3.00
m^3/dt
Qpengelak (Q10)
10.000
m^3/dt
Q 50th
25.000
m^3/dt
Coarse sand ( n )
0.032
38
2.25
27%
Diameter sedimen
el. Sawah tertinggi
Saluran Pengelak
Q=
n=
b/h=
m=
V=
10
m3/dt
0.032
koef. Manning (untuk tanah berpasir)
5 (tabel De Voss)
1.5 (tabel De Voss)
0.7 (tabel De Voss)
Perhitungan :
1). A = (b + mh)*h = (3h + 1,5h)*h =
2). P = b + 2h (m2+1)0.5 = 3.5h + 2h(2)0,5 =
3). R = A / P =
0.7553 h
4). Q = V*A =
6.5 h2
8.6056 h
10
=
0.7*5h2
h=
1.4825 m
Maka :
5). w = 1/3 * h
w=
0.4942 m
6). H = h + w
H=
1.9767
7). Cek Aliran
Fr = (Q/A) / (g*h)0.5
Fr =
0.2036 1 (aliran sub kritis)
A=
14.2857 m
P=
12.7577 m
5,6,7 buat hitungan sal. Pengelak
R=
1.1198 m
b=
7.4125 m
T=
11.8600
D=
1.2045
Patok
Jarak
Elevasi
dasar
Beda tinggi
Slope
P1
0.0
27.971
0.00
0.000
Q 10(m /dt)
b/h
V(m/dt)
A(m 2)
h(m)
b(m)
P(m)
P2
64.00
27.800
0.17
0.003
10.00
5.0
1.5
0.7000
0.0320
14.2857
1.4825
7.4125
12.7577
P3
23.00
27.615
0.19
0.008
P4
23.50
27.560
0.05
0.002
P5
42.00
27.393
0.17
0.004
P6
24.00
26.986
0.41
0.017
P7
21.00
26.876
0.11
0.005
P8
30.50
26.782
0.09
0.003
P9
22.00
26.428
0.35
0.016
10
P10
15.00
26.105
0.32
0.022
Jumlah
152.5
Rerata Slope
0.008
R(m)
T(m)
D(m)
Fr
Aliran
1.120
0.00043
11.860
1.205
0.204
subkritis
10.24
10.24
0.20
He
Data-data perencanaan :
Dengan satu pintu pembilas
Lbr bendung sungai (b)
13.448
2.00
1.79
0.90
Pilar rencana :
- Kp (pilar berujung bulat)
0.01
0.10
26.971
2.206
27.500
29.000
2.029
10.24 m
10.24
Debit rencana
(Q)
0.20
26.971
29.000
(P)
(hasil perhitungan)
2.029
1.000
9.81
Perhitungan He
Cd (asumsi)1.27
Rumus Q = Cd x 2/3 x (2/3.g)0,5 x Be x He1,5
Shg
11.5462
1.0988
1.27
Co (konstanta) = 1,30
1. Be = 31,320 - 0,20 He
10.02
0.80
3. Hd = He - (V2 / 2g)
1.0664
1/3P+Hd
2.566
P+Hd
5.566
4. P / Hd = 1.90
5. He/Hd = 1.030
--> C1 =
1.000
6. P / He = 1.85
--> C2 =
0.980
7. Cd (hitung) = Co x C1 x C2 =
1.27
(mendekati Cd asumsi)
1,5
He
25 m3/det
25.08
koefisien
1.85
= 2.0x Hd
0,85
xY
pngkt Hd 0.850
0.476
x X1,85
Y'
0.880
xX
0,85
1
0.880
x X0,85
1.136
X=
1.162
0.476
Y=
0.628
x (0,813)1,85
0.100
0.007
0.200
0.024
0.300
0.051
0.400
0.087
0.500
0.132
0.600
0.185
0.700
0.246
0.800
0.315
0.900
0.391
1.000
0.476
1.162
0.628
2.000
pngkt X
1.850
2.172
He (m)
Be (m)
Q (m3/dt)
29.000
0.00
10.24
0.000
29.100
0.10
10.22
0.702
29.200
0.20
10.20
1.982
29.300
0.30
10.18
3.635
29.400
0.40
10.16
5.585
29.500
0.50
10.14
7.790
29.600
0.60
10.12
10.220
29.700
0.70
10.10
12.854
29.800
0.80
10.08
15.673
30.099
1.10
10.02
25.079
Yu
0.29
( dlm m )
Vz = Q / ( Yz. Be)
8.68
Fz = Vz / (g.Yz)^0,5 =
m/dt
5.17
0.29
2.44
m3/dt
(1/2*((1+(8*7,33^2))^0.5 - ))/0,29
1.962
= 10.02
Vz =
* He
= 1.0988
Vz =
*Q
= 25
*g
= 9.81
Fr =
19,62(Z+HeYz)
Q
BexYz
Vz
9,81 xYz
Yz
Vz
Fr
Elevasi
muka air
1.000
0.4367
5.71
2.76
28.000
28.437
1.500
0.3778
6.60
3.43
27.500
27.878
2.000
0.3389
7.36
4.04
27.000
27.339
2.500
0.3105
8.03
4.60
26.500
26.810
3.000
0.2884
8.65
5.14
26.000
26.288
3.500
0.1485
16.79
13.91
25.500
25.649
4.000
0.1400
17.82
15.21
25.000
25.140
3.029
0.1285
19.41
17.29
25.971
26.099
4.128
1.000
26.971
2.206
27.500
maka :
elevasi sawah tertinggi
27.500
0.100
0.100
0.100
0.100
0.150
0.400
0.200
0.100
0.250
29.000
2.029
Co ada di KP..
0.533
Jarak R1 = 0.175 Hd =
0.187
R2 = 0.2 Hd =
0.213
Jarak R2 = 0.282 Hd =
0.301
1.20
He (m)
1.10
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
Q (m3/ dt)
0.00
0.000
10.000
20.000
30.000
40.000
50.000
60.000
27.971
b (m)
H (m)
A (m2)
P (m)
R (m)
V (m/dt)
Q (m3/dt)
b (m)
T
Fr
lebar sungai
rencana
(b x H)
(b+2h)
(A / P)
(1/n*R2/3*S1/2)
(V x A)
13.448
0.000
0.000
13.448
0.000
0.000
0.000
13.448
0.000
0.000
0.000
0.500
1.000
1.500
2.000
2.500
0.000
0.000
6.724
13.448
20.172
26.896
33.620
0.000
0.000
14.448
15.448
16.448
17.448
18.448
13.448
13.448
0.465
0.871
1.226
1.541
1.822
0.000
0.000
0.455
0.691
0.868
1.011
1.130
0.000
0.000
3.059
9.289
17.510
27.191
38.002
0.000
0.000
13.448
13.448
13.448
13.448
13.448
13.448
13.448
8.909
10.940
12.209
13.448
14.687
0.000
0.000
0.755
1.229
1.652
2.000
2.289
###
###
0.167
0.199
0.216
0.228
0.239
#DIV/0!
