DITUJUKAN KEPADA NAMA NAMA TERSEBUT DI BAWAH INI, BAHWA MULAI: HARI/TGL JAM Nama: 1. Risfanand 2. Daniel DENGAN ALASAN : SENIN, 12 JUNI 2006 : 00.00 (dini hari) Menempati : Group C : Group D SAUDARA SUBUR (STAF LABORAT) SEDANG
KETENTUAN INI BERLAKU SELAMA KURANG LEBIH SATU MINGGU, MELAKSANAKAN TUGAS MENGOPERASIKAN DAN TRAINING IPA MOBIL DI DESA UJUNG MANIK KECAMATAN KAWUNGANTEN KABUPATEN CILACAP. JIKA SAVAN CAHKWATO BERANGKAT KE YOGYAKARTA, MAKA DANIEL KEMBALI KE GROUP SEMULA DAN KUSTONO SEBAGAI LABORAT. JIKA SUBUR KEMBALI DARI UJUNG MANIK, RISFANAND KEMBALI KE GROUP SEMULA. DEMIKIAN UNTUK DIPERHATIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
Kesugihan, 10 Juni 2006 Bagian Produksi Ttd Endar B Sasongko, ST Kepala Bagian
DAFTAR KARYAWAN PEDULI SECURITY DAN CLEANING SERVIS BAGIAN PRODUKSI PDAM KABUPATEN CILACAP
NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
NAMA Budi Priyatno Turijo Tufan P Agus W Sutono Amin YK Subardi Marjono A. Setiadi Savan C Dede M Adman Mukhsinun C. Daniel W Subur Herwanto Kustono Antonius S Mubed Sanding M
NOMINAL (Rp) 1.
PENGUMUMAN
DITUJUKAN KEPADA SEMUA OPERATOR DAN KARYAWAN, BAHWA SEHUBUNGAN DENGAN AKAN DIPERGUNAKANNYA ABSENSI DENGAN SISTEM ID NUMBER DAN SIDIK JARI MAKA: 1. KARYAWAN OPERATOR a. JAM KERJA PAGI ADALAH JAM 08.88 16.00 WIB b. JAM 07.45 HARUS SUDAH HADIR DI TEMPAT KERJA DAN MENEMPELKAN SIDIK JARI PADA SCANNER. c. JIKA DILANGGAR HAK-HAK TKK AKAN BERKURANG SESUAI ATURAN. d. UNTUK YANG SHIFT SORE DAN MALAM KETENTUAN MENUNGGU INFORMASI LEBIH LANJUT. 2. KARYAWAN ADMINISTRASI a. JAM KERJA ADALAH JAM 07.30 14.30 WIB (JUMAT JAM 07.00 11.00 WIB) b. JAM 07.15 WIB (JUMAT JAM 06.45 WIB) HARUS SUDAH HADIR DI TEMPAT KERJA DAN MENEMPELKAN SIDIK JARI PADA SCANNER. c. JIKA DILANGGAR HAK-HAK TKK AKAN BERKURANG SESUAI ATURAN. DEMIKIAN UNTUK DIPERHATIKAN DAN TERIMA KASIH.
