.14 Pemasangan Dinding Homogeneous Tile 30x60 cm ( Niro) m2
17 BG.4.4.3.15 Pemasangan Dinding Homogeneous Tile 40x60 cm m2
18 BG.4.4.3.16 Pemasangan Dinding Batu Andesit m2
19 A.4.4.3.60 Pemasangan Wallpaper Lebar 50 Cm m2
20 BG.4.4.3.17 Pemasangan Paving Block Natural Tebal 6 Cm Persegi ( Model Bata ) ABC m2
21 BG.4.4.3.18 Pemasangan Paving Block Natural Tebal 8 Cm Persegi ( Model Bata ) ABC m2
22 BG.4.4.3.19 Pemasangan Paving Block Berwarna Tebal 6 Cm Persegi ( Model Bata ) ABC m2
23 BG.4.4.3.20 Pemasangan Paving Block Berwarna Tebal 8 Cm Persegi ( Model Bata ) ABC m2
IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT
1 A.4.5.1.7 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm m2
2 BG.4.5.1.1 Memasang Langit-langit GRC Board, Ukuran (120x240) tebal 4 mm m2
3 BG.4.5.1.2 Memasang Langit-langit Kalsiboard, Ukuran (120x240) tebal 3 mm m2
4 A.4.5.1.9 List Langit-Langit Kayu Profil Uk. 4x2x120 cm m1
5 BG.4.5.1.3 List Langit-Langit GypsumBoard 10 cm m1
X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
1 BG.4.5.2.1 Pemasangan Atap Genteng Press Jatiwangi m2
2 BG.4.5.2.2 Pemasangan Atap Genteng Morando Natural m2
3 BG.4.5.2.3 Pemasangan Atap Genteng Morando Glasur m2
4 BG.4.5.2.4 Pemasangan Genteng Bubung Press Jatiwangi m'
5 BG.4.5.2.5 Pemasangan Genteng Bubung Morando Natural m'
6 BG.4.5.2.6 Pemasangan Genteng Bubung Morando Glasur m'
7 BG.4.5.2.7 Pemasangan Atap Genteng Keramik Uk. 31x31 cm (KIA) m2
Pasang Atap Onduline Classic( kemiringan atap > 10˚) Uk. 200x95x0.30 cm, Jarak Rangka Gording
8 A.4.5.2.31 m2
atau Reng max. 45 cm
Pasang Atap Onduvilla Shaded Colour ( kemiringan atap > 15˚) Uk. 160x40x0.30 cm, jarak Rangka
9 BG.4.5.2.8 m2
Gording atau Reng max.32 cm

10 BG.4.5.2.9 Pasang Atap Onduline Tile Uk. 200x97x0.30 cm, Jarak Rangka Gording atau Reng max. 45 cm m2

11 A.4.5.2.32 Pemasangan Atap Genteng Metal m2


12 BG.4.5.2.10 Pemasangan Nok Genteng Keramik m'
13 BG.4.5.2.11 Pasang Nok Bitumen Monolayer (Onduline / Onduvilla) m'
14 A.4.5.2.39 Pemasangan Atap Seng Gelombang m2
15 A.4.5.2.40 Pemasangan Atap Nok Seng m'
16 A.4.5.2.43 Pasang Aluminium Foil / Sisalation Tb. 4 mm m2
XI A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
1 BG.4.6.1.1 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati m3
2 BG.4.6.1.2 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kruing m3

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 46 dari 74 Halaman
KODE
No. URAIAN PEKERJAAN SAT.
ANALISA

3 BG.4.6.1.3 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Kruing m2


4 BG.4.6.1.4 Pembuatan & Pemasangan Daun Pintu Panel, Kayu jati Tb.3 cm m2
5 BG.4.6.1.5 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Kruing m2
6 BG.4.6.1.6 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Jati m2
7 BG.4.6.1.7 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Kruing m2
8 BG.4.6.1.8 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Jati m2

9 BG.4.6.1.9 Pembuatan & Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kruing (lbr s/d 90 cm) m2

10 BG.4.6.1.10 Pembuatan & Memasang Konstruksi Kuda-kuda Konvensional Kayu Kruing Bentang 6 meter m3

11 BG.4.6.1.11 Pembuatan & Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkir Bentang 6 meter m3

12 BG.4.6.1.12 Pembuatan & Pemasangan Konstruksi Kuda-kuda Expose, Kayu Kruing m3


13 BG.4.6.1.13 Pemasangan konstruksi Murplat,Gording,Nok Kayu Kruing m3
14 BG.4.6.1.14 Pemasangan konstruksi Murplat,Gording,Nok Kayu Bengkir m3
15 BG.4.6.1.15 Pemasangan Rangka Atap Genteng Keramik, Kayu kruing m2
16 BG.4.6.1.16 Pemasangan Rangka Atap Genteng Press Jatiwangi, Kayu kruing m2
17 BG.4.6.1.17 Pemasangan Rangka Atap Genteng Morando, Kayu kruing m2
18 BG.4.6.1.18 Pemasangan Rangka Atap Genteng Kodok, Kayu kruing m2
19 BG.4.6.1.19 Pemasangan Rangka Langit-langit (50x1,00) m, kayu kruing m2
20 BG.4.6.1.20 Pemasangan Rangka Langit-langit (60x60) cm, kayu kruing m2
21 BG.4.6.1.21 Pemasangan Listplank Uk. (3x20)cm Kayu jati m'
22 BG.4.6.1.22 Pemasangan Listplank Uk. (3x30)cm Kayu Kruing m'
23 BG.4.6.1.23 Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu Kruing m2
24 BG.4.6.1.24 Pemasangan Dinding Pemisah Plywood Rangkap, Rangka Kayu Kruing Modul 60x120 cm m2
XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA
1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa Buah
2 A.4.6.2.4 Pemasangan Kunci Selinder Buah
3 A.4.6.2.5 Pemasangan Engsel Pintu 3'' kuning (KICA) Buah
4 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu Buah
5 A.4.6.2.7 Pemasangan Engsel Angin Uk.3" (Koboi) Buah
6 A.4.6.2.9 Pemasangan Kait Angin Buah
7 A.4.6.2.10 Pasang Door Closer 300 (DEKSON) Buah
8 A.4.6.2.13 Pemasangan Door Stop (DEKSON) Buah
9 A.4.6.2.14 Pemasangan Rel Pintu Dorong 1,8 Meter Type J3 (DEKSON) Buah
10 BG.4.6.2.1 Pemasangan Rel Pintu Dorong 2,4 Meter Type J3(Henderson) Buah
11 A.4.6.2.16 Pemasangan Kaca Bening Tebal 3 mm m2
12 A.4.6.2.17 Pemasangan Kaca Bening Tebal 5 mm m2
13 BG.4.6.2.2 Pemasangan Kaca Bening Tebal 8 mm m2
14 BG.4.6.2.3 Pemasangan Kaca Bening Tebal 10 mm m2
15 A.4.6.2.18 Pemasangan Kaca Cermin tebal 5 mm m2
XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
1 A.4.7.1.1 Pengikisan/pengerokan Permukaan Cat Tembok Lama m2
2 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2
3 BG.4.7.1.1 Pengecatan Bidang Kayu Lama (1 lp Cat dasar, 2 Lp Cat Penutup) m2
4 BG.4.7.1.2 Pengecatan Bidang Besi ( 2 Lp Cat Penutup) m2
5 A.4.7.1.5 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup) m2
6 A.4.7.1.7 Pelaburan Bidang Kayu dg Politur m2
7 A.4.7.1.8 Pelaburan Bidang Kayu dg Cat Residu & Ter m2
8 A.4.7.1.9 Pelaburan Bidang Kayu dg Vernis m2
9 A.4.7.1.10 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup) m2
10 A.4.7.1.11 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup) m2
11 BG.4.7.1.3 Pelapisan Kayu dengan Melamic m2
12 BG.4.7.1.4 Pelapisan Waterproofing (No Drop) m2
13 BG.4.7.1.5 Pengecatan Permukaan Baja dg Meni Besi m2
XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
1 A.5.1.1.1 Pemasangan Closet Duduk / Mono Blok (TOTO) Unit
2 A.5.1.1.2 Pemasangan Closet Jongkok Porselen (TOTO) Unit
3 A.5.1.1.4 Pemasangan Urinoir (TOTO) Unit
4 A.5.1.1.5 Pemasangan Wastafel (TOTO) Unit
5 A.5.1.1.7 Pemasangan Bak Fibreglass vol.1 m3 (ALCO) Unit
6 BG.5.1.1.1 Pemasangan Bak Cuci Piring Stainless steel uk.96x43 cm buah
7 A.5.1.1.14 Pemasangan Floor Drain Stainless Uk. 10x10 cm buah
8 A.5.1.1.18 Pemasangan Pipa Galvanis Ø ½" m'
9 A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾" bh
10 A.5.1.1.20 Pemasangan Pipa Galvanis Ø ¾" m'
11 A.5.1.1.21 Pemasangan Pipa Galvanis Ø 1" m'
12 A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ " m'
13 A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3" m'
14 A.5.1.1.24 Pemasangan Pipa Galvanis Ø 4" m'

