PELA
DAFTAR
KSAN ALOKASI ANGGARAN SETIAP DISTRIK
AAN
PADA
TTAHUN ANGGARAN 2020
KARY
LOKASI : Kabupaten mimika
A
TUNAI
NO NAMA DISTRIK HPS
REALISASI
0
VI. DISTRIK MIMIKA BARAT JAUH Rp 2,500,000,000.00
REALISASI
NAMA POKJA NAMA KETUA NAMA
NAMA PPK
OPERASIONAL FISIK POKJA KADES/LURAH.
Rp 1,050,000,000.00 Rp 1,950,000,000.00
MATOREN JULIANUS
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 KILIARMA POLLI ANIPARO ANGGAIBAK
1 003
MATOREN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 MAFASIMAMO BARTOL KAU HUGO AMENAO
1 003
Rp 875,000,000.00 Rp 1,625,000,000.00
MATOREN STEFANUS
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 OMAWITA YAMURU FITALIS IPI
1 003
Rp 875,000,000.00 Rp 1,625,000,000.00
MATOREN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 KANMAPRI TONI YAMAHE TERY MAWAMA
1 003
MATOREN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 SEMPAN TIMUR LINUS NAMEA MARSELUS SEARO
1 003
BENYAMIN BATO
Rp 175,000,000.00 Rp 325,000,000.00 SAU,ST,MM/19721227200212 WENIM LEDY WIJANGGE YOPY PILIGAME
1000
Rp 875,000,000.00 Rp 1,625,000,000.00
MATOREN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 PARIPI BLESIUS ERAKIPIA FINSENSIUS IMINI
1 003
MATOREN YOSEPH
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 YARAYA BEATRIX WARMANI KAWAREYAU
1 003
Rp 875,000,000.00 Rp 1,625,000,000.00
MATOREN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 MIMIKA IMANUEL KAPAN URBANUS AKIRI
1 003
MATOREN YANJARIUS
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 KIURA ETREYAU FREDI SAMIN
1 003
Rp 875,000,000.00 Rp 1,625,000,000.00
MATOREN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 AINDUA LIBER UKU PETRUS KAMUTU
1 003
MATOREN MARTINUS
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 YAPAKOBA TENAMA SAPRIUS NAIMU
1 003
MATOREN POTOWAIBURU
Rp 175,000,000.00 Rp 325,000,000.00 WENDA,SH/19700707200112
KM.4 MARTINUS AUTI ISIDORES TENAMA
1 003
REALISASI
NAMA POKJA NAMA KETUA NAMA
NAMA PPK
OPERASIONAL FISIK POKJA KADES/LURAH.
REALISASI
NAMA POKJA NAMA KETUA NAMA
NAMA PPK
OPERASIONAL FISIK POKJA KADES/LURAH.
Rp 875,000,000.00 Rp 1,625,000,000.00
MATOREN UNGILAN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 MAPAR WANIMBO MELIANUS TAKATI
1 003
BENYAMIN BATO
Rp 175,000,000.00 Rp 325,000,000.00 SAU,ST,MM/19721227200212 KAPIRAYA TIUS WANIMBO MARUS UPATO
1000
Rp 875,000,000.00 Rp 1,625,000,000.00
MATOREN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 IWAKA AGUSTINA TAWAIN ELTIUS AWIYUTA
1 003
Rp 1,050,000,000.00 Rp 1,950,000,000.00
MATOREN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 KARANG SENANG YONAS KWAITO EDUWAR PENTURY
1 003
BENYAMIN BATO
Rp 350,000,000.00 Rp 650,000,000.00 SAU,ST,MM/19721227200212 JIMBI BINI KOGOYA WELES WENDA
1000
BENYAMIN BATO
Rp 350,000,000.00 Rp 650,000,000.00 SAU,ST,MM/19721227200212 UTIKINI TIGA LIS WANIMBO YAN TINAL
1000
Rp 875,000,000.00 Rp 1,625,000,000.00
MATOREN
Rp 350,000,000.00 Rp 650,000,000.00 WENDA,SH/19700707200112 MATOA SIMMONI JIKWA PENINA MURIB
1 003
BENYAMIN BATO
Rp 175,000,000.00 Rp 325,000,000.00 SAU,ST,MM/19721227200212 BINTANG LIMA KRIS WENDA TONTI YANENGGA
1000
BENYAMIN BATO
Rp 175,000,000.00 Rp 325,000,000.00 SAU,ST,MM/19721227200212 DAMAI YANES KOGOYA LUTHER WAKER
1000
BENYAMIN BATO
Rp 175,000,000.00 Rp 325,000,000.00 SAU,ST,MM/19721227200212 WALANI EMINUS WANDIK AS WENDA
1000
Rp 875,000,000.00 Rp 1,625,000,000.00
BENYAMIN BATO
Rp 350,000,000.00 Rp 650,000,000.00 SAU,ST,MM/19721227200212 PASAR SENTRAL URBANUS BEANAL DOMINICUS
TEUBUN
SAVIO
1000
BENYAMIN BATO
Rp 175,000,000.00 Rp 325,000,000.00 SAU,ST,MM/19721227200212 NINABUA DINA WENDA PINUS TABUNI
1000
Rp 875,000,000.00 Rp 1,625,000,000.00
BENYAMIN BATO
Rp 175,000,000.00 Rp 325,000,000.00 SAU,ST,MM/19721227200212 MAWOKO JAYA MERLIN JITMAO EDISON RAFRA
1000
REALISASI
NAMA POKJA NAMA KETUA NAMA
NAMA PPK
OPERASIONAL FISIK POKJA KADES/LURAH.
