KONTRAK NOMOR
S P M K NOMOR
LOKASI
No. Item
Pembayaran
1.2
:
:
:
:
:
:
:
URAIAN PEKERJAAN
Mobilisasi
Satuan
Ls
VOLUME
KE
BUTUHAN
HARGA
SATUAN
1.00
38,925,000.00
JUMLAH HARGA
SESUAI KONTRAK
BOBOT
(%)
38,925,000.00
RENCANA
REALISASI
NAMA KEGIATAN
PAKET KEGIATAN
KONSULTAN SUPERVISI
KONTRAKTOR PELAKSANA
WAKTU PELAKSANAAN
APRIL
JUNI
MEI
1
12-Apr
15-Apr
22-Apr
14-Apr
21-Apr
28-Apr
10
11
12
13
29-Apr
6-May
13-May
20-May
27-May
3-Jun
10-Jun
17-Jun
24-Jun
5-May
12-May
19-May
26-May
2-Jun
9-Jun
16-Jun
23-Jun
30-Jun
0.030
0.030
0.030
0.030
0.56 Rencana
0.080
0.080
0.080
0.030
0.35 Realisasi
0.080
0.081
0.084
0.101
AGUSTUS
JULY
14
15
16
17
1-Jul
8-Jul
15-Jul
22-Jul
7-Jul
14-Jul
21-Jul
28-Jul
SEPTEMBER
18
19
20
21
22
29-Jul
5-Aug
12-Aug
19-Aug
26-Aug
4-Aug
11-Aug
18-Aug
25-Aug
1-Sep
24
25
26
2-Sep
9-Sep
16-Sep
23-Sep
8-Sep
15-Sep
22-Sep
29-Sep
0.019
0.019
0.019
0.019
"3.2.(1)b
M3
1,500.00
33,320.00
49,980,000.00
0.72 Rencana
0.144
0.144
0.144
0.144
0.144
0.310
0.207
0.437
0.587
M3
10.000
109,172.15
1,091,721.50
2.76 Realisasi
0.02 Rencana
0.03
"3.2.(6)b
0.005
0.005
0.005
0.087
0.087
0.087
0.304
0.642
0.483
0.483
OKTOBER
23
27
28
29
30-Sep
7-Oct
14-Oct
21-Oct
6-Oct
13-Oct
20-Oct
27-Oct
0.019
0.019
0.019
0.019
NOPEMB
ER
31
28-Oct 4-Nov
8-Nov
3-Nov
30
KETERANGAN
100
0.019
0.603
0.580
0.000
90
0.882
0.906
0.853
0.000
80
0.483
0.483
0.483
0.483
3.881
3.881
3.881
3.881
3.881
3.059
4.023
4.136
5.511
0.000
0.204
0.204
0.204
0.204
0.204
0.000
0.000
0.463
0.463
0.000
"3.3.(2)
Urugan pilihan
M3
186.00
97,961.94
18,220,920.84
Realisasi
0.26 Rencana
"5.1.(2)
M3
750.00
268,760.00
201,570,000.00
4.09 Realisasi
2.90 Rencana
-
"5.8
M3
5,785.00
466,807.98
2,700,484,164.30
Lt
17,532.00
8,107.46
142,139,988.72
0.051
Realisasi
38.81 Rencana
20.59 Realisasi
"6.1.(1)
0.456
0.242
2.174
0.93 Realisasi
"6.1.(2)
Lt
2,625.00
8,000.00
21,000,000.00
0.30 Rencana
Ton
2,021.00
403,271.77
815,012,247.17
11.71 Rencana
122.00
9,159,000.00
1,117,398,000.00
16.06 Rencana
43,824.00
1,331.25
58,340,700.00
0.84 Rencana
"6.7.(1.1)
"6.7.(1.2)
Ton
"6.7.(1.3)
Kg
Ton
1,643.00
419,266.53
688,854,908.79
9.90 Rencana
Ton
103.00
9,159,000.00
943,377,000.00
13.56 Rencana
Kg
35,706.00
1,331.25
47,533,612.50
0.68 Rencana
M3
23.00
474,220.00
10,907,060.00
0.16 Rencana
"8.1.(5)
M3
10.000
1,955,000.00
19,550,000.00
0.28 Rencana
"8.4.(1)
Marka Jalan
M2
713.00
100,000.00
71,300,000.00
1.02 Rencana
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
1.464
1.464
1.464
1.464
1.464
1.464
1.464
1.464
2.007
2.007
2.007
2.007
2.007
2.007
2.007
2.007
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
1.100
1.100
1.100
1.100
1.100
1.100
1.100
1.100
1.100
1.506
1.506
1.506
1.506
1.506
1.506
1.506
1.506
1.506
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
70
0.022
0.022
0.022
0.022
0.022
0.022
60
50
40
RENCANA
30
Realisasi
0.052
0.052
0.052
Realisasi
0.094
0.094
0.094
20
Realisasi
0.342
0.342
0.342
Realisasi
"8.4.(4)
Patok hektometer
Bh
23.00
103,740.00
2,386,020.00
0.03 Rencana
"8.11(3)
Penebangan pohon O/ 50 - 75 cm
Bh
25.00
400,000.00
10,000,000.00
0.14 Rencana
0.204
Realisasi
3.881
0.204
Realisasi
3.881
0.204
Realisasi
"7.9
3.881
0.204
Realisasi
3.881
0.204
Realisasi
"6.8.(1.2)
0.000
3.881
Realisasi
"6.8.(1.1)
"6.8.(1.3)
1.449
2.04 Rencana
0.017
0.017
REALISASI
Realisasi
10
0.144
0.49 Realisasi
0.224
0.092
0.167
0.000
0.006
`
Realisasi
0
JUMLAH
PPN 10 %
JUMLAH + PPN (10%)
DIBULATKAN
RENCANA KEMAJUAN MINGGU INI
KUMULATIF RENCANA SAMPAI DENGAN MINGGU INI
REALISASI PEKERJAAN MINGGU INI
KUMULATIF REALISASI PEKERJAAN SAMPAI DENGAN MINGGU INI
DEVIASI PEKERJAAN SAMPAI DENGAN MINGGU INI
Disetujui Oleh :
62,093,290.33
6,958,071,343.82
695,807,134.38
7,653,878,478.20
7,653,878,000.00
100.00
5,701,568,000.00
0.00
0.00
0.00
0.00
0.00
0.080
0.080
0.080
0.080
0.000
0.080
0.160
0.081
0.161
0.001
0.080
0.241
0.084
0.245
0.004
0.030
0.271
0.101
0.346
0.075
0.174
0.445
0.327
0.672
0.228
Diperiksa
Oleh
:
0.966
3.685
0.179
0.624
2.940
3.613
2.989
3.865 SUPERVISI
3.684
KONSULTAN
2.000
PT. GUBAH 2.500
ALAM LESTARI
-1.365
Ir. WIHARKO
Site Engineer
0.749
1.373
1.960
5.573
4.200
4.928
6.301
4.362
9.935
3.634
4.893
11.194
5.585
15.519
4.325
4.806
16.000
6.275
21.794
5.795
4.568
20.568
7.407
29.202
8.634
4.568
25.136
0.006
29.207
4.072
7.683
7.683
7.736
7.736
7.736
0.000
0.000
6.280
6.280
6.299
2.723
2.723
2.723
2.723
2.740
3.081
0.360
0.360
0.000
32.819 40.502 48.238 55.973 63.709 63.709 63.709 69.989 76.269 82.568 85.291 88.013 90.736 93.459 96.198 99.280 99.640 100.000 100.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207 29.207
-3.612 -11.295 -19.030 -26.766 -34.501 -34.501 -34.501 -40.782 -47.062 -53.361 -56.083 -58.806 -61.529 -64.251 -66.991 -70.072 -70.432 -70.793 -70.793
Dibuat Oleh :
KONTRAKTOR PELAKSANA
PT. DUA PUTERI
KEDATONJATI ONO
KONTRAK NOMOR
S P M K NOMOR
LOKASI
No. Item
Pembayaran
1.2
:
:
:
:
:
:
:
URAIAN PEKERJAAN