PENGUMUMAN
DIBERITAHUKAN KEPADA SELURUH KARYAWAN BAGIAN PRODUKSI, PERALATAN TEKNIK DAN CABANG KESUGIHAN UNTUK DAPAT
MENGIKUTI KETENTUAN SEBAGAI BERIKUT: 1. Dalam rangka memperingati hari KORPRI, maka seluruh karyawan mengenakan seragam KORPRI lengkap pada hari: RABU, 29 NOPEMBER 2006. 2. Untuk Kepala Bagian Produksi, Peralatan Teknik dan Kacab. Kesugihan mendapat undangan hadir pada: a. Upacara peringatan hari KORPRI di Stadion WIJAYA KUSUMA Gumilir tepat pukul 08.00 b. Mengikuti acara Resepsi di Pendopo Kabupaten Cilacap pada pukul 19.00 dengan mengenakan pakaian bebas rapi. DEMIKIAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
BAGIAN PRODUKSI
TTD
PENGUMUMAN
BERDASAR INFORMASI DARI PERSONALIA, DIBERITAHUKAN KEPADA KARYAWAN BAGIAN PRODUKSI, PERALATAN TEKNIK DAN CABANG KESUGIHAN BEBERAPA HAL BERIKUT: A. CUTI NYADRAN CUTI NYADRAN DI BAGI MENJADI 3 KELOMPOK, KELOMPOK I KELOMPOK II : TGL. 18 19 SEPTEMBER 2006 : TGL. 20 21 SEPTEMBER 2006
KELOMPOK III : TGL. 22 23 SEPTEMBER 2006 DAFTAR NAMA NAMA KARYAWAN DAN JADWAL CUTI NYADRAN DIAMBIL DISERAHKAN KE PERSONALIA PALING LAMBAT HARI SABTU, 16 SEPTEMBER 2006 B. JAM KERJA KANTOR HARIAN DI BULAN PUASA SENIN KAMIS : JAM 08.00 13.00 JUMAT SABTU : JAM 08.00 11.00 : JAM 08.00 11.30
NB: SEHUBUNGAN ADANYA CUTI, SEMUA KARYAWAN BAGIAN PRODUKSI DIMOHON MENGHADAP KABAG. PRODUKSI PALING LAMBAT
JAM OPERASIONAL POMPA TRANSMISI SELAMA BULAN RAMADHAN INSTALASI PENGOLAHAN AIR KESUGIHAN BAGIAN PRODUKSI
A. TRANSMISI I (Ke Reservoir G. Kapitan) PAGI SIANG SORE : 03.00 08.00 : 08.00 16.00 : 16.00 20.00 3 pompa 4 pompa 3 pompa 4 pompa POMPA 1 x 66 l/dt POMPA 2 x 100 l/dt POMPA 2 x 66 l/dt POMPA 2 x 100 l/dt POMPA 1 x 66 l/dt POMPA 2 x 100 l/dt MALAM : 20.00 03.00 POMPA 2 x 66 l/dt POMPA 2 x 100 l/dt B. TRANSMISI II (Ke Maos, Sampang, Kroya dan Nusawungu) PAGI SIANG SORE : 03.00 08.00 : 08.00 16.00 : 16.00 20.00 POMPA 66 l/dt POMPA 30 l/dt POMPA 66 l/dt POMPA 30 l/dt
Mengetahui:
PENGUMUMAN
SESUAI DENGAN INSTRUKSI DIREKTUR UTAMA BAHWA SELAMA BULAN PUASA RAMADHAN SERAGAM
PAKAIAN DINAS HARIAN (PDH) DILENGKAPI DENGAN ATRIBUT SEBAGAI BERIKUT: 1. UNTUK KARYAWAN PRIA DIWAJIBKAN
NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
NAMA Endar B Sasongko, ST Turijo Tufan P Agus W., ST Sutono Amin YK Iwan S., ST Subardi Agus S Savan C., Amd. Risfanand Adman Mukhsinun Subur Herwanto C Daniel W Kustono Antonius S Mubed Dede M Mengetahui:
UKURAN
UKURAN JAS
SEPATU HUJAN 41 Standard 42 Standard 39 Standard 41 Standard 41 Standard 40 Standard 40 Standard 40 Standard 39 Standard 42 Standard 40 Standard 40 Standard 39 Standard 38 Standard 40 Standard 41 Standard 39 Standard 41 Standard 41 Standard 40 Standard Kesugihan, 25 September 2006 Dibuat:
NO 1 2
3 Tufan P 4 Agus W., ST 5 Sutono 6 Amin YK 7 Iwan S., ST 8 Subardi 9 Agus S 10 Savan C., Amd. 11 Risfanand 12 Adman 13 Mukhsinun 14 Subur 15 Herwanto 16 C Daniel W 17 Kustono 18 Antonius S 19 Mubed 20 Dede M Nomor Koordinasi: 21 Ir. M. Hadjid, MM 22 Agung Yulianto, ST 23 Susilo, ST 24 Sartam 25 Suparno, SE 26 Marly S. 24 PLN Kroya 25 PLN Cilacap 26 Bagian Umum 27 Bagian Teknik 28 Bagian Langganan 29 PDAM Maos 30 PDAM Sidareja 31 PDAM Majenang 32 PDAM Jeruklegi 33 PDAM Kroya 34 Litbang 35 Rodi PU Pengairan
085647874643 081327180954 081327102756 081542774141 0813276087 081327391509 085659007613 081327034983 081548881122 081327230979 081327306336 085227056303 0812158287 081327797762 085869760784 08122713915 081327585755 081327117653 0822990216 0822990213
548979
547841 531579 492220 531705 545772 545793 545413 695632 (0280) 523947 (0280) 6213737 5500710 492326 546108
08156994544
PENGUMUMAN
Cilacap yang jatuh pada hari Sabtu, 11 Nopember 2006, maka perlu kami sampaikan 1. Operator yang sedang dinas pagi mengenakan pakaian PERPAMSI lengkap & topi 2. Operator diluar tugas dinas mengenakan batik terbaru, celana hitam & peci 3. Penempatan personil kilang: a. b. c. 4. a. b. c. 5. Area Sumber air: Tufan P, anggota: Herwanto, Dede M. Ruang panel & Genset: Mukhsinun, anggota: Subur, Sartam Treatment & Laborat: Agus W, anggota: C Daniel W., Savan C & Amin YK Penempatan personil Keamanan: Treatment: 2 orang personil OBVIT Area bangunan & WC: 2 personel keamanan SATPAM Area parkir dan halaman depan: POLSEK, KORAMIL dan SATPAM Cilacap Petugas pengontrol dan pengawas konsumsi:
a. Jentoro & Wardoyo di area konsumsi pelanggan dan undangan non VIP b. Risfanand, toni & Anton di area konsumsi karyawan c. Sie konsumsi dari Bag. Umum di area konsumsi ruang undangan VIP 6. Petugas penjemput tamu karyawan: Kasno Hartono, Suprapto & Subardi 7. Petugas penjemput tamu undangan lokal: Sutisno & Riyanto 8. Petugas pengawas souvenir: Slamet Riyadi 9. Ketentuan tambahan: a. Anak anak dilarang memasuki area kilang kecuali bersama orang tuanya. b. Operator hendaknya melakukan pemanasan Genset pada pagi hari untuk berjaga jaga jika listrik dari PLN Off. c. Operator yang selesai tugas malam dapat mengikuti prosesi tetapi tidak sampai berakhirnya acara. d. Semua Karyawan Bag. Produksi, Cabang dan Peralatan teknik melakukan pembersihan sampah bersama setelah acara berakhir. e. Petugas di area kilang menyiapkan payung untuk Bp. Bupati f. Petugas kilang Koordinasi dengan Subur menjelang tinjauan Bupati ke kilang g. Laboratorium disetting dengan kondisi life h. Pakaian istri karyawan menggunakan busana muslim.