Rp 700,000,000.00 Rp 1,300,000,000.00
Rp 700,000,000.00 Rp 1,300,000,000.00
BENYAMIN BATO
KP.KAMORA ABEDSINA NUS HANAU
Rp 175,000,000.00 Rp 325,000,000.00 SAU,ST,MM/19721227200212
LEIWAKABESSY
1000
RENCANA ALOKASI
NO NAMA DISTRIK PPN 10%
DANA
0
VI. DISTRIK MIMIKA BARAT JAUH Rp 2,500,000,000.00 Rp 227,272,727.27 Rp 2,272,727,272.73
MATOREN WENDA,SH/19700707200112 1
MAFASIMAMO BARTOL KAU HUGO AMENAO
003
MATOREN WENDA,SH/19700707200112 1
OMAWITA STEFANUS FITALIS IPI
003 YAMURU
MATOREN WENDA,SH/19700707200112 1
FANAMO AGUSTINUS FALENTINUS
003 SUMAA MITO'O
MATOREN WENDA,SH/19700707200112 1
KP.KANMAPRI TONI YAMAHE TERY MAWAMA
003
MATOREN WENDA,SH/19700707200112 1
KP.SEMPAN TIMUR LINUS NAMEA MARSELUS SEARO
003
BENYAMIN BATO
KP. WENIM LEDY WIJANGGE YOPY PILIGAME
SAU,ST,MM/197212272002121000
BENYAMIN BATO
IPIRI FRANS ONAMA LUDIFIKUS
SAU,ST,MM/197212272002121000 MAIRAPEA
MATOREN WENDA,SH/19700707200112 1
MIMIKA IMANUEL KAPAN URBANUS AKIRI
003
MATOREN WENDA,SH/19700707200112 1
KIURA YANJARIUS FREDI SAMIN
003 ETREYAU
BENYAMIN BATO
MIGIWIA AGUSTINA ESTAGIUS KAWAI
SAU,ST,MM/197212272002121000 MAIWIPA
MATOREN WENDA,SH/19700707200112 1
AINDUA LIBER UKU PETRUS KAMUTU
003
BENYAMIN BATO
UTIKINI TIGA LIS WANIMBO YAN TINAL
SAU,ST,MM/197212272002121000
MATOREN WENDA,SH/19700707200112 1
MATOA SIMMONI JIKWA PENINA MURIB
003
MATOREN WENDA,SH/19700707200112 1
KEBUN SIRIH ONA SUSANA YOHANES WENDA
003 TABITA MSEN
BENYAMIN BATO
KEL. NINABUA DINA WENDA PINUS TABUNI
SAU,ST,MM/197212272002121000
BENYAMIN BATO
KADUM JAYA JULIANA LINDA ELIAS YAWA
SAU,ST,MM/197212272002121000 BONAY
I DISTRIK AGIMUGA
1 KILIARMA 45,248,035.45 Rp 1,000,000,000.00 Rp 1,000,000,000.00
2 MAFASIMAMO 37,635,535.45 Rp 1,000,000,000.00 Rp 1,000,000,000.00
23 FAKAFUKU 37,435,000.00 1,000.00 6,000,000.00 14,000,000.00 Rp 1,000,000,000.00 Rp 1,000,000,000.00
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
1 Semen Portland @50 Kg sak Rp 95,000.00
2 Semen Putih Kg Rp 4,250.00
3 Semen Warna Kg Rp 10,000.00
4 Air Bersih m3 Rp 150.00
5 Kawat beton Kg Rp 35,000.00
6 Kawat Duri Kg
7 Kawat Ram m2
8 Kawat Las Listrik Kg Rp 125,000.00
9 Plywood 3 mm Ukuran 122 x 224 cm Lembar
10 Plywood tebal 4 mm ( 90 x 220 ) cm Lembar
11 Plywood tebal 4 mm ( 120 x 240 ) cm Lembar
12 Plywood 4 mm Lembar Rp -
13 Plywood 5 mm Lembar
14 Plywood 6 mm Lembar
9 Plywood 9 mm Lembar Rp 135,000.00
10 Plywood 12 mm Lembar
11 Plywood 18 mm Lembar
12 Teakwood tebal 4 mm ( 90 x 220 ) cm Lembar
13 Teakwood tebal 4 mm ( 120 x 240 ) cm Lembar
14 Dolken Kayu Dia. 8-10/400 cm Batang Rp 25,300.00
15 Formika Lembar
16 Gypsum Board 9 mm Lembar
17 Akustik 60 x 60 cm Lembar
18 Akustik 30 x 30 cm Lembar
19 Akustik 60 x 120 cm Lembar Rp -
20 List Plafond M1
21 Paku Kg
Paku 7 Cm Kg Rp 25,000.00
Paku 10 Cm Kg Rp 25,000.00
22 Sekrup Sekrup Biji
23 Vinil J Channel Btg
15 Paku Biasa Kg Rp 35,000.00
16 Paku Seng Kg Rp 40,000.00
17 Paku Plywood Kg
18 Paku Atap Kg
19 Paku Beton Kg Rp 150,000.00
20 Paku sekrup Kg
21 Paku Skrup bj Rp -
22 Paku Hak Pnjang 15 cm Kg
23 Paku Pancing 60 x 230 Kg
24 Besi Baja IWF Kg
25 Gording Canal Kg
25 Besi strip tebal 5 mm Kg
16 Besi strip Btg Rp 50,000.00
26 Mur Baut Dia. 12 - 14 mm Batang Rp 20,000.00
Gerobak
Kampak
Garpu besi
Mobilisasi
I DISTRIK AGIMUGA
1 KILIARMA 45,248,035.45 Rp 1,000,005,678.00
2 MAFASIMAMO 37,635,535.45 Rp 1,000,005,678.00
23 FAKAFUKU
II DISTRIK MIMIKA TIMUR JAUH
3 OMAWITA 26,285,535.45 Rp 1,000,005,678.00
4 FANAMO 26,285,535.45 Rp 1,000,005,678.00
24 OHOTYA/OTAKWA
III DISTRIK JITA
5 KANMAPRI 37,635,535.45 Rp 1,000,005,678.00
6 SEMPAN TIMUR 50,000,000.00 Rp 1,000,005,678.00
25 WENIM
IV DISTRIK AMAR
7 PARIPI 45,000,000.00 Rp 1,000,004,500.00
V Operasional Rp 173,896,070.91
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 45,248,035.45 Rp 90,496,070.91
c Bahan bakar non subsidi 1,500 Liter Rp 12,000.00 Rp 18,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 20 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
Transportasi Sekretaris Kelompok/PLPK (1 Org x 20
e 21.00 OH Rp 750,000.00 Rp 15,750,000.00
Hari)
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 20,000,000.00 Rp 20,000,000.00
Jumlah Rp 909,096,070.91
PNN 10% Rp 90,909,607.09
Total... Rp 1,000,005,678.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
IX 39 UTIKINI TIGA
UPATEN MIMIKA
jaan Umum, Penataan Ruang, Perumahan dan Kawasan Permukiman Provinsi Papua
15 Dok IV - Jayapura
15 Dok IV - Jayapura
Pejabat Pembuat Komitmen 2 Pejabat Pembuat Komitmen
MATOREN WENDA,SH BENYAMIN BATO SAU,ST,MM
19700707200112 1 003 NIP 19721227 200212 1008
KILIARMA
MAFASIMAMO
23 FAKAFUKU
OMAWITA
FANAMO
24 OHOTYA/OTAKWA
KANMAPRI
SEMPAN TIMUR
25 WENIM
PARIPI
YARAYA
26 IPIRI
MIMIKA
KIURA
27 MIGIWIA
AINDUA
YAPAKOBA
POTOWAIBURU KM.4
MAPAR
35 KAPIRAYA
40 UMUKA
IWAKA
29 PIGAPU
42 WANGIRJA
KARANG SENANG
28 JIMBI
39 UTIKINI TIGA
MATOA
30 BINTANG LIMA
36 DAMAI
41 WALANI
KEBUN SIRIH
PASAR SENTRAL
37 NINABUA
20 KOMORO JAYA
31 KADUM JAYA
34 MAWOKO JAYA
21 POUMAKO
32 TIPUKA
22 ATUKA
33 KAMORA
38 TIWAKA
MATOREN WENDA,SH 19700707200112 1 003
19721227 200212 1008 Penataan Lingkungan di Distrik Mimika Baru Kabupaten Mimika (Padat
Karya)
19721227 200212 1008 Pembersihan, Pembabatan, Pengecetan dan Pemeliharaan Jalan dan
Drainese di Distrik Wania Kabupaten Mimika (Padat Karya)
Pembangunan, Peningkatan, Rehap Jaringan dan Peyedian Intek/Resevoar
19721227 200212 1008 Peyediaan Air Baku /Bersih di Distrik Wania Kabupaten Mimika (Padat
Karya)
19721227 200212 1008 Penataan Lingkungan di Distrik Wania Kabupaten Mimika (Padat Karya)
19721227 200212 1008 Pembersihan, Pembabatan, Pengecetan dan Pemeliharaan Jalan dan
Drainese di Distrik Mimika Timur Kabupaten Mimika (Padat Karya)