Mobilisasi
Satuan
Ls
VOLUME
KE
BUTUHAN
HARGA
SATUAN
1.00
38,925,000.00
JUMLAH HARGA
38,925,000.00
M3
5,762.10
33,320.00
191,993,172.00
"3.2.(6)b
M3
25.000
109,172.15
2,729,303.75
"3.3.(2)
Urugan pilihan
M3
2,952.90
97,961.94
289,271,812.63
"5.1.(2)
M3
765.00
268,760.00
205,601,400.00
M3
3,069.60
466,807.98
1,432,913,775.41
Lt
10,233.00
8,107.46
82,963,638.18
"5.8
"6.1.(2)
"6.7.(1.1)
Lt
7,434.00
8,000.00
59,472,000.00
Ton
2,662.77
403,271.77
1,073,819,971.00
"6.7.(1.2)
Ton
176.56
9,159,000.00
1,617,113,040.00
"6.7.(1.3)
Kg
54,994.10
1,331.25
73,210,895.63
"6.8.(1.1)
Ton
1,639.22
419,266.53
687,270,081.31
"6.8.(1.2)
Ton
104.83
9,159,000.00
960,137,970.00
Kg
33,781.88
1,331.25
44,972,127.75
M3
67.02
474,220.00
31,782,224.40
"8.1.(5)
M3
25.000
1,955,000.00
48,875,000.00
"8.4.(1)
Marka Jalan
M2
809.82
100,000.00
80,982,000.00
"6.8.(1.3)
"7.9
BOBOT
(%)
"3.2.(1)b
"6.1.(1)
"8.4.(4)
Patok hektometer
Bh
25.00
103,740.00
2,593,500.00
"8.11(3)
Penebangan pohon O/ 50 - 75 cm
Bh
84.00
400,000.00
33,600,000.00
0.56
0.35
2.76
2.76
0.04
0.04
4.16
4.09
2.95
20.59
20.59
1.19
0.93
0.85
0.29
15.43
11.01
23.24
16.56
1.05
0.75
9.88
13.80
0.65
0.46
0.70
0.70
1.16
0.04
0.48
0.48
RENCANA
REALISASI
NAMA KEGIATAN
PAKET KEGIATAN
KONSULTAN SUPERVISI
KONTRAKTOR PELAKSANA
Rencana
Realisasi
Rencana
WAKTU PELAKSANAAN
APRIL
1
12-Apr
14-Apr
2
15-Apr
21-Apr
JUNI
MEI
3
22-Apr
28-Apr
4
29-Apr
5-May
0.080
0.080
0.080
0.030
0.080
0.081
0.084
0.101
Realisasi
Rencana
5
6
7
8
6-May 13-May 20-May 27-May
12-May 19-May 26-May 2-Jun
9
3-Jun
9-Jun
0.030
0.030
0.030
0.030
0.552
0.552
0.552
0.552
0.552
0.03
0.310
0.207
0.437
0.587
0.013
0.013
0.013
Realisasi
Rencana
10
10-Jun
16-Jun
11
17-Jun
23-Jun
AGUSTUS
JULY
12
24-Jun
30-Jun
13
1-Jul
7-Jul
14
8-Jul
14-Jul
15
15-Jul
21-Jul
16
22-Jul
28-Jul
17
29-Jul
4-Aug
18
5-Aug
11-Aug
19
12-Aug
18-Aug
SEPTEMBER
20
19-Aug
25-Aug
21
26-Aug
1-Sep
22
2-Sep
8-Sep
0.019
OKTOBER
23
9-Sep
15-Sep
24
16-Sep
22-Sep
25
23-Sep
29-Sep
26
30-Sep
6-Oct
0.019
0.019
0.019
0.019
27
7-Oct
13-Oct
0.019
28
14-Oct
20-Oct
0.019
29
21-Oct
27-Oct
0.019
NOPEMB
ER
31
30
28-Oct
3-Nov
KETERANGAN
4-Nov
8-Nov
100
0.019
0.603
0.580
0.000
90
80
0.039
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
Rencana
Realisasi
0.051
0.242
0.456
2.174
1.386
1.386
1.386
0.304
0.642
0.882
0.906
0.853
0.000
0.492
0.492
0.492
0.492
0.492
0.492
2.059
2.059
2.059
2.059
2.059
3.059
4.023
4.136
5.511
0.000
0.119
0.119
0.119
0.119
0.119
0.463
0.463
0.000
0.146
0.146
0.000
1.449
5.504
5.504
8.282
8.282
0.375
2.059
2.059
2.059
2.059
2.059
0.119
0.119
0.119
0.119
0.119
0.061
0.061
0.061
0.061
0.061
0.061
0.061
0.061
1.929
1.929
1.929
1.929
1.929
1.929
1.929
1.929
2.905
2.905
2.905
2.905
2.905
2.905
2.905
2.905
0.132
0.132
0.132
0.132
0.132
0.132
0.132
0.132
1.097
1.097
1.097
1.097
1.097
1.097
1.097
1.097
1.097
1.533
1.533
1.533
1.533
1.533
1.533
1.533
1.533
1.533
0.072
0.072
0.072
0.072
0.072
0.072
0.072
0.072
0.072
70
0.061
0.061
0.061
0.061
0.061
0.061
60
50
0.375
RENCANA
40
30
0.152
0.234
REALISASI
0.234
0.152
0.152
0.234
20
0.70
0.388
0.019
0.388
0.388
0.019
10
0.483
0.224
0.092
0.167
0.000
0.000
`
Realisasi
0
JUMLAH
PPN 10 %
JUMLAH + PPN (10%)
DIBULATKAN
RENCANA KEMAJUAN MINGGU INI
KUMULATIF RENCANA SAMPAI DENGAN MINGGU INI
REALISASI PEKERJAAN MINGGU INI
KUMULATIF REALISASI PEKERJAAN SAMPAI DENGAN MINGGU INI
DEVIASI PEKERJAAN SAMPAI DENGAN MINGGU INI
Disetujui Oleh :
62,093,290.33
6,958,226,912.05
695,822,691.20
7,654,049,603.25
7,654,049,000.00
100.00
5,701,568,000.00
0.00
0.00
0.00
0.00
0.00
0.080
0.080
0.080
0.080
0.000
0.080
0.160
0.081
0.161
0.001
0.080
0.241
0.084
0.245
0.004
0.030
0.271
0.101
0.346
0.075
0.582
0.853
0.327
0.672
-0.180
Diperiksa
Oleh
:
0.966
3.685
0.595
1.448
2.940
3.613
2.165
3.865 SUPERVISI
3.684
KONSULTAN
2.000
PT. GUBAH 2.500
ALAM LESTARI
-1.365
Ir. WIHARKO
Site Engineer
2.473
3.921
1.960
5.573
1.651
4.886
8.807
4.362
9.935
1.127
4.843
13.650
6.325
16.260
2.610
3.388
17.038
20.583
36.843
19.805
2.671
19.709
21.715
58.559
38.850
2.671
22.380
0.000
58.559
36.179
7.205
29.585
0.000
58.559
28.973
7.205
36.790
0.000
58.559
21.768
7.357
44.148
0.000
58.559
14.411
7.357
51.505
0.000
58.559
7.053
7.357
58.863
0.000
58.559
-0.304
0.000
58.863
0.000
58.559
-0.304
0.000
58.863
0.000
58.559
-0.304
7.729
7.729
7.748
2.782
2.782
2.782
2.782
2.801
3.189
0.407
0.407
0.000
66.592 74.321 82.069 84.851 87.633 90.415 93.197 95.998 99.187 99.593 100.000 100.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
58.559 58.559 58.559 58.559 58.559 58.559 58.559 58.559 58.559 58.559 58.559 58.559
-8.033 -15.762 -23.510 -26.292 -29.074 -31.857 -34.639 -37.439 -40.628 -41.035 -41.441 -41.441
Dibuat Oleh :
KONTRAKTOR PELAKSANA
PT. DUA PUTERI
KEDATONJATI ONO
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
1
12 s/d 14 April 2013
KEMAJUAN PEKERJAAN
KONTRAK
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.000