#DIV/0!
28.471
13.448
28.971
13.448
29.471
13.448
29.971
13.448
30.471
13.448
0.000
13.448
0.000
13.448
Sumber : Hasil perhitungan
0.000450
4.875
Keterangan
D
aliran
sub kritis
sub kritis
sub kritis
sub kritis
sub kritis
#DIV/0!
#DIV/0!
Kantong Lumpur
Pola operasi pintu
data perencanaan :
Q intake =
z=
=
a=
g=
3.100 m3/dt
0.25 kehilangan tinggi energi pada permukan
0.8 koefisien debit untuk bukaan bawah permukaan air dengan kehilangan energi kecil
0.7 tinngi bukaan
9.81
sehingga Q = 1,2*Qintake
Q=
3.720
m3/dt
Q = m *b.a.(2g.z)
0,5
1,68 = 0,8*b.1.(2.9,81.0,2)0.5
b=
2.999 m
Jadi lebar bukaan bersih = 1,790 m dengan tinggi bukaan = 0.5 m
Desain Pintu Penguras
Diketahui :
B intake =
2.999 m
B pembilas=
1.800 m
Direncanakan :
Lebar bukaan =
1.800 m
Tinggi bukaan max =
1m
Jumlah pintu penguras =
1m
n=
0.032
1.49970352
0.99970352 1.999407044
0.89982211
0.64982211 1.299644226
Kecepatan Penggelontoran
Kecepatan rencana (V)
V = 1,5.c.(d)0.5
dimana: c =
d=
Maka V = 1,5*3,3*(0,00007)0.5
V=
0.1249 m/dt
Kecepatan kritis pada pintu penguras (Vc)
V = (q.hc)0.5
q = Q/B
Q = 1,2*Q kebutuhan
Q=
3.7200 m3/dt
q=
1.2402 m3/dt
1/3
0.1797
Jadi Vc = (g*hc)0.5
Vc =
2.300
m
Kontrol : Vrencana < Vc
0,1442 m/dt < 1,888 m/dt ..(OK CHUY!!!!!)
Kemiringan Lantai Penguras
m=
1.5
V = (1/n)*R2/3*S1/2
A = (b+mh)*h =
2.054 m2
P = b + (m*h*(m +1) ) =
R = A/P =
2
4.458 m
0.461 m
0.5
Vc = (g*hc)0.5
Maka V = (1/n)*R2/3*S1/2
g.hc = (1/n)*R2/3*S1/2
S=
0.01522
0.719
3.100 m3/dt
0,8 mm
0.0006 m
Qs = Debit pembilas =
Dimensi Kantong lumpur
3.7200 m3/dt
V = 5.10-4.Qn.T
Selang waktu pembilasan (T) = 4 minggu sekali =
T=
1814400 detik
21 hari
2812.32 m3
dari grafik dengan diameter 0.8 mm dan suhu 200C didapat niali w =
Maka L*B = Qn/w =
1033.333333
karena (L*B)/B2>
0.003
8 , untuk mencegah agar aliran tidak meander dalam kantong, maka dpt dihitung :
B2 = 129.166666667
B=
11.37 m
L*B = 1033.33333333
L=
90.921 m
68257571
Kontrol :
L/B = 20,248/2,47 =
8.000000 .> 8 (Aman !!!!)
maka dapat diambil nilai rencana :
L >20,248 m
B < 2,47 m
Kemiringan normal (Sn)
koefisien kekasaran strickler =
60 (pasangan batu)
Vn =
0.3 m/dt (asumsi)
An = Qn/Vn =
10.333 m2
hn = An / B =
0.909 m
Lebar dasar saluran untuk kemiringan 1:1
b = B - 2*(m.hn)
b=
4.000
m
Keliling basah (Pn)
Pn = b + (2*hn(m2+1)0.5)
Pn =
6.572
Jari-jari hidrolis (Rn)
Rn = An /Pn =
1.572
Slope untuk kondisi normal :
An/hn
m*hn
hn
hn+hc
w
m
m
=
=
11.36515141
17.04772712
0.909 hc
1.448
0.483
1.022
1.533
V =k*Rn2/3*Sn1/2
hn+hs
1.529
0,4 = 40*0,587/3.Sn1/2
Sn =
0.00001367
Kemiringan dasar pembilas (Ss) kondisi Kosong
1/3(hn+hs)
0.510
Qs = 1,2*Qn =
Vs =
As = Qs / Vs =
b=
3.72 m3/dt
1.5 m/dt
As = b.hshs = As / b =
Rs = As / Ps . Ps = (b + 2*hs) =
Rs =
0.473
Vs =k*Rs2/3*Ss1/2
1 =40*0,494/3*Ss1/2
Ss =
(asumsi)
2.48 m2
4.000 m
0.00169
0.620 m2
5.240
m
Kontrol :
Fr < 1
Fr = Vs / (g*hs)0.5
Fr =
0.608
Panjang kantong Lumpur
V =( 0.5*b*L1 )+ (0.5*(Ss-Sn)*L12*b)
V
2812.320
( 0.5*b*L(0.5*(Ss-Sn)*L2*b
)
1328.662341 1483.6577
2812.320056
4900.604 = (0.5*11,805*L1)+(0.5*(0,00156-0,00064457)*L12*11,805m)
dengan coba-coba diperoleh nilai L1 =
664.3312 m
L2. b = Qn / w =
1033.33333333 .. b =
4.000
m
didapat L2 =
258.333
m
Nilai L diambil harga rata-rata :
L = (L1 + L2) / 2
L=
461.332
m
sehingga L / B = 332,663/12,99 =
5918263 m> 8 (OK !!!)
