NO

URAIAN PEKERJAAN

VOLUME

SATUAN

HARGA SATUAN MATERIAL


(Rp.)

STORAGE TANK AREA


A.

POWERHOUSE BUILDING
1 Galian Tanah Manual

34.78

m3

2 Perkerasan Scrop T.20 cm


3 Perkerasan Basecourse T.10 cm

21.60

150,000.00

10.80

m3

150,000.00

4 Pasang Bekisting Bawah

172.30

120,000.00

5 Pasang Bekisting Atas + Scaffolding


6 Pekerjaan Pembesian Str Bawah (Kubikasi beton x Rp.250.000)
7 Pekerjaan Pembesian Str Atas (Kubikasi beton x Rp.400.000)

180.27
0.00
0.00

m2
-

240,000.00
-

47.69

m3

8.39

m3

21.60

m3

11 Pekerjaan Pasangan Bata Merah

121.19

m2

80,000.00

12 Pekerjaan Plester

242.38

m2

35,000.00

13 Pekerjaan Acian

242.38

m2

12,500.00

14 Pekerjaan Pengecatan Dinding

372.38

m2

12,000.00

15 Pekerjaan Pengecatan Kusen Pintu dan Jalusi

28.00

m2

8,000.00

16 Pekerjaan Pengecatan Daun Pintu


17 Finishing Listplank

17.06
48.60

m2
m'

8,000.00
12,000.00

146.62
2.00
9.00
1.00
28.00
1.00

m2
Titik
Titik
Unit
Unit
Set

50,000.00
130,000.00
130,000.00
-

100.00

m3

8 Pekerjaan Beton K-350


9 Pekerjaan Beton B0
10 Pekerjaan Beton K-500

18 Finishing Lantai Dak


19 Pemasangan Titik Stop Kontak
20 Pemasangan Titik Lampu
21 Pasangan Pintu Plat Baja
22 Pasangan Jalusi Baja
23 Pekerjaan Ventilator
SUBTOTAL
B.

PUMP HOUSE BUILDING & GROUND TANK


1 Perapihan Galian Tanah Manual

2 Perkerasan Batu Kali T.40 cm

36.00

m3

120,000.00

3 Perkerasan Scrop T.20 cm

14.40

m3

150,000.00

7.20

150,000.00

361.20

m2

240,000.00

6 Pasang Bekisting Atas + Scaffolding


7 Pekerjaan Pembesian Str Bawah (Kubikasi beton x Rp.250.000)
8 Pekerjaan Pembesian Str Atas (Kubikasi beton x Rp.400.000)

88.80
0.00
0.00

m
-

240,000.00
-

9 Pekerjaan Beton K-350

12.31

m3

5.76

m3

11 Pekerjaan Beton K-500

62.32

m3

12 Pekerjaan Pasangan Bata Merah

77.77

m2

80,000.00

13 Pekerjaan Plester

221.34

m2

35,000.00

14 Pekerjaan Acian

270.34

m2

12,500.00

15 Pekerjaan Pengecatan Dinding

270.34

m2

12,000.00

16 Pekerjaan Pengecatan Kusen Pintu dan Jalusi

19.00

m2

8,000.00

17 Pekerjaan Pengecatan Daun Pintu


18 Finishing Listplank

12.28
28.00

m2
m'

8,000.00
10,000.00

19 Finishing Lantai Dak

49.00

m2

50,000.00

20 Finishing Coating
21 Pemasangan Titik Stop Kontak
22 Pemasangan Titik Lampu
23 Pasangan Pintu Plat Baja
24 Pasangan Jalusi Baja

252.00
2.00
4.00
2.00
16.00

m
Titik
Titik
Unit
Unit

130,000.00
130,000.00
-

25 Pekerjaan Water Profing


26 Water Stop
27 Pekerjaan Tangga Pipa Baja
28 Pekerjaan Tutp Main Hole 600x600 mm
29 Comissioning

252.00
30.00
1.00
1.00
1.00

m2
m'
Unit
Unit
Lot

50,000.00
150,000.00
-

9.50

m3

4 Perkerasan Basecourse T.10 cm


5 Pasang Bekisting Bawah + Scaffolding

10 Pekerjaan Beton B0

SUBTOTAL
C.

WORKSHOP BUILDING
1 Galian Tanah Manual

3 Perkerasan Scrop T.20 cm

7.20

m2

150,000.00

4 Perkerasan Basecourse T.10 cm

3.60

m2

150,000.00

46.80

120,000.00

112.80
0.00
0.00

m2
-

240,000.00
-

2.88

m2

10 Pekerjaan Beton K-350

20.198

m3

11 Pekerjaan Beton K-500

7.2

m3

53.04

m2

80,000.00

13 Pekerjaan Plester

185.88

m2

12,500.00

14 Pekerjaan Acian

235.88

m2

12,500.00

15 Pekerjaan Pengecatan Dinding


16 Finishing Listplank

235.88
30.00

m2
m'

12,000.00
10,000.00

17 Finishing Lantai Dak


18 Pemasangan Titik Stop Kontak
19 Pemasangan Titik Lampu
20 Pasangan Pintu Aluminium
21 Jendela Aluminium

50.00
3.00
4.00
2.00
5.00

m2
m'
Titik
Unit
Unit

50,000.00
130,000.00
130,000.00
-

22 Pasangan Kaca Reyben t.5mm

6.20

m2

1 Galian Tanah Manual

7.15

m3

2 Perkerasan Scrop T.20 cm


3 Perkerasan Basecourse T.10 cm

5 Pasang Bekisting Bawah


6 Pasang Bekisting Atas + Scaffolding
7 Pekerjaan Pembesian Str Bawah (Kubikasi beton x Rp.250.000)
8 Pekerjaan Pembesian Str Atas (Kubikasi beton x Rp.400.000)
9 Pekerjaan Beton B0

12 Pekerjaan Pasangan Bata Merah

SUBTOTAL
D.

AIR COMPRESSOR BUILDING


6.00

150,000.00

3.00

m3

150,000.00

4 Pasang Bekisting Bawah

39.40

120,000.00

5 Pasang Bekisting Atas + Scaffolding


6 Pekerjaan Pembesian Str Bawah (Kubikasi beton x Rp.250.000)
7 Pekerjaan Pembesian Str Atas (Kubikasi beton x Rp.400.000)

96.80
0.00
0.00

m2
-

240,000.00
-

8 Pekerjaan Beton K-350

15.45

m3

9 Pekerjaan Beton B0
10 Pekerjaan Beton K-500
11 Pekerjaan Pasangan Bata Merah

2.40

m3

6.00

m3

73.57

80,000.00

12 Pekerjaan Plester

204.74

m2

35,000.00

13 Pekerjaan Acian

246.74

12,500.00

14 Pekerjaan Pengecatan Dinding

132.80

m2

12,000.00

15 Pekerjaan Pengecatan Kusen Pintu dan Jalusi

14.00

8,000.00

16 Pekerjaan Pengecatan Daun Pintu


17 Finishing Listplank

9.48
26.00

m2
m'

8,000.00
10,000.00

18 Finishing Lantai Dak


19 Pemasangan Titik Stop Kontak
20 Pemasangan Titik Lampu
21 Pasangan Pintu Plat T.4mm
22 Jalusi Dinding
23 Pekerjaan Ventilator

42.00
2.00
3.00
1.00
13.00
1.00

m2
m'
Titik
Unit
Unit
Set

50,000.00
130,000.00
130,000.00
-

15.12

m3

2 Perkerasan Scrop T.20 cm


3 Perkerasan Basecourse T.10 cm

SUBTOTAL
E.

