Rev.D
BA4-BB-CS-C-TLS4-002
Halaman
KLIEN
KONTRAKTOR
NAMA PEKERJAAN
LOKASI
NOMOR KONTRAK
047/PJJ/P69700,P69701/EKS-0100/HK.03/2014
05/10/2015
14
Approval
TFK
GTT
EYN
28/09/2015
14
Approval
TFK
GTT
EYN
19/09/2015
14
Approval
TFK
GTT
EYN
07/09/2015
14
Approval
TFK
Prepared
By :
GTT
Checked
By :
EYN
Approved
By :
Rev.
Tanggal
Date
Page
Description
Checked
By :
05/10/2015
1
dari
14
Approved
By :
BA4-BB-CS-C-TLS4-002
Tanggal
Halaman
05/10/2015
2 dari
14
LEMBAR REVISI
No.
Rev.
KOMENTAR KLIEN
PENJELASAN KONTRAKTOR
1.
Sudah Di cek
2.
KS Spring
Sudah Di cek
PAGE
Tanggal
Halaman
05/10/2015
3 dari
14
DAFTAR ISI
1.
GENERAL
1.1. Pendahuluan
1.2. Lingkup Pekerjaan
1.3. Satuan Unit Perhitungan
1.4. Peraturan dan Standar
1.5. Referensi
Hal.
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
2.
STRUCTURES DESIGN
2.1. Kondisi Geologis
2.2. Desain Struktur dan Analisa Model
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
3.
MATERIAL SPECIFICATION
3.1. Beton
3.2. Baja Tulangan
3.3. Letak Train Loading Station
..................................................................................................................................................
..................................................................................................................................................
..................................................................................................................................................
..................................................................................................................................................
4.
5.
Attachment
Attachment
Attachment
Attachment
Attachment
4
4
4
5
..................................................................................................................................................
6
..................................................................................................................................................
10
1.
Tanggal
Halaman
PENDAHULUAN
1.1. Umum
PT Bukit Asam (Persero) Tbk. yang selanjutnya disebut PTBA adalah Perusahaan Terbuka yang bergerak dibidang
Batubara yang berkedudukan di Tanjung Enim - Sumatera Selatan. Sesuai dengan rencana peningkatan produksi
di tambang batubara di Tanjung Enim, PTBA berencana meningkatkan kapasitas fasilitas penanganan
batubara (Coal Handling Facility) di Muara Tiga Besar dan Banko Barat.
1.2. Lingkup
Lingkup laporan kalkulasi ini mencakup :
- Desain Pelat Lantai Train Loading Station 4
1.3. Satuan Unit
Satuan yang digunakan dalam perhitungan desain adalah Metric System Units.
1.4. Referensi
- SNI 03 - 2847 - 2002 : Tata Cara Perencanaan Struktur Beton Untuk Bangunan Gedung
- SNI 03 - 1726 - 2012 - Tata Cara Perencanaan Ketahanan Gempa Untuk Bangunan Gedung
- Foundation Analysis And Design Engineering - Bowles
2.
DESAIN STRUKTUR
2.1. Kondisi Geografis
Kondisi geografis dan karakteristik tanah berdasarkan laporan hasil investigasi tanah (soil investigation report).
2.2. Desain Struktural dan Analisa Model
Analisa model struktur menggunakan bantuan program software Structure Analysis Program (SAP 2000 v.14)
3.
SPESIFIKASI MATERIAL
Spesifikasi material utama pada desain pelat lantai Train Loading Station ini meliputi:
3.1. Beton
3
- Berat jenis beton, c : 2400 kg/m
- Material strength beton, K-300 (fc = 25 MPa)
- Modulus elastisitas beton, Ec = 4700fc' = 23500 Mpa
- Poisson ratio beton, c = 0.2
05/10/2015
4 dari
14
Tanggal
Halaman
TLS 4
05/10/2015
5 dari
14
600 x600 x
Rev.D
BA4-BB-CS-C-TLS4-002
Tanggal
Halaman
Pelat Lantai
A. SLAB DATA
f c' =
25
MPa
fy =
240
MPa
Lx =
Ly =
11,00
10,00 m
h = 150 mm
Ly / Lx = 0,91 Slab moment coefficient
= 10 mm
ts = 60 mm
concrete cover
B. SLAB LOADING
1. DEAD LOAD
Dead Load for Slab
No
1
Load
3
selfweight slab (kN/m )
Berat satuan
thickness (m)
Q (kN/m2)
24,0
0,15
3,600
2. LIVE LOAD
Live load (People) =
QL =
500
5,0
kg/m2
kN/m2
05/10/2015
6
Dari
14
BA4-BB-CS-C-TLS4-002
C.
Tanggal
Halaman
05/10/2015
MN/m3
5000
kN/m3
11 M
10 M
Dari
14
BA4-BB-CS-C-TLS4-002
Tanggal
Halaman
05/10/2015
8
Dari
Pada pelat lantai ukuran 11 x 10 m didiskritisasi tiap 500 mm x 500 mm . Tumpuan struktur pelat lantai berupa spring dengan nilai konstanta spring yaitu 5000 kN/m3.