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 47 dari 74 Halaman
KODE
No. URAIAN PEKERJAAN SAT.
ANALISA

15 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½" (RUCIKA) m'


16 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾" (RUCIKA) m'
17 A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1" (RUCIKA) m'
18 A.5.1.1.28 Pemasangan Pipa PVC tipe AW Ø 1½" (RUCIKA) m'
19 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2" (RUCIKA) m'
20 A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 3" (RUCIKA) m'
21 A.5.1.1.32 Pemasangan Pipa PVC tipe AW Ø 4" (RUCIKA) m'
21 Hit. Pipa Ø6" Pemasangan Pipa PVC tipe AW Ø 6" (RUCIKA) m'
22 A.5.1.1.33 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm m'
23 A.5.1.1.34 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm m'
24 A.5.1.1.35 Pemasangan Pipa Beton Ø 20 cm m'
25 A.5.1.1.36 Pemasangan Pipa Beton Ø 30 cm m'
XVI A.8.4.1. HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
1 BG.8.4.1.1 Pemasangan pipa PVC DN 100 mm (Ø 4") ; Rubber Ring Joint (RRJ) m'
2 BG.8.4.1.2 Pemasangan pipa PVC DN 100 mm (Ø 6") ; Rubber Ring Joint (RRJ) m'
3 BG.8.4.1.3 Pemasangan pipa PVC DN 100 mm (Ø 8") ; Rubber Ring Joint (RRJ) m'
4 A.8.4.1.6 Pemasangan pipa PVC Ø 250 mm m'
5 A.8.4.1.7 Pemasangan pipa PVC Ø 315 mm m'
6 A.8.4.1.8 Pemasangan pipa PVC Ø 400 mm m'
7 BG.8.4.1.4 Pemasangan pipa HDPE DN 50 mm (Ø 2") m'
8 BG.8.4.1.5 Pemasangan pipa HDPE DN 100 mm (Ø 4") m'
9 A.8.4.1.19 Pemasangan pipa HDPE Ø 125 mm m'
10 BG.8.4.1.6 Pemasangan pipa HDPE DN 150 mm (Ø 6") m'
11 BG.8.4.1.7 Pemasangan pipa HDPE DN 200 mm (Ø 8") m'
12 BG.8.4.1.8 Pemasangan pipa HDPE DN 250 mm (Ø 10") m'
13 A.8.4.1.23 Pemasangan pipa HDPE Ø 315 mm m'
14 A.8.4.1.24 Pemasangan pipa HDPE Ø 400 mm m'
15 A.8.4.1.33 Pemasangan pipa GIP Ø 63 mm m'
16 A.8.4.1.34 Pemasangan pipa GIP Ø 100 mm m'
17 A.8.4.1.35 Pemasangan pipa GIP Ø 125 mm m'
18 A.8.4.1.36 Pemasangan pipa GIP Ø 150 mm m'
19 A.8.4.1.37 Pemasangan pipa GIP Ø 200 mm m'
20 A.8.4.1.38 Pemasangan pipa GIP Ø 250 mm m'
21 A.8.4.1.39 Pemasangan pipa GIP Ø 300 mm m'
22 A.8.4.1.40 Pemasangan pipa GIP Ø 400 mm m'
XVII A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA
1 A.8.4.3.1 Pemasangan Valve Ø 150 mm bh
2 A.8.4.3.2 Pemasangan Valve Ø 200 mm bh
3 A.8.4.3.3 Pemasangan Valve Ø 250 mm bh
XVIII A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA
1 A.8.4.5.1 Pengetesan pipa Ø 50 mm m'
2 A.8.4.5.2 Pengetesan pipa Ø 75 mm m'
3 A.8.4.5.3 Pengetesan pipa Ø 100 mm m'
4 A.8.4.5.4 Pengetesan pipa Ø 150 mm m'
5 A.8.4.5.5 Pengetesan pipa Ø 200 mm m'
6 A.8.4.5.6 Pengetesan pipa Ø 250 mm m'
7 A.8.4.5.7 Pengetesan pipa Ø 300 mm m'
8 A.8.4.5.8 Pengetesan pipa Ø 400 mm m'
9 A.8.4.5.9 Pengetesan pipa Ø 400 mm m'

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 48 dari 74 Halaman
KODE
No. URAIAN PEKERJAAN SAT.
ANALISA

XIX HARGA SATUAN PEKERJAAN JALAN (BPJK)


1 K. 637a Propelering Penetrasi Makadam (Menggunakan Buruh) m3
2 K.020 Memproduksi Campuran Latasir (Menggunakan Alat) Tonne
3 K.618a Lapis Penetrasi Makadam 5 Cm / Lapen (Menggunakan Buruh) m2
4 K.615a Laburan Aspal Satu Lapis / Burtu (Menggunakan Buruh) m2
5 K.617a Laburan Aspal Dua Lapis / Burda ( Menggunakan Buruh ) m2
6 K.516 Konstruksi Lapis Pondasi Bawah ( LPB ) Telford (Menggunakan Buruh) m3
7 K.621b Membuat Campuran, Menghampar dan Pemadatan Latasir 2 Cm /Sandsheet Manual (Menggunakan Bu m2
8 K.621c Menghampar & Memadatkan Latasir 2 Cm / Sandsheet AMP (Menggunakan Buruh) m2
9 K.210 Pengupasan Tanah Dan Pembersihan Semak Pada Damija (Menggunakan Buruh) m2
10 K.T04 Pelapisan Prime Coat ( Menggunakan Buruh ) m2

Slawi,10 Desember 2020

Menyetujui : Disusun Oleh :


Kepala Bidang Bangunan Gedung Konsultan Penyusun AHSP
Dinas Perkimtaru Kabupaten Tegal CV. Lemlit Global Riset
Selaku Pejabat Pembuat Komitmen

TTD TTD

KARDI, S.IP, MM TEGUH HARIS SANTOSO.ST.MT


NIP. 197208241994031004 DIREKTUR

Mengetahui :
Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

TTD

M. BUDI EKO S, ST,. MM


NIP. 19770201 200312 1 003

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 49 dari 74 Halaman
DAFTAR HARGA SATUAN PEKERJAAN

JUMLAH (Rp)

169,304.82
1,191,969.28
946,261.10
963,913.90
8,500.00
310,037.00
1,133,390.00
283,347.50
101,192.22
466,325.00
7,314.00
293,250.00
4,887.50
4,887.50
1,955.00
12,125.00

63,750.00
87,975.00
102,637.50
97,750.00
146,625.00
117,300.00
4,887.50
32,257.50
62,204.55
97,750.00
42,500.00
217,500.00

174,666.61

151,072.30

83,662.50
205,500.00

238,779.11

920,965.00
911,365.00
863,860.00
854,260.00
528,420.00

1,027,835.50

753,784.75
688,114.00

953,051.00
983,963.00
1,008,067.00
773,600.00
938,200.00
1,063,911.00
1,084,473.00
1,097,997.00
1,121,503.00
1,128,679.00
1,208,799.50
1,218,321.50
1,303,253.60
1,344,543.20
1,414,219.40
1,483,895.60

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 50 dari 74 Halaman
JUMLAH (Rp)

10,700.00
11,274.49
39,690.97
65,565.97
101,024.31
191,835.10
173,835.10
205,835.10
142,835.10
132,710.10
343,821.75
217,146.80
161,146.80
224,484.28
168,000.00
215,484.28
350,871.75
217,146.80
161,146.80
228,009.28
168,000.00
219,009.28
510,395.01
381,595.01
188,887.50
399,132.51
344,910.01
112,941.73
89,460.20

