Anda di halaman 1dari 145

Analisa Harga Satuan Pekerjaan Persiapan

No.

A-01

URAIAN

HARGA
SATUAN
(Rp)

HARGA
(Rp)

Btg

1.25

28,000.00

35,000.00

Kg

2.5

1,406.00

3,515.00

M3

0.005

255,400.00

1,277.00

M3

0.009

211,100.00

1,899.90

M3

0.072 2,640,000.00

190,080.00

1 M' Pagar Sementara Dari Kayu


Tinggi 2 m

Dolken
Kayu 810 / 400
cm
Semen
Portland
Pasir
beton
Koral
Beton 2/3

Kayu
balok
terentang

A-02

VOLUME

SATUAN

Paku
Biasa 2" 5"
Residu
Pekerja
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

Kg
Kg
Oh

0.06
0.4
0.4

23,400.00
8,100.00
42,000.00

1,404.00
3,240.00
16,800.00

Oh

0.2

65,000.00

13,000.00

Oh
Oh

0.02
0.02

75,000.00
80,000.00

1,500.00
1,600.00
269,315.90
269,316.00

Dibulatkan
1 M' Pagar Sementara Seng Gelombang
Tinggi 2 m

Dolken
Kayu 810 / 400
cm
Semen
Portland

Btg

1.25

28,000.00

35,000.00

Kg

2.5

1,406.00

3,515.00

Lbr

1.2

62,900.00

75,480.00

M3

0.005

255,400.00

1,277.00

M3

0.009

211,100.00

1,899.90

0.072 2,640,000.00

190,080.00

Seng
Gelomba
ng BJLS30
Pasir
beton
Koral
Beton 2/3

Kayu
balok
terentang

M3

Paku
Biasa 2" 5"

Kg

0.06

23,400.00

1,404.00

Meni Besi
Pekerja
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

Kg
Oh

0.45
0.4

30,400.00
42,000.00

13,680.00
16,800.00

Oh

0.2

65,000.00

13,000.00

Oh
Oh

0.02
0.02

75,000.00
80,000.00

1,500.00
1,600.00
355,235.90
355,236.00

Btg

28,000.00

28,000.00

Kg

1,406.00

2,812.00

Kg

2.5

63,500.00

158,750.00

M3

0.005

255,400.00

1,277.00

M3

0.009

211,100.00

1,899.90

Kg
Oh

0.06
0.3

23,400.00
42,000.00

1,404.00
12,600.00

Oh

0.2

65,000.00

13,000.00

Oh
Oh

0.02
0.02

75,000.00
80,000.00

1,500.00
1,600.00
222,842.90
222,843.00

0.012 1,870,500.00

22,446.00

Dibulatkan

A-03

1 M' Pagar
SementaraKawat
Duri Tinggi 1,80 m

Dolken
Kayu 810 / 400
cm
Semen
Portland
Kawat
Duri
Pasir
beton
Koral
Beton 2/3
Paku
Biasa 2" 5"
Pekerja
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

Dibulatkan

A-04

1 M2 Pengukuran
Dan Pasang
Bouwplank
Kayu
kaso 5/7

Paku
Biasa 2" 5"
Kayu
papan
albasia
Pekerja
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

M3

Kg

M3
Oh

0.02

23,400.00

468

0.007 2,071,700.00
0.1
42,000.00

14,501.90
4,200.00

Oh

0.1

65,000.00

6,500.00

Oh
Oh

0.01
0.005

75,000.00
80,000.00

750
400
49,265.90

Dibulatkan

A-05

49,266.00

1 M2 Pembuatan
Kantor Sementara
dgn Lantai Diplester

Dolken
Kayu 810 / 400
cm

Kayu
Balok
terentang
Paku
Biasa
Besi Strip
Semen
Portland
Pasir
Pasang
Pasir
beton
Koral
Beton2/3
Bata
Merah
Seng Plat

Kawat
harmonik
a

Kaca
Polos
3mm
Kunci
Tanam
Plywood
120 x 240
x 0,4 cm
Pekerja
Tukang
Kayu
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

Btg

1.25

28,000.00

35,000.00

M3

0.18 2,640,000.00

475,200.00

Kg
Kg

0.85
1.1

23,400.00
26,800.00

19,890.00
29,480.00

Kg

35

1,406.00

49,210.00

M3

0.15

233,400.00

35,010.00

M3

0.1

255,400.00

25,540.00

M3

0.15

211,100.00

31,665.00

Bh
m'

30
0.25

775
15,815.00

23,250.00
3,953.75

M2

35,900.00

71,800.00

M2

0.08

87,400.00

6,992.00

Bh

0.15

94,500.00

14,175.00

Lbr
Oh

0.06
2

140,000.00
42,000.00

8,400.00
84,000.00

Oh

65,000.00

130,000.00

Oh

65,000.00

65,000.00

Oh
Oh

0.3
0.05

75,000.00
80,000.00

22,500.00
4,000.00
1,135,065.75
1,135,066.00

Btg

1.7

28,000.00

47,600.00

Dibulatkan

A-06

1 M2 Pembuatan
Gudang Semen dan
Alat-alat

Dolken
Kayu 810 / 400
cm

A-07

Seng
Gelomba
ng BJLS
30
Pekerja
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

M3

0.21 2,640,000.00

Dolken
Kayu 810 / 400
cm
Kayu
balok
terentang
Paku
Biasa
Semen
Portland
Pasir
Beton
Koral
Beton 2/3
Seng
Gelomba
ng BJLS
30
Pekerja
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

554,400.00

Kg

0.3

23,400.00

7,020.00

Kg

10.5

1,406.00

14,763.00

M3

0.03

255,400.00

7,662.00

M3

0.05

211,100.00

10,555.00

Lbr
Oh

1.5
1

62,900.00
42,000.00

94,350.00
42,000.00

Oh

65,000.00

130,000.00

Oh
Oh

0.2
0.05

75,000.00
80,000.00

15,000.00
4,000.00
927,350.00
927,350.00

Btg

1.25

28,000.00

35,000.00

0.186 2,640,000.00

491,040.00

Dibulatkan
1 M2 Pembuatan
Bedeng Buruh

A-08

Kayu
balok
terentang
Paku
Biasa
Semen
Portland
Pasir
Beton
Koral
Beton 2/3

M3
Kg

0.3

23,400.00

7,020.00

Kg

18

1,406.00

25,308.00

M3

0.03

255,400.00

7,662.00

M3

0.05

211,100.00

10,555.00

Lbr
Oh

1.5
1

62,900.00
42,000.00

94,350.00
42,000.00

Oh

65,000.00

130,000.00

Oh
Oh

0.2
0.05

75,000.00
80,000.00

15,000.00
4,000.00
861,935.00
861,935.00

Dibulatkan
1 M2 Membersihkan Lapangan
dan Perataan

A-09

A-11

A-12

0.1
0.05

42,000.00
80,000.00

4,200.00
4,000.00
8,200.00
8,200.00

Batu
Belah
15/20

M3

0.15

205,500.00

30,825.00

Batu
Pecah 5/7
Pasir
Pasang
Pekerja
Mandor
Jumlah

M3

0.09

196,000.00

17,640.00

M3
Oh
Oh

0.01
1
0.05

233,400.00
42,000.00
80,000.00

2,334.00
42,000.00
4,000.00
96,799.00
96,799.00

42,000.00
80,000.00

280,014.00
26,640.00
306,654.00

Dibulatkan
1 M3 Bongkaran
Beton Bertulang
Pekerja
Oh
6.667
Mandor
Oh
0.333
Jumlah
Dibulatka
n
1 M3 Bongkaran Dinding Tembok Bata
Merah
Pekerja
Oh
6.667
Mandor
Oh
0.033
Jumlah
Dibulatkan
1 M Pagar beton Pracetak ( 5 x
50 x 213 ) cm

A-13

Oh
Oh

Dibulatkan
1M2 Pembuatan
Jalan Sementara

A-10

Pekerja
Mandor
Jumlah

Panel
Beton
Pracetak
Kolom
Beton
Pracetak
Pasir
Beton
Koral 2/3
Semen
abu - abu
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

306,654.00

42,000.00
80,000.00

280,014.00
2,640.00
282,654.00
282,654.00

Lbr

0.986

199,200.00

196,411.20

Btg

0.525

264,000.00

138,600.00

M3
M3

0.074
0.146

255,400.00
211,100.00

18,899.60
30,820.60

Kg
Oh

45
0.375

1,406.00
42,000.00

63,270.00
15,750.00

Oh

0.125

65,000.00

8,125.00

Oh
Oh

0.012
0.019

75,000.00
80,000.00

900
1,520.00
474,296.40
474,296.00

Dibulatkan
1 M Pagar kawat ayam tiang besi L50.50.5,
tinggi 1 m'

A-14

Besi pelat
(1,2 x 3)
mm
Baut
Semen
Portland
Pasir
beton
Koral
Beton 2/3
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

Lbr

0.434

14,900.00

6,466.60

Kg

6.786

18,300.00

124,183.80

Kg
bh

0.0424
4

18,300.00
600

775.92
2,400.00

Kg

2.5

1,406.00

3,515.00

M3

0.005

255,400.00

1,277.00

M3
Oh

0.009
0.375

211,100.00
42,000.00

1,899.90
15,750.00

Oh

0.125

65,000.00

8,125.00

Oh
Oh

0.012
0.019

75,000.00
80,000.00

900
1,520.00
166,813.22
166,813.00

Lbr

0.434

171,300.00

74,344.20

Kg

1,406.00

2,812.00

Kg

2.5

63,500.00

158,750.00

M3

0.005

255,400.00

1,277.00

M3
Oh

0.009
0.375

211,100.00
42,000.00

1,899.90
15,750.00

Oh

0.125

65,000.00

8,125.00

Oh
Oh

0.012
0.019

75,000.00
80,000.00

900
1,520.00
265,378.10
265,378.00

btng
kg
org

1
0.25
0.25

25,000.00
23,400.00
42,000.00

25,000.00
5,850.00
10,500.00

org

0.017

65,000.00

1,105.00

Dibulatkan
1 M2 Pagar BRC lengkap
dengan tiang

A-15

Kawat
ram ayam
Besi siku
L 50.50.5

BRC
lengkap
dengan
tiang
Semen
Portland
Kawat
Duri
Pasir
beton
Koral
Beton 2/3
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

Dibulatkan
1 M2 Steiger Werk / perancah
dari Bambu

Bambu
6 - 10
(600) cm
Tali ijuk
Pekerja
Tukang
kayu

A-16

Kepala
tukang
Mandor
Jumlah

org
org

0.002
0.013

75,000.00
80,000.00

150
1,040.00
43,645.00
43,645.00

btng
org
org

1.25
0.5
0.025

25,000.00
42,000.00
80,000.00

31,250.00
21,000.00
2,000.00
54,250.00
54,250.00

Dibulatkan
1 M' Cerucuk Bambu

Bambu
7 -10
(400) cm
Pekerja
Mandor
Jumlah

Dibulatkan
Kembali ke Analisa AHS SNI

B. ANALISA HARGA SATUAN PEKERJAAN TANAH

No.

B-01

URAIAN
1 M3
Galian
Tanah
Biasa
sedalam
1m
-

SATUAN

Pekerja
Mandor
Jumlah

Oh
Oh

0.4 42,000.00 16,800.00


0.04 80,000.00 3,200.00
20,000.00
20,000.00

Pekerja
Mandor
Jumlah

Oh
Oh

0.526 42,000.00 22,092.00


0.052 80,000.00 4,160.00
26,252.00
26,252.00

Pekerja
Mandor
Jumlah

Oh
Oh

0.735 42,000.00 30,870.00


0.073 80,000.00 5,840.00
36,710.00
36,710.00

Pekerja
Mandor
Jumlah

Oh
Oh

0.625 42,000.00 26,250.00


0.062 80,000.00 4,960.00
31,210.00
31,210.00

Dibulatkan

B-02

1 M3
Galian
Tanah
Biasa
Sedalam
2m
Dibulatkan

B-03

1 M3
Galian
Tanah
Biasa
Sedalam
3m
Dibulatkan

B-04

1 M3
Galian
Tanah
Keras
Sedalam
1m
Dibulatkan

B-05

1 M3
Galian
Tanah
Lumpur
Sedalam
1m

HARGA
VOLUME SATUAN HARGA
(Rp)
(Rp)

Dibulatkan

Pekerja
Mandor
Jumlah

Oh
Oh

0.823 42,000.00 34,566.00


0.083 80,000.00 6,640.00
41,206.00
41,206

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

No.

C-01

URAIAN

SATUAN

HARGA
VOLUME SATUAN
HARGA
(Rp)
(Rp)

1 M3
Pasanag
Pondasi
batu Kali
adk 1pc :
3 ps
-

Batu
Belah
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

M3

1.1 205,500.00 226,050.00

Kg

202

M3
Oh

1,406.00 284,012.00

0.485 233,400.00 113,199.00


1.5 42,000.00 63,000.00

Oh

0.6

65,000.00

39,000.00

Oh
Oh

0.06
0.075

75,000.00
80,000.00

4,500.00
6,000.00
735,761.00
735,761.00

Dibulatkan

C-02

1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
4ps
Dibulatkan

C-03

1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
5ps

Batu
Belah
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

M3

1.1 205,500.00 226,050.00

Kg

163

M3
Oh

0.52 233,400.00 121,368.00


1.5 42,000.00 63,000.00

1,406.00 229,178.00

Oh

0.6

65,000.00

39,000.00

Oh
Oh

0.06
0.075

75,000.00
80,000.00

4,500.00
6,000.00
689,096.00
689,096.00

Batu
Belah
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

M3

1.1 205,500.00 226,050.00

Kg

136

M3
Oh

1,406.00 191,216.00

0.544 233,400.00 126,969.60


1.5 42,000.00 63,000.00

Oh

0.6

65,000.00

39,000.00

Oh
Oh

0.06
0.075

75,000.00
80,000.00

4,500.00
6,000.00
656,735.60
656,736.00

Dibulatkan

C-04

1 M3
Pasang
Pondasi
Batu
Kosong
(aanstam
ping)
Dibulatkan

Batu
Belah
Pasir
Urug
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

M3

1.2 205,500.00 246,600.00

M3
Oh

0.3 175,300.00
0.78 42,000.00

52,590.00
32,760.00

Oh

0.39

65,000.00

25,350.00

Oh
Oh

0.039
0.039

75,000.00
80,000.00

2,925.00
3,120.00
363,345.00
363,345.00

Analisa Harga Satuan Pekerjaan Beton


NO
D-17r2

URAIAN
1 M3 Sloof Beton Tulang 15/20 (180 kg besi +
bekisting) 4dia. 12 ring 8-15
Kayu papan terentang
Paku Biasa 2" - 5"
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Pekerja
Tukang Batu

SAT VOLUME HRG.SAT

M3
Kg
Kg
Kg
Kg
M3
M3
Oh
Oh

0.27 2,850,000 769,500


2
23,400
46,800
180
16,500 2,970,000
3
27,700
83,100
323
1,200 387,600
0.52 225,000 117,000
0.78 200,000 156,000
4.85
55,000 266,750
0.35
70,000
24,500

Tukang Kayu

Oh

1.56

70,000

109,200

Tukang Besi

Oh

1.4

70,000

98,000

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.331
0.17

80,000
85,000

26,480
14,450
5,069,380

Dibulatkan

JUMLAH

5,069,380

1 M3 Kolom Beton Tulang 15/20 (180 kg besi +


bekisting) 4dia.12 8-15

Kayu papan terentang

M3

0.4 2,850,000 1,140,000

Paku Biasa 2" - 5"

Kg

Minyak Bekisting

Ltr

Besi Beton

Kg

180

16,500 2,970,000

Kawat Beton

Kg

1.8

27,700

49,860

Semen Portland

Kg

323

1,200

387,600

Pasir Beton

M3

0.52

225,000

117,000

Koral Beton 2/3

M3

0.78

200,000

156,000

Kayu Balok Terentang

M3

0.15 2,640,000

396,000

23,400

93,600

40,500

Dolken -8-10/4m
Pekerja

Btg
Oh

20
7.3

15,000
55,000

300,000
401,500

Tukang Batu

Oh

0.35

70,000

24,500

Tukang Kayu

Oh

3.3

70,000

231,000

Tukang Besi

Oh

2.1

70,000

147,000

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.57
0.25

80,000
85,000

45,600
21,250
6.480.910

Dibulatkan

6.481.000

1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring


balk + balok poratl (180 kg besi + bekisting)
4dia. 12, 8-15

Kayu papan terentang

M3

0.32 2,850,000

Paku Biasa 2" - 5"

Kg

3.2

23,400

Besi Beton

Kg

180

16,500 2,970,000

Kawat Beton

Kg

2.25

27,700

62,325

Semen Portland

Kg

323

1,200

387,600

Pasir Beton

M3

0.52

225,000

117,000

Koral Beton 2/3

M3

0.78

200,000

156,000

Kayu Balok Terentang

M3

0.14 2,640,000

369,600

Dolken -8-10/4m

Btg

16

15,000

912,000

74,880

240,000

Pekerja

Oh

5.96

55,000

327,800

Tukang Batu

Oh

0.35

70,000

24,500

Tukang Kayu

Oh

2.8

70,000

196,000

Tukang Besi

Oh

1.4

70,000

98,000

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.455
0.208

80,000
85,000

36,400
17,680
6.412.865

Dibulatkan

D-29

6,413,000

1 M3 Tangga Beton Tulang (90 kg besi +


bekisting)

Kayu papan terentang

M3

0.25 2,850,000

712,500

Paku Biasa 2" - 5"

Kg

23,400

70,200

Minyak Bekisting

Ltr

1.2

40,500

48,600

Besi Beton

Kg

90

16,500 1,485,000

Kawat Beton

Kg

27,700

83,100

Semen Portland

Kg

323

1,200

387,600

Pasir Beton

M3

0.52

225,000

117,000

Koral Beton 2/3

M3

0.78

200,000

156,000

Kayu Balok Terentang

M3

0.105 2,640,000

277,200

Dolken -8-10/4m
Pekerja

Btg
Oh

14
5.6

15,000
55,000

210,000
308,000

Tukang Batu

Oh

0.35

70,000

24,500

Tukang Kayu

Oh

2.3

70,000

161,000

Tukang Besi

Oh

1.4

70,000

98,000

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.405
0.202

80,000
85,000

Dibulatkan

32,400
17,170
4,188,720
4,189,000

1 M3 Membuat Plat Lantai Tb. 10 Cm Beton


3 Bertulang ( 90 Kg Besi + Bekisting )
Kayu Terentang

M3

0.4 2,850,000 1,140,000

Paku Biasa 2" - 5"

Kg

23,400

93,600

Minyak Bekisting

Ltr

40,500

81,000

Besi Beton Polos

Kg

90

Kawat Beton

Kg

27,700

83,100

Kayu Balok Terentang

M3

0.105

151,100

15,866

Plywood Tebal 9 mm

Lbr

3.5

151,100

528,850

Dolken kayu Galam o - 8-10/4 m

Btg

60

15,000

900,000

Semen Portland

Kg

323

1,200

387,600

Pasir Beton

M3

0.52

225,000

117,000

Koral Beton 2/3


Pekerja

M3
Oh

0.78
5.2

200,000
55,000

156,000
286,000

Tukang Batu

Oh

0.35

70,000

24,500

Tukang Kayu

Oh

3.3

70,000

231,000

16,500 1,485,000

Kepala Tukang
Mandor
Jumlah
Dibulatkan

Oh
Oh

0.365
1.06

80,000
85,000

29,200
90,100
5,648,816
5,649,000

E. ANALISA HARGA SATUAN PEKERJAAN DINDING


No.