Pembangunan, Peningkatan, Rehap Jaringan dan Peyedian Intek/Resevoar
19721227 200212 1008 Peyediaan Air Baku /Bersih di Distrik Mimika Timur Kabupaten Mimika
(Padat Karya)
Penataan Lingkungan
Penataan Lingkungan
Penataan Lingkungan
Penataan Lingkungan
Penataan Lingkungan
Rp 1,000,000,000.00 Jimbi
Rp 500,000,000.00 Walani
ONA SUSANA TABITA MSEN Kampung Kebun Sirih Kelompok Kerja Kebun Sirih
JULIANUS ANGGAIBAK
HUGO AMENAO
ABRAHAM MOTATIA
FITALIS IPI
FALENTINUS MITO'O
BERNARDUS IRAHEWA
TERY MAWAMA
MARSELUS SEARO
YOPY PILIGAME
FINSENSIUS IMINI
YOSEPH KAWAREYAU
LUDIFIKUS MAIRAPEA
URBANUS AKIRI
FREDI SAMIN
ESTAGIUS KAWAI
PETRUS KAMUTU
SAPRIUS NAIMU
ISIDORES TENAMA
MELIANUS TAKATI
MARUS UPATO
KONSTANTINUS WARE
ELTIUS AWIYUTA
SABINUS MAPARAYAU
YEZEKIEL WAKER
WELES WENDA
YAN TINAL
PENINA MURIB
TONTI YANENGGA
LUTHER WAKER
AS WENDA
PINUS TABUNI
ELIAS YAWA
EDISON RAFRA
YOHANES YAKIHOR
RONI URUMAMI
ARNOL NATIKAPEREYAU
NUS HANAU
YULIANUS AMATIMUKUTA
JABATAN
Kampung Potowaiburu KM. 4 Distrik Mimika Barat Jauh Kabupaten Mimika - Papua
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
POKJA MAFASIMAMO
KAMPUNG MAFASIMAMO DISTRIK AGIMUGA KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
PROGRAM : PROGRAM KEGIATAN SWAKELOLA DAN PADAT KARYA INFRASTRUKTUR KE-PU-AN DI KABUPATEN MIMIKA
T.A : 2020
0.1
BUL
MG 1 MG 1 MG
VOLUME
SATUAN
27/11
28/11
29/11
30/11
01/12
02/12
03/12
04/12
05/12
06/12
07/12
NO URAIAN PEKERJAAN HARGA SATUAN JUMLAH BOBOT
1 2 3 4 5 6 7 8 9 10 11
0.5%
0.6%
0.7%
0.8%
0.9%
1.0%
1.2%
1.3%
Rp 158,500,000.00 17.44%
4 5 6 7 8 9 10 11
0.2%
0.4%
0.6%
Rp 207,775,000.00 22.86%
1 2 3
0.2%
0.3%
0.5%
0.7%
0.8%
Rp 234,400,000.00 25.78%
12,1%
1 2 3 4 5
0,00% 1.21%
0.1%
0.1%
0.2%
0.3%
0.4%
0.4%
0.5%
0.6%
0.7%
0.7%
0.8%
V Operasional 1.00 Ls Rp 173,896,070.91 Rp 173,896,070.91 19.13%
1 2 3 4 5 6 7 8 9 10 11
JUMLAH TOTAL .................. Rp 909,090,000.00 100.00%
0.1%
0.1%
0.2%
0.8%
1.0%
1.1%
1.5%
1.9%
2.4%
3.0%
3.5%
BOBOT
HARIAN/MINGGUAN 100.00%
RENCANA
12.1%
15.6%
0.1%
0.2%
0.4%
1.2%
2.2%
3.3%
4.8%
6.7%
9.1%
KOMULTAIF HARIAN/MINGGUAN 0.00%
0% 1.21%
S-Curve Pokja (1)
12,1%
08/12
12
19.7% 4.1%
12
0.9% 1.0%
4
0.8%
12
1.4%
09/12
13
24.2% 4.5%
13
1.0%
7
1.1%
5
1.0%
12
1.4%
10/12
14
LOKASI
29.1% 4.9%
14
1.0%
8
1.3%
6
1.2%
11
1.3%
MG 2
11/12
15
34.7% 5.6%
15
1.1%
9
1.5%
7
1.5%
1
0.4%
10
1.2%
12/12
16
40.9% 6.2%
16
1.2%
10
1.6%
8
1.7%
2
0.7%
9
1.0%
NAMA KELOMPOK
13/12
17
47.7% 6.8%
15
1.1%
11
1.8%
9
1.9%
3
1.1%
8
0.9%
14/12
55.3% 7.6% 18
14
1.0%
14
2.3%
10
2.1%
4
1.4%
7
0.8%
47,7%
BULAN DESEMBER 2020
15/12
19
62.8% 7.5%
13
1.0%
12
2.0%
10
2.1%
5
1.8%
6
0.7%
16/12
20
70.1% 7.3%
12
0.9%
11
1.8%
9
1.9%
6
2.1%
5
0.6%
AT KARYA INFRASTRUKTUR KE-PU-AN DI KABUPATEN MIMIKA
17/12
21
76.7% 6.7%
11
0.8%
10
1.6%
8
1.7%
6
2.1%
4
0.5%
MG 3
PERUMAHAN DAN KAWASAN PERMUKIMAN PROVINSI PAPUA
18/12
22
9
1.5%
7
1.5%
5
10
1.8%
3
0.3%
: POKJA KILIARMA
19/12
23
87.4% 4.9%
9
0.7%
8
1.3%
6
1.2%
4
1.4%
2
0.2%
Timika,
20/12
24
91.3% 4.0%
8
0.6%
7
1.1%
5
1.0%
3
1.1%
1
0.1%
21/12
25
7
6
4
0.8%
2
0.7%
91,3%
22/12
26
6
5
3
0.6%
1
0.4%
Disusun Oleh ;
23/12
27
19700707200112 1 003
98.1% 1.4%
5
0.4%
4
0.7%
2
0.4%
MATOREN WENDA,SH
Pejabat Pembuat Komitmen
November 2020
24/12
28
99.1% 1.0%
4
0.3%
3
0.5%
1
0.2%
MG 4
25/12
29
99.6% 0.6%
3
0.2%
2
0.3%
26/12
30
0.1%
1
100.0% 27/12
31
0.1% 0.1%
1
100,0%
0.00%
20.00%
40.00%
60.00%
80.00%
-20.00%
100.00%
120.00%
: KAMPUNG KILIARMA DISTRIK AGIMUGA KABUPATEN MIMIKA - PAPUA
KETERANGAN
RENCANA ANGGARAN BIAYA
PROGRAM : PROGRAM KEGIATAN SWAKELOLA DAN PADAT KARYA INFRASTRUKTUR KE-PU-AN DI
KEGIATAN : PENATAAN
KABUPATENKAWASAN
MIMIKA LINGKUNGAN PERUMAHAN/TEMPAT TINGGAL MASYARAKAT
PEKERJAAN : PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN DRAINASE
LOKASI : KAMPUNG KILIARMA DISTRIK AGIMUGA KABUPATEN MIMIKA - PAPUA
T.A : 2020
V Operasional Rp 173,896,070.91
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 45,248,035.45 Rp 90,496,070.91
c Bahan bakar non subsidi 1,500 Liter Rp 12,000.00 Rp 18,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 20 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
Transportasi Sekretaris Kelompok/PLPK (1 Org x 20
e 21.00 OH Rp 750,000.00 Rp 15,750,000.00
Hari)
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 20,000,000.00 Rp 20,000,000.00
Jumlah Rp 909,096,070.91
PNN 10% Rp 90,909,607.09
Total... Rp 1,000,005,678.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
MATOREN WENDA,SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
PROGRAM : PROGRAM KEGIATAN SWAKELOLA DAN PADAT KARYA INFRASTRUKTUR KE-PU-AN DI KABUPATEN MIMIKA
T.A : 2020
0.1
BUL
MG 1 MG 1 MG
VOLUME
SATUAN
27/11
28/11
29/11
30/11
01/12
02/12
03/12
04/12
05/12
06/12
07/12
NO URAIAN PEKERJAAN HARGA SATUAN JUMLAH BOBOT
1 2 3 4 5 6 7 8 9 10 11
0.5%
0.7%
0.8%
0.9%
1.0%
1.2%
1.3%
1.4%
Rp 177,325,000.00 19.51%
4 5 6 7 8 9 10 11
0.2%
0.4%
0.6%
Rp 207,775,000.00 22.86%
1 2 3
0.2%
0.3%
0.5%
0.7%
0.8%
Rp 234,400,000.00 25.78%
1 2 3
12,1%
4 5
0,00% 1.21%
0.1%
0.1%
0.2%
0.3%
0.3%
0.4%
0.5%
0.5%
0.6%
0.7%
0.7%
V Operasional 1.00 Ls Rp 155,071,070.91 Rp 155,071,070.91 17.06%
1 2 3 4 5 6 7 8 9 10 11
JUMLAH TOTAL .................. Rp 909,090,000.00 100.00%
0.1%
0.1%
0.2%
0.8%
1.0%
1.2%
1.5%
1.9%
2.5%
3.0%
3.6%
BOBOT
HARIAN/MINGGUAN 100.00%
RENCANA
12.3%
15.9%
0.1%
0.2%
0.4%
1.2%
2.2%
3.3%
4.9%
6.8%
9.3%
KOMULTAIF HARIAN/MINGGUAN 0.00%
09/12
10/12
11/12
12/12
13/12
14/12
15/12
16/12
17/12
18/12
19/12
120.00%
12 13 14 15 16 17 18 19 20 21 22 23
100.00%
91,3% 100,0%
1.6%
1.6%
1.4%
1.3%
1.2%
1.0%
0.9%
0.8%
0.7%
0.5%
0.4%
0.3%
12 12 11 10 9 8 7 6 5 4 3 2
80.00%
0.4%
0.7%
1.1%
1.4%
1.8%
2.1%
2.1%
1.8%
1.4%
1 2 3 4 5 6 6 5 4 60.00%
47,7%
0.8%
1.0%
1.2%
1.5%
1.7%