5,476,875.00
5,235,375.00
42,205.00
79,407.37

32,602.50
847,320.00
249,962.85
237,312.85
195,359.00
536,643.00
156,057.02
306,762.50
267,662.50

207,544.00

216,520.00

269,642.80

245,901.28

237,705.92

274,804.00

259,320.40

264,481.60

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 51 dari 74 Halaman
JUMLAH (Rp)

287,190.88

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 52 dari 74 Halaman
JUMLAH (Rp)

339,064.85
285,934.00
165,018.56
139,666.60
335,564.25
174,455.00

64,128.74
53,716.08
58,724.75
48,355.66
58,673.92
30,640.00
90,045.00
35,937.50

265,112.89
298,635.39
130,600.33
104,400.00
516,100.00
143,054.83
150,673.58
153,711.32
146,650.88
28,371.85
30,899.24
31,419.35
231,470.28
226,899.03
202,519.03
366,068.19
543,839.03
280,755.25
126,212.50
138,300.00
182,045.00
179,745.00
202,745.00

45,000.00
40,258.35
44,444.35
20,482.85
21,700.00

74,500.00
87,687.50
95,737.50
108,000.00
119,692.00
128,892.00
145,456.04

178,609.26

287,965.52

176,453.70

77,257.00
133,223.88
189,298.28
72,034.97
37,906.30
31,280.00

16,805,233.19
9,608,246.25

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 53 dari 74 Halaman
JUMLAH (Rp)

714,960.75
899,190.75
549,230.00
815,844.50
935,237.50
1,262,757.50

742,851.83

8,510,255.20

13,265,543.48

11,677,968.48
7,282,000.00
12,508,953.65
209,333.64
134,700.00
203,813.64
242,798.64
139,648.41
143,000.00
171,248.46
89,300.00
264,002.68
477,035.66

120,850.00
167,468.75
32,075.00
25,950.00
73,500.00
29,875.00
314,582.50
69,977.50
362,365.00
529,115.00
167,353.75
148,275.00
181,275.00
284,366.25
81,966.25

16,548.50
47,103.62
30,822.77
28,318.06
64,353.62
61,457.22
11,224.00
44,007.17
50,700.00
15,154.00
202,611.60
60,357.75
10,702.36

2,347,301.80
582,411.75
1,849,568.00
997,130.50
1,538,470.00
209,932.50
92,977.50
54,378.90
79,187.97
79,902.00
79,156.80
159,804.00
371,803.05
569,281.05

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 54 dari 74 Halaman
JUMLAH (Rp)

23,460.00
27,186.00
37,805.10
81,206.10
119,304.45
233,309.70
279,519.00
439,340.00
439,840.50
269,446.15
139,584.59
241,728.28

89,958.75
172,994.50
275,729.75
715,139.00
1,119,743.50
1,830,961.00
55,861.25
155,788.20
177,531.25
319,927.70
499,431.20
773,760.25
1,098,250.00
1,774,392.50
178,087.08
389,390.00
466,877.00
552,471.50
716,404.00
1,527,389.75
1,833,709.50
2,678,143.00

3,740,909.75
5,820,598.50
7,787,098.50

1,690.50
1,805.50
2,035.50
2,610.50
3,358.00
4,393.00
5,658.00
8,820.50
8,820.50

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 55 dari 74 Halaman
JUMLAH (Rp)

2,064,121.73
1,812,345.50
110,803.18
48,250.64
72,907.28
509,876.42
82,378.13
90,250.60
3,775.83
16,764.13

Mengetahui :
Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

TTD

M. BUDI EKO S, ST,. MM


NIP. 19770201 200312 1 003

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) DAFTAR HARGA SATUAN PEKERJAAN Halaman 56 dari 74 Halaman
BANTUAN KEUANGAN
PEMERINTAH KABUPATEN TEGAL
KECAMATAN KRAMAT
DESA KERTAYASA

RENCANA ANGGARAN BIAYA ( RAB )

PEMBANGUNAN PENDOPO BALAI DESA

DESA KERTAYASA
KECAMATAN KRAMAT
KABUPATEN TEGAL
PROVINSI JAWA TENGAH

DAFTAR USULAN KEBUTUHAN PRASARANA

BELANJA MODAL
NAMA PEKERJAAN LOKASI TOTAL BIAYA
BAHAN,UPAH DLL

PEMBANGUNAN
PENDOPO BALAI DESA KERTAYASA Rp 200,000,188 Rp 200,000,188
DESA

Dibulatkan Rp 200,000,000
PEMERINTAH KABUPATEN TEGAL
DESA KERTAYASA KECAMATAN KRAMAT

RENCANA ANGGARAN BIAYA ( RAB )

KEGIATAN : BANTUAN KEUANGAN


PEKERJAAN : PEMBANGUNAN PENDOPO BALAI DESA
LOKASI : DESA KERTAYASA
TAHUN ANGGARAN : 2023

Jumlah Harga Total Harga


No. Jenis Kegiatan Analisa Volume Sat Harga Sat
( Rp ) ( Rp )
I. PEKERJAAN TANAH 3,534,394.50
1 Pengurugan dengan Sirtu BG.2.3.1.6 17.199 m3 205,500.00 3,534,394.50

II. PEKERJAAN BETON 2,068,731.00


1 Pek. Beton K-175 Kolom 15/15 A.4.1.1.5 0.11 M3 938,200.00 101,325.60
2 Pek. Beton K-175 Balok - B.1 15/30 A.4.1.1.5 0.05 M3 938,200.00 42,219.00
3 Pek. Beton K-175 Ring Balok - RB. 15/20 A.4.1.1.5 0.49 M3 938,200.00 461,594.40
4 Pek. Beton K-175 Jurai Beton - JB. 15/20 A.4.1.1.5 1.56 M3 938,200.00 1,463,592.00

III. PEKERJAAN PEMBESIAN 9,069,208.01


1 Pek. Pembesian Kolom 15/15 BG.4.1.1.5 22.29 Kg 10,700.00 238,541.52
2 Pek. Pembesian Balok - B.1 15/30 BG.4.1.1.5 5.91 Kg 10,700.00 63,190.63
3 Pek. Pembesian Ring Balok - RB. 15/20 BG.4.1.1.5 189.90 Kg 10,700.00 2,031,882.92
4 Pek. Pembesian Jurai Beton - JB. 15/20 BG.4.1.1.5 629.49 Kg 10,700.00 6,735,592.93

IV. PEKERJAAN BEKISTING 8,436,960.00


1 Pek. Bekisting 2 kali pakai Kolom 15/15 BG.4.1.1.16 1.44 M2 168,000.00 241,920.00
2 Pek. Bekisting 2 kali pakai Balok - B.1 15/30 BG.4.1.1.21 0.90 M2 168,000.00 151,200.00
3 Pek. Bekisting Ring Balok - RB. 15/20 A.4.1.1.24a 11.48 M2 168,000.00 1,928,640.00
4 Pek. Bekisting Jurai Beton - JB. 15/20 BG.4.1.1.21 36.40 M2 168,000.00 6,115,200.00

V. PEKERJAAN PENGECATAN 16,683,468.75


1 Pek. Cat Kolom & balok A.4.7.1.10 98.64 M2 50,700.00 5,001,048.00
2 Pek. Cat Plafound A.4.7.1.10 230.42 M2 50,700.00 11,682,420.75

VI PEKERJAAN KAYU DAN LANGIT-LANGIT 95,665,767.82


1 Pek. Pas. Nok gording Mur Plat Kayu Keruing BG.4.6.1.13 1.24 M3 7,282,000.00 9,028,514.88
2 Pek. Pas. Rangka atap Kayu Keruing BG.4.6.1.16 161.43 M2 134,700.00 21,744,115.88
3 Pek. Pas. List Plank Uk. (3 x 20 ) kayu kruing BG.4.6.1.22 42.00 M' 89,300.00 3,750,600.00
4 Pek. Pas. Rangka plafond (60x60) cm, kayu kruing BG.4.6.1.20 230.42 M2 143,000.00 32,950,417.50
5 Pek. Plafound Gypsum Board, Ukuran (120x240) tebal 9 mm A.4.5.1.7 230.42 M2 45,000.00 10,369,012.50
6 Pek List Langit-Langit GypsumBoard 10 cm BG.4.5.1.3 53.85 M 21,700.00 1,168,545.00
7 Pek. Pas. Genteng Genteng Press Jatiwangi BG.4.5.2.1 161.43 M2 70,250.00 11,340,194.06
8 Pas. Genteng Bubungan Press Jatiwangi BG.4.5.2.4 53.15 M' 94,720.00 5,034,368.00
9 Mur Baut 12 mm Kuda-kuda Taksir 28.00 Bh 10,000.00 280,000.00
VII PEKERJAAN LANTAI
1 Pemasangan Lantai Keramik 40 x 40 cm warna BG.4.4.3.5 114.66 m2 511,300.00 58,625,658.00 58,625,658.00

