CONTRA

PAKET

: REHABILITASI/PEMELIHARAAN BERKALA JALAN KOTA SENGKANG - IMPA

KONTRAKTOR

: PT. Gangking Raya

NO. KONTRAK

: KU.08.08/PPK.16/APBN/JLN.01/V/2014

TANGGAL

: 14 Mei 2014

NILAI KONTRAK

: Rp

KONSULTAN SUPERVISI

: CV. Aurama Karya Konsultan

NO.ITEM

7,307,128,130.32

URAIAN PEKERJAAN

HARGA SATUAN

KON
Volume

DIV.I UMUM
1.2

Mobilisasi

LS

83,800,000.00

1.00

1.8.1

Manajemen dan Keeselamatan lalu lintas

LS

5,500,000.00

1.00

1.17

Pengamanan Lingkungan Hidup

LS

4,500,000.00

1.00

1.21

Manajemen Mutu

LS

7,000,000.00

1.00

M3

52,674.95

61.01

M3

41,663.34

M3

645,726.60

SUB TOTAL DIV.I


DIV.II DRAINASE
2.1.1

2.2.1

Galian untuk Selokan Drainase dan Saluran Air

Pasangan Batu dengan Mortar

95.80

NO.ITEM

URAIAN PEKERJAAN

HARGA SATUAN

KON
Volume

SUB TOTAL DIV.II


DIV.III PEKERJAAN TANAH
3.1.(7)

3.2.(1)
3.3.1

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

265,192.36

M3

168,087.39

Timbunan Biasa

M3

79,488.74

Penyiapan Badan Jalan

M2

3,177.54

M3

314,441.31

M3

476,525.69

M3

404,485.10

28.72

853.85

SUB TOTAL DIV.III


DIV.IV PELEBARAN PERKERASAN DAN BAHU JALAN
4.2.(2b)

Lapis Pondasi Agregat Kelas S


SUB TOTAL DIV.IV
DIV.V PERKERASAN BERBUTIR

5.1.1.

Lapis Pondasi Agregat Kelas A

525.00

SUB TOTAL DIV.V


DIV.VI PERKERASAN ASPAL
6.1.(1a)

Lapis Resap Pengikat - Aspal Cair

Liter

12,057.65

2,625.00

6.1.(2a)

Lapis Perekat - Aspal Cair

Liter

11,417.86

9,774.45

6.3.(5a)

Laston Lapis Aus (AC-WC) (gradasi halus/kasar)

Ton

616,760.30

714.24

6.3.(5c)

Laston Lapis Aus Perata (AC-WC(L)) (gradasi halus/kasar)

Ton

605,907.02

1,767.62

NO.ITEM
6.3.(6c)

URAIAN PEKERJAAN
Laston Lapis Antara Perata (AC-BC (L)) (gradasi halus/kasar)

HARGA SATUAN
Ton

471,601.60

Ton

451,572.23

KON
Volume
923.22

NO.ITEM

URAIAN PEKERJAAN

HARGA SATUAN

KON
Volume

6.3.(8a)

Aspal Keras

Ton

11,800,000.00

217.48

6.3.(9)

Bahan Anti Pengelupasan

Kg

70,000.00

652.43

Bahan Pengisi (Filler) Tambahan Semen

Kg

1,500.00

34,394.70

6.3.(10b)

SUB TOTAL DIV.VI


DIV.VII PEKERJAAN STUKTUR
7.1.7a

Beton Mutu Sedang fc' = 20 Mpa

M3

1,443,190.75

759.50

7.3.1

Baja Tulangan U24 Polos

Kg

14,639.63

500.00

Pasangan Batu

M3

609,759.58

138.69

40.00

7.9.(1)

SUB TOTAL DIV.VII


DIV.VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1.(1)

Lapis Pondasi Agregat kelas A Untuk Pekerjaan Minor

M3

700,585.09

8.1.(2)

Lapis Pondasi Agregat kelas B Untuk Pekerjaan Minor

M3

343,023.17

8.1.(5)

Campuran Aspal Panas Untuk Pekerjaan Minor

M3

2,999,069.89

M3

2,899,939.22

M2

130,453.18

M2

130,453.18

LS

26,773,185.71

8.4.(1)

Marka Jalan Termoplastik

22.00

1,180.47

SUB TOTAL DIV.VIII


DIV.X PEKERJAAN PEMELIHARAAN RUTIN
10.1.(3)

Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan

1.00

NO.ITEM

URAIAN PEKERJAAN

HARGA SATUAN

SUB TOTAL DIV.X


TOTAL DIV.I S/D X
PPN 10 %
T O TAL
D

PEMBULATAN

Panitia Peneliti Pelaksanaan Kontrak :


1. Thomas Aspa, ST.
2. Hartawan T, ST.

Ketua
Sekretaris

3. Dibya Tenrilangi, ST, MT.

Anggota

4. Muhammad Aqsha Q, ST.

Anggota

5. Ishak Rahim, ST, MT.

Anggota

1
2..
3...
4..
5.

KON
Volume

CONTRACT CHANGE ORDER (CCO)

GKANG - IMPA IMPA

KONTRAK AWAL
Jumlah Harga Rp.

CONTRACT CHANGE ORDER-01


Bobot %

Volume

Jumlah Harga Rp.

PEKERJAN TAMBAH

Bobot %

Volume

PEKERJAN

Jumlah Harga Rp.