WASTE WATER
1 Perapihan Galian Tanah Manual

4.23

150,000.00

2.12

m3

150,000.00

165.50
0.00

m
-

120,000.00
-

1.44

m2

21.95

8 Pekerjaan Plester

127.75

m2

35,000.00

9 Pekerjaan Acian

127.75

12,500.00

115.35
30.00
3.00
3.00
0.00

m2
m'
Unit
Unit
m'

50,000.00
150,000.00
-

4 Pasang Bekisting Bawah


5 Pekerjaan Pembesian (Kubikasi beton x Rp.250.000)
6 Pekerjaan Beton B0
7 Pekerjaan Beton K-500

10 Pekerjaan Water Profing


11 Water Stop
12 Pekerjaan Tangga Pipa Baja
13 Pekerjaan Tutup Main Hole
14 Pekerjaan Instalasi Pipa

15 Pekerjaan Tangga Pipa Baja


16 Pekerjaan Tutp Main Hole 600x600 mm
17 Finishing Coating

3.00
3.00

Unit
Unit

115.35

m2

SUBTOTAL
TOTAL

SECURITY POST
F.

SECURITY POST
1 Galian Tanah Manual

22.91

m3

2 Urugan Tanah Manual

11.46

3 Perkerasan Scrop T.20 cm

11.46

m3

150,000.00

5.73

150,000.00

5 Pasangan Batu Kali

30.67

m3

120,000.00

6 Pasang Bekisting Bawah

47.01

120,000.00

7 Pasang Bekisting Atas + Scaffolding


8 Pekerjaan Pembesian (Kubikasi beton x Rp.250.000)

63.00
0.00

m2
kg

240,000.00
-

9 Pekerjaan Beton K-350

21.46

m3

56.82

m2

130.69

m2

80,000.00

56.82
92.00

m2
m'

175,000.00
10,000.00

14 Pekerjaan Plester

261.38

m2

35,000.00

15 Pekerjaan Acian

261.38

12,500.00

16 Finshing Beton Ekspose

209.36

m2

190,500.00

2.70

10,500.00

318.20
14.00
3.00
4.00
9.00

m2
Titik
Titik
Unit
Unit

12,000.00
130,000.00
130,000.00
-

9.85
2.00

m2
Unit

4 Perkerasan Basecourse T.10 cm

10 Pekerjaan Beton B0
11 Pekerjaan Pasangan Bata Merah
12 Pekerjaan Plafond
13 Upah List Plafond + Bahan

17 Finshing Rabat Beton


18 Pekerjaan Pengecatan Dinding dan Plafond
19 Pemasangan Titik Lampu
20 Pemasangan Stop Kontak
21 Pasangan Pintu Aluminium
22 Jendela Aluminium
23 Pasangan Kaca Reyben t.5mm
24 Pasangan Pintu PVC

25 Jalusi Dinding Aluminium

3.00

Unit

26 Lantai Keramik 40x40cm

5.75

180,000.00

27 Dinding Kamar Mandi Keramik 25x40cm

41.46

m2

200,000.00

28 Lantai Kamar Mandi Keramik 25x25cm


29 Pekerjaan Septick Tank
30 Pekerjaan Instalasi Pipa

15.36
1.00
0.00

m
Lot
m'

200,000.00
-

1 Galian Tanah Manual

24.17

m3

2 Urugan Tanah Manual

12.60

m3

3 Perkerasan Scrop T.20 cm


4 Perkerasan Basecourse T.10 cm

SUBTOTAL
G.

MUSHOLA

7.56

150,000.00

5.04

m3

150,000.00

5 Pasangan Batu Kali

12.13

120,000.00

6 Pasang Bekisting Bawah


7 Pekerjaan Pembesian (Kubikasi beton x Rp.250.000)
8 Pekerjaan Erection Baja

48.24
0.00
0.00

m2
kg

120,000.00
-

2.52

m2

9 Pekerjaan Beton B0
10 Pekerjaan Beton Site Mix
11 Pekerjaan Pasangan Bata Merah
12 Pekerjaan Pengecatan Dinding dan Plafond
13 Pekerjaan Pengecatan Struktur Baja
14 Pekerjaan Plafond
15 Upah List Plafond + Bahan

2.88

1,500,000.00

69.30

m2

80,000.00

138.60

12,000.00

0.00

m2

55.44
65.00

m
m'

175,000.00
10,000.00

16 Pekerjaan Plester

138.60

m2

35,000.00

17 Pekerjaan Acian
18 Pemasangan Titik Lampu
19 Pemasangan Stop Kontak
20 Pasangan Pintu Geser Aluminium
21 Jendela Aluminium

