No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.400 130,000.00 52,000.00
Tukang Kayu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.020 190,000.00 3,800.00
JUMLAH TENAGA KERJA 88,600.00
B BAHAN
Dolken Kayu Ø 8 -10/400 cm Batang 1.250 3,500.00 4,375.00
Semen Portland Kg 5.000 1,740.20 8,701.00
Pasir Beton M3 0.005 280,000.00 1,400.00
Koral Beton M3 0.009 190,000.00 1,710.00
Kayu 5/7 M3 0.072 2,500,000.00 180,000.00
Paku biasa 2" - 5" Kg 0.060 13,000.00 780.00
Residu Liter 0.400 16,400.00 6,560.00
JUMLAH HARGA BAHAN 203,526.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 130,000.00 26,000.00
Tukang Kayu L.02 OH 0.400 145,000.00 58,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.020 190,000.00 3,800.00
JUMLAH TENAGA KERJA 91,600.00
B BAHAN
Dolken Kayu Ø 8 -10/400 cm Batang 1.250 3,500.00 4,375.00
Semen Portland Kg 2.500 1,740.20 4,350.50
Seng Gelombang Lbr 1.200 50,000.00 60,000.00
Pasir Beton M3 0.005 280,000.00 1,400.00
Koral Beton M3 0.009 190,000.00 1,710.00
Kayu 5/7 M3 0.072 2,500,000.00 180,000.00
Paku biasa 2" - 5" Kg 0.060 13,000.00 780.00
Meni Besi Liter 0.450 40,000.00 18,000.00
JUMLAH HARGA BAHAN 270,615.50
C PERALATAN
A.2.2.1.3. Pembuatan 1 M2 Pagar Sementara dari Kawat Duri Tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 130,000.00 26,000.00
Tukang Kayu L.02 OH 0.300 145,000.00 43,500.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.020 190,000.00 3,800.00
JUMLAH TENAGA KERJA 77,100.00
B BAHAN
Dolken Kayu Ø 8 -10/400 cm Batang 1.000 3,500.00 3,500.00
Semen Portland Kg 2.000 1,740.20 3,480.40
Kawat duri M' 25.000 1,246.88 31,171.88
Pasir Beton M3 0.005 280,000.00 1,400.00
Koral Beton M3 0.009 190,000.00 1,710.00
Paku biasa 2" - 5" Kg 0.060 13,000.00 780.00
JUMLAH HARGA BAHAN 42,042.28
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Kayu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 30,350.00
B BAHAN
Kayu Balok 5/7 M3 0.012 2,500,000.00 30,000.00
Paku 2" - 3" Kg 0.020 13,000.00 260.00
Kayu Papan 3/20 M3 0.007 2,000,000.00 14,000.00
JUMLAH HARGA BAHAN 44,260.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.750 130,000.00 97,500.00
Mandor L.04 OH 0.025 190,000.00 4,750.00
JUMLAH TENAGA KERJA 102,250.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.900 130,000.00 117,000.00
Mandor L.04 OH 0.045 190,000.00 8,550.00
JUMLAH TENAGA KERJA 125,550.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.050 130,000.00 136,500.00
Mandor L.04 OH 0.067 190,000.00 12,730.00
JUMLAH TENAGA KERJA 149,230.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 130,000.00 130,000.00
Mandor L.04 OH 0.032 190,000.00 6,080.00
JUMLAH TENAGA KERJA 136,080.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.500 130,000.00 195,000.00
Mandor L.04 OH 0.060 190,000.00 11,400.00
JUMLAH TENAGA KERJA 206,400.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.200 130,000.00 156,000.00
Mandor L.04 OH 0.045 190,000.00 8,550.00
JUMLAH TENAGA KERJA 164,550.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.050 130,000.00 6,500.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 7,450.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.330 130,000.00 42,900.00
Mandor L.04 OH 0.010 190,000.00 1,900.00
JUMLAH TENAGA KERJA 44,800.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.500 130,000.00 65,000.00
Mandor L.04 OH 0.050 190,000.00 9,500.00
JUMLAH TENAGA KERJA 74,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.500 130,000.00 65,000.00
Mandor L.04 OH 0.050 190,000.00 9,500.00
JUMLAH TENAGA KERJA 74,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Mandor L.04 OH 0.010 190,000.00 1,900.00
JUMLAH TENAGA KERJA 40,900.00
B BAHAN
Pasir Urug 1.200 167,500.00 201,000.00
JUMLAH HARGA BAHAN 201,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.250 130,000.00 32,500.00
Mandor L.04 OH 0.025 190,000.00 4,750.00
JUMLAH TENAGA KERJA 37,250.00
B BAHAN
Tanah M3 1.200 117,500.00 141,000.00
JUMLAH HARGA BAHAN 141,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.500 130,000.00 195,000.00
Tukang Batu L.02 OH 0.750 145,000.00 108,750.00
Kepala Tukang L.03 OH 0.075 190,000.00 14,250.00
Mandor L.04 OH 0.075 190,000.00 14,250.00
JUMLAH TENAGA KERJA 332,250.00
B BAHAN
Batu Belah M3 1.200 342,500.00 411,000.00
Semen Portlan Kg 202.000 1,740.20 351,520.40
Pasir Pasang M3 0.485 280,000.00 135,800.00
JUMLAH HARGA BAHAN 898,320.40
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 130,000.00 214,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Kepala Tukang L.03 OH 0.028 190,000.00 5,320.00
Mandor L.04 OH 0.083 190,000.00 15,770.00
JUMLAH TENAGA KERJA 275,465.00
B BAHAN
Semen Portland Kg 247.000 1,740.20 429,829.40
Pasir Beton M3 0.869 280,000.00 243,320.00
Kerikil (Maks 30mm) M3 0.999 190,000.00 189,810.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,292,959.40
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 130,000.00 214,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Kepala Tukang L.03 OH 0.028 190,000.00 5,320.00
Mandor L.04 OH 0.083 190,000.00 15,770.00
JUMLAH TENAGA KERJA 275,465.00
B BAHAN
Semen Portland Kg 276.000 1,740.20 480,295.20
Pasir Beton M3 0.828 280,000.00 231,840.00
Kerikil (maks 30 mm) M3 1.012 190,000.00 192,280.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,334,415.20
C PERALATAN
A.4.1.1.3. Membuat 1 M3 BetonMutu f' c = 12,2 Mpa (K 150), slump (12 ±2) cm, ʷ/c = 0.72
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 130,000.00 214,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Kepala Tukang L.03 OH 0.028 190,000.00 5,320.00
Mandor L.04 OH 0.083 190,000.00 15,770.00
JUMLAH TENAGA KERJA 275,465.00
B BAHAN
Semen Portland Kg 299.000 1,740.20 520,319.80
Pasir Beton M3 0.799 280,000.00 223,720.00
Kerikil (maks 30 mm) M3 1.017 190,000.00 193,230.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,367,269.80
C PERALATAN
A.4.1.1.4. Membuat 1 M3 Lantai Kerja BetonMutu f' c = 7,4 Mpa (K 100), slump (3-6) cm, ʷ/c = 0.87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.200 130,000.00 156,000.00
Tukang Batu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.060 190,000.00 11,400.00
JUMLAH TENAGA KERJA 200,200.00
B BAHAN
Semen Portland Kg 230.000 1,740.20 400,246.00
Pasir Beton M3 0.893 280,000.00 250,040.00
Kerikil (maks 30 mm) M3 1.027 190,000.00 195,130.00
Air Liter 200.000 2,000.00 400,000.00
JUMLAH HARGA BAHAN 1,245,416.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 130,000.00 214,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Kepala Tukang L.03 OH 0.028 190,000.00 5,320.00
Mandor L.04 OH 0.083 190,000.00 15,770.00
JUMLAH TENAGA KERJA 275,465.00
B BAHAN
Semen Portland Kg 326.000 1,740.20 567,305.20
Pasir Beton M3 0.760 280,000.00 212,800.00
Kerikil (maks 30 mm) M3 1.029 190,000.00 195,510.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,405,615.20
C PERALATAN
A.4.1.1.6. Membuat 1 M3 Beton Mutu f' c = 16,9 Mpa (K 200), slump (12 ±2) cm, ʷ/c = 0.61
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 130,000.00 214,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Kepala Tukang L.03 OH 0.028 190,000.00 5,320.00
Mandor L.04 OH 0.083 190,000.00 15,770.00
JUMLAH TENAGA KERJA 275,465.00
B BAHAN
Semen Portland Kg 352.000 1,740.20 612,550.40
Pasir Beton M3 0.731 280,000.00 204,680.00
Kerikil (maks 30 mm) M3 1.031 190,000.00 195,890.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,443,120.40
C PERALATAN
A.4.1.1.7. Membuat 1 M3 Beton Mutu f' c = 19,3 Mpa (K 225), slump (12 ±2) cm, ʷ/c = 0.58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 130,000.00 214,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Kepala Tukang L.03 OH 0.028 190,000.00 5,320.00
Mandor L.04 OH 0.083 190,000.00 15,770.00
JUMLAH TENAGA KERJA 275,465.00
B BAHAN
Semen Portland Kg 371.000 1,740.20 645,614.20
Pasir Beton M3 0.698 280,000.00 195,440.00
Kerikil (maks 30 mm) M3 1.047 190,000.00 198,930.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,469,984.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 130,000.00 214,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Kepala Tukang L.03 OH 0.028 190,000.00 5,320.00
Mandor L.04 OH 0.083 190,000.00 15,770.00
JUMLAH TENAGA KERJA 275,465.00
B BAHAN
Semen Portland Kg 384.000 1,740.20 668,236.80
Pasir Beton M3 0.692 280,000.00 193,760.00
Kerikil (maks 30 mm) M3 1.039 190,000.00 197,410.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,489,406.80
C PERALATAN
A.4.1.1.9. Membuat 1 M3 Beton Mutu f' c = 24,0 Mpa (K 275), slump (12 ±2) cm, ʷ/c = 0.53
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 130,000.00 214,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Kepala Tukang L.03 OH 0.028 190,000.00 5,320.00
Mandor L.04 OH 0.083 190,000.00 15,770.00
JUMLAH TENAGA KERJA 275,465.00
B BAHAN
Semen Portland Kg 406.000 1,740.20 706,521.20
Pasir Beton M3 0.684 280,000.00 191,520.00
Kerikil (maks 30 mm) M3 1.026 190,000.00 194,940.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,522,981.20
C PERALATAN
A.4.1.1.10. Membuat 1 M3 BetonMutu f' c = 26,4 Mpa (K 300), slump (12 ±2) cm, ʷ/c = 0.52
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 130,000.00 214,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Kepala Tukang L.03 OH 0.028 190,000.00 5,320.00
Mandor L.04 OH 0.083 190,000.00 15,770.00
JUMLAH TENAGA KERJA 275,465.00
B BAHAN
Semen Portland Kg 413.000 1,740.20 718,702.60
Pasir Beton M3 0.681 280,000.00 190,680.00
Kerikil (maks 30 mm) M3 1.021 190,000.00 193,990.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,533,372.60
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.100 130,000.00 273,000.00
Tukang Batu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.105 190,000.00 19,950.00
JUMLAH TENAGA KERJA 350,350.00
B BAHAN
Semen Portland Kg 439.000 1,740.20 763,947.80
Pasir Beton M3 0.670 280,000.00 187,600.00
Kerikil (maks 30 mm) M3 1.006 190,000.00 191,140.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,572,687.80
C PERALATAN
A.4.1.1.12. Membuat 1 M3 Beton Mutu f' c = 31,2 Mpa (K 350), slump (12 ±2) cm, ʷ/c = 0.48
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.100 130,000.00 273,000.00
Tukang Batu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.105 190,000.00 19,950.00
JUMLAH TENAGA KERJA 350,350.00
B BAHAN
Semen Portland Kg 448.000 1,740.20 779,609.60
Pasir Beton M3 0.667 280,000.00 186,760.00
Kerikil (maks 30 mm) M3 1.000 190,000.00 190,000.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,586,369.60
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 130,000.00 9,100.00
Tukang Besi L.02 OH 0.070 145,000.00 10,150.00
Kepala Tukang L.03 OH 0.007 190,000.00 1,330.00
Mandor L.04 OH 0.004 190,000.00 760.00
JUMLAH TENAGA KERJA 21,340.00
B BAHAN
Besi Beton (Polos/Ulir) Kg 10.500 14,000.00 147,000.00
Kawat Beton Kg 0.150 21,000.00 3,150.00
JUMLAH HARGA BAHAN 150,150.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.520 130,000.00 67,600.00
Tukang Kayu L.02 OH 0.260 145,000.00 37,700.00
Kepala Tukang L.03 OH 0.026 190,000.00 4,940.00
Mandor L.04 OH 0.026 190,000.00 4,940.00
JUMLAH TENAGA KERJA 115,180.00
B BAHAN
Kayu Kelas III M3 0.040 2,500,000.00 100,000.00