Kesugihan, 08 Nop 06
PENGUMUMAN
Untuk karyawan Bagian Produksi pembagian tugas dalam rangka Silaturahmi tanggal 11 Nopember 2006 diwajibkan untuk melaksanakan tugas sebagai berikut:
1. Jam 07.30 sudah hadir di tempat (paling lambat) 2. Operator yang tugas pagi menganakan PERPAMSI lengkap & topi 3. Operator diluar tugas pagi mengenakan batik terbaru, celana hitam & peci Penanggung jawab tugas operasional IPA dipimpin Group C Koordinator lapangan: Tufan P (area bawah) & Agus W (area atas), meliputi: 1. Area sumber: Herwanto (penanggung jawab), Dede Marsudi, Mubed & Adman 2. Ruang panel: Subur (penanggung jawab), Iwan Setyawan, Kustono & Sutono 3. Ruang Genset: Mukhsinun (penanggung jawab), Agus Setiadi & Sartam 4. Treatment & Laborat: Daniel (penanggung jawab), Savan C, Anton S & Amin YK. Petugas yang diperbantukan ke Panitia: 1. Penerima tamu karyawan PDAM: Subardi (penanggung jawab), Kasno H, Suprapto & Sutono 2. Penerima tamu cabang Kesugihan: Sutrisno, Riyanto 3. Pengawas Souvenir: Slamet Riyadi 4. Petugas pengawas konsumsi karyawan: Risfanand & Toni 5. Petugas pengawas konsumsi tamu non VIP & pelanggan: Jentoro & Wardoyo 6. Petugas pengawas konsumsi ruang VIP: Vienna N dkk (sie konsumsi) Ketentuan tambahan: a. b. c. d. e. f. kilang g. h. Laboratorium disetting dengan kondisi life Pakaian istri karyawan menggunakan busana muslimat. Kesugihan, 08 Nop 06 Anak anak dilarang memasuki area kilang (treatment) kecuali bersama Operator hendaknya melakukan pemanasan Genset pada pagi hari untuk Operator yang selesai tugas malam dapat mengikuti prosesi tetapi tidak Semua Karyawan Bag. Produksi, Cabang dan Peralatan teknik melakukan Petugas di area kilang menyiapkan payung untuk Bp. Bupati Petugas kilang Koordinasi dengan Tufan P menjelang tinjauan Bupati ke orang tuanya. berjaga jaga jika listrik dari PLN Off. sampai berakhirnya acara. pembersihan sampah bersama setelah acara berakhir.
DAFTAR NAMA PEGAWAI BAGIAN PRODUKSI YANG MENGIKUTI PEMBINAAN KARYAWAN DI BALI TANGGAL: 29 Januari s/d 15 Pebruari 2007
PENGUMUMAN
DITUJUKAN
KEPADA
SELURUH
KARYAWAN
BAGIAN
PRODUKSI,
PERALATAN TEKNIK DAN CABANG KESUGIHAN DIMOHON UNTUK HADIR PADA: HARI/TGL JAM : RABU, 24 JANUARI 2007 : 09.00 SELESAI
: SOSIALISASI PEMBINAAN KARYAWAN DI BALI : RUANG KONTROL PENGOLAHAN LT. II DIPERHATIKAN DAN DILAKSANAKAN, ATAS
TTD
DAFTAR HADIR SOSIALISASI PEMBINAAN KARYAWAN BAGIAN PRODUKSI, PERALATAN TEKNIK DAN CABANG KESUGIHAN KESUGIHAN, 24 JANUARI 2007
A. Bagian Produksi NO 1. 2. 3. 4. 5 NAMA Endar B Sasongko, ST Turij Tufan Pujiantoro Agus Wibowo, ST Sutono TANDA TANGAN 1. 2. 3. 4. 5.
6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20.
Amin Y Kurniawan Iwan Setyawan, ST Subardi Agus Setiadi Savan Cahkwato, Amd Adman Dede Marsudi Mukhsinun Cristian D Warella Subur Herwanto Kustono Antonius Supriyanto Mubed Sanding Mulyadi
6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20
B. Bagian Peralatan Teknik 1. 2. 3. 4. 5. 6. 7. Susilo, ST Sartam Kasno Hartono Aris Sukmono Firman Barlianto Toni Gatot Subiantoro, SP 1. 2. 3. 4. 5. 6. 7.
C. Cabang Kesugihan 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Suparno, SE Marly Suwartono Slamet Riyadi Sutrisno Riyanto Mijan Yuliawati, S. Sos Suprapto Wardoyo Jentoro S. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
DAFTAR NAMA KARYAWAN BESERTA UKURAN KAOS & TRENING BAGIAN PRODUKSI PDAM KABUPATEN CILACAP
NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
NAMA Endar B Sasongko, ST Turijo Tufan P Agus W., ST Sutono Amin YK Iwan S., ST Subardi Agus S Savan C., Amd. Sanding M Adman Mukhsinun Subur Herwanto C Daniel W Kustono Antonius S Mubed Dede M
NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
NAMA Endar B Sasongko, ST Turijo Tufan P Agus W., ST Sutono Amin YK Iwan S., ST Subardi Agus S Savan C., Amd. Sanding M Adman Mukhsinun Subur Herwanto C Daniel W Kustono Antonius S Mubed 1.