Besar konstanta spring tiap join berbeda-beda sesuai dengan luasan pelat yang ditumpu:
Ks joint tengah
Ks joint tepi
Ks joint ujung
note
E.
=
=
=
5000
5000
5000
kN/m3
kN/m3
kN/m3
x
x
x
0,5
0,5
0,5
m
m
m
x
x
x
0,5
0,5
0,5
m
m
m
x
x
0,5
0,25
=
=
=
nilai Ks joint tersebut akan dimasukkan ke dalam program bantu SAP dalam Assign joint spring sesuai dengan besarnya Ks
masing-masing pada translation 3.
Hasil Analisa Struktur Pelat Lantai Dengan Program Bantu SAP 2000
1250
625
312,5
kN/m
kN/m
kN/m
14
BA4-BB-CS-C-TLS4-002
Tanggal
Halaman
05/10/2015
9
Dari
Ultimate moment,
0,650
G. SLAB REINFORCEMENT
1 = 0,85
1 = 0,85
distribution factor
ratio in balance condition
ds = h/ 2 =
75,0
mm
d efective
reviewed from 1m slab
ds = h/ 2 =
75,0
1000
mm
mm
0,813
kNm
b=
Mn = Mu / =
nominal moment
Rn = Mn * 10-6 / ( b * d2 ) = 0,14444
<
Rmax (OK)
0,0006
min =
=
0,0018
0,0018
As = b * d =
As required
required spacing
max spacing
s
s use
Use
582
mm
300
mm
smax =
200
200
200
200
10 As = / 4 * 2 * b / s =
393
mm2
smax = 2 * h =
s=
s=
As
135
s = / 4 * * b / As =
2
3,3
mm (Output SAP 2000, Gambar 4.4)
tot Lx / 240
3,30
<
45,8 SAVE (OK)
mm
mm
mm
mm
mm2
14
600 x600 x
Rev.D
BA4-BB-CS-C-TLS4-002
Tanggal
Halaman
Pelat Lantai
A. SLAB DATA
f c' =
25
MPa
fy =
400
MPa
Lx =
Ly =
10,00
4,00 m
h = 300 mm
Ly / Lx = 0,40 Slab moment coefficient
D= 13 mm
ts = 60 mm
B. SLAB LOADING
Note
Untuk dinding slab akan disamakan penulangan serta tebalnya dengan perhitungan Bottom slab (Perhitungan paling kritis).
Load
selfweight slab
Berat Batu Pecah
Berat Slepeer
thickness (m)
0,3
0,51
0,21
Q (kN/m2)
7,200
7,395
5,040
05/10/2015
10
Dari
14
BA4-BB-CS-C-TLS4-002
Tanggal
Halaman
05/10/2015
11
Dari
14
2. LIVE LOAD
Live load (People) =
QL =
500
5,0
kg/m
2
kN/m
( Brosur Lampiran)
Beban kereta api 50000 (plus muatan batu bara) kg didistribusikan ke masing-masih rel kereta menjadi 25000 kg. Beban kereta tersebut selanjutnya dijadikan
beban area, dengan area beban tersebut adalah lebar penampang rel kereta 14 cm (spesifikasi rel R54) dan panjang rel di pelat lantai adalah 10 m
Beban kereta api =
0,14
=
C.
25000
m x
17857,14 kg/m
10
kg
m
MN/m3
5000
kN/m3
BA4-BB-CS-C-TLS4-002
Tanggal
Halaman
05/10/2015
12
Dari
2
Pada pelat lantai ukuran 4 x 10 m didiskritisasi . Tumpuan struktur pelat lantai berupa spring dengan nilai konstanta spring yaitu 5000 kN/m3.
Besar konstanta spring tiap join dengan luasan pelat yang ditumpu (Diambil diskritisasi kritis 500 mm x 500 mm):
Ks joint tengah
Ks joint tepi
Ks joint ujung
note
=
=
=
5000
5000
5000
kN/m3
kN/m3
kN/m3
x
x
x
0,5
0,5
0,5
m
m
m
x
x
x
0,5
0,5
0,5
m
m
m
x
x
0,5
0,25
=
=
=
nilai Ks joint tersebut akan dimasukkan ke dalam program bantu SAP dalam Assign joint spring sesuai dengan besarnya Ks
masing-masing pada translation 3.