83,800,000.00

1.26

1.00

83,800,000.00

1.26

5,500,000.00

0.08

1.00

5,500,000.00

0.08

4,500,000.00

0.07

1.00

4,500,000.00

0.07

7,000,000.00

0.11

1.00

7,000,000.00

0.11

100,800,000.00

1.52

100,800,000.00

1.52

3,213,698.70

0.05

61.01

3,213,698.70

0.05

50.24

2,093,166.20

0.03

53.92

34,817,578.27

0.52

61,860,608.28

0.93

Volume

0.00

50.24

0.00

2,093,166.20
41.88

KONTRAK AWAL

CONTRACT CHANGE ORDER-01

Jumlah Harga Rp.

Bobot %

65,074,306.98

0.98

7,616,324.58

0.11

2,713,142.53

0.04

10,329,467.11

0.16

250,175,987.25

3.77

Volume

Jumlah Harga Rp.

PEKERJAN TAMBAH

Bobot %

Volume

PEKERJAN

Jumlah Harga Rp.

40,124,443.17

0.60

28.72

7,616,324.58

0.11

595.45

100,087,613.01

1.51

595.45

100,087,613.01

112.69

8,957,576.77

0.13

112.69

8,957,576.77

6,960.68

22,117,826.14

0.33

6,106.83

19,404,683.61

138,779,340.50

2.09

12,734,873.06

0.19

12,734,873.06

0.19

525.00

250,175,987.25

3.77

914.40

369,861,175.44

5.57

250,175,987.25

3.77

40.50

Volume

2,093,166.20

128,449,873.40

40.50

12,734,873.06
12,734,873.06

914.40

369,861,175.44

250,175,987.25

3.77

31,651,331.25

0.48

8,261.93

99,619,399.98

1.50

111,603,301.68

1.68

4,970.85

56,756,473.98

0.85

440,514,876.67

6.63

549.63

338,992,313.55

5.10

164.61

1,071,013,366.69

16.12

1,738.46

1,053,346,014.73

15.86

29.16

5,636.93

67,968,068.73
4,803.60

KONTRAK AWAL
Jumlah Harga Rp.
435,392,029.15

CONTRACT CHANGE ORDER-01


Bobot %
6.55

Volume

Jumlah Harga Rp.

PEKERJAN TAMBAH

Bobot %

923.22

435,392,029.15

6.55

248.71

112,310,653.51

1.69

Volume

248.71

Jumlah Harga Rp.

112,310,653.51

PEKERJAN
Volume

KONTRAK AWAL
Jumlah Harga Rp.

CONTRACT CHANGE ORDER-01


Bobot %

Volume

Jumlah Harga Rp.

PEKERJAN TAMBAH

Bobot %

Volume

PEKERJAN

Jumlah Harga Rp.

Volume

2,566,264,000.00

38.63

202.91

2,394,382,991.04

36.04

14.57

45,670,100.00

0.69

608.74

42,611,900.69

0.64

43.69

51,592,050.00

0.78

32,565.03

48,847,545.16

0.74

4,753,701,055.44

71.56

4,582,259,321.78

68.98

1,096,103,374.63

16.50

89.84

129,657,446.62

1.95

7,319,815.00

0.11

1,080.02

15,811,163.46

0.24

84,567,556.15

1.27

124.73

76,054,321.55

1.14

1,187,990,745.78

17.88

221,522,931.64

3.33

28,023,403.60

0.42

30.97

21,699,922.58

0.33

33.99

11,659,913.25

0.18

22.00

65,979,537.58

0.99

112.81

327,141,850.51

4.92

1,180.47

153,996,065.39

2.32

1,187.34

154,892,278.74

2.33

580,477,289.31

8.74

26,773,185.71

0.40

65,979,537.58

153,996,065.39

0.99

2.32

247,999,006.57

3.73

26,773,185.71

0.40

1.00

1,829.67

180,278,722.23

669.66
580.02

8,491,348.46
-

13.96

8,491,348.46

33.99

11,659,913.25
-

112.81

327,141,850.51
-

1,187.34

154,892,278.74
338,801,763.76

9.03

KONTRAK AWAL

CONTRACT CHANGE ORDER-01

Jumlah Harga Rp.

Bobot %

26,773,185.71
6,642,843,754.84
664,284,375.48
7,307,128,130.32

Volume

Jumlah Harga Rp.

0.40
100.00

26,773,185.71
5,953,647,372.42
595,364,737.24
6,549,012,109.66
758,116,020.66
689,196,382.42

PEKERJAN TAMBAH

Bobot %
0.40
89.62

Volume

Jumlah Harga Rp.

PEKERJAN
Volume

670,849,747.11
67,084,974.71
737,934,721.82

Disetujui Oleh :
Pejabat Pembuat Komitmen 16
Pompanua-Ulugalung-Sengkang-Tarumpakkae
Impa Impa-Anabanua-Bts. Luwu Selatan

Diperiksa Oleh :
Konsultan Supervisi
CV. Aurama Karya Konsultan

Ir. H. Syahrir Hud, M.Si.


Nip 19651211 199703 1 003

Ir. Seperding
Site Engineer

D
Kontr
PT.

PEKERJAN KURANG
Jumlah Harga Rp.

27,043,030.01

KET

PEKERJAN KURANG
Jumlah Harga Rp.
27,043,030.01

54,846,827.70
101,522,563.13
17,667,351.96

KET

PEKERJAN KURANG
Jumlah Harga Rp.
-

KET

PEKERJAN KURANG
Jumlah Harga Rp.
171,881,008.96
3,058,199.31
2,744,504.84
351,720,455.90

966,445,928.00

8,513,234.60
974,959,162.60

6,323,481.02

6,323,481.02

KET

PEKERJAN KURANG
Jumlah Harga Rp.
1,360,046,129.53
136,004,612.95
1,496,050,742.48

Dibuat Oleh :
Kontraktor Pelaksana
PT. Gangking Raya

Ashabur, SE.
Direktur