TANDA TANGAN 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19.
KETERANGAN
20
Dede M
DITUJUKAN KEPADA SEMUA KARYAWAN DI BAGIAN PRODUKSI YANG NAMANYA TIDAK DISEBUTKAN DIBAWAH INI DIWAJIBKAN MENGIKUTI KEGIATAN BERIKUT INI, PADA: HARI/TGL. JAM ACARA TEMPAT KETENTUAN : 24 25 MARET 2007 : 17.00 06.00 WIB : PEMBINAAN KARYAWAN : PUSDIKLAT, Jl. Dr. Soetomo, Cilacap. : MUSLIM mengenakan pakaian muslim dan celana panjang, perlengkapan sholat NON MUSLIM mengenakan baju lengan dan celana panjang Membawa alat tulis BAGI Group B Agus Setiadi Savan C., Amd Adman YANG NAMANYA DISEBUTKAN Group D Kustono Antonius S Mubed BERIKUT INI MELAKSANAKAN OPERASIONAL PENGOLAHAN AIR DENGAN JADWAL DAN PERSONEL BERIKUT:
DAFTAR NAMA KARYAWAN BAGIAN PRODUKSI PDAM KABUPATEN CILACAP YANG MENGIKUTI PEMBINAAN KARYAWAN TANGGAL: 24 25 MARET 2007
NO
NAMA
KETERANGAN
1 Endar B Sasongko, ST 2 Turijo 3 Tufan P 4 Agus W., ST 5 Sutono 6 Amin YK 7 Iwan S., ST 8 Subardi 9 Sanding M 10 Mukhsinun 11 Subur 12 Herwanto 13 C Daniel W 14 Dede M KARYAWAN YANG SEDANG OPERASIONAL (TIDAK IKUT) 1 Agus Setiadi 2 Savan C., Amd 3 Adman 4 Kustono 5 Antonius S 6 Mubed Kesugihan, 21 Maret 2007 Bagian Produksi PDAM Kabupaten Cilacap ttd Endar B Sasongko, ST Kepala Bagian
PENGUMUMAN
DIBERITAHUKAN KEPADA NAMA NAMA KARYAWAN YANG DISEBUTKAN DI BAWAH INI UNTUK HADIR DENGAN KETENTUAN BERIKUT: NO. 1. 2. 3. 4. 5. 6. 7. NAMA Endar B Sasongko, ST & Istri Agus Wibowo, ST & Istri Subardi Kustono Herwanto Sanding Mulyadi Mubed : Jumat, 30 Maret 2007 : 07.00 selesai : Kantor pusat PDAM Cilacap : Undangan prosesi kenaikan pangkat, mutasi dan jabatan PAKAIAN Jas, peci, darwin Jas, peci, darwin Korpri lengkap Korpri lengkap Korpri lengkap Korpri lengkap Korpri lengkap KETERANGAN Mutasi Jabatan baru Pangkat/golongan Pangkat/golongan Pangkat/golongan Pangkat/golongan Pangkat/golongan
Bagian Produksi PDAM Kabupaten Cilacap Ttd Endar B Sasongko, ST Kepala Bagian
PENGUMUMAN
DIBERITAHUKAN SELURUH KARYAWAN (BAGIAN PRODUKSI & KOPERASI) UNTUK HADIR PADA: HARI/TGL JAM ACARA TEMPAT : SABTU, 07 APRIL 2007 : 09.00 SELESAI : SERAH TERIMA JABATAN BAGIAN PRODUKSI : AULA BAGIAN PRODUKSI KESUGIHAN