1.9%
2.1%
2.1%
1.9%
1.7%
1.5%
1.2%
40.00%
4 5 6 7 8 9 10 10 9 8 7 6
1.0%
1.1%
1.3%
1.5%
1.6%
1.8%
2.3%
2.0%
1.8%
1.6%
1.5%
1.3%
20.00%
12,1% 6 7 8 9 10 11 14 12 11 10 9 8
0,00% 1.21%
0.8%
0.9%
0.9%
1.0%
1.1%
1.0%
0.9%
0.9%
0.8%
0.7%
0.7%
0.6%
0.00%
12 13 14 15 16 15 14 13 12 11 10 9
-20.00%
4.2%
4.6%
4.9%
5.6%
6.2%
6.8%
7.6%
7.4%
7.2%
6.7%
5.7%
4.8%
20.1%
24.7%
29.6%
35.2%
41.4%
48.2%
55.8%
63.2%
70.4%
77.1%
82.9%
87.7%
MATOREN WENDA,SH
19700707200112 1 003
RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN DRAINESE
LOKASI : KAMPUNG MAFASIMAMO DISTRIK AGIMUGA KABUPATEN MIMIKA
T.A : 2020
V Operasional Rp 155,071,070.91
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 37,635,535.45 Rp 75,271,070.91
c Bahan bakar non subsidi 1,200 Liter Rp 12,000.00 Rp 14,400,000.00
d Trasportasi Ketua Kelompok (1 Org x 20 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
Transportasi Sekretaris Kelompok/PLPK (1 Org x 20
e 21.00 OH Rp 750,000.00 Rp 15,750,000.00
Hari)
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 20,000,000.00 Rp 20,000,000.00
Jumlah Rp 909,096,070.91
PNN 10% Rp 90,909,607.09
Total... Rp 1,000,005,678.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
LOKASI : KAMPUNG OMAWITA DISTRIK MIMIKA TIMUR JAUH KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 129,971,070.91
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 26,285,535.45 Rp 52,571,070.91
c Bahan bakar non subsidi 1,000 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 20 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
Transportasi Sekretaris Kelompok/PLPK (1 Org x 20
e 21.00 OH Rp 750,000.00 Rp 15,750,000.00
Hari)
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 20,000,000.00 Rp 20,000,000.00
Jumlah Rp 909,096,070.91
PNN 10% Rp 90,909,607.09
Total... Rp 1,000,005,678.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
LOKASI : KAMPUNG OMAWITA DISTRIK MIMIKA TIMUR JAUH KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 129,971,070.91
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 26,285,535.45 Rp 52,571,070.91
c Bahan bakar non subsidi 1,000 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 20 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 20 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 20,000,000.00 Rp 20,000,000.00
Jumlah Rp 909,096,070.91
PNN 10% Rp 90,909,607.09
Total... Rp 1,000,005,678.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 155,071,070.91
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 37,635,535.45 Rp 75,271,070.91
c Bahan bakar non subsidi 1,200 Liter Rp 12,000.00 Rp 14,400,000.00
d Trasportasi Ketua Kelompok (1 Org x 20 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 20 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 20,000,000.00 Rp 20,000,000.00
Jumlah Rp 909,096,070.91
PNN 10% Rp 90,909,607.09
Total... Rp 1,000,005,678.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 155,071,070.91
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 37,635,535.45 Rp 75,271,070.91
c Bahan bakar non subsidi 1,200 Liter Rp 12,000.00 Rp 14,400,000.00
d Trasportasi Ketua Kelompok (1 Org x 20 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 20 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 20,000,000.00 Rp 20,000,000.00
Jumlah Rp 909,096,070.91
PNN 10% Rp 90,909,607.09
Total... Rp 1,000,005,678.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 142,520,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 37,060,000.00 Rp 74,120,000.00
c Bahan bakar non subsidi 1,000 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 12,000,000.00 Rp 12,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 142,520,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 37,060,000.00 Rp 74,120,000.00
c Bahan bakar non subsidi 1,000 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 12,000,000.00 Rp 12,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
V Operasional Rp 155,071,070.91
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 37,635,535.45 Rp 75,271,070.91
c Bahan bakar non subsidi 1,200 Liter Rp 12,000.00 Rp 14,400,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 20,000,000.00 Rp 20,000,000.00
Jumlah #N/A
PNN 10% #N/A
Total... #N/A
Dibulatkan #N/A
Terbilang : Satu miliar rupiah
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 142,520,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 36,760,000.00 Rp 73,520,000.00
c Bahan bakar non subsidi 800 Liter Rp 12,000.00 Rp 9,600,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 142,520,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 36,760,000.00 Rp 73,520,000.00
c Bahan bakar non subsidi 800 Liter Rp 12,000.00 Rp 9,600,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
LOKASI : KAMPUNG AINDUA DISTRIK MIMIKA BARAT JAUH KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
REKAPITULASI RAB VI. DISTRIK MIMIKA BARAT JAUH - 11. POKJA AINDUA
RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN DRAINESE
LOKASI : KAMPUNG AINDUA DISTRIK MIMIKA BARAT JAUH KABUPATEN MIMIKA
T.A : 2020
V Operasional Rp 150,660,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 39,130,000.00 Rp 78,260,000.00
c Bahan bakar non subsidi 1,000 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA, SH
Nip. 19700707200112 1 003
PEKERJAAN :
PENATAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT TINGGAL
MASYARAKAT
LOKASI
LOKASI : KAMPUNG YAPAKOBA DISTRIK MIMIKA BARAT JAUH KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
REKAPITULASI RAB VI. DISTRIK MIMIKA BARAT JAUH - 12. POKJA YAPAKOBA
RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PENATAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT TINGGAL MASYARAKAT