138.60
9.00
2.00
1.00
2.00

m
Titik
Titik
Unit
Unit

12,500.00
130,000.00
130,000.00
-

20.57
1.00

m2
Unit

22 Pasangan Kaca Reyben t.5mm


23 Jalusi Aluminium

24 Lantai Keramik 60x60cm

55.44

m2

180,000.00

25 Dinding Kamar Mandi Keramik 20x25cm

30.00

m2

200,000.00

26 Lantai Kamar Mandi Keramik 20x20cm


27 Pekerjaan Septick Tank
28 Pekerjaan Instalasi Pipa

18.00
1.00
0.00

m
Lot
m'

200,000.00
-

29 Pekerjaan Atap Zincalume

58.50

m2

SUBTOTAL
TOTAL
H.

PONDASI TANAH WARNASARI


1 Upah Bor Pondasi Strauss Pile Dia.300 mm

120.00

m'

Upah Pembesian Pondasi Strauss Pile Dia.300 mm

120.00

'

Upah Pengecoran Pondasi Strauss Pile Dia.300 mm

120.00

m'

Beton Site Mix


Besi Beton D.8mm
2 Pondasi Batu Kali
3 Pondasi Pile Cap 600x600x300mm + Upah
4 Sloof 200x200mm + Upah
5 Pagar Panel + Upah

8.40
100.00

m
kg

1,500,000.00
4,830.00

89.25

m3

400,000.00

5.88

m3

2,800,000.00

4.08
102.00

m3
m'

2,800,000.00
460,000.00
TOTAL
GRAND TOTAL

JUMLAH HARGA MATERIAL


(Rp.)

HARGA SATUAN UPAH (Rp.)

JUMLAH HARGA UPAH (Rp.)

TOTAL (Rp.)