Paku 5-10 cm Kg 0.300 13,000.00 3,900.00
Minyak Bekisting Liter 0.100 9,000.00 900.00
JUMLAH HARGA BAHAN 104,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.520 130,000.00 67,600.00
Tukang Kayu L.02 OH 0.260 145,000.00 37,700.00
Kepala Tukang L.03 OH 0.026 190,000.00 4,940.00
Mandor L.04 OH 0.026 190,000.00 4,940.00
JUMLAH TENAGA KERJA 115,180.00
B BAHAN
Kayu Kelas III M3 0.045 2,500,000.00 112,500.00
Paku 5-10 cm Kg 0.300 13,000.00 3,900.00
Minyak Bekisting Liter 0.100 9,000.00 900.00
JUMLAH HARGA BAHAN 117,300.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 130,000.00 85,800.00
Tukang Kayu L.02 OH 0.330 145,000.00 47,850.00
Kepala Tukang L.03 OH 0.033 190,000.00 6,270.00
Mandor L.04 OH 0.033 190,000.00 6,270.00
JUMLAH TENAGA KERJA 146,190.00
B BAHAN
Kayu Kelas III M3 0.040 2,500,000.00 100,000.00
Paku 5-12 cm Kg 0.400 13,000.00 5,200.00
Minyak Bekisting Liter 0.200 9,000.00 1,800.00
Balok Kayu Kelas II M3 0.015 3,700,000.00 55,500.00
Plywood tebal 9mm Lbr 0.350 68,200.00 23,870.00
Dolken Kayu Ø 8 -10/400 cm Batang 2.000 3,500.00 7,000.00
JUMLAH HARGA BAHAN 193,370.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 130,000.00 85,800.00
Tukang Kayu L.02 OH 0.330 145,000.00 47,850.00
Kepala Tukang L.03 OH 0.033 190,000.00 6,270.00
Mandor L.04 OH 0.033 190,000.00 6,270.00
JUMLAH TENAGA KERJA 146,190.00
B BAHAN
Kayu Kelas III M3 0.040 2,500,000.00 100,000.00
Paku 5-12 cm Kg 0.400 13,000.00 5,200.00
Minyak Bekisting Liter 0.200 9,000.00 1,800.00
Balok Kayu Kelas II M3 0.018 3,700,000.00 66,600.00
Plywood tebal 9mm Lbr 0.350 68,200.00 23,870.00
Dolken Kayu Ø 8 -10/400 cm Batang 2.000 3,500.00 7,000.00
JUMLAH HARGA BAHAN 204,470.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 130,000.00 85,800.00
Tukang Kayu L.02 OH 0.330 145,000.00 47,850.00
Kepala Tukang L.03 OH 0.033 190,000.00 6,270.00
Mandor L.04 OH 0.033 190,000.00 6,270.00
JUMLAH TENAGA KERJA 146,190.00
B BAHAN
Kayu Kelas III M3 0.040 2,500,000.00 100,000.00
Paku 5-12 cm Kg 0.400 13,000.00 5,200.00
Minyak Bekisting Liter 0.200 9,000.00 1,800.00
Balok Kayu Kelas II M3 0.015 3,700,000.00 55,500.00
Plywood tebal 9mm Lbr 0.350 68,200.00 23,870.00
Dolken Kayu Ø 8 -10/400 cm Batang 6.000 3,500.00 21,000.00
JUMLAH HARGA BAHAN 207,370.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 130,000.00 85,800.00
Tukang Kayu L.02 OH 0.330 145,000.00 47,850.00
Kepala Tukang L.03 OH 0.033 190,000.00 6,270.00
Mandor L.04 OH 0.033 190,000.00 6,270.00
JUMLAH TENAGA KERJA 146,190.00
B BAHAN
Kayu Kelas III M3 0.030 2,500,000.00 75,000.00
Paku 5-12 cm Kg 0.400 13,000.00 5,200.00
Minyak Bekisting Liter 0.200 9,000.00 1,800.00
Balok Kayu Kelas II M3 0.020 3,700,000.00 74,000.00
Plywood tebal 9mm Lbr 0.350 68,200.00 23,870.00
Dolken Kayu Ø 8 -10/400 cm Batang 3.000 3,500.00 10,500.00
Penjaga Jarak Bekisting/Spacer Buah 4.000 -
JUMLAH HARGA BAHAN 115,370.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 130,000.00 85,800.00
Tukang Kayu L.02 OH 0.330 145,000.00 47,850.00
Kepala Tukang L.03 OH 0.033 190,000.00 6,270.00
Mandor L.04 OH 0.033 190,000.00 6,270.00
JUMLAH TENAGA KERJA 146,190.00
B BAHAN
Kayu Kelas III M3 0.030 2,500,000.00 75,000.00
Paku 5-12 cm Kg 0.400 13,000.00 5,200.00
Minyak Bekisting Liter 0.150 9,000.00 1,350.00
Balok Kayu Kelas II M3 0.015 3,700,000.00 55,500.00
Plywood tebal 9mm Lbr 0.350 68,200.00 23,870.00
Dolken Kayu Ø 8 -10/400 cm Batang 2.000 3,500.00 7,000.00
JUMLAH HARGA BAHAN 167,920.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III (papan) M3 0.200 2,500,000.00 500,000.00
Paku 5-12 cm Kg 1.500 13,000.00 19,500.00
Minyak Bekisting Liter 0.400 9,000.00 3,600.00
Besi Beton Polos Kg 157.500 14,000.00 2,205,000.00
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 320,000.00 259,200.00
JUMLAH HARGA BAHAN 3,770,457.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.265 190,000.00 50,350.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,170,325.00
B BAHAN
Kayu Kelas III (Papan mal) M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 59.783 14,000.00 836,966.20
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.120 3,700,000.00 444,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 32.000 3,500.00 112,000.00
JUMLAH HARGA BAHAN 3,376,983.40
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.180 130,000.00 23,400.00
Tukang Batu L.02 OH 0.020 145,000.00 2,900.00
Tukang Kayu L.02 OH 0.020 145,000.00 2,900.00
Tukang besi L.02 OH 0.020 145,000.00 2,900.00
Kepala Tukang L.03 OH 0.006 190,000.00 1,140.00
Mandor L.04 OH 0.090 190,000.00 17,100.00
JUMLAH TENAGA KERJA 50,340.00
B BAHAN
Kayu Kelas III M3 0.002 2,500,000.00 5,000.00
Paku 5-12 cm Kg 0.010 13,000.00 130.00
Besi Beton Polos Kg 3.000 14,000.00 42,000.00
Kawat Beton Kg 0.450 21,000.00 9,450.00
Semen Portland Kg 4.000 1,740.20 6,960.80
Pasir Beton M3 0.006 280,000.00 1,680.00
Kerikil M3 0.009 190,000.00 1,710.00
JUMLAH HARGA BAHAN 66,930.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 117,270.80
E Overhead & Profit 14% 16,417.91
F Harga Satuan Pekerjaan (D+E) 133,688.71
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III /mal M3 0.200 2,500,000.00 500,000.00
Paku 5-12 cm Kg 1.500 13,000.00 19,500.00
Minyak Bekisting Liter 0.400 9,000.00 3,600.00
Besi Beton Polos Kg 89.250 14,000.00 1,249,500.00
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
JUMLAH HARGA BAHAN 2,709,657.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III (papan) M3 0.200 2,500,000.00 500,000.00
Paku 5-12 cm Kg 1.500 13,000.00 19,500.00
Minyak Bekisting Liter 0.400 9,000.00 3,600.00
Besi Beton Polos Kg 105.500 14,000.00 1,477,000.00
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
JUMLAH HARGA BAHAN 2,937,157.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III (papan) M3 0.200 2,500,000.00 500,000.00
Paku 5-12 cm Kg 1.500 13,000.00 19,500.00
Minyak Bekisting Liter 0.400 9,000.00 3,600.00
Besi Beton Polos Kg 205.500 14,000.00 2,877,000.00
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
JUMLAH HARGA BAHAN 4,337,157.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III (papan) M3 0.200 2,500,000.00 500,000.00
Paku 5-12 cm Kg 1.500 13,000.00 19,500.00
Minyak Bekisting Liter 0.400 9,000.00 3,600.00
Besi Beton Polos Kg 236.500 14,000.00 3,311,000.00
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
JUMLAH HARGA BAHAN 4,771,157.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.650 130,000.00 734,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.560 145,000.00 226,200.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.323 190,000.00 61,370.00
Mandor L.04 OH 0.283 190,000.00 53,770.00
JUMLAH TENAGA KERJA 1,318,715.00
B BAHAN
Kayu Kelas III /mal M3 0.270 2,500,000.00 675,000.00
Paku 5-12 cm Kg 2.000 13,000.00 26,000.00
Minyak Bekisting Liter 0.600 9,000.00 5,400.00
Besi Beton Polos Kg 59.783 14,000.00 836,966.20
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
JUMLAH HARGA BAHAN 2,496,173.40
C PERALATAN
A TENAGA
Pekerja L.01 OH 5.650 130,000.00 734,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.560 145,000.00 226,200.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.323 190,000.00 61,370.00
Mandor L.04 OH 0.283 190,000.00 53,770.00
JUMLAH TENAGA KERJA 1,318,715.00
B BAHAN
Kayu Kelas III /mal M3 0.270 2,500,000.00 675,000.00
Paku 5-12 cm Kg 2.000 13,000.00 26,000.00
Minyak Bekisting Liter 0.600 9,000.00 5,400.00
Besi Beton Polos Kg 120.500 14,000.00 1,687,000.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
JUMLAH HARGA BAHAN 3,346,207.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.650 130,000.00 734,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.560 145,000.00 226,200.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.323 190,000.00 61,370.00
Mandor L.04 OH 0.283 190,000.00 53,770.00
JUMLAH TENAGA KERJA 1,318,715.00
B BAHAN
Kayu Kelas III /mal M3 0.270 2,500,000.00 675,000.00
Paku 5-12 cm Kg 2.000 13,000.00 26,000.00
Minyak Bekisting Liter 0.600 9,000.00 5,400.00
Besi Beton Polos Kg 130.500 14,000.00 1,827,000.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
JUMLAH HARGA BAHAN 3,486,207.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.650 130,000.00 734,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.560 145,000.00 226,200.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.323 190,000.00 61,370.00
Mandor L.04 OH 0.283 190,000.00 53,770.00
JUMLAH TENAGA KERJA 1,318,715.00
B BAHAN
Kayu Kelas III /mal M3 0.270 2,500,000.00 675,000.00
Paku 5-12 cm Kg 2.000 13,000.00 26,000.00
Minyak Bekisting Liter 0.600 9,000.00 5,400.00
Besi Beton Polos Kg 155.500 14,000.00 2,177,000.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
JUMLAH HARGA BAHAN 3,836,207.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.650 130,000.00 734,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.560 145,000.00 226,200.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.323 190,000.00 61,370.00
Mandor L.04 OH 0.283 190,000.00 53,770.00
JUMLAH TENAGA KERJA 1,318,715.00
B BAHAN
Kayu Kelas III /mal M3 0.270 2,500,000.00 675,000.00
Paku 5-12 cm Kg 2.000 13,000.00 26,000.00
Minyak Bekisting Liter 0.600 9,000.00 5,400.00
Besi Beton Polos Kg 183.750 14,000.00 2,572,500.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
JUMLAH HARGA BAHAN 4,231,707.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.050 130,000.00 916,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 2.100 145,000.00 304,500.00
Kepala Tukang L.03 OH 0.403 190,000.00 76,570.00
Mandor L.04 OH 0.353 190,000.00 67,070.00
JUMLAH TENAGA KERJA 1,643,765.00
B BAHAN
Kayu Kelas III /Mal M3 0.400 2,500,000.00 1,000,000.00
Paku 5-12 cm Kg 4.000 13,000.00 52,000.00
Minyak Bekisting Liter 2.000 9,000.00 18,000.00
Besi Beton Polos Kg 59.783 14,000.00 836,966.20
Kawat Beton Kg 4.500 21,000.00 94,500.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190000 153,900.00
Kayu Kelas II Balok M3 0.150 3,700,000.00 555,000.00
Plywood 9mm Lbr 3.500 68,200.00 238,700.00
Dolken Kayu Ø 8 -10/400 cm Batang 20.000 3,500.00 70,000.00
JUMLAH HARGA BAHAN 3,754,973.40
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.050 130,000.00 916,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 2.100 145,000.00 304,500.00
Kepala Tukang L.03 OH 0.403 190,000.00 76,570.00
Mandor L.04 OH 0.353 190,000.00 67,070.00
JUMLAH TENAGA KERJA 1,643,765.00
B BAHAN
Kayu Kelas III /mal M3 0.400 2,500,000.00 1,000,000.00
Paku 5-12 cm Kg 4.000 13,000.00 52,000.00
Minyak Bekisting Liter 2.000 9,000.00 18,000.00
Besi Beton Polos Kg 140.500 14,000.00 1,967,000.00
Kawat Beton Kg 4.500 21,000.00 94,500.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190000 153,900.00
Kayu Kelas II Balok M3 0.150 3,700,000.00 555,000.00
Plywood 9mm Lbr 3.500 68,200.00 238,700.00
Dolken Kayu Ø 8 -10/400 cm Batang 20.000 3,500.00 70,000.00
JUMLAH HARGA BAHAN 4,885,007.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.050 130,000.00 916,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 2.100 145,000.00 304,500.00
Kepala Tukang L.03 OH 0.403 190,000.00 76,570.00
Mandor L.04 OH 0.353 190,000.00 67,070.00
JUMLAH TENAGA KERJA 1,643,765.00
B BAHAN
Kayu Kelas III /mal M3 0.400 2,500,000.00 1,000,000.00