LOKASI : KAMPUNG YAPAKOBA DISTRIK MIMIKA BARAT JAUH KABUPATEN MIMIKA
T.A : 2020
NO URAIAN VOL/SAT HARGA SATUAN TOTAL
V Operasional Rp 150,660,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 39,130,000.00 Rp 78,260,000.00
c Bahan bakar non subsidi 1,000 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA, SH
Nip. 19700707200112 1 003
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
KAMPUNG POTOWAIBURU KM. 4 DISTRIK MIMIKA BARAT JAUH KABUPATEN MIMIKA -
PAPUA
LOKASI : KAMPUNG POTOWAIBURU KM. 4 DISTRIK MIMIKA BARAT JAUH KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
REKAPITULASI RAB VI. DISTRIK MIMIKA BARAT JAUH - 13. POKJA POTOWAIBURU KM.4
RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI : KAMPUNG POTOWAIBURU KM.4 DISTRIK MIMIKA BARAT JAUH KABUPATEN MIMIKA
T.A : 2020
V Operasional Rp 139,560,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 39,330,000.00 Rp 78,660,000.00
c Bahan bakar non subsidi 1,000 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 20 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 20 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
h Biya pembuatan laporan 1.00 Ls Rp 7,000,000.00 Rp 7,000,000.00
Jumlah Rp 454,550,000.00
PNN 10% Rp 45,455,000.00
Total... Rp 500,005,000.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah- .
MATOREN WENDA, SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
LOKASI : KAMPUNG MAPAR DISTRIK MIMIKA BARAT TENGAH KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
REKAPITULASI RAB VII. DISTRIK MIMIKA BARAT TENGAH - 14. POKJA MAPAR
RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN DRAINESE DI
PEKERJAAN : DISTRIK MIMIKA BARAT TENGAH KABUPATEN MIMIKA (PADAT KARYA)
LOKASI : KAMPUNG MAPAR DISTRIK MIMIKA BARAT TENGAH KABUPATEN MIMIKA
T.A : 2020
NO URAIAN VOL/SAT HARGA SATUAN TOTAL
b Bahan
1 Balok kayu besi 5x10 Cm 10.00 M3 Rp 5,500,000.00 Rp 55,000,000.00
2 Balok kayu besi 10x10 Cm 5.00 M3 Rp 5,500,000.00 Rp 27,500,000.00
3 Paku 7 Cm 10.00 Kg Rp 25,000.00 Rp 250,000.00
4 Paku 10 Cm 30.00 Kg Rp 25,000.00 Rp 750,000.00
c Alat bantu kerja
1 Sekop 20.00 Bh Rp 200,000.00 Rp 4,000,000.00
2 Linggis 20.00 Bh Rp 120,000.00 Rp 2,400,000.00
3 Parang besar 20.00 Bh Rp 200,000.00 Rp 4,000,000.00
4 Gergaji 5.00 Bh Rp 75,000.00 Rp 375,000.00
5 Palu 5.00 Bh Rp 60,000.00 Rp 300,000.00
6 Gerobak 10.00 Bh Rp 650,000.00 Rp 6,500,000.00
7 Garpu besi
d Upah
1 Pekerja (20 Org x 21 Hari) 420.00 OH Rp 275,000.00 Rp 115,500,000.00
2 Mandor (1 Org x 21 Hari) 21.00 OH Rp 325,000.00 Rp 6,825,000.00
V Operasional Rp 143,770,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 40,185,000.00 Rp 80,370,000.00
c Bahan bakar non subsidi 500 Liter Rp 12,000.00 Rp 6,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 6,500,000.00 Rp 6,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 14,000,000.00 Rp 14,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
MATOREN WENDA, SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 128,900,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 26,750,000.00 Rp 53,500,000.00
c Bahan bakar non subsidi 1,000 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,099,000.00
PNN 10% Rp 90,909,900.00
Total... Rp 1,000,008,900.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
MATOREN WENDA, SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
LOKASI : KAMPUNG KARANG SENANG DISTRIK KUALA KENCANA KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
REKAPITULASI RAB IX. DISTRIK KUALA KENCANA - 16. POKJA KARANG SENANG
RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN DRAINESE DI
DISTRIK KUALA KENCANA KABUPATEN MIMIKA (PADAT KARYA)
LOKASI : KAMPUNG KARANG SENANG DISTRIK KUALA KENCANA KABUPATEN MIMIKA
T.A : 2020
V Operasional Rp 106,670,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 18,635,000.00 Rp 37,270,000.00
c Bahan bakar non subsidi 500 Liter Rp 12,000.00 Rp 6,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA, SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
V Operasional Rp 106,670,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 18,635,000.00 Rp 37,270,000.00
c Bahan bakar non subsidi 500 Liter Rp 12,000.00 Rp 6,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA, SH
Nip. 19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
LOKASI : KAMPUNG KEBUN SIRIH DISTRIK MIMIKA BARU KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
REKAPITULASI RAB XI. DISTRIK MIMIKA BARU - 18. POKJA KEBUN SIRIH
RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN DRAINESE
LOKASI : KAMPUNG KEBUN SIRIH DISTRIK MIMIKA BARU KABUPATEN MIMIKA - PAPUA
T.A : 2020
V Operasional Rp 97,646,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 14,123,000.00 Rp 28,246,000.00
c Bahan bakar non subsidi 500.00 Liter Rp 12,000.00 Rp 6,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,096,000.00
PNN 10% Rp 90,909,600.00
Total... Rp 1,000,005,600.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
LOKASI : KAMPUNG PASAR SENTRAL DISTRIK MIMIKA BARU KABUPATEN MIMIKA - PAPUA
T.A : 2020
MATOREN WENDA,SH
19700707200112 1 003
REKAPITULASI RAB XI. DISTRIK MIMIKA BARU - 19. POKJA PASAR SENTRAL
RENCANA ANGGARAN BIAYA
KEGIATAN : Err:509
PEKERJAAN : PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN DRAINESE
LOKASI : KAMPUNG PASAR SENTRAL DISTRIK MIMIKA BARU KABUPATEN MIMIKA - PAPUA
T.A : 2020
V Operasional Rp 97,646,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 14,123,000.00 Rp 28,246,000.00
c Bahan bakar non subsidi 500.00 Liter Rp 12,000.00 Rp 6,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,096,000.00
PNN 10% Rp 90,909,600.00
Total... Rp 1,000,005,600.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah- .
