Anda di halaman 1dari 3

Pu max (T)

f'c (Mpa)
fy (Mpa)
d = diameter pile cap (m)
h = tinggi pile cap (m)
b (m)
R1 (T)

62.298
20
410
0.5
0.45
1
1.08

Tinjauan terhadap titik A


Mu (Tm)
Rt = tinggi pile cap (m)
p = selimut beton (m)
diameter sengkang (m)
diameter tulangan (m)
d' (m)
d (m)
Mn (Tm)

61.218
0.45
0.04
0.012
0.022
0.063
0.387
76.5225

Diambil :
f'c (kg/cm2)
fy (kg/cm2)
R (kg/cm2)
Mn (kgcm)
b (cm)
d (cm)
k
f
rho
rho min
rho max

200
4100
170
7652250
100
38.7
0.300551084
0.368416409
0.015275802
0.003414634
0.015702729

Momen yang harus ditahan tulangan atas


As (cm2)
3.802857143
d (cm)
6.3
M2 (kgcm)
404137.2343
M2/b.d2
2.69840377
a
39537.12
b
-3280
c
2.69840377
rho 1
0.082129005
rho 2
-0.004609468
rho min
0.003414634
rho max
0.015702729
Momen yang harus ditahan tulangan bawah
M1
7248112.766
M1/b.d2
48.3952805

0.004609468
Atas
rho 1
rho 2
rho min
rho max

0.082129005
-0.004609468
0.003414634
0.015702729

Bawah
rho 1
rho 2
rho min
rho max

a
b
c
rho 1
rho 2
rho min
rho max

39537.12
-3280
48.3952805
0.06376328
0.019196733
0.003414634
0.015702729

Tulangan atas
As (cm2)
n = jumlah tulangan
Jarak antar tulangan (cm)
Jarak antar tulangan (mm)

17.83864102
4.690852258
21.31808774
213

Tulangan bawah
As (cm2)
n = jumlah tulangan
Jarak antar tulangan (cm)
Jarak antar tulangan (mm)

41.27871402
10.85465808
9.212634727
92

0.010666334

0.06376328
0.019196733
0.003414634
0.015702729

Anda mungkin juga menyukai