Paku 5-12 cm Kg 4.000 13,000.00 52,000.00
Minyak Bekisting Liter 2.000 9,000.00 18,000.00
Besi Beton Polos Kg 180.500 14,000.00 2,527,000.00
Kawat Beton Kg 4.500 21,000.00 94,500.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190000 153,900.00
Kayu Kelas II Balok M3 0.150 3,700,000.00 555,000.00
Plywood 9mm Lbr 3.500 68,200.00 238,700.00
Dolken Kayu Ø 8 -10/400 cm Batang 20.000 3,500.00 70,000.00
JUMLAH HARGA BAHAN 5,445,007.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.050 130,000.00 916,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 2.100 145,000.00 304,500.00
Kepala Tukang L.03 OH 0.403 190,000.00 76,570.00
Mandor L.04 OH 0.353 190,000.00 67,070.00
JUMLAH TENAGA KERJA 1,643,765.00
B BAHAN
Kayu Kelas III /mal M3 0.400 2,500,000.00 1,000,000.00
Paku 5-12 cm Kg 4.000 13,000.00 52,000.00
Minyak Bekisting Liter 2.000 9,000.00 18,000.00
Besi Beton Polos Kg 205.500 14,000.00 2,877,000.00
Kawat Beton Kg 4.500 21,000.00 94,500.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190000 153,900.00
Kayu Kelas II Balok M3 0.150 3,700,000.00 555,000.00
Plywood 9mm Lbr 3.500 68,200.00 238,700.00
Dolken Kayu Ø 8 -10/400 cm Batang 20.000 3,500.00 70,000.00
JUMLAH HARGA BAHAN 5,795,007.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.050 130,000.00 916,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 2.100 145,000.00 304,500.00
Kepala Tukang L.03 OH 0.403 190,000.00 76,570.00
Mandor L.04 OH 0.353 190,000.00 67,070.00
JUMLAH TENAGA KERJA 1,643,765.00
B BAHAN
Kayu Kelas III /mal M3 0.400 2,500,000.00 1,000,000.00
Paku 5-12 cm Kg 4.000 13,000.00 52,000.00
Minyak Bekisting Liter 2.000 9,000.00 18,000.00
Besi Beton Polos Kg 255.500 14,000.00 3,577,000.00
Kawat Beton Kg 4.500 21,000.00 94,500.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190000 153,900.00
Kayu Kelas II Balok M3 0.150 3,700,000.00 555,000.00
Plywood 9mm Lbr 3.500 68,200.00 238,700.00
Dolken Kayu Ø 8 -10/400 cm Batang 20.000 3,500.00 70,000.00
JUMLAH HARGA BAHAN 6,495,007.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.350 130,000.00 825,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.333 190,000.00 63,270.00
Mandor L.04 OH 0.318 190,000.00 60,420.00
JUMLAH TENAGA KERJA 1,431,315.00
B BAHAN
Kayu Kelas III /mal M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 105.500 14,000.00 1,477,000.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 16.000 3,500.00 56,000.00
JUMLAH HARGA BAHAN 4,050,767.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.350 130,000.00 825,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.333 190,000.00 63,270.00
Mandor L.04 OH 0.318 190,000.00 60,420.00
JUMLAH TENAGA KERJA 1,431,315.00
B BAHAN
Kayu Kelas III /mal M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 130.500 14,000.00 1,827,000.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 16.000 3,500.00 56,000.00
JUMLAH HARGA BAHAN 4,400,767.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.350 130,000.00 825,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.333 190,000.00 63,270.00
Mandor L.04 OH 0.318 190,000.00 60,420.00
JUMLAH TENAGA KERJA 1,431,315.00
B BAHAN
Kayu Kelas III /Mal M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 155.500 14,000.00 2,177,000.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 16.000 3,500.00 56,000.00
JUMLAH HARGA BAHAN 4,750,767.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.350 130,000.00 825,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.333 190,000.00 63,270.00
Mandor L.04 OH 0.318 190,000.00 60,420.00
JUMLAH TENAGA KERJA 1,431,315.00
B BAHAN
Kayu Kelas III /Mal M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 180.500 14,000.00 2,527,000.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 16.000 3,500.00 56,000.00
JUMLAH HARGA BAHAN 5,100,767.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.350 130,000.00 825,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.333 190,000.00 63,270.00
Mandor L.04 OH 0.318 190,000.00 60,420.00
JUMLAH TENAGA KERJA 1,431,315.00
B BAHAN
Kayu Kelas III /Mal M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 255.500 14,000.00 3,577,000.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 16.000 3,500.00 56,000.00
JUMLAH HARGA BAHAN 6,150,767.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.350 130,000.00 825,500.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.650 145,000.00 239,250.00
Tukang besi L.02 OH 1.400 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.333 190,000.00 63,270.00
Mandor L.04 OH 0.318 190,000.00 60,420.00
JUMLAH TENAGA KERJA 1,431,315.00
B BAHAN
Kayu Kelas III /Papan Mal M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 305.500 14,000.00 4,277,000.00
Kawat Beton Kg 3.000 21,000.00 63,000.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 16.000 3,500.00 56,000.00
JUMLAH HARGA BAHAN 6,850,767.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 105.500 14,000.00 1,477,000.00
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 24.000 3,500.00 84,000.00
JUMLAH HARGA BAHAN 4,063,017.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 125.500 14,000.00 1,757,000.00
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 24.000 3,500.00 84,000.00
JUMLAH HARGA BAHAN 4,343,017.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 155.500 14,000.00 2,177,000.00
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 24.000 3,500.00 84,000.00
JUMLAH HARGA BAHAN 4,763,017.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 205.500 14,000.00 2,877,000.00
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 24.000 3,500.00 84,000.00
JUMLAH HARGA BAHAN 5,463,017.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Kayu Kelas III (Papan mal) M3 0.320 2,500,000.00 800,000.00
Paku 5-12 cm Kg 3.200 13,000.00 41,600.00
Minyak Bekisting Liter 1.600 9,000.00 14,400.00
Besi Beton Polos Kg 59.783 14,000.00 836,966.20
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.140 3,700,000.00 518,000.00
Plywood 9mm Lbr 2.800 68,200.00 190,960.00
Dolken Kayu Ø 8 -10/400 cm Batang 24.000 3,500.00 84,000.00
JUMLAH HARGA BAHAN 3,422,983.40
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.300 130,000.00 689,000.00
Tukang Batu L.02 OH 0.275 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.300 145,000.00 188,500.00
Tukang besi L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.262 190,000.00 49,780.00
Mandor L.04 OH 0.265 190,000.00 50,350.00
JUMLAH TENAGA KERJA 1,169,755.00
B BAHAN
Plat Bondex m2 10.000 150,000.00 1,500,000.00
Kayu Kelas III (Papan mal) M3 0.340 425,400.00 144,636.00
Paku 5-12 cm Kg 0.850 13,000.00 11,050.00
Minyak Bekisting Liter 0.425 9,000.00 3,825.00
Besi Beton Polos Kg 59.783 14,000.00 836,966.20
Kawat Beton Kg 2.250 21,000.00 47,250.00
Semen Portland Kg 336.000 1,740.20 584,707.20
Pasir Beton M3 0.540 280,000.00 151,200.00
Kerikil M3 0.810 190,000.00 153,900.00
Kayu Kelas II Balok M3 0.319 3,700,000.00 1,179,375.00
Dolken Kayu Ø 8 -10/400 cm Batang 15.000 3,500.00 52,500.00
JUMLAH HARGA BAHAN 3,165,409.40
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.060 130,000.00 7,800.00
Tukang Las Konstruksi L.02 OH 0.060 150,000.00 9,000.00
Kepala Tukang L.03 OH 0.006 190,000.00 1,140.00
Mandor L.04 OH 0.003 190,000.00 570.00
JUMLAH TENAGA KERJA 18,510.00
B BAHAN
Besi Baja IWF Kg 1.150 25,000.00 28,750.00
JUMLAH HARGA BAHAN 28,750.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.040 130,000.00 5,200.00
Tukang Besi Konstruksi L.02 OH 0.020 145,000.00 2,900.00
Kepala Tukang L.03 OH 0.002 190,000.00 380.00
Mandor L.04 OH 0.002 190,000.00 380.00
JUMLAH TENAGA KERJA 8,860.00
B BAHAN
Kawat Las Listrik Kg 0.400 22,000.00 8,800.00
Solar Liter 2.500 27,000.00 67,500.00
Minyak Pelumas Liter 1.200 9,000.00 10,800.00
JUMLAH HARGA BAHAN 87,100.00
C PERALATAN
Sewa Alat (Las) Jam 0.170 34,500.00 5,865.00
JUMLAH HARGA ALAT 5,865.00
D Jumlah (A+B+C) 101,765.00
E Overhead & Profit 14% 14,247.10
F Harga Satuan Pekerjaan (D+E) 116,012.10
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.440 130,000.00 57,200.00
Tukang Las Biasa L.02 OH 0.440 145,000.00 63,800.00
Kepala Tukang L.03 OH 0.044 190,000.00 8,360.00
Mandor L.04 OH 0.022 190,000.00 4,180.00
JUMLAH TENAGA KERJA 133,540.00
B BAHAN
Pintu Folding Gate m2 1.000 600,000.00 600,000.00
JUMLAH HARGA BAHAN 600,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.150 130,000.00 19,500.00
Tukang Besi L.02 OH 0.300 145,000.00 43,500.00
Kepala Tukang L.03 OH 0.030 190,000.00 5,700.00
Mandor L.04 OH 0.075 190,000.00 14,250.00
JUMLAH TENAGA KERJA 82,950.00
B BAHAN
Besi Holow M' 8.000 6,562.50 52,500.00
10 cm Pengelasan Dengan Las Listrik CM 1.200 116,012.10 139,214.52
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.043 130,000.00 5,590.00
Tukang Besi L.02 OH 0.043 145,000.00 6,235.00
Kepala Tukang L.03 OH 0.004 190,000.00 817.00
Mandor L.04 OH 0.002 190,000.00 399.00
JUMLAH TENAGA KERJA 13,041.00
B BAHAN
Aluminium Profil M1 1.100 33,300.00 36,630.00
Sekrup Fixser Bh 2.000 200.00 400.00
Sealant TUBE 0.060 25,750.00 1,545.00
JUMLAH HARGA BAHAN 38,575.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.085 130,000.00 11,050.00
Tukang Besi L.02 OH 0.085 145,000.00 12,325.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,615.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 25,940.00
B BAHAN
Aluminium Profil M1 4.400 33,300.00 146,520.00
Aluminium Strip M1 5.000 26,000.00 130,000.00
Kaca Bening Tbl. 5 mm M2 0.500 100,000.00 50,000.00
Sealant TUBE 0.270 25,750.00 6,952.50
JUMLAH HARGA BAHAN 333,472.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.085 130,000.00 11,050.00
Tukang Besi L.02 OH 0.085 145,000.00 12,325.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,615.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 25,940.00
B BAHAN
Aluminium Profil M1 4.400 33,300.00 146,520.00
Aluminium Strip M1 5.000 26,000.00 130,000.00
Kaca Bening Tbl. 5 mm M2 0.500 100,000.00 50,000.00
Sealant TUBE 0.270 25,750.00 6,952.50
JUMLAH HARGA BAHAN 333,472.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.085 130,000.00 11,050.00
Tukang Besi L.02 OH 0.085 145,000.00 12,325.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,710.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 26,035.00
B BAHAN
Aluminium Profil M1 4.400 33,300.00 146,520.00
Aluminium Strip M1 5.000 26,000.00 130,000.00
Kaca Bening Tbl. 8 mm M2 0.500 528,000.00 264,000.00
Sealant TUBE 0.270 25,750.00 6,952.50
JUMLAH HARGA BAHAN 547,472.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.085 130,000.00 11,050.00
Tukang Besi L.02 OH 0.085 145,000.00 12,325.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,710.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 26,035.00
B BAHAN
Aluminium T M1 1.200 157,100.00 188,520.00
Kaca Bening Tbl. 12 mm M2 1.100 946,000.00 1,040,600.00
Sealant TUBE 0.270 25,750.00 6,952.50
JUMLAH HARGA BAHAN 1,236,072.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.000 130,000.00 1,560.00
Tukang Besi L.02 OH 6.000 145,000.00 1,740.00
Kepala Tukang L.03 OH 3.000 190,000.00 1,140.00
Mandor L.04 OH 3.000 190,000.00 1,140.00
