Rab Ruko Sudiang
Rab Ruko Sudiang
ITEM PEKERJAAN
SAT.
VOL
HARGA SAT
I
1
2
PEKERJAAN PERSIAPAN :
II
PEKERJAAN LANTAI I :
A
1
2
3
PEKERJAAN TANAH
Galian tanah lubang pondasi dan floor plat
Urugan tanah sisi pondasi
Urugan pasir dibawah pondasi, floor plat dan lantai
m3
m3
m3
900,000.00
66,000.00
150,000.00
B
1
2
3
4
5
m3
m3
m3
m3
m3
3,900,000.00
3,900,000.00
3,840,000.00
3,000,000.00
4,200,000.00
C
1
2
4
PEKERJAAN PASANGAN
Pasangan pondasi batu belah
Pasangan dinding batu bata adk. 1 :4
Plesteran dinding 1 : 2
m3
m2
m2
540,000.00
115,000.00
72,000.00
D
1
2
unit
bh
15,000,000.00
420,000.00
E
1
2
3
PEKERJAAN LANTAI
Pas. Lantai keramik 40/40 cm
Pas. Lantai dan dinding keramik 20/20 cm
Pas. Lantai keramik Tangga
m2
unit
m2
110,000.00
5,400,000.00
125,000.00
F
1
PEKERJAAN PENGECATAN
Cat Dinding, kolom & plafon
m2
48,000.00
G
1
2
3
4
5
6
7
titik
bh
bh
bh
bh
bh
bh
150,000.00
60,000.00
54,000.00
30,000.00
48,000.00
36,000.00
240,000.00
Pembersihan lapangan
Pengukuran dan pasang bouwplank
ls
ls
1.00
1.00
2,500,000.00
9,600,000.00
1
2
3
4
5
6
7
8
bh
bh
ls
ls
bh
bh
bh
ls
I
1
PEKERJAAN LAIN-LAIN
Pek. Pas. Profil
ls
1.00
1.00
1.00
150,000.00
420,000.00
3,600,000.00
3,000,000.00
15,000.00
25,000.00
15,000.00
2,500,000.00
8,000,000.00
II
PEKERJAAN LANTAI II :
A
1
2
3
4
5
6
m3
m3
m3
m3
m3
m3
m3
m3
3,250,000.00
3,250,000.00
3,250,000.00
3,000,000.00
3,250,000.00
2,500,000.00
3,250,000.00
3,500,000.00
B
1
2
PEKERJAAN PASANGAN
Pasangan dinding batu bata adk. 1 :4
Plesteran dinding 1 : 2
m2
m2
115,000.00
70,000.00
C
1
2
unit
bh
1,800,000.00
375,000.00
D
1
2
m2
m2
70,000.00
45,000.00
E
1
2
PEKERJAAN LANTAI
Pas. Lantai keramik 40/40 cm
Pas. Lantai dan dinding keramik 20/20 cm
m2
unit
95,000.00
4,000,000.00
F
1
PEKERJAAN PENGECATAN
Cat Dinding, kolom & plafon
m2
42,500.00
G
1
2
3
4
5
6
7
titik
bh
bh
bh
bh
bh
bh
145,000.00
55,000.00
50,000.00
275,000.00
42,500.00
35,000.00
250,000.00
H
1
2
3
4
5
6
7
bh
bh
ls
ls
bh
bh
bh
1.00
1.00
1,900,000.00
435,000.00
4,200,000.00
3,500,000.00
24,000.00
30,000.00
24,000.00
1
2
J
1
PEKERJAAN LAIN-LAIN
Pek. Pas. Profil
Jumlah total pekerjan lantai II
Jumlah Total
PIHAK
220,000.00
300,000.00
m2
m1
ls
1.00
25,000,000.00
M. AMINTOHARI
RAN BIAYA
MAN SUDIANG RAYA
BOBOT
(%)
JUMLAH
2,500,000.00
9,600,000.00
12,100,000.00
20.4
3,600,000.00
3,000,000.00
6,600,000.00
11.111
8,000,000.00
13.468
26,700,000.00
4,200,000.00
3,500,000.00
7,700,000.00
12.963
25,000,000.00
32,700,000.00
59,400,000.00
M. AMINTOHARI
42.088
100.000