Anda di halaman 1dari 20

CALCULATION

Rev.D

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

BA4-BB-CS-C-TLS4-002

Halaman

KLIEN

PT BUKIT ASAM (PERSERO) Tbk.

KONTRAKTOR

PT. WIJAYA KARYA (PERSERO) Tbk.

NAMA PEKERJAAN

EPC FASILITAS PENANGANAN BATUBARA, TANJUNG ENIM


TAHAP IV (PAKET 14-004)

LOKASI

TANJUNG ENIM (SUMATERA SELATAN) INDONESIA

NOMOR KONTRAK

047/PJJ/P69700,P69701/EKS-0100/HK.03/2014

05/10/2015

14

Approval

TFK

GTT

EYN

28/09/2015

14

Approval

TFK

GTT

EYN

19/09/2015

14

Approval

TFK

GTT

EYN

07/09/2015

14

Approval

TFK
Prepared
By :

GTT
Checked
By :

EYN
Approved
By :

Rev.

Tanggal

Date

Page

Description

PT. WIJAYA KARYA (PERSERO) Tbk.

Checked
By :

05/10/2015
1

dari

14

Approved
By :

PT BUKIT ASAM (PERSERO) Tbk.

EPC FASILITAS PENANGANAN


BATUBARA, TANJUNG ENIM - TAHAP IV
(PAKET 14-004)
Rev.D

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

BA4-BB-CS-C-TLS4-002

Tanggal

Halaman

05/10/2015
2 dari

14

LEMBAR REVISI
No.

Rev.

KOMENTAR KLIEN

PENJELASAN KONTRAKTOR

1.

Cek SAP Pelat

Sudah Di cek

2.

KS Spring

Sudah Di cek

PAGE

EPC FASILITAS PENANGANAN


BATUBARA, TANJUNG ENIM - TAHAP IV
(PAKET 14-004)
Rev.D
BA4-BB-CS-C-TLS4-002

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

Tanggal

Halaman

05/10/2015
3 dari

14

DAFTAR ISI

1.

GENERAL
1.1. Pendahuluan
1.2. Lingkup Pekerjaan
1.3. Satuan Unit Perhitungan
1.4. Peraturan dan Standar
1.5. Referensi

Hal.
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4

2.

STRUCTURES DESIGN
2.1. Kondisi Geologis
2.2. Desain Struktur dan Analisa Model

.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4

3.

MATERIAL SPECIFICATION
3.1. Beton
3.2. Baja Tulangan
3.3. Letak Train Loading Station

..................................................................................................................................................
..................................................................................................................................................
..................................................................................................................................................
..................................................................................................................................................

4.
5.

Desain Pelat Lantai tanpa dilewati rel


Desain Pelat Lantai dilewati rel

Attachment
Attachment
Attachment
Attachment
Attachment

Concrete Sleeper Detail


Cross Section STA. 1+350
Spesifikasi Rel
Spesifikasi Kereta Api
Konsep Slab

4
4
4
5

..................................................................................................................................................
6
..................................................................................................................................................
10

EPC FASILITAS PENANGANAN


BATUBARA, TANJUNG ENIM - TAHAP IV
(PAKET 14-004)
Rev.D
BA4-BB-CS-C-TLS4-002

1.

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

Tanggal

Halaman

PENDAHULUAN
1.1. Umum
PT Bukit Asam (Persero) Tbk. yang selanjutnya disebut PTBA adalah Perusahaan Terbuka yang bergerak dibidang
Batubara yang berkedudukan di Tanjung Enim - Sumatera Selatan. Sesuai dengan rencana peningkatan produksi
di tambang batubara di Tanjung Enim, PTBA berencana meningkatkan kapasitas fasilitas penanganan
batubara (Coal Handling Facility) di Muara Tiga Besar dan Banko Barat.

1.2. Lingkup
Lingkup laporan kalkulasi ini mencakup :
- Desain Pelat Lantai Train Loading Station 4
1.3. Satuan Unit
Satuan yang digunakan dalam perhitungan desain adalah Metric System Units.
1.4. Referensi
- SNI 03 - 2847 - 2002 : Tata Cara Perencanaan Struktur Beton Untuk Bangunan Gedung
- SNI 03 - 1726 - 2012 - Tata Cara Perencanaan Ketahanan Gempa Untuk Bangunan Gedung
- Foundation Analysis And Design Engineering - Bowles

2.

DESAIN STRUKTUR
2.1. Kondisi Geografis
Kondisi geografis dan karakteristik tanah berdasarkan laporan hasil investigasi tanah (soil investigation report).
2.2. Desain Struktural dan Analisa Model
Analisa model struktur menggunakan bantuan program software Structure Analysis Program (SAP 2000 v.14)

3.

SPESIFIKASI MATERIAL
Spesifikasi material utama pada desain pelat lantai Train Loading Station ini meliputi:
3.1. Beton
3
- Berat jenis beton, c : 2400 kg/m
- Material strength beton, K-300 (fc = 25 MPa)
- Modulus elastisitas beton, Ec = 4700fc' = 23500 Mpa
- Poisson ratio beton, c = 0.2

3.2. Baja Tulangan


- Berat jenis baja, s : 7850 kg/m3
- Tulangan longitudinal, BJTD 40 (ulir), fy = 400 Mpa
- Tulangan transversal/sengkang, BJTP 24 (polos), fys = 240 Mpa (trestle), Fys = 400 Mpa (GF)
- Poisson ratio baja, c = 0.3

05/10/2015
4 dari

14

EPC FASILITAS PENANGANAN


BATUBARA, TANJUNG ENIM - TAHAP IV
(PAKET 14-004)
Rev.D
BA4-BB-CS-C-TLS4-002

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

Tanggal

Halaman

3.3. Letak Train Loading Station 4

TLS 4

05/10/2015
5 dari

14

600 x600 x

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)

Rev.D

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

BA4-BB-CS-C-TLS4-002

Tanggal

Halaman

4. Desain Pelat Lantai tebal 150 mm ( tanpa dilewati Rel)


4.1

Pelat Lantai
A. SLAB DATA
f c' =

25

MPa

fy =

240

MPa

Slab lenght X dir

Lx =

Slab lenght Y dir


Slab thickness

Ly =

slab moment coefficient


Rebar diameter

11,00

10,00 m
h = 150 mm
Ly / Lx = 0,91 Slab moment coefficient
= 10 mm
ts = 60 mm

concrete cover
B. SLAB LOADING
1. DEAD LOAD
Dead Load for Slab
No
1

Load
3
selfweight slab (kN/m )

Berat satuan

thickness (m)

Q (kN/m2)

24,0

0,15

3,600

2. LIVE LOAD
Live load (People) =
QL =

500
5,0

kg/m2
kN/m2

05/10/2015
6

Dari

14

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.D

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

BA4-BB-CS-C-TLS4-002

C.

Tanggal

Halaman

05/10/2015

Menentukan konstanta spring


Karena pelat langsung terkena tanah, maka permodelan dilakukan dengan permodelah spring. Dalam permodelan spring dibutuhkan
suatu konstanta spring. Untuk menentukan konstanta spring digunakan buku J. Hemsley, 2000 "Design Applications of
Raft Foundations pada halaman 16 tabel 1.2.

Gambar 4.1 Harga koefisien spring


*
Karena pelat lantai terletak di atas lapisan top soil atau tanah humus, maka digunakan ks sebesar :
Ks

MN/m3

5000

kN/m3

D. Permodelan pelat di program bantu SAP 2000:

11 M
10 M

Gambar 4.2 Permodelan Plat

Dari

14

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.D

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

BA4-BB-CS-C-TLS4-002

Tanggal

Halaman

05/10/2015
8

Dari

Pada pelat lantai ukuran 11 x 10 m didiskritisasi tiap 500 mm x 500 mm . Tumpuan struktur pelat lantai berupa spring dengan nilai konstanta spring yaitu 5000 kN/m3.
Besar konstanta spring tiap join berbeda-beda sesuai dengan luasan pelat yang ditumpu:

Ks joint tengah
Ks joint tepi
Ks joint ujung

note

E.

=
=
=

5000
5000
5000

kN/m3
kN/m3
kN/m3

x
x
x

0,5
0,5
0,5

m
m
m

x
x
x

0,5
0,5
0,5

m
m
m

x
x

0,5
0,25

=
=
=

nilai Ks joint tersebut akan dimasukkan ke dalam program bantu SAP dalam Assign joint spring sesuai dengan besarnya Ks
masing-masing pada translation 3.

Hasil Analisa Struktur Pelat Lantai Dengan Program Bantu SAP 2000

Gambar 4.3 Momen Pelat

1250
625
312,5

kN/m
kN/m
kN/m

14

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.D

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

BA4-BB-CS-C-TLS4-002

Tanggal

Halaman

05/10/2015
9

Dari

Gambar 4.4 Lendutan Maksimum Pelat Lantai

F. MOMEN PLAT AKIBAT BEBAN TERFAKTOR 1,2D + 1,6L


Mu =

Ultimate moment,

0,650

kNm/m (maxsimum antara momen asli atau akibat mobilisasi m12)

G. SLAB REINFORCEMENT
1 = 0,85

For : fc' 30 MPa,

1 = 0.85 - 0.05 * ( fc' - 30) / 7 =

For : fc' > 30 MPa,

1 = 0,85

distribution factor
ratio in balance condition

b = 1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) = 0,0538


max moment resistance
Rmax = 0.75 * b * fy * [ 1 * 0.75 * b * fy / ( 0.85 * fc') ] = 7,4732
= 0,80
reduction factor for flexible rebar
d

ds = h/ 2 =

75,0

mm

d efective
reviewed from 1m slab

ds = h/ 2 =

75,0
1000

mm
mm

0,813

kNm

b=
Mn = Mu / =

nominal moment

Rn = Mn * 10-6 / ( b * d2 ) = 0,14444

moment resistance factor


Rn

<

Rmax (OK)

required rebar ratio


= 0.85 * fc' / fy * [ 1 - [ 1 2 * Rn / ( 0.85 * fc' ) ] =

0,0006

min =
=

0,0018
0,0018

minimum rebar ratio

As = b * d =

As required
required spacing
max spacing
s
s use
Use

582

mm

300

mm

smax =

200
200
200
200

10 As = / 4 * 2 * b / s =

393

H. SLAB DEFLECTION CONTROL


deflection ()
Requirement:

mm2

smax = 2 * h =
s=
s=

As

135

s = / 4 * * b / As =
2

3,3
mm (Output SAP 2000, Gambar 4.4)
tot Lx / 240
3,30
<
45,8 SAVE (OK)

mm
mm
mm
mm
mm2

14

600 x600 x

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)

Rev.D
BA4-BB-CS-C-TLS4-002

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

Tanggal

Halaman

5. Desain Pelat Lantai tebal 300 mm ( dilewati Rel)


5.1

Pelat Lantai
A. SLAB DATA
f c' =

25

MPa

fy =

400

MPa

Slab lenght X dir

Lx =

Slab lenght Y dir


Slab thickness

Ly =

slab moment coefficient


Rebar diameter
concrete cover

10,00

4,00 m
h = 300 mm
Ly / Lx = 0,40 Slab moment coefficient
D= 13 mm
ts = 60 mm

B. SLAB LOADING

Gambar 5.1 Konsep Desain Slab

Note

Untuk dinding slab akan disamakan penulangan serta tebalnya dengan perhitungan Bottom slab (Perhitungan paling kritis).

Gambar 5.2 Penampang Rel (BA4-BB-DWG-C-CSR-037)


1. DEAD LOAD
Dead Load for Slab
No
1
2
3

Load
selfweight slab
Berat Batu Pecah
Berat Slepeer

Berat satuan (kN/m3)


24,0
14,5
24,0

thickness (m)
0,3
0,51
0,21

Q (kN/m2)

7,200
7,395
5,040

05/10/2015
10

Dari

14

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.D

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

BA4-BB-CS-C-TLS4-002

Tanggal

Halaman

05/10/2015
11

Dari

14

2. LIVE LOAD
Live load (People) =
QL =

500
5,0

kg/m
2
kN/m

3. Beban Kereta Api


Beban kereta api = 50000 kg
QL = 500,0 kN

( Brosur Lampiran)

Beban kereta api 50000 (plus muatan batu bara) kg didistribusikan ke masing-masih rel kereta menjadi 25000 kg. Beban kereta tersebut selanjutnya dijadikan
beban area, dengan area beban tersebut adalah lebar penampang rel kereta 14 cm (spesifikasi rel R54) dan panjang rel di pelat lantai adalah 10 m
Beban kereta api =
0,14
=

C.

25000
m x

17857,14 kg/m

10

kg
m

Menentukan konstanta spring


Karena pelat langsung terkena tanah, maka permodelan dilakukan dengan permodelah spring. Dalam permodelan spring dibutuhkan
suatu konstanta spring. Untuk menentukan konstanta spring digunakan buku J. Hemsley, 2000 "Design Applications of
Raft Foundations pada halaman 16 tabel 1.2.

Gambar 5.3 Harga koefisien spring


*
Karena pelat lantai terletak di atas lapisan top soil atau tanah humus, maka digunakan ks sebesar :
Ks

MN/m3

5000

kN/m3

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.D

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

BA4-BB-CS-C-TLS4-002

Tanggal

Halaman

05/10/2015
12

Dari

D. Permodelan pelat di program bantu SAP 2000:

Gambar 5.4 Permodelan Plat

2
Pada pelat lantai ukuran 4 x 10 m didiskritisasi . Tumpuan struktur pelat lantai berupa spring dengan nilai konstanta spring yaitu 5000 kN/m3.

Besar konstanta spring tiap join dengan luasan pelat yang ditumpu (Diambil diskritisasi kritis 500 mm x 500 mm):

Ks joint tengah
Ks joint tepi
Ks joint ujung

note

=
=
=

5000
5000
5000

kN/m3
kN/m3
kN/m3

x
x
x

0,5
0,5
0,5

m
m
m

x
x
x

0,5
0,5
0,5

m
m
m

x
x

0,5
0,25

=
=
=

nilai Ks joint tersebut akan dimasukkan ke dalam program bantu SAP dalam Assign joint spring sesuai dengan besarnya Ks
masing-masing pada translation 3.

1250
625
312,5

kN/m
kN/m
kN/m

14

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.D
BA4-BB-CS-C-TLS4-002
E.

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

Hasil Analisa Struktur Pelat Lantai Dengan Program Bantu SAP 2000

Gambar 5.5 Momen Pelat

Gambar 5.6 Lendutan Maksimum Pelat Lantai

Tanggal

Halaman

05/10/2015
13

Dari

14

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.D

Concrete Slab Train Loading Station 4


Foundation LOAD OUT BB

BA4-BB-CS-C-TLS4-002

Tanggal

Halaman

05/10/2015
14

Dari

F. MOMEN PLAT AKIBAT BEBAN TERFAKTOR 1,2D + 1,6L


Mu =

Ultimate moment,

11,114

kNm/m (maxsimum antara momen asli atau akibat mobilisasi m12)

G. SLAB REINFORCEMENT
1 = 0,85

For : fc' 30 MPa,

1 = 0.85 - 0.05 * ( fc' - 30) / 7 =

For : fc' > 30 MPa,

1 = 0,85

distribution factor
ratio in balance condition

b = 1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) = 0,0271


max moment resistance
Rmax = 0.75 * b * fy * [ 1 * 0.75 * b * fy / ( 0.85 * fc') ] = 6,5736
= 0,80
reduction factor for flexible rebar
d
d efective
reviewed from 1m slab

ds = ts + / 2 =

66,5

mm

d = h - ds =

233,5
1000

mm
mm

13,892

kNm

b=
Mn = Mu / =

nominal moment

Rn = Mn * 10-6 / ( b * d2 ) = 0,25479

moment resistance factor


Rn

<

Rmax (OK)

required rebar ratio


= 0.85 * fc' / fy * [ 1 - [ 1 2 * Rn / ( 0.85 * fc' ) ] =

0,0006

min =
=

0,0018
0,0018

minimum rebar ratio


As required

420

s = / 4 * D * b / As =

316

mm

smax = 2 * h =

600

mm

smax =

200
200
200
200

required spacing
max spacing
s
s use
Use

s=
s=
D 13 As = / 4 * D 2 * b / s =

As

664

H. SLAB DEFLECTION CONTROL


deflection ()
Requirement:

mm2

As = b * d =

6,84 mm (Output SAP 2000, Gambar 5.6)


tot Lx / 240
6,840
<
41,7 SAVE (OK)

mm
mm
mm
mm
mm2

14

TAMPAK ATAS
B

POT. A-A

POT. B-B

BANTALAN BETON

POT. C-C

TIPE
PENAMBAT

PANDROL

DECLIP

TIPE
REL

R.54

R.54

LEBAR
SEPUR
( mm )

NOM

1067
1072
1077
1082
1087
1067
1072
1077
1082
1087

158
158
158
158
158
158
158
158
158
158

POSISI BAHU ( mm )
A
B
TOLERANSI
TOLERANSI
NOM
+
+
1,5
0,5
1303,5
1,5
0,5
1,5
0,5
1308,5
1,5
0,5
1,5
0,5
1313,5
1,5
0,5
1,5
0,5
1318,5
1,5
0,5
1,5
0,5
1323,5
1,5
0,5
1,0
1,0
1303,0
2,0
2,0
1,0
1,0
1308,0
2,0
2,0
1,0
1,0
1313,0
2,0
2,0
1,0
1,0
1318,0
2,0
2,0
1,0
1,0
1323,0
2,0
2,0

UKURAN
LUAS PENAMPANG :
PENAMPANG A = 430 cm 2
PENAMPANG B = 420 cm 2
PENAMPANG C = 357 cm 2
LUAS PERMUKAAN :
BAWAH
= 4846 cm 2
SAMPING = 3986 cm 2
BERAT BANTALAN :
BERAT
= 190 Kg

MOMEN LENTUR IJIN


DUDUKAN REL ( positif )
DUDUKAN REL ( negatif )
DITENGAH BANTALAN ( positif )
DITENGAH BANTALAN ( negatif )

= 1500 Kg.m
= 750 Kg.m
= 660 Kg.m
= 930 Kg.m

PARAMETER DISAIN :
- BEBAN GