Anda di halaman 1dari 3

REKAPITULASI

PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
TH. ANGGARAN

:
:
:
:
:

PERENCANAAN INFRASTRUKTUR PERDESAAN DAN PERKOTAAN


PENYUSUNAN DETAIL ENGGINEER DESIGN (DED) AIR BERSIH
PENYUSUNAN DED AIR BERSIH
KECAMATAN NUHON
2015

No.

URAIAN

A.

BIAYA LANGSUNG PERSONIL

A.1
A.2

TENAGA AHLI
TENAGA PENDUKUNG

B.

BIAYA LANGSUNG NON PERSONIL

B.1
B.2
B.3

BIAYA OPERASIONAL KANTOR


BIAYA TRANSPORTASI/AKOMODASI
LAPORAN

JUMLAH HARGA
( Rp )

REAL COST
PPN 10 %
TOTAL
DIBULATKAN

TERBILANG :

........................., ..................... 2015


Penawar,
PT./CV. ..................

Nama Pimpinan Perusahaan


Jabatan

HARGA PERKIRAAN SENDIRI (HPS)


PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
TH. ANGGARAN

I.

:
:
:
:
:

PERENCANAAN INFRASTRUKTUR PERDESAAN DAN PERKOTAAN


PENYUSUNAN DETAIL ENGGINEER DESIGN (DED) AIR BERSIH
PENYUSUNAN DED AIR BERSIH
KECAMATAN NUHON
2015

BIAYA LANGSUNG PERSONIL

A.1 TENAGA AHLI


No.

URAIAN

SATUAN

JUMLAH
PERSONIL

JUMLAH
BULAN

(Orang)
1

Team Leader

OB

1,00

4,0

2
3

Ahli Geodesi
Ahli Teknik Bangunan Gedung

OB
OB

1,00
1,00

4,0
4,0

HARGA SATUAN

JUMLAH HARGA

( Rp )

( Rp )

Jumlah A.1
A.2 TENAGA PENDUKUNG
No.

URAIAN

SATUAN

JUMLAH
PERSONIL

JUMLAH
BULAN

(Orang)
1
2
3
4

Tenaga Surveyor (Juru Ukur)


Draftman
Juru Hitung Kwantitas
Operator Komputer

OB
OB
OB
OB

5,00
3,00
1,00
1,00

HARGA SATUAN

JUMLAH HARGA

( Rp )

( Rp )

3,0
3,0
3,0
4,0
Jumlah A.2

II. BIAYA LANGSUNG NON PERSONIL


B.1 BIAYA OPERASIONAL KANTOR
No.

URAIAN

SATUAN

VOLUME
Unit

1
2
3
4
5
6
7

Sewa Kantor
Sewa Alat Theodolit + Bak Ukur
Sewa Alat GPS
Sewa Komputer + Printer
ATK
Foto copy/Penggandaan
Dokumentasi

UB
UB
UB
UB
Paket
Paket
Ls

1,00
3,00
1,00
3,00
1,00
1,00
1,00

JUMLAH
BULAN

HARGA SATUAN

JUMLAH HARGA

( Rp )

( Rp )

4,0
3,0
3,0
4,0
4,0
3,0
Jumlah B.1

B.2 BIAYA TRANSPORTASI/AKOMODASI


No.

1
2
3

URAIAN

Sewa Kendaraan Roda Empat


Sewa Kendaraan Roda Dua
Akomodasi/Penginapan

SATUAN

Unit
Unit
LS

VOLUME

1,00
3,00
1,00

JUMLAH
BULAN

HARGA SATUAN

JUMLAH HARGA

( Rp )

( Rp )

4,0
3,0
3,0
Jumlah B.2

Page 1

B.3 LAPORAN
No.

1
2
3
4
5
6
7
8
9
10

URAIAN

Laporan Bulanan
Laporan Pendahuluan
Laporan Antara (Interim Report)
Laporan Akhir
Executive Summary
Album Gambar dan Desain Uk A3
Peta Jaringan Pipa Uk A1
Spesifikasi Teknis
CD
Pertemuan Presentasi

SATUAN

buku
buku
buku
buku
buku
buku
lembar
buku
keping
kali

VOLUME

8,00
3,00
3,00
5,00
5,00
4,00
5,00
3,00
9,00
2,00

JUMLAH
BULAN

HARGA SATUAN

JUMLAH HARGA

( Rp )

( Rp )

Jumlah B.3

Page 2

Anda mungkin juga menyukai