E-01

URAIAN

SATUAN

VOLUME

HARGA
SATUAN
(Rp)

M2 Pasang Bata Merah Tebal 1 Bata, 1pc


: 3ps

Bata Merah

Bh

140

Semen Portland

Kg

32.95

1,406.00

46,327.70

Pasir Pasang
Pekerja

M3
Oh

0.091 233,400.00
0.65 42,000.00

21,239.40
27,300.00

Tukang Batu

Oh

0.2

65,000.00

13,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.02
0.03

75,000.00
80,000.00

1,500.00
2,400.00
220,267.10

775 108,500.00

Dibulatkan

E-02

220,267.00

M2 Pasang Bata
Merah Tebal 1
Bata, 1pc : 4ps

Bata Merah

Bh

140

Semen Portland

Kg

26.55

1,406.00

37,329.30

Pasir Pasang
Pekerja

M3
Oh

0.093 233,400.00
0.65 42,000.00

21,706.20
27,300.00

Tukang Batu

Oh

0.2

65,000.00

13,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.02
0.03

75,000.00
80,000.00

1,500.00
2,400.00
211,735.50

Dibulatkan

E-03

HARGA
(Rp)

M2 Pasang Bata
Merah Tebal 1
Bata, 1pc : 5ps

775 108,500.00

211,736.00

E-04

E-05

E-06

Bata Merah

Bh

140

775 108,500.00

Semen Portland

Kg

22.2

Pasir Pasang
Pekerja

M3
Oh

Tukang Batu

Oh

0.2

65,000.00

13,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.02
0.03

75,000.00
80,000.00

1,500.00
2,400.00
207,720.00

1,406.00

31,213.20

0.102 233,400.00
0.65 42,000.00

23,806.80
27,300.00

Dibulatkan
M2 Pasang Bata Merah Tebal 1/2 Bata,
1pc : 3ps

207,720.00

Bata Merah

Bh

70

775

54,250.00

Semen Portland

Kg

14.37

1,406.00

20,204.22

Pasir Pasang
Pekerja

M3
Oh

0.04 233,400.00
0.32 42,000.00

9,336.00
13,440.00

Tukang Batu

Oh

0.1

65,000.00

6,500.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.01
0.015

75,000.00
80,000.00

750
1,200.00
105,680.22

Dibulatkan
M2 Pasang Bata Merah Tebal 1/2 Bata,
1pc : 4ps

Bata Merah

Bh

70

775

54,250.00

Semen Portland

Kg

11.5

1,406.00

16,169.00

Pasir Pasang
Pekerja

M3
Oh

0.043 233,400.00
0.32 42,000.00

10,036.20
13,440.00

Tukang Batu

Oh

0.1

65,000.00

6,500.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.01
0.015

75,000.00
80,000.00

750
1,200.00
102,345.20

Dibulatkan
M2 Pasang Bata Merah Tebal 1/2 Bata,
1pc : 5ps

105,680.00

102,345.00

Bata Merah

Bh

70

775

54,250.00

Semen Portland

Kg

9.68

1,406.00

13,610.08

Pasir Pasang
Pekerja

M3
Oh

0.045 233,400.00
0.32 42,000.00

10,503.00
13,440.00

Tukang Batu

Oh

0.1

65,000.00

6,500.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.01
0.015

75,000.00
80,000.00

750
1,200.00
100,253.08

Dibulatkan

100,253.00

F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN


No.

F-01

F-02

URAIAN

1 M2
Plesteran
adk. 1pc :
2ps Tebal
15 mm
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
1 M2
Plesteran
adk. 1pc :
3ps Tebal
15 mm
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan

F-03
-

1 M2
Plesteran
adk. 1pc :
4ps Tebal
15 mm
Semen
Portland
Pasir
Pasang
Pekerja

SATUAN

Kg
M3
Oh

VOLUME

8.52

HARGA
SATUAN
(Rp)

HARGA
(Rp)

1,406.00 11,979.12

0.017 233,400.00
0.2 42,000.00

3,967.80
8,400.00

Oh

0.15

65,000.00

9,750.00

Oh
Oh

0.015
0.01

75,000.00
80,000.00

1,125.00
800
36,021.92
36,022.00

Kg

6.48

1,406.00

9,110.88

0.019 233,400.00
0.2 42,000.00

4,434.60
8,400.00

M3
Oh
Oh

0.15

65,000.00

9,750.00

Oh
Oh

0.015
0.01

75,000.00
80,000.00

1,125.00
800
33,620.48
33,620.00

Kg

5.2

1,406.00

7,311.20

0.02 233,400.00
0.2 42,000.00

4,668.00
8,400.00

M3
Oh

Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
-

F-04

F-05

1 M2
Plesteran
adk. 1pc :
3ps Tebal
20 mm
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
1 M2
Plesteran
adk. 1pc :
4ps Tebal
20 mm
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan

F-06
-

1 M2
Plesteran
adk.
1pc:5ps
tebal 20
mm
Semen
Portland

Oh

0.15

65,000.00

9,750.00

Oh
Oh

0.015
0.01

75,000.00
80,000.00

1,125.00
800
32,054.20
32,054.00

Kg

10.8

M3
Oh

0.026 233,400.00 6,068.40


0.25 42,000.00 10,500.00

Oh

0.2

Oh
Oh

0.02
0.0125

Kg

8.68

M3
Oh

1,406.00 15,184.80

65,000.00 13,000.00
75,000.00
80,000.00

1,500.00
1,000.00
47,253.20
47,253.00

1,406.00 12,204.08

0.028 233,400.00 6,535.20


0.25 42,000.00 10,500.00

Oh

0.2

Oh
Oh

0.02
0.0125

Kg

7.29

65,000.00 13,000.00
75,000.00
80,000.00

1,500.00
1,000.00
44,739.28
44,739.00

1,406.00 10,249.74

Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
-

F-11

1 M2
Acian
Plesteran
Semen
Portland
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan

M3
Oh

0.026 233,400.00 6,068.40


0.25 42,000.00 10,500.00

Oh

0.2

65,000.00 13,000.00

Oh
Oh

0.02
0.0125

75,000.00
80,000.00

1,500.00
1,000.00
42,318.14
42,318.00

Kg
Oh

4
0.143

1,406.00
42,000.00

5,624.00
6,006.00

Oh

0.107

65,000.00

6,955.00

Oh
Oh

0.0105
0.0105

75,000.00
80,000.00

787.5
840
20,212.50
20,213.00

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP


HARGA
No.
URAIAN
SATUAN VOLUME SATUAN
(Rp)

G-01
-

G-02

G-03

M2
Pasang
Atap
Genteng
1 Palentong
Genteng
palentong
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatka
n

Bh
Oh

HARGA
(Rp)

25 1,900.00 47,500.00
0.15 42,000.00 6,300.00

Oh

0.075 65,000.00

4,875.00

Oh
Oh

0.008 75,000.00
0.008 80,000.00

600
640
59,915.00
59,915.00

1 M2 Pasang
Genteng Bubung
Palentong
Genteng
bubung
palentong
Bh
Semen
Kg
Portland
Pasir
pasang
M3
Pekerja
Oh
Tukang
kayu
Oh
Kepala
tukang
Oh
Mandor
Oh
Jumlah
Dibulatka
n
1 M2 Pasang Roof Light
Fibreglass ( 180 x 90 ) cm
Roof light
fibreglass
Lbr

Paku
biasa " 1"
Pekerja
Tukang
kayu

6,000.00 30,000.00

1,406.00 11,248.00

0.032
### 7,468.80
0.4 42,000.00 16,800.00
0.2 65,000.00 13,000.00
0.02 75,000.00
0.002 80,000.00

1,500.00
160
80,176.80
80,177.00

0.6

### 60,000.00

Kg
Oh

0.05 23,800.00
0.14 42,000.00

1,190.00
5,880.00

Oh

0.067 65,000.00

4,355.00

Kepala
tukang
Mandor
Jumlah
Dibulatka
n

Oh
Oh

0.007 75,000.00
0.007 80,000.00

525
560
72,510.00
72,510.00

G-04

1 M2 Pasang Atap
Asbes Gelombang
( 3,00 x 1,05 m ) x 4
mm

G-05

Asbes
gelomban
g
Lbr
0.35 80,000.00 28,000.00
Paku
seng
Kg
0.12 23,800.00 2,856.00
Pekerja
Oh
0.14 42,000.00 5,880.00
Tukang
kayu
Oh
0.07 65,000.00 4,550.00
Kepala
tukang
Oh
0.007 75,000.00
525
Mandor
Oh
0.007 80,000.00
560
Jumlah
42,371.00
Dibulatkan
42,371.00
1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m )
x 4 mm

G-06

Asbes
gelomban
g
Paku
seng
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatka
n

Lbr

0.42 73,300.00 30,786.00

Kg
Oh

0.12 23,800.00
0.14 42,000.00

2,856.00
5,880.00

Oh

0.07 65,000.00

4,550.00

Oh
Oh

0.007 75,000.00
0.007 80,000.00

525
560
45,157.00
45,157.00

1 M2 Pasang Atap
Asbes Gelombang
( 2,40 x 1,05 m ) x 4
mm

Asbes
gelomban
g
Paku
seng
Pekerja
Tukang
kayu

Lbr

0.44 65,900.00 28,996.00

Kg
Oh

0.12 23,800.00
0.14 42,000.00

2,856.00
5,880.00

Oh

0.067 65,000.00

4,355.00

0.007 75,000.00
0.007 80,000.00

525
560
43,172.00
43,172.00

Asbes
gelomban
g
Paku
seng
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatka
n

Lbr

0.51 58,500.00 29,835.00

Kg
Oh

0.12 23,800.00
0.14 42,000.00

2,856.00
5,880.00

Oh

0.067 65,000.00

4,355.00

Oh
Oh

0.007 75,000.00
0.007 80,000.00

525
560
44,011.00
44,011.00

1 M2 Pasang Atap
Asbes Gelombang
( 1,50 x 1,05 m ) x 4
mm

G-09

Oh
Oh

M2
Pasang
Atap
Asbes
Gelomba
ng ( 2,10
x 1,05 m )
1 x 4 mm

G-07

G-08

Kepala
tukang
Mandor
Jumlah
Dibulatka
n

Asbes
gelomban
g
Paku
seng
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatka
n

1 M Pasang Nok
Stel Gelombang 1,05
m

Lbr

0.8 42,300.00 33,840.00

Kg
Oh

0.12 23,800.00
0.14 42,000.00

2,856.00
5,880.00

Oh

0.067 65,000.00

4,355.00

Oh
Oh

0.007 75,000.00
0.007 80,000.00

525
560
48,016.00
48,016.00

G-10

Nok stel
gelomban
g

Paku
sekrup
3,5"
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatka
n
1 M2 Pasang Atap
Genteng Beton
Genteng
beton
Paku
biasa 2" 5"
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatkan

G-11

2.1 38,100.00 80,010.00

Bh
Oh

6
800
0.084 42,000.00

4,800.00
3,528.00

Oh

0.125 65,000.00

8,125.00

Oh
Oh

0.013 75,000.00
0.004 80,000.00

975
320
97,758.00
97,758.00

bh

11

8,500.00 93,500.00

Kg
Oh

0.03 23,400.00
0.2 42,000.00

702
8,400.00

Oh

0.1 65,000.00

6,500.00

Oh
Oh

0.01 75,000.00
0.01 80,000.00

750
800
###
###

bh
Oh

18 2,700.00 48,600.00
0.15 42,000.00 6,300.00

1 M2 Pasang Atap
Genteng Murando
Natural

G-12

Lbr

Genteng
murando
natural
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatka
n

Oh

0.075 65,000.00

4,875.00

Oh
Oh

0.008 75,000.00
0.008 80,000.00

600
640
61,015.00
61,015.00

1 M2 Pasang Atap
Genteng Murando
Glazur

Genteng
murando
glazur

bh

18

4,000.00 72,000.00

Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatka
n

Oh

0.15 42,000.00

6,300.00

Oh

0.075 65,000.00

4,875.00

Oh
Oh

0.008 75,000.00
0.008 80,000.00

600
640
84,415.00
84,415.00

H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT


HARGA
No.
URAIAN
SATUAN VOLUME SATUAN HARGA
(Rp)
(Rp)
(Rp)
(Rp)

H-01

1 M2 Langit-langit
Asbes ( 1,00 x 1,00 )
m, tebal 5 mm

Pelat
asbes
tebal 4
mm
Paku
seng
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

m2

1.1 22,500.00 24,750.00

Kg
Oh

0.01 23,800.00
0.03 42,000.00

238
1,260.00

Oh

0.07 65,000.00

4,550.00

Oh
Oh

0.007 75,000.00
0.0015 80,000.00

525
120
31,443.00
31,443.00

Dibulatkan

H-02

1 M2 Langit-langit
Asbes ( 1,00 x 1,00 )
m, tebal 3,5 mm

H-03

Pelat
asbes
tebal 3,5
mm
Paku
seng
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Lbr

1.1 19,500.00 21,450.00

Kg
Oh

0.01 23,800.00
0.03 42,000.00

238
1,260.00

Oh

0.07 65,000.00

4,550.00

Oh
Oh

0.007 75,000.00
0.0015 80,000.00

525
120
28,143.00
28,143.00

Lbr
Kg
Oh

1.5
###
0.05 23,800.00
0.06 42,000.00

###
1,190.00
2,520.00

Oh

0.1 65,000.00

6,500.00

Oh
Oh

0.01 75,000.00
0.003 80,000.00

750
240

Dibulatkan
1 M2 Langit-langit Akustik ( 60 x
120 ) cm

Akustik
600 x
1200
Paku
Pekerja
Tukang
kayu
Kepala
tukang
Mandor

Jumlah

H-04

Dibulatkan
1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka
Alluminium

H-05

Profil
Alluminiu
m "T"
Kawat f 4
mm
Ramset /
dina bolt
Akustik
600 x
1200
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

3.6 12,200.00 43,920.00

Kg

0.15 28,200.00

4,230.00

Bh

1.05

7,200.00

7,560.00

Lbr
Oh

1.5
###
0.15 42,000.00

###
6,300.00

Oh
Oh
Oh

0.5 65,000.00 32,500.00

3,750.00
600
###
Dibulatkan
###
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka
kayu borneo super

0.05 75,000.00
0.0075 80,000.00

Kayu
Balok
Borneo
Super

M3

Paku
biasa 2" 5"

Kg

0.06 23,400.00

Lbr
Oh

0.39
### 51,363.00
0.27 42,000.00 11,340.00

Oh

0.4 65,000.00 26,000.00

H-06

###
###

Teakwood
120 cm x
240 cm x
0,4 cm
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Oh
Oh

0.023

0.04 75,000.00
0.0135 80,000.00

Dibulatkan
1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu
Borneo Super

Kayu
Balok
Borneo
Super

M3

### 60,720.00

0.023

1,404.00

3,000.00
1,080.00
###
###

### 60,720.00

H-07

Teakwood
(120 x
240x 0,3)
cm
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Kg

0.06 23,400.00

Lbr
Oh

0.39
### 50,349.00
0.27 42,000.00 11,340.00

Oh

0.4 65,000.00 26,000.00

Oh
Oh

0.04 75,000.00
0.0135 80,000.00

Dibulatkan
1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo
Super

1,404.00

3,000.00
1,080.00
###
###

Kayu
Balok
Borneo
Super

M3

Paku
biasa 2" 5"

Kg

0.06 23,800.00

Lbr
Oh

0.39 64,400.00 25,116.00


0.27 42,000.00 11,340.00

Oh

0.4 65,000.00 26,000.00

H-08

Paku
biasa 2" 5"

Triplek
120 cm x
240 cm x
0,4 cm
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Oh
Oh

0.023

### 60,720.00

0.04 75,000.00
0.0135 80,000.00

Dibulatkan
1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka
besi hollow

Hollow
4/4
Zincromat
e
Hollow
2/4
Zincromat
e
Gypsum
board
( 120 x
240 x 9 )
mm

Btg

Btg

Lbr

1,428.00

3,000.00
1,080.00
###
###

0.415 29,200.00 12,118.00

0.15 22,600.00

3,390.00

0.364 79,800.00 29,047.20

H-09

kg

0.11 17,500.00

Bh

Bh
Zak
Oh

0.072 15,000.00
0.125 75,000.00
0.1 42,000.00

1,080.00
9,375.00
4,200.00

Oh

0.05 65,000.00

3,250.00

Oh
Oh

0.005 75,000.00
0.005 80,000.00

375
400
93,960.20
93,960.00

Hollow
4/4
Zincromat
e

Btg

Hollow
2/4
Zincromat
e
GRC

Btg

( 120 x
240 x 4 )
mm
Paku
GRC
Ramset /
dina bolt
Cotton
plaster
Compoun
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Lbr
kg
Bh

0.415 29,200.00 12,118.00

0.15 22,600.00

3,390.00

0.364 67,500.00 24,570.00


0.11 35,000.00
4

3,850.00

7,200.00 28,800.00

Bh
Zak
Oh

0.072 15,000.00
0.125 75,000.00
0.1 42,000.00

1,080.00
9,375.00
4,200.00

Oh

0.05 65,000.00

3,250.00

Oh
Oh

0.005 75,000.00
0.005 80,000.00

375
400
91,408.00
91,408.00

Dibulatkan
1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu
Borneo Super
Kayu
Balok
Borneo
Super

1,925.00

7,200.00 28,800.00

Dibulatkan
1 M2 Langit-langit GRC t = 4 mm + rangka
besi hollow

H-10

Paku
gypsum
Ramset /
dina bolt
Cotton
plaster
Compoun
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