38,925,000.00
0.56
0.00
0.14
0.14
0.00
0.08
0.08
M3
M3
M3
33,320.00
109,172.15
97,961.94
1,500.000
10.000
186.000
49,980,000.00
1,091,721.50
18,220,920.84
0.72
0.02
0.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M3
268,760.00
466,807.98
750.000
5,785.000
201,570,000.00
2,700,484,164.30
2.90
38.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
17,532.000
2,625.000
2,021.000
122.000
43,824.000
1,643.000
103.000
35,706.000
142,139,988.72
21,000,000.00
815,012,247.17
1,117,398,000.00
58,340,700.00
688,854,908.79
943,377,000.00
47,533,612.50
2.04
0.30
11.71
16.06
0.84
9.90
13.56
0.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
23.000
10,907,060.00
0.16
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
10.000
713.000
23.000
25.000
19,550,000.00
71,300,000.00
2,386,020.00
10,000,000.00
0.28
1.02
0.03
0.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,958,071,343.82
100.00
0.00
0.08
0.08
0.08
0.00
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
2
15 s/d 21 April 2013
KEMAJUAN PEKERJAAN
KONTRAK
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.000
38,925,000.00
0.56
0.14
0.15
0.29
0.08
0.08
0.16
M3
M3
M3
33,320.00
109,172.15
97,961.94
1,500.000
10.000
186.000
49,980,000.00
1,091,721.50
18,220,920.84
0.72
0.02
0.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M3
268,760.00
466,807.98
750.000
5,785.000
201,570,000.00
2,700,484,164.30
2.90
38.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
17,532.000
2,625.000
2,021.000
122.000
43,824.000
1,643.000
103.000
35,706.000
142,139,988.72
21,000,000.00
815,012,247.17
1,117,398,000.00
58,340,700.00
688,854,908.79
943,377,000.00
47,533,612.50
2.04
0.30
11.71
16.06
0.84
9.90
13.56
0.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
23.000
10,907,060.00
0.16
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
10.000
713.000
23.000
25.000
19,550,000.00
71,300,000.00
2,386,020.00
10,000,000.00
0.28
1.02
0.03
0.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,958,071,343.82
100.00
0.08
0.08
0.16
0.00
0.16
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
3
22 s/d 28 April 2013
KEMAJUAN PEKERJAAN
CCO
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.00
38,925,000.00
0.56
0.29
0.150
0.44
0.16
0.08
0.25
M3
M3
M3
33,320.00
109,172.15
97,961.94
5,762.10
24.97
2,952.90
191,993,172.00
2,726,028.59
289,271,812.63
2.76
0.04
4.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M3
268,760.00
466,807.98
765.00
3,069.60
205,601,400.00
1,432,913,775.41
2.95
20.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
10,232.84
7,434.00
2,662.77
176.55
54,993.53
1,639.22
104.83
33,781.88
82,962,340.99
59,472,000.00
1,073,819,971.00
1,617,021,450.00
73,210,136.81
687,270,081.31
960,137,970.00
44,972,127.75
1.19
0.85
15.43
23.24
1.05
9.88
13.80
0.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
67.02
31,782,224.40
0.46
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
24.97
809.82
25.00
84.00
48,816,350.00
80,982,000.00
2,593,500.00
33,600,000.00
0.70
1.16
0.04
0.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,958,071,340.88
100.00
0.16
0.08
0.25
0.00
0.25
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
4
29 s/d 05 Mei 2013
KEMAJUAN PEKERJAAN
CCO
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.00
38,925,000.00
0.56
0.44
0.180
0.62
0.25
0.10
0.35
M3
M3
M3
33,320.00
109,172.15
97,961.94
5,762.10
24.97
2,952.90
191,993,172.00
2,726,028.59
289,271,812.63
2.76
0.04
4.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M3
268,760.00
466,807.98
765.00
3,069.60
205,601,400.00
1,432,913,775.41
2.95
20.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
10,232.84
7,434.00
2,662.77
176.55
54,993.53
1,639.22
104.83
33,781.88
82,962,340.99
59,472,000.00
1,073,819,971.00
1,617,021,450.00
73,210,136.81
687,270,081.31
960,137,970.00
44,972,127.75
1.19
0.85
15.43
23.24
1.05
9.88
13.80
0.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
67.02
31,782,224.40
0.46
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
24.97
809.82
25.00
84.00
48,816,350.00
80,982,000.00
2,593,500.00
33,600,000.00
0.70
1.16
0.04
0.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,958,071,340.88
100.00
0.25
0.10
0.35
0.00
0.35
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
5
06 s/d 12 Mei 2013
KEMAJUAN PEKERJAAN
CCO
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.00
38,925,000.00
0.56
0.62
0.00
0.62
0.35
0.00
0.35
M3
M3
M3
33,320.00
109,172.15
97,961.94
5,762.10
24.97
2,952.90
191,993,172.00
2,726,028.59
289,271,812.63
2.76
0.04
4.16
0.00
0.00
0.00
72.00
0.00
36.00
72.00
0.00
36.00
0.00
0.00
0.00
0.03
0.00
0.05
0.03
0.00
0.05
M3
M3
268,760.00
466,807.98
765.00
3,069.60
205,601,400.00
1,432,913,775.41
2.95
20.59
0.00
0.00
0.00
36.00
0.00
36.00
0.00
0.00
0.00
0.24
0.00
0.24
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
10,232.84