Pengecekan Efisiensi Pengendapan
Wo = (hn*Vn) / L
Wo =
0.0010558592
W / wo =
2.8412878535
W / Vo =
0.01
Maka dari grafik camp (KP 02 bangunan Utama hal 151 ) diperoleh efisiensi pengendapan = 83%
ur
an/hn
m*hn
6.4158515298
1.9213518006
10.333
4 4.4944997292
1.6106
0.5369
0.539
2.173
(0.5*(Ss-Sn)*L2*b
L
664.33117074 m
Perhitungan He
34,37-0,20 He
10.24
10.02
hasil
0.20
(0,20*He)
0.2197552159
11.546189
He
1.0988
Perhitungan Nilai Cd
Be
10.02
0.797
Hd
P/Hd
He/Hd
P/He
Cd
Ho
=
=
=
=
=
=
1.0664
1.90
1.030
1.85
1.27
1.565
Q 50 =
25
Q 50 =
25 m3/dt
----------->
----------->
C1 (KP02_49)
C2 (KP02_45)
(P / r xg) =
He
(P / r xg) =
1.3
1.000
0.980
34,37-0,20 He (0,20*He)
10.24
He^1,5
He
10.025
21975523
1.15
1.0988
hasil 11.5461893 11.5461874
di goal seek dulu..
-0.35
-0.3845716
Be
V
Hd
P/Hd
He/Hd
P/He
Cd
Ho
=
=
=
=
=
=
=
=
10.025
0.797
1.066
1.903
1.030
1.847
1.274
1.565
0.3370190295
Y2 = - (Y1/2)+{(Y12/4)+(2.q2/g.Y1)}0,5
y1/2 -0.1436456
y1^2/4 0.02063407
2.q^2 / g.y1 4.2260462
2.060748
1.917102
gx2
19.62
He
1.10
Be
Q
10.02
25
29
Yz (coba-coba)
Q/(B*Yz)
Hasil Akhir
0.500
1.000
1.500
2.000
2.500
3.000
3.600
4.200
4.800
5.400
6.500
7.100
7.700
7.000
3.029
0.54966
0.43674
0.37778
0.33892
0.31048
0.28843
0.14854
0.13995
0.13272
0.12651
0.12196
0.12651
0.12197
0.13237
0.12846
4.53691140
5.71045026
6.60120167
7.35855859
8.03220348
8.64633005
9.44858223
10.06062056
10.63625876
11.18140302
12.11177404
12.58482346
13.04756196
12.50203862
8.85813301
4.53698542
5.710144
6.60118062
7.35814905
8.03204571
8.6462414
16.789312
17.8188395
18.7899468
19.7117491
20.4473368
19.7118123
20.4456508
18.8403703
19.4127384
0.000
0.000
0.000
0.000
0.000
0.000
-7.341
-7.758
-8.154
-8.530
-8.336
-7.127
-7.398
-6.338
-10.555
0.28729125
yu 0.287
yj 0.2872912539
3.840490247
19.62
2.4938207816
0.2872912539
Z
0.500
1.000
1.500
2.000
2.500
3.000
3.600
4.200
4.800
5.400
6.500
7.100
7.700
7.000
3.029
Yz
0.550
0.437
0.378
0.339
0.310
0.288
0.149
0.140
0.133
0.127
0.122
0.127
0.122
0.132
0.128
Vz
4.537
5.710
6.601
7.358
8.032
8.646
16.789
17.819
18.790
19.712
20.447
19.712
20.446
18.840
19.413
Fr
1.954
2.759
3.429
4.035
4.602
5.140
13.909
15.207
16.467
17.694
18.693
17.694
18.691
16.534
17.293
Elevasi
Elevasi
Lereng Bendung
28.500
28.000
27.500
27.000
26.500
26.000
25.400
24.800
24.200
23.600
22.500
15.400
7.700
0.700
-2.329
Muka Air
29.050
28.437
27.878
27.339
26.810
26.288
25.549
24.940
24.333
23.727
22.622
15.527
7.822
0.832
-2.201
8.680 m/dt
0.287 m
8.680 m/dt
5.171
1.962 m
0.6540195974
2.61608
0.143645627
0.2963986127
Panjang kolam olak
Lb =
2,7 . Y2
=
5.29756 m
panjang kolam olak yg dipakai adalah =
5.298 m
0.6540195974
Tinggi (qc), panjang (pc) dan lebar (bc) chute block:
Qc = Pc = bc = Yj =
0.287 m
2.616
Tinggi end sill (ambang ujung)
Jarak ant. Chute block (sc)
endsill = Yj . (18+Fr)/18
0.0878218112 Sc = Yj =
0.287 m
=
0.370
Tinggi blok halang (n3)
Lebar dan jarak antar blok halang (n)
n3 = Yj. (4+Fr) / 6 =
0.439 m
n = 0,75*n3
0.675*n3
0.0878218112
=
0.329
0.2963986
1.96
2.029
1
1.10
10.02
m
m
m
m
m
25 m3/dt
1.27 m/dt
2.44 m/dt
1.658
tinggi kecepatan
0.0823394
H
2.08
hc
0.85 m
H/hc
2.46 .. 2,4
dari gambar grafik 4.22 diperoleh Rmin/hc
Rmin
1.40 m
1.65
Lj2 = 5 (n+Y2)
Lj2 =
11.556 m
=
13 m
=
karena Lj>Lj2 maka yang digunakan Lj = 13.119 m
9.810 m
11 m
8
(lantai dasar hulu ke dasar sheet pile)
(jarak bendung)
(dari hulu sampai hilir - endsill)
(titik awal hulu ke sheet pile)
2.811
1 - b1/b
0.978
0.022
47 %
36 %
38 %
107.78-106.28
C1
=
=
=
=
Panjang Pile 1 ke 2
107.78
0
Panjang lantai dasar apron sampai pile 1
= 8.00
= 6.50
(+)
=
52.486 %
%
%
1 - b1/b
0.217
[(60-22)/6.45 x1.45
-2.31
(+)
koreksi untuk E2
=
=
=
[(f E2 - f D2)/d]*t
[(50-60)/6/45*1.45
-0.231
(+)
Pile 2 ke 3
= 8.00
= 6.50
(+)
(+)
F 43
F41
=
=
54 %
10 %
N48
H48
57.653 %
33.682 %
F57
F66
b3 =
1 - b/b3
b/b3 =
3.4600
29.991
-0.334
1.334
1-50%
=
1.709
= [(f E3 - f D3)/d]*t
= [(50-28)/4]*0.95
=
-11.569 (-)
13.608
6.5
6.5
F77
H82
F91
13.608 %
% Pressure
(f)
52.486
33.682
57.653
13.608
Pressure Head
1.030
0.661
1.131
0.267
Hitung
0.729
0.893
0.855
Ketebalan
Rencana
1,5( aman !!!!)
