LOCKOUT / TAGOUT

(PENGUNCIAN / PENANDAAN)
OBJECTIVE:
1. MENGISOLIR BAGIAN SISTEM TENAGA LISTRIK AGAR AMAN UNTUK KERJA
2. MENGURAIKAN PERSYARATAN PROSEDUR PENGUNCIAN / PENANDAAN
3. MEMASANG PENTANAHAN SEMENTARA
PROSEDUR URUTAN PENGUNCIAN:
1. PERINGATAN KEPADA SEMUA PEKERJA BAHWA ALASAN PENGUNCIAN DIPERLUKAN
(COACH)
2. JIKA SEMUA PERALATAN DALAM KEADAAN BEKERJA, MATIKAN SESUAI PROSEDUR
NORMAL.
3. OPERASIKAN SWITCH, MEMUTUS SEMUA SUMBER ENERGI LISTRIK, MEKANIKAL,
HIDRAULIK DSB. SEDEMIKIAN SEHINGGA KAPASITOR, PEGAS, BAGIAN MESIN
ANGKAT RODAGILA PUTAR, HIDRAULIK, UDARA KEMPA, GAS, UAP ATAU AIR
BERTEKANAN, DLL., HARUS DIDESIPASIKAN (DIBEBASKAN TENAGANYA) ATAU
DICEGAH MISALNYA, MEMASANG GROUNDING, REPOSISI, PENGEBLOKAN,
BLEEDING-DOWN. DSB.
4. KUNCI SEMUA PENGISOLIR TENAGA DENGAN GEMBOK, KUNCI ATAU ALAT
YANG MEMADAI UNTUK PENGUNCIAN.
5. PASTIKAN TIDAK ADA PEKERJA DILINGKUNGAN PEKERJAAN, OPERASIKAN
TOMBOL KONTROL ATAU HANDEL OPERASI UNTUK MEYAKINKAN BAHWA
PERALATAN TIDAK BEKERJA.
PERHATIAN: KEMBALIKAN TOMBOL KONTROL ATAU HANDEL OPERASI PADA
POSISI NETRAL/OFF SETELAH MELAKUKAN TEST
6. PENANDAAN ALAT-PENGISOLIR TENAGA LENGKAP DENGAN NOMOR, TANGGAL,
WAKTU, PIHAK YANG BERWENANG MELEPAS. CATAT SEMUA TEMPAT
PENGUNCIAN SEBAGAI CHECK-LIST UNTUK PEKERJAAN PENORMALAN. DENGAN
DEMIKIAN SEKARANG TELAH DIKUNCI DAN AMAN UNTUK DILAKUKAN
PEKERJAAN.
BAHAYA
JANGAN
DIJALANKAN
Kunci/Tag ini hanyaboleh
Dilepasoleh:
Nama : _____________________
Dept : _____________________
PerkiraanSelesai: ____________
TandaTangan:
LIHAT BALIKNYA
HSS
BAHAYA
JANGAN
DIJALANKAN
Sumberenergi sudah
DIMATIKANdanDIKUNCI !
Hanyapetugasyang berwenang
dibaliktanda-bahayaini boleh
melepaskunci/tandaini !
Catatan: ____________________
____________________________
____________________________
LIHAT BALIKNYA
HSS
CONTOH TAG
ALAT TIDAK BERFUNGSI
TANGGAL: ____________________________________
PENANGGUNG J AWAB: __________________________
DEPT: ________________________________________
NAMA MESIN: _________________________________
NO. MESIN: ___________________________________
NO.WO: _____________________________________
KERUSAKAN: __________________________________
REPAIR SECRAP
SIAP DIGUNAKAN
TANGGAL: ____________________________________
PENANGGUNG J AWAB: __________________________
NO.WO: _____________________________________
KETERANGAN: _________________________________
STOCK RE-FIT
DALAM PERBAI KAN
TANGGAL: ____________________________________
DEPT: __________________________
PENANGGUNG J AWAB: _________________________
KETERANGAN: _________________________________
CONTOH LABEL
PERALATAN
YANG MENUNJ UKKAN
KONDI SI PERALATAN :
1.ALAT TI DAK BERFUNGSI
2.ALAT SI AP DI GUNAKAN
3.ALAT DALAM PERBAI KAN
NO
TITIK
PEMASANGAN
TAG
PEMASANGAN
TAG
PELEPASAN TAG
KETERANGAN/
CATATAN
JAM OLEH JAM OLEH
CONTOH REKAMAN TAGOUT
1. PLASTI C HELMETS
2. PLASTI C I NSULATI NG J ACKETS
3. RUBBER INSULATING GLOVES
4. PROTECTI VE GLOVES
5. PLASTI C I NSULATI NG TROUSERS
6. RUBBER INSULATING BOOTS
VOLTAGE CLASSIFICATION FOR RUBBER GLOVES
CLASS AC TEST
VOLTAGE
AC MAX.USE VOLTAGE
ASTM D120-84a
0 5000 LOW VOLTAGE (1000 V)
1 10000 7500
2 20000 17000
3 30000 26500
4 40000 36000
7. PROSEDUR PENGOPERASIAN SISTEM TENAGA LISTRIK
(STANDING OPERATION PROCEDURES, SOP) DAN
SAFETY AUDIT.
