Soehatman Ramli
Latar Belakang
Lingkungan industri khususnya yang
mengelola bahan berbahayasangat
rawan terhadap bahaya kecelakaan.
Pada umumnya kecelakaan terjadi
pada pekerjaan pemeliharaan.
Perlu pengawasan dan pencegahan
yang baik melalui sistem ijin kerja
Permit #
location:
Issued to:
to
__/___/___
M D Y
____
time
Work Description:
____________________________________________
____________________________________________
____________________________________________
Atm Combustible vapors or gases (<10%)
Tests
________________________________
Supervisors Signature
Print name
Work Order No.
FUEL
TEMPERATURE
Oksigen
Panas
1. Mengendalikan Bahan
Bakar
2. Mengendalikan Panas
3. Mengendalikan Oksigen
Mencegah atau
mengendalikan adanya
sumber bahan bakar
Boleh menggunakan api
Oksigen
Panas
Oksigen
Oksigen
Kadar Oksigen
diperkirakan tidak aman
bagi manusia atau untuk
kelangsungan proses
pembakaran (segi tiga api)
Panas
Ijin Kerja
Safety
Advisor
Perrforming
Authority
Pengawas Operasi
Shift superintendent
Kepala pabrik
Pengawas instalasi dll
Bagian pemeliharaan
Bagian teknik sipil, listrik atau mekanik
Pekerja telekomunikasi
Pekerja pembersihan dll
Fungsi K3 perusahaan
Fungsi Listrik
Fungsi Inspeksi
Fungsi Telekomunikasi
Dll yang diperlukan
Excavations may expose hazardous materials, which have leaked and are
contaminating the soil.
Permits ensure that procedures to protect workers from exposure to toxic
substances have been identified.
PREPARATION OF
WORKPERMIT
RESIDUAL HAZARDS
Lack of oxygen
H2S and/or any other toxic gases
Combustible gases
Corrosive chemicals
Steam / Condensate
Pyrophoric iron
High humidity
RESIDUAL HAZARDS
Lack of oxygen
H2S and/or any other toxic gases
Combustible gases
Corrosive chemicals
Steam / Condensate
Pyrophoric iron
High humidity
PROTECTION MEASURES
Protective clothing
Hearing protection
Safety Harness
Eye protection
Face protection
Respiratory protection
Keep fire equipment stand-by
PROTECTIVE MEASURES
CONTD.
LEL
4
5
2
1.1
0.7
0.7
1
UEL
75
15
9.5
5.9
5.0
5.0
5.0
F Pt.(C) AIT(C)
Gas
585
Gas
538
- 104
466
- 18
288
35-50
210
32-96
256
66
262-407
over 700
TOXIC GAS - CO
TOXIC AS WELL AS FLAMMABLE
TLV
50 PPM
STEL
- 400 PPM
IDLH
- 1500 PPM
LEL
- 12.5%
UEL
- 74 %
GAS TEST - CO
HEALTH HAZARDS:
CO combines with hemoglobin of blood and
make it unable to carry oxygen.
Symptoms : Headache, dizziness to
unconscious and ultimately death.
First Aid :
Remove to fresh air and apply oxygen at the
earliest.
TLV
NH3
SO2
CL2
25
2
0.5
STEL IDLH
35
5
1
30
RESPONSIBILIES OF GAS
TESTING AUTHORITY
To check & confirm that the gas
testing instrument is working in
perfect condition before proceeding
for the area/equipment
To carry out gas test at all critical
locations/positions
To advise on safe method to work
inside/at the location i.e., further
gas freeing , use of PPE etc.
ELECTRICAL ISOLATION
Before issuing a Work Permit, it is
essential to ensure that the equipment /
facility to be worked on is electrically
safe and electrical power is isolated to
the extent necessary for the safe
conduct of the authorized work.
Issuing, Executing authorities and
Electrical Maintenance shall jointly
decide the extent of isolation required.
VALIDITY OF PERMIT
Work permit shall be initially issued for a
period of 8 hrs. and shall be renewed for
one more shift .
On need basis , permit can be given for
max. 7 days period.
Clearance to be obtained every shift.
Clearance to be given after physically
checking the site.