7,434.00
2,662.77
176.55
54,993.53
1,639.22
104.83
33,781.88
82,962,340.99
59,472,000.00
1,073,819,971.00
1,617,021,450.00
73,210,136.81
687,270,081.31
960,137,970.00
44,972,127.75
1.19
0.85
15.43
23.24
1.05
9.88
13.80
0.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
67.02
31,782,224.40
0.46
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
24.97
809.82
25.00
84.00
48,816,350.00
80,982,000.00
2,593,500.00
33,600,000.00
0.70
1.16
0.04
0.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,958,071,340.88
100.00
0.35
0.33
0.67
0.44
0.23
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
6
13 s/d 19 Mei 2013
KEMAJUAN PEKERJAAN
CCO
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.00
38,925,000.00
0.56
0.62
0.00
0.62
0.35
0.00
0.35
M3
M3
M3
33,320.00
109,172.15
97,961.94
5,762.10
24.97
2,952.90
191,993,172.00
2,726,028.59
289,271,812.63
2.76
0.04
4.16
72.00
0.00
36.00
648.00
0.00
324.00
720.00
0.00
360.00
0.03
0.00
0.05
0.31
0.00
0.46
0.34
0.00
0.51
M3
M3
268,760.00
466,807.98
765.00
3,069.60
205,601,400.00
1,432,913,775.41
2.95
20.59
0.00
36.00
0.00
324.00
0.00
360.00
0.00
0.24
0.00
2.17
0.00
2.42
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
10,232.84
7,434.00
2,662.77
176.55
54,993.53
1,639.22
104.83
33,781.88
82,962,340.99
59,472,000.00
1,073,819,971.00
1,617,021,450.00
73,210,136.81
687,270,081.31
960,137,970.00
44,972,127.75
1.19
0.85
15.43
23.24
1.05
9.88
13.80
0.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
67.02
31,782,224.40
0.46
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
24.97
809.82
25.00
84.00
48,816,350.00
80,982,000.00
2,593,500.00
33,600,000.00
0.70
1.16
0.04
0.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,958,071,340.88
100.00
0.67
2.94
3.61
0.62
2.99
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
7
20 Mei s/d 26 Mei 2013
KEMAJUAN PEKERJAAN
CCO
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.00
38,925,000.00
0.56
0.62
0.00
0.62
0.35
0.00
0.35
M3
M3
M3
33,320.00
109,172.15
97,961.94
5,762.10
24.97
2,952.90
191,993,172.00
2,726,028.59
289,271,812.63
2.76
0.04
4.16
720.00
0.00
360.00
432.00
0.00
216.00
1,152.00
0.00
576.00
0.34
0.00
0.51
0.21
0.00
0.30
0.55
0.00
0.81
M3
M3
268,760.00
466,807.98
765.00
3,069.60
205,601,400.00
1,432,913,775.41
2.95
20.59
0.00
360.00
0.00
216.00
0.00
576.00
0.00
2.42
0.00
1.45
0.00
3.86
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
10,232.84
7,434.00
2,662.77
176.55
54,993.53
1,639.22
104.83
33,781.88
82,962,340.99
59,472,000.00
1,073,819,971.00
1,617,021,450.00
73,210,136.81
687,270,081.31
960,137,970.00
44,972,127.75
1.19
0.85
15.43
23.24
1.05
9.88
13.80
0.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
67.02
31,782,224.40
0.46
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
24.97
809.82
25.00
84.00
48,816,350.00
80,982,000.00
2,593,500.00
33,600,000.00
0.70
1.16
0.04
0.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,958,071,340.88
100.00
3.61
1.96
5.57
1.37
4.20
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
8
27 Mei s/d 02 Juni 2013
KEMAJUAN PEKERJAAN
ADDENDUM
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.00
38,925,000.00
0.56
0.62
0.00
0.62
0.35
0.00
0.3457
M3
M3
M3
33,320.00
109,172.15
97,961.94
5,762.10
24.97
2,952.90
191,993,172.00
2,726,028.59
289,271,812.63
2.76
0.04
4.16
1,152.00
0.00
576.00
912.00
0.00
456.00
2,064.00
0.00
1,032.00
0.55
0.00
0.81
0.44
0.00
0.64
0.99
0.00
1.45
M3
M3
268,760.00
466,807.98
765.00
3,069.60
205,601,400.00
1,432,913,775.41
2.95
20.59
0.00
576.00
0.00
456.00
0.00
1,032.00
0.00
3.86
0.00
3.06
0.00
6.92
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
10,232.84
7,434.00
2,662.77
176.55
54,993.53
1,639.22
104.83
33,781.88
82,962,340.99
59,472,000.00
1,073,819,971.00
1,617,021,450.00
73,210,136.81
687,270,081.31
960,137,970.00
44,972,127.75
1.19
0.85
15.43
23.24
1.05
9.88
13.80
0.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
67.02
31,782,224.40
0.46
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
24.97
809.82
25.00
84.00
48,816,350.00
80,982,000.00
2,593,500.00
33,600,000.00
0.70
1.16
0.04
0.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.00
0.00
0.00
0.00
39.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.22
0.00
0.00
0.00
0.22
6,958,071,340.88
100.00
5.57
4.36
9.93
8.81
1.13
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
9
03 s/d 09 Juni 2013
KEMAJUAN PEKERJAAN
ADDENDUM
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.00
38,925,000.00
0.56
0.62
0.00
0.62
0.35
0.00
0.35
M3
M3
M3
33,320.00
109,172.15
97,961.94
5,762.10
24.97
2,952.90
191,993,172.00
2,726,028.59
289,271,812.63
2.76
0.04
4.16
2,064.00
0.00
1,032.00
1,226.25
24.97
626.55
3,290.25
24.97
1,658.55
0.99
0.00
1.45
0.59
0.04
0.88
1.58
0.04
2.34
M3
M3
268,760.00
466,807.98
765.00
3,069.60
205,601,400.00
1,432,913,775.41
2.95
20.59
0.00
1,032.00
0.00
599.70
0.00
1,631.70
