Anda di halaman 1dari 7

DINAS PEKERJAAN UMUM

KABUPATEN MIMIKA

LAPORAN
HARIAN

PEKERJAAN

: PEMBANGUNAN JALAN FAKAFUKU-KILIARMA

HARI

TAHUN ANGGARAN

: 2014

TANGGAL :

LOKASI

: DISTRIK AGIMUGA

MINGGU KE:

KONTRAKTOR PELAKSANA

: PT.KURNIA JAYA KARYA

KONSULTAN PENGAWAS

: PT. SANTIKA KONSULINDO

NO. KONTRAK

:050.1/129.F /Tanggal 3 September 2014

NO, KONTRAK

NO

TENAGA KERJA

PEKERJAAN YANG DILAKSANAKAN

JUMLAH

SATUAN

VOLUME

JUMLAH (Orang) .

NO

PERALATAN

SAT

VOLUME

JENIS BAHAN

SATUAN

VOLUME

LAPORAN CUACA
Cerah

JML

S/D
S/D
S/D
S/D
Gerimis

JML

S/D
S/D
S/D
S/D
Hujan deras
S/D
S/D
S/D
S/D
CATATAN KEJADIAN :

TAMU :

JML

DIKETAHUI OLEH,
DIREKSI TEKNIS
: PEMBANGUNAN JALAN FAKAFUKU-KILIARMA

HARUN RUMANIOWI ,Amd


NIP.

DIPERIKSA OLEH,
KONSULTAN PENGAWAS
: PT. SANTIKA KONSULINDO

Site Engineering

Agimuga, 2014
DIBUAT OLEH,
KONTRAKTOR PELAKSANA
: PT.KURNIA JAYA KARYA

Site Manager

hr. 89

Selasa hr. 90
hr. 91
hr. 92
hr. 93
hr. 94

HARI
Senin

Rabu
Kamis
Jumat
Sabtu
Minggu hr. 95
Senin
Selasa hr. 97

TANGGAL

2/12

3/12

4/12

5/12

6/12

7/12

8/12

9/12

MINGGU

Mg ke 14

Mg ke 15
hr. 101

hr. 105

Mg ke 11

Mg ke 16

19/12 Jumat hr. 107

18/12 Kamis hr. 106

17/12 Rabu

hr. 68

hr. 70

hr. 73

hr. 75

#### Rabu

hr. 77

#### Selasa hr. 76

#### Senin

#### Minggu hr. 74

#### Sabtu

#### Jumat hr. 72

#### Kamis hr. 71

#### Rabu

#### Selasa hr. 69

#### Senin

hr. 31

hr. 33

hr. 35

hr. 38

hr. 40

hr. 42

hr. 45

#### Minggu hr. 46

#### Sabtu

#### Jumat hr. 44

#### Kamis hr. 43

#### Rabu

#### Selasa hr. 41

#### Senin

#### Minggu hr. 39

#### Sabtu

#### Jumat hr. 37

9/10 Kamis hr. 36

8/10 Rabu

7/10 Selasa hr. 34

6/10 Senin

5/10 Minggu hr. 32

4/10 Sabtu

3/10 Jumat hr. 30

Mg ke 2

16/12 Selasa hr. 104

hr. 103

hr. 66

9/11 Minggu hr. 67

8/11 Sabtu

7/11 Jumat hr. 65

6/11 Kamis hr. 64

hr. 63

Mg ke 6

15/12 Senin

14/12 Minggu #####

13/12 Sabtu

Mg ke 10

12/12 Jumat hr. 100

Mg ke 9

5/11 Rabu

4/11 Selasa hr. 62

Mg ke 5

hr. 99

MINGGU
Mg ke 1

11/12 Kamis

TANGGAL
hr. 61

MINGGU

hr. 98

HARI
2/10 Kamis hr. 29

hr. 10

13/9 Sabtu

19/9 Jumat

18/9 Kamis

hr. 16

hr. 15

hr. 14

hr. 13

16/9 Selasa
17/9 Rabu

hr. 12

15/9 Senin

14/9 Minggu hr. 11

hr. 9

hr. 6

Selasa
9/9

12/9 Jumat

hr. 5

Senin
8/9

hr. 8

Minggu hr. 4
7/9

11/9 Kamis

hr. 3

Sabtu
6/9

hr. 7

hr. 2

Jumat
5/9

10/9 Rabu

hr. 1

Kamis
4/9

2/9

Rabu

Selasa

1/9

3/9

Senin

TANGGAL

10/12 Rabu

HARI KE
hr. 28

HARI

3/11 Senin

MINGGU

2/11 Minggu hr. 60

TANGGAL
1/10 Rabu

HARI

hr. 59

HARI KE

1/11 Sabtu

HARI KE

hr. 96

HARI KE

1/12

BULAN SEPTEMBER 2014

Mg ke 3

BULAN OKTOBER 2014

Mg ke 7

BULAN NOPEMBER 2014

Mg ke 12

BULAN DESEMBER 2014

108

111
112
113
114
115

23/12 Selasa

24/12 Rabu

25/12 Kamis

26/12 Jumat

27/12 Sabtu

1/1

31/12

118

30/12 Selasa

Mg ke 12
hr. 84

hr. 87

#### Minggu hr. 88

#### Sabtu

#### Jumat hr. 86

#### Kamis hr. 85

#### Rabu

Mg ke 8

117

hr. 82

#### Selasa hr. 83

#### Senin

hr. 47

hr. 49

hr. 52

hr. 54

hr. 56

#### Jumat hr. 58

#### Kamis hr. 57

#### Rabu

#### Selasa hr. 55

#### Senin

#### Minggu hr. 53

#### Sabtu

#### Jumat hr. 51

#### Kamis hr. 50

#### Rabu

#### Selasa hr. 48

#### Senin

Mg ke 4

29/12 Senin

hr. 80

#### Minggu hr. 81

#### Sabtu

#### Jumat hr. 79

#### Kamis hr. 78

ke 3

28/12 Minggu 116

110

22/12 Senin

21/12 Minggu 109

20/12 Sabtu
hr. 17

hr. 20
hr. 21
hr. 22
hr. 23
hr. 24

23/9 Selasa
24/9 Rabu
25/9 Kamis
26/9 Jumat
27/9 Sabtu

30/9 Selasa

29/9 Senin

hr. 27

hr. 26

28/9 Minggu hr. 25

hr. 19

22/9 Senin

21/9 Minggu hr. 18

20/9 Sabtu

R 2014

Mg ke 5

2014

Mg ke 9

2014

Mg ke 13

2014

TIME
KEGIATAN
PEKERJAAN
KABUPATEN
TAHUN

SCHEDULE
:
:
:
:

PEMBANGUNAN JALAN KABUPATEN


PEMBANGUNAN JALAN FAKA FUKU - KILIARMA (15 KM)
KABUPATEN MIMIKA-PAPUA
2014

RENCANA PELAKSANAAN PEKERJAAN


SEPTEMBER

NO.
MATA
PEMB

P E K E R J A A N

JUMLAH HARGA

BOBOT
(%)

OKTOBER

NOPEMBER

Mg ke 1

Mg ke 2

Mg ke 3

Mg ke 4

Mg ke 5

Mg ke 6

Mg ke 7

Mg ke 8

Mg ke 9

Mg ke 10

Mg ke 11

Mg ke 12

Mg ke 13

4/9-14
S/d.
7/9-14

8/9-14
S/d.
14/9-14

15/9-14
S/d.
21/9-14

22/9-14
S/d.
28/9-14

29/9-14
S/d.
5/10-14

6/10-14
S/d.
12/10-14

13/10-14
S/d.
19/10-14

20/10-14
S/d.
26/10-14

27/10-14
S/d.
2/11-14

3/11-14
S/d.
9/11-14

10/11-14
S/d.
16/11-14

17/11-14
S/d.
23/11-14

24/11-14
S/d.
30/11-14

DESEMBER
Mg ke 14
Mg ke 15
1/12-14
S/d.
7/12-14

KET.

8/12-14
S/d.
14/12-14

UMUM
100%

93.91%
898,500,000.00

Mobilisasi dan Demobilisasi

9.34%

2.155%

2.873%

2.155%

1.437%

0.718%

90%
80%

II

PEKERJAAN DRAINASE
2,797,841,473.45

Galian untuk Saluran Air

29.08%

3.231%

4.523%

3.877%

3.231%

3.231%

70%

62.56% 2.585%
2.585%

1.939%

2.585%

1.292%

60%
50%

III

PEKERJAAN TANAH
2,140,703,181.11

Urugan Tanah dari Hasil Galian

40%

22.25%

1.534%

0.767%

1.534%

2.302%

3.069%

3.836%

3.069%

2.302%

1.534%

2.302%

30%

1,064,784,409.57

Urugan Tanah (Borrow Pit)