MATOREN WENDA,SH
19700707200112 1 003
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
V Operasional Rp 100,392,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 15,196,000.00 Rp 30,392,000.00
c Bahan bakar non subsidi 550.00 Liter Rp 12,000.00 Rp 6,600,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,092,000.00
PNN 10% Rp 90,909,200.00
Total... Rp 1,000,001,200.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
T.A : 2020
d Upah
1 Pekerja (20 Org x 21 Hari) 420.00 OH Rp 275,000.00 Rp 115,500,000.00
2 Mandor (1 Org x 21 Hari) 21.00 OH Rp 325,000.00 Rp 6,825,000.00
V Operasional Rp 100,392,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 15,196,000.00 Rp 30,392,000.00
c Bahan bakar non subsidi 550.00 Liter Rp 12,000.00 Rp 6,600,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,092,000.00
PNN 10% Rp 90,909,200.00
Total... Rp 1,000,001,200.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
PEKERJAAN :
PEMBERSIHAN, PEMBABATAN, PENGECETAN DAN PEMELIHARAAN JALAN DAN
DRAINESE
LOKASI
d Upah
1 Pekerja (20 Org x 21 Hari) 420.00 OH Rp 275,000.00 Rp 115,500,000.00
2 Mandor (1 Org x 21 Hari) 21.00 OH Rp 325,000.00 Rp 6,825,000.00
V Operasional Rp 111,344,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 20,272,000.00 Rp 40,544,000.00
c Bahan bakar non subsidi 700.00 Liter Rp 12,000.00 Rp 8,400,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 17,000,000.00 Rp 17,000,000.00
Jumlah Rp 909,094,000.00
PNN 10% Rp 90,909,400.00
Total... Rp 1,000,003,400.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
V Operasional Rp 143,770,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 37,435,000.00 Rp 74,870,000.00
c Bahan bakar non subsidi 1,000.00 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 6,000,000.00 Rp 6,000,000.00
h Biya pembuatan laporan 1.00 Ls Rp 14,000,000.00 Rp 14,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
KAMPUNG OHOTYA/OTAKWA DISTRIK MIMIKA TIMUR JAUH KABUPATEN MIMIKA -
PAPUA
T.A : 2020
REKAPITULASI RAB II. DISTRIK MIMIKA TIMUR JAUH - 24. POKJA OHOTYA/OTAKWA
RENCANA ANGGARAN BIAYA
PROGRAM : PROGRAM KEGIATAN SWAKELOLA DAN PADAT KARYA INFRASTRUKTUR KE-PU-AN DI
KABUPATEN MIMIKA
KEGIATAN : PENATAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT TINGGAL MASYARAKAT
PEKERJAAN : PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI : KAMPUNG OHOTYA/OTAKWA DISTRIK MIMIKA TIMUR JAUH KABUPATEN MIMIKA - PAPUA
T.A : 2020
V Operasional Rp 109,326,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 25,163,000.00 Rp 50,326,000.00
c Bahan bakar non subsidi 800.00 Liter Rp 12,000.00 Rp 9,600,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
h Biya pembuatan laporan 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
Jumlah Rp 454,551,000.00
PNN 10% Rp 45,455,100.00
Total... Rp 500,006,100.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
V Operasional Rp 139,850,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 36,725,000.00 Rp 73,450,000.00
c Bahan bakar non subsidi 1,000.00 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
h Biya pembuatan laporan 1.00 Ls Rp 12,500,000.00 Rp 12,500,000.00
Jumlah Rp 454,550,000.00
PNN 10% Rp 45,455,000.00
Total... Rp 500,005,000.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
V Operasional Rp 139,850,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 37,225,000.00 Rp 74,450,000.00
c Bahan bakar non subsidi 1,000.00 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 9,000,000.00 Rp 9,000,000.00
Jumlah Rp 454,550,000.00
PNN 10% Rp 45,455,000.00
Total... Rp 500,005,000.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
V Operasional Rp 134,076,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 35,038,000.00 Rp 70,076,000.00
c Bahan bakar non subsidi 800.00 Liter Rp 12,000.00 Rp 9,600,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 10,000,000.00 Rp 10,000,000.00
Jumlah Rp 454,551,000.00
PNN 10% Rp 45,455,100.00
Total... Rp 500,006,100.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
d Upah
1 Pekerja (20 Org x 21 Hari) 420.00 OH Rp 275,000.00 Rp 115,500,000.00
2 Mandor (1 Org x 21 Hari) 21.00 OH Rp 325,000.00 Rp 6,825,000.00
V Operasional Rp 106,670,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 18,635,000.00 Rp 37,270,000.00
c Bahan bakar non subsidi 500.00 Liter Rp 12,000.00 Rp 6,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
d Upah
1 Pekerja (10 Org x 21 Hari) 210.00 OH Rp 275,000.00 Rp 57,750,000.00
2 Mandor (1 Org x 21 Hari) 21.00 OH Rp 325,000.00 Rp 6,825,000.00
V Operasional Rp 115,400,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 26,750,000.00 Rp 53,500,000.00
c Bahan bakar non subsidi 1,000.00 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 6,000,000.00 Rp 6,000,000.00
h Biya pembuatan laporan 1.00 Ls Rp 7,000,000.00 Rp 7,000,000.00
Jumlah Rp 454,550,000.00
PNN 10% Rp 45,455,000.00
Total... Rp 500,005,000.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
KAMPUNG BINTANG LIMA DISTRIK KWAMKI NARAMA KABUPATEN MIMIKA -
PAPUA
V Operasional Rp 112,400,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 20,000,000.00 Rp 40,000,000.00