0.00
6.92
0.00
4.02
0.00
10.95
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
10,232.84
7,434.00
2,662.77
176.55
54,993.53
1,639.22
104.83
33,781.88
82,962,340.99
59,472,000.00
1,073,819,971.00
1,617,021,450.00
73,210,136.81
687,270,081.31
960,137,970.00
44,972,127.75
1.19
0.85
15.43
23.24
1.05
9.88
13.80
0.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
67.02
31,782,224.40
0.46
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
24.97
809.82
25.00
84.00
48,816,350.00
80,982,000.00
2,593,500.00
33,600,000.00
0.70
1.16
0.04
0.48
0.00
0.00
0.00
39.00
24.97
0.00
0.00
16.00
0.00
0.00
0.00
55.00
0.00
0.00
0.00
0.22
0.70
0.00
0.00
0.09
0.70
0.00
0.00
0.32
6,958,071,340.88
100.00
9.93
6.33
16.26
13.65
2.61
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
10
10 s/d 16 Juni 2013
KEMAJUAN PEKERJAAN
ADDENDUM
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.00
38,925,000.00
0.56
0.62
0.00
0.62
0.35
0.00
0.35
M3
M3
M3
33,320.00
109,172.15
97,961.94
5,762.10
24.97
2,952.90
191,993,172.00
2,726,028.59
289,271,812.63
2.76
0.04
4.16
3,290.25
24.97
1,658.55
1,259.85
0.00
643.35
4,550.10
24.97
2,301.90
1.58
0.04
2.34
0.60
0.00
0.91
2.18
0.04
3.24
M3
M3
268,760.00
466,807.98
765.00
3,069.60
205,601,400.00
1,432,913,775.41
2.95
20.59
0.00
1,631.70
0.00
616.50
0.00
2,248.20
0.00
10.95
0.00
4.14
0.00
15.08
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
10,232.84
7,434.00
2,662.77
176.55
54,993.53
1,639.22
104.83
33,781.88
82,962,340.99
59,472,000.00
1,073,819,971.00
1,617,021,450.00
73,210,136.81
687,270,081.31
960,137,970.00
44,972,127.75
1.19
0.85
15.43
23.24
1.05
9.88
13.80
0.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,974.61
1,270.97
949.74
62.92
19,614.36
0.00
0.00
0.00
3,974.61
1,270.97
949.74
62.92
19,614.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.46
0.15
5.50
8.28
0.38
0.00
0.00
0.00
0.46
0.15
5.50
8.28
0.38
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
67.02
31,782,224.40
0.46
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
24.97
809.82
25.00
84.00
48,816,350.00
80,982,000.00
2,593,500.00
33,600,000.00
0.70
1.16
0.04
0.48
0.00
0.00
0.00
55.00
0.00
0.00
0.00
29.00
0.00
0.00
0.00
84.00
0.70
0.00
0.00
0.32
0.00
0.00
0.00
0.17
0.70
0.00
0.00
0.48
6,958,071,340.88
100.00
16.26
20.58
36.84
17.04
19.81
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
:
:
:
:
:
:
:
:
MATA
PEMBAYARAN
PENINGKATAN JALAN BATAS KAB. PAMEKASAN - BATAS KOTA SUMENEP (LINK 232)
602.1 / 0721 / KTR / 110 / PNK. 10 / 2013 tanggal 5 April 2013
PT.DUA PUTRI KEDATON
PT. GUBAH ALAM LESTARI
2013
7,653,878,000.00
Rp.
11
17 s/d 23 Juni 2013
KEMAJUAN PEKERJAAN
ADDENDUM
URAIAN
SAT
HARGA SATUAN
VOLUME
JUMLAH HARGA
(Rp)
VOLUME
BOBOT
(%)
MINGGU
LALU
MINGGU
PROGRES (%)
INI
S/D MINGGU
INI
MINGGU
LALU
MINGGU
INI
S/D MINGGU
INI
DIVISI 1. UMUM
Mobilisasi
Ls
38,925,000.00
1.00
38,925,000.00
0.56
0.62
0.00
0.62
0.35
0.00
0.35
M3
M3
M3
33,320.00
109,172.15
97,961.94
5,762.10
24.97
2,952.90
191,993,172.00
2,726,028.59
289,271,812.63
2.76
0.04
4.16
4,550.10
24.97
2,301.90
1,212.00
0.00
606.00
5,762.10
24.97
2,907.90
2.18
0.04
3.24
0.58
0.00
0.85
2.76
0.04
4.09
M3
M3
268,760.00
466,807.98
765.00
3,069.60
205,601,400.00
1,432,913,775.41
2.95
20.59
0.00
2,248.20
0.00
821.40
0.00
3,069.60
0.00
15.08
0.00
5.51
0.00
20.59
6.1(1)
6.1(2)
6.7 (1.1)
6.7 (1.2)
6.7 (1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
8,107.46
8,000.00
403,271.77
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
10,232.84
7,434.00
2,662.77
176.55
54,993.53
1,639.22
104.83
33,781.88
82,962,340.99
59,472,000.00
1,073,819,971.00
1,617,021,450.00
73,210,136.81
687,270,081.31
960,137,970.00
44,972,127.75
1.19
0.85
15.43
23.24
1.05
9.88
13.80
0.65
3,974.61
1,270.97
949.74
62.92
19,614.36
0.00
0.00
0.00
3,974.61
1,270.97
949.74
62.92
19,614.36
0.00
0.00
0.00
7,949.22
2,541.94
1,899.48
125.84
39,228.72
0.00
0.00
0.00
0.46
0.15
5.50
8.28
0.38
0.00
0.00
0.00
0.46
0.15
5.50
8.28
0.38
0.00
0.00
0.00
0.93
0.29
11.01
16.56
0.75
0.00
0.00
0.00
7.10
DIVI 7. STRUKTUR
Pasangan Batu (Material Batu Hitam Abrasi < 40%)
M3
474,220.00
67.02
31,782,224.40
0.46
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Bh
Bh
1,955,000.00
100,000.00
103,740.00
400,000.00
24.97
809.82
25.00
84.00
48,816,350.00
80,982,000.00
2,593,500.00
33,600,000.00
0.70
1.16
0.04
0.48
0.00
0.00
0.00
84.00
0.00
0.00
0.00
0.00
24.97
0.00
0.00
84.00
0.70
0.00
0.00
0.48
0.00
0.00
0.00
0.00
0.70
0.00
0.00
0.48
6,958,071,340.88
100.00
36.84
21.72
58.56
19.71
38.85
1.2
3.2(1)a
3.2(7)
3.3(2)
8.1(5)
8.4(1)
8.4(4)
8.11(3)
JUMLAH
RENCANA KEMAJUAN TERHADAP MC
DEVIASI
Disetujui Oleh :
BINA MARGA
PROJECT OFFICER
Diperiksa Oleh :
Konsultan Supervisi
Dibuat Oleh :
PENYEDIA JASA
PT. DUA PUTRI KEDATON
ZAINAL FATAH
NIP. 19660222 200801 1 005
HERLAMBANG SUSETYO, ST
Chief Inspector
A
:
Kegiatan
:
PPK
Nama Paket :
Lokasi Paket :
No.