1,5 ( aman !!!!)
1,709 ( aman !!!!)
Exit Gradien
beda tinggi air
=
1.9620587923
d
=
el. Lantai hulu - el. Pile 3
= 107.23-102.28
=8
gs=
2.25
sehingga
=
= (2,115/5)*0,77
=
0.066
aman.
25 m3/dt
Perhitungan He
Cd (asumsi) =
1.27
Rumus Q 100 = Cd x 2/3 x (2/3.g)0,5 x Be x He1,5
sin 40
Shg 78 =
2.1652
x (10.24 - 0,20 He) x He1,5
(34,56 - 0,26 He) x He1,5 =
11.5462
1.0988
Dgn cara coba-coba didpt He =
Perhitungan Penentuan nilai Cd
1.27
Cd= 1,28443
1.30
Co (konstanta) =
1. Be = 34,56 - 0,26 He =
2. V = Q/A = Q / Be. ( P + He) =
3. Hd = He - (V2 / 2g) =
4. P / Hd =
5. He/Hd =
6. P / He =
7. Cd (hitung) = Co x C1 x C2 =
10.025
0.797
1.0664
1.903
1.030 --> C1 =
1.847 --> C2 =
1.274
0,5
8. Rumus Q hitung= Cd x 2/3 x (2/3.g) x Be x He1,5
Sin 38=
sin F di bab 3
0.61566148
0.384339
0.2379
1.000
0.980
(mendekati Cd asumsi)
3.095
1.032
5.627
1.463
2.392
m
m
m
m
m
8.254 1.0317917
4.127
38
0.2379
2.876
1.349
1.615661
tg 38
0.781
((1+w)/(1+e)).w.Gs (dimana Gs diambildari besarnya koefisien antara 2,6-2,7)
e = (w.Gs)/Sr ; Sr = 1
w = (e.Sr)/Gs
0.1200
sub =
1.9843
(w.(Gs+1))/(1+e)
2.5591
sat - w
1.5591
3.095
1,0.(sub).Kp
6.554
1.728.(t).Ka
0.637
4.741(sub)Ka
2.240
4.741(w)Ka
1.437
2(w)
l
1.601
2.464
1.580
g
(t/m3)
Gaya
(t)
Lengan
(m)
Momen Tahan
(t.m)
w1
0.750
x 3.377 x
2.533
2.400
6.079
2.000
12.157
w2
0.750
x 0.750 x
0.563
2.400
1.350
1.110
1.499
w3
0.750
x 0.750 x
0.563
2.559
1.439
3.000
4.318
w4
0.282
x 0.713 x
0.5
0.101
2.400
0.241
3.230
0.779
w5
0.282
x 0.713 x
0.5
0.101
2.559
0.257
2.400
0.617
w6
0.929
x 1.032 x
0.959
2.559
2.453
3.100
7.606
w7
0.713
x 3.095 x
2.207
2.400
5.296
3.000
15.888
w8
0.929
x 3.095 x
0.5
1.438
1.559
2.241
1.100
2.466
w9
0.929
x 3.095 x
0.5
1.438
2.400
3.450
2.000
6.901
w10
2.292
x 1.500 x
3.438
2.400
8.251
1.400
11.552
Jumlah
31.059
gamma sub
gamma t
63.783
g beton = 2.4 ..
bawah air gamma sub = 1.5591(dari sheet dinding penahan )
Tabel 3.12 Perhitungan Gaya Horisontal Pasif
P
Pw
2.876
x 3.095 x
0.5
4.451
1.800
8.011
Pp
0.750
x 2.102 x
0.5
0.788
0.200
0.158
Jumlah
5.239
8.169
Pa1
0.637
x 1.349 x
Pa2
4.278
Pa3
1.067
Pa4
0.684
0.5
0.430
7.200
3.094
x 0.637 x
2.725
3.170
8.639
x 4.278 x
0.5
2.282
2.100
4.793
x 4.409 x
0.500
1.508
2.100
Jumlah
6.945
3.167
19.692
Pv1
2.392
Pv2
2.392
x 2.876 x
1.5
Jumlah
Cd
3.588
1.800
0.5
3.440
1.200
7.028
1.28
2.172
0.803
3. Hd = He - (V2 / 2g) =
1.0659
P+Hd =
3.095
1/3 h =
1.032
h+W+2 =
6.127
b=0.26H
1.593
0.425 H =
2.604
Tabel 3.15
Gaya vertikal
7.028
Gaya Horisontal
31.059
6.945
5.239
Momen Tahan
Momen Guling
63.783
19.692
8.169
10.586
71.952
24.032
30.278
1.706
41.674
2.3764
aman CHUY!!!
10.1670
aman CHUY!!!