15.95%

11.07%

0.395%

0.790%

1.186%

1.581%

1.976%

1.581%

1.581%

1.186%

0.790%

20%
10%

0.00%
Pekerjaan Tebas Tebang Rencek dan Pembersihan

RENCANA
REALISASI

2,719,760,633.83

28.27%

9,621,589,697.96

100.00%

Tiap Minggu
Kumulatif
Tiap Minggu
Kumulatif

0.00
0%

0.975%

1.949%

1.949%

3.899%

4.874%

3.899%

3.899%

2.924%

1.949%

0%

1.949%

-10%

2.16%
2.16%

2.87%
5.03%

3.13%
8.16%

5.18%
13.34%

8.01%
21.35%

8.54%
29.89%
29.20%

10.03%
39.92%

10.22%
50.15%

10.74%
60.88%

10.93%
71.81%

8.93%
80.74%

DEVIASI
Timika,25 Agustus 2014
Dibuat Oleh

Direktur

8.42%
89.16%

4.41%
93.57%

4.92%
98.49%

1.51%
100.00%

U A C

PROYEK : PEMBANGUNAN GEDUNG DPRD KAB. MIMIKA


BULAN : JUNI 2011
T.A
: 2011
JUMLAH JAM
KONDISI
JAM
NO
HARI/TANGGAL
CUACA 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 ### ### ### ### ### ### ### ### ### ### ### ### ### ### Cerah Gerimis Deras
1

SENIN

01/09/14

CERAH
GERIMIS
DERAS

SELASA

02/09/14

CERAH
GERIMIS
DERAS

RABU

03/09/14

CERAH
GERIMIS
DERAS

KAMIS

04/09/14

CERAH
GERIMIS
DERAS

JUMAT

05/09/14

CERAH
GERIMIS
DERAS

SABTU

06/09/14

CERAH
GERIMIS
DERAS

MINGGU

07/09/14

CERAH
GERIMIS
DERAS

SENIN

08/09/14

CERAH
GERIMIS
DERAS

SELASA

09/09/14

CERAH
GERIMIS
DERAS

10

RABU

10/09/14

CERAH
GERIMIS
DERAS

11

KAMIS

11/09/14

CERAH
GERIMIS
DERAS

12

JUMAT

12/09/14

CERAH
GERIMIS
DERAS

13

SABTU

13/09/14

CERAH
GERIMIS
DERAS

14

MINGGU

14/09/14

CERAH
GERIMIS
DERAS

15

SENIN

15/09/14

CERAH
GERIMIS
DERAS

16

SELASA

16/09/14

CERAH
GERIMIS
DERAS

17

RABU

17/09/14

CERAH
GERIMIS
DERAS

18

KAMIS

18/09/14

CERAH
GERIMIS
DERAS

19

JUMAT

19/09/14

CERAH
GERIMIS
DERAS

20

SABTU

20/09/14

CERAH
GERIMIS
DERAS

21

MINGGU

21/09/14

CERAH
GERIMIS
DERAS

22

SENIN

22/09/14

CERAH
GERIMIS
DERAS

23

SELASA

23/09/14

CERAH
GERIMIS
DERAS

24

RABU

24/09/14

CERAH
GERIMIS
DERAS

25

KAMIS

25/09/14

CERAH
GERIMIS
DERAS

26

JUMAT

26/09/14

CERAH
GERIMIS
DERAS

27

SABTU

27/09/14

CERAH
GERIMIS
DERAS

28

MINGGU

28/09/14

CERAH
GERIMIS
DERAS

29

SENIN

29/09/14

CERAH
GERIMIS
DERAS

30

SELASA

30/09/14

CERAH
GERIMIS
DERAS

Total Jam .

Timika, 30 September 2014


DIKETAHUI OLEH
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPK)
KAB. MIMIKA

DIKETAHUI OLEH
KONSULTAN PENGAWAS
CV. DINAMIKA KONSULTAN

Dibuat Oleh :
KONTRAKTOR PELAKSANA

(JHONI WASAREAK, ST )

Ir. MUH. SYUKUR

IR. M.YUSUF HAMIM

NIP. 1978 1402 2006 05 1 001

Site Engineering

Direktir

KETERANGAN

DAFTAR HADIR TENAGA KERJA HARIAN


TGL............................................

PEKERJAAN
TAHUN ANGGARAN
LOKASI

NO

S/D

TGL............................................

: PEMBANGUNAN JALAN FAKAFUKU-KILIARMA


: 2014
: DISTRIK AGIMUGA

NAMA

JOB

MIGGU
PAGI
SORE

SENIN
PAGI

SORE

SELASA
PAGI
SORE

HARI KERJA
RABU
PAGI
SORE

PAGI

KAMIS
SORE

PAGI

JUM'AT
SORE

PAGI

SABTU
SORE

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
AGIMUGA, .........................2014

JUMLAH HARI
KERJA