VOLTAGE DETECTOR
150-257.5KV
60-196.5KV
20-80.5KV
3 34.5KV
HIGH VOLTAGE WIRELESS PHASE TESTER
HI GH VOLTAGE AC CABLE PROXI MI TY ALARM
HANYA DIGUNAKAN SEBAGAI ALAT BANTU SAJ A
SENSITIVITAS ALAT TERGANTUNG POSISI TANGAN
HARUS MENGI KUTI CARA PEMAKAI AN DARI MANUFAKTUR
SI STEM TEGANGAN J ARAK AMAN (CM)
20 70
30 85
70 100
150 150
500 500
LIVE LINE INSULATOR TESTER
OUTAGE REDUCTION AND MODERNIZATION OF
DISTRIBUTION WORK METHODS
HARUS DI YAKI NKAN KELAYAKAN PAKAI
HARUS MENGIKUTI PROSEDUR YANG DITETAPKAN
PELAKSANA HARUS SEHAT, SELALU WASPADA DAN TELITI
HOT LI NE MAI NTENANCE
TAHAPAN PELAKSANAAN PEKERJ AAN DAN PEMBAGIAN WEWENANG
MULAI
SELESAI
OPERASI
NORMAL
MANUVER
J ARINGAN
UNTUK
KEHANDALAN
MANUVER
PEMBEBASAN
TEGANGAN
(DEENERGI ZED)
BUKA SWG DAN
MASUKKAN
PENTANAHAN
I NSTALASI
PEMASANGAN
PENTANAHAN
LOKAL DAN
RAMBU-RAMBU
PELAKSANAAN
KERJ A
PELEPASAN
PENTANAHAN
LOKAL DAN
RAMBU-RAMBU
BUKA
PENTANAHAN
DAN TUTUP
MANUVER
REENERGI ZED
I NSTALASI
MANUVER
J ARINGAN
PENORMALAN
SI STEM
PERMINTAAN
DAN PERSI APAN
SERAH TERIMA
DISPATCHER KE
PENGAWAS MANUVER
SERAH TERIMA
DARI PM KE
PENGAWAS PEKRJ N
DI SUBSTATION
SERAH TERIMA
DARI PWS. PEKRJ N
KE PWS.MANUVER
DI SUBSTATION
SERAH TERIMA
PENGAWAS MANUVER
KE DI SPATCHER
PEMBAGI AN WEWENANG
WEWENANG/ TUGAS DISPATCHER
WEWENANG TUGAS OPERATOR
WEWENANG TUGAS PEKERJ A PEMELIHARAAN
PELAKSANAAN
PENGAWASAN
KESELAMATAN KERJ A
OLEH PENGAWAS K3
TAHAPAN PEMBEBASAN J ARINGAN DARI TEGANGAN LISTRIK
1. SI APKAN DAN PAHAMI DI AGRAM SATU GARI S DARI SI STEM J ARI NGAN TENAGA
LI STRI K YANG HENDAK DI BEBASKAN TEGANGANNYA.
LABEL PERALATAN PEMUTUS DALAM DIAGRAM HARUS SAMA DENGAN YANG TERTULI S
PADA SETI AP PERALATAN PEMUTUS.
2. LAKUKAN PEMBEBASAN J ARI NGAN DENGAN NORMAL PROSEDUR SESUAI STANDI NG
OPERATI ON PROCEDURE UNTUK SETI AP PERALATAN PEMUTUS (OFF-RACKOUT-
LOCKOUT-TAGOUT)
3. TEST TEGANGAN BAGI AN YANG DI BEBASKAN UNTUK MEYAKI NKAN BAHWA
TI DAK BERTEGANGAN.
ALAT TEST TEGANGAN PERLU DI YAKI NKAN BAHWA ALAT LAI K PAKAI
4. PASANG KABEL GROUNDI NG HUBUNG PENDEK. REKAM TEMPAT PEMASANGAN
GROUNDI NG DAN J UMLAH GROUNDI NG YANG DI PASANG.
5. PASANG RAMBU RAMBUPENGAMAN AGAR ORANG LAI N TAHU ADA PEKERJ AAN
LI STRI K DAN LARANGAN AKTI FI TAS DI PERALATAN TERKAI T DANTI DAK MENDEKAT
DI AREA YANG DILARANG.
6. PEMBERI TAUAN KEPADA PEKERJ A PEMELI HARAAN ATAU KONSTRUKTOR LI STRI K
BAHWA TELAH DAPAT DI MULAI BEKERJ A. PEMBERI TAUAN HARUSRESMI
DENGAN TI MBANG TERI MA.
CARA PEMASANGAN PENGAMAN
PENTANAHAN
RENCANA
LATAR BELAKANG
KESEPAKATAN GATT, AFTA DAN APEC
TUNTUTAN PENGELOLAAN KETENAGALISTRIKAN
YANG ANDAL, AMAN DAN RAMAH LINGKUNGAN
PERATURAN PERUNDANG-UNDANGAN
TERSEDIANYA TENAGA KERJA YANG KOMPETEN
KOMPETENSI PEKERJ A SANGAN MENETUKAN
KESELAMATAN DAN KEHANDALAN KETENAGALI STRI KAN
DITINJAU DARI SEGI BAHASA
STANDAR DIARTIKAN SEBAGAI UKURAN
ATAU PATOKAN YANG DISEPAKATI.
KOMPETENSI DIARTIKAN KEMAMPUAN
MELAKUKAN PEKERJAAN YANG
DILANDASI OLEH PENGETAHUAN,
KETERAMPILAN DAN SIKAP KERJA
DEFINISI STANDAR KOMPETENSI
STANDAR KOMPETENSI ADALAH
PERUMUSAN TENTANG KEMAMPUAN
YANG HARUS DIMILIKI SESEORANG
UNTUK MELAKUKAN SUATU TUGAS
ATAU PEKERJAAN YANG DIDASARI
ATAS PENGETAHUAN, KETERAMPILAN PENGETAHUAN, KETERAMPILAN
DAN SIKAP KERJ A DAN SIKAP KERJ ASESUAI DENGAN
UNJUK KERJA YANG
DIPERSYARATKAN.
DEFINISI STANDAR KOMPETENSI
DENGAN DIKUASAINYA KOMPETENSI TERSEBUT, MAKA
YANG BERSANGKUTAN AKAN MAMPU :
BAGAIMANA MENGERJAKAN SUARTU TUGAS /
PEKERJAAN
MENGORGANISASIKAN AGAR PEKERJAAN TERSEBUT
DAPAT DILAKSANAKAN.
APA YANG HARUS DILAKUKAN BILAMANA TERJADI
SESUATU YANG BERBEDA DARI KONDISI SEMULA.
BAGAIMANA MENGGUNAKAN KEMAMPUANNYAUNTUK
MEMECAHKAN MASALAH / MELAKSANAKAN TUGAS
DENGAN KONDISI YANG BERBEDA
CONTOH STANDAR KOMPETENSI :
STANDAR KOMPETENSI OPERATOR PLTD KECIL
STANDAR KOMPETENSI PEMELIHARAAN PLTD KECIL
ELECTRICAL SAFETY AUDITS
AUDIT ITEMS
ELECTRICAL ONE LINE DIAGRAM
TRAINED PEOPLE
CLEARING PROCEDURES
ENERGIZED PROCEDURES
GROUNDING
CORROSION
FAULT-CLEARING EQUIPMENT
SYSTEM GROUNDING
SWITCHING PROCEDURES
PROTECTIVE EQUIPMENT
SAFETY AUDIT CHECK LIST
MANAGING SAFETY
MANAJ EMENT KESELAMATAN TIDAK TERLEPAS DARI
MANAJ EMENT KESELURUHAN DALAM SUATU ORGANISASI
PERUSAHAAN.
MANAJ EMENT KESELAMATAN MENEKANKAN SEMUA
PEKERJ AAN DILAKUKAN MENURUT PROSEDUR YANG
AMAN BAGI SEMUA ORANG.
PLANNING
TETAPKAN DAHULU TARGET YANG HENDAK DICAPAI
TINJ AU KEMAJ UANNYA SETIAP TIGA BULAN
BAGIAN UTAMA DARI ELECTRICAL SAFETY PLAN :
1. GOALS, AND REVIEW OF THESE GOALS
2. ORGANIZATION
3. REPORTING FORMAT, TECHNIQUES AND ROUTING
4. REPORT AND PLANNING REVIEW
5. ACCIDENT AND NEAR ACCIDENT REVIEW PROCEDURES
6. DEVELOPMENT OF SAFETY PROCEDURES, FORM AND
HANDBOOKS