c Bahan bakar non subsidi 1,000.00 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
Jumlah Rp 454,550,000.00
PNN 10% Rp 45,455,000.00
Total... Rp 500,005,000.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
V Operasional Rp 100,392,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 15,196,000.00 Rp 30,392,000.00
c Bahan bakar non subsidi 550.00 Liter Rp 12,000.00 Rp 6,600,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,092,000.00
PNN 10% Rp 90,909,200.00
Total... Rp 1,000,001,200.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
PEKERJAAN :
PENATAAAN KAWASAN LINGKUNGAN PERUMAHAN/TEMPAT MASYARAKAT
LOKASI
IV Operasional Rp 109,980,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 19,990,000.00 Rp 39,980,000.00
c Bahan bakar non subsidi 550.00 Liter Rp 12,000.00 Rp 6,600,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,092,500.00
PNN 10% Rp 90,909,250.00
Total... Rp 1,000,001,750.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
PEKERJAAN :
PEMBUATAN MCK DAN PENYEDIAAN INSTALASI AIR BERSIH
LOKASI
PROGRAM : PROGRAM KEGIATAN SWAKELOLA DAN PADAT KARYA INFRASTRUKTUR KE-PU-AN DI KABUPATEN MIMIKA
SATUAN
07/12
08/12
09/12
10/12
11/12
12/12
13/12
1 2 3 4 5 6 7
0.6%
1.1%
1.7%
2.3%
2.8%
3.4%
3.9%
I PEKERJAAN BAK AIR 1.00 Ls Rp 157,982,000.00 Rp 157,982,000.00 31.60%
1 2 3 4 5 6 7
0.5%
1.1%
1.6%
2.2%
2.7%
III UPAH 1.00 Ls Rp 196,350,000.00 Rp 196,350,000.00 39.27%
1 2 3 4
21,1%
5
23,1%
0.3%
0.6%
0.9%
1.2%
IV OPERASIONAL 1.00 Ls Rp 122,738,000.00 Rp 122,738,000.00 24.55%
0,00% 1 2 3 4
1 2 3 4 5 6 7
JUMLAH TOTAL .................. Rp 500,000,000 100.00%
0.6%
1.1%
2.2%
3.7%
5.1%
6.5%
7.9%
BOBOT
HARIAN/MINGGUAN 100.00%
RENCANA
12.6%
19.1%
27.0%
0.6%
1.7%
3.9%
7.6%
: POKJA KAMORA
: 2020
KETERANGAN
14/12
15/12
16/12
17/12
18/12
19/12
20/12
21/12
22/12
23/12
24/12
25/12
26/12
27/12
120
8 9 10 11 12 13 14 15 16 17 18 19 20 21
100,0%
100
83,9%
3.9%
3.4%
2.8%
2.3%
1.7%
1.1%
0.6%
7 6 5 4 3 2 1 80
0.2%
0.4%
0.6%
0.7%
0.9%
0.7%
0.6%
0.4%
0.2%
68,6% 60
1 2 3 4 5 4 3 2 1
3.3%
3.8%
4.4%
4.4%
3.8%
3.3%
2.7%
2.2%
1.6%
1.1%
0.5%
40
21,1% 6 7 8 8 7 6 5 4 3 2 1
20
23,1%
1.5%
1.8%
2.1%
2.4%
2.7%
2.4%
2.1%
1.8%
1.5%
1.2%
0.9%
0.6%
0.3%
0,00% 5 6 7 8 9 8 7 6 5 4 3 2 1 0
8 9 10 11 10 9 8 7 6 5 4 3 2 1
-20
8.9%
9.4%
9.9%
9.8%
9.2%
7.6%
6.0%
4.4%
3.3%
2.3%
1.5%
0.6%
0.3%
0.0%
100.0%
100.0%
35.9%
45.3%
55.2%
65.0%
74.1%
81.7%
87.6%
92.0%
95.3%
97.6%
99.1%
99.7%
IV Operasional Rp 111,580,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 20,390,000.00 Rp 40,780,000.00
c Bahan bakar non subsidi 700.00 Liter Rp 12,000.00 Rp 8,400,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 17,000,000.00 Rp 17,000,000.00
Jumlah Rp 454,550,000.00
PNN 10% Rp 45,455,000.00
Total... Rp 500,005,000.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
Timika, November 2020
PEKERJAAN :
PENATAAN LINGKUNGAN
LOKASI
PROGRAM : PROGRAM KEGIATAN SWAKELOLA DAN PADAT KARYA INFRASTRUKTUR KE-PU-AN DI KABUPATEN MIMIKA
SATUAN
07/12
08/12
09/12
10/12
11/12
12/12
13/12
1 2 3 4 5 6 7
0.3%
0.7%
1.0%
1.3%
1.6%
2.0%
2.3%
I PEMBERSIHAN / PEMBABATAN 1.00 Ls Rp 91,602,500.00 Rp 91,602,500.00 18.32%
1 2 3 4 5 6 7
0.3%
0.6%
0.9%
1.2%
1.5%
III PEMELIHARAAN JALAN 1.00 Ls Rp 109,373,000.00 Rp 109,373,000.00 21.87%
1 2 3 4 5
21,1%
23,1%
0.2%
0.4%
0.6%
0.8%
IV PEMELIHARAAN DRAINASE 1.00 Ls Rp 78,226,500.00 Rp 78,226,500.00 15.65%
0,00%
1 2 3 4
0.2%
0.4%
0.6%
0.8%
1.0%
1.3%
1.5%
V OPERASIONAL 1.00 Ls Rp 126,940,000.00 Rp 126,940,000.00 25.39%
1 2 3 4 5 6 7
JUMLAH TOTAL .................. Rp 500,000,000 100.00%
0.5%
1.1%
1.9%
2.9%
4.0%
5.0%
6.1%
BOBOT
HARIAN/MINGGUAN 100.00%
RENCANA
10.5%
15.5%
21.5%
0.5%
1.6%
3.5%
6.5%
: 2020
KETERANGAN
14/12
15/12
16/12
17/12
18/12
19/12
20/12
21/12
22/12
23/12
24/12
25/12
26/12
27/12
8 9 10 11 12 13 14 15 16 17 18 19 20 21
120.00%
2.3%
2.0%
1.6%
1.3%
1.0%
0.7%
0.3%
100,0%
100.00%
7 6 5 4 3 2 1
83,9%
80.00%
0.8%
1.5%
2.3%
3.0%
3.8%
3.0%
2.3%
1.5%
0.8%
1 2 3 4 5 4 68,6%
3 2 1 60.00%
1.8%
2.1%
2.4%
2.4%
2.1%
1.8%
1.5%
1.2%
0.9%
0.6%
0.3%
40.00%
21,1% 6 7 8 8 7 6 5 4 3 2 1
20.00%
23,1%
1.0%
1.2%
1.4%
1.5%
1.7%
1.5%
1.4%
1.2%
1.0%
0.8%
0.6%
0.4%
0.2%
0,00%
0.00%
5 6 7 8 9 8 7 6 5 4 3 2 1
-20.00%
1.7%
1.9%
2.1%
2.3%
2.1%
1.9%
1.7%
1.5%
1.3%
1.0%
0.8%
0.6%
0.4%
0.2%
8 9 10 11 10 9 8 7 6 5 4 3 2 1
10.6%
10.7%
7.5%
8.6%
9.8%
8.9%
7.1%
5.3%
3.9%
2.4%
1.7%
1.0%
0.6%
0.2%
100.0%
29.0%
37.7%
47.4%
58.0%
68.7%
77.6%
84.8%
90.1%
94.0%
96.4%
98.2%
99.2%
99.8%
V Operasional Rp 91,400,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 15,200,000.00 Rp 30,400,000.00
c Bahan bakar non subsidi 550.00 Liter Rp 12,000.00 Rp 6,600,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 9,000,000.00 Rp 9,000,000.00
Jumlah Rp 454,550,000.00
PNN 10% Rp 45,455,000.00
Total... Rp 500,005,000.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
PEKERJAAN :
PENATAAN LINGKUNGAN
LOKASI
KAMPUNG KAPIRAYA DISTRIK MIMIKA BARAT TENGAH KABUPATEN MIMIKA -
PAPUA
REKAPITULASI RAB VII. DISTRIK MIMIKA BARAT TENGAH - 35. POKJA KAPIRAYA
TIME SCHEDULE & S-CURVE