M3

0.023

### 60,720.00

H-11

Paku
biasa 2" 5"
Gypsum
board
( 120 x
240 x 9 )
mm
Paku
sekrup
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Kg

0.06 23,800.00

Lbr

0.39 79,800.00 31,122.00

kg
Oh

0.11 17,500.00 1,925.00


0.27 42,000.00 11,340.00

Oh

0.4 65,000.00 26,000.00

Oh
Oh

0.04 75,000.00
0.0135 80,000.00

Dibulatkan
1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu
Borneo Super

3,000.00
1,080.00
###
###

Kayu
Balok
Borneo
Super

M3

Paku
biasa 2" 5"
GRC

Kg

0.06 23,800.00

Lbr

0.39 67,500.00 26,325.00

kg
Oh

0.11 35,000.00 3,850.00


0.27 42,000.00 11,340.00

Oh

0.4 65,000.00 26,000.00

( 120 x
240 x 4 )
mm
Paku
GRC
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Oh
Oh

0.023

### 60,720.00

0.04 75,000.00
0.0135 80,000.00

Dibulatkan

H-12

1,428.00

1 M List Langit-langit
Kayu Profil 10 cm
List Kayu
profil
Paku
Pekerja
Tukang
kayu
Kepala
tukang
Mandor

1,428.00

3,000.00
1,080.00
###
###

M
Kg
Oh

1.05 29,400.00 30,870.00


0.01 23,800.00
238
0.05 42,000.00 2,100.00

Oh

0.05 65,000.00

3,250.00

Oh
Oh

0.005 75,000.00
0.003 80,000.00

375
240

Jumlah

37,073.00
37,073.00

Dibulatkan

H-13

1 M List Langit-langit
Gypsum 10 cm
List
gypsum
Tepung
gypsum
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatkan

1.05

8,500.00

8,925.00

Kg
Oh

0.15 12,500.00
0.05 42,000.00

1,875.00
2,100.00

Oh

0.05 65,000.00

3,250.00

Oh
Oh

0.005 75,000.00
0.003 80,000.00

375
240
16,765.00
16,765.00

Analisa Harga Satuan Pekerjaan Penutup Lantai dan Dinding


HARGA
No.
URAIAN
SATUAN VOLUME
SATUAN
(Rp)

I-01

1 M2 Lantai Ubin
Granito ukuran 40 x
40 cm Setara
Essenza

Granito
40 x 40
cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

m2
Kg
M3

1.05 345,000.00 362,250.00


9.8

1,406.00

13,778.80

0.0215 233,400.00

5,018.10

Kg
Oh

1.3
0.25

15,700.00
42,000.00

20,410.00
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
421,656.90
421,657.00

Dibulatkan

I-02

1 M2 Lantai Ubin
Granito ukuran 30 x
30 cm Setara
Essenza

Granito
30 x 30
cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

I-03

HARGA
(Rp)

1 M Plint Ubin
Granito ukuran 10 x
40 cm Setara
Essenza

m2
Kg
M3

1.05 322,800.00 338,940.00


10

1,406.00

14,060.00

0.0215 233,400.00

5,018.10

Kg
Oh

1.5
0.26

15,700.00
42,000.00

23,550.00
10,920.00

Oh

0.125

65,000.00

8,125.00

Oh
Oh

0.0125
0.013

75,000.00
80,000.00

937.5
1,040.00
402,590.60
402,591.00

Plint
granito 10
x 40 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

Bh

2.65

27,600.00

73,140.00

Kg

1.2

1,406.00

1,687.20

0.003 233,400.00

700.2

M3
Kg
Oh

0.1
0.06

15,700.00
42,000.00

1,570.00
2,520.00

Oh

0.03

65,000.00

1,950.00

Oh
Oh

0.003
0.003

75,000.00
80,000.00

225
240
82,032.40
82,032.00

Bh

3.33

25,900.00

86,247.00

Kg

1.65

1,406.00

2,319.90

0.0032 233,400.00

746.88

Dibulatkan

I-04

1 M Plint Ubin
Granito ukuran 10 x
30 cm Setara
Essenza

I-05

Plint
granito 10
x 30 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

M3
Kg
Oh

0.1
0.09

15,700.00
42,000.00

1,570.00
3,780.00

Oh

0.09

65,000.00

5,850.00

Oh
Oh

0.009
0.0045

75,000.00
80,000.00

675
360
101,548.78
101,549.00

Dibulatkan
1 M2 Lantai Keramik Corak 10 x 20 cm
setara Mulia

Keramik
corak 10 x
20 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja

m2

56,000.00

56,000.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Tukang
batu
Kepala
tukang
Mandor
Jumlah

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
92,670.20
92,670.00

m2

62,500.00

62,500.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

Dibulatkan

I-06

1 M2 Lantai Keramik
corak 20 x 20 cm
setara Mulia

Keramik
corak 20 x
20 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
99,170.20
99,170.00

m2

53,000.00

53,000.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

Dibulatkan

I-07

1 M2 Lantai Keramik
polos 30 x 30 cm
setara Mulia

Keramik
polos 30 x
30 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

I-08

1 M2 Lantai Keramik
corak 30 x 30 cm
Setara Mulia

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
89,670.20
89,670.00

Keramik
corak 30 x
30 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

m2

58,000.00

58,000.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
94,670.20
94,670.00

m2

56,800.00

56,800.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

Dibulatkan

I-09

1 M2 Lantai Keramik
polos 40 x 40 cm
Setara Mulia

Keramik
polos 40 x
40 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
93,470.20
93,470.00

m2

65,500.00

65,500.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

Dibulatkan

I-10

1 M2 Lantai Keramik
corak 40 x 40 cm
Setara Mulia

Keramik
corak 40 x
40 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

I-11

Tukang
batu
Kepala
tukang
Mandor
Jumlah

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
102,170.20
102,170.00

Dibulatkan
1 M2 Lantai Keramik Corak 10 x 20 cm
setara Roman

Keramik
corak 10 x
20 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

m2

72,200.00

72,200.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
108,870.20
108,870.00

m2

75,200.00

75,200.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

Dibulatkan

I-12

1 M2 Lantai Keramik
corak 20 x 20 cm
setara Roman

Keramik
corak 20 x
20 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

I-13

1 M2 Lantai Keramik
polos 30 x 30 cm
setara Roman

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
111,870.20
111,870.00

Keramik
polos 30 x
30 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

m2

68,900.00

68,900.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
105,570.20
105,570.00

M2

76,600.00

76,600.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

Dibulatkan

I-14

1 M2 Lantai Keramik
corak 30 x 30 cm
Setara Roman

Keramik
corak 30 x
30 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
113,270.20
113,270.00

m2

72,500.00

72,500.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

Dibulatkan

I-15

1 M2 Lantai Keramik
polos 40 x 40 cm
setara Roman

Keramik
polos 40 x
40 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Tukang
batu
Kepala
tukang
Mandor
Jumlah

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
109,170.20
109,170.00

m2

77,000.00

77,000.00

Kg

1,406.00

11,248.00

0.0215 233,400.00

5,018.10

Dibulatkan

I-16

1 M2 Lantai Keramik
corak 40 x 40 cm
Setara Roman

I-17

I-18

Keramik
corak 40 x
40 cm
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah

Dibulatkan
1 M2 Lantai Marmer
Marmer
Semen
portland
Pasir
pasang
Semen
warna
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Jumlah
Dibulatkan
1 M2 Lantai Parquet
Jati
Parquet
jati
Lem vinyl
Pekerja
Tukang

M3
Kg
Oh

0.013
0.25

15,700.00
42,000.00

204.1
10,500.00

Oh

0.12

65,000.00

7,800.00

Oh
Oh

0.012
0.0125

75,000.00
80,000.00

900
1,000.00
113,670.20
113,670.00

m2

1.06 550,000.00 583,000.00

Kg

8.19

M3

1,406.00

11,515.14

0.045 233,400.00

10,503.00

Kg
Oh

0.65
0.7

15,700.00
42,000.00

10,205.00
29,400.00

Oh

0.35

65,000.00

22,750.00

Oh
Oh

0.035
0.035

75,000.00
80,000.00

2,625.00
2,800.00
672,798.14
672,798.00

M2
Kg
Oh
Oh

1.05 375,400.00 394,170.00


0.6 44,000.00 26,400.00
0.65 42,000.00 27,300.00
0.35 65,000.00 22,750.00

Dibulatkan

Kepala
tukang
Mandor
Jumlah

Oh
Oh

0.035
0.0325

75,000.00
80,000.00

2,625.00
2,600.00
475,845.00
475,845.00

arga Satuan Pekerjaan Kayu - AHS SNI 2011

Berikut adalah penggalan analisa harga satuan pekerjaan kayu, untuk menghitung harga satuan pekerjaan kayu per m3, sepe
J. ANALISA HARGA SATUAN PEKERJAAN KAYU
No.

J-01

URAIAN

SATUAN

VOLUME

HARGA
SATUAN

1 M3 Kusen Pintu & jendela kayu


Kamper Samarinda

Kayu Balok Kamper


Samarinda
Pekerja

m3
Oh

1.2 8,633,700.00 10,360,440.00


6
42,000.00
252,000.00

Tukang Kayu

Oh

18

65,000.00

1,170,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

2
0.3

75,000.00
80,000.00

150,000.00
24,000.00
11,956,440.00
11,956,440.00

Dibulatkan

M3 Kusen Pintu &


jendela kayu Kamper
1 Medan/Kruing

J-02

Kayu Balok Kamper


Medan
Pekerja

M3
Oh

1.2 5,692,600.00
6
42,000.00

6,831,120.00
252,000.00

Tukang Kayu

Oh

18

65,000.00

1,170,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

2
0.3

75,000.00
80,000.00

150,000.00
24,000.00
8,427,120.00
8,427,120.00

Dibulatkan

J-03

HARGA

M3 Kusen Pintu &


jendela kayu Borneo
1 Super

Kayu Borneo Balok


Super
Pekerja

M3
Oh

1.2 5,280,000.00
6
42,000.00

6,336,000.00
252,000.00

Tukang Kayu

Oh

18

65,000.00

1,170,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

2
0.3

75,000.00
80,000.00

150,000.00
24,000.00
7,932,000.00
7,932,000.00

345,348.00

Dibulatkan
J-04

1 M2 Pintu Panel Kayu Kamper Samarinda

Kayu Papan Kamper


Samarinda

M3

0.04 8,633,700.00

Paku Biasa 2" - 5"


Pekerja

Kg
Oh

0.05
1

23,400.00
42,000.00

1,170.00
42,000.00

Tukang Kayu

Oh

2.5

65,000.00

162,500.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.25
0.05

75,000.00
80,000.00

18,750.00
4,000.00
573,768.00
573,768.00

227,704.00

Dibulatkan
J-05

1 M2 Pintu Panel Kayu Kamper Medan/Kruing

Kayu Papan Kamper


Medan

M3

0.04 5,692,600.00

Paku Biasa 2" - 5"


Pekerja

Kg
Oh

0.05
1

23,400.00
42,000.00

1,170.00
42,000.00

Tukang Kayu

Oh

2.5

65,000.00

162,500.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.25
0.05

75,000.00
80,000.00

18,750.00
4,000.00
456,124.00
456,124.00

Dibulatkan
J-06

1 M2 Pintu & Jendela Kaca Kayu Kamper Medan

Kayu Papan Kamper


Medan
Pekerja

M3
Oh

Tukang Kayu

Oh

65,000.00

130,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.2
0.04

75,000.00
80,000.00

15,000.00
3,200.00
381,041.00
381,041.00

0.035 5,595,800.00
0.8
42,000.00

195,853.00
33,600.00

0.035 5,692,600.00
0.8
42,000.00

Dibulatkan

199,241.00
33,600.00

M2 Pintu & Jendela


1 Kaca Kayu Borneo

J-07

Kayu Papan Borneo


Super
Pekerja

M3
Oh

Tukang Kayu

Oh

65,000.00

130,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.2
0.04

75,000.00
80,000.00

15,000.00
3,200.00
377,653.00
377,653.00

0.064 5,692,600.00
1
42,000.00

364,326.40
42,000.00

Dibulatkan

M2 Pintu & Jendela


Jalusi Kayu Kamper
1 Medan

J-08

Kayu Papan Kamper


Medan
Pekerja

M3
Oh

Tukang Kayu

Oh

65,000.00

195,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.3
0.5

75,000.00
80,000.00

22,500.00
40,000.00
663,826.40
663,826.00

Dibulatkan

M2 Pintu Triplek
Rangkap, Rangka
Tertutup Kayu Kamper
1 Medan

J-09

Kayu Papan Kamper


Medan

M3

Paku Biasa " - 1"

Kg

0.03

23,800.00

714

Lem Kayu

Ltr

0.3

23,900.00

7,170.00

Triplek 120 x 240 x 0,4


cm
Pekerja

Lbr
Oh

1
0.6

64,400.00
42,000.00

64,400.00
25,200.00

Tukang Kayu

Oh

65,000.00

130,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.2
0.03

75,000.00
80,000.00

15,000.00
2,400.00
356,458.96
356,459.00

341,556.00

0.0196 5,692,600.00

Dibulatkan
J-10

1 M2 Jalusi Mati Kusen Kayu kamper Medan

Kayu Papan Kamper


Medan

M3

0.06 5,692,600.00

Paku Biasa " - 1"


Pekerja

Kg
Oh

0.15
0.5

23,800.00
42,000.00

3,570.00
21,000.00

Tukang Kayu

Oh

65,000.00

130,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.2
0.025

75,000.00
80,000.00

15,000.00
2,000.00
513,126.00
513,126.00

0.0196 5,595,800.00

109,677.68

Dibulatkan
J-11

111,574.96

1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super

Kayu Papan Borneo


Super

M3

Paku Biasa " - 1"

Kg

0.03

23,800.00

714

Lem Kayu

Ltr

0.3

23,900.00

7,170.00

Triplek 120 x 240 x 0,4


cm
Pekerja

Lbr
Oh

1
0.6

64,400.00
42,000.00

64,400.00
25,200.00

Tukang Kayu

Oh

65,000.00

130,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.2
0.03

75,000.00
80,000.00

15,000.00
2,400.00
354,561.68
354,562.00

0.0196 5,692,600.00

111,574.96

Dibulatkan

M2 Pintu Teakwood
Rangkap, rangka Kayu
1 Kamper Medan

J-12

Kayu Papan Kamper


Medan

M3

Paku Biasa " - 1"

Kg

0.3

23,800.00

7,140.00

Lem Kayu

Ltr

0.3

23,900.00

7,170.00

Teakwood 4 mm
Pekerja

Lbr
Oh

1
0.6

131,700.00
42,000.00

131,700.00
25,200.00

Tukang Kayu

Oh

65,000.00

130,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.2
0.03

75,000.00
80,000.00

15,000.00
2,400.00
430,184.96
430,185.00

Dibulatkan

J-13

M2 Pintu Triplek &


Formika, Rangka Kayu
1 Kamper Medan

Kayu Papan Kamper


Medan

M3

Paku Biasa " - 1"

Kg

0.3

23,800.00

7,140.00

Lem Kayu

Ltr

0.8

23,900.00

19,120.00

Triplek 120 x 240 x 0,4


cm

Lbr

64,400.00

64,400.00

Formica 3" x 6"


Pekerja

Lbr
Oh

0.5
0.8

132,900.00
42,000.00

66,450.00
33,600.00

Tukang Kayu

Oh

2.5

65,000.00

162,500.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.25
0.04

75,000.00
80,000.00

18,750.00
3,200.00
486,734.96
486,735.00

0.0196 5,692,600.00

111,574.96

0.0196 5,692,600.00

Dibulatkan

111,574.96

M2 Pintu Teakwood &


Formika, Rangka Kayu
Kamper Medan
1 (dipolitur)

J-14

Kayu Papan Kamper


Medan

M3

Paku Biasa " - 1"

Kg

0.3

23,800.00

7,140.00

Lem Kayu

Ltr

0.8

23,900.00

19,120.00

Teakwood 120 x 240 x


0,4 cm

Lbr

131,700.00

131,700.00

Formica 4" x 8"


Pekerja

Lbr
Oh

0.5
0.8

238,100.00
42,000.00

119,050.00
33,600.00

Tukang Kayu

Oh

2.5

65,000.00

162,500.00

Kepala Tukang

Oh

0.25

75,000.00

18,750.00

Mandor
Jumlah

Oh

0.04

80,000.00

3,200.00
606,634.96
606,635.00

6,261,860.00
402,000.00

Dibulatkan
J-15

1 M3 Kuda-kuda Kayu Kamper Medan

Kayu Balok Kamper


Medan
Besi Strip

M3
Kg

1.1 5,692,600.00
15
26,800.00

Paku Biasa 2" - 5"


Pekerja

Kg
Oh

0.8
4

23,800.00
42,000.00

19,040.00
168,000.00

Tukang Kayu

Oh

12

65,000.00

780,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

1.2
0.2

75,000.00
80,000.00

90,000.00
16,000.00
7,736,900.00
7,736,900.00

5,808,000.00
402,000.00

Dibulatkan

M3 Kuda-kuda Kayu
1 Borneo Super

J-16

Kayu balok Borneo


super
Besi Strip

M3
Kg

1.1 5,280,000.00
15
26,800.00

Paku Biasa 2" - 5"


Pekerja

Kg
Oh

0.8
4

23,800.00
42,000.00

19,040.00
168,000.00

Tukang Kayu

Oh

12

65,000.00

780,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

1.2
0.2

75,000.00
80,000.00

90,000.00
16,000.00
7,283,040.00
7,283,040.00

Dibulatkan

J-17

M2 Kaso + Reng
Genteng Plentong
1 Kayu Borneo Super

Kayu balok Borneo


super

m3

Paku Biasa 2" - 5"


Pekerja

Kg
Oh

0.15
0.1

23,800.00
42,000.00

3,570.00
4,200.00

Tukang Kayu

Oh

0.1

65,000.00

6,500.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.01
0.005

75,000.00
80,000.00

750
400
78,780.00
78,780.00

0.014 5,280,000.00

73,920.00

0.012 5,280,000.00

Dibulatkan

63,360.00

M2 Kaso + Reng
Genteng Beton Kayu
1 Borneo Super

J-18

Kayu balok Borneo


super

M3

Paku Biasa 2" - 5"


Pekerja

Kg
Oh

0.15
0.1

23,800.00
42,000.00

3,570.00
4,200.00

Tukang Kayu

Oh

0.1

65,000.00

6,500.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.01
0.005

75,000.00
80,000.00

750
400
89,340.00
89,340.00

0.0072 5,823,400.00

41,928.48

Dibulatkan

M' Lisplang uk
(3x20)cm, Kayu
1 Kamper Medan

J-19

Kayu Papan Kamper


Medan

M3

Paku Biasa 2" - 5"

Kg

0.05

23,800.00

1,190.00

Pekerja

Oh

0.1

42,000.00

4,200.00

Tukang Kayu

Oh

0.2

65,000.00

13,000.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.02
0.005

75,000.00
80,000.00

1,500.00
400
62,218.48
62,218.00

0.011 5,692,600.00

62,618.60

Dibulatkan
J-20

1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan

Kayu Papan Kamper


Medan

M3

Paku Biasa 2" - 5"


Pekerja

Kg
Oh

0.05
0.11

23,800.00
42,000.00

1,190.00
4,620.00

Tukang Kayu

Oh

0.22

65,000.00

14,300.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.022
0.005

75,000.00
80,000.00

1,650.00
400
84,778.60
84,779.00

Dibulatkan
J-21

1 M List Plafond + kayu Profil 10 cm

Kayu Profil 10 cm
Pekerja

M'
Oh

1.05
0.021

29,400.00
42,000.00

30,870.00
882

Tukang Kayu

Oh

0.021

65,000.00

1,365.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.002
0.001

75,000.00
80,000.00

150
80
33,347.00
33,347.00

Dibulatkan

ekerjaan kayu per m3, seperti pekerjaan kusen dan jendela, pekerjaan plapond, dan pekerjaan atap.

