PERSIAPAN SEBELUM START DEARATOR

1. INFORMASI KE BAGIAN WTP,UNTUK MEMPERSIAPKAN WATER


DEMIN DENGAN KUALITAS BAIK,
2. CHECK SEMUA ALAT PARAMETER PADA DEARATOR SEPERTI,PRESS
GAUGE,TEMP GAUGE,LEVEL DEARATOR,CONTROL VALVE
DEARATOR,MOTOR VALVE DEARATOR
3. TEST OPEN/CLOSE CONTROL VALVE DEARATOR (WATER/STEAM)
NOTE : SAAT MAU MELAKUKAN TEST STOP VALVE BEFORE DAN
AFTER CONTROL VALVE KONDISI HARUS CLOSE
4. OPEN VALVE AIR VENT DEARATOR +- 50 % UNTUK PERSIAPAN
HEATING DEARATOR
5. OPEN 10 % VALVE DRAIN KE DRAIN TANK UNTUK FLUSHING
DEARATOR
START DEARATOR
1. OPEN VALVE REBOILING UNTUK HEATING DEARATOR
2. HEATING WATER TANK DEARATOR SAMPAI TEMP +- 100 C
3. OPEN VALVE DEMIN DAN OPEN CONTROL VALVE 15 %,DAN
BIARKAN FLUSHING PADA WATER TANK DEARATOR DAN MONITOR
TEMP WATER TANK ,PRESS DEARATOR
4. CLOSE VALVE DRAIN KE DRAIN TANK,DAN MULAI MENGISI WATER
TANK DEARATOR DAN MONITOR TEMP DAN LEVEL
DEARATOR,PRESS DEARATOR
5. BILA TERJADI WATER HAMMER KURANGI PEMBUKAAN VALVE
REBOILING
6. OPEN VALVE STEAM BALANCE DAN CLOSE VALVE REBOILING
7. MONITOR LEVEL DEARATOR DAN TEMP,DAN PRESS DEARATOR
8. OPEN VALVE STEAM FROM LINE EXHAUSTTURBIN/LETDOWN
DESUPERHEATER,MONITOR LEVEL,TEMP,DAN PRESS
9. BILA SEMUA NORMAL OPEN VALVE OUTLET DEARATOR
10. MONITOR LEVEL,TEMP,PRESS DEARATOR
11. OPEN VALVE CIRCULATING BFWP,VALVE SLAG COOLER,RETURN
CONDESATE FROM PLANT,VALVE RAPTURING DISC,CONDESATE
HIGH PRESS,STEAM LEAKAGE (DAN APABILA DEARATOR RUNNING
2 UNIT OPEN VALVE WATER BALANCE DEARATOR)
12. MONITOR KANDUNGAN O2 DENGAN MENGATUR PEMBUKAAN
AIR VENT DEARATOR

STOP DEARATOR
1. PASTIKAN DEARATOR YANG RUNNING SUDAH KONDISI NORMAL.
2. KURANGI PEMBUKAAN VALVE DEMIN DAN VALVE STEAM KE
DEARATOR
3. CLOSE VALVE CIRCULATING BFWP,STEAM LEAKAGE,SLAG
COOLER,CONDENSATE FROM PLANT,RAPTURING
4.
5.
6.
7.

DISC,CONDENSATE HIGH PRESS


CLOSE VALVE OUTLET DEARATOR
CLOSE VALVE DEMIN FULL DAN MANUAL STOP VALVE
CLOSE VALVE STEAM DAN MANUAL STOP VALVE
MONITOR PRESS,TEMP DEARATOR,AIR VENT DEARATOR POSISI

OPEN
8. BILA PRESS DEARATOR SUDAH TURUN,WATER DI DEARATOR BISA
DI DRAIN
NOTE.
1. SETELAH DEARATOR SELESAI DI INSTAL,FLUSHING DEARATOR
DENGAN WATER DEMIN SAMPAI PARAMETER WATER DEMIN INLET
2.
3.
4.
5.
6.

DAN OUTLET SAMA


PERTAMA KALI START DEARATOR BELUM ADA STEAM
OPEN VALVE AIR VENT DEARATOR
MAKE UP DEARATOR WATER TANK SAMPAI LEVEL NORMAL
OPEN OUTLET VALVE DEARATOR INLET BFWP
SETELAH BOILER START UP DAN MENGHASILKAN STEAM,VALVE

REBOILING TO DEARATOR BISA DI BUKA.


7. HEATING WATER TANK DEARATOR SAMPAI TEMP DAN PRESS
NORMAL
8. OPEN VALVE STEAM FROM LETDOWN DESUPERHEATER/EXHAUST
TURBIN,
9. CLOSE VALVE REBOILING
10. OPEN STEAM BALANCE
11. MONITOR PRESS,TEMP DEARATOR,LEVEL DEARATOR
12. OPEN VALVE CIRCULATING BFWP,VALVE SLAG COOLER,RETURN
CONDESATE FROM PLANT,VALVE RAPTURING DISC,CONDESATE
HIGH PRESS,STEAM LEAKAGE (DAN APABILA DEARATOR RUNNING
2 UNIT OPEN VALVE WATER BALANCE DEARATOR)
13. MONITOR KANDUNGAN O2 DENGAN MENGATUR PEMBUKAAN
AIR VENT DEARATOR

PARAMETER YANG HARUS DI MONITOR PADA DEARATOR


1. LEVEL DEARATOR (CORDINASI DENGAN WTP/DCS+ LOCAL)
+dengan mengatur level control water dearator
2. PRESS DEARATOR (DCS+ LOCAL)+mengatur pembukaan control
valve steam to dearator
3. TEMP DEARATOR (DCS+LOCAL)+ mengatur pembukaan control
valve steam to dearator