VIII PEKERJAAN ELEKTRIKAL 1,110,000.00


1 Pas. Stop Kontak Ls 4.00 Ttk 40,000.00 160,000.00
2 Pas. Saklar Tunggal Ls 2.00 Bh 30,000.00 60,000.00
3 Pas. Saklar Ganda Ls 2.00 Ttk 40,000.00 80,000.00
4 Pas. Lampu Pijar 14 W Ls 8.00 Bh 45,000.00 360,000.00
5 Pas. Kabel NYY 2 x 1.5 Ls 50.00 m' 9,000.00 450,000.00

JUMLAH Rp 195,194,188.07
BOP Rp 4,806,000.00
JUMLAH TOTAL Rp 200,000,188.07
JUMLAH DIBULATKAN Rp 200,000,000.00
TERBILANG : Dua ratus juta Rupiah

Kertayasa, 26 Juni 2023

Diverifikasi oleh: Dibuat Oleh:


Sekretaris Desa Kertayasa Pelaksana Kegiatan Anggaran

FITRI NURHAYATI WAHUDI


Disetujui / Mengesahkan:
Kepala Desa Kertayasa

PURWOKO HENDRO WINARNO, ST


PEMERINTAH KABUPATEN TEGAL
DESA KERTAYASA KECAMATAN KRAMAT

DETAIL RENCANA ANGGARAN BIAYA

Kegiatan : BANTUAN KEUANGAN


Pekerjaan : PEMBANGUNAN PENDOPO BALAI DESA
Lokasi : DESA KERTAYASA
Tahun Anggaran : 2023

Jumlah
No Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Total
Harga
Rp. Rp. Rp.
1 PEKERJAAN TANAH
1 Pengurugan dengan Sirtu 17.20 m3
Tenaga
Pekerja 5.16 OH 85,000.00 438,574.50
Mandor OH
438,574.50
Material m3
Sirtu
20.64 m3 150,000.00 3,095,820.00 3,095,820.00
Jumlah Total I. 3,534,394.50
II. PEKERJAAN BETON
1 Pek. Beton K-175 Kolom 15/15 0.11 M3
Tenaga
Pekerja 0.16 OH 85,000.00 13,770.00
Tukang Batu 0.05 OH 100,000.00 5,400.00
19,170.00
Material
Portland Semen 35.21 kg 1,200.00 42,249.60
Pasir Beton 82.08 kg 200.00 16,416.00
Kerikil (maksimum 30 mm) 111.78 kg 200.00 22,356.00
Air 22.68 Ltr 50.00 1,134.00
82,155.60
2 Pek. Beton K-175 Balok - B.1 15/30 0.045 M3
Tenaga
Pekerja 0.07 OH 85,000.00 5,737.50
Tukang Batu 0.02 OH 100,000.00 2,250.00
7,987.50

Material
Portland Semen 14.67 kg 1,200.00 17,604.00
Pasir Beton 34.20 kg 200.00 6,840.00
Kerikil (maksimum 30 mm) 46.58 kg 200.00 9,315.00
Air 9.45 Ltr 50.00 472.50
34,231.50
3 Pek. Beton K-175 Ring Balok - RB. 15/20 0.49 M3
Tenaga
Pekerja 0.74 OH 85,000.00 62,730.00
Tukang Batu 0.25 OH 100,000.00 24,600.00
87,330.00

Material
Portland Semen 160.39 kg 1,200.00 192,470.40
Pasir Beton 373.92 Ltr 200.00 74,784.00
Kerikil (maksimum 30 mm) 509.22 kg 200.00 101,844.00
Air 103.32 kg 50.00 5,166.00
374,264.40
4 Pek. Beton K-175 Jurai Beton - JB. 15/20 1.56 M3
Tenaga
Pekerja 2.34 OH 85,000.00 198,900.00
Tukang Batu 0.78 OH 100,000.00 78,000.00
276,900.00

Material
Portland Semen 508.56 Kg 1,200.00 610,272.00
Pasir Beton 1,185.60 Kg 200.00 237,120.00
Kerikil (maksimum 30 mm) 1614.60 Kg 200.00 322,920.00
Air 327.60 ltr 50.00 16,380.00
1,186,692.00
Jumlah Total I. 2,068,731.00
III. PEKERJAAN PEMBESIAN
1 Pek. Pembesian Kolom 15/15 22.29 Kg
Tenaga
Pekerja 0.45 OH 85,000.00 37,899.12
Tukang Besi 0.22 OH 100,000.00 22,293.60
60,192.72
Material
Besi Beton (polos) 22.29 Kg 7,600.00 169,431.36
Kawat Beton 0.4 Kg 20,000.00 8,917.44
178,348.80
2 Pek. Pembesian Balok - B.1 15/30 5.91 Kg
Tenaga
Pekerja 0.12 OH 85,000.00 10,039.63
Tukang Besi 0.06 OH 100,000.00 5,905.67
Kepala Tukang OH
Mandor OH
15,945.30
Material
Besi Beton (polos) 5.91 Kg 7,600.00 44,883.07
Kawat Beton 0.1 Kg 20,000.00 2,362.27
47,245.33
3 Pek. Pembesian Ring Balok - RB. 15/20 189.90 Kg
Tenaga
Pekerja 3.80 OH 85,000.00 322,822.52
Tukang Besi 1.90 OH 100,000.00 189,895.60
Kepala Tukang OH
Mandor OH
512,718.12
Material
Besi Beton (polos) 189.90 Kg 7,600.00 1,443,206.56
Kawat Beton 3.8 Kg 20,000.00 75,958.24
1,519,164.80