Analisa Harga Satuan Pekerjaan Penutup Besi dan Aluminium

No.
K-01

URAIAN
1 Kg
-

Besi profil
Besi profil
WF
Meni besi
Pekerja
Tukang
besi
Kepala
tukang
Mandor
Jumlah

SAT VOLUME HARGA SAT


(Rp)

Kg
Kg
Oh

1.1
0.08
0.06

24,000.00
30,400.00
42,000.00

26,400.00
2,432.00
2,520.00

Oh

0.006

65,000.00

390

Oh
Oh

0.006
0.0003

75,000.00
80,000.00

450
24
32,216.00
32,216.00

m'

0.01

7,150.00

71.5

m'
jam
Oh

0.001
0.008
0.001

55,000.00
100,000.00
42,000.00

55
800
42

Oh

0.00001

65,000.00

0.65

Oh
Oh

0.00001
0.00005

75,000.00
80,000.00

0.75
4
973.9
974

kg
ltr

0.04
0.03

23,600.00
7,150.00

944
214.5

ltr
jam
org
org

0.004
0.017
0.004
0.002

55,000.00
100,000.00
42,000.00
65,000.00

220
1,700.00
168
130

org
org

0.0002
0.0002

75,000.00
80,000.00

15
16
2,463.50
2,464.00

M2
Oh

1
1.05

306,600.00
42,000.00

306,600.00
44,100.00

Dibulatkan
K-02

1 Kg
-

K-03

K-04

Perakitan
baja
Solar
Minyak
pelumas
Sewa alat
Pekerja
Tukang
besi
Kepala
tukang
Mandor
Jumlah

Dibulatkan
1 Cm Pengelasan
dengan las listrik
kawat las
Solar
Minyak
pelumas
Sewa alat
Pekerja
Tukang
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
1 m2 Pintu Rolling
Door
Rolling
door
Pekerja

HARGA
(Rp)

Oh

1.5

65,000.00

97,500.00

Oh
Oh

0.105
0.0052

75,000.00
80,000.00

7,875.00
416
456,491.00
456,491.00

m2
Oh

1
1.05

211,800.00
42,000.00

211,800.00
44,100.00

Oh

1.05

65,000.00

68,250.00

Oh
Oh

0.105
0.0052

75,000.00
80,000.00

7,875.00
416
332,441.00
332,441.00

m'
Oh

11.5
1.2

5,500.00
42,000.00

63,250.00
50,400.00

Oh

1.2

65,000.00

78,000.00

Oh
Oh

0.012
0.0006

75,000.00
80,000.00

900
48
192,598.00
192,598.00

Kawat
harmonik
a

M2

1.1

35,900.00

39,490.00

Paku
biasa " 1"

kg

0.02

23,800.00

476

0.0018 5,692,600.00
0.1
42,000.00

10,246.68
4,200.00

K-05

Dibulatkan
1 m2 Pintu
Alluminium Natural

K-06

K-07

Tukang
besi
Kepala
tukang
Mandor
Jumlah

Pintu
alluminiu
m natural
Pekerja
Tukang
besi
Kepala
tukang
Mandor
Jumlah

Dibulatkan
1 m2 Terali Besi
Besi strip
2x3
Pekerja
Tukang
las
Kepala
tukang
Mandor
Jumlah
Dibulatkan
1 m2 Kawat
Harmonika 4 cm

Dibulatkan

Papan
kayu
kamper
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

M2
Oh
Oh

0.1

65,000.00

6,500.00

Oh
Oh

0.01
0.005

75,000.00
80,000.00

750
400
62,062.68
62,063.00

K-08

1 m' Talang Datar,


Seng BJLS 28 lebar
90 cm

Seng plat
3' x 6'
BJLS 30

m'

1.05

20,801.00

21,841.05

Paku
biasa " 1"

Kg

0.015

23,800.00

357

0.0096 5,595,800.00

53,719.68

Kayu
papan
borneo
super
Flincote /
meni besi
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

M3
Kg
Oh

0.25
0.15

30,400.00
42,000.00

7,600.00
6,300.00

Oh

0.4

65,000.00

26,000.00

Oh
Oh

0.025
0.0013

75,000.00
80,000.00

1,875.00
104
117,796.73
117,797.00

Seng plat
3' x 6'
BJLS 30

m'

1.05

20,801.00

21,841.05

Paku
biasa " 1"

Kg

0.015

23,800.00

357

M3

0.019 5,595,800.00

106,320.20

Dibulatkan

K-09

1 m' Talang Miring,


Seng BJLS 28 lebar
90 cm

Kayu
papan
borneo
super
Flincote /
meni besi
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

K-10

1 m' Talang 1/2


lingkaran D-15 cm,
seng pelat BJLS 28
lebar 90 cm

Kg
Oh

0.3
0.2

30,400.00
42,000.00

9,120.00
8,400.00

Oh

0.4

65,000.00

26,000.00

Oh
Oh

0.025
0.0013

75,000.00
80,000.00

1,875.00
100
174,013.25
174,013.00

Seng plat
3' x 6'
BJLS 30

m'

1.05

20,801.00

21,841.05

Paku
biasa " 1"

Kg

0.1

23,800.00

2,380.00

0.019 5,595,800.00
0.5
26,800.00
0.15
42,000.00

106,320.20
13,400.00
6,300.00

Kayu
papan
borneo
super
Besi strip
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

kg
Kg
Oh
Oh

0.3

65,000.00

19,500.00

Oh
Oh

0.03
0.008

75,000.00
80,000.00

2,250.00
640
172,631.25
172,631.00

m'

1.1

151,100.00

166,210.00

bh
m'
Oh

2
1
0.043

250
7,500.00
42,000.00

500
7,500.00
1,806.00

Oh

0.043

65,000.00

2,795.00

Oh
Oh

0.0043
0.0021

75,000.00
80,000.00

322.5
168
179,301.50
179,302.00

m'

1.1

163,000.00

179,300.00

bh
m'
Oh

2
1
0.043

250
7,500.00
42,000.00

500
7,500.00
1,806.00

Oh

0.043

65,000.00

2,795.00

Oh
Oh

0.0043
0.0021

75,000.00
80,000.00

322.5
168

Dibulatkan

K-11

1 m' Pasang kusen


pintu/jendela
alluminium natural 4"

Alumuniu
m profil
natural 4"
Skrup
fixer
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

K-12

1 m' Pasang kusen


pintu/jendela
alluminium warna 4"

Alumuniu
m profil
warna 4"
Skrup
fixer
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
Mandor

Jumlah

192,391.50
192,392.00

Dibulatkan

K-13

1 m' Pasang kusen


pintu/jendela
alluminium natural 3"

Alumuniu
m profil
natural 3"
Skrup
fixer
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

m'

1.1

81,000.00

89,100.00

bh
m'
Oh

2
1
0.043

250
7,500.00
42,000.00

500
7,500.00
1,806.00

Oh

0.043

65,000.00

2,795.00

Oh
Oh

0.0043
0.0021

75,000.00
80,000.00

322.5
168
102,191.50
102,192.00

m'

1.1

102,000.00

112,200.00

bh
m'
Oh

2
1
0.043

250
7,500.00
42,000.00

500
7,500.00
1,806.00

Oh

0.043

65,000.00

2,795.00

Oh
Oh

0.0043
0.0021

75,000.00
80,000.00

322.5
168
125,291.50
125,292.00

m'

4.4

151,100.00

664,840.00

m2
Oh

1.05
0.085

171,800.00
42,000.00

180,390.00
3,570.00

Oh

0.085

65,000.00

5,525.00

Oh
Oh

0.0085
0.0042

75,000.00
80,000.00

637.5
336

Dibulatkan

K-14

1 m' Pasang kusen


pintu/jendela
alluminium warna 3"

Alumuniu
m profil
warna 3"
Skrup
fixer
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

K-15

1 m2 Pintu
alluminium strip lebar
8 cm

Alumuniu
m profil 4"
natural
Alumuniu
m strip
6mm
Pekerja
Tukang
kayu
Kepala
tukang
Mandor

Jumlah

855,298.50
855,299.00

Dibulatkan

K-16

1 m2 Pintu/jendela
kaca rangka
alluminium natural 4"

Alumuniu
m profil
natural 4"

m'

4.4

151,100.00

664,840.00

m'
tube
Oh

4.5
0.27
0.085

12,200.00
7,500.00
42,000.00

54,900.00
2,025.00
3,570.00

Oh

0.085

65,000.00

5,525.00

Oh
Oh

0.0085
0.005

75,000.00
80,000.00

637.5
400
731,897.50
731,898.00

m'

4.4

163,000.00

717,200.00

m'
tube
Oh

4.5
0.27
0.085

12,200.00
7,500.00
42,000.00

54,900.00
2,025.00
3,570.00

Oh

0.085

65,000.00

5,525.00

Oh
Oh

0.0085
0.005

75,000.00
80,000.00

637.5
400
784,257.50
784,258.00

Jendela
nako
(rangka +
kaca 5
mm)

m2

1.1

300,000.00

330,000.00

Paku
skrup
1cm 2,5cm
Besi strip
Pekerja

bh
m'
Oh

10
7
0.2

250
5,500.00
42,000.00

2,500.00
38,500.00
8,400.00

Profil
alluminiu
mT
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

K-17

1 m2 Pintu/jendela
kaca rangka
alluminium warna 4"

K-18

Alumuniu
m profil
warna 4"
Profil
alluminiu
mT
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan
1 m2 Jendela nako &
teralis (10 klips)

Oh

0.2

65,000.00

13,000.00

Oh
Oh

0.02
0.001

75,000.00
80,000.00

Dibulatkan
1 m2 Pintu pelat baja tebal 2mm rangkap,
rangka baja siku
Besi siku
L 30.30.3
Kg
15

1,500.00
80
393,980.00
393,980.00

24,000.00

360,000.00

K-19

Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Baja pelat
kawat las
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Kg
Kg
Oh

32.8
0.05
0.2

24,000.00
23,600.00
42,000.00

787,200.00
1,180.00
8,400.00

Oh

0.2

65,000.00

13,000.00

Oh
Oh

0.02
0.001

75,000.00
80,000.00

1,500.00
80
1,171,360.00
1,171,360.00

4.76

7,300.00

34,748.00

Kg

4.522

24,000.00

108,528.00

Cm
Oh

20
0.65

2,464.00
42,000.00

49,280.00
27,300.00

Oh

0.65

65,000.00

42,250.00

Oh
Oh

0.065
0.032

75,000.00
80,000.00

4,875.00
2,560.00
269,541.00
269,541.00

M2
Oh

1
1.05

501,700.00
42,000.00

501,700.00
44,100.00

Oh

1.05

65,000.00

68,250.00

Oh

0.105

75,000.00

7,875.00

Dibulatkan

K-20

1 m2 Rangka jendela
besi square tube (5 x
5) cm

Besi
square
tube
Besi lis
kaca (1 x
1) cm
Pengelas
an
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

K-21

1 m2 Pintu lipat
(folding door) bahan
besi
-

Pintu lipat
Pekerja
Tukang
kayu
Kepala
tukang

Mandor
Jumlah

Oh

0.0052

80,000.00

416
622,341.00
622,341.00

M2
Oh

1
0.35

537,300.00
42,000.00

537,300.00
14,700.00

Oh

0.35

65,000.00

22,750.00

Oh
Oh

0.035
0.0018

75,000.00
80,000.00

2,625.00
144
577,519.00
577,519.00

Dibulatkan

K-22

1 m2 Tirai (venetions
blinds and vertical
blinds)
Tirai
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatkan

Analisa Harga Satuan Pekerjaan Sanitasi


No.
M-01

M-02

M-03

URAIAN

SAT VOLUME HARGA SAT


(Rp)
1 Buah Closet jongkok Porselen Standar
Closet
jongkok
bh
1 188,200.00
P.C (50
gk)
Kg
6
1,406.00
Pasir
pasang
m3
0.01 233,400.00
Pekerja
org
1
42,000.00
Tukang
batu
org
1.5
65,000.00
Kepala
org
1.5
75,000.00
Tukang
Mandor
org
0.16
80,000.00
Jumlah
Dibulatka
n
1 Buah
Urinoir
Urinoir
bh
1 1,773,400.00
P.C (50
gk)
Kg
6
1,406.00
Pasir
pasang
m3
0.01 233,400.00
Pekerja
org
1
42,000.00
Tukang
batu
org
1
65,000.00
Kepala
Tukang
org
0.1
75,000.00
Mandor
org
0.001
80,000.00
Perlengka
pan 30 %
harga
urinoir
Jumlah
Dibulatka
n
1 Buah
Wastafel
wastafel
standar
P.C (50
gk)
Pasir
pasang
Pekerja

lot

0.3 1,773,400.00

HARGA
(Rp)

188,200.00
8,436.00
2,334.00
42,000.00
97,500.00
112,500.00
12,800.00
463,770.00
463,770.00

1,773,400.00
8,436.00
2,334.00
42,000.00
65,000.00
7,500.00
80

532,020.00
2,430,770.00
2,430,770.00

unit

1 1,012,700.00

1,012,700.00

Kg

1,406.00

8,436.00

m3
org

0.01
1.2

233,400.00
42,000.00

2,334.00
50,400.00

Tukang
batu
Kepala
Tukang
Mandor

M-04

org

1.45

65,000.00

94,250.00

org
org

0.15
0.1

75,000.00
80,000.00

11,250.00
8,000.00

Perlengka
pan 12 %
harga
wastafel
lot
0.12 1,773,400.00
Jumlah
Dibulatka
n
1 Buah bak Mandi Fibreglass Volume 0,30 m3

212,808.00
1,400,178.00

Bak
fibreglass
0.60m x
0.60m
Pekerja
Tukang
batu
Kepala
Tukang
Mandor

M-05

1,400,178.00

bh
org

1
1.8

255,300.00
42,000.00

255,300.00
75,600.00

org

2.7

65,000.00

175,500.00

org
org

0.54
0.11

75,000.00
80,000.00

40,500.00
8,800.00

Perlengka
pan 18 %
harga bak
lot
0.18 255,300.00
45,954.00
Jumlah
601,654.00
Dibulatka
n
601,654.00
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
Buis
beton
30 cm
Bata
merah
P.C (50
gk)
Pasir
pasang
Pasir urug
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Jumlah
Dibulatka
n

bh

1.1

61,700.00

67,870.00

bh

25

775

19,375.00

Kg

10.3

1,406.00

14,481.80

m3

0.061

233,400.00

14,237.40

m3
org

0.069
0.38

175,300.00
42,000.00

12,095.70
15,960.00

org

0.19

65,000.00

12,350.00

org
org

0.019
0.019

75,000.00
80,000.00

1,425.00
1,520.00
159,314.90
159,315.00

M-06

M-07

M-08

1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm


Bata
merah
bh
186
775
144,150.00
P.C (50
gk)
Kg
114
1,406.00
160,284.00
Pasir
pasang
m3
0.184 233,400.00
42,945.60
Batu
pecah 2/3
m3
0.033
211,100.00
6,966.30
Besi
beton
m3
4.85
16,500.00
80,025.00
Pasir
beton
m3
0.12 255,400.00
30,648.00
Pekerja
org
2.16
42,000.00
90,720.00
Tukang
batu
org
0.72
65,000.00
46,800.00
Kepala
Tukang
org
0.072
75,000.00
5,400.00
Mandor
org
0.108
80,000.00
8,640.00
Tukang
gali
org
0.1
42,000.00
4,200.00
Jumlah
620,778.90
Dibulatka
n
620,779.00
1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
Bata
merah
bh
53
775
41,075.00
P.C (50
gk)
Kg
44
1,406.00
61,864.00
Pasir
pasang
m3
0.07 233,400.00
16,338.00
Batu
m3
0.07
211,100.00
14,777.00
pecah 2/3
Besi
beton
m3
1.6
16,500.00
26,400.00
Pasir
beton
m3
0.06 255,400.00
15,324.00
Pekerja
org
3.2
42,000.00
134,400.00
Tukang
batu
org
1.015
65,000.00
65,975.00
Kepala
Tukang
org
0.0015
75,000.00
112.5
Mandor
org
0.016
80,000.00
1,280.00
Jumlah
377,545.50
Dibulatka
377,546.00
n
1 M' Pipa
PVC
1/2" (AW)
Pipa pvc
1/2"

m'

