TIME SCHEDULE

PEKERJAAN PERBAIKAN JALAN RUAS JL. KRAMAT JATI RAYA - CIMANGGIS JAKARTA TIMUR

TAHUN 2014

NO

URAIAN PEKERJAAN

SAT

VOLUME

e. Asphalt sprayer

10

11

12

JUNI
13

14

15

16

JULI
17

18

19

20

AGUSTUS
21

22

23

24

25

SEPTEMBER
26

27

28

29

30

OKTOBER
31

32

33

34

NOPEMBER
35

36

37

38

DESEMBER

39

40

41

42

0.102
0.122

0.025

0.025

0.025

0.025

0.031

0.031

0.031

0.031

0.041
0.081
0.024

0.010

0.010

0.010

0.010

0.020

0.020

0.020

0.020

0.006

0.006

0.006

0.006

unit

1.00

unit
unit
unit
unit

1.00
1.00
2.00
1.00

m2

134.60

0.438

m2
m2

21,660.00
21,660.00

Pek. Patching
- Patching jalan yang rusak

MEI

Mobilisasi & Demobilisasi alat


a. Tandem roller
b. Asphalt Finisher
c. Tire Roller
d. Dump truck

APRIL
3

%
1

MARET

BOBOT

0.073

0.073

0.073

0.073

6.695

0.096

0.096

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

92.497

1.200

1.443

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

0.073

0.073

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

0.191

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

2.643

Pek. Lapisan Permukaan Jalan


- Pek. Tack Coat 0.4 ltr/ m2
- Lapisan Asphalt Wearing
Coarse t=5 Cm

JUMLAH BOBOT
RENCANA PROGRESS
REALISASI PROGRESS

100.00
Kemajuan Pekerjaan

0.093

0.093

0.073

1.369

1.611

2.907

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.907

2.907

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.834

2.927

0.093

Komulatif kemajuan Pek

0.093

0.185

0.258

1.627

3.238

6.145

8.979

11.813

14.647

17.481

20.315

23.149

25.984

28.818

31.725

34.632

37.466

40.300

43.134

45.968

48.802

51.636

54.470

57.304

60.138

62.972

65.806

68.640

71.474

74.308

77.143

79.977

82.811

85.645

88.479

91.313

94.147

96.981

99.907

100.00

Kemajuan Pekerjaan
Komulatif kemajuan Pek

JAKARTA ,

MARET 2014

MENYETUJUI ,
DINAS PEKERJAAN UMUM
BINA MARGA

DIPERIKSA OLEH,
MANAJEMEN KONSTRUKSI
PT. ATELIER ENAM PM

DIBUAT OLEH,
KONTRAKTOR
PT. MAJU MAKMUR

Ir. Subianto, Msc


Kuasa Pengguna Anggaran

Team Leader

Ir. Adi Winarno


Direktur

43