Item
Pembayaran
a
DIVISI 1. UMUM
1.2
PEKERJAAN TANAH
3.2(1)a
3.2(8)
3.3(2)
6.7(1.2)
6.7(1.3)
6.8(1.1)
6.8(1.2)
6.8(1.3)
JUMLAH
PPN 10 %
TOTAL KONTRAK
DIBULATKAN
URAIAN
Satuan
DIVISI 1. UMUM
Mobilisasi
Ls
PEKERJAAN TANAH
M3
M3
M3
M
M
Ltr
Ltr
Ton
Ton
Kg
Ton
Ton
Kg
M3
JUMLAH
PPN 10 %
TOTAL KONTRAK
DIBULATKAN
Mengetahui :
PEJABAT PEMBUAT KOMITMEN
M3
M2
Bh
Bh
Bh
Heroe Soedarmadji, BE
NIP. 19661218 199603 1 002
Harga
Satuan
(Rp)
d
38,925,000.00
Volume
e
KONTRAK ASAL
Jumlah Harga
(Rp)
f
1.00
38,925,000.00
REKAYASA LAPANGA
Bobot
(%)
Volume
0.56
38,925,000.00
33,320.00
109,172.15
97,961.94
1,500.00
10.00
186.00
49,980,000.00
1,091,721.50
18,220,920.84
0.72
0.02
0.26
648.00
324.00
2.90
38.81
324.00
2.04
0.30
11.71
69,292,642.34
268,760.00
466,807.98
750.00
5,785.00
201,570,000.00
2,700,484,164.30
2,902,054,164.30
8,107.46
8,000.00
403,271.77
17,532.00
2,625.00
2,021.00
142,139,988.72
21,000,000.00
815,012,247.17
9,159,000.00
1,331.25
419,266.53
9,159,000.00
1,331.25
122.00
43,824.00
1,643.00
103.00
35,706.00
1,117,398,000.00
58,340,700.00
688,854,908.79
943,377,000.00
47,533,612.50
16.06
0.84
9.90
13.56
0.68
3,833,656,457.18
474,220.00
23.00
10,907,060.00
0.16
10,907,060.00
1,955,000.00
100,000.00
103,740.00
400,000.00
200,000.00
10.00
713.00
23.00
25.00
19,550,000.00
71,300,000.00
2,386,020.00
10,000,000.00
0.28
1.02
0.03
0.14
103,236,020.00
6,958,071,343.82
100.00
695,807,134.38
7,653,878,478.20
7,653,878,000.00
Diperiksa Oleh :
KONSULTAN PENGAWAS
Dibuat Oleh :
PENYEDIA JASA
Ir. WIHARKO
Site Engineer
REKAYASA LAPANGAN
Jumlah Harga
(Rp)
Bobot
(%)
21,591,360.00
31,739,668.56
0.31
0.46
53,331,028.56
151,245,785.52
2.17
151,245,785.52
204,576,814.08
2.94
20,457,681.41
225,034,495.49
225,034,000.00
Pamekasan,
Dibuat Oleh :
PENYEDIA JASA
2013
#####
#####
NO
PEKERJAAN
7 Prime Coat
L
x
- x
- x
75.00
1.60 x
1.60 x
1.00 x
########
VOLUME
T
0.600
0.400
0.600
100.00
2.00
0.050
1.10
0.200
75.00
1.60
0.300
1.60
x
- x
- x
1.00
3.00
x
x
x
x
x
1.25
1.000
0.80
1.000
x
- x
1.60
x
1.60 x
0.300
1.60
2.000
75.00
1.00
0.200
0.150
0.300
3.000
0.200
N
A SUMENEP (LINK 232)
-
25+000
VOLUME
K
x
x
x
=
1.00 =
1.00 =
1.00
72.00
72.00
m3
m3
m3
1.00
m3
2.00
m3
x
x
x
x
x
1.00
36.00
-
m3
0.50
=
=
=
=
=
2.00
m3
x
x
2.00
1.00
1.00
1.00
m3
m3
m3
m3
36.00 m3
36.00 m3
36.00 m3
2.00
72.00
2.00
75.00
ltr
NO
PEKERJAAN
675.00
7 Prime Coat
25+000
x
- x
- x
1.60
1.60
100.00
2.00
0.050
1.00
1.10
0.200
2.00
675.00
1.60
x
x
1.00 x
1.00 x
3.00 x
0.300
x
x
0.150 x
0.300 x
3.000 x
1.00
1.60
0.200
2.00
2.00
x
x
- x
-
x
x
1.00 x
######## VOLUME
T
0.600 x
0.400 x
0.600 x
1.25
1.000
0.80
1.000
675.00
x
x
1.60
1.60
x
x
0.300
1.60
2.000
0.200
x
x
=
=
1.00 =
1.00
648.00
1.00
648.00
=
=
2.00 =
1.00 =
0.50 =
1.00
324.00
324.00
324.00
2.00
1.00
324.00
-
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
ltr
NO
PEKERJAAN
L
x
x
1.00 x
0.60 x
- x
2.00 x
- x (0.6+0.5)/2
x
100.00
2.00
0.050
1.00
1.10
0.200
2.00
450.00
1.60
x
x
1.00 x
1.00 x
3.00 x
0.300
x
x
0.150 x
0.300 x
3.000 x
1.00
1.60
0.200
2.00
2.00
x
x
- x
-
=
=
1.00 =
1.00 =
1.00 =
=
1.00
m3
m3
216.00
-
m3
m3
=
=
2.00 =
1.00 =
0.50 =
1.25
1.000
0.80
1.000
450.00
x
x
- x
- x
1.60
x
x
1.00 x
7.20 x
0.300
1.60
x
x
0.300 x
0.200 x
1.00
0.200
2.00
1.00
=
=
1.60
0.300
2.00
x
x
1.00
x
x
0.200
x
x
2.00
7 Prime Coat
Prime Coat (Tiang Pancang)
Prime Coat (Rekon)
Prime Coat (Rising)
x
x
- x
- x
1.60
x
x
1.00 x
7.20 x
1.000
2.00
1.000
x
x
- x
- x
- x
7.00
x
x
6.00 x
6.00 x
1.50 x
1.000
0.20
4.00
1.000
0.35
x
x
- x
- x
1.54
x
x
1.00 x
2.00 x
0.060
2.310
4.00
0.068
1.000
9 ATB pelebaran
ATB existing
ATB Rising
Campuran Aspal Panas
Aggregat
Aspal
1.00
0.200
1.000
1.000
x
x
1.000
1.000
1.000
x
x
1.000 x
0.050 x
x
x
432.00 m3
m3
m3
CTSB (Pelebaran)
432.00
1.00
450.00
1.60
1.60
25+000
x
- x
- x
######## VOLUME
T
0.600 x
0.400 x
0.600 x
0.620 x
0.300 x
0.500 x
m3
m3
m3
m3
m3
m3
216.00 m3
216.00
216.00
-
m3
=
=
m3
m3
1.00
=
=
1.00 =
1.00 =
ltr
ltr
ltr
ltr
=
=
0.15 =
0.15 =
0.35 =
ltr
ltr
ltr
ltr
ltr
ltr
=
=
2.310 =
1.00 =
ton
m3
ton
m3
ton
ton
0.9200 =
0.0610 =
ton
ton
1.00
2.00
m3
m3