4 Pek. Pembesian Jurai Beton - JB. 15/20 629.49 Kg


Tenaga
Pekerja 12.59 OH 85,000.00 1,070,140.93
Tukang Besi 6.29 OH 100,000.00 629,494.67
1,699,635.60
Material
Besi Beton (polos) 629.49 Kg 7,600.00 4,784,159.47
Kawat Beton 12.6 Kg 20,000.00 251,797.87
5,035,957.33
Jumlah Total IV. 9,069,208.01
V. PEKERJAAN PENGECATAN
1 Pek. Cat Kolom & balok 98.64 M2
Tenaga
Pekerja 1.97 OH 85,000.00 167,688.00
Tukang Cat 5.92 OH 100,000.00 591,840.00
Material 759,528.00
Plamir 9.86 Kg 30,000.00 295,920.00
Cat tembok dasar (Dulux) 39.46 Kg 28,000.00 1,104,768.00
Cat Penutup 2 Kali ( Catylac) 98.64 Kg 28,800.00 2,840,832.00
4,241,520.00
Pek. Cat Plafound 230.42 M2
Tenaga
Pekerja 4.61 OH 85,000.00 391,718.25
Tukang Cat 13.83 OH 100,000.00 1,382,535.00
Material 1,774,253.25
Plamir 23.04 Kg 30,000.00 691,267.50
Cat tembok dasar (Dulux) 92.17 Kg 28,000.00 2,580,732.00
Cat Penutup 2 Kali ( Catylac) 230.42 Kg 28,800.00 6,636,168.00
9,908,167.50
Jumlah Total I. 16,683,468.75
IV. PEKERJAAN BEKISTING
1 Pek. Bekisting 2 kali pakai Kolom 15/15 1.44 m2
Tenaga
Pekerja 1.15 OH 85,000.00 97,920.00
Tukang Kayu 0.58 OH 100,000.00 57,600.00
155,520.00
Material
Papan kayu pinus 0.03 m3 2,200,000.00 63,360.00
Paku Biasa 2" - 5" 0.58 Kg 16,000.00 9,216.00
Minyak Bekisting 0.29 Ltr 48,000.00 13,824.00
86,400.00
2 Pek. Bekisting 2 kali pakai Balok - B.1 15/30 0.90 m2
Tenaga
Pekerja 0.72 OH 85,000.00 61,200.00
Tukang Kayu 0.36 OH 100,000.00 36,000.00
97,200.00
Material
Papan kayu pinus 0.02 m3 2,200,000.00 39,600.00
Paku Biasa 2" - 5" 0.36 Kg 16,000.00 5,760.00
Minyak Bekisting 0.18 Ltr 48,000.00 8,640.00
54,000.00
3 Pek. Bekisting Ring Balok - RB. 15/20 11.48 m2
Tenaga
Pekerja 9.18 OH 85,000.00 780,640.00
Tukang Kayu 4.59 OH 100,000.00 459,200.00
1,239,840.00
Material
Papan kayu pinus 0.23 m3 2,200,000.00 505,120.00
Paku Biasa 2" - 5" 4.59 Kg 16,000.00 73,472.00
Minyak Bekisting 2.30 Ltr 48,000.00 110,208.00
688,800.00
4 Pek. Bekisting Jurai Beton - JB. 15/20 36.4 M2
Tenaga
Pekerja 29.12 OH 85,000.00 2,475,200.00
Tukang Kayu 14.56 OH 100,000.00 1,456,000.00
Kepala Tukang 0.00
Mandor 0.00
3,931,200.00
Material
Papan kayu pinus 0.73 m3 2,200,000.00 1,601,600.00
Paku Biasa 2" - 5" 14.56 Kg 16,000.00 232,960.00
Minyak Bekisting 7.28 Ltr 48,000.00 349,440.00
2,184,000.00
Jumlah Total E. 8,436,960.00
VI PEKERJAAN KAYU DAN LANGIT-LANGIT
1 Pek. Pas. Nok gording Mur Plat Kayu Keruing 1.24 M3
Tenaga
Pekerja 2.98 OH 85,000.00 252,927.36
Tukang Kayu 8.93 OH 100,000.00 892,684.80
1,145,612.16
Material
Kayu Kruing, balok 1.36 m3 5,600,000.00 7,637,414.40
Besi Strip 12.40 Kg 15,000.00 185,976.00
Paku Biasa 2" - 5" 3.72 Kg 16,000.00 59,512.32
7,882,902.72
2 Pek. Pas. Rangka atap Kayu Keruing 161.43 M2
Tenaga
Pekerja 16.14 OH 85,000.00 1,372,123.13
Tukang Kayu 16.14 OH 100,000.00 1,614,262.50
2,986,385.63

Material
Kayu kruing, Kaso-kaso (5x7) cm 1.78 m3 4,600,000.00 8,168,168.25
Kayu Kruing, Reng (2x3) cm 2.26 Kg 4,400,000.00 9,943,857.00
Paku Biasa 2" - 5" 40.36 Kg 16,000.00 645,705.00
18,757,730.25
3 Pek. Pas. List Plank Uk. (3 x 20 ) kayu kruing 42.00 M'
Tenaga
Pekerja 4.20 OH 85,000.00 357,000.00
Tukang Kayu 8.40 OH 100,000.00 840,000.00
1,197,000.00

Material
Kayu Kruing, papan 0.42 m3 6,000,000.00 2,520,000.00
Paku Biasa 2" - 5" 2.10 Kg 16,000.00 33,600.00
2,553,600.00
4 Pek. Pas. Rangka plafond (60x60) cm, kayu kruing 230.42 M'
Tenaga
Pekerja 46.08 OH 85,000.00 3,917,182.50
Tukang Kayu 69.13 OH 100,000.00 6,912,675.00
10,829,857.50

Material
Kayu kruing, Kaso-kaso (5x7) cm 4.61 m3 4,600,000.00 21,198,870.00
Paku Biasa 2" - 5" 57.61 Kg 16,000.00 921,690.00
22,120,560.00
5 Pek. Plafound Gypsum Board, Ukuran (120x240) tebal 9 mm 230.42 m2
Tenaga
Pekerja 23.04 OH 85,000.00 1,958,591.25
Tukang Kayu 11.52 OH 100,000.00 1,152,112.50
3,110,703.75
Material
Gypsum Board 115.21 m3 56,400.00 6,497,914.50
Paku Sekrup 25.35 m3 30,000.00 760,394.25
7,258,308.75
6 Pek List Langit-Langit GypsumBoard 10 cm 53.85 M
Tenaga
Pekerja 3.23 OH 85,000.00 274,635.00
Tukang Kayu 2.69 OH 100,000.00 269,250.00
543,885.00
Material
Lis gypsum 10 cm 53.85 m3 11,000.00 592,350.00
Gypsump powder 10.77 kg 3,000.00 32,310.00
624,660.00
7 Pek. Pas. Genteng Genteng Press Jatiwangi 161.43 M2
Tenaga
Pekerja 24.21 OH 85,000.00 2,058,184.69
Tukang Kayu 12.11 OH 100,000.00 1,210,696.88
3,268,881.56
Material Genteng press jatiwangi 4035.66 Buah 2,000.00 8,071,312.50
8,071,312.50
8 Pas. Genteng Bubungan Press Jatiwangi 53.15 M'
Tenaga
Pekerja 21.26 OH 85,000.00 1,807,100.00
Tukang Kayu 10.63 OH 100,000.00 1,063,000.00
2,870,100.00
Material Genteng Bubung Press Jatiwangi 212.60 Buah 5,500.00 1,169,300.00
Portland Semen 425.20 Kg 1,200.00 510,240.00
Pasir Pasang 1.70 m3 285,000.00 484,728.00
2,164,268.00
9 Mur Baut 12 mm Kuda-kuda Bh 0.00
Mur Baut 12 mm Kuda-kuda 28.00 Bh 10,000 280,000.00 280,000.00
Jumlah Total VII. 95,665,767.82
VII Pemasangan Lantai Keramik 40 x 40 cm warna 114.66 m2
Tenaga
Pekerja 22.9 OH 85,000.00 1,949,220.00
Tukang Batu 14.3 OH 100,000.00 1,433,250.00
3,382,470.00
Material Ubin Keramik 40 x 40 cm warna 2293.2 Buah 7,200.00 16,511,040.00
Portland Semen 1146.6 Kg 1,100.00 1,261,260.00
Pasir Pasang 9.2 m3 285,000.00 2,614,248.00
Plin Granit 10 x 60 cm 2178.5 Buah 16,000.00 34,856,640.00
55,243,188.00
Jumlah Total VI. 58,625,658.00
VIII PEKERJAAN ELEKTRIKAL
Pas. Stop Kontak 4.00 Ttk 40,000.00 160,000.00
Pas. Saklar Tunggal 2.00 Bh 30,000.00 60,000.00
Pas. Saklar Ganda 2.00 Ttk 40,000.00 80,000.00
Pas. Lampu Pijar 14 W 8.00 Bh 45,000.00 360,000.00
Pas. Kabel NYY 2 x 1.5 50.00 m' 9,000.00 450,000.00 1,110,000.00

Jumlah Total VIII. 1,110,000.00


IX BOP
1 Honor Pelaksana Kegiatan 1.0 OP 945,000.00 945,000.00
2 Honor Ketua tim Pengadaan 1.0 OP 381,500.00 381,500.00
3 Honor Sekretaris tim Pengadaan 1.0 OP 329,000.00 329,000.00
4 Honor Anggota tim Pengadaan 1.0 OP 269,500.00 269,500.00
5 Honor Ketua Pemeriksa 1.0 OP 238,000.00 238,000.00
6 Honor Sekretaris Pemeriksa 1.0 OP 203,000.00 203,000.00
7 Perencanaan 1.0 paket 1,581,000.00 1,581,000.00
8 ATK Buku Tulis 1.0 bh 5,000.00 5,000.00
Ballpoint 1.0 bh 2,500.00 2,500.00
Buku Kwitansi 1.0 bh 4,000.00 4,000.00
Kertas HVS 70 gr 500.0 lbr 100.00 50,000.00
Materai 6000 10.0 bh 10,000.00 100,000.00
Lem Kertas 1.0 bh 4,000.00 4,000.00
Snelhecter Plastik 2.0 bh 7,500.00 15,000.00
Binder/folder 1.0 bh 17,500.00 17,500.00
Fotocopy 355.0 lbr 200.00 71,000.00
Penjilidan Laporan 4.0 bh 10,000.00 40,000.00
9 Konsumsi Rapat 1.0 kali 150,000.00 150,000.00
10 Papan Proyek 1.0 bh 50,000.00 50,000.00
11 Prasasti 1.0 bh 350,000.00 350,000.00 4,806,000.00
Jumlah Total IX. 4,806,000.00
Jumlah Total I+II+III+IV+V+VI+VII+VIII+IX 200,000,188.07