JUMLAH TENAGA KERJA 5,580.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.000 130,000.00 1,040.00
Tukang Besi L.02 OH 4.000 145,000.00 1,160.00
Kepala Tukang L.03 OH 2.000 190,000.00 760.00
Mandor L.04 OH 2.000 190,000.00 760.00
JUMLAH TENAGA KERJA 3,720.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 16.000 130,000.00 4,160.00
Tukang Besi L.02 OH 16.000 145,000.00 4,640.00
Kepala Tukang L.03 OH 8.000 190,000.00 3,040.00
Mandor L.04 OH 4.000 190,000.00 1,520.00
JUMLAH TENAGA KERJA 13,360.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 24.000 130,000.00 6,240.00
Tukang Besi L.02 OH 24.000 145,000.00 6,960.00
Kepala Tukang L.03 OH 12.000 190,000.00 4,560.00
Mandor L.04 OH 12.000 190,000.00 4,560.00
JUMLAH TENAGA KERJA 22,320.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 14.000 130,000.00 3,640.00
Tukang Besi L.02 OH 14.000 145,000.00 4,060.00
Kepala Tukang L.03 OH 7.000 190,000.00 2,660.00
Mandor L.04 OH 3.500 190,000.00 1,330.00
JUMLAH TENAGA KERJA 11,690.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
A.4.4.1.1. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu Campuran 1 PC : 2 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.600 130,000.00 78,000.00
Tukang Batu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.030 190,000.00 5,700.00
JUMLAH TENAGA KERJA 116,500.00
B BAHAN
Bata Merah Bh 140.000 1,200.00 168,000.00
Semen Portlan Kg 43.500 1,740.20 75,698.70
Pasir Pasang m3 0.080 280,000.00 22,400.00
JUMLAH HARGA BAHAN 266,098.70
C PERALATAN
A.4.4.1.2. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu Campuran 1 PC : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.600 130,000.00 78,000.00
Tukang Batu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.030 190,000.00 5,700.00
JUMLAH TENAGA KERJA 116,500.00
B BAHAN
Bata Merah Bh 140.000 1,200.00 168,000.00
Semen Portlan Kg 32.950 1,740.20 57,339.59
Pasir Pasang m3 0.091 280,000.00 25,480.00
JUMLAH HARGA BAHAN 250,819.59
C PERALATAN
A.4.4.1.3. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu Campuran 1 PC : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.600 130,000.00 78,000.00
Tukang Batu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.030 190,000.00 5,700.00
JUMLAH TENAGA KERJA 116,500.00
B BAHAN
Bata Merah Bh 140.000 1,200.00 168,000.00
Semen Portlan Kg 26.550 1,740.20 46,202.31
Pasir Pasang m3 0.093 280,000.00 26,040.00
JUMLAH HARGA BAHAN 240,242.31
C PERALATAN
A.4.4.1.7. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1/2 Batu Campuran 1 PC : 2 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 58,250.00
B BAHAN
Bata Merah Bh 70.000 1,200.00 84,000.00
Semen Portlan Kg 18.950 1,740.20 32,976.79
Pasir Pasang m3 0.038 280,000.00 10,640.00
JUMLAH HARGA BAHAN 127,616.79
C PERALATAN
A.4.4.1.8. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1/2 Batu Campuran 1 PC : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 58,250.00
B BAHAN
Bata Merah Bh 70.000 1,200.00 84,000.00
Semen Portlan Kg 14.370 1,740.20 25,006.67
Pasir Pasang m3 0.040 280,000.00 11,200.00
JUMLAH HARGA BAHAN 120,206.67
C PERALATAN
A.4.4.1.9. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1/2 Batu Campuran 1 PC : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 58,250.00
B BAHAN
Bata Merah Bh 70.000 1,200.00 84,000.00
Semen Portlan Kg 11.500 1,740.20 20,012.30
Pasir Pasang m3 0.043 280,000.00 12,040.00
JUMLAH HARGA BAHAN 116,052.30
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 58,250.00
B BAHAN
Bata Rooster Bh 30.000 10,500.00 315,000.00
Semen Portlan Kg 11.000 1,740.20 19,142.20
Pasir Pasang m3 0.035 280,000.00 9,800.00
JUMLAH HARGA BAHAN 343,942.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 58,250.00
B BAHAN
Bata Berongga Bh 30.000 12,000.00 360,000.00
Semen Portlan Kg 11.000 1,740.20 19,142.20
Pasir Pasang m3 0.035 280,000.00 9,800.00
JUMLAH HARGA BAHAN 388,942.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.150 145,000.00 21,750.00
Kepala Tukang L.03 OH 0.015 190,000.00 2,850.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 66,450.00
B BAHAN
Bata Rooster Bh 70.000 10,500.00 735,000.00
Semen Portlan Kg 14.000 1,740.20 24,362.80
Pasir Pasang m3 0.032 280,000.00 8,960.00
JUMLAH HARGA BAHAN 768,322.80
C PERALATAN
A.4.4.1.25. Pemasangan 1m2 Dinding Bata Merah (9x9x18) cm tebal 1 Batu Campuran 1 PC : 2 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.600 130,000.00 78,000.00
Tukang Batu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.030 190,000.00 5,700.00
JUMLAH TENAGA KERJA 116,500.00
B BAHAN
Bata Merah Bh 90.000 1,200.00 108,000.00
Semen Portlan Kg 28.275 1,740.20 49,204.16
Pasir Pasang m3 0.031 280,000.00 8,736.00
JUMLAH HARGA BAHAN 165,940.16
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.600 130,000.00 78,000.00
Tukang Batu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.030 190,000.00 5,700.00
JUMLAH TENAGA KERJA 116,500.00
B BAHAN
Bata Merah Bh 90.000 1,200.00 108,000.00
Semen Portlan Kg 21.418 1,740.20 37,270.73
Pasir Pasang m3 0.059 280,000.00 16,562.00
JUMLAH HARGA BAHAN 161,832.73
C PERALATAN
A.4.4.1.27. Pemasangan 1m2 Dinding Bata Merah (9x9x18) cm tebal 1 Batu Campuran 1 PC : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.600 130,000.00 78,000.00
Tukang Batu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.030 190,000.00 5,700.00
JUMLAH TENAGA KERJA 116,500.00
B BAHAN
Bata Merah Bh 90.000 1,200.00 108,000.00
Semen Portlan Kg 17.258 1,740.20 30,031.50
Pasir Pasang m3 0.060 280,000.00 16,926.00
JUMLAH HARGA BAHAN 154,957.50
C PERALATAN
A.4.4.1.28. Pemasangan 1m2 Dinding Bata Merah (9x9x18) cm tebal 1/2 Batu Campuran 1 PC : 2 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 58,250.00
B BAHAN
Bata Merah Bh 45.000 1,200.00 54,000.00
Semen Portlan Kg 12.318 1,740.20 21,434.91
Pasir Pasang m3 0.025 280,000.00 6,916.00
JUMLAH HARGA BAHAN 82,350.91
C PERALATAN
A.4.4.1.29. Pemasangan 1m2 Dinding Bata Merah (9x9x18) cm tebal 1/2 Batu Campuran 1 PC : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 58,250.00
B BAHAN
Bata Merah Bh 45.000 1,200.00 54,000.00
Semen Portlan Kg 9.341 1,740.20 16,254.34
Pasir Pasang m3 0.026 280,000.00 7,280.00
JUMLAH HARGA BAHAN 77,534.34
C PERALATAN
A.4.4.1.30. Pemasangan 1m2 Dinding Bata Merah (9x9x18) cm tebal 1/2 Batu Campuran 1 PC : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 58,250.00
B BAHAN
Bata Merah Bh 45.000 1,200.00 54,000.00
Semen Portlan Kg 7.475 1,740.20 13,008.00
Pasir Pasang m3 0.028 280,000.00 7,826.00
JUMLAH HARGA BAHAN 74,834.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.150 145,000.00 21,750.00
Kepala Tukang L.03 OH 0.015 190,000.00 2,850.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 66,450.00
B BAHAN
Semen Portlan Kg 10.224 1,740.20 17,791.80
Pasir Pasang m3 0.020 280,000.00 5,600.00
JUMLAH HARGA BAHAN 23,391.80
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.150 145,000.00 21,750.00
Kepala Tukang L.03 OH 0.015 190,000.00 2,850.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 66,450.00
B BAHAN
Semen Portlan Kg 7.776 1,740.20 13,531.80
Pasir Pasang m3 0.023 280,000.00 6,440.00
JUMLAH HARGA BAHAN 19,971.80
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.150 145,000.00 21,750.00
Kepala Tukang L.03 OH 0.015 190,000.00 2,850.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 66,450.00
B BAHAN
Semen Portlan Kg 6.240 1,740.20 10,858.85
Pasir Pasang m3 0.024 280,000.00 6,720.00
JUMLAH HARGA BAHAN 17,578.85
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 130,000.00 26,000.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.010 190,000.00 1,900.00
JUMLAH TENAGA KERJA 44,300.00
B BAHAN
Semen Portlan Kg 3.250 1,740.20 5,655.65
JUMLAH HARGA BAHAN 5,655.65
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 130,000.00 39,000.00
Tukang Batu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.015 190,000.00 2,850.00
JUMLAH TENAGA KERJA 74,650.00
B BAHAN
Semen PC M3 0.500 1,740.20 870.10
Pasir Beton M3 0.006 280,000.00 1,680.00
Bata Cote Kg 2.900 22,000.00 63,800.00
JUMLAH HARGA BAHAN 66,350.10
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Kayu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 155,050.00
B BAHAN
Ubin keramik Bh 53.000 15,500.00 821,500.00
Semen Portland Kg 8.190 1,740.20 14,252.24
Pasir Pasang M3 0.045 280,000.00 12,600.00
Semen Warna Kg 2.750 13,700.00 37,675.00
JUMLAH HARGA BAHAN 886,027.24
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Kayu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 155,050.00
B BAHAN
Ubin keramik Bh 106.000 15,500.00 1,643,000.00
Semen Portland Kg 8.190 1,740.20 14,252.24
Pasir Pasang M3 0.045 280,000.00 12,600.00
Semen Warna Kg 3.200 13,700.00 43,840.00
JUMLAH HARGA BAHAN 1,713,692.24
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Kayu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 155,050.00
B BAHAN
Ubin keramik Bh 10.000 5,500.00 55,000.00
Semen Portland Kg 8.190 1,740.20 14,252.24
Pasir Pasang M3 0.045 280,000.00 12,600.00
Semen Warna Kg 1.620 13,700.00 22,194.00
JUMLAH HARGA BAHAN 104,046.24
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Kayu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 155,050.00
B BAHAN
Ubin keramik Bh 11.870 5,500.00 65,285.00
Semen Portland Kg 10.000 1,740.20 17,402.00
Pasir Pasang M3 0.045 280,000.00 12,600.00
Semen Warna Kg 1.500 13,700.00 20,550.00
JUMLAH HARGA BAHAN 115,837.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Kayu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 155,050.00
B BAHAN
Ubin keramik Bh 26.500 6,000.00 159,000.00
Semen Portland Kg 10.400 1,740.20 18,098.08
Pasir Pasang M3 0.045 280,000.00 12,600.00
Semen Warna Kg 1.620 13,700.00 22,194.00
JUMLAH HARGA BAHAN 211,892.08
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.900 130,000.00 117,000.00
Tukang Batu L.02 OH 0.450 145,000.00 65,250.00
Kepala Tukang L.03 OH 0.045 190,000.00 8,550.00
Mandor L.04 OH 0.045 190,000.00 8,550.00
JUMLAH TENAGA KERJA 199,350.00
B BAHAN
Keramik 20 x 25 Bh 21.200 9,000.00 190,800.00
Semen Portland Kg 9.300 1,740.20 16,183.86
Pasir Pasang m3 0.018 280,000.00 5,040.00
Semen Warna Kg 1.940 13,700.00 26,578.00
JUMLAH HARGA BAHAN 238,601.86
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Batu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 155,050.00
B BAHAN
Batu tempel Bh 1.100 22,000.00 24,200.00
Semen Portland Kg 11.750 1,740.20 20,447.35
Pasir Pasang m3 0.035 280,000.00 9,800.00
JUMLAH HARGA BAHAN 54,447.35
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Batu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 155,050.00
B BAHAN
Batu Sikat m2 1.000 250,000.00 250,000.00
Semen Portland Kg 7.875 1,740.20 13,704.08
Pasir Pasang m3 0.030 280,000.00 8,400.00
JUMLAH HARGA BAHAN 272,104.08
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 130,000.00 97,500.00
Tukang Kayu L.02 OH 0.7500 145,000.00 108,750.00
Kepala Tukang L.03 OH 0.0800 190,000.00 15,200.00
Mandor L.04 OH 0.0800 190,000.00 15,200.00
JUMLAH TENAGA KERJA 236,650.00
B BAHAN
Aluminium Composite Panel Type m2 1.000 250,000.00 250,000.00
PVDF 0.3 Warna
Srew bh 20.000 450.00 9,000.00