1.7342
-0.0658 < 0.60
6.6754
1.1097
0.8903
L dinding =
3.6
7.4080
5.94281
No
Ka
Kp
t
sat
sub
L
0.238
4.204
1.984
2.559
1.559
23.310
Garis
Panjang Rembesan
Vertikal Horizontal
1/3 . Horiz
A
A- B
B-C
0.625
D-E
2.563
F-G
1.813
H-I
0.625
J-K
0.625
L-M
0.625
1.708
0.4019
4.621
4.219
2.208
0.5195
4.121
3.601
3.063
0.7205
4.121
3.400
3.563
0.8381
4.600
3.762
4.167
0.9802
4.600
3.620
4.667
1.0978
4.120
3.022
4.875
1.1469
4.120
2.973
5.375
1.2645
3.590
2.326
5.583
1.3135
3.590
2.277
6.083
1.4311
2.800
1.369
6.292
1.4801
2.800
1.320
6.792
1.5978
2.730
1.132
7.000
1.6468
1.950
0.303
7.500
1.7644
2.240
0.476
7.708
1.8134
4.150
2.337
8.208
1.9310
2.130
0.199
8.542
2.0094
2.130
0.120
8.917
2.0977
4.990
2.892
9.333
2.1957
4.990
2.794
9.583
2.2545
4.750
2.496
11.250
2.6466
4.750
2.103
11.750
2.7642
5.250
2.486
12.083
2.8426
5.250
2.407
0.500
N
N-O
0.625
0.208
O
0.500
P
P-Q
0.625
0.208
Q
0.500
R
R-S
1.000
0.333
S
0.375
T
T-U
1.250
0.417
U
0.250
V
V-W
5.000
1.667
W
0.500
X
Y
0.208
X-Y
4.268
0.500
W-X
4.621
0.208
U-V
0.3529
0.500
S-T
1.500
0.208
Q-R
0.500
O-P
2.121
0.604
M-N
2.121
0.500
K-L
0.854
I-J
0.500
G-H
P = H - DH
0.208
E-F
1.500
C-D
DH = Lw/Cw
Lw
1.000
0.333
Y-Z
Z
1.944
14.028
3.3000
3.300
0.000
8.569
16.375
5.458
2.4238337
L
= 4.251
Lv
Hv
Hw
L
H
98.4332
###
Bligh
Cw =
40.4109
Lw
Lane
171.778
Gaya (t)
G1
1.000 x 1.500
1.500
2.4
3.600
18.810
-67.716
-1
G2
1.000 x 6.000
6.000
2.4
14.400
15.310
-220.464
-1
G3
G4
G5
G6
G7
G8
G9
G10
G11
G12
G13
G14
G15
G16
G17
G18
G19
G20
G21
Wa1
Wa2
1.000
1.000
4.620
0.770
4.040
4.040
2.250
1.180
1.500
2.560
0.500
0.500
5.500
1.000
1.000
0.390
0.100
0.500
0.500
4.500
4.620
2.000
3.500
10.395
0.177
3.111
8.161
3.375
1.770
1.125
3.840
0.060
0.125
5.500
1.500
0.500
0.039
0.019
0.125
0.125
31.500
10.395
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
3.4
4.4
1.0
1.0
4.800
8.400
24.948
0.425
7.466
19.586
8.100
4.248
2.700
9.216
0.144
0.300
13.200
3.600
1.200
0.094
0.046
0.425
0.550
31.500
10.395
11.810
10.560
9.230
7.440
7.310
5.570
5.180
3.470
2.380
2.780
1.440
1.210
1.250
0.750
3.500
3.770
3.950
18.140
2.830
15.810
10.770
-56.688
-88.704
-230.270
-3.162
-54.576
-109.094
-41.958
-14.741
-6.426
-25.620
-0.207
-0.363
16.500
-2.700
4.200
0.353
0.180
-7.710
1.557
-498.015
-111.954
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
1
-1
1
1
1
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
2.000
3.500
4.500
0.460
0.770
4.040
1.500
1.500
1.500
1.500
0.120
0.500
1.000
1.500
0.500
0.200
0.190
0.500
0.500
7.000
4.500
x
x
0.500
0.500
0.500
0.500
0.500
0.500
x
x
0.500
0.500
0.500
Jumlah
169.342
-1517.578
-1
1
-1
-1
B-C
D-E
F-G
H-I
J-K
L-M
N-O
P-Q
R-S
T-U
Notasi
Volume/m panjang
Pv1
2.652
2.652
18.810
49.887
Pv2
Pv3
Pv4
Pv5
Pv6
Pv7
Pv8
Pv9
Pv10
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
19.253
7.382
5.995
5.753
3.025
1.823
2.109
0.479
2.843
1
1
1
1
1
1
1
1
1
19.253
7.382
5.995
5.753
3.025
1.823
2.109
0.479
2.843
15.390
11.790
9.770
7.450
5.120
2.720
0.730
1.450
3.510
296.309
87.030
58.574
42.856
15.487
4.959
1.540
-0.695
-9.980
1
1
1
1
1
1
1
-1
-1
(
(
(
(
(
(
(
(
(
3.601
3.762
3.022
2.326
1.369
1.132
0.476
0.199
2.892
+
+
+
+
+
+
+
+
+
3.400
3.620
2.973
2.277
1.320
0.303
2.337
0.120
2.794
)
)
)
)
)
)
)
)
)
x
x
x
x
x
x
x
x
x
5.500
2.000
2.000
2.500
2.250
2.540
1.500
3.000
1.000
Jumlah
Keterangan :
Asumsi pusat perputaran momen pada titik koordinat (0,0)
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
Gaya (t)
51.314
545.968
Ph1
0.5 (
Ph3
Ph6
Ph7
Ph8
Ph10
Pa
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Pw
Gaya (t)
Jarak (m)
Momen Guling
4.125
4.125
3.000
12.375
4.495
2.895
4.020
3.230
0.973
1
1
1
1
1
4.495
2.895
4.020
3.230
0.973
2.540
3.440
1.890
0.550
0.770
11.417
9.959
7.598
1.777
0.749
1
1
1
1
1
1
0.531
0.531
3.000
1.593
10.125
10.125
30.394
5.500
55.688
101.155
Volume/m panjang
1.500 x
5.500 )
(
4.160 + 4.830
(
1.430 + 2.430
(
2.180 + 3.180
(
2.900 + 3.560
(
1.780 + 2.110
x Ka x
t
x 0.238 x 1.984
x w x
h2
x 1.000 x 20.25
)
)
)
)
)
x
x
x
x
x
x
x
1.000
1.500
1.500
1.000
0.500
h2
2.25
Jumlah
Pw
Pa
0.238 x
x 20.25 =
1.984 x
20.25
2.25
Keterangan :
Asumsi pusat perputaran momen pada titik koordinat (0,0)
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
1.062
Pa = Ka . t . h2 + . Ka . t . H2
Pd = 0,5 . t . Ce
Pw = 0,5 x w x (p)2
Ps = 0,5. (sat - w). Cs . H2
Ph2
Ph4
Ph5
Ph9
Ph11
Volume/m panjang
0.5 x
0.5
0.5
0.5
0.5
0.5
0.5
(
(
(
(
(
(
Kp
sub
4.204
4.720
3.270
1.710
2.060
1.700
x
+
+
+
+
x
1.559
5.390
4.610
3.050
3.390
2.000
x
)
)
)
)
)
)
x
x
x
x
x
h
2.89
0.500
1.000
1.000
1.000
9.470
2.528
3.940
2.380
2.725
1.700
Jumlah
Pp
4.204 x
Gaya (t)
Jarak (m)
Momen Tahan
1
1
1
1
1
9.470
2.528
3.940
2.380
2.725
1.700
1.070
2.770
2.580
3.640
0.620
1.000
-10.133
-7.001
-10.165
-8.663
-1.690
-1.700
22.743
1.559 x
Keterangan :
Asumsi pusat perputaran momen pada titik koordinat (0,0)
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
2.89 =
-39.352
18.94068855
-1
-1
-1
-1
-1
-1
=
=
118.028
7.651
Mt
Mg
M
=
=
=
1556.931
647.123
909.808
-3.94657
3.88500
5.06339
10.20701915
aman
aman
3.94657
1.01585
=
=
-0.080
10.207
(6*e)/L
(-)karen auntuk penandaan arah nya saja
5.409
=
23.31
0.7625 dari mana? Di tumus mencari geser
v/L itu yang L nya diganti a masss???