STORAGE TANK AREA


-

60,000.00

2,086,560.00

2,086,560.00

3,240,000.00

25,000.00

540,000.00

3,780,000.00

1,620,000.00

15,000.00

162,000.00

1,782,000.00

20,676,000.00

55,000.00

9,476,500.00

30,152,500.00

43,264,800.00
-

90,000.00
5,400,000.00
19,076,800.00

16,224,300.00
5,400,000.00
19,076,800.00

59,489,100.00
5,400,000.00
19,076,800.00

45,000.00

2,146,140.00

2,146,140.00

20,000.00

167,796.00

167,796.00

45,000.00

972,000.00

972,000.00

9,695,360.00

60,000.00

7,271,520.00

16,966,880.00

8,483,440.00

25,000.00

6,059,600.00

14,543,040.00

3,029,800.00

15,000.00

3,635,760.00

6,665,560.00

4,468,608.00

10,000.00

3,723,840.00

8,192,448.00

224,000.00

4,000.00

112,000.00

336,000.00

136,480.00
583,200.00

4,000.00
60,000.00

68,240.00
2,916,000.00

204,720.00
3,499,200.00

7,331,125.00
260,000.00
1,170,000.00
104,182,813.00

20,000.00
70,000.00
70,000.00
-

2,932,450.00
140,000.00
630,000.00
83,741,506.00

10,263,575.00
400,000.00
1,800,000.00
187,924,319.00

13,000,000.00

13,000,000.00

4,320,000.00

30,000.00

1,080,000.00

5,400,000.00

2,160,000.00

25,000.00

360,000.00

2,520,000.00

1,080,000.00

15,000.00

108,000.00

1,188,000.00

86,688,000.00

55,000.00

19,866,000.00

106,554,000.00

21,312,000.00
-

90,000.00
15,580,000.00
4,922,800.00

7,992,000.00
15,580,000.00
4,922,800.00

29,304,000.00
15,580,000.00
4,922,800.00

45,000.00

553,815.00

553,815.00

20,000.00

115,200.00

115,200.00

45,000.00

2,804,400.00

2,804,400.00

6,221,600.00

60,000.00

4,666,200.00

10,887,800.00

7,746,900.00

25,000.00

5,533,500.00

13,280,400.00

3,379,250.00

15,000.00

4,055,100.00

7,434,350.00

3,244,080.00

10,000.00

2,703,400.00

5,947,480.00

152,000.00

4,000.00

76,000.00

228,000.00

98,240.00
280,000.00

4,000.00
60,000.00

49,120.00
1,680,000.00

147,360.00
1,960,000.00

2,450,000.00

20,000.00

980,000.00

3,430,000.00

260,000.00
520,000.00
-

70,000.00
70,000.00
-

140,000.00
280,000.00
-

400,000.00
800,000.00
-

12,600,000.00
4,500,000.00
157,012,070.00

10,000.00
5,000.00
-

2,520,000.00
150,000.00
89,215,535.00

15,120,000.00
4,650,000.00
246,227,605.00

60,000.00

570,000.00

570,000.00

1,080,000.00

25,000.00

180,000.00

1,260,000.00

540,000.00

15,000.00

54,000.00

594,000.00

5,616,000.00

55,000.00

2,574,000.00

8,190,000.00

27,072,000.00
-

90,000.00
5,049,500.00
2,880,000.00

10,152,000.00
5,049,500.00
2,880,000.00

37,224,000.00
5,049,500.00
2,880,000.00

20,000.00

57,600.00

57,600.00

45,000.00

908,910.00

908,910.00

45,000.00

324,000.00

324,000.00

4,243,200.00

60,000.00

3,182,400.00

7,425,600.00

2,323,500.00

25,000.00

4,647,000.00

6,970,500.00

2,948,500.00

15,000.00

3,538,200.00

6,486,700.00

2,830,560.00
300,000.00

10,000.00
60,000.00

2,358,800.00
1,800,000.00

5,189,360.00
2,100,000.00

2,500,000.00
390,000.00
520,000.00
-

20,000.00
70,000.00
70,000.00
100,000.00
75,000.00

1,000,000.00
210,000.00
280,000.00
200,000.00
375,000.00

3,500,000.00
600,000.00
800,000.00
200,000.00
375,000.00

40,341,410.00

90,705,170.00

60,000.00

429,000.00

429,000.00

900,000.00

25,000.00

150,000.00

1,050,000.00

450,000.00

15,000.00

45,000.00

495,000.00

4,728,000.00

55,000.00

2,167,000.00

6,895,000.00

23,232,000.00
-

90,000.00
3,861,500.00
2,400,000.00

8,712,000.00
3,861,500.00
2,400,000.00

31,944,000.00
3,861,500.00
2,400,000.00

45,000.00

695,070.00

695,070.00

50,363,760.00
-

20,000.00

48,000.00

48,000.00

45,000.00

270,000.00

270,000.00

5,885,600.00

60,000.00

4,414,200.00

10,299,800.00

7,165,900.00

25,000.00

5,118,500.00

12,284,400.00

3,084,250.00

15,000.00

3,701,100.00

6,785,350.00

1,593,600.00

10,000.00

1,328,000.00

2,921,600.00

112,000.00

