Anda di halaman 1dari 1

JADWAL PREVENTIF &PEMBERSIHAN AC GEDUNG TAHUN 2015

BULAN
NO

LOKASI

LT .3
1. Daikin Function Room
Ac No 1 (160000 Btuh)
Ac No 2 ( 160000 Btuh)
Ac No 3 (160000 Btuh)
Ac No 4 (200000 Btuh)
2. Daikin Koridor Toilet(200000 Btuh)

LT .2
1. Daikin depan Fun Factory(160000 Btuh)
2. Daikin samping tangga darurat(160000 Btuh)
3. York depan Lift (150000Btuh)
4. York depan Snaps (150000Btuh)
5. York Family Fitnes
AC No 1 (150000Btuh)
AC No 2 (150000 Btuh)
AC No 3 (150000 Btuh)
AC No 4 (150000 Btuh)

LT. 1
1. Daikin depan Lift (160000 Btuh)
2. Daikin depan Gramedia (160000 Btuh)
3. York depan Lift (120000 Btuh)
4. York Arah Mc D (150000 Btuh)
5. York Gramedia
AC No 1 (125000 Btuh)
AC No 2 (125000 Btuh)
AC No 3 (125000 Btuh)
AC No 4 (125000 Btuh)
6.AC York Samping Ace hardware(120000 Btuh)

Lantai Dasar
1. Daikin depan Lift
AC No 1 (120000 Btuh)
AC No 2 (120000 Btuh)
2. Daikin depan Killiney
AC No 1 (120000 Btuh)
AC No 2 (120000 Btuh)
3. Daikin samping Pepper Lunch
AC No 1 (120000 Btuh)
AC No 2(120000 Btuh)
4.Daikin Didalam Market Place
Ac No 1 (160000 Btuh)
Ac No 2 (160000 Btuh)

AC Split
1. Kantor Management
AC No 1 (2 Pk)
AC No 2 (2 Pk)
2. Kantor Operasional
AC No 1 (2 Pk)
AC No 2 (2 Pk)
3. Kantor GM (2 Pk)
4. Ruang Kontrol
AC No 1 (2 Pk)
AC No 2 (2 Pk)
5.Ruang Trafo
AC No 1 (2 Pk)
AC No 2 (2 Pk)
6. Ruang ATM
AC No 1 (2 Pk)
AC No 2 (2 Pk)
7. Mushollah Lt1 (2 Pk)
6 Ruang Accounting B1 (2 Pk)

10

11

12

Anda mungkin juga menyukai