1.2

10,025.00

12,030.00

Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa
Jumlah
Dibulatka
n

M-09

M-10

1 M' Pipa
PVC 1"
(AW)
Pipa pvc
1"
Pekerja
Tukang
batu
Kepala
Tukang
Mandor

org

0.036

42,000.00

1,512.00

org

0.06

65,000.00

3,900.00

org
org

0.006
0.0018

75,000.00
80,000.00

450
144

lot

0.35

12,030.00

4,210.50
22,246.50
22,247.00

m'
org

1.2
0.036

15,800.00
42,000.00

18,960.00
1,512.00

org

0.06

65,000.00

3,900.00

org
org

0.006
0.0018

75,000.00
80,000.00

450
144

Perlengka
pan 35 %
harga
pipa
Jumlah
Dibulatka
n

lot

0.35

18,960.00

6,636.00
31,602.00

1 M' Pipa
PVC
11/2"
(AW)
Pipa pvc
11/2"
Pekerja
Tukang
batu
Kepala
Tukang
Mandor

m'
org

1.2
0.036

26,475.00
42,000.00

31,770.00
1,512.00

org

0.06

65,000.00

3,900.00

org
org

0.006
0.0018

75,000.00
80,000.00

450
144

Perlengka
pan 35 %
harga
pipa
Jumlah
Dibulatka
n

lot

0.35

31,770.00

11,119.50
48,895.50

31,602.00

48,896.00

M-11

1 M' Pipa
PVC 2"
(AW)
Pipa pvc
2"
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa
Jumlah
Dibulatka
n

M-12

1 M' Pipa
PVC 4"
(AW)
Pipa pvc
4"
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa
Jumlah
Dibulatka
n

M-13

1 M' Pipa
PVC
3/4" (AW)
Pipa pvc
3/4"
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa

m'
org

1.2
0.036

27,675.00
42,000.00

33,210.00
1,512.00

org

0.06

65,000.00

3,900.00

org
org

0.006
0.0018

75,000.00
80,000.00

450
144

lot

0.35

31,770.00

11,119.50
50,335.50
50,336.00

m'
org

1.2
0.081

86,975.00
42,000.00

104,370.00
3,402.00

org

0.135

65,000.00

8,775.00

org
org

0.0135
0.0041

75,000.00
80,000.00

1,012.50
328

lot

0.35

104,370.00

36,529.50
154,417.00
154,417.00

m'
org

1.2
0.081

13,050.00
42,000.00

15,660.00
3,402.00

org

0.135

65,000.00

8,775.00

org
org

0.0135
0.0041

75,000.00
80,000.00

1,012.50
328

lot

0.35

15,660.00

5,481.00

M-14

Jumlah
Dibulatka
n
1 Buah Bak Cuci piring Stainless steel
Bak cuci
stainless
steel +
asesoris
lengkap
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Jumlah
Dibulatka
n

M-15

M-16

M-17

1 Buah
Kran
1/2" - 3/4"
Kran air
Seal tape
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Jumlah
Dibulatka
n

34,658.50
34,659.00

bh
org

1
0.03

397,800.00
42,000.00

397,800.00
1,260.00

org

0.3

65,000.00

19,500.00

org
org

0.03
0.0015

75,000.00
80,000.00

2,250.00
120
420,930.00
420,930.00

bh
bh
org

1
0.025
0.01

40,900.00
4,200.00
42,000.00

40,900.00
105
420

org

0.1

65,000.00

6,500.00

org
org

0.01
0.005

75,000.00
80,000.00

750
400
49,075.00

1 Buah
Floor
Drain
Floor
bh
1
drain
Pekerja
org
0.01
Tukang
batu
org
0.1
Kepala
Tukang
org
0.01
Mandor
org
0.005
Jumlah
Dibulatka
n
1 M' Grafel beton U 20 cm -60
cm
Pipa
bh
1.1
beton U

49,075.00

66,600.00
42,000.00

66,600.00
420

65,000.00

6,500.00

75,000.00
80,000.00

750
400
74,670.00
74,670.00

44,300.00

48,730.00

Bata
merah
P.C (50
gk)
Pasir
pasang

M-18

bh

12

775

9,300.00

zak

0.103

1,406.00

144.82

m3

0.0305

233,400.00

7,118.70

Pasir urug
m3
0.0345 175,300.00
Pekerja
org
0.01
42,000.00
Tukang
batu
org
0.1
65,000.00
Kepala
Tukang
org
0.01
75,000.00
Mandor
org
0.005
80,000.00
Jumlah
Dibulatka
n
1 M' Pasang Talang Plastik PVC U 15 cm (AW)

6,047.85
420

Talang
plastik
PVC

M-19

m'

1.05

Perlengka
pan 35 %
harga
talang
lot
0.35
Pekerja
org
0.15
Tukang
batu
org
0.4
Kepala
Tukang
org
0.025
Mandor
org
0.0013
Jumlah
Dibulatka
n
1 M' Saluran Air Limbah Buis
Beton 60 cm
Buis
beton
60 cm
Bata
merah
P.C (50
gk)
Pasir
pasang
Pasir urug
Pekerja
Tukang
batu

6,500.00
750
400
79,411.37
79,411.00

60,000.00

63,000.00

63,000.00
42,000.00

22,050.00
6,300.00

65,000.00

26,000.00

75,000.00
80,000.00

1,875.00
100
119,325.00
119,325.00

bh

1.1

130,900.00

143,990.00

bh

25

775

19,375.00

zak

0.206

1,406.00

289.64

m3

0.061

233,400.00

14,237.40

m3
org

0.069
0.38

175,300.00
42,000.00

12,095.70
15,960.00

org

0.19

65,000.00

12,350.00

Kepala
Tukang
Mandor
Jumlah
Dibulatka
n

M-20

M-22

0.019
0.019

75,000.00
80,000.00

1,425.00
1,520.00
221,242.74
221,243.00

1 M'
Pasang
Talang
Seng
Datar
Seng
pelat 3" x
6"
Paku
Kayu
kelas II
Meni besi
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Jumlah
Dibulatka
n

M-21

org
org

1 Buah
Closet
Duduk
Closet
duduk
Pekerja
Tukang
batu
Kepala
Tukang
Mandor

lbr
kg
m3
kg
org

0.5
0.015

20,801.00
23,400.00

10,400.50
351

0.0096 2,850,000.00
0.25
30,400.00
0.15
42,000.00

27,360.00
7,600.00
6,300.00

org

0.4

65,000.00

26,000.00

org
org

0.025
0.0013

75,000.00
80,000.00

1,875.00
100
79,986.50
79,987.00

bh
org

1 1,724,700.00
3.3
42,000.00

org

1.1

65,000.00

71,500.00

org
org

0.001
0.16

75,000.00
80,000.00

75
12,800.00

Perlengka
pan 6 %
harga
closet
lot
0.06 1,724,700.00
Jumlah
Dibulatka
n
1 Buah Tangki Air fibreglass Volume 1 m3

103,482.00
2,051,157.00

Bak
fibreglass
kapasitas
1 m3
Pekerja

bh
org

1 1,316,400.00
3.3
42,000.00

1,724,700.00
138,600.00

2,051,157.00

1,316,400.00
138,600.00

Tukang
batu
Kepala
Tukang
Mandor

M-23

1.1

65,000.00

71,500.00

org
org

0.001
0.16

75,000.00
80,000.00

75
12,800.00

Perlengka
pan 6 %
harga bak
lot
0.06 1,316,400.00
Jumlah
Dibulatka
n
1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian
tanah
m3
4.5
26,252.00
Pasir urug
lantai
kerja

78,984.00
1,618,359.00
1,618,359.00

118,134.00

m3

0.214

175,300.00

37,514.20

m3

2.25

716,798.00

1,612,795.50

Pas bata
adk 1pc :
3ps

m2

15

220,267.10

3,304,006.50

Pelat
beton K225

m3

0.3 6,438,864.00

1,931,659.20

Plesteran
adk 1pc :
3ps

m2

15

41,301.82

619,527.30

Pipa PVC
4" jenis
AW
Pipa GIP
1 1/2"

m'

5.4

256,800.00

1,386,720.00

m'

46,750.00

233,750.00

Galian
tanah
untuk
rembesan
Pas ijuk
Urugan
kerikil 3/5

m3
kg

3.375
5.4

20,000.00
23,400.00

67,500.00
126,360.00

m3

1.05

205,000.00

215,250.00

m'

36,700.00

330,300.00

Pipa PVC
4"
berlubang
jenis AW

M-24

org

Urugan
dan
perataan
tanah
m3
1.125
34,584.00
38,907.00
Jumlah
10,022,423.70
Dibulatka
n
10,022,424.00
1 Unit Septictank 1x1,50x1,50 m + Rembesan

Galian
tanah

m3

2.25

20,000.00

45,000.00

m3

0.107

175,300.00

18,757.10

m3

1.125

716,798.00

806,397.75

Pas bata
adk 1pc :
3ps

m2

7.5

220,267.10

1,652,003.25

Pelat
beton K225

m3

0.15 6,438,864.00

965,829.60

Plesteran
adk 1pc :
3ps

m2

7.5

41,301.82

309,763.65

Pipa PVC
4" jenis
AW
Pipa GIP
1 1/2"

m'

256,800.00

2,311,200.00

m'

2.5

46,750.00

116,875.00

Galian
tanah
untuk
rembesan
Pas ijuk
Urugan
kerikil 3/5

m3
kg

1.688
2.7

20,000.00
23,400.00

33,760.00
63,180.00

m3

0.525

205,000.00

107,625.00

m'

36,700.00

330,300.00

m3

0.563

34,584.00

19,470.79
6,780,162.14

Pasir urug
lantai
kerja

Pipa PVC
4"
berlubang
jenis AW
Urugan
dan
perataan
tanah
Jumlah
Dibulatka
n

6,780,162.00

Analisa Harga Satuan Pekerjaan Pengecatan

No.
N-01

N-02

N-03

URAIAN

HARGA
SAT

HARGA

1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama


Soda api
Kg
0.05 35,600.00
Pekerja
Oh
0.15 42,000.00
Mandor
Oh
0.0025 80,000.00
Jumlah
Dibulatkan
1 M2 Mendempul Dan Menggosok Kayu
Dempul
Kg
0.08 35,800.00
Minyak
Kg
0.02 38,400.00
cat
Batu
apung
Kg
0.01 29,600.00
Pekerja
Oh
0.04 42,000.00
Tukang
cat
Oh
0.04 65,000.00
Kepala
tukang
Oh
0.004 75,000.00
Mandor
Oh
0.0025 80,000.00
Jumlah
Dibulatkan
1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
Plamir
Kg
0.15 25,000.00
Cat dasar
Kg
0.17 30,000.00

N-04

SAT VOLUME

Cat
penutup
setara
sieve 2x
Pekerja
Tukang
cat
Kepala
tukang
Mandor
Jumlah

2,864.00
768
296
1,680.00
2,600.00
300
200
8,708.00
8,708.00
3,750.00
5,100.00

Kg
Oh

0.17 41,700.00
0.07 42,000.00

7,089.00
2,940.00

Oh

0.075 65,000.00

4,875.00

Oh
Oh

0.0075 75,000.00
0.0025 80,000.00

562.5
200
24,516.50
24,517.00

Dibulatkan
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
Cat meni
Kg
0.2 30,400.00
Plamir
Kg
0.15 25,000.00
Cat dasar
Kg
0.17 30,000.00
Cat
penutup
3x setara
sieve
Pekerja

1,780.00
6,300.00
200
8,280.00
8,280.00

Kg
Oh

6,080.00
3,750.00
5,100.00

0.35 41,700.00 14,595.00


0.07 42,000.00 2,940.00

N-05

N-06

N-07

Oh

0.105 65,000.00

6,825.00

Oh
Oh

0.004 75,000.00
0.0025 80,000.00

300
200
39,790.00
39,790.00

Dibulatkan
1 M2 Pelaburan Bidang Kayu dengan
Politur
Politur
Ltr
0.15 48,000.00 7,200.00
Politur
jadi
Ltr
0.372
### 41,924.40
Ampelas
Lbr
2 5,000.00 10,000.00
Tukang
cat
Oh
0.06 65,000.00 3,900.00
Kepala
tukang
Oh
0.016 75,000.00 1,200.00
Mandor
Oh
0.0025 80,000.00
200
Jumlah
64,424.40
Dibulatkan
64,424.00
1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
Residu
atau ter
Ltr
0.35 8,100.00 2,835.00
Pekerja
Oh
0.1 42,000.00 4,200.00
Mandor
Oh
0.006 80,000.00
480
Jumlah
7,515.00
Dibulatkan
7,515.00
1 M2 Pengecatan Tembok Baru
Setara ICI
Plamir
tembok
Kg
0.1 25,000.00 2,500.00
Cat dasar
Kg
0.1 30,000.00 3,000.00

N-08

Tukang
cat
Kepala
tukang
Mandor
Jumlah

Cat
penutup
2x setara
ICI
Pekerja
Tukang
cat
Kepala
tukang
Mandor
Jumlah

Kg
Oh

0.26 75,000.00 19,500.00


0.02 42,000.00
840

Oh

0.063 65,000.00

4,095.00

Oh
Oh

0.0063 75,000.00
0.0025 80,000.00

472.5
200
30,607.50
30,608.00

Dibulatkan
1 M2 Pengecatan Tembok Lama Setara ICI
Cat dasar
Kg
0.12 30,000.00

Cat
penutup 2
x
Pekerja

Kg
Oh

3,600.00

0.18 75,000.00 13,500.00


0.028 42,000.00 1,176.00

N-09

0.042 65,000.00

2,730.00

Oh
Oh

0.0042 75,000.00
0.0025 80,000.00

315
200
21,521.00
21,521.00

Cat
tembok
setara ICI
Plamir
tembok
Rol cat
Steger
werk
Ampelas
Pekerja
Tukang
cat
Kepala
tukang
Mandor
Jumlah

Kg

0.2 75,000.00 15,000.00

Kg
Bh

0.16 25,000.00
0.01 32,500.00

4,000.00
325

Ls
Lbr
Oh

1 1,000.00
0.5 5,000.00
0.2 42,000.00

1,000.00
2,500.00
8,400.00

Oh

0.3 65,000.00 19,500.00

Oh
Oh

0.03 75,000.00
0.01 80,000.00

Dibulatkan
1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex

N-10-r'

Oh

Dibulatkan
1 M2 Pengecatan Plafond ( 3x ) Setara ICI

N-10

Tukang
cat
Kepala
tukang
Mandor
Jumlah

Cat
tembok
setara
Vinilex
Plamir
tembok
Rol cat
Steger
werk
Ampelas
Pekerja
Tukang
cat
Kepala
tukang
Mandor
Jumlah

Kg

0.2 25,000.00

5,000.00

Kg
Bh

0.16 25,000.00
0.01 32,500.00

4,000.00
325

Ls
Lbr
Oh

1 1,000.00
0.5 5,000.00
0.2 42,000.00

1,000.00
2,500.00
8,400.00

Oh

0.3 65,000.00 19,500.00

Oh
Oh

0.03 75,000.00
0.01 80,000.00

Dibulatkan
1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex

Cat
tembok
setara
Vinilex
Plamir
tembok

2,250.00
800
53,775.00
53,775.00

2,250.00
800
43,775.00
43,775.00

Kg

0.13 25,000.00

3,250.00

Kg

0.11 25,000.00

2,750.00

N-11

N-13

Bh

0.1 32,500.00

3,250.00

Ls
Lbr
Oh

0.67 1,000.00
0.33 5,000.00
0.13 42,000.00

670
1,650.00
5,460.00

Oh
Oh
Oh

0.2 65,000.00 13,000.00


0.02 75,000.00
0.01 80,000.00

Dibulatkan
1 M2 Memasang Wallpaper
-

N-12

Rol cat
Steger
werk
Ampelas
Pekerja
Tukang
cat
Kepala
tukang
Mandor
Jumlah

Wallpaper
Lem
Perekat
Pekerja
Tukang
cat
Kepala
tukang
Mandor
Jumlah

1,500.00
800
32,330.00
32,330.00

m2

1.2 55,700.00 66,840.00

Kg
Oh

0.25 35,700.00 8,925.00


0.35 42,000.00 14,700.00

Oh

0.175 65,000.00 11,375.00

Oh
Oh

0.017 75,000.00
0.0017 80,000.00

1,275.00
136
###
###

Dibulatkan
1 M2 Pengecatan Permukaan Baja dengan Meni Besi
Meni besi
Kg
0.1 30,400.00 3,040.00
Kuas 3"
Bh
0.01 16,000.00
160
Pekerja
Oh
0.02 42,000.00
840
Tukang
cat
Oh
0.2 65,000.00 13,000.00
Kepala
tukang
Oh
0.02 75,000.00 1,500.00
Mandor
Oh
0.01 80,000.00
800
Jumlah
19,340.00
Dibulatkan
19,340.00
1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan
Perancah
Meni besi
Kg
0.1 30,400.00 3,040.00
Kuas 3"
Bh
0.01 16,000.00
160
Kayu
perancah
m3
0.002
### 4,139.60
Pekerja
Oh
0.25 42,000.00 10,500.00
Tukang
cat
Oh
0.225 65,000.00 14,625.00
Kepala
tukang
Oh
0.0225 75,000.00 1,687.50
Mandor
Oh
0.0075 80,000.00
600
Jumlah
34,752.10
Dibulatkan
34,752.00

N-14

N-15

1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara


manual 1 lps cat 2 um
Cat besi
setara ICI
Kg
0.3 67,700.00 20,310.00
Pekerja
Oh
0.006 42,000.00
252
Tukang
cat
Oh
0.06 65,000.00 3,900.00
Kepala
tukang
Oh
0.012 75,000.00
900
Mandor
Oh
0.006 80,000.00
480
Jumlah
25,842.00
Dibulatkan
25,842.00
1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
Plamir
tembok
Kg
0.1 25,000.00 2,500.00
Cat dasar
Kg
0.1 30,000.00 3,000.00

N-15r'

Kg
Oh

0.26 25,000.00
0.02 42,000.00

6,500.00
840

Oh

0.063 65,000.00

4,095.00

Oh
Oh

0.0063 75,000.00
0.0025 80,000.00

Kg
Oh

0.39 25,000.00
0.03 42,000.00

9,750.00
1,260.00

Oh

0.0945 65,000.00

6,142.50

Oh
Oh

0.0095 75,000.00
0.0038 80,000.00

712.5
304
23,669.00
23,669.00

472.5
200
17,607.50
Dibulatkan
17,608.00
1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
Plamir
tembok
Kg
0.1 25,000.00 2,500.00
Cat dasar
Kg
0.1 30,000.00 3,000.00

N-16

Cat
penutup
2x setara
vinilex
Pekerja
Tukang
cat
Kepala
tukang
Mandor
Jumlah

Cat
penutup
3x setara
vinilex
Pekerja
Tukang
cat
Kepala
tukang
Mandor
Jumlah

Dibulatkan
1 M2 Pengecatan Tembok Lama Setara Vinilex
Cat dasar
Kg
0.12 30,000.00

Cat
penutup 2
x
Pekerja

Kg
Oh

0.18 25,000.00
0.028 42,000.00

3,600.00

4,500.00
1,176.00

Dibulatkan

Tukang
cat
Kepala
tukang
Mandor
Jumlah

Oh

0.042 65,000.00

2,730.00

Oh
Oh

0.0042 75,000.00
0.0025 80,000.00

315
200
12,521.00
12,521.00

Analisa Harga Satuan Pekerjaan Penanaman Pohon

NO.
O-01

O-02

O-03

O-04

HARGA
URAIAN
KOEF
SAT. SAT. (Rp)
1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
Pupuk kandang
0.08
krg 25,000.00
Furadan
0.001
kg 24,000.00
Pohon pelindung
1
btng 25,000.00
Pekerja
0.025
org 42,000.00
Mandor
0.0025
org 80,000.00
Jumlah
Dibulatkan
1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
Pupuk kandang
0.08
krg 25,000.00
Furadan
0.001
kg 24,000.00
Bambu krisik/jepang
1
btng 50,000.00
Pekerja
0.025
org 42,000.00
Mandor
0.0025
org 80,000.00
Jumlah
Dibulatkan
1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
Pupuk kandang
0.04
krg 25,000.00
Furadan
0.001
kg 24,000.00
Pohon perdu
1
btng 10,000.00
Pekerja
0.02
org 42,000.00
Mandor
0.002
org 80,000.00
Jumlah
Dibulatkan
1 M2 Tanam rumput gajah (silang papan catur)
Pupuk kandang
0.04
krg 25,000.00
Rumput gajah mini
0.5
m2 15,000.00
Pekerja
0.04
org 42,000.00
Mandor
0.004
org 80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
2,000.00
24
25,000.00
1,050.00
200
28,274.00
28,274.00
2,000.00
24
50,000.00
1,050.00
200
53,274.00
53,274.00
1,000.00
24
10,000.00
840
160
12,024.00
12,024.00
1,000.00
7,500.00
1,680.00
320
10,500.00
10,500.00

Harga Satuan Upah Kerja Bangunan - AHS 2011

UPAH
(Rp.)