4,000.00

531,200.00

643,200.00

75,840.00
260,000.00

4,000.00
60,000.00

56,000.00
1,560,000.00

131,840.00
1,820,000.00

2,100,000.00
260,000.00
390,000.00
50,237,190.00

20,000.00
70,000.00
70,000.00
-

840,000.00
140,000.00
210,000.00
36,676,570.00

2,940,000.00
400,000.00
600,000.00
86,913,760.00

60,000.00

907,200.00

907,200.00

634,500.00

45,000.00

190,350.00

824,850.00

317,250.00

15,000.00

31,725.00

348,975.00

19,860,000.00
-

55,000.00
5,487,500.00

9,102,500.00
5,487,500.00

28,962,500.00
5,487,500.00

20,000.00

28,800.00

28,800.00

45,000.00

987,750.00

987,750.00

4,471,250.00

25,000.00

3,193,750.00

7,665,000.00

1,596,875.00

15,000.00

1,916,250.00

3,513,125.00

5,767,500.00
4,500,000.00
-

10,000.00
5,000.00
-

1,153,500.00
150,000.00
-

6,921,000.00
4,650,000.00
-

37,147,375.00

23,149,325.00

Rp

60,296,700.00
672,067,554.00

SECURITY POST
-

60,000.00

1,374,600.00

1,374,600.00

45,000.00

515,511.00

515,511.00

1,718,370.00

20,000.00

229,116.00

1,947,486.00

859,185.00

15,000.00

85,918.50

945,103.50

3,679,800.00

100,000.00

3,066,500.00

6,746,300.00

5,641,200.00

55,000.00

2,585,550.00

8,226,750.00

15,120,000.00
-

90,000.00
5,364,000.00

5,670,000.00
5,364,000.00

20,790,000.00
5,364,000.00

45,000.00

965,520.00

965,520.00

20,000.00

1,136,400.00

1,136,400.00

10,455,000.00

60,000.00

7,841,250.00

18,296,250.00

9,943,500.00
920,000.00

25,000.00
20,000.00

1,420,500.00
1,840,000.00

11,364,000.00
2,760,000.00

9,148,125.00

25,000.00

6,534,375.00

15,682,500.00

3,267,187.50

15,000.00

3,920,625.00

7,187,812.50

39,883,080.00

95,000.00

19,889,200.00

59,772,280.00

28,350.00

75,000.00

202,500.00

230,850.00

3,818,340.00
1,820,000.00
390,000.00
-

15,000.00
70,000.00
70,000.00
100,000.00
75,000.00

4,772,925.00
980,000.00
210,000.00
400,000.00
675,000.00

8,591,265.00
2,800,000.00
600,000.00
400,000.00
675,000.00

100,000.00

200,000.00

200,000.00

1,035,000.00

40,000.00

230,000.00

1,265,000.00

8,292,300.00

45,000.00

1,865,767.50

10,158,067.50

3,072,000.00
119,091,437.50

40,000.00
3,200,000.00
-

614,400.00
3,200,000.00
75,789,658.00

3,686,400.00
3,200,000.00
194,881,095.50

60,000.00

1,450,080.00

1,450,080.00

45,000.00

567,000.00

567,000.00

1,134,000.00

20,000.00

151,200.00

1,285,200.00

756,000.00

15,000.00

75,600.00

831,600.00

1,455,840.00

100,000.00

1,213,200.00

2,669,040.00

5,788,800.00
-

55,000.00
719,250.00
-

2,653,200.00
719,250.00
-

8,442,000.00
719,250.00
-

20,000.00

50,400.00

50,400.00

4,315,500.00

500,000.00

1,438,500.00

5,754,000.00

5,544,000.00

60,000.00

4,158,000.00

9,702,000.00

1,663,200.00

15,000.00

2,079,000.00

3,742,200.00

9,702,000.00
650,000.00

25,000.00
20,000.00

1,386,000.00
1,300,000.00

11,088,000.00
1,950,000.00

4,851,000.00

25,000.00

3,465,000.00

8,316,000.00

1,732,500.00
1,170,000.00
260,000.00
-

15,000.00
70,000.00
70,000.00
100,000.00
75,000.00

2,079,000.00
630,000.00
140,000.00
100,000.00
150,000.00

3,811,500.00
1,800,000.00
400,000.00
100,000.00
150,000.00

9,979,200.00

40,000.00

2,217,600.00

12,196,800.00

6,000,000.00

45,000.00

1,350,000.00

7,350,000.00

3,600,000.00
-

40,000.00
3,200,000.00
-

720,000.00
3,200,000.00
-

4,320,000.00
3,200,000.00
-

31,293,030.00

89,895,070.00
284,776,165.50

58,602,040.00

L
OTAL

Rp
-

75,000.00

9,000,000.00

9,000,000.00

40,000.00

4,800,000.00

4,800,000.00

30,000.00

3,600,000.00

3,600,000.00

12,600,000.00
483,000.00

500,000.00
-

4,200,000.00
-

16,800,000.00
483,000.00

35,700,000.00

100,000.00

8,925,000.00

44,625,000.00

16,450,000.00

16,450,000.00

11,424,000.00
46,920,000.00

11,424,000.00
46,920,000.00
154,102,000.00
1,110,945,719.50

Rp
Rp