JUMLAH HARGA BAHAN 259,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 130,000.00 97,500.00
Tukang Besi L.02 OH 0.7500 145,000.00 108,750.00
Kepala Tukang L.03 OH 0.0800 190,000.00 15,200.00
Mandor L.04 OH 0.0800 190,000.00 15,200.00
JUMLAH TENAGA KERJA 236,650.00
B BAHAN
Besi Hollow 30/30 m' 6.000 30,000.00 180,000.00
Screw 20.000 450.00 9,000.00
Elektroda baja (20%) bh 0.500 22,000.00 11,000.00
JUMLAH HARGA BAHAN 200,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Kayu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 155,050.00
B BAHAN
Wallpaper M 1.100 147,000.00 161,700.00
Lem Kg 11.750 22,700.00 266,725.00
JUMLAH HARGA BAHAN 428,425.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Kayu L.02 OH 0.350 145,000.00 50,750.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 155,050.00
B BAHAN
Ubin keramik Bh 6.250 14,500.00 90,625.00
Semen Portland Kg 10.000 1,740.20 17,402.00
Pasir Pasang M3 0.045 280,000.00 12,600.00
Semen Warna Kg 1.500 13,700.00 20,550.00
JUMLAH HARGA BAHAN 141,177.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.350 130,000.00 45,500.00
Tukang Batu L.02 OH 0.700 145,000.00 101,500.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 160,300.00
B BAHAN
Keramik Granito 60 x 60 Bh 2.850 69,450.00 197,932.50
Semen Portland Kg 10.000 1,740.20 17,402.00
Pasir Beton m3 0.045 280,000.00 12,600.00
Semen Warna Kg 1.500 13,700.00 20,550.00
JUMLAH HARGA BAHAN 248,484.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.350 130,000.00 45,500.00
Tukang Batu L.02 OH 0.700 145,000.00 101,500.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 160,300.00
B BAHAN
Keramik Granito 40 x 40 Bh 6.250 56,000.00 350,000.00
Semen Portland Kg 10.000 1,740.20 17,402.00
Pasir Beton m3 0.045 280,000.00 12,600.00
Semen Warna Kg 1.500 13,700.00 20,550.00
JUMLAH HARGA BAHAN 400,552.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.350 130,000.00 45,500.00
Tukang Batu L.02 OH 0.700 145,000.00 101,500.00
Kepala Tukang L.03 OH 0.035 190,000.00 6,650.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 160,300.00
B BAHAN
Keramik Granito 30 x 30 Bh 11.870 50,000.00 593,500.00
Semen Portland Kg 10.000 1,740.20 17,402.00
Pasir Beton m3 0.045 280,000.00 12,600.00
Semen Warna Kg 1.500 13,700.00 20,550.00
JUMLAH HARGA BAHAN 644,052.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.090 130,000.00 11,700.00
Tukang Batu L.02 OH 0.090 145,000.00 13,050.00
Kepala Tukang L.03 OH 0.090 190,000.00 17,100.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 42,800.00
B BAHAN
Keramik Granito 10 x 30 (Plint) Bh 3.530 16,666.67 58,833.33
Semen Portland Kg 0.570 1,740.20 991.91
Pasir Beton m3 0.003 280,000.00 840.00
Semen Warna Kg 0.100 13,700.00 1,370.00
JUMLAH HARGA BAHAN 62,035.25
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.090 130,000.00 11,700.00
Tukang Batu L.02 OH 0.090 145,000.00 13,050.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,710.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 27,410.00
B BAHAN
Keramik Granito 10 x 40 (Plint) Bh 2.650 14,000.00 37,100.00
Semen Portland Kg 0.570 1,740.20 991.91
Pasir Beton m3 0.003 280,000.00 840.00
Semen Warna Kg 0.100 13,700.00 1,370.00
JUMLAH HARGA BAHAN 40,301.91
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.090 130,000.00 11,700.00
Tukang Batu L.02 OH 0.090 145,000.00 13,050.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,710.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 27,410.00
B BAHAN
Keramik Granito 10 x 60 cm (Plint) Bh 1.700 11,575.00 19,677.50
Semen Portland Kg 0.570 1,740.20 991.91
Pasir Beton m3 0.003 280,000.00 840.00
Semen Warna Kg 0.100 13,700.00 1,370.00
JUMLAH HARGA BAHAN 22,879.41
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.090 130,000.00 11,700.00
Tukang Batu L.02 OH 0.090 145,000.00 13,050.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,710.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 27,410.00
B BAHAN
Keramik 10 x 20 (Plint) Bh 5.300 2,100.00 11,130.00
Semen Portland Kg 0.570 1,740.20 991.91
Pasir Beton m3 0.003 280,000.00 840.00
Semen Warna Kg 0.100 13,700.00 1,370.00
JUMLAH HARGA BAHAN 14,331.91
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.090 130,000.00 11,700.00
Tukang Batu L.02 OH 0.090 145,000.00 13,050.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,710.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 27,410.00
B BAHAN
Keramik 10 x 30 (Plint) Bh 3.530 3,300.00 11,649.00
Semen Portland Kg 0.570 1,740.20 991.91
Pasir Beton m3 0.003 280,000.00 840.00
Semen Warna Kg 0.100 13,700.00 1,370.00
JUMLAH HARGA BAHAN 14,850.91
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.090 130,000.00 11,700.00
Tukang Batu L.02 OH 0.090 145,000.00 13,050.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,710.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 27,410.00
B BAHAN
Keramik 10 x 40 (Plint) Bh 2.650 6,600.00 17,490.00
Semen Portland Kg 0.570 1,740.20 991.91
Pasir Beton m3 0.003 280,000.00 840.00
Semen Warna Kg 0.100 13,700.00 1,370.00
JUMLAH HARGA BAHAN 20,691.91
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.090 130,000.00 11,700.00
Tukang Batu L.02 OH 0.090 145,000.00 13,050.00
Kepala Tukang L.03 OH 0.009 190,000.00 1,710.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 27,410.00
B BAHAN
Keramik 10 x 60 cm (Plint) Bh 1.700 8,150.00 13,855.00
Semen Portland Kg 0.570 1,740.20 991.91
Pasir Beton m3 0.003 280,000.00 840.00
Semen Warna Kg 0.100 13,700.00 1,370.00
JUMLAH HARGA BAHAN 17,056.91
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.900 130,000.00 117,000.00
Tukang Batu L.02 OH 0.450 145,000.00 65,250.00
Kepala Tukang L.03 OH 0.045 190,000.00 8,550.00
Mandor L.04 OH 0.045 190,000.00 8,550.00
JUMLAH TENAGA KERJA 199,350.00
B BAHAN
Granit Stone M2 1.050 329,000.00 345,450.00
Semen Portland Kg 9.300 1,740.20 16,183.86
Pasir Beton m3 0.018 280,000.00 5,040.00
JUMLAH HARGA BAHAN 366,673.86
C PERALATAN
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Kayu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 30,350.00
B BAHAN
Tripleks Lembar 0.375 104,500.00 39,187.50
Paku tripleks Kg 0.030 14,000.00 420.00
JUMLAH HARGA BAHAN 39,607.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.050 130,000.00 6,500.00
Tukang Kayu L.02 OH 0.050 145,000.00 7,250.00
Kepala Tukang L.03 OH 0.005 190,000.00 950.00
Mandor L.04 OH 0.030 190,000.00 5,700.00
JUMLAH TENAGA KERJA 20,400.00
B BAHAN
list kayu profil m 1.050 10,000.00 10,500.00
Paku Kg 0.010 13,000.00 130.00
JUMLAH HARGA BAHAN 10,630.00
C PERALATAN
A.4.5.1.11. Pemasangan 1 m2 langit-langit Teakwood ukuran (120 x 240) cm, tebal 3 mm, 4 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Kayu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 30,350.00
B BAHAN
Teakwood Lembar 0.375 86,400.00 32,400.00
Paku tripleks Kg 0.030 14,000.00 420.00
JUMLAH HARGA BAHAN 32,820.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Kayu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 30,350.00
B BAHAN
Kayu Papan Lambriziring Lembar 0.015 3,700,000.00 55,500.00
Paku tripleks Kg 0.030 14,000.00 420.00
JUMLAH HARGA BAHAN 55,920.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Kayu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 30,350.00
B BAHAN
Gypsum Board Lembar 0.375 80,000.00 30,000.00
Paku Skrup Kg 0.030 45,000.00 1,350.00
JUMLAH HARGA BAHAN 31,350.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.050 130,000.00 6,500.00
Tukang Kayu L.02 OH 0.050 145,000.00 7,250.00
Kepala Tukang L.03 OH 0.005 190,000.00 950.00
Mandor L.04 OH 0.030 190,000.00 5,700.00
JUMLAH TENAGA KERJA 20,400.00
B BAHAN
List Plafonnd profil m 1.050 17,500.00 18,375.00
Tepung Gypsum Kg 0.150 9,100.00 1,365.00
Paku Kg 0.010 13,000.00 130.00
JUMLAH HARGA BAHAN 19,870.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 130,000.00 26,000.00
Tukang Kayu L.03 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.11 OH 0.010 190,000.00 1,900.00
Mandor L.15 OH 0.001 190,000.00 190.00
JUMLAH TENAGA KERJA 42,590.00
B BAHAN
Genteng metal Bh 1.020 160,000.00 163,200.00
Paku biasa 1/2" - 1" Kg 0.200 13,000.00 2,600.00
JUMLAH HARGA BAHAN 165,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.250 130,000.00 32,500.00
Tukang Kayu L.03 OH 0.150 145,000.00 21,750.00
Kepala Tukang L.11 OH 0.015 190,000.00 2,850.00
Mandor L.15 OH 0.013 190,000.00 2,470.00
JUMLAH TENAGA KERJA 59,570.00
B BAHAN
Nok genteng metal Lbr 1.100 45,000.00 49,500.00
Paku biasa 1/2" - 1" Kg 0.050 13,000.00 650.00
JUMLAH HARGA BAHAN 50,150.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.120 130,000.00 15,600.00
Tukang Kayu L.03 OH 0.060 145,000.00 8,700.00
Kepala Tukang L.11 OH 0.006 190,000.00 1,140.00
Mandor L.15 OH 0.006 190,000.00 1,140.00
JUMLAH TENAGA KERJA 26,580.00
B BAHAN
Seng Gel 3" x 6" Lbr 0.700 50,000.00 35,000.00
Paku biasa 1/2" - 1" Kg 0.020 13,000.00 260.00
JUMLAH HARGA BAHAN 35,260.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.120 130,000.00 15,600.00
Tukang Kayu L.03 OH 0.060 145,000.00 8,700.00
Kepala Tukang L.11 OH 0.006 190,000.00 1,140.00
Mandor L.15 OH 0.006 190,000.00 1,140.00
JUMLAH TENAGA KERJA 26,580.00
B BAHAN
Seng plat 3" x 6" bjls28 Lbr 0.300 54,500.00 16,350.00
Paku biasa 1/2" - 1" Kg 0.040 13,000.00 520.00
JUMLAH HARGA BAHAN 16,870.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.120 130,000.00 15,600.00
Tukang Kayu L.03 OH 0.060 145,000.00 8,700.00
Kepala Tukang L.11 OH 0.006 190,000.00 1,140.00
Mandor L.15 OH 0.006 190,000.00 1,140.00
JUMLAH TENAGA KERJA 26,580.00
B BAHAN
Seng Multy Colour Bh 0.700 68,200.00 47,740.00
Paku Seng Kg 0.020 20,000.00 400.00
JUMLAH HARGA BAHAN 48,140.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.120 130,000.00 15,600.00
Tukang Kayu L.03 OH 0.060 145,000.00 8,700.00
Kepala Tukang L.11 OH 0.006 190,000.00 1,140.00
Mandor L.15 OH 0.006 190,000.00 1,140.00
JUMLAH TENAGA KERJA 26,580.00
B BAHAN
Seng plat Multy Colour Lbr 0.300 68,200.00 20,460.00
Paku Seng Kg 0.040 20,000.00 800.00
JUMLAH HARGA BAHAN 21,260.00
C PERALATAN
A.4.6.1.1 Pembuatan Dan Pemasangan 1 m3 Kusen Pintu Dan Kusen Jendela, Kayu Kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.000 130,000.00 910,000.00
Tukang Kayu L.02 OH 21.000 145,000.00 3,045,000.00
Kepala Tukang L.03 OH 2.100 190,000.00 399,000.00
Mandor L.04 OH 0.350 190,000.00 66,500.00
JUMLAH TENAGA KERJA 4,420,500.00
B BAHAN
Balok Kayu M3 1.100 4,000,000.00 4,400,000.00
Paku 10 Cm Kg 1.250 13,000.00 16,250.00
Lem Kayu Kg 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 4,441,250.00
C PERALATAN
A.4.6.1.2 Pembuatan Dan Pemasangan 1 m3 Kusen Pintu Dan Kusen Jendela, Kayu Kelas II dan III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.000 130,000.00 910,000.00
Tukang Kayu L.02 OH 18.000 145,000.00 2,610,000.00
Kepala Tukang L.03 OH 1.800 190,000.00 342,000.00
Mandor L.04 OH 0.300 190,000.00 57,000.00
JUMLAH TENAGA KERJA 3,919,000.00
B BAHAN
Balok Kayu M3 1.200 3,700,000.00 4,440,000.00
Paku 10 Cm Kg 1.250 13,000.00 16,250.00
Lem Kayu Kg 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 4,481,250.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.350 130,000.00 45,500.00