NO

URAIAN

SATUAN

Mandor

Org/hr

Rp
80,000.00

Kepala Tukang Batu

Org/hr

Rp
75,000.00

Kepala Tukang Kayu

Org/hr

Rp
75,000.00

Kepala Tukang Besi

Org/hr

Rp
75,000.00

Kepala Tukang Cat

Org/hr

Rp
75,000.00

Kepala Tukang Listrik

Org/hr

Kepala Tukang

Org/hr

Tukang Batu

Org/hr

Tukang Kayu

Org/hr

10

Tukang Besi/Baja

Org/hr

11

Tukang Cat

Org/hr

12

Tukang Listrik

Org/hr

13

Tukang Pipa

Org/hr

14

Tukang Plitur

Org/hr

15

Tukang Taman

Org/hr

16

Tukang

Org/hr

17

Pembantu Tukang

Org/hr

Rp
75,000.00
Rp
75,000.00
Rp
65,000.00
Rp
65,000.00
Rp
65,000.00
Rp
65,000.00
Rp
65,000.00
Rp
65,000.00
Rp
65,000.00
Rp
65,000.00
Rp
65,000.00
Rp
42,000.00

18

Pekerja Biasa

Org/hr

19

Penjaga Malam

Org/hr

20

Sopir

Org/hr

21

Operator

Org/hr

22

Mekanik

Org/hr

23

Pembantu Sopir

Org/hr

Rp
42,000.00
Rp
42,000.00
Rp
65,000.00
Rp
75,000.00
Rp
65,000.00
Rp
42,000.00

24

Pembantu Operator

Org/hr

Rp
50,000.00

25

Pembantu Mekanik

Org/hr

Rp
42,000.00

Harga Satuan Bahan Bangunan - AHS 2011

NO

MATERIAL

SAT

HARGA (Rp)

A.

AGREGAT KASAR,BAHAN
PEREKAT & BAHAN JADINYA

Pasir Urug

m3

175,300.00

2
3

Tanah Urug Pilihan


Sirtu

m3
m3

89,200.00
203,500.00

Pasir Teras

m3

174,200.00

Pasir Pasang Kali

m3

233,400.00

6
7

Pasir Beton
Abu Batu

m3
m3

255,400.00
259,000.00

Batu Gosok ( Apung )

kg

29,600.00

Batu Pecah Mesin 1/2

m3

223,600.00

10

Batu Pecah Mesin 2/3

m3

211,100.00

11

Batu Pecah Mesin 3/5

m3

205,000.00

12

Batu Pecah Mesin 5/7

m3

196,000.00

13

Batu Belah Pondasi

m3

205,500.00

14

Batu Bronjol ( Untuk Bronjong )

m3

180,800.00

15

Batu Koral Beton Kali

m3

172,600.00

16

Batu Tempel Hitam

m3

96,600.00

17

Batu Pinggir Beton 10 x 20 x 35

bh

14,100.00

18

Batu Pinggir Beton 15 x 35 x 50


( K-225 )

bh

73,700.00

19

Batu Telor

m3

97,800.00

20

Batako Kecil 8 x 10 x 20

bh

2,000.00

21

Batako Besar 8 x 20 x 30

bh

2,400.00

22

Con Blok 8 x 20 x 40

bh

5,400.00

23

Bata Merah Bakar kelas I

bh

775

24

Bata Merah Bakar kelas II

bh

675

25

Bata Merah Oven ( Klingker )

bh

1,800.00

26

Roster Beton 20 x 20

bh

14,800.00

27

Roster Beton 30 x 30

bh

15,500.00

28

Grass Blok 20 x 20

bh

9,700.00

29

Grass Blok 30 x 30

bh

22,500.00

30

Paving Blok Natural 8 cm

m2

81,100.00

31

Paving Blok Warna 8 cm

m2

108,600.00

32

Paving Blok Natural 6 cm

m2

76,000.00

33

Paving Blok Warna 6 cm

m2

86,000.00

34

Canstin Paving Blok

m1

34,900.00

35

Semen PC /50 kg

zak

70,300.00
1,406.00

36

Semen Putih

zak

92,700.00

37

Kanstin Jalan Ukuran Besar ( Bina


Marga ) 1bh =60cm

bh

58,900.00

38

Readymix Beton K500, Tanpa


Pompa ( Selang )

m3

1,105,000.00

39

Readymix Beton K400, Tanpa


Pompa ( Selang )

m3

903,500.00

40

Readymix Beton K350, Tanpa


Pompa ( Selang )

m3

877,500.00

41

Readymix Beton K300, Tanpa


Pompa ( Selang )

m3

925,000.00

42

Readymix Beton K225, Tanpa


Pompa ( Selang )

m3

850,000.00

43

Readymix Beton K175, Tanpa


Pompa ( Selang )

m3

825,000.00

44

Kapur Pasang / Kapur Tembok

m3

353,300.00

45

Kapur Sirih

kg

18,300.00

46
47
48

Semen Warna
Tanah liat
Air

kg
m3
ltr

15,700.00
31,300.00
3

49

Formite/spacer

bh

2,500.00

50

Hollow/Con Blok 8 x 20 x 40

bh

5,000.00

51

Hollow/Con Blok 8 x 15 x 40

bh

4,000.00

52

Hollow/Con Blok 8 x 10 x 40

bh

3,000.00

LABURAN,PENGISI DAN
ALATNYA

Plamir Tembok

kg

25,000.00

Cat Tembok ICI Eksterior ( Beton )

lt

120,000.00

Cat Tembok ICI Interior ( Plafon


Dan Dinding )

lt

75,000.00

Cat Tembok Vinilex

kg

25,000.00

Cat Dasar ICI untuk Interior ( 2


Pelapis )

lt

75,000.00

Cat Tembok Sanlek

kg

20,000.00

Cat Dasar

kg

30,000.00

Cat Tahan Asam

lt

40,000.00

Pelapis Alkali ICI ( Cat Dasar Beton


Ekterior )

kg

90,000.00

10

Cat Marka / Spotlight

kg

185,000.00

11

Water Profing Emulsion

ml

70,000.00

12

Water Profing Membrance

bh

62,500.00

13

Rool Cat Tembok

bh

32,500.00

14

Kape Tembok

bh

8,500.00

15

Kape Kayu

5 lt

10,000.00

16
17

Soligneum 1 Blek
Plincote

kg
m3

25,000.00
29,000.00

18

Penawetan Kayu

m3

382,600.00

19
20
21
22

Pegopenan Kayu
Kwas 3"
Oker
Oyan

bh
bh
bks
bks

370,000.00
16,000.00
22,000.00
5,200.00

23
24

Oten ( Pewarna Plitur )


Spirtus

lt
kg

5,500.00
15,000.00

25

Bahan Pelitur Kripik ( Sirlak India )

kg

110,000.00

26

Dempul Lilin

kg

34,200.00

27

Dempul Plitur

kg

37,700.00

28

Dempul Halus / Imfra ( Wood


Filler )

lt

37,700.00

29
30

Dempul Jadi
Politur

kg
lt

35,800.00
48,000.00

31
32
33
34
35
36

Politur Jadi
Terpentin
Tiner A
Tiner B
Kumpon
Melamik

lt
kg
kg
kg
lbr
kg

112,700.00
19,500.00
23,900.00
21,400.00
30,800.00
52,500.00

37

Dempul Plastik

kg

39,200.00

38
39

Dempul Duco
Ampelas

kg
lbr

35,800.00
5,000.00

40

Dempul Kayu Cap Kucing

kg

24,400.00

41

Meni Kayu / Besi

kg

30,400.00

42

Sincromat

kg

40,900.00

43
44

Cat Kayu Sieve


Cat Besi

lt
lt

41,700.00
44,000.00

45
46
47

Cat Besi Duco Danaglos / ICI


Cat Bron
Karet lis

bh
kg
bh

76,300.00
67,700.00
3,300.00

48

Minyak cat

kg

38,400.00

49
50

Glass beet
Residu

kg
lt

50,100.00
8,100.00

BAHAN KAYU BERIKUT BAHAN


JADINYA

Bambu 5 s.d 7

bt

17,700.00

Bambu 7 s.d 10

bt

25,000.00

Bambu Gombong

bt

37,200.00

Kayu Kamper Singkil / Kapur


( Kayu Samarinda kls II )

m3

7,094,450.00

Kayu Balok Borneo Super

m3

5,280,000.00

Kayu Papan Borneo Super

m3

5,595,800.00

Kayu Balok Kamper Medan (Kruing


)

m3

5,692,600.00

Kayu Papan Kamper Medan


(Kruing )

m3

5,823,400.00

Kayu Balok Kamper Banjar

m3

6,363,600.00

10

Kayu Papan Kamper Banjar

m3

6,645,300.00

11

Kayu Balok Kamper Samarinda

m3

8,633,700.00

12

Kayu Papan Kamper Samarinda

m3

8,724,300.00

13

Kayu Balok Rasamala

m3

2,658,000.00

14

Kayu Jati Jatim Tua dia. 40 cm

m3

20,772,000.00

15

Kayu Jati Jateng Tua dia. 40 cm

m3

22,188,400.00

16

Kayu Jati Jabar Tua dia. 40 cm

m3

13,625,400.00

17

Kayu Jati Jabar Tua dia. 40 cm


kebawah

m3

12,736,100.00

18

Kayu Hutan Kelas I


( Segeng,Mahoni, Laban )

m3

2,069,800.00

19

Kayu Balok Albasia

m3

1,870,500.00

20

Kayu Papan Albasia

m3

2,071,700.00

21

Dolken 5 s/d 7

bt

22,600.00

22

Dolken 7 s/d 10

bt

28,000.00

23

List Profil Kamper 1 cm

m1

8,900.00

24

List Profil Kamper 2 cm

m1

10,000.00

25

List Profil Kamper 4 cm

m1

14,300.00

26

List Profil Kamper 5 cm

m1

17,200.00

27

List Profil Kamper 10 cm

m1

29,400.00

28

Pegangan Tangga Profil Jati

m1

160,100.00

29

Pegangan Tangga Profil Kamper

m1

122,500.00

30

Kayu Kaso 4/6

m3

2,772,000.00

31

Kayu Kaso 5/7 Kamper Medan

m3

3,356,800.00

32

Kayu Reng 2/3 Borneo Super

m1

2,500.00

33

Kayu Reng 2/3 Kamper Banjar

m1

3,300.00

34

Kayu Reng 3/4 Kamper Medan

m3

4,000.00

35

Kayu Papan Terentang

m3

2,850,000.00

36

Kayu Balok Terentang

m3

2,640,000.00

37
38

Batang Kelapa
Tali Ijuk

bt
kg

139,500.00
23,400.00

39

lapisan Ijuk tebal 10 cm

m2

22,000.00

40

Venetion Blind

m2

537,300.00

41

Vertikal Blind

m2

351,200.00

BAHAN PENUTUP RANGKA


PLAFOND

Plafond Enternit 4 mm

m2

17,400.00

Plafond hardpleks 5 mm 120 x 240

lbr

62,400.00

Plafond Asbes Semen 5 mm

m2

22,500.00

Plafond Asbes Semen 3,5 mm

m2

19,500.00

Gypsum 120 x 240 t= 9 mm ex DN

lbr

79,800.00

Gypsum 120 x 240 t= 9 mm ex


Luar

lbr

83,800.00

Tepung gypsum

kg

12,500.00

Acustik Amstrong 60 x 120

lbr

132,800.00

Cotton Plester

bh

15,000.00

10

GRC (120 x 240) cm, t = 4 mm

lbr

67,500.00

11

Cornice Coumpound

zak

75,000.00

12

List gypsum

m'

8,500.00

BAHAN KAYU LAPIS

Triplek 3 mm 120 x 240

lbr

61,700.00

Triplek 4 mm 120 x 240

lbr

64,400.00

Triplek 4 mm ukuran Pintu

lbr

56,200.00

Triplek 6 mm 120 x 240

lbr

92,000.00

Triplek 9 mm 120 x 240

lbr

166,600.00

Jabar Wood 4 mm

lbr

119,000.00

Bilik Bambu ( tanpa kulit )

m2

19,800.00

Bilik Bambu ( dengan kulit )

m2

22,700.00

Bilik Bambu Hitam Variasi

m2

34,200.00

10

Wall paper

m2

55,700.00

11

MultiPlek 9 mm 120 x 240

lbr

151,100.00

12

MultiPlek 12 mm 120 x 240

lbr

195,000.00

13

MultiPlek 18 mm 120 x 240

lbr

255,400.00

14

Ply Wood 18 mm 120 x 240

lbr

323,900.00

15

Ply Wood 9 mm 120 x 240

lbr

235,000.00

16

Ply Wood 4 mm 120 x 240

lbr

140,000.00

17

Teak Wood 3 mm 120 x 240

lbr

129,100.00

18

Teak Wood 4 mm 120 x 240

lbr

131,700.00

19

Teak Wood 3 mm 120 x 240 ukuran


Pintu

lbr

127,200.00

20

Teak Wood ukuran Pintu 4 mm

lbr

114,700.00

21
22

Tacon ( Tahan Bakar )


Supercon

m2
m2

128,200.00
57,900.00

23

Melamin 4 mm 120 x 240

lbr

89,200.00

24

Melamin TOK 4 mm

lbr

133,400.00

25

Formika 120 x 240

lbr

170,000.00

26

Formika ukuran Pintu

lbr

132,900.00

27

Formika Warna 4" x 8"

lbr

238,100.00

BAHAN LANTAI DAN PELAPIS


DINDING

Tegel PC 20 x 20

bh

3,400.00

Plin Tegel PC 10 x 20

bh

2,400.00

Tegel PC 30 x 30

bh

3,400.00

Plin Tegel PC 15 x 30

bh

2,800.00

Tegel Warna 20 x 20

bh

3,600.00

Plin Tegel Warna 10 x 20

bh

3,400.00

Tegel Warna 30 x 30

bh

5,700.00

Plin Tegel Warna 15 x 30

bh

6,300.00

Tegel Wafel PC 20 x 20

bh

3,200.00

10

Tegel Wafel Warna 20 x 20

bh

2,500.00

11

Tegel Badak PC 30 x 30

bh

4,100.00

12

Poslin 11 x 11 Warna Standar DN

m2

63,300.00

13

Poslin 11 x 11 Warna khusus DN

m2

67,300.00

14

Keramik 10 x 20 dan 20 x 20 KW I
DN Putih / Polos Mulia

m2

54,500.00

15

Keramik 10 x 20 KW I DN
Corak/Warna/Anti Slip Mulia

m2

56,000.00

16

Keramik 20 x 20 (KM) KW I DN
Corak/Warna /Anti Slip Mulia

m2

62,500.00

17

Keramik 20 x 20 (KM) KW I DN
Putih Polos Mulia

m2

54,500.00

18

Keramik 20 x 25 Dinding KM KW I
DN Corak Mulia

m2

62,500.00

19

Keramik 30 x 30 KWI DN Putih


Polos Mulia

m2

53,000.00

20

Keramik 30 x 30 KWI DN
Warna/Corak (ANTI SLIP) Mulia

m2

58,000.00

21

Keramik 40 x 40 KWI DN Putih


Polos Mulia

m2

56,800.00

22

Keramik 40 x 40 KWI DN
Warna/Corak (ANTI SLIP) Mulia

m2

65,500.00

23

Keramik 10 x 20 dan 20 x 20 KW I
DN Putih / Polos Roman

m2

64,400.00

24

Keramik 10 x 20 KW I DN
Corak/Warna/Anti Slip Roman

m2

72,200.00

25

Keramik 20 x 20 (KM) KW I DN
Corak/Warna/Anti Slip Roman

m2

75,200.00

26

Keramik 20 x 20 (KM) KW I DN
Putih Polos Roman

m2

72,900.00

27

Keramik 20 x 25 Dinding KM KW I
DN Corak Roman

m2

75,200.00

28

Keramik 20 x 25 KW I DN Putih
Polos Roman

m2

72,900.00

29

Keramik 30 x 30 KW I DN Polos
Roman

m2

68,900.00

30

Keramik 30 x 30 KW I DN
Warna/Corak (ANTI SLIP) Roman

m2

76,600.00

31

Keramik 40 x 40 KW I DN Polos
Roman

m2

72,500.00

32

Keramik 40 x 40 KW I DN
Warna/Corak (ANTI SLIP) Roman

m2

77,000.00

33

Vinyl Lantai Standar

m2

56,000.00

34

Karpet Kelas Baik LN

m2

1,025,500.00

35

Karpet Kelas Sedang LN

m2

353,500.00

36

Parquet Jati

m2

375,400.00

37

Stairnosing Keramik 10/20

bh

13,700.00

38

Stairnosing Fiber

25,000.00

39

Taraso Kerang 30 x 30

m2

31,800.00

40

Plin Taraso 10 x 30

bh

13,500.00

41

Granit Alam LN Ukuran Besar

m2

1,848,400.00

42

Granit Alam LN Ukuran Kecil

m2

1,612,900.00

43

Granit Alam DN Ukuran Besar

m2

1,331,100.00

44

Granit Alam DN Ukuran Kecil

m2

1,299,400.00

45

Granito Tile Essenza Ukuran 40 x


40 Polis

m2

345,000.00

46

Granito Tile Essenza Ukuran 30 x


30

m2

322,800.00

47
48

Granito Tile Essenza Ukuran 40 x


40 UnPolis
Marmer

m2
m2

204,900.00
550,000.00

49

Marmer Alam Lampung Ukuran


Besar

m2

550,200.00

50

Marmer Alam Lampung Ukuran


kecil

m2

345,700.00

51

Marmer Alam Citatah Ukuran Besar

m2

340,800.00

52

Marmer Alam Citatah Ukuran Kecil

m2

237,600.00

53

Marmer Sintetis

m2

157,900.00

54

Granito Tile Essenza 60 x 60 Polis

m2

358,100.00

55

Granito Tile Essenza 60 x 60


UnPolis

m2

231,800.00

56

Batu Tempel Hitam

m2

96,500.00

57

Bata Karawang

bh

600

58

Campuran untuk Kedap Air ( AM )

ltr

37,600.00

59

Plint keramik 10 x 20

bh

3,000.00

60

Plint keramik 10 x 25

bh

3,250.00

61

Plint keramik 10 x 30

bh

3,500.00

62

Plint keramik 10 x 40

bh

4,000.00

63

Plint keramik 15 x 30

bh

4,500.00

64

Plint keramik 15 x 40

bh

5,250.00

65

Plint granito 10 x 30

bh

25,900.00

66

Plint granito 10 x 40

bh

27,600.00

67

Plint granito 15 x 30

bh

31,100.00

68

Plint granito 15 x 40

bh

41,300.00

BAHAN SALURAN AIR KOTOR /


BERSIH

Grafel U 20 cm'

m1

44,300.00

Grafel U 30 cm'

m1

56,400.00

Grafel U 40 cm'

m1

74,200.00

Buis Beton 20 cm ( 1 M' )

m1

49,200.00

Buis Beton 30 cm ( 1 M' )

m1

61,700.00

Buis Beton 40 cm ( 1 M' )

m1

80,900.00

Buis Beton 50 cm ( 1 M' )

stk

94,300.00

Buis Beton 60 cm ( 1 M' )

stk

130,900.00

Buis Beton 100 cm ( 0.50 M' )

stk

299,800.00

10

Buis Beton 80 cm ( 0.50 M' )

stk

298,500.00

11

BuisTanah 10 cm ( 0.50 M' )

stk

9,600.00

12

BuisTanah 15 cm ( 0.50 M' )

stk

12,700.00

13

BuisTanah 20 cm ( 0.50 M' )

stk

16,800.00

14
15

BuisTanah 25 cm ( 0.50 M' )