m3
m3
Semen
0.920
19.0000
kg
NO
PEKERJAAN
950.00
100.00
2.00
0.050
1.10
0.200
950.00
1.60
x
x
1.00 x
1.00 x
3.00 x
0.300
1.60
0.200
x
- x
- x
1.60 x
1.60 x
1.00 x
0.60 x
- x
2.00 x
- x (0.6+0.5)/2
x
########
VOLUME
T
0.600
0.400
0.600
0.620
0.300
x
- x
- x
-
0.500
0.150
0.300
3.000
1.25
1.000
0.80
1.000
x
- x
- x
- x
1.60
x
1.60 x
1.00 x
7.20 x
0.300
1.60
0.300
x
- x
1.00
x
1.00 x
0.200
x
- x
- x
- x
1.60
x
2.00 x
1.00 x
7.20 x
2.000
950.00
7 Prime Coat
Prime Coat (Tiang Pancang)
Prime Coat (Rekon)
Prime Coat (Rising)
0.200
0.300
0.200
0.200
1.000
1.000
1.000
x
x
x
x
x
7.00
x
x
- x
- x
9 ATB pelebaran
ATB existing
ATB Rising
Campuran Aspal Panas
Aggregat
Aspal
Semen
10 AC
AC Rising
AC Rising
1.000
1.54
x
x
1.00 x
2.00 x
0.060
4.00
0.068
4.00
6.00
6.00
1.50
1.000
1.000
1.000
1.000
1.000
0.050
- x
- x
- x
Aggregat
Aspal
Semen
11 Pas. Batu
x
x
x
x
x
0.920
6.00
1.000
7.00
1.000
x
x
1.00 x
0.040
-
0.922
0.45 x
0.60 x
0.45 x
1.300
0.30 x
- x
- x (0.5+0.4)/2 x
0.800
- x
- x
- x
0.500
0.700
0.300
13 Pancang
- :
0.25
8.000
14 Pemancangan
- :
0.25
4.000
- x
0.15 x
1.000
16 Baja Tulangan
- x
125.00
17 Patok Pengarah
- :
3.00
18 Patok Hekto
- :
1,000.00 x
9.000
19 Marka Jalan
Garis Lurus Pinggir
Garis Putus
Garis Zebra Cross
- x
- x
- x
0.12 x
0.12 x
2.00
2.000
0.80
0.375
N
A SUMENEP (LINK 232)
-
25+000
=
=
=
=
=
=
912.00
VOLUME
K
x
x
x
x
x
x
1.00
1.00
1.00
1.00
1.00
m3
m3
m3
m3
m3
912.00
1.00
m3
2.00
m3
x
x
x
x
x
1.00
456.00
-
m3
2.00
m3
=
=
2.00 =
1.00 =
0.50 =
2.00
m3
m3
m3
m3
456.00 m3
456.00
456.00
-
m3
x
x
x
x
1.00
2.00
x
x
2.00
=
2.00 =
m3
m3
=
=
1.00 =
1.00 =
ltr
ltr
ltr
ltr
2.00
=
1.00 =
1.00
1.00
x
x
m3
m3
m3
m3
2,150.00
2,064.00
=
=
=
=
=
ltr
ltr
ltr
ltr
ltr
ltr
=
=
2.310 =
1.00 =
ton
m3
ton
m3
ton
ton
0.9200 =
0.0610 =
19.0000 =
ton
ton
kg
1.00
m2
m2
ton
ton
23.00
m3
m3
m3
m3
=
=
m3
m3
m3
m3
m'
m'
m3
Kg
0.20
0.35
0.15
0.15
0.35
x
x
x
x
x
x
x
x
x
2.310
1.000
=
=
2.327 =
1.000
x
x
x
=
0.0590 =
19.0000 =
x
x
x
1.00
2.00
0.9220
=
=
0.30 =
2.00
Bh
Bh
=
=
=
m2
m2
NO
PEKERJAAN
x
x
x
1.50
0.050
1.00 =
950.00
150.00
200.00
-
x
x
x
x
x
x
x
0.300
0.300
0.150
0.300
3.000
1.000
1.000
x
x
x
x
x
x
1.00
1.00
2.00
1.00
0.50
2.00
=
=
=
=
=
=
=
456.00
80.55
90.00
626.55
m3
x
x
x
x
x
1.60
1.79
1.00
1.50
3.00
1.25
0.80
950.00
150.00
200.00
-
x
x
x
x
1.60
1.79
1.50
7.20
x
x
x
x
0.300
0.200
0.300
0.200
x
x
x
x
1.00
1.00
1.00
1.00
m3
1.60
0.300
2.00
456.00
53.70
90.00
599.70
-
1.00
0.200
2.00
m3
1,950.00
-
x
x
x
x
1.60
2.00
1.50
7.20
x
x
x
x
1.000
1.000
1.000
1.000
x
x
x
x
x
7.00
4.00
6.00
6.00
1.50
x
x
x
x
x
1.000
1.000
1.000
1.000
1.000
CTSB (Pelebaran)
7 Prime Coat
Prime Coat (Tiang Pancang)
Prime Coat (Rekon)
Prime Coat (Rising)
(150.00)
-
x
x
1.50 x
0.60 x
x
2.00 x
x (0.6+0.5)/2 x
25+000
950.00
150.00
200.00
-
1.60
1.79
######## VOLUME
T
0.600 x
0.500 x
0.600 x
0.620 x
0.300 x
0.500 x
1.00
1.00
1.00
1.00
1.00
=
=
=
=
=
=
=
=
=
=
1.00 =
1.00 =
1.00
x
x
912.00 m3
134.25
180.00
1,226.25
m3
m3
m3
m3
24.97 m3
3,120.00
3,120.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
ltr
ltr
ltr
ltr
0.20
0.35
0.15
0.15
0.35
=
=
=
=
=
(210.00)
(210.00)
ltr
ltr
ltr
ltr
ltr
ltr
9 ATB (Pelebaran)
ATB (Gal tanpa)
x
x
1.04
1.50
x
x
0.060
0.060
x
x
2.00
1.00
=
=
m3
m3
ton
9 ATB pelebaran
ATB existing
ATB Rising
Campuran Aspal Panas
x
x
x
x
1.54
4.00
1.00
2.00
x
x
x
x
0.060
0.068
1.000
0.050
x
x
x
x
2.310
1.000
2.310
1.00
=
=
=
=
1.50
0.050
1.000
24.97
24.97
-
ton
m3
ton
m3
ton
ton
ATBL rekondisi
NO
PEKERJAAN
985.00
150.00
200.00
-
x
x
x
1.60 x
1.79 x
1.50 x
0.60 x
x
2.00 x
x (0.6+0.5)/2 x
- x
########
VOLUME
T
0.600
0.500
0.600
0.620
0.300
0.500
1.50 x
0.050
x
x
x
x
x
x
x
0.300
0.300
0.150
0.300
3.000
1.000
1.000
985.00
150.00
200.00
-
x
x
x
x
x
x
1.60
1.79
1.00
1.50
3.00
1.25
0.80
985.00
150.00
200.00
-
x
x
x
x
1.60
1.79
1.50
7.20
x
x
x
x
0.300
0.200
0.300
0.200
1.60
0.300
1.00
0.200
7 Prime Coat
Prime Coat (Tiang Pancang)
Prime Coat (Rekon)
Prime Coat (Rising)
x
x
x
x
1.60
2.00
1.50
7.20
x
x
x
x
1.000
1.000
1.000
1.000
CTSB (Pelebaran)
N
A SUMENEP (LINK 232)
-
25+000
VOLUME
K
x
x
x
x
x
x