Tukang Kayu L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.105 190,000.00 19,950.00
Mandor L.04 OH 0.018 190,000.00 3,420.00
JUMLAH TENAGA KERJA 221,120.00
B BAHAN
Papan Kayu M3 0.040 3,700,000.00 148,000.00
Paku 5 - 7 Cm Kg 0.050 13,000.00 650.00
JUMLAH HARGA BAHAN 369,770.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.350 130,000.00 45,500.00
Tukang Kayu L.02 OH 1.050 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.105 190,000.00 19,950.00
Mandor L.04 OH 0.018 190,000.00 3,420.00
JUMLAH TENAGA KERJA 221,120.00
B BAHAN
Papan Kayu M3 0.040 2,500,000.00 100,000.00
Paku 5 - 7 Cm Kg 0.050 13,000.00 650.00
JUMLAH HARGA BAHAN 321,770.00
C PERALATAN
A.4.6.1.5 Pembuatan Dan Pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 130,000.00 130,000.00
Tukang Kayu L.02 OH 3.000 145,000.00 435,000.00
Kepala Tukang L.03 OH 0.300 190,000.00 57,000.00
Mandor L.04 OH 0.050 190,000.00 9,500.00
JUMLAH TENAGA KERJA 631,500.00
B BAHAN
Papan Kayu M3 0.040 3,700,000.00 148,000.00
Lem Kayu Kg 0.500 25,000.00 12,500.00
JUMLAH HARGA BAHAN 160,500.00
C PERALATAN
A.4.6.1.6 Pembuatan Dan Pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 130,000.00 130,000.00
Tukang Kayu L.02 OH 3.000 145,000.00 435,000.00
Kepala Tukang L.03 OH 0.300 190,000.00 57,000.00
Mandor L.04 OH 0.050 190,000.00 9,500.00
JUMLAH TENAGA KERJA 631,500.00
B BAHAN
Papan Kayu M3 0.064 3,700,000.00 236,800.00
Lem Kayu Kg 0.500 25,000.00 12,500.00
JUMLAH HARGA BAHAN 249,300.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 130,000.00 130,000.00
Tukang Kayu L.02 OH 3.000 145,000.00 435,000.00
Kepala Tukang L.03 OH 0.300 190,000.00 57,000.00
Mandor L.04 OH 0.050 190,000.00 9,500.00
JUMLAH TENAGA KERJA 631,500.00
B BAHAN
Papan Kayu M3 0.064 3,700,000.00 236,800.00
Lem kayu Kg 0.500 25,000.00 12,500.00
JUMLAH HARGA BAHAN 249,300.00
C PERALATAN
A.4.6.1.8 Pembuatan 1 m2 daun pintu plywood rangkap kayu kelas II tertutup ( Lebar Sampai 90 Cm )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.700 130,000.00 91,000.00
Tukang Kayu L.02 OH 2.100 145,000.00 304,500.00
Kepala Tukang L.03 OH 0.210 190,000.00 39,900.00
Mandor L.04 OH 0.035 190,000.00 6,650.00
JUMLAH TENAGA KERJA 442,050.00
B BAHAN
Papan Kayu M3 0.025 3,700,000.00 92,500.00
Paku 1 Cm - 2,5 Cm Kg 0.030 13,000.00 390.00
Lem kayu Kg 0.500 25,000.00 12,500.00
Plywood Tebal 4 mm Ukuran ( 90 x 220 ) Lembar 1.000 68,200.00 68,200.00
cm
JUMLAH HARGA BAHAN 173,590.00
C PERALATAN
A.4.6.1.9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I Atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 130,000.00 130,000.00
Tukang Kayu L.02 OH 1.500 145,000.00 217,500.00
Kepala Tukang L.03 OH 0.150 190,000.00 28,500.00
Mandor L.04 OH 0.050 190,000.00 9,500.00
JUMLAH TENAGA KERJA 385,500.00
B BAHAN
Papan Kayu M3 0.026 3,700,000.00 94,720.00
Paku 1 Cm - 2,5 Cm Kg 0.030 13,000.00 390.00
Lem Kayu Kg 0.500 25,000.00 12,500.00
Plywood 4 mm (90 x 220) cm Lembar 1.000 68,200.00 68,200.00
JUMLAH HARGA BAHAN 175,810.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.670 130,000.00 87,100.00
Tukang Kayu L.02 OH 2.000 145,000.00 290,000.00
Kepala Tukang L.03 OH 0.200 190,000.00 38,000.00
Mandor L.04 OH 0.335 190,000.00 63,650.00
JUMLAH TENAGA KERJA 478,750.00
B BAHAN
Papan Kayu M3 0.060 3,700,000.00 222,000.00
Paku 1 - 2,5 cm Kg 0.150 13,000.00 1,950.00
JUMLAH HARGA BAHAN 223,950.00
C PERALATAN
A.4.6.1.12 Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.850 130,000.00 110,500.00
Tukang Kayu L.02 OH 2.550 145,000.00 369,750.00
Kepala Tukang L.03 OH 0.255 190,000.00 48,450.00
Mandor L.04 OH 0.043 190,000.00 8,170.00
JUMLAH TENAGA KERJA 536,870.00
B BAHAN
Papan Kayu M3 0.025 3,700,000.00 92,500.00
Paku 1 - 2,5 Cm Kg 0.030 13,000.00 390.00
Lem Kayu Kg 0.800 59,100.00 47,280.00
Teak wood 4 mm 90 x 220 Cm Lembar 1.000 86,400.00 86,400.00
Formika Lembar 0.500 109,100.00 54,550.00
JUMLAH HARGA BAHAN 281,120.00
C PERALATAN
A.4.6.1.13 Pemasangan 1 m3 konstruksi kuda - kuda konvensional, kayu kelas I, II Dan III Bentang 6 Meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.000 130,000.00 520,000.00
Tukang Kayu L.02 OH 12.000 145,000.00 1,740,000.00
Kepala Tukang L.03 OH 1.200 190,000.00 228,000.00
Mandor L.04 OH 0.200 190,000.00 38,000.00
JUMLAH TENAGA KERJA 2,526,000.00
B BAHAN
Balok Kayu M3 1.100 3,700,000.00 4,070,000.00
Besi Strip Tebal 5mm Kg 15.000 16,000.00 240,000.00
Paku 12 Cm Kg 5.600 13,000.00 72,800.00
JUMLAH HARGA BAHAN 4,382,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.700 130,000.00 871,000.00
Tukang Kayu L.02 OH 20.100 145,000.00 2,914,500.00
Kepala Tukang L.03 OH 2.010 190,000.00 381,900.00
Mandor L.04 OH 0.335 190,000.00 63,650.00
JUMLAH TENAGA KERJA 4,231,050.00
B BAHAN
Balok Kayu M3 1.200 4,000,000.00 4,800,000.00
Besi Strip Tebal 5mm Kg 15.000 16,000.00 240,000.00
Paku 12 Cm Kg 5.600 13,000.00 72,800.00
JUMLAH HARGA BAHAN 5,112,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.700 130,000.00 871,000.00
Tukang Kayu L.02 OH 20.100 145,000.00 2,914,500.00
Kepala Tukang L.03 OH 2.010 190,000.00 381,900.00
Mandor L.04 OH 0.335 190,000.00 63,650.00
JUMLAH TENAGA KERJA 4,231,050.00
B BAHAN
Balok Kayu M3 1.100 3,700,000.00 4,070,000.00
Besi Strip Tebal 5mm Kg 15.000 16,000.00 240,000.00
Paku 12 Cm Kg 3.000 13,000.00 39,000.00
JUMLAH HARGA BAHAN 4,349,000.00
C PERALATAN
A.4.6.1.20 Pemasangan 1 m2 Rangka langit - langit ( 60 x 60 ) cm Kayu Kelas II atau Kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 130,000.00 26,000.00
Tukang Kayu L.02 OH 0.300 145,000.00 43,500.00
Kepala Tukang L.03 OH 0.030 190,000.00 5,700.00
Mandor L.04 OH 0.010 190,000.00 1,900.00
JUMLAH TENAGA KERJA 77,100.00
B BAHAN
Kaso 5 x 7 Cm M3 0.016 3,700,000.00 60,310.00
Paku 7 - 10 Cm Kg 0.010 13,000.00 130.00
JUMLAH HARGA BAHAN 60,440.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Kayu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 46,750.00
B BAHAN
Papan Kayu M3 0.011 3,700,000.00 39,960.00
Paku 5 dan 7 cm Kg 0.100 13,000.00 1,300.00
JUMLAH HARGA BAHAN 41,260.00
C PERALATAN
A.4.6.1.22 Pemasangan 1 m2 lisplank ukuran (3 x 30) Cm, kayu Kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Kayu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 46,750.00
B BAHAN
Papan Kayu M3 0.011 3,700,000.00 40,700.00
Paku 5 Dan 7 Cm Kg 0.050 13,000.00 650.00
JUMLAH HARGA BAHAN 41,350.00
C PERALATAN
A.4.6.1.23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) Cm Kayu Kelas II Atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.150 130,000.00 19,500.00
Tukang Kayu L.02 OH 0.450 145,000.00 65,250.00
Kepala Tukang L.03 OH 0.045 190,000.00 8,550.00
Mandor L.04 OH 0.008 190,000.00 1,520.00
JUMLAH TENAGA KERJA 94,820.00
B BAHAN
Balok Kayu M3 0.028 3,700,000.00 103,600.00
Paku 5 Dan 7 Cm Kg 0.150 13,000.00 1,950.00
JUMLAH HARGA BAHAN 105,550.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 130,000.00 26,000.00
Tukang Kayu L.02 OH 0.600 145,000.00 87,000.00
Kepala Tukang L.03 OH 0.060 190,000.00 11,400.00
Mandor L.04 OH 0.010 190,000.00 1,900.00
JUMLAH TENAGA KERJA 126,300.00
B BAHAN
Balok Kayu 6 x 12 M3 0.028 3,700,000.00 103,600.00
Paku 5 Dan 10 Kg 0.150 13,000.00 1,950.00
Plywood 4 mm, 120 x 240 Lembar 0.860 68,200.00 58,652.00
Lem Kayu Kg 0.560 25,000.00 14,000.00
JUMLAH HARGA BAHAN 178,202.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 130,000.00 26,000.00
Tukang Kayu L.02 OH 0.300 145,000.00 43,500.00
Kepala Tukang L.03 OH 0.030 190,000.00 5,700.00
Mandor L.04 OH 0.010 190,000.00 1,900.00
JUMLAH TENAGA KERJA 77,100.00
B BAHAN
Kaso 5 x 7 Cm M3 0.016 3,700,000.00 60,310.00
Paku 7 - 10 Cm Kg 0.010 13,000.00 130.00
JUMLAH HARGA BAHAN 60,440.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Kayu L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.025 190,000.00 4,750.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 47,700.00
B BAHAN
Lisplank Grc L. 20 cm m 1.100 26,250.00 28,875.00
Paku Kg 0.050 13,000.00 650.00
JUMLAH HARGA BAHAN 29,525.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.015 130,000.00 1,950.00
Tukang Kayu L.02 OH 0.150 145,000.00 21,750.00
Kepala Tukang L.03 OH 0.015 190,000.00 2,850.00
Mandor L.04 OH 0.001 190,000.00 152.00
JUMLAH TENAGA KERJA 26,702.00
B BAHAN
engsel pintu Bh 1.000 18,200.00 18,200.00
JUMLAH HARGA BAHAN 18,200.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 130,000.00 1,300.00
Tukang Kayu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.001 190,000.00 95.00
JUMLAH TENAGA KERJA 17,795.00
B BAHAN
engsel kupu-kupu Bh 1.000 13,600.00 13,600.00
JUMLAH HARGA BAHAN 13,600.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.015 130,000.00 1,950.00
Tukang Kayu L.02 OH 0.150 145,000.00 21,750.00
Kepala Tukang L.03 OH 0.015 190,000.00 2,850.00
Mandor L.04 OH 0.008 190,000.00 1,520.00
JUMLAH TENAGA KERJA 28,070.00
B BAHAN
kait angin Bh 1.000 10,000.00 10,000.00
JUMLAH HARGA BAHAN 10,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.015 130,000.00 1,950.00
Tukang Kayu L.02 OH 0.150 145,000.00 21,750.00
Kepala Tukang L.03 OH 0.015 190,000.00 2,850.00
Mandor L.04 OH 0.001 190,000.00 152.00
JUMLAH TENAGA KERJA 26,702.00
B BAHAN
kaca tebal 3 mm m2 1.100 80,000.00 88,000.00
Sealant kg 0.050 25,750.00 1,287.50
JUMLAH HARGA BAHAN 89,287.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.015 130,000.00 1,950.00
Tukang Kayu L.02 OH 0.150 145,000.00 21,750.00
Kepala Tukang L.03 OH 0.015 190,000.00 2,850.00
Mandor L.04 OH 0.001 190,000.00 152.00
JUMLAH TENAGA KERJA 26,702.00
B BAHAN
kaca tebal 5 mm m2 1.100 100,000.00 110,000.00
Sealant kg 0.050 25,750.00 1,287.50
JUMLAH HARGA BAHAN 111,287.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.017 130,000.00 2,210.00
Tukang Kayu L.02 OH 0.170 145,000.00 24,650.00
Kepala Tukang L.03 OH 0.017 190,000.00 3,230.00
Mandor L.04 OH 0.001 190,000.00 171.00
JUMLAH TENAGA KERJA 30,261.00
B BAHAN
kaca tebal 8 mm m2 1.100 528,000.00 580,800.00
Sealant kg 0.070 25,750.00 1,802.50
JUMLAH HARGA BAHAN 582,602.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.025 130,000.00 3,250.00
Tukang Kayu L.02 OH 0.250 145,000.00 36,250.00
Kepala Tukang L.03 OH 0.025 190,000.00 4,750.00
Mandor L.04 OH 0.001 190,000.00 247.00
JUMLAH TENAGA KERJA 44,497.00
B BAHAN
kaca tebal 12 mm m2 1.100 946,000.00 1,040,600.00
Sealant kg 0.070 25,750.00 1,802.50
JUMLAH HARGA BAHAN 1,042,402.50
C PERALATAN
A.4.7.1.4. Pengecatan 1 M2 bidang kayu baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 130,000.00 26,000.00
Tukang cat L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.003 190,000.00 570.00
JUMLAH TENAGA KERJA 59,370.00
B BAHAN
cat menie kg 0.200 30,000.00 6,000.00
plamur kg 0.150 20,500.00 3,075.00
cat dasar kg 0.170 36,400.00 6,188.00
cat penutup kg 0.260 45,500.00 11,830.00
kuas bh 0.010 9,000.00 90.00
pengencer kg 0.030 31,800.00 954.00
ampelas lbr 0.200 6,000.00 1,200.00
JUMLAH HARGA BAHAN 29,337.00
C PERALATAN
A.4.7.1.16. Pengecatan 1 M2 tembok Baru (1 Lapis Plamour, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 130,000.00 26,000.00
Tukang cat L.02 OH 0.200 145,000.00 29,000.00
Kepala Tukang L.03 OH 0.020 190,000.00 3,800.00
Mandor L.04 OH 0.010 190,000.00 1,900.00
JUMLAH TENAGA KERJA 60,700.00
B BAHAN
Plamour kg 0.160 22,700.00 3,632.00
cat dasar kg 0.120 27,300.00 3,276.00
cat penutup kg 0.330 68,200.00 22,506.00
JUMLAH HARGA BAHAN 29,414.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.300 130,000.00 429,000.00
Tukang Batu L.02 OH 1.100 145,000.00 159,500.00
Kepala tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.160 190,000.00 30,400.00
JUMLAH TENAGA KERJA 620,800.00
B BAHAN
Closet duduk Unit 1.000 1,500,000.00 1,500,000.00
perlengkapan Ls 6% x closet 90,000.00 90,000.00
JUMLAH HARGA BAHAN 1,590,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 130,000.00 130,000.00
Tukang Batu L.02 OH 1.500 145,000.00 217,500.00
Kepala tukang L.03 OH 0.150 190,000.00 28,500.00
Mandor L.04 OH 0.160 190,000.00 30,400.00
JUMLAH TENAGA KERJA 406,400.00
B BAHAN
Closet Jongkok Unit 1.000 280,000.00 280,000.00
Semen Portland Kg 6.000 1,740.20 10,441.20
Pasir Pasang M3 0.010 280,000.00 2,800.00
JUMLAH HARGA BAHAN 293,241.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 130,000.00 130,000.00
Tukang Batu L.02 OH 1.000 145,000.00 145,000.00
Kepala tukang L.03 OH 0.100 190,000.00 19,000.00
Mandor L.04 OH 0.050 190,000.00 9,500.00
JUMLAH TENAGA KERJA 303,500.00
B BAHAN
Kitchenzink Unit 1.000 1,200,000.00 1,200,000.00
Semen Portland Kg 6.000 1,740.20 10,441.20
Pasir Pasang M3 0.010 280,000.00 2,800.00
Perlengkapan % 7.000 17,500.00 17,500.00
JUMLAH HARGA BAHAN 1,230,741.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.200 130,000.00 156,000.00
Tukang Batu L.02 OH 1.450 145,000.00 210,250.00
Kepala tukang L.03 OH 0.150 190,000.00 28,500.00
Mandor L.04 OH 0.060 190,000.00 11,400.00
JUMLAH TENAGA KERJA 406,150.00
B BAHAN
Wastafel Unit 1.200 409,100.00 490,920.00
Semen Portland Kg 6.000 1,740.20 10,441.20
Pasir Pasang M3 0.010 280,000.00 2,800.00
Perlengkapan % 12.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 534,161.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.000 130,000.00 390,000.00
Tukang Batu L.02 OH 4.500 145,000.00 652,500.00
Kepala tukang L.03 OH 0.050 190,000.00 9,500.00
Mandor L.04 OH 0.900 190,000.00 171,000.00
JUMLAH TENAGA KERJA 1,223,000.00
B BAHAN
Bak fibreglass Unit 1.000 350,000.00 350,000.00
Perlengkapan % 12 % x bak 42,000.00 42,000.00
JUMLAH HARGA BAHAN 392,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 130,000.00 1,300.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala tukang L.03 OH 0.010 190,000.00 1,900.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 18,650.00
B BAHAN
Floor drain Bh 1.000 36,400.00 36,400.00
JUMLAH HARGA BAHAN 36,400.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 130,000.00 1,300.00
Tukang Batu L.02 OH 0.400 145,000.00 58,000.00
Kepala tukang L.03 OH 0.040 190,000.00 7,600.00
Mandor L.04 OH 0.005 190,000.00 950.00
JUMLAH TENAGA KERJA 67,850.00
B BAHAN
kran air Bh 1.200 25,000.00 30,000.00
sealtape Bh 0.025 6,000.00 6,000.00
JUMLAH HARGA BAHAN 36,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.135 130,000.00 17,550.00
Tukang Batu L.02 OH 0.225 145,000.00 32,625.00
Kepala tukang L.03 OH 0.023 190,000.00 4,370.00
Mandor L.04 OH 0.007 190,000.00 1,330.00
JUMLAH TENAGA KERJA 55,875.00
B BAHAN
Pipa galvanis 4" M1 1.200 142,000.00 170,400.00
perlengkapan % 35.000 49,700.00 49,700.00
JUMLAH HARGA BAHAN 220,100.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.036 130,000.00 4,680.00
Tukang Batu L.02 OH 0.060 145,000.00 8,700.00
Kepala tukang L.03 OH 0.006 190,000.00 1,140.00
Mandor L.04 OH 0.002 190,000.00 380.00
JUMLAH TENAGA KERJA 14,900.00
B BAHAN
Pipa PVC 1/2" M1 1.200 7,250.00 8,700.00
perlengkapan % 35.000 2,537.50 2,537.50
JUMLAH HARGA BAHAN 11,237.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.036 130,000.00 4,680.00
Tukang Batu L.02 OH 0.060 145,000.00 8,700.00
Kepala tukang L.03 OH 0.006 190,000.00 1,140.00
Mandor L.04 OH 0.002 190,000.00 380.00
JUMLAH TENAGA KERJA 14,900.00
B BAHAN
Pipa PVC 3/4" M1 1.200 9,100.00 10,920.00
perlengkapan % 35.000 3,185.00 3,185.00
JUMLAH HARGA BAHAN 14,105.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.081 130,000.00 10,530.00
Tukang Batu L.02 OH 0.135 145,000.00 19,575.00
Kepala tukang L.03 OH 0.014 190,000.00 2,565.00
Mandor L.04 OH 0.004 190,000.00 760.00
JUMLAH TENAGA KERJA 33,430.00
B BAHAN
Pipa PVC 3" M1 1.200 72,700.00 87,240.00
perlengkapan % 35.000 25,445.00 25,445.00
JUMLAH HARGA BAHAN 112,685.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.081 130,000.00 10,530.00
Tukang Batu L.02 OH 0.135 145,000.00 19,575.00
Kepala tukang L.03 OH 0.014 190,000.00 2,565.00
Mandor L.04 OH 0.004 190,000.00 760.00
JUMLAH TENAGA KERJA 33,430.00
B BAHAN
Pipa PVC 4" M1 1.200 90,900.00 109,080.00
perlengkapan % 35.000 31,815.00 31,815.00
JUMLAH HARGA BAHAN 140,895.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Pipa L.02 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 190,000.00 4,750.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Pipa PVC SNI diameter 0,5" M 1.000 9,000.00 9,000.00
JUMLAH HARGA BAHAN 9,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Pipa L.02 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 190,000.00 4,750.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Pipa PVC SNI diameter 3/4" M 1.000 12,500.00 12,500.00
JUMLAH HARGA BAHAN 12,500.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Pipa L.02 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 190,000.00 4,750.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Pipa PVC SNI diameter 1" M 1.000 16,800.00 16,800.00
JUMLAH HARGA BAHAN 16,800.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Pipa L.02 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 190,000.00 4,750.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Pipa PVC SNI diameter 1,5" M 1.000 31,000.00 31,000.00
JUMLAH HARGA BAHAN 31,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Pipa L.02 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 190,000.00 4,750.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Pipa PVC SNI diameter 2" M 1.000 40,000.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 130,000.00 13,000.00
Tukang Pipa L.02 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 190,000.00 4,750.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Pipa PVC SNI diameter 3" M 1.000 60,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.250 130,000.00 32,500.00
Tukang Batu L.02 OH 0.020 145,000.00 2,900.00
Kepala Tukang L.03 OH 0.100 190,000.00 19,000.00
Mandor L.04 OH 0.025 190,000.00 4,750.00
JUMLAH TENAGA KERJA 59,150.00
B BAHAN
Galian Tanah M2 0.210 116,565.00 24,478.65
Urugan Pasir M3 0.025 275,766.00 6,894.15
Cor 1 Pc : 3 Ps : 5 Krl M3 0.013 1,788,003.82 22,350.05
Pas. Dinding Bata ad. 1 : 4 M2 0.350 465,396.23 162,888.68
Plesteran ad. 1 : 4 M2 0.575 95,792.89 55,080.91
JUMLAH HARGA BAHAN 271,692.44
C PERALATAN
TINGGI /
NO URAIAN PEKERJAAN PANJANG LEBAR LUAS BANYAK VOLUME SATUAN
DALAM
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 1.00 1.00 Ls
2 Pek. Pas. Papan Nama Proyek 1.00 1.00 Ls
3 Pek. Mobilisasi dan Demobilisasi Alat 1.00 1.00 Ls
4 Pek. Landclaring / Galian Borrow Area 25.87 x 20.00 x 1.50 775.97 M³
5 Pek. Barak Kerja 1.00 1.00 Ls
6 Pek. Pemasangan Bouwplank 65.00 65.00 M¹
7 Pek. Dokumentasi dan Pelaporan 1.00 1.00 Ls
5 Pek. Pasangan Batu Ad. 1 Pc : 4 Psr 104.80 x 0.60 x 0.55 + 0.30 26.72 M³
- - 2
IV PEKERJAAN STRUKTUR
- Pekerjaan Struktur Lantai 1 -
1 Pek. Sloof 20/30 cm (Besi 162 kg/m3) -
- Beton Fc' = 21.7 Mpa 144.20 x 0.20 x 0.30 8.65 M³
- Pembesian Sloof Uk. 20 x 30 cm Besi 162 kg/m3 162.00 1,401.62 Kg
- Bekisting Balok Sloof Uk. 20 x 30 Cm 4.17 36.06 M²
2 Pek. Kolom 30x30 cm (besi 114 kg/m3) -
- Beton 0.35 x 0.35 x 4.00 x 22.00 10.78 M³
- Pembesian Kolom Uk. 35x35cm 114.00 1,228.92 Kg
- Bekisting Kolom Uk. 35x35cm 2.50 26.95 M²
3 Pek. Kolom 25x25 cm (besi 156 kg/m3) -
- Beton Fc' = 21.7 Mpa 0.25 x 0.25 x 3.70 x 16.00 3.70 M³
- Pembesian Kolom Utama Uk. 25 x 25 cm Besi 156 kg/m3 156.00 577.20 Kg
- Bekisting Kolom Utama Uk. 25 x 25 Cm 3.00 11.10 M²
4 Pek. Kolom Praktis -
- Beton Fc' = 14.5 Mpa 0.11 x 0.11 x 2.50 x 20.00 0.61 M³
- Pembesian Kolom Praktis Uk. 11 x 11 cm Besi 258 kg/m3 258.00 156.09 Kg
- Bekisting Kolom Praktis Uk. 11x 11 Cm 6.82 4.12 M²
5 Pek. Balok Pinggang -
- Beton Fc' = 14.5 Mpa 74.00 x 0.08 x 0.20 1.18 M³
- Pembesian Balok Pinggang Uk. 10 x 20 cm Besi 168 kg/m3 168.00 198.91 Kg
- Bekisting Balok Pinggang Uk. 10 x 20 Cm 6.25 7.40 M²
6 Pek. Balok Lantai 20/30 (Besi 162 kg/m3) -
- Beton Fc' = 21.7 Mpa 61.20 x 0.25 x 0.35 5.36 M³
- Pembesian BalokUk. 20 x 30 cm Besi 162 kg/m3 162.00 867.51 Kg
- Bekisting Balok Uk. 20 x 30 Cm 61.20 x 0.25 + 0.35 36.72 M²
VI PEKERJAAN DINDING
1 Pek. Pas. Dinding 1/2 Bata 1 : 4 M²
Lantai 1 69.90 x 4.00 279.60
44.70 x 4.00 178.80
57.60 x 0.80 46.08
Lantai 2 53.60 x -
37.00 x - -
504.48
Vol Kusen Pintu Lantai 1
TINGGI /
NO URAIAN PEKERJAAN PANJANG LEBAR LUAS BANYAK VOLUME SATUAN
DALAM
4 Pek. Dinding Keramik KM 25x40 cm, Tinggi 160 cm 5.40 x 1.60 1.00 8.64 M²
6.40 x 1.60 2.00 20.48
29.12
211.74
- Lantai 2 -
1 Pek. Rangka Plafond Besi Hollow 4x4 Galvanis (Lantai 2) M²
R. Tamu Camat, arsip 3.85 x 3.85 x - -
Kes. Sos 3.85 x 3.85 x - -
3.85 x 0.80 x - -
Kes. Trantip 3.85 x 3.85 x - -
1.85 x 0.80 x - -
Camat 3.85 x 2.35 - -
1.50 x 2.35 - -
Koridor 1.85 - 11.85 - -
R. Rapat 7.85 x 9.85 - -
1.85 x 0.80 - -
Pek. Keramik KM 25x25 cm 1.35 x 1.35 x - - -
Void Tangga 3.85 x 3.85 x -
Selasar 57.60 x 0.70 x -
-
- -
X PEKERJAAN SANITARY
1 Pas.Closet Jongkok Unit
2 Pas.Bak Fiber Bh
3 Pas.Floor Drain Bh
4 Pas.Kran Tembok Bh
5 Wastafel Unit
6 Pas.Instalasi Air Bersih Pipa D 1/2" M¹
7 Pas.Instalasi Air Kotor Pipa D 4" M¹
8 Pek. Saluran Air Hujan Pipa D 3" M¹
8 Pek. Septictank Unit
- -
XI PEKERJAAN INSTALASI LISTRIK
1 Pek. Instalasi Listrik Titik Lampu Titik
2 Pek. Bok Zekring + MCB Bh
3 Pek. Stop Kontak Persegi Setara BROCO Bh
4 Pek. Saklar Tunggal Setara BROCO Bh
5 Pek. Saklar Ganda Setara BROCO Bh
6 Pek. Lampu TL (Tubular Lamp) 18 - 20 Watt' Bh
7 Pek. Lampu DL (DownLight) Dia 3,5" 10-15 Watt' Bh
8 Pek. Lampu SL (Soft Light) 10-15 Watt Bh
9 Pek. Lampu Baret Bh
10 Pek. Lampu Dinding Artistik Bh
- -
XII PEKERJAAN PENGECATAN DAN FINISHING
1 Pek. Cat Tembok +Kolom + Balok M²
2 Pek. Cat Minyak M²
Kusen
P1 8.16 x 0.25 1.00 2.04
P2 6.60 x 0.25 7.00 11.55
P3 5.30 x 0.25 3.00 3.98
P4 7.65 x 0.25 1.00 1.91
J1 23.13 x 0.25 1.00 5.78
J2 6.20 x 0.25 2.00 3.10
J3 10.20 x 0.25 12.00 30.60
J4 26.40 x 0.25 - -
TINGGI /
NO URAIAN PEKERJAAN PANJANG LEBAR LUAS BANYAK VOLUME SATUAN
DALAM
J5 26.40 x 0.25 - -
J6 5.51 x 0.25 - -
J7 5.96 x 0.25 - -
J8 19.76 x 0.25 - -
VS 2.00 x 0.25 5.00 2.50
Pek. Pasangan Pintu Panel
P1 1.40 x 2.25 x 2.00 1.00 6.30
P2 0.80 x 2.25 x 2.00 7.00 25.20
P3 0.70 x 2.25 x 2.00 3.00 9.45
P4 1.25 x 2.25 x 2.00 1.00 5.63
Pek. Pasangan Jendela Kaca terpasang + Grendel
J2 5.00 x 0.07 2.00 0.70
J3 5.00 x 0.07 24.00 8.40
J5 3.98 x 0.07 - -
117.13
Kerinci, 2021
Diperiksa Oleh : Dibuat Oleh :
Kabid Cipta Karya Staf Teknis Bidang Cipta Karya
Dinas Pekerjaan Umum dan Perumahan Rakyat Dinas Pekerjaan Umum dan Perumahan Rakyat
Kabupaten Kerinci Kabupaten Kerinci
Terbilang : #NAME?