Injuk

stk
kg

22,800.00
17,400.00

BAHAN LOGAM DAN BAHAN


JADINYA

Besi Beton U-24 Rata-rata

kg

16,500.00

Besi Beton U-39 / U-32 Rata-rata

kg

20,700.00

3
4

Pagar BRC lengkap tiang ( Tanpa


Pondasi )
Bondek

m2
m2

171,300.00
185,000.00

Besi WF Ex DN SII

kg

24,000.00

Besi WF Ex Jepang

kg

23,900.00

Besi Profil DN SII

kg

18,300.00

Besi Profil Ex LN

kg

21,600.00

Besi C Lip Chanel

kg

19,200.00

10

Ongkos Galfanis Besi

kg

10,600.00

11

Kawat Beton

kg

27,700.00

12

Kawat Duri

kg

63,500.00

13

Kawat Pengikat

m1

1,000.00

14

Kawat Bronjong 4 mm

kg

28,200.00

15

Kawat Tembaga

kg

41,400.00

16

Ram Nyamuk Hijau

m2

13,400.00

17

Ram Kawat 1 x 1 cm

m2

15,300.00

18

Ram Ayam

m2

14,900.00

19

Kawat Kasa 1 x 1 ( Putih )

m2

32,100.00

20

Kawat Harmonika 4 cm

m2

35,900.00

21

Kawat Harmonika 2 cm

m2

28,600.00

22

Kawat Las Listrik

kg

23,600.00

23

Wiremesh M8

m2

51,900.00

24
25

Wiremesh M6
Timah

m2
kg

38,700.00
46,300.00

26

Timah Hitam

kg

43,300.00

27

Ram nyamuk Alumunium

m2

32,400.00

28

Plat Srip 2 x 30 mm ( 6 m1 )

bt

33,000.00

29
30
31

Plat Srip 3 x 30 mm ( 6 m1 )
Plat Strip
Besi Strip

bt
bt
kg

33,100.00
18,200.00
26,800.00

32

Plat Alumunium 0.2 mm

m2

89,800.00

33

Plat Alumunium 0.3 mm

m2

110,500.00

34

Plat Alumunium 0.4 mm

m2

141,400.00

35

Plat Alumunium 0.5 mm

m2

143,100.00

36

Plat Alumunium 0.6 mm

m2

171,800.00

37

Plat Alumunium 0.1 mm

m2

56,300.00

38

Kusen Alumunium Natural 1.3 mm


t= 1,3 mm ( 4 " )

m1

151,100.00

39

Kusen Alumunium Warna 1.3 mm


t= 1,3 mm ( 4 " )

m1

163,000.00

40

Kusen Alumunium Natural 1.3 mm


t= 1,3 mm ( 3 " )

m1

81,000.00

41

Kusen Alumunium Warna 1.3 mm


t= 1,3 mm ( 3 " )

m1

102,000.00

42

Daun Jendela Alumunium Natural


( tanpa kaca dan accessories )

m2

98,800.00

43

Daun Jendela Alumunium Warna


( tanpa kaca dan accessories )

m2

148,800.00

44

Daun Pintu Alumunium Natural


( tanpa kaca dan accessories )

m2

211,800.00

45

Daun Pintu Alumunium Warna


( tanpa kaca dan accessories )

m2

207,500.00

46

Handle Alumunium ( Tarikan Pintu


Alumunium )

bh

345,200.00

47

Kait Angin Alumunium

ps

104,500.00

48

Karet Asisoris Kusen / Pintu


Alumunium

m1

7,500.00

49

Jalusi Alluminium

m'

35,000.00

50

Sunscreen Almunium

m2

380,200.00

51

Seng Plat BJLS 30 60 cm ( 100 m1


)

roll

1,581,500.00

52

Seng Plat BJLS 30 90 cm ( 100 m1


)

roll

2,080,100.00

53

Plat Besi Tipis 1 mm

kg

16,800.00

54

Plat Besi Tipis 0.5 mm

kg

17,700.00

55

Plat Besi 2 mm s/d 5 mm

kg

14,100.00

56

Plat Besi 6 mms/d 10 mm

kg

14,100.00

57

Plat Besi 10 mm keatas

kg

14,700.00

58

Kabel presstressed polos

kg

26,700.00

59

Jaring Kawat Baja

kg

28,900.00

60
61

Lem Kuning ( Aibond )


Lem Fox

kg
kg

35,700.00
23,900.00

62

Lem Vinyl

kg

44,000.00

63

Besi Strip Kaca Nako

kg

11,000.00

64

Profil alumunium "T"

m1

12,200.00

65

Besi Hallow ( 2 x 4 x 4) cm (400cm)

btg

22,600.00

66

Besi Hallow ( 4 x 4) cm (400 cm)

btg

29,200.00

67

Besi Rail Pengamanan

kg

459,300.00

68

Jendela Besi

m2

390,200.00

69

Jendela Besi tahan api

m2

501,700.00

70

Pintu gulung besi

m2

501,700.00

71

Pintu Roliing Door

m2

306,600.00

72

Jendela nako kaca ryben + tralis 6


klips

set

170,000.00

73

Jendela nako kaca ryben + tralis 7


klips

set

200,000.00

74

Jendela nako kaca ryben + tralis 8


klips

set

230,000.00

75

Jendela nako kaca ryben + tralis 10


klips

set

290,000.00

76

Jendela nako kaca bening + tralis 4


klips

set

120,000.00

77

Jendela nako kaca bening + tralis 5


klips

set

140,000.00

78

Jendela nako kaca bening + tralis 6


klips

set

170,000.00

79

Jendela nako kaca bening + tralis 7


klips

set

210,000.00

80

Jendela nako kaca bening + tralis 8


klips

set

230,000.00

81

Jendela nako kaca bening + tralis


10 klips

set

300,000.00

BAHAN KACA

Kaca Polos 2 mm ( ASAHI )

m2

69,000.00

Kaca Polos 3 mm ( ASAHI )

m2

87,400.00

Kaca Polos 5 mm ( ASAHI )

m2

111,000.00

Kaca Polos 8 mm ( ASAHI )

m2

183,100.00

Kaca Rayband 5 mm ( ASAHI )

m2

148,700.00

Kaca Rayband 8 mm ( ASAHI )

m2

323,400.00

Kaca Rayband 12 mm ( ASAHI )

m2

627,000.00

Kaca cermin 5 mm

m2

150,500.00

Kaca cermin 6 mm

m2

186,400.00

10

Kaca cermin 8 mm

m2

234,300.00

11

Kaca Patri Lokal Terpasang


( ASAHI )

m2

1,621,100.00

12

Kaca Patri Ex Luar Negeri


Terpasang

m2

3,425,700.00

13

Kaca 6 mm Gravver

m2

1,263,900.00

14

Glass Block DN 20 x 20
( Kedawung )

bh

22,000.00

15
16

Glass Block DN 20 x 20 Ex LN
Sealant

bh
kg

125,700.00
211,800.00

17

Jendela Nako

bh

109,200.00

BAHAN PAKU DAN MUR BAUT

Paku 1/2" s/d 2"

kg

23,800.00

Paku 2" s/d 5"

kg

23,400.00

Paku 8 cm s/d 15 cm

kg

20,000.00

Paku Beton 2 cm s/d 5 cm

bh

1,600.00

Paku Kait Lengkap

bh

900

Paku Cacing

kg

57,100.00

Besi Beugel Kuda - Kuda

kg

21,700.00

Duk Angker

bh

7,500.00

Angker Mur Baut dia. 19 / Panjang


60 cm

bh

71,800.00

10

Mur Baut HTB dia. 19 s/d 16 ( 5 cm


)

bh

15,900.00

11

Mur Baut Biasa dia. 19 s/d 16 ( 5


cm )

bh

9,300.00

12

Piser dia.12 s/d 20 cm

bh

5,300.00

13

Paku skrup 3"

bh

800

14

Ramset / Dinabolt

bh

7,200.00

15

Baut Besar

bh

600

16

Baut Kecil

bh

300

17

Paku GRC

kg

35,000.00

18

Paku gypsum

kg

17,500.00

19

Sekrup fixer

bh

250

BAHAN PERPIPAAN

Besi Pipa Untuk Hydrant BSP 1"

bt

166,700.00

Besi Pipa Untuk Hydrant BSP 1.25"

bt

210,200.00

Besi Pipa Untuk Hydrant BSP 1.5"

bt

298,000.00

Besi Pipa Untuk Hydrant BSP 2"

bt

351,800.00

Besi Pipa Untuk Hydrant BSP 2.5"

bt

439,300.00

Besi Pipa Untuk Hydrant BSP 3"

bt

595,000.00

Besi Pipa Untuk Hydrant BSP 4"

bt

869,600.00

Besi Pipa Untuk Hydrant BSP 6"

bt

1,423,400.00

Besi Pipa Hitam 1" t = 2 mm

bt

172,300.00

10

Besi Pipa Hitam 2" t = 2 mm

bt

227,900.00

11

Besi Pipa Hitam 3" t = 2mm

bt

365,800.00

12

Besi Pipa Hitam 4" t = 2 mm

bt

573,100.00

13

Besi Pipa Hitam 6" t = 2 mm

bt

772,400.00

14

Pipa GIP Medium A 1/2" ( 6 m1 )

bt

109,100.00

15

Pipa GIP Medium A 3/4" ( 6 m1 )

bt

159,400.00

16

Pipa GIP Medium A 1" ( 6 m1 )

bt

181,500.00

17

Pipa GIP Medium A 1 1/4" ( 6 m1 )

bt

259,300.00

18

Pipa GIP Medium A 1 1/2" ( 6 m1 )

bt

280,500.00

19

Pipa GIP Medium A 1 3/4" ( 6 m1 )

bt

326,400.00

20

Pipa GIP Medium A 2" ( 6 m1 )

bt

467,400.00

21

Pipa GIP Medium A 2 1/2" ( 6 m1 )

bt

672,100.00

22

Pipa GIP Medium A 3" ( 6 m1 )

bt

849,900.00

23

Pipa GIP Medium A 4" ( 6 m1 )

bt

920,300.00

24

Macam2 Sambungan GIP 1/2"

bh

6,300.00

25

Macam2 Sambungan GIP 3/4"

bh

8,600.00

26

Macam2 Sambungan GIP 1"

bh

16,700.00

27

Macam2 Sambungan GIP 1 1/4"

bh

19,800.00

28

Macam2 Sambungan GIP 1 1/2"

bh

20,700.00

29

Macam2 Sambungan GIP 1 3/4"

bh

22,700.00

30

Macam2 Sambungan GIP 2"

bh

51,200.00

31

Macam2 Sambungan GIP 2 1/2"

bh

60,400.00

32

Macam2 Sambungan GIP 3"

bh

75,900.00

33

Macam2 Sambungan GIP 4"

bh

118,600.00

34

Pipa PVC RUCIKA type AW 1/2"

bt

40,100.00

35

Pipa PVC RUCIKA type AW 3/4"

bt

52,200.00

36

Pipa PVC RUCIKA type AW 1"

bt

63,200.00

37

Pipa PVC RUCIKA type AW 1 1/4"

bt

79,900.00

38

Pipa PVC RUCIKA type AW 1 1/2"

bt

105,900.00

39

Pipa PVC RUCIKA type AW 2"

bt

110,700.00

40

Pipa PVC RUCIKA type AW 2 1/2"

bt

167,100.00

41

Pipa PVC RUCIKA type AW 3"

bt

205,100.00

42

Pipa PVC RUCIKA type AW 4"

bt

347,900.00

43

Pipa PVC RUCIKA type AW 6"

bt

640,000.00

44

Pipa PVC RUCIKA type AW 8"

bt

818,300.00

45

Pipa PVC MASPION ABU ( AW )


1/2"

bt

22,500.00

46

Pipa PVC MASPION ABU ( AW )


3/4"

bt

27,800.00

47

Pipa PVC MASPION ABU ( AW ) 1"

bt

40,500.00

48

Pipa PVC MASPION ABU ( AW ) 1


1/4"

bt

58,500.00

49

Pipa PVC MASPION ABU ( AW ) 1


1/2"

bt

60,200.00

50

Pipa PVC MASPION ABU ( AW ) 2"

bt

75,800.00

51

Pipa PVC MASPION ABU ( AW ) 2


1/2"

bt

126,300.00

52

Pipa PVC MASPION ABU ( AW ) 3"

bt

145,700.00

53

Pipa PVC MASPION ABU ( AW ) 4"

bt

256,800.00

54

Macam2 Sambungan Paralon 1/2"

bh

4,400.00

55

Macam2 Sambungan Paralon 3/4"

bh

4,700.00

56

Macam2 Sambungan Paralon 1"

bh

4,900.00

57

Macam2 Sambungan Paralon 1


1/4"

bh

7,200.00

58

Macam2 Sambungan Paralon 1


1/2"

bh

9,500.00

59

Macam2 Sambungan Paralon 1


3/4"

bh

13,500.00

60

Macam2 Sambungan Paralon 2"

bh

15,800.00

61

Macam2 Sambungan Paralon 2


1/2"

bh

26,400.00

62

Macam2 Sambungan Paralon 3"

bh

29,700.00

63

Macam2 Sambungan Paralon 4"

bh

34,000.00

64

Sambungan Pipa PVC Jenis AW 4"