1250
625
312,5
kN/m
kN/m
kN/m
14
Hasil Analisa Struktur Pelat Lantai Dengan Program Bantu SAP 2000
Tanggal
Halaman
05/10/2015
13
Dari
14
BA4-BB-CS-C-TLS4-002
Tanggal
Halaman
05/10/2015
14
Dari
Ultimate moment,
11,114
G. SLAB REINFORCEMENT
1 = 0,85
1 = 0,85
distribution factor
ratio in balance condition
ds = ts + / 2 =
66,5
mm
d = h - ds =
233,5
1000
mm
mm
13,892
kNm
b=
Mn = Mu / =
nominal moment
Rn = Mn * 10-6 / ( b * d2 ) = 0,25479
<
Rmax (OK)
0,0006
min =
=
0,0018
0,0018
420
s = / 4 * D * b / As =
316
mm
smax = 2 * h =
600
mm
smax =
200
200
200
200
required spacing
max spacing
s
s use
Use
s=
s=
D 13 As = / 4 * D 2 * b / s =
As
664
mm2
As = b * d =
mm
mm
mm
mm
mm2
14
TAMPAK ATAS
B
POT. A-A
POT. B-B
BANTALAN BETON
POT. C-C
TIPE
PENAMBAT
PANDROL
DECLIP
TIPE
REL
R.54
R.54
LEBAR
SEPUR
( mm )
NOM
1067
1072
1077
1082
1087
1067
1072
1077
1082
1087
158
158
158
158
158
158
158
158
158
158
POSISI BAHU ( mm )
A
B
TOLERANSI
TOLERANSI
NOM
+
+
1,5
0,5
1303,5
1,5
0,5
1,5
0,5
1308,5
1,5
0,5
1,5
0,5
1313,5
1,5
0,5
1,5
0,5
1318,5
1,5
0,5
1,5
0,5
1323,5
1,5
0,5
1,0
1,0
1303,0
2,0
2,0
1,0
1,0
1308,0
2,0
2,0
1,0
1,0
1313,0
2,0
2,0
1,0
1,0
1318,0
2,0
2,0
1,0
1,0
1323,0
2,0
2,0
UKURAN
LUAS PENAMPANG :
PENAMPANG A = 430 cm 2
PENAMPANG B = 420 cm 2
PENAMPANG C = 357 cm 2
LUAS PERMUKAAN :
BAWAH
= 4846 cm 2
SAMPING = 3986 cm 2
BERAT BANTALAN :
BERAT
= 190 Kg
= 1500 Kg.m
= 750 Kg.m
= 660 Kg.m
= 930 Kg.m
PARAMETER DISAIN :
- BEBAN GANDAR
- KECEPATAN KERETA
= 18 ton
= 120 Km/hour
1.5
Kelas
Jalan
Daya Angkut
Lintas
(ton/tahun)
V
maks
(km/jam)
P
maks
gandar
(ton)
Tipe Rel
> 20.106
120
18
R.60/R.54
Jenis Bantalan
Jarak antar sumbu
bantalan (cm)
Beton
60
10.106
20.106
II
110
18
R.54/R.50
60
III
IV
Beton/Kayu
5.10
10.106
100
2,5.106
5.106
90
< 2.5.106
80
18
R.54/R.50/R.42
Beton/Kayu/Baja
60
Beton/Kayu/Baja
18
R.54/R.50/R.42
60
18
R.42
Kayu/Baja
60
Tebal Lebar
Balas Bahu
Jenis
Penambat Atas Balas
(cm)
(cm)
Elastis
Ganda
30
60
Elastis
Ganda
30
50
Elastis
Ganda
30
40
Elastis
Ganda/
Tunggal
25
40
Elastis
Tunggal
25
35
Kelas
Jalan
Daya Angkut
Lintas
(ton/tahun)
> 20.106
P
V
maks
maks
gandar
(km/jam)
(ton)
160
22,5
Jenis Bantalan
Tipe Rel
Jarak antar sumbu
bantalan (cm)
R.60
Beton
60
II
III
IV
10.106
6
20.10
140
5.106
6
10.10
120
< 5.106
100
22,5
R.60
Beton
60
22,5
R.60/R.54
Beton
60
22,5
R.60/R.54
Beton
60
Tebal Lebar
Balas Bahu
Jenis
Penambat Atas Balas
(cm) (cm)
Elastis
Ganda
30
60
Elastis
Ganda
30
50
Elastis
Ganda
30
40
Elastis
Ganda
30
40
2.
www.djpp.kemenkumham.go.id
41
Y
65
14.1
70
30.6
19
49
R-30
R13
30.6
1:
2.75
153
25.4
31.5
R-22
X
15
38.2
79.4
R 500
1:
1:
2.75
69.9
R20
76
6
-1
R
2.75
40
11
R - 50
70
18
30
1 : 10
70
127
49.4
.3
R.
30.6
1:2
.7 5
36.3
1 : 20
1 : 20
R300
R8
0
R300
0
R8
14.18
49 .8
19
2 .7 5
1:
159
25.4
31.5
R -2 2
79.4
16
38.2
R 508
R-
1:2
.7 5
.7 5
1 :2
11
40
R - 54
18
1 : 18
1 : 18
13.6
R2
2
R-
3
R
30.2
16
74.97
16
76.2
R-
46.3
70
70
14 0
www.djpp.kemenkumham.go.id