1.0158473289
-10.55287
110.377
Garis
Panjang Rembesan
Vertikal Horizontal 1/3 . Horiz
A
A- B
B-C
0.625
D-E
2.563
F-G
1.813
H-I
0.625
J-K
0.625
1.708
0.402
4.621
4.219
2.208
0.520
4.121
3.601
3.063
0.720
4.121
3.400
3.563
0.838
4.600
3.762
4.167
0.980
4.600
3.620
4.667
1.098
4.120
3.022
4.875
1.147
4.120
2.973
5.375
1.264
3.590
2.326
5.583
1.313
3.590
2.277
6.083
1.431
2.800
1.369
6.292
1.480
2.800
1.320
6.792
1.598
2.730
1.132
7.000
1.647
1.950
0.303
7.500
1.764
2.240
0.476
7.708
1.813
4.150
2.337
8.208
1.931
2.130
0.199
8.542
2.009
2.130
0.120
8.917
2.098
4.990
2.892
9.333
2.196
4.990
2.794
9.583
2.254
4.750
2.496
0.500
L
L-M
0.625
0.208
M
0.500
N
N-O
0.625
0.208
O
0.500
P
P-Q
0.625
0.208
Q
0.500
R
R-S
1.000
0.333
S
0.375
T
T-U
1.250
U
V
Sumber : Hasil Perhitungan
4.268
0.208
U-V
4.621
0.500
S-T
0.353
0.208
Q-R
1.500
0.500
O-P
2.121
0.604
M-N
2.121
0.500
K-L
0.000
0.854
I-J
0.000
0.500
G-H
P = H - DH
0.208
E-F
1.500
C-D
DH = Lw/Cw
Lw
0.417
0.250
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
1.500
6.000
2.000
3.500
4.500
0.460
0.770
4.040
1.500
1.500
1.500
1.500
0.120
0.500
1.000
1.500
0.500
0.200
0.190
0.500
0.500
7.000
4.500
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
1.500
6.000
2.000
3.500
10.395
0.177
3.111
8.161
3.375
1.770
1.125
3.840
0.060
0.125
5.500
1.500
0.500
0.039
0.019
0.125
0.125
31.500
10.395
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
3.4
4.4
1.0
1.0
18.810
15.310
11.810
10.560
9.230
7.440
7.310
5.570
5.180
3.470
2.380
2.780
1.440
1.210
1.250
0.750
3.500
3.770
3.950
18.140
2.830
15.810
10.770
Momen Tahan
-67.716
-220.464
-56.688
-88.704
-230.270
-3.162
-54.576
-109.094
-41.958
-14.741
-6.426
-25.620
-0.207
-0.363
16.500
-2.700
4.200
0.353
0.180
-7.710
1.557
-498.015
-111.954
-1517.578
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
1
-1
1
1
1
-1
1
-1
-1
Gaya (t)
Jarak (m)
Momen Guling
Pv1
0.5 ( 4.268 +
Volume/m panjang
4.219 ) x 0.625
2.652
2.652
18.810
49.887
Pv2
Pv3
Pv4
Pv5
Pv6
Pv7
Pv8
Pv9
Pv10
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
3.400
3.620
2.973
2.277
1.320
0.303
2.337
0.120
2.794
19.253
7.382
5.995
5.753
3.025
1.823
2.109
0.479
2.843
1
1
1
1
1
1
1
1
1
19.253
7.382
5.995
5.753
3.025
1.823
2.109
0.479
2.843
51.314
15.390
11.790
9.770
7.450
5.120
2.720
0.730
1.450
3.510
296.309
87.030
58.574
42.856
15.487
4.959
1.540
-0.695
-9.980
545.968
1
1
1
1
1
1
1
-1
-1
(
(
(
(
(
(
(
(
(
3.601
3.762
3.022
2.326
1.369
1.132
0.476
0.199
2.892
+
+
+
+
+
+
+
+
+
)
)
)
)
)
)
)
)
)
x
x
x
x
x
x
x
x
x
5.500
2.000
2.000
2.500
2.250
2.540
1.500
3.000
1.000
Keterangan :
Asumsi pusat perputaran momen pada titik koordinat (0,0)
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
Ph1
0.5 (
Ph3
Ph6
Ph7
Ph8
Ph10
Pa
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Pw
Ps
Gaya (t)
Jarak (m)
Momen Guling
4.125
4.125
3.000
12.375
1.000
1.500
1.500
1.000
0.500
4.495
2.895
4.020
3.230
0.973
4.495
2.895
4.020
3.230
0.973
2.540
3.440
1.890
0.550
0.770
11.417
9.959
7.598
1.777
0.749
1
1
1
1
1
1
2.250
0.531
1
1
1
1
1
1
1
1
1
1
1
0.531
3.000
1.593
10.125
5.500
55.688
Volume/m panjang
1.500 x
( 4.160
( 1.430
( 2.180
( 2.900
( 1.780
x Ka
x 0.238
x w
x 1.000
x
t
x 1.9843
5.500 )
+
4.830
+
2.430
+
3.180
+
3.560
+
2.110
x t
x
1.984
x h2
x 20.250
x
h2
x 20.25
)
)
)
)
)
x
x
x
x
x
x
x
h2
10.125
x
x
Ka
0.238
4.779
1
1
4.779
35.173
21.126
Keterangan :
Asumsi pusat perputaran momen pada titik koordinat (0,0)
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
7.97669
Pa = Ka . t . h2 + . Ka . t . H2
Pd = 0,5 . t . Ce
Pw = 0,5 x w x (p)2
Ps = 0,5. (sat - w). Cs . H2
3.988
5.500
26.286
127.440
Ph2
Ph4
Ph5
Ph9
Ph11
Volume/m panjang
0.5 x
0.5
0.5
0.5
0.5
0.5
0.5
(
(
(
(
(
(
Kp
sub
4.204
4.720