DINAS PEKERJAAN UMUM, PENATAAN RUANG, PERUMAHAN DAN KAWASAN PERMUK
PROGRAM KEGIATAN SWAKELOLA DAN PADAT KARYA INFRASTRUKTUR KE-PU-AN DI
PROGRAM : PROGRAM KEGIATAN SWAKELOLA DAN PADAT KARYA INFRASTRUKTUR KE-PU-AN DI KABUPATEN MIMIKA
SATUAN
07/12
08/12
09/12
10/12
11/12
12/12
13/12
1 2 3 4 5 6 7
0.3%
0.7%
1.0%
1.3%
1.6%
2.0%
2.3%
I PEMBERSIHAN / PEMBABATAN 1.00 Ls Rp 92,152,500.00 Rp 92,152,500.00 18.43%
1 2 3 4 5 6 7
0.3%
0.6%
0.9%
1.2%
1.5%
III PEMELIHARAAN JALAN 1.00 Ls Rp 110,473,000.00 Rp 110,473,000.00 22.09%
1 2 3 4 5
0.2%
0.4%
0.5%
0.7%
IV PEMELIHARAAN DRAINASE 1.00 Ls Rp 72,424,000.00 Rp 72,424,000.00 14.48% 21,1%
1 2 3 4
0.2% 23,1%
0.5%
0.7%
1.0%
1.2%
1.4%
1.7%
V OPERASIONAL 1.00 Ls Rp 144,568,600.00 Rp 144,568,600.00 28.91%
0,00%
1 2 3 4 5 6 7
JUMLAH TOTAL .................. Rp 500,000,000 100.00%
0.6%
1.1%
2.0%
3.1%
4.1%
5.2%
6.2%
BOBOT
HARIAN/MINGGUAN 100.00%
RENCANA
10.9%
16.1%
22.3%
0.6%
1.7%
3.7%
6.8%
: POKJA KAPIRAYA
: 2020
KETERANGAN
14/12
15/12
16/12
17/12
18/12
19/12
20/12
21/12
22/12
23/12
24/12
25/12
26/12
27/12
120
8 9 10 11 12 13 14 15 16 17 18 19 20 21
100,0%
100
2.3%
2.0%
1.6%
1.3%
1.0%
0.7%
0.3%
83,9%
7 6 5 4 3 2 1
80
0.6%
1.3%
1.9%
2.6%
3.2%
2.6%
1.9%
1.3%
0.6%
1 2 3 4 5 4 68,6%
3 2 1
60
1.8%
2.1%
2.5%
2.5%
2.1%
1.8%
1.5%
1.2%
0.9%
0.6%
0.3%
6 7 8 8 7 6 5 4 3 2 1
40
0.9%
1.1%
1.3%
1.4%
1.6%
1.4%
1.3%
1.1%
0.9%
0.7%
0.5%
0.4%
0.2%
21,1%
5 6 7 8 9 8 7 6 5 4 3 2 1 20
23,1%
1.9%
2.2%
2.4%
2.6%
2.4%
2.2%
1.9%
1.7%
1.4%
1.2%
1.0%
0.7%
0.5%
0.2%
,00%
0
8 9 10 11 10 9 8 7 6 5 4 3 2 1
-20
10.4%
10.3%
7.6%
8.6%
9.7%
8.7%
7.0%
5.3%
3.9%
2.5%
1.8%
1.1%
0.7%
0.2%
100.0%
29.9%
38.5%
48.2%
58.6%
68.9%
77.6%
84.6%
89.8%
93.7%
96.2%
98.0%
99.1%
99.8%
V Operasional Rp 131,426,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 37,763,000.00 Rp 75,526,000.00
c Bahan bakar non subsidi 500.00 Liter Rp 12,000.00 Rp 6,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
h Biya pembuatan laporan 1.00 Ls Rp 8,000,000.00 Rp 8,000,000.00
Jumlah Rp 454,551,000.00
PNN 10% Rp 45,455,100.00
Total... Rp 500,006,100.00
Dibulatkan Rp 500,000,000.00
V Operasional Rp 112,400,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 20,000,000.00 Rp 40,000,000.00
c Bahan bakar non subsidi 1,000.00 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
Jumlah Rp 454,550,000.00
PNN 10% Rp 45,455,000.00
Total... Rp 500,005,000.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
V Operasional Rp 84,026,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 14,063,000.00 Rp 28,126,000.00
c Bahan bakar non subsidi 500.00 Liter Rp 12,000.00 Rp 6,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 6,000,000.00 Rp 6,000,000.00
h Biya pembuatan laporan 1.00 Ls Rp 7,000,000.00 Rp 7,000,000.00
Jumlah Rp 454,551,000.00
PNN 10% Rp 45,455,100.00
Total... Rp 500,006,100.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
V Operasional Rp 112,314,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 20,757,000.00 Rp 41,514,000.00
c Bahan bakar non subsidi 700.00 Liter Rp 12,000.00 Rp 8,400,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 17,000,000.00 Rp 17,000,000.00
Jumlah Rp 454,549,000.00
PNN 10% Rp 45,454,900.00
Total... Rp 500,003,900.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
V Operasional Rp 106,670,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 18,035,000.00 Rp 36,070,000.00
c Bahan bakar non subsidi 600.00 Liter Rp 12,000.00 Rp 7,200,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
V Operasional Rp 143,770,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 40,185,000.00 Rp 80,370,000.00
c Bahan bakar non subsidi 500.00 Liter Rp 12,000.00 Rp 6,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 6,500,000.00 Rp 6,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 14,000,000.00 Rp 14,000,000.00
Jumlah Rp 909,095,000.00
PNN 10% Rp 90,909,500.00
Total... Rp 1,000,004,500.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-
V Operasional Rp 112,400,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 20,000,000.00 Rp 40,000,000.00
c Bahan bakar non subsidi 1,000.00 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00
Jumlah Rp 454,550,000.00
PNN 10% Rp 45,455,000.00
Total... Rp 500,005,000.00
Dibulatkan Rp 500,000,000.00
Terbilang : Lima Ratus Juta Rupiah-
V Operasional Rp 128,900,000.00
a Papan Nama Pekerjaan 1.00 Set Rp 600,000.00 Rp 600,000.00
b Biaya Mobilisasi/demobilisasi 2.00 res Rp 26,750,000.00 Rp 53,500,000.00
c Bahan bakar non subsidi 1,000.00 Liter Rp 12,000.00 Rp 12,000,000.00
d Trasportasi Ketua Kelompok (1 Org x 21 Hari) 21.00 OH Rp 800,000.00 Rp 16,800,000.00
e Transportasi Sekretaris Kelompok/PLPK (1 Org x 21 Hari) 21.00 OH Rp 750,000.00 Rp 15,750,000.00
f Transportasi Bendahara Kelompok (1 Org x 5 Hari) 5.00 OH Rp 750,000.00 Rp 3,750,000.00
g Biaya Dokumentasi 1.00 Ls Rp 8,500,000.00 Rp 8,500,000.00
h Biya pembuatan laporan 1.00 Ls Rp 18,000,000.00 Rp 18,000,000.00
Jumlah Rp 909,099,000.00
PNN 10% Rp 90,909,900.00
Total... Rp 1,000,008,900.00
Dibulatkan Rp 1,000,000,000.00
Terbilang : Satu Milyar Rupiah-