Kerinci, 2021
Disetujui Oleh : Di Buat Oleh :
Pejabat Pelaksana Teknis Kegiatan (PPTK) Tenaga Ahli
Diketahui Oleh ;
Pejabat Pembuat Komitmen ( PPK )
TERBILANG : #NAME?
H. SATUAN JML HARGA
NO. URAIAN PEKERJAAN VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5
Kerinci, 2021
Diketahui Oleh ;
Pejabat Pembuat Komitmen ( PPK )
Upah Tenaga
NO Uraian Satuan Keterangan
Kerja (Rp)
I. TENAGA KERJA
1 Kepala Tukang oh 190,000.00
2 Mandor oh 190,000.00
3 Mekanik oh 250,000.00
4 Mekanik Pembantu (Asisten Mekanik) oh 200,000.00
5 Operator Terampil oh 250,000.00
6 Operator Pembantu (Asisten Operator) oh 200,000.00
7 Pekerja oh 130,000.00
8 Penjaga / Satpam oh 125,000.00
9 Sopir Truck / Dumpt Truck oh 115,000.00
10 Sopir Personil oh 115,000.00
11 Sopir Pembantu (Kernet) oh 100,000.00
12 Tukang Batu oh 145,000.00
13 Tukang Besi oh 145,000.00
14 Tukang Kayu oh 145,000.00
15 Tukang Cat oh 145,000.00
16 Tukang Cat Semprot oh 145,000.00
17 Tukang Ornamen/Relief oh 250,000.00
PERPIPAAN (AIR BERSIH)
1 Alat Bantu Ls 1,250.00
2 Pembersihan Lapangan Ls 2,300.00
3 Angkutan Pipa m1 242.00
4 Pemadatan Tanah Ls 242.00
Harga di Quary
NO Uraian Satuan Jumlah Harga (Rp) Keterangan
(Rp)
II. MATERIAL
A Material Galian
1 Aspal kg 15,500.00
2 Bata Bata bh 1,200.00
7 Batu Belah m3 342,500.00
8 Batu Kali Bulat m3 339,500.00
9 Batu Pecah (Stone Crusher) 0,5 - 1 Cm m3 320,000.00
10 Batu Pecah (Stone Crusher) 1 - 2 Cm m3 320,000.00
11 Batu Pecah (Stone Crusher) 2 - 3 Cm m3 320,000.00
12 Batu Pecah (Stone Crusher) 3 - 5 Cm m3 320,000.00
13 Batu Pecah (Stone Crusher) 5 - 7 Cm m3 320,000.00
14 Batu Pecah (Stone Crusher) 7 - 10 Cm m3 320,000.00
15 Filler kg 1,500.00
16 Kerikil m3 190,000.00
17 Kerikil Sungai tak diayak/Sirtu m3 170,000.00
18 Pasir Pasangan m3 280,000.00
19 Pasir Beton m3 280,000.00
20 Pasir Timbun / Urug m3 167,500.00
21 Tanah Urug / Timbunan Biasa m3 117,500.00
22 Tanah Urug / Timbunan Pilihan m3 147,500.00
B Material Kayu
1 Kayu Bekisting / Mal m3 2,500,000.00
2 Kayu Klas I m3 4,000,000.00
3 Kayu Klas II m3 3,700,000.00
4 Kayu Klas III m3 2,500,000.00
5 Kayu Perancah m3 2,000,000.00
6 Kayu Dolken bh 3,500.00
7 Kayu Bakar m3 800,000.00
C Material Olahan
1 Batako (Hollow Brick) bh 2,600.00
2 Batako Krawang (Roster) bh 10,500.00
3 Batu Berongga Ekspos bh 12,000.00
Harga di Quary
NO Uraian Satuan Jumlah Harga (Rp) Keterangan
(Rp)
F ACCESORIS PIPA
1 Air Valve Dia 50mm Unit 2,750,000.00
2 Baut Moor 5/8 Bh 7,200.00
Harga di Quary
NO Uraian Satuan Jumlah Harga (Rp) Keterangan
(Rp)
B BIAYA PLN
1 BP (Biaya Penyambungan) PLN VA 850.00
2 Biaya Administrasi, SJI, SLO & Pemasangan APP VA 1,000.00
3 Biaya UJL (Uang Jaminan Pelanggan) VA 300.00
4 Biaya Pemasangan Instalasi Listrik ttk 160,000.00
Kerinci, 2021
Disetujui Oleh : Di Buat Oleh :
Pejabat Pelaksana Teknis Kegiatan (PPTK) Tenaga Ahli
Diketahui Oleh ;
Pejabat Pembuat Komitmen ( PPK )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang Batu L.02 OH 0.275 140,000.00 38,500.00
Kepala Tukang L.03 OH 0.028 160,000.00 4,480.00
Mandor L.04 OH 0.083 -
JUMLAH TENAGA KERJA 240,980.00
B BAHAN
Semen Portland Kg 384.000 1,740.20 668,236.80
Pasir Beton M3 0.692 280,000.00 193,760.00
Kerikil (maks 30 mm) M3 1.039 270,000.00 280,530.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,572,526.80
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.008 120,000.00 960.00
Tukang Besi L.02 OH 0.008 140,000.00 1,120.00
Kepala Tukang L.03 OH 0.0008 160,000.00 128.00
Mandor L.04 OH 0.0004 -
JUMLAH TENAGA KERJA 2,208.00
B BAHAN
Besi Beton (Polos/Ulir) Kg 1.050 14,000.00 14,700.00
Kawat Beton Kg 0.020 21,000.00 420.00
JUMLAH HARGA BAHAN 15,120.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.520 120,000.00 62,400.00
Tukang Kayu L.02 OH 0.260 140,000.00 36,400.00
Kepala Tukang L.03 OH 0.026 160,000.00 4,160.00
Mandor L.04 OH 0.026 -
JUMLAH TENAGA KERJA 102,960.00
B BAHAN
Kayu Kelas III M3 0.045 2,500,000.00 112,500.00
Paku 5-10 cm Kg 0.300 13,000.00 3,900.00
Minyak Bekisting Liter 0.100 9,000.00 900.00
JUMLAH HARGA BAHAN 117,300.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 120,000.00 79,200.00
Tukang Kayu L.02 OH 0.330 140,000.00 46,200.00
Kepala Tukang L.03 OH 0.033 160,000.00 5,280.00
Mandor L.04 OH 0.033 -
JUMLAH TENAGA KERJA 130,680.00
B BAHAN
Kayu Kelas III M3 0.040 2,500,000.00 100,000.00
Paku 5-12 cm Kg 0.400 13,000.00 5,200.00
Minyak Bekisting Liter 0.200 9,000.00 1,800.00
Balok Kayu Kelas II M3 0.018 3,700,000.00 66,600.00
Plywood tebal 9mm Lbr 0.350 68,200.00 23,870.00
Dolken Kayu Ø 8 -10/400 cm Batang 2.000 3,500.00 7,000.00
JUMLAH HARGA BAHAN 204,470.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang Batu L.02 OH 0.275 140,000.00 38,500.00
Kepala Tukang L.03 OH 0.028 160,000.00 4,480.00
Mandor L.04 OH 0.083 -
JUMLAH TENAGA KERJA 240,980.00
B BAHAN
Semen Portland Kg 326.000 1,740.20 567,305.20
Pasir Beton M3 0.760 280,000.00 212,800.00
Kerikil (maks 30 mm) M3 1.029 270,000.00 277,830.00
Air Liter 215.000 2,000.00 430,000.00
JUMLAH HARGA BAHAN 1,487,935.20
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang Batu L.02 OH 0.100 140,000.00 14,000.00
Kepala Tukang L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.015 -
JUMLAH TENAGA KERJA 51,600.00
B BAHAN
Bata Merah Bh 70.000 1,200.00 84,000.00
Semen Portlan Kg 11.500 1,740.20 20,012.30
Pasir Pasang m3 0.043 280,000.00 12,040.00
JUMLAH HARGA BAHAN 116,052.30
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.000 120,000.00 1,440.00
Tukang Besi L.02 OH 6.000 140,000.00 1,680.00
Kepala Tukang L.03 OH 3.000 160,000.00 960.00
Mandor L.04 OH 3.000 -
JUMLAH TENAGA KERJA 4,080.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.000 120,000.00 960.00
Tukang Besi L.02 OH 4.000 140,000.00 1,120.00
Kepala Tukang L.03 OH 2.000 160,000.00 640.00
Mandor L.04 OH 2.000 -
JUMLAH TENAGA KERJA 2,720.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 16.000 120,000.00 3,840.00
Tukang Besi L.02 OH 16.000 140,000.00 4,480.00
Kepala Tukang L.03 OH 8.000 160,000.00 2,560.00
Mandor L.04 OH 4.000 -
JUMLAH TENAGA KERJA 10,880.00
B BAHAN
A TENAGA
Pekerja L.01 OH 24.000 120,000.00 5,760.00
Tukang Besi L.02 OH 24.000 140,000.00 6,720.00
Kepala Tukang L.03 OH 12.000 160,000.00 3,840.00
Mandor L.04 OH 12.000 -
JUMLAH TENAGA KERJA 16,320.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 14.000 120,000.00 3,360.00
Tukang Besi L.02 OH 14.000 140,000.00 3,920.00
Kepala Tukang L.03 OH 7.000 160,000.00 2,240.00
Mandor L.04 OH 3.500 -
JUMLAH TENAGA KERJA 9,520.00
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.100 140,000.00 14,000.00
Kepala Tukang L.11 OH 0.010 160,000.00 1,600.00
Mandor L.15 OH 0.001 -
JUMLAH TENAGA KERJA 39,600.00
B BAHAN
Genteng metal Bh 1.020 160,000.00 163,200.00
Paku biasa 1/2" - 1" Kg 0.200 13,000.00 2,600.00
JUMLAH HARGA BAHAN 165,800.00
C PERALATAN
Harga Satuan
NO URAIAN PEKERJAAN Satuan Ket.
(Rp)
1 2 3 4 5
TM. 04.a Galian Tanah di borrow area (untuk bahan timbunan tidak termasuk beli tanah)
Kerinci, 2021
Disetujui Oleh : Di Buat Oleh :
Pejabat pelaksana teknis kegiatan (PPTK) Tenaga Ahli
Diketahui Oleh ;
Pejabat Pembuat Komitmen ( PPK )
IV PEKERJAAN STRUKTUR 30.17 1.500 1.500 6.000 6.300 6.700 5.178 2.988 70
MASA PEMELIHARAAN
V PEKERJAAN PENUTUP LANTAI 14.94 4.200 3.200 4.500 3.037
60
VI PEKERJAAN DINDING 26.23 2.400 3.600 4.500 4.500 4.000 3.200 4.033
50
VII PEKERJAAN ATAP 0.78 0.779
40
VIII PEKERJAAN PLAFOND 1.09 0.700 0.395
IX PEK. KUSEN, PINTU, JENDELA DAN VENTILASI 6.09 0.800 1.200 1.500 1.800 0.788 30
Kerinci, 2021
Diketahui Oleh ; Disetujui Oleh :
Pejabat Pembuat Komitmen ( PPK ) Pejabat Pelaksana Teknis Kegiatan (PPTK) Di Buat Oleh :
Tenaga Ahli
SAFRIDA IRIYANI, S.T., M.T HENDRI DONNEL, S.T., M.T ZURAHMAN. D.N, S.T, M.T
Nip. 19750717 200701 2 008 Nip. 19820110 200902 1 003
DINAS PEKERJAAN UMUM
KOTA SUNGAI PENUH
TAHUN 2016
DINAS PEKERJAAN UMUM
KOTA SUNGAI PENUH
TAHUN 2016
DINAS PEKERJAAN UMUM
KOTA SUNGAI PENUH
TAHUN 2016
DINAS PEKERJAAN UMUM
KOTA SUNGAI PENUH
TAHUN 2016
PEMERINTAH KOTA SUNGAI PENUH
DINAS PEKERJAAN UMUM
Website : http//www.sungai penuhkota.go.id http//www.sungaipenuhkota.go.id
e-mail : pu@sungaipenuhkota.go.id
Sekretariat : Dusun Sungai Ampuh Desa Sungai Jernih Telp. (0748) 323616 - Fax. (0748)323616
SUNGAI PENUH 37112
(SNI)
TRIWULAN II (KEDUA) APRIL - JUNI
TAHUN ANGGARAN 2016
(SNI)
TRIWULAN II
APRIL - JUNI
TAHUN ANGGARAN 2016
Terbilang : #NAME?
LENI MARLENI, ST
Team Leader
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PENGEMBANGAN KOMPLEK PERKANTORAN DINAS PU KOTA SUNGAI PENUH
PEKERJAAN : PENGEMBANGAN GEDUNG KANTOR DINAS PU KOTA SUNGAI PENUH
LOKASI : KOTA SUNGAI PENUH