3.270
1.710
2.060
1.700
x
+
+
+
+
x
1.559
5.390
4.610
3.050
3.390
2.000
x
)
)
)
)
)
)
x
x
x
x
x
h2
2.89
0.500
1.000
1.000
1.000
9.470
2.528
3.940
2.380
2.73
1.700
Gaya (t)
Jarak (m)
Momen Tahan
1
1
1
1
1
9.470
2.528
3.940
2.380
2.725
1.700
1.070
2.770
2.580
3.640
0.620
1.000
-10.133
-7.001
-10.165
-8.663
-1.690
-1.700
22.743
Keterangan :
Asumsi pusat perputaran momen pada titik koordinat (0,0)
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
-39.352
-1
-1
-1
-1
-1
-1
0
V
H
Mt
Mg
M
=
=
=
=
=
118.028
12.430
1556.931
673.408
883.522
aman
2.31202 > 1,75
7.41862 > 1,75
aman
4.16927
1.07317
=
=
-0.3705
10.49728
(6*e)/L
L
23.31
5.06
1.0731722548
-5.9186233986
105.598
Garis
Panjang Rembesan
Vertikal Horizontal 1/3 . Horiz
A
A- B
B
B-C
C
C-D
D
D-E
E
E-F
F
F-G
G
G-H
H
H-I
I
I-J
J
J-K
K
K-L
L
L-M
M
M-N
N
N-O
O
O-P
P
P-Q
Q
Q-R
R
R-S
S
S-T
T
T-U
U
U-V
V
1.500
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.375
0.000
0.000
0.000
0.250
0.000
0
0
0.625
0
0
0
2.5625
0
0
0
1.8125
0
0
0
0.625
0
0
0
0.625
0
0
0
0.625
0
0
0
0.625
0
0
0
0.625
0
0
0
1
0
0
0
1.25
0
0
0
DH = Lw/Cw
P = H - DH
0.000
0.000
2.880
2.880
2.121
1.500
0.862
5.380
4.517
4.621
1.708
0.982
5.380
4.398
4.621
2.208
1.269
4.880
3.610
4.121
3.063
1.760
4.880
3.119
4.121
3.563
2.048
5.359
3.311
4.600
4.167
2.395
5.359
2.964
4.600
4.667
2.683
4.879
2.196
4.120
4.875
2.802
4.879
2.077
4.120
5.375
3.090
4.349
1.259
3.590
5.583
3.210
4.349
1.139
3.590
6.083
3.497
3.559
0.062
2.800
6.292
3.617
3.559
-0.058
2.800
6.792
3.904
3.489
-0.415
2.730
7.000
4.024
2.709
-1.315
1.950
7.500
4.311
2.999
-1.312
2.240
7.708
4.431
4.909
0.478
4.150
8.208
4.719
2.889
-1.830
2.130
8.542
4.910
2.889
-2.021
2.130
8.917
5.126
5.749
0.623
4.990
9.333
5.365
5.749
0.384
4.990
9.583
5.509
5.509
0.000
4.750
Lw
0.208
0.854
0.604
0.208
0.208
0.208
0.208
0.208
0.333
0.417
0.759
Bligh
Cw =
L
H
1.740
A
0
B
0
C
0
D
0
E
0
F
0
G
0
H
0
I
0
J
0
K
0
L
0
M
0
N
0
O
0
P
0
Q
0
R
0
S
0
T
0
U
0
V
W
X
G1
1.000
G2
1.000
G3
1.000
G4
1.000
G5
4.620
G6
0.770
G7
4.040
G8
4.040
G9
2.250
G10 1.180
G11 1.500
G12 2.560
G13 0.500
G14 0.500
G15 5.500
G16 1.000
G17 1.000
G18 0.390
G19 0.100
G20 0.500
G21 0.500
Wa1 4.500
Wa2 4.620
Wa3 11.060
Wa4 0.560
Wa5 0.560
Wa6 0.610
Wa7 0.490
Wa8 0.430
Wa9 0.430
Wa10 0.310
Wa11 0.220
Wa12 0.220
Wa13 0.390
Wa14 0.490
Wa15 1.610
1.500
6.000
2.000
3.500
4.500
0.460
0.770
4.040
1.500
1.500
1.500
1.500
0.120
0.500
1.000
1.500
0.500
0.200
0.190
0.500
0.500
7.000
4.500
0.760
0.150
0.610
0.810
0.810
0.490
0.310
8.200
0.220
4.170
0.200
1.610
3.330
x
x
0.500
0.500
0.500
0.500
0.500
0.500
x
x
0.500
0.500
0.5
x
x
x
x
x
x
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
1.500
6.000
2.000
3.500
10.395
0.177
3.111
8.161
3.375
1.770
1.125
3.840
0.060
0.125
5.500
1.500
0.500
0.039
0.019
0.125
0.125
31.500
10.395
8.406
0.042
0.171
0.247
0.198
0.105
0.067
2.542
0.024
0.917
0.039
0.789
2.681
Gaya (t)
Jarak (m)
Momen Tahan
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
3.600
14.400
4.800
8.400
24.948
0.425
7.466
19.586
8.100
4.248
2.700
9.216
0.144
0.300
13.200
3.600
1.200
0.094
0.046
0.300
0.300
31.500
10.395
8.406
0.042
0.171
0.247
0.198
0.105
0.067
2.542
0.024
0.917
0.039
0.789
2.681
185.195
18.810
15.310
11.810
10.560
9.230
7.440
7.310
5.570
5.180
3.470
2.380
2.780
1.440
1.210
1.250
0.750
3.500
3.770
3.950
18.140
2.830
15.810
10.770
13.780
8.060
7.970
7.420
7.160
6.740
6.670
3.670
0.730
1.430
3.640
3.760
2.320
-67.716
-220.464
-56.688
-88.704
-230.270
-3.162
-54.576
-109.094
-41.958
-14.741
-6.426
-25.620
-0.207
-0.363
16.500
-2.700
4.200
0.353
0.180
-5.442
0.849
-498.015
-111.954
115.829
0.339
1.361
1.833
1.421
0.710
0.445
9.329
0.018
1.312
0.142
2.966
6.219
-1374.095
Jumlah