Kertayasa, 26 Juni 2023


Diverifikasi oleh: Dibuat Oleh:
Sekretaris Desa Kertayasa Pelaksana Kegiatan Anggaran

FITRI NURHAYATI WAHUDI

Disetujui / Mengesahkan:
Kepala Desa Kertayasa

PURWOKO HENDRO WINARNO, ST


PEMERINTAH KABUPATEN TEGAL
DESA KERTAYASA KECAMATAN KRAMAT

BACKUP VOLUME

KEGIATAN : BANTUAN KEUANGAN


PEKERJAAN : PEMBANGUNAN PENDOPO BALAI DESA
LOKASI : DESA KERTAYASA
TAHUN ANGGARAN : 2023

Volume
No. Uraian Pekerjaan P L T Unit / Luas Sat
(m) (m) (m) Juml
I PEKERJAAN TANAH
1 Pengurugan dengan Sirtu 11.70 9.80 0.15 1 17.199 M3

I PEKERJAAN BETON 17.199


A KOLOM 15/15
1 Beton Kolom 15/15 Kolom tambahan 1.20 0.15 0.15 4 0.11 M3

Jumlah 0.11 M3
Jml Tulangan Panjang P.Seng Jml Koefesien Vol Kg
2 Kolom tambahan pokok Ø 10 4.00 1.40 4.00 0.62 13.89 Kg
beugel Ø 8 9.33 0.57 4.00 0.40 8.41 Kg

Jumlah 22.29 Kg
3 Bekisting 15/15 1.2 0.15 2.00 4.00 1.44 M2

Jumlah 1.44 M2

B BALOK
BALOK - B.1 ( 15 / 30 )
1 Beton Balok
Balok - B.1 15 / 30 1.00 0.15 0.30 1.00 0.05 M3

Jumlah 0.05 M3

Jml Tulangan Panjang P.Seng Jml Koefesien Vol Kg


2 Pembesian 15/30 Pokok Ø 10 6 1.00 1.00 0.62 3.72 Kg
Beugel Ø 8 7 0.83 0.40 2.19 Kg
Jumlah 5.91 Kg

3 Bekisting Dua Kali Pakai Balok 15/30 1.00 0.90 1.00 Jumlah 0.90 m2

RING BALOK - RB. ( 15 / 20 )


1 Beton Balok
Balok - RB.1 15 / 20 4.10 0.15 0.20 4.00 0.49 M3

Jumlah 0.49 M3

Jml Tulangan Panjang P.Seng Jml Koefesien Vol Kg


2 Pembesian 15/20 Pokok Ø 10 4 16.40 4.00 0.62 162.69 Kg
Beugel Ø 8 109 0.63 0.40 27.21 Kg
Jumlah 189.90 Kg
3 Bekisting Dua Kali Pakai Balok 15/20 16.40 0.70 1.00 Jumlah 11.48 m2

JURAI BETON - JB. ( 15 / 20 )


1 Beton Balok
Balok - JB. 15 / 20 13.00 0.15 0.20 4.00 1.56 M3

Jumlah 1.56 M3

Jml Tulangan Panjang P.Seng Jml Koefesien Vol Kg


2 Pembesian 15/20 Pokok Ø 10 4 52.00 4.00 0.62 515.84 Kg
Beugel Ø 8 347 0.83 0.40 113.65 Kg
Jumlah 629.49 Kg

3 Bekisting Dua Kali Pakai Balok 15/30 52.00 0.70 1.00 Jumlah 36.40 m2
Volume
No. Uraian Pekerjaan P L T Unit / Jumlah Sat
(m) (m) (m) Juml Kuda
II PEKERJAAN ATAP
1 Pekerjaan Mur Baut Balok Kayu 2.00 7.00 2 28.00 Bh

Jumlah 28.00 Bh
2 PEKERJAAN PAS. NOK GORDING MURPLAT 8/12
Nok 1.15 0.08 0.12 1.00 0.01 m3
Gording 15.00 0.08 0.12 4.00 0.58 m3
Murplat 12.50 0.08 0.12 4.00 0.48 m3
Balok kayu 4.50 0.08 0.12 4.00 0.17 m3
Jumlah 1.24 M3
P dan L T JML
3 PEKERJAAN RANGKA ATAP
Depan - Belakang Bawah 19.10 5.30 2.00 101.2
0.50 50.62
Depan - Belakang Atas 5.25 3.65 2.00 19.2
0.50 9.58
Kanan - Kiri Bawah 19.10 5.30 2.00 101.23
0.50 50.62
Kanan - Kiri Atas 5.25 3.65 2.00 101.23
0.50 50.62

Jumlah 161.43 M2
4 Pas. Genteng Press Jatiwangi
Jumlah 161.43 M2

5 Pek. Pas. Bubungan Press Jatiwangi


53.15 1.00 53.15
+
Jumlah 53.15 M'
6 Pek. Pas. Rangka Langit-langit
Pendopo 11.85 11.85 1.00 1.00 140.42 M2
Tepi 1.50 15.00 1.00 4.00 90.00 M2

Jumlah 230.42 M2

7 Pek. Pas. Eternit/Plafound


Jumlah 230.42 M2

8 PEKERJAAN PAS. LIST PLANK 3/20


Depan 42.00 1 42.00 M'
Jumlah 42.00 M'
9 LIST PLAFOND Pendopo 42.00 + 11.85 1.00 53.85 M'

Jumlah 53.85 M'

Volume
No. Uraian Pekerjaan P L T Unit / Sat
(m) (m) (m) Juml

III PEKERJAAN FINISHING CAT DIDING DAN PLAFOND


1 Pengecatan Kolom & Ringbalok kolom 15 x 15 1.20 0.60 4.00 2.88 M2
Ringbalok 15 x 20 17.10 0.70 8.00 95.76 M2
Jumlah 98.64 M2

2 Pengecatan Plafound 230.42 230.42 M2

Volume
No. Uraian Pekerjaan P L T Unit / Sat
(m) (m) (m) Juml

VI PEKERJAAN LANTAI
1 Pemasangan Lantai Keramik 40 x 40 cm warna 11.70 9.80 1.00 114.66 M2
- - - M2
Jumlah 114.66 M2

Kertayasa, 26 Juni 2023

Diverifikasi oleh: Dibuat Oleh:


Sekretaris Desa Kertayasa Pelaksana Kegiatan Anggaran

FITRI NURHAYATI WAHUDI

Disetujui / Mengesahkan:
Kepala Desa Kertayasa

PURWOKO HENDRO WINARNO, ST


(120,000,000.00)

43.37184

12.25
3.24

15.49
15.6025
20
20
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
BIDANG CIPTA KARYA BERDASARKAN PERMEN PUPR NO.28/PRT/M/2016
Tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum

HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


16 BG.2.3.1.6 1 m3 Pengurugan dengan Sirtu
A TENAGA 25,500.00
0.300 OH Pekerja 85,000.00 25,500.00
0.025 OH Mandor - -
B BAHAN 180,000.00
1.200 m3 Sirtu 150,000.00 180,000.00
C PERALATAN -
D JUMLAH A + B + C 205,500.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 205,500.00

IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON


5 A.4.1.1.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slump (12±2)cm, w/c = 0,66
A TENAGA 177,500.00
L.01 1.500 OH Pekerja 85,000.00 127,500.00
L.02 0.500 OH Tukang Batu 100,000.00 50,000.00
L.03 0.028 OH Kepala Tukang - -
L.04 0.083 OH Mandor - -
B BAHAN 760,700.00
326.000 Kg Portland Semen 1,200.00 391,200.00
760.000 Kg Pasir Beton 200.00 152,000.00
1,035.000 Kg Kerikil (maksimum 30 mm) 200.00 207,000.00
210.000 ltr Air 50.00 10,500.00
C PERALATAN -
D JUMLAH A + B + C 938,200.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 938,200.00