1.00
1.00
1.00
1.00
1.00
2730
=
=
=
=
=
=
1.00 =
x
x
x
x
x
x
1.00
1.00
2.00
1.00
0.50
2.00
x
x
x
x
945.60
134.25
180.00
1,259.85
m3
m3
m3
m3
m3
4,550.10
m3
=
=
=
=
=
=
=
472.80
80.55
90.00
643.35
m3
1.00
1.00
1.00
1.00
m3
2.00
472.80
53.70
90.00
616.50
-
2.00
m3
=
=
1.00 =
1.00 =
1.00
x
x
=
=
3,974.61
4,085.00
300.00
4,385.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
ltr
ltr
ltr
ltr
5460
1,075.00
NO
PEKERJAAN
1,075.00
200.00
-
x
x
x
1,075.00
200.00
-
7 Prime Coat
Prime Coat (Tiang Pancang)
Prime Coat (Rekon)
Prime Coat (Rising)
1.60 x
1.60 x
1.50 x
0.60 x
x
2.00 x
x (0.6+0.5)/2 x
########
VOLUME
T
0.600
0.400
0.600
0.620
0.300
0.500
x
x
x
x
x
1.60
1.60
1.00
1.50
3.00
1.25
0.80
x
x
x
x
x
x
x
0.300
0.200
0.150
0.300
3.000
1.000
1.000
1,075.00
200.00
-
x
x
x
x
1.60
1.60
1.50
7.20
x
x
x
x
0.300
0.200
0.300
0.200
1.60
0.300
x
x
1.00
1.00
x
x
0.200
0.200
1,150.00
-
x
x
x
x
1.60
2.00
1.50
7.20
x
x
x
x
1.000
1.000
1.000
1.000
x
x
x
x
7.00
4.00
6.00
6.00
x
x
x
x
1.000
1.000
1.000
1.000
1.50
1.000
9 ATB (Pelebaran)
ATB (Gal tanpa)
x
x
1.04
1.50
x
x
0.060
0.060
9 ATB pelebaran
ATB existing
ATB Rising
Campuran Aspal Panas
x
x
x
x
1.54
4.00
1.00
2.00
x
x
x
x
0.060
0.068
1.000
0.050
1.50
0.050
ATBL rekondisi
Aggregat
Aspal
Semen
10 AC
AC Rising
AC Rising
0.920
- x
- x
- x
Aggregat
Aspal
Semen
6.00
7.00
1.00
x
x
x
1.000
1.000
0.040
-
0.922
11 Pas. Batu
- x
- x
- x
0.45 x
0.60 x
0.45 x
1.300
0.500
0.700
0.30 x
- x
- x (0.5+0.4)/2 x
0.800
0.300
13 Pancang
- :
0.25
8.000
14 Pemancangan
- :
0.25
4.000
- x
0.15 x
1.000
16 Baja Tulangan
- x
125.00
17 Patok Pengarah
- :
3.00
18 Patok Hekto
- :
1,000.00 x
9.000
19 Marka Jalan
Garis Lurus Pinggir
Garis Putus
Garis Zebra Cross
- x
- x
- x
0.12 x
0.12 x
2.00
2.000
0.375
0.80
N
A SUMENEP (LINK 232)
-
25+000
VOLUME
K
x
x
x
x
x
x
1.00
1.00
1.00
1.00
1.00
=
=
=
=
=
=
m3
m3
180.00 m3
m3
m3
1,212.00
1,032.00
x
x
x
x
x
x
1.00
2.00
2.00
1.00
0.50
2.00
=
=
=
=
=
=
=
516.00
90.00
606.00
m3
x
x
x
x
1.00
2.00
1.00
1.00
m3
2.00
516.00
90.00
606.00
-
x
x
2.00
2.00
=
=
m3
m3
=
=
=
=
1.00 =
1.00 =
1.00
x
x
0.20
0.35
0.15
0.15
=
=
=
=
1,840.00
1,840.00
-
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
ltr
ltr
ltr
ltr
ltr
ltr
ltr
ltr
5,160.00
300.00
5,460.00
5,762.10
2730
540.00
5460
-
0.35
ltr
ltr
x
x
2.00
1.00
=
=
m3
m3
ton
x
x
x
x
2.310
1.000
2.310
1.00
=
=
=
=
1.000
ton
m3
ton
m3
ton
ton
ton
ton
ton
kg
m2
m2
ton
ton
x
x
x
0.9200 =
0.0610 =
19.0000 =
x
x
1.00
1.000
2.327
=
=
=
x
x
x
0.9220
0.0590
19.0000
=
=
=
x
x
x
1.00
2.00
0.30
=
=
=
23.00
m3
m3
m3
m3
2.00
=
=
m3
m3
m3
m3
m'
m'
m3
Kg
Bh
Bh
=
=
=
m2
m2
NO
PEKERJAAN
x
x
- x
1.60
1.79
x
x
1.00 x
0.60 x
- x
2.00 x
- x (0.6+0.5)/2
x
######## VOLUME
T
0.600 x
0.500 x
0.600 x
0.620 x
0.300 x
0.500 x
25+000
m3
m3
m3
K
1.00
1.00
1.00
1.00
1.00
=
=
=
=
=
=
m3
m3
x
x
x
x
x
x
x
0.300
0.300
0.150
0.300
3.000
1.000
1.000
x
x
x
x
x
x
1.00
1.00
2.00
1.00
0.50
2.00
=
=
=
=
=
=
=
m3
x
x
x
x
x
1.60
1.79
1.00
1.00
3.00
1.25
0.80
x
x
x
x
1.60
1.79
1.00
7.20
x
x
x
x
0.300
0.200
0.300
0.200
x
x
x
x
1.00
1.00
1.00
1.00
m3
1.60
0.300
2.00
x
x
1.00
1.00
x
x
0.200
0.200
x
x
2.00
2.00
=
=
m3
m3
7 Prime Coat
Prime Coat (Tiang Pancang)
Prime Coat (Rekon)
Prime Coat (Rising)
x
x
x
x
1.60
2.00
1.00
7.20
x
x
x
x
1.000
1.000
1.000
1.000
=
=
1.00 =
1.00 =
ltr
ltr
ltr
ltr
x
x
x
x
x
7.00
4.00
6.00
6.00
1.50
x
x
x
x
x
1.000
1.000
1.000
1.000
1.000
0.20
0.35
0.15
0.15
0.35
=
=
=
=
=
ltr
ltr
ltr
ltr
ltr
ltr
9 ATB (Pelebaran)
ATB (Gal tanpa)
x
x
1.04
1.00
x
x
0.060
0.060
x
x
2.00
1.00
=
=
m3
m3
ton
9 ATB pelebaran
ATB existing
ATB Rising
Campuran Aspal Panas
x
x
x
x
1.54
4.00
1.00
2.00
x
x
x
x
0.060
0.068
1.000
0.050
x
x
x
x
2.310
1.000
2.310
1.00
=
=
=
=
1.50
0.050
1.000
ton
m3
ton
m3
ton
ton
ton
x
x
x
ton
ton
kg
1.000
1.000
0.040
x
x
1.00
1.000
2.327
=
=
=
m2
m2
ton
ton
x
x
0.9220
0.0590
=
=
CTSB (Pelebaran)
ATBL rekondisi
Aggregat
Aspal
Semen
10 AC
AC Rising
AC Rising
0.920
- x
- x
- x
Aggregat
Aspal
6.00
7.00
1.00
x
x
x
=
=
1.00
x
x
0.9200 =
0.0610 =
19.0000 =
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3