Asumsi pusat perputaran momen pada titik koordinat (0,0)
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
Momen Gempa
Notasi Gaya (t) Gaya Gempa Jarak (m) Momen Gempa
K1
3.600
0.540
0.75
-0.405
K2
14.400
2.160
0.5
-1.08
K3
4.800
0.720
0.5
-0.36
K4
8.400
1.260
0.5
-0.63
K5
24.948
3.742
1.5
-5.6133
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
1
-1
1
1
1
-1
1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
1
1
1
1
z
A'
B'
C'
D'
E'
K6
K7
K8
K9
K10
K11
K12
K13
K14
K15
K16
K17
K18
K19
K20
K21
0.425
7.466
19.586
8.100
4.248
2.700
9.216
0.144
0.300
13.200
3.600
1.200
0.094
0.046
0.300
0.300
0.064
1.120
2.938
1.215
0.637
0.405
1.382
0.022
0.045
1.980
0.540
0.180
0.014
0.007
0.045
0.045
19.060812
4.19
2
1.35
0.75
2.25
2
0.75
2.25
2.17
0.5
0.5
0.25
1.57
1.6
0.17
0.17
-0.26713764
-2.26217376
-3.9661488
-0.91125
-1.4337
-0.81
-1.0368
-0.0486
-0.09765
0.99
-0.27
0.045
0.0220428
0.010944
-0.00765
-0.00765
-18.1390734
-1
-1
-1
-1
-1
-1
-1
-1
-1
1
-1
1
1
1
-1
-1
B-C
D-E
F-G
H-I
J-K
L-M
N-O
P-Q
R-S
T-U
Volume/m panjang
Pv1
0.625
2.786
2.786
18.810
52.405
Pv2
Pv3
Pv4
Pv5
Pv6
Pv7
Pv8
Pv9
Pv10
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
5.500
2.000
2.000
2.500
2.250
2.560
1.500
3.000
1.000
18.505
6.275
4.273
2.998
0.005
-2.215
-0.626
-5.776
0.503
1
1
1
1
1
1
1
1
1
18.505
6.275
4.273
2.998
0.005
-2.215
-0.626
-5.776
0.503
15.390
11.790
9.770
7.450
5.120
2.720
0.730
1.450
3.510
284.799
73.981
41.747
22.337
0.024
-6.024
-0.457
-8.376
1.767
1
1
1
1
1
1
1
-1
-1
(
(
(
(
(
(
(
(
(
3.610
3.311
2.196
1.259
0.062
-0.415
-1.312
-1.830
0.623
+
+
+
+
+
+
+
+
+
3.119
2.964
2.077
1.139
-0.058
-1.315
0.478
-2.021
0.384
)
)
)
)
)
)
)
)
)
x
x
x
x
x
x
x
x
x
Jumlah
26.729
L
Keterangan :
Asumsi pusat perputaran momen pada titik koordinat (0,0)
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
462.203
Ph1
0.5
Ph3
Ph6
Ph7
Ph8
Ph10
Pa
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
( 4.770 + 5.390 )
( 1.840 + 2.780 )
( 2.500 + 3.440 )
( 3.120 + 3.740 )
( 1.870 + 2.190 )
x Ka x
t x
x 0.238 x 1.984 x
x w x
h2
x 1.000 x 20.25
x
t
x
h2 x
x 1.9843 x 20.25 x
w x
h2 x
1
x 27.66 x
Jumlah
Pw
Ps
Pd
Gaya (t)
Jarak (m)
Momen Guling
3.388
3.388
3.000
10.164
5.080
3.465
4.455
3.430
1.015
1
1
1
1
1
5.080
3.465
4.455
3.430
1.015
2.530
3.400
1.870
0.550
0.770
12.852
11.781
8.331
1.887
0.782
1
1
1
1
1
0.531
0.531
3.000
1.593
10.125
10.125
5.500
55.688
4.779
4.779
5.500
26.286
5.531
5.531
41.800
5.750
31.806
161.168
Volume/m panjang
1.500 x
4.517 )
x
x
x
x
x
1.000
1.500
1.500
1.000
0.500
h2
2.25
Ka
0.238
Kh
0.2
Keterangan :
Asumsi pusat perputaran momen pada3.610
t
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
Pa = Ka . t . h2 + . Ka . t . H2
Pd = 0,5 . t . Ce
Pw = 0,5 x w x (p)2
Ps = 0,5. (sat - w). Cs . H2
0.708
2.01
Ph2
Ph4
Ph5
Ph9
Ph11
Volume/m panjang
0.5 x
0.5
0.5
0.5
0.5
0.5
0.5
(
(
(
(
(
(
Kp
sub
4.204 x 1.559
5.390 + 6.070
3.770 + 5.140
2.150 + 3.520
2.180 + 3.560
1.700 x 2.060
Jumlah
x
)
)
)
)
)
)
x
x
x
x
x
h
2.89
0.500
1.000
1.000
1.000
Gaya (t)
Jarak (m)
Momen Tahan
1
1
1
1
1
9.470
2.865
4.455
2.835
2.87
1.751
24.246
1.070
2.760
2.580
3.620
0.620
1.060
-10.133
-7.907
-11.494
-10.263
-1.779
-1.856
-43.433
9.470
2.865
4.455
2.835
2.870
1.751
Keterangan :
Asumsi pusat perputaran momen pada titik koordinat (0,0)
Gaya yang searah jarum jam terhadap titik (0,0) dianggap (+)
Gaya yang berlawanan arah jarum jam terhadap titik (0,0) dianggap (-)
-1
-1
-1
-1
-1
-1
V
H
Mt
Mg
=
=
=
=
158.466
36.614
1417.527
605.232
812.295
V/L =
6.79822
[(1 (6 . 8,8355) / 21,821] =
smin =
smax =
2.34212
0.00000
aman
> 1,25
> 1,75
tidak aman
6.52902
1.68057
=
=
-4.62667
18.22310
-4.62667
18.22310
(6*e)/L
7.262
L
23.31
1.6805716024
1.5
121.852
129
130
129.8333
0
12
10