17 BG.4.1.1.5 1 Kg Pembesian Dengan Besi Beton Polos


A TENAGA 2,700.00
L.01 0.020 OH Pekerja 85,000.00 1,700.00
L.02 0.010 OH Tukang Besi 100,000.00 1,000.00
L.03 0.001 OH Kepala Tukang - -
L.04 0.000 OH Mandor - -
B BAHAN 8,000.00
1.000 Kg Besi Beton (polos) 7,600.00 7,600.00
0.020 Kg Kawat Beton 20,000.00 400.00
C PERALATAN -
D JUMLAH A + B + C 10,700.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 10,700.00
31 BG.4.1.1.16 1 m2 Memasang Bekisting untuk Kolom (papan kayu lokal, 2x pakai)
A TENAGA 108,000.00
L.01 0.800 OH Pekerja 85,000.00 68,000.00
L.02 0.400 OH Tukang Kayu 100,000.00 40,000.00
L.03 0.033 OH Kepala Tukang - -
L.04 0.033 OH Mandor - -
B BAHAN 60,000.00
0.020 m3 Papan kayu lokal 2,200,000.00 44,000.00
0.400 Kg Paku Biasa 2" - 5" 16,000.00 6,400.00
0.200 Ltr Minyak Bekisting 48,000.00 9,600.00
C PERALATAN -
D JUMLAH A + B + C 168,000.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 168,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) Analisa Harga Satuan Pekerjaan Halaman 67 dari 74 Halaman
HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

37 BG.4.1.1.21 1 m2 Memasang Bekisting untuk Balok (papan kayu lokal, 2x pakai)


A TENAGA 108,000.00
L.01 0.800 OH Pekerja 85,000.00 68,000.00
L.02 0.400 OH Tukang Kayu 100,000.00 40,000.00
L.03 0.033 OH Kepala Tukang - -
L.04 0.033 OH Mandor - -
B BAHAN 60,000.00
0.020 m3 Papan kayu lokal 2,200,000.00 44,000.00
0.400 Kg Paku Biasa 2" - 5" 16,000.00 6,400.00
0.200 Ltr Minyak Bekisting 48,000.00 9,600.00
C PERALATAN -
D JUMLAH A + B + C 168,000.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 168,000.00

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


5 BG.4.4.3.5 1 m2 Pemasangan Lantai Keramik 40 x 40 cm warna
A TENAGA 29,500.00
L.01 0.200 OH Pekerja 85,000.00 17,000.00
L.02 0.125 OH Tukang Batu 100,000.00 12,500.00
L.03 0.013 OH Kepala Tukang - -
L.04 0.013 OH Mandor - -
B BAHAN 486,600.00
20.000 Buah Ubin Keramik 40 x 40 cm warna 7,200.00 144,000.00
10.000 Kg Portland Semen 1,100.00 11,000.00
0.080 m3 Pasir Pasang 285,000.00 22,800.00
2.000 Kg Semen Warna 2,400.00 4,800.00
19.000 Buah Plin Granit 10 x 60 cm 16,000.00 304,000.00
C PERALATAN -
D JUMLAH A + B + C 516,100.00
E OVERHEAD & PROFIT (maksimal 15%) -
F HARGA SATUAN PEKERJAAN (D+E) 516,100.00

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.7 1 m2 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm
A TENAGA 13,500.00
L.01 0.100 OH Pekerja 85,000.00 8,500.00
L.04 0.005 OH Mandor - -
B BAHAN 31,500.00
0.500 Lbr Gypsum Board 56,400.00 28,200.00
0.110 Kg Paku Sekrup 30,000.00 3,300.00
C PERALATAN -
D JUMLAH A + B + C 45,000.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -

5 BG.4.5.1.3 1 m1 List Langit-Langit GypsumBoard 10 cm


A TENAGA 10,100.00
L.01 0.060 OH Pekerja 85,000.00 5,100.00
L.04 0.003 OH Mandor - -
B BAHAN 11,600.00
1.000 m1 Lis gypsum 10 cm 11,000.00 11,000.00
0.200 Kg Gypsump powder 3,000.00 600.00
C PERALATAN -
D JUMLAH A + B + C 21,700.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 21,700.00

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 BG.4.5.2.1 1 m2 Pemasangan Atap Genteng press jatiwangi
A TENAGA 24,500.00
L.01 0.200 OH Pekerja 85,000.00 17,000.00
L.02 0.075 OH Tukang Kayu 100,000.00 7,500.00
L.03 0.008 OH Kepala Tukang - -
L.04 0.008 OH Mandor - -
B BAHAN 50,000.00
25.000 Buah Genteng press jatiwangi 2,000.00 50,000.00
C PERALATAN -
D JUMLAH A + B + C 74,500.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 74,500.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) Analisa Harga Satuan Pekerjaan Halaman 68 dari 74 Halaman
HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

4 BG.4.5.2.4 1 m' Pemasangan Genteng Bubung Press Jatiwangi


A TENAGA 54,000.00
L.01 0.400 OH Pekerja 85,000.00 34,000.00
L.04 0.002 OH Mandor - -
B BAHAN 54,000.00
6.000 Buah Genteng Bubung Press Jatiwangi 5,500.00 33,000.00
8.000 Kg Portland Semen 1,200.00 9,600.00
0.040 m3 Pasir Pasang 285,000.00 11,400.00
C PERALATAN -
D JUMLAH A + B + C 108,000.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -

13 BG.4.6.1.13 1 m3 Pemasangan konstruksi Murplat,Gording,Nok Kayu Kruing


A TENAGA 924,000.00
L.01 2.400 OH Pekerja 85,000.00 204,000.00
L.04 0.120 OH Mandor - -
B BAHAN 6,358,000.00
1.100 m3 Kayu Kruing, balok 5,600,000.00 6,160,000.00
10.000 Kg Besi Strip 15,000.00 150,000.00
3.000 Kg Paku Biasa 2" - 5" 16,000.00 48,000.00
C PERALATAN -
D JUMLAH A + B + C 7,282,000.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -

16 BG.4.6.1.16 1 m2 Pemasangan Rangka Atap Genteng Press Jatiwangi, Kayu kruing


A TENAGA 18,500.00
L.01 0.100 OH Pekerja 85,000.00 8,500.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang - -
L.04 0.005 OH Mandor - -
B BAHAN 116,200.00
0.011 m3 Kayu kruing, Kaso-kaso (5x7) cm 4,600,000.00 50,600.00
0.014 m3 Kayu Kruing, Reng (2x3) cm 4,400,000.00 61,600.00
0.250 Kg Paku Biasa 2" - 5" 16,000.00 4,000.00
C PERALATAN -
D JUMLAH A + B + C 134,700.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 134,700.00

20 BG.4.6.1.20 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu kruing


A TENAGA 47,000.00
L.01 0.200 OH Pekerja 85,000.00 17,000.00
L.02 0.300 OH Tukang Kayu 100,000.00 30,000.00
L.03 0.030 OH Kepala Tukang - -
L.04 0.010 OH Mandor - -
B BAHAN 96,000.00
0.020 m3 Kayu kruing, Kaso-kaso (5x7) cm 4,600,000.00 92,000.00
0.250 Kg Paku Biasa 2" - 5" 16,000.00 4,000.00
C PERALATAN -
D JUMLAH A + B + C 143,000.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 143,000.00

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) Analisa Harga Satuan Pekerjaan Halaman 69 dari 74 Halaman
HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

22 BG.4.6.1.22 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu Kruing


A TENAGA 28,500.00
L.01 0.100 OH Pekerja 85,000.00 8,500.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang - -
L.04 0.005 OH Mandor - -
B BAHAN 60,800.00
0.010 m3 Kayu Kruing, papan 6,000,000.00 60,000.00
0.050 Kg Paku Biasa 2" - 5" 16,000.00 800.00
C PERALATAN -
D JUMLAH A + B + C 89,300.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -
F HARGA SATUAN PEKERJAAN (D+E) 89,300.00

9 A.4.7.1.10 1 m2 Pengecatan Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup)
A TENAGA 7,700.00
L.01 0.020 OH Pekerja 85,000.00 1,700.00
L.02 0.060 OH Tukang Cat 100,000.00 6,000.00
L.03 0.006 OH Kepala Tukang - -
L.04 0.003 OH Mandor - -
B BAHAN 43,000.00
0.100 Kg Plamir 30,000.00 3,000.00
0.400 Kg Cat tembok dasar (Dulux) 28,000.00 11,200.00
1.000 Kg Cat Penutup 2 Kali ( Catylac) 28,800.00 28,800.00
C PERALATAN -
D JUMLAH A + B + C 50,700.00
E OVERHEAD & PROFIT (maksimal 15%) 0% -

(AHSP BIDANG CIPTA KARYA EDISI DESEMBER 2020) Analisa Harga Satuan Pekerjaan Halaman 70 dari 74 Halaman
MATERIAL START

Kegiatan : BANTUAN KEUANGAN


Pekerjaan : PEMBANGUNAN PENDOPO BALAI DESA
Lokasi : DESA KERTAYASA
Tahun Anggaran :
Waktu Pelaksanaan :

HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL


NO URAIAN VOLUME
Rp. Rp. Rp.

