Beton K-175
Beton K-175
4%
30.00
2%
2%
4%
28.00
28.00
26.00
Drainase Existing
24.00
JL. R.E. MARTADINATA NO.21 MAMUJU
JARAK
2.00
0 + 000
STA
2.00
0 + 150
STA
100.25
100.32
ELEV.
EXISTING
ELEV.
RENCANA
100.00
ELEV.
RENCANA
100.07
PROGRAM/KEGIATAN :
ELEV.
EXISTING
2.00
2.00
LOKASI :
JARAK
MENGETAHUI :
Beton K - 175
Beton K-175
30.00
CL
32.00
28.00
4%
2%
2%
30.00
4%
26.00
4%
2%
2%
H. SUAIB, S.SOS, MM
NIP. 19661007 198703 1 011
28.00
DISETUJUI :
Drainase Existing
24.00
JARAK
2.00
0 + 050
STA
2.00
0 +200
STA
100.35
100.30
ELEV.
EXISTING
ELEV.
RENCANA
100.05
ELEV.
RENCANA
100.05
ELEV.
EXISTING
2.00
2.00
JARAK
SURYA YULIAWAN, ST
NIP. 19790718 200212 1 007
KONSULTAN PERENCANA :
Beton K-175
Timbunan Pilihan (Sirtu)
30.00
32.00
4%
2%
2%
Beton K - 175
Timbunan Pilihan (Sirtu)
KEAHLIAN
CL
4%
28.00
30.00
26.00
28.00
4%
2%
2%
NAMA
Drainase Existing
24.00
Ahli Jalan
Muhammad Nur, ST
Estimator
/Drafter
Anwar Sadat, ST
Surveyor
Nirwan
NAMA GAMBAR :
JARAK
2.00
2.00
STA
0 +250
STA
2.00
100.30
0 + 100
ELEV.
RENCANA
100.05
100.30
ELEV.
EXISTING
100.05
SITE PLAN
ELEV.
RENCANA
TTD
ELEV.
EXISTING
2.00
JARAK
SKALA
V = 1 : 4000
H = 1 : 4000
TANGGAL :
NO. LBR
JML. LBR
KODE