TY

bh

89,900.00

65

Lem Paralon

tb

10,100.00

66

Solatip Ledeng

gl

4,200.00

67

Pipa PVC 4" Berlobang Jenis AW

m1

36,700.00

68

PVC Waterstop lebar 150

m1

53,500.00

69

PVC Waterstop lebar 200

m1

57,900.00

70

PVC Waterstop lebar 230

m1

65,700.00

71

PVC Waterstop lebar 250

m1

74,700.00

72

PVC Waterstop lebar 300

m1

83,600.00

73

PVC Waterstop lebar 320

m1

92,500.00

BAHAN SANITAIR

Stop Kran 3/4" KIT

bh

103,900.00

Stop Kran 1" KIT

bh

124,200.00

Stop Kran 1 1/2" KIT

bh

208,000.00

Stop Kran 2" KIT

bh

267,900.00

Stop Kran 2 1/2" KIT

bh

713,200.00

Stop Kran 3" KIT

bh

830,300.00

Check Valve 1/2"

bh

86,400.00

Double Neple 1/2"

bh

32,400.00

Water Mur 1/2"

bh

40,200.00

10

Gate walve 1/2"

bh

55,500.00

11

Saringan Air Lt. KM Stainless Steel

bh

66,600.00

12

Apooer Bath Tube

bh

267,800.00

13

Kran Stainless Lokal Kait

bh

46,100.00

14

Shower Dengan Tiang

bh

221,000.00

15

Shower Tanpa Tiang

bh

134,800.00

16

Kran Tembok Sun Eui dia. 1/2"

bh

86,900.00

17

Kran Tembok ITAP dia. 1/2"

bh

40,900.00

18

Kran Bebek Sun Eui 1/2"

bh

144,600.00

19

Kran Bebek ITAP 1/2"

bh

51,500.00

20

Kran Panas Dingin San Eui


Standard

bh

228,400.00

21

Bath Cape Washteren

unit

2,098,700.00

22

Tempat Sabun Poslin

bh

46,300.00

23

Wastafel Lengkap TOTO LW 230

unit

1,012,700.00

24

Wastafel Lengkap INA

unit

699,900.00

25

Closet Jongkok Poslin Warna


TOTO

unit

205,600.00

26

Closet Jongkok Standard Putih


Poslin TOTO

unit

188,200.00

27

Closet Jongkok Lengkap Sistem


Jet TOTO

unit

2,032,900.00

28

Closet Duduk Warna Standard


TOTO C 240 Lengkap

unit

1,724,700.00

29

Wastafel Bulat Warna Standard


Lengkap

unit

910,800.00

30

Closet Duduk Warna Standard INA


Lengkap

bh

1,272,100.00

31

Urinoir Lengkap TOTO Warna


Standard Lengkap

unit

1,773,400.00

32

Penyekat Poslin Urinoar TOTO

lbr

495,900.00

33

Kitchen Zink Stainless Standard


Lokal ( 1 Lubang )

bh

397,800.00

34

Kitchen Zink Stainless Non


Standard Franke ( 1 Lubang )

bh

1,272,300.00

35

Kitchen Zink Stainless Non


Standard Franke ( 2 Lubang )

bh

1,650,200.00

36

Talang PVC U - 15 cm

BAHAN PENUTUP ATAP

btng

60,000.00

Atap Plastik Gelombang 80 x 180

lbr

33,100.00

Atap Fiber Glass Tipis 80 x 180


( Gelombang )

lbr

47,100.00

Atap Fiber Glass Tebal 80 x 180


( Gelombang )

lbr

100,000.00

Atap Alumunium Natural USR 26


( JAINDO )

m2

140,600.00

Atap Alumunium Warna USR 26


( JAINDO )

m2

164,700.00

Atap Asbes Gel. Kecil 80 x 180 x 4


mm

lbr

77,200.00

Atap Asbes Gel. Besar 80 x 180 x 5


mm

lbr

111,100.00

Atap Seng Gelombang 80 cm x 180


cm x 3 mm

lbr

62,900.00

Atap Seng Gelombang 80 cm x 180


cm x 5 mm

lbr

83,100.00

10

Atap Seng Gelombang 270 cm x


105 cm x 4mm

lbr

73,300.00

11

Atap Seng Gelombang 240 cm x


105 cm x 4mm

lbr

65,900.00

12

Atap Seng Gelombang 210 cm x


105 cm x 4mm

lbr

58,500.00

13

Atap Seng Gelombang 150 cm x


105 cm x 4mm

lbr

42,300.00

14

Atap Seng Gelombang 150 cm x


102 cm x 5mm

lbr

78,500.00

15

Atap Seng Gelombang 180 cm x


102 cm x 5mm

lbr

97,200.00

16

Atap Asbes Gelombang 300 cm x


105 cm x 4 mm

lbr

80,000.00

17

Atap Tegola Kubota, lengkap

m2

487,100.00

18

Atap Tegola Kwalitas Sedang

m2

283,600.00

19

Alumunium Foile

m2

19,600.00

20

Atap Genteng Plentong pres Bakar


KW I

bh

1,900.00

21

Atap Genteng Plentong pres Molen


Oven KW I

bh

2,700.00

22

Atap Genteng Flam pres Molen


Oven Jatiwangi

bh

2,300.00

23

Bubung Genteng pres Bulat Ex


Jatiwangi

bh

7,500.00

24

Genteng Bubungan Ex Jatiwangi


Segi Tiga

bh

4,800.00

25

Genteng Bubungan Beton

bh

10,500.00

26

Genteng Metal ( Rainbow Roof )

m2

203,100.00

27

Genteng Metal Hana

m2

172,700.00

28

Nok Atas Metal ( Rainbow Roof )

lbr

138,500.00

29

Nok Atas Metal Hana

lbr

80,900.00

30

Nok Pingir Metal ( Rainbow Roof )

lbr

105,300.00

31

Nok Pingir Metal Hana

lbr

100,800.00

32

Wall Flasing ( Rainbow Roof )

lbr

83,900.00

33

Wall Flasing Hana

lbr

88,700.00

34

Atap Genteng Beton Warna


14.5/m2

m2

96,700.00

35

Genteng Beton Natural

bh

8,500.00

36

Sirap Kelas I ( 80 / m2 )

m2

26,400.00

37

Genteng Keramik Natural Intan


14.5 / m2

m2

112,400.00

38

Genteng Keramik Glasur Standard


14.5 /m2

m2

142,200.00

39

Genteng Keramik Glasur Special


14.5 /m2

m2

139,300.00

40

Genteng Keramik Glasur Premium


14.5 /m2

m2

145,100.00

41

Genteng Murando Natural 1m2 =


18 bh

bh

2,700.00

42

Genteng Murando Glasur 1m2 = 18


bh

bh

4,000.00

43

Bubung Murando Natural

bh

7,500.00

44

Bubung Murando Glasur

bh

10,700.00

45

Bubungan Genteng Keramik

bh

10,000.00

46

Atap Genteng Kodok

bh

3,000.00

47

Bubungan Genteng Kodok

bh

4,500.00

48

Bubungan Genteng Plentong

bh

6,000.00

49

Bubungan Stel Gelombang

bh

7,500.00

50

Nok Stel Gelombang

lbr

38,100.00

51

Nok Atap Seng

lbr

37,500.00

52

Nok standar 40 cm 18, SWG 22

m2

75,000.00

53

Pelat Asbes tebal 4 mm

lbr

21,000.00

54

Pelat Asbes tebal 3.5 mm

lbr

16,400.00

55

Trusses ZAM-75 t=0.8 Rangka


Utama

m1

34,500.00

56

Trusses ZAM-75 t=0.5 Rangka


Utama

m1

22,000.00

57

Reng 16-DB Roof Battens t=0.48


mm

m1

11,000.00

58

Foot Plate t= 1.22 mm

m1

7,200.00

59

PLD - Diafragma Plate

bh

2,200.00

60

WIND Bracing

m1

1,700.00

61

Tensioner ( Pengaku Tali angin )

bh

7,200.00

BAHAN MEKANIKAL

Jockey Pump kap. 80 gln/menit 100


m1 ( 18.6 kW )

unit

71,396,400.00

Electrical Pump kap. 750 gln/menit


120 m1 ( 90 kW )

unit

216,358,900.00

Diesel Pump kap. 750 gln/menit


120 m1 ( 105 kW )

unit

591,647,100.00

Presure Tank kap. 500 liter lengkap

unit

36,997,300.00

Hydran Box dlm Gedung ( Lengkap


)

unit

6,854,400.00

Fire House 1.5 x 30 m + nose

unit

4,866,100.00

Exhose Fan H 360 W 60 x 60 cm

unit

6,862,900.00

Exhose Fan H 380 W CFM 55 x 55


cm

unit

5,491,100.00

Exhose Fan H 100 W 40 x 40 cm

unit

1,092,600.00

10

AC Split 3 PK Setara TOSHIBA

unit

30,791,800.00

11

AC Split 2 PK Setara TOSHIBA

unit

21,926,500.00

12

AC Split 1 PK Setara TOSHIBA

unit

5,174,100.00

13

Mesin AC Split DAIKIN ( Indoor /


Outdoor Unit )

1 BTU

4,200,000.00

BAHAN ELEKTRIKAL

Kabel NYA 1 x 1.5 Prima ( 1 rol =


50 m' )

ROLL

102,700.00

Kabel NYA 1 x 2.5 Prima ( 1 rol =


50 m' )

ROLL

151,700.00

Kabel NYM 2 x 1.5 Prima ( 1 rol =


50 m' )

m'

6,600.00

Kabel NYM 3 x 1.5 Prima ( 1 rol =


50 m' )

m'

7,600.00

Kabel NYM 2 x 2.5 Prima ( 1 rol =


50 m' )

m'

4,900.00

Kabel NYM 3 x 2.5 Prima ( 1 rol =


50 m' )

m'

10,900.00

Kabel NYM 4 x 2.5 Prima ( 1 rol =


50 m' )

m'

7,600.00

Kabel NYM 2 x 4 Prima ( 1 rol = 50


m' )

m'

6,300.00

Kabel NYM 3 x 4 Prima ( 1 rol = 50


m' )

m'

15,400.00

10

Kabel NYM 4 x 4 Prima ( 1 rol = 50


m' )

m'

20,700.00

11

Kabel NYM 2 x 6 Supreme ( 1 rol =


50 m' )

m'

11,800.00

12

Kabel NYM 3 x 6 Supreme ( 1 rol =


50 m' )

m'

13,700.00

13

Kabel NYM 4 x 6 Supreme ( 1 rol =


50 m' )

m'

18,600.00

14

Kabel NYM 2 x 10 Supreme ( 1 rol


= 50 m' )

m'

17,600.00

15

Kabel NYM 3 x 10 Supreme ( 1 rol


= 50 m' )

m'

119,700.00

16

Kabel NYM 4 x 10 Supreme ( 1 rol


= 50 m' )

m'

26,500.00

17

Kabel NYM 4 x 16 Supreme ( 1 rol


= 50 m' )

m'

29,700.00

18

Kabel NYY 2 x 4 Supreme ( 1 rol =


50 m' )

m'

12,000.00

19

Kabel NYY 3 x 4 Supreme ( 1 rol =


50 m' )

m'

19,300.00

20

Kabel NYY 4 x 4 Supreme ( 1 rol =


50 m' )

m'

23,800.00

21

Kabel NYY 2 x 6 Supreme ( 1 rol =


50 m' )

m'

14,500.00

22

Kabel NYY 3 x 6 Supreme ( 1 rol =


50 m' )

m'

19,200.00

23

Kabel NYY 4 x 6 Supreme ( 1 rol =


50 m' )

m'

18,500.00

24

Kabel NYY 2 x 10 Supreme ( 1 rol


= 50 m' )

m'

20,400.00

25

Kabel NYY 3 x 10 Supreme ( 1 rol


= 50 m' )

m'

25,800.00

26

Kabel NYY 4 x 10 Supreme ( 1 rol


= 50 m' )

m'

35,500.00

27

Kabel NYY 4 x 16 Supreme ( 1 rol


= 50 m' )

m'

41,900.00

28

NSFB FUJI EA - 100 A

bh

841,900.00

29

NSFB FUJI EA - 150 A

bh

2,182,600.00

30

Rumah Panel 30 x 60 cm
( Kosong )

unt

153,500.00

31

Skring Kas 2 grop Biasa

unt

204,800.00

32

Skring Kas 3 grop Biasa

unt

222,600.00

33

Skring Kas 5 grop Biasa

unt

468,800.00

34

MCB 1 PAS

bh

55,100.00

35

MCB 3 PAS

bh

106,000.00

36

Tahanan 50 A Merk Fuji

bh

521,100.00

37

Saklar Broko Tunggal Standard ( 1


Phase )

bh

23,800.00

38

Saklar Broko Seri Standard ( 1


Phase )

bh

26,300.00

39

Stop Kontak Broko Standard ( 1


Phase )

bh

23,800.00

40

Stop Kontak Broko 3 Phase (Out


Bow)

bh

87,700.00

41

Stop Kontak Broko 3 Phase ( In


Bow)

bh

144,900.00

42

Stop Kontak Handle 3 Phase

bh

87,800.00

43

Instalas Titik Lampu / Stop Kontak


(Upah dan Alat)

ttk

179,600.00

44

Lampu pijar 25 Watt s/d 100 Watt

bh

61,200.00

45

Lampu Neon Phillips 20 Watt

bh

29,700.00

46

Lampu Neon Phillips 40 Watt

bh

35,200.00

47

Trapo TL 20 W (Phillips)

bh

41,800.00

48

Trapo TL 40 W (Phillips)

bh

37,900.00

49

Trapo TL 20 W (Sinar)

bh

40,600.00

50

Trapo TL 40 W (sinar)

bh

41,300.00

51

Stater Neon Phillips

bh

8,300.00

52

Stater Neon Biasa

bh

6,500.00

53

Rumah TL In Bow / Out Bow 2 x 20


W (kosongan)

bh

144,000.00

54

Down Light + SL 25 W

bh

306,900.00

55

Lampu SL Philip 25 W

bh

306,900.00

56

Lampu Sirkel TL 20 W Lengkap

bh

67,900.00

57

Lampu Mercuri 80 W

bh

147,400.00

58

Lampu Taman + Tiang + Lampu 1


Buah

bh

307,600.00

59

Lampu Baret 30 cm + Neon

bh

221,700.00

60

Lampu Neon Arcrilik 2 x 40 W


Lengkap

bh

738,000.00

61

Jarum Penangkal Petir 16

bh

101,500.00

62

Kawat BC ( Tembaga )

kg

65,100.00

63

Pentanahan Penangkal Petir

ttk

423,700.00

64

Pentanahan Panel

ttk

296,100.00

BAHAN ALAT PENGANTUNG DAN


KUNCI

Kunci Silinder ALFA untuk Pintu


Alumunium

bh

410,900.00

Tarikan Pintu Alumunium

bh

408,600.00

Kunci 2 Slaag ROYAL

bh

126,500.00

Rel Henderson Lengkap

bh

864,300.00

Rel maraton I Pintu

unt

193,100.00

Kunci 2 Slaag Silinder SEIS Asli


type 210 s/d type 226

bh

335,900.00

Kunci 2 Slaag Ancor Asli

bh

165,300.00

Kunci 2 Slaag ISO

bh

207,300.00

Kunci KM Bulat Kualitas Biasa

bh

54,400.00

10

Kunci kM Bulat ALFA

bh

102,700.00

11

Kunci 2 Slaag Silinder Utama


Standard

bh

586,600.00

12

Kunci Gembok Besar

bh

85,200.00

13

Kunci 2 Slaag Kuda Terbang

bh

94,500.00

14

Kunci Lemari

bh

46,800.00

15

Espangolet

ps

51,600.00

16

Grendel 15 cm

bh

49,800.00

17

Grendel 5 cm

bh

5,500.00

18

Hak Angin Kait Jendela Biasa

ps

7,100.00

19

Hak Angin Jendela Antik

ps

29,000.00

20

Hak Angin Sendok Stainless /


Kuningan

bh

32,200.00

21

Sloot Pintu Berikut Rantai

bh

31,500.00

22

Sloot Jendela Tunggal

bh

33,000.00

23

Engsel Pintu Unilon Standard

ps

21,000.00

24

Engsel Jendela Unilon

ps

15,000.00

25

Engsel Patrun

ps

13,700.00

26

Engsel Harmonika

m1

9,100.00

27

Door Closer Kelas Standard ( Kelas


Sedang )

unt

420,000.00

28

Door Closer Kelas Standard ( Kelas


Baik )

unt

597,500.00

29

Door Closer Kelas Rendah

unt

200,000.00

30

Door Holder

unt

205,400.00

31

Door Stoper

unt

255,500.00

32

Tarikan Almari Rata-rata

bh

19,500.00

33

Seng BJLS 30 Lebar 60 cm ( 1 rol


50 m' )

m1

43,500.00

34

Seng BJLS 30 Lebar 90 cm ( 1 rol


50 m' )

m1

53,500.00

35
36

Seng BJLS 30 / 3 x 0.3 mm


Seng Plat

lbr
lbr

86,900.00
50,100.00

37

Waterstop Lebar 200 mm

m1

57,900.00

BAHAN PENGIKAT UNTUK


KONSTRUKSI JALAN

Aspal Bitumen

kg

12,459.00

Aspal Emulsi

kg

12,459.00

Aspal Curah

kg

10,890.00

Aspal Concrete / Laston( AC -WC)

ton

1,348,300.00

Aspal Threated Base ( ATB )

ton

1,200,200.00

Lataston /Hot Rolls Sheet ( HRS )

ton

1,666,900.00

BAHAN PENGISAP AIR SUMUR


DALAM

Pompa Kodok

unit

172,600.00

Pompa Dragon Tegal

unit

243,800.00

Pompa Dragon Asli

unit

718,500.00

Mesin Pompa Air 100 W - Sanyo

unit

1,100,200.00

Mesin Pompa Air 150 W - Sanyo

unit

1,890,700.00

Pompa Zet Pump 250 W - Sanyo

unit

4,961,500.00

Pompa Zet Pump 450 W - Sanyo

unit

7,878,000.00

Pompa Submersible kap. 150 liter /


menit 3 KW

unit

27,151,200.00

Gear Pump Kap. 60 liter / menit

unit

15,702,700.00

10

Deep Well dengan kelengkapannya


kap. 150 liter / menit

unit

172,052,500.00

11

Hand Oil Pump

unit

5,195,300.00

BAHAN PENAMPUNG AIR

Tangki Air Fiber Glass 0.5 m3


( Excel )

bh

1,172,500.00

Tangki Air Fiber Glass 1 m3


( Excel )

bh

1,316,400.00

Tangki Air Fiber Glass 2 m3


( Excel )

bh

1,954,200.00

Bak KM Fiber 60 x 60

bh

255,300.00

Bak Taraso WC 40 x 40

bh

118,500.00

Bak KM Taraso 60 x 60

bh

161,100.00

ALAT TUKANG

1
2
3
4
5
6

Palu 0.5 kg
Cangkul
Singkup
Sekrop
Pengki
Linggis

bh
bh
bh
bh
bh
bh

39,300.00
24,500.00
41,400.00
50,100.00
12,300.00
41,700.00

Rool Meter 30 meter ( Bahan


Plastik )

bh

101,000.00

Rool Meter 5 meter ( Bahan Besi )

bh

37,800.00

Selang Plastik untuk Water Pas


dia. 0.5 cm

1,600.00

10

Water Pas Alumunium 60 cm

bh

88,200.00

BAHAN BAKAR DAN PELUMAS

Minyak Tanah

Kayu Bakar dari Kayu Karet

lt

18,000.00

m3

151,100.00

Bahan Bakar Residu

lt

28,435.00

Minyak Solar

lt

7,150.00

5
6

Bensin Premium
Plus Oil

lt
lt

7,800.00
3,300.00

Oil Mesran 40 SAE

lt

55,000.00

Elpiji / botol

15 kg

104,600.00

Asitilin / Botol

15.1 kg btl

88,900.00

10
11

Angin ( O2 ) / botol
Karbit

btl
kg

66,400.00
19,400.00

12
13
14
15

Minyak Bekisting
Rapidrant
Soda Api
Sabun

ltr
Gln
kg
kg

40,500.00
15,700.00
35,600.00
2,400.00

16

Arang Kayu

kg

11,100.00

17

Kawat Las

bh

1,400.00

BAHAN PAGAR

Panel Beton Pracetak

lbr

199,200.00

Kolom Beton Pracetak

btg

264,000.00

B.

BIDANG PERTAMANAN

Aglonema

batang

50,000.00

2
3

Bambu krisik/jepang
Furadan

batang
kg

50,000.00
24,000.00

Kompos/pupuk kandang

karung

25,000.00

M atoa (2 m)

batang

40,000.00

6
7

Palm (botol, ekor tupai, putri, dll)


tinggi 2 m
Philo

batang
batang

100,000.00
75,000.00

Pohon pelindung (angsana,


mahoni, kamboja dll) tinggi 2m

batang

25,000.00

Pohon perdu (kaca piring, puring,


mawar, melati, dll)

batang

10,000.00

10

Rumput gajah mini

m2

15,000.00

Anda mungkin juga menyukai