DEMIKIAN, ATAS PERHATIANNYA DAN KEHADIRANNYA DIUCAPKAN TERIMA KASIH. Bagian Produksi PDAM Kabupaten Cilacap Ttd Endar B Sasongko,ST Kepala Bagian
PENGUMUMAN
DIBERITAHUKAN KEPADA SELURUH KARYAWAN BAGIAN PRODUKSI, PERALATAN TEKNIK & CABANG KESUGIHAN WAJIB HADIR PADA: HARI/TGL JAM ACARA TEMPAT : KAMIS, 05 APRIL 2007 : 08.00 SELESAI : PENGUKURAN SEPATU SAVETY : AULA I BAGIAN PRODUKSI KESUGIHAN
DEMIKIAN, ATAS PERHATIANNYA DAN KEHADIRANNYA DIUCAPKAN TERIMA KASIH. Bagian Produksi PDAM Kabupaten Cilacap Ttd Endar B Sasongko,ST Kepala Bagian
PENGUMUMAN
DITUJUKAN KEPADA SEMUA OPERATOR YANG BERTUGAS, BAHWA DENGAN TELAH DIPASANGNYA KEMBALI STAND METER DIGITAL
SIGNET DAN DAPAT DIOPERASIKAN DENGAN BAIK, MAKA MULAI: HARI/TGL JAM PENGGUNAAN : RABU, 30 MEI 2007 : 23.00 DAN SETERUSNYA STAND METER BACA DEBIT DIALIHKAN DARI
PENGGUNAAN STAND METER SEMENTARA YANG LAMA KE STAND METER DIGITAL SIGNET. NAMUN DEMIKIAN PEMBACAAN TEKANAN POMPA TRANSMISI MASIH TETAP MENGGUNAKAN MANOMETER LAMA. DEMIKIAN YANG DAPAT KAMI SAMPAIKAN AGAR SEGERA
TURIJO KASUB.
PENGUMUMAN
KEPADA SELURUH KARYAWAN PDAM KABUPATEN CILACAP PADA BAGIAN PRODUKSI DAN PERALATAN TEKNIK DIINFORMASIKAN BAHWA PADA: HARI/TGL JAM PAKAIAN KEGIATAN TEMPAT : KAMIS, 29 APRIL 2010 : 08.00 SELESAI : PERPAMSI LENGKAP : PENGAMBILAN FOTO DIRI UNTUK ID CARD : RUANG KONTROL PENGOLAHAN LT. II
DEMIKIAN INFORMASI YANG DAPAT DISAMPAIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
TTD TURIJO
PENGUMUMAN
DITUJUKAN KEPADA SELURUH KARYAWAN PDAM KABUPATEN CILACAP PADA BAGIAN PRODUKSI, PERALATAN TEKNIK DAN CABANG
KESUGIHAN, DIINFORMASIKAN BAHWA PADA: HARI/TGL JAM KEGIATAN TEMPAT : SELASA, 13 MEI 2008 : 08.00 SELESAI : PENGUKURAN BAJU DINAS : RUANG PENGOLAHAN LT. I
DEMIKIAN INFORMASI YANG DAPAT DISAMPAIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
PENGUMUMAN
DITUJUKAN KEPADA SELURUH KARYAWAN PDAM KABUPATEN CILACAP PADA BAGIAN PRODUKSI, PERALATAN TEKNIK DAN CABANG KESUGIHAN, DIINFORMASIKAN BAHWA PADA: HARI/TGL MENGENAKAN : SENIN, 19 NOVEMBER 2007* PAKAIAN BATIK TERBARU (BESERTA
Ket:
* Bertepatan dengan acara Pelantikan Bupati dan Wakil Bupati Kabupaten Cilacap periode 2007-2012
PERINGATAN
(CAUTION)
SEMENTARA WAKTU DILARANG MENGGUNAKAN RUANGAN INI UNTUK KEPERLUAN APAPUN, SAMPAI BATAS WAKTU YANG BELUM DAPAT DITENTUKAN.
DEMIKIAN INFORMASI YANG DAPAT DISAMPAIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
TTD TURIJO
PENGUMUMAN
DITUJUKAN KEPADA SELURUH ANGGOTA DHARMA WANITA PERSATUAN PDAM KABUPATEN CILACAP PADA BAGIAN PRODUKSI, PERALATAN TEKNIK DAN CABANG KESUGIHAN, DIINFORMASIKAN BAHWA
AKAN DILAKSANAKAN PADA TANGGAL 31 MEI 2008 PADA: HARI/TGL TEMPAT : SABTU, 14 JUNI 2008 : AULA PDAM KAB. CILACAP JL. TEMBAGA NO.2 CILACAP PUKUL PAKAIAN DEMIKIAN : 09.00 s/d SELESAI
INFORMASI
PENGUMUMAN
DITUJUKAN
KEPADA
SELURUH
KARYAWAN, DAN
CILACAP
ANGGOTA
DI
DHARMA
WANITA
PDAM
PERSATUAN
KABUPATEN
KOPERASI
PADA
LINGKUNGAN
BAGIAN
PRODUKSI, PERALATAN TEKNIK DAN CABANG KESUGIHAN, DIINFORMASIKAN BAHWA ACARA SILATURAHMI (SYAWALAN)
INFORMASI
PERHATIAN
DITUJUKAN KEPADA OPERATOR BAGIAN PRODUKSI UNTUK SELALU MEMANTAU GENANGAN AIR PADA RUANG POMPA TRANSMISI I, DENGAN MENGOPERASIKAN POMPA PENGURAS.
*PADA
SAAT
PENGOPERASIAN
POMPA
PENGURAS,
KETINGGIAN GENANGAN AIR HARUS TERUS DIPANTAU (BILA PERLU DITUNGGU). MATIKAN POMPA KETIKA LEVEL AIR MENCAPAI BADAN POMPA*.
DEMIKIAN INFORMASI YANG DAPAT DISAMPAIKAN, ATAS
PERHATIAN
SETIAP
(DUA)
JAM,
MULAI
TGL.
19 NOPEMBER 2008.
PUKUL 05.00 s/d 08.00 WIB DAN 16.00 s/d 21.00 WIB
(SATU) POMPA kecil (66 LT/S) DAN 2 (DUA) POMPA BESAR (100 LT/S).
3.
(DUA) POMPA kecil (66 LT/S) DAN 1 (SATU) POMPA BESAR (100 LT/S).
DEMIKIAN YANG DAPAT DISAMPAIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
TTD TURIJO
PENGUMUMAN
DITUJUKAN KEPADA SELURUH KARYAWAN PDAM KABUPATEN CILACAP DAN KARYAWAN KOPERASI CAHAYA TIRTA PADA BAGIAN PRODUKSI, PERALATAN TEKNIK DAN CABANG KESUGIHAN, DIINFORMASIKAN BAHWA PADA: HARI/TGL JAM ACARA TEMPAT : RABU, 04 PEBRUARI 2009 : 08.00 SELESAI : PENGUKURAN BAJU BATIK : RUANG PENGOLAHAN LT. I
DEMIKIAN INFORMASI YANG DAPAT DISAMPAIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
PERHATIAN
TRANSMISI
III
(WILAYAH
PERHATIAN
MEMANTAU JAM OPERASI POMPA TRANSMISI III . SCHEDULE PENGOPERASIAN POMPA TRANSMISI III, ADALAH:
POMPA PU 01 (CILACAP) BEROPERSI MULAI JAM 08.00 s/d
14.00 WIB.
HAL-HAL LAIN YANG PERLU DIPERHATIKAN, ADALAH:
PANTAU KETINGGIAN AIR DI RESERVOIR KAPITAN KETIKA AKAN MEMATIKAN POMPA TRANSMISI I (NO.3 dan NO.4).
DEMIKIAN YANG DAPAT DISAMPAIKAN, ATAS KERJA SAMANYA DIUCAPKAN TERIMA KASIH.
TTD TURIJO
PENGUMUMAN
HARI/TGL TEMPAT
: JUMAT, 05 FEBRUARI 2010 : RUANG PANEL ATAS GEDUNG UTAMA IPA KESUGIHAN
PUKUL PAKAIAN
DEMIKIAN PENGUMUMAN YANG DAPAT DISAMPAIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
PENGUMUMAN
DITUJUKAN KEPADA STAF LABORAT (OPERATOR) YANG BERTUGAS, DALAM RANGKA UNTUK MENINGKATKAN KINERJA DAN KEWASPADAAN KEADAAN KEKERUHAN AIR BAKU SERTA UNTUK KETELITIAN DALAM MENENTUKAN KESESUAIAN DOSIS BAHAN KIMIA MAKA DENGAN INI DIPERINTAHKAN UNTUK MELAKUKAN REVITALISASI JARTEST DENGAN KETENTUAN BERIKUT: 1. MELAKUKAN JAR TEST MINIMAL 1 KALI SELAMA JAM KERJA SHIFT. 2. PEMILIHAN DOSIS PAC HASIL JAR TEST DILAPOKAN SECARA TERTULIS DI DALAM KOLOM KETERANGAN BLANKO MONITOR LABORAT YANG ADA. 3. LAPORAN HASIL JAR TEST BERISI: KEKERUHAN AIR BAKU RANGE DOSIS PAC JAR TEST KONSENTRASI PAC DOSIS TERPILIH (OPTIMUM) DOSIS PAC TREATMENT ADALAH : : : : NTU gr/l mg/l :.s/dmg/l
1 ppm diatas dosis optimum jar test (debit transmisi normal) 2 ppm diatas dosis optimum jar test (debit transmisi bypass) 4. JIKA ADA KEJADIAN KHUSUS, CATAT SEBAGAI KETERANGAN. DEMIKIAN YANG DAPAT DISAMPAIKAN AGAR DILAKSANAKAN DAN SELAMAT BERTUGAS.
PENGUMUMAN
DITUJUKAN KEPADA SELURUH ANGGOTA DHARMA WANITA PERSATUAN PDAM KABUPATEN CILACAP PADA BAGIAN PRODUKSI, DAN BAGIAN PERALATAN TEKNIK, DIINFORMASIKAN BAHWA
PENGUMUMAN
KEPADA SELURUH KARYAWAN PDAM KABUPATEN CILACAP PADA
BAGIAN
PRODUKSI
DAN
PERALATAN
TEKNIK,
DIINFORMASIKAN BAHWA PADA: HARI/TGL JAM KEGIATAN TEMPAT : KAMIS, 10 JUNI 2010 : 08.00 SELESAI : PENGUKURAN BAJU (SERAGAM HIJAU) : RUANG PENGOLAHAN
DEMIKIAN INFORMASI YANG DAPAT DISAMPAIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
PENGUMUMAN
KEPADA SELURUH KARYAWAN PDAM KABUPATEN CILACAP PADA
BAGIAN
PRODUKSI
DAN
PERALATAN
TEKNIK,
DIINFORMASIKAN BAHWA PADA: HARI/TGL JAM KEGIATAN : SELASA 22 JUNI 2010 : 08.00 SELESAI : PENGUKURAN BAJU (SERAGAM OLAH
RAGA)
TEMPAT : RUANG PENGOLAHAN
DEMIKIAN INFORMASI YANG DAPAT DISAMPAIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.
PERHATIAN
DIINFORMASIKAN KEPADA KARYAWAN BAGIAN PRODUKSI YANG MEMEGANG JAS HUJAN BARU (HASIL PEMBAGIAN) UNTUK SEGERA MENGEMBALIKAN KE KASUBAG INSTALASI. JAS HUJAN INI KEMUDIAN HANYA DIPERGUNAKAN UNTUK OPERASIONAL PRODUKSI BAGI
TIDAK UNTUK DI
BAWA PULANG.
ATAS PERHATIAN DAN KERJA SAMANYA, DIUCAPKAN TERIMA KASIH
PENGUMUMAN
KEPADA SELURUH KARYAWAN PDAM KABUPATEN CILACAP PADA
BAGIAN
PRODUKSI
DAN
PERALATAN
TEKNIK,
DIINFORMASIKAN BAHWA PADA: HARI/TGL JAM KEGIATAN : RABU, 10 NOVEMBER 2010 : 08.00 SELESAI : PENGUKURAN LURIK) TEMPAT : RUANG PENGOLAHAN
BAJU
(WERPAK &
BTK.
DEMIKIAN INFORMASI YANG DAPAT DISAMPAIKAN, ATAS PERHATIANNYA DIUCAPKAN TERIMA KASIH.