A BOP
1 Honor Pelaksana Kegiatan 1.0 OP 945,000.00 945,000.00 945,000.00
2 Honor Ketua tim Pengadaan 1.0 OP 381,500.00 381,500.00 381,500.00
3 Honor Sekretaris tim Pengadaan 1.0 OP 329,000.00 329,000.00 329,000.00
4 Honor Anggota tim Pengadaan 1.0 OP 269,500.00 269,500.00 269,500.00
5 Honor Ketua Pemeriksa 1.0 OP 238,000.00 238,000.00 238,000.00
6 Honor Sekretaris Pemeriksa 1.0 OP 203,000.00 203,000.00 203,000.00
7 Perencanaan 1.0 paket 1,775,000.00 1,775,000.00 1,775,000.00
8 ATK Buku Tulis 1.0 bh 5,000.00 5,000.00 5,000.00
Ballpoint 1.0 bh 2,500.00 2,500.00 2,500.00
Buku Kwitansi 1.0 bh 4,000.00 4,000.00 4,000.00
Kertas HVS 70 gr 500.0 lbr 100.00 50,000.00 50,000.00
Materai 6000 10.0 bh 10,000.00 100,000.00 100,000.00
Lem Kertas 1.0 bh 4,000.00 4,000.00 4,000.00
Snelhecter Plastik 2.0 bh 7,500.00 15,000.00 15,000.00
Binder/folder 1.0 bh 17,500.00 17,500.00 17,500.00
Fotocopy 355.0 lbr 200.00 71,000.00 71,000.00
Penjilidan Laporan 4.0 bh 10,000.00 40,000.00 40,000.00
9 Konsumsi Rapat 1.0 kali 150,000.00 150,000.00 150,000.00
10 Papan Proyek 1.0 bh 50,000.00 50,000.00 50,000.00
11 Prasasti 1.0 bh 350,000.00 350,000.00 350,000.00
JUMLAH A 5,000,000.00 5,000,000.00
B BAHAN
1 Portland Semen 1,144.0 kg 1,200.00 1,372,836.00 1,372,836.00
2 Pasir Beton 1,675.8 kg 200.00 335,160.00 335,160.00
3 Kerikil (maksimum 30 mm) 2,282.2 kg 200.00 456,435.00 456,435.00
4 Air 463.1 Ltr 50.00 23,152.50 23,152.50
5 Pasir Pasang 1.7 m3 285,000.00 484,728.00 484,728.00
6 Besi Beton (polos) 847.6 Kg 7,600.00 6,441,680.45 6,441,680.45
7 Kawat Beton 17.0 Kg 20,000.00 339,035.81 339,035.81
8 Plamir 32.9 Kg 30,000.00 987,187.50 987,187.50
9 Cat tembok dasar (Dulux) 131.6 Kg 28,000.00 3,685,500.00 3,685,500.00
10 Cat Penutup 2 Kali ( Catylac) 329.1 Kg 28,800.00 9,477,000.00 9,477,000.00
11 Papan kayu pinus 1.0 m3 2,200,000.00 2,209,680.00 2,209,680.00
12 Paku Biasa 2" - 5" 123.9 Kg 16,000.00 1,981,915.32 1,981,915.32
13 Minyak Bekisting 10.0 Ltr 48,000.00 482,112.00 482,112.00
14 Kayu Kruing, balok 1.4 m3 5,600,000.00 7,637,414.40 7,637,414.40
15 Besi Strip 12.4 Kg 15,000.00 185,976.00 185,976.00
16 Kayu kruing, Kaso-kaso (5x7) cm 6.4 m3 4,600,000.00 29,367,038.25 29,367,038.25
17 Kayu Kruing, Reng (2x3) cm 2.3 Kg 4,400,000.00 9,943,857.00 9,943,857.00
18 Kayu Kruing, papan 0.4 m3 6,000,000.00 2,520,000.00 2,520,000.00
19 Gypsum Board 115.2 m3 56,400.00 6,497,914.50 6,497,914.50
20 Paku Sekrup 25.3 m3 30,000.00 760,394.25 760,394.25
21 Lis gypsum 10 cm 53.9 m3 11,000.00 592,350.00 592,350.00
22 Gypsump powder 10.8 kg 3,000.00 32,310.00 32,310.00
23 Genteng press jatiwangi 4,035.7 Buah 2,000.00 8,071,312.50 8,071,312.50
24 Genteng Bubung Press Jatiwangi 212.6 Buah 5,500.00 1,169,300.00 1,169,300.00
25 Mur Baut 12 mm Kuda-kuda 28.0 Bh 10,000.00 280,000.00 280,000.00
26 Pas. Stop Kontak 4.0 Ttk 40,000.00 160,000.00 160,000.00
27 Pas. Saklar Tunggal 2.0 Bh 30,000.00 60,000.00 60,000.00
26 Pas. Saklar Ganda 2.0 Ttk 40,000.00 80,000.00 80,000.00
27 Pas. Lampu Pijar 14 W 8.0 Bh 45,000.00 360,000.00 360,000.00
28 Pas. Kabel NYY 2 x 1.5 50.0 m' 9,000.00 450,000.00 450,000.00
JUMLAH B 96,444,289.49 96,444,289.49
C UPAH -
1 Pekerja 208.2 OH 85,000.00 17,694,149.88 17,694,149.88
2 Tukang Batu 189.0 OH 100,000.00 18,895,696.21 18,895,696.21
JUMLAH C 36,589,846.09 36,589,846.09
D LAIN-LAIN
1 Pek. Septictank ls 5,000,000.00 - -
2 Pemb. Sumur Bor - paket 2,000,000.00 - -
3 Pas. Instlasi Listrik Baru - unit 3,500,000.00 - -
4 Pintu Sliding unit 5,200,000.00 -
JUMLAH D - -
JUMLAH A+B+C 138,034,135.57 138,034,135.57
GRAND TOTAL 138,034,135.57
DIBULATKAN 138,034,000.00
Seratus dua puluh delapan juta sembilan ratus sembilan puluh tujuh ribu rupiah
Kertayasa, 05 Juli 2022

Dibuat Oleh:
Diverifikasi Oleh : Pelaksana Kegiatan Anggaran
Sekertaris Ds. Kertayasa

SOYI LANTASI SUHADI


Disetujui/ Mengesahkan
Kepala Desa Kertayasa

PURWOKO HENDRO WINARNO, ST


100 - 500 JT 50-100 JT 5-50 JT
INDEK INDEK INDEK
0.3
1,350,000 700,000.00 500000 405,000
545,000 385,000 385,000 163,500
470,000 320,000 320,000 141,000
385,000 265,000 265,000 115,500
340,000 235,000 155,000 102,000
290,000 205,000 120,000 87,000
2,775,000

0.03 0.015
185,000,000 2,775,000

945,000
381,500
329,000
269,500
238,000
203,000

rapat 150,000

BOP 6,000,000
1,000,000 5000
900,000
4,117,575
3,247,864
2,166,100
440,496
596,408
31,154
3,558,985
133,796
1,517,160
828,119
309,888
369,752
342,475
907,770
2,153,125
178,125
3,104,957
104,976
9,376,395
5,307,120
1,163,608
1,231,230
198,436
4,252,500

120,000

46,925,312

23,897,671

133,034,136 70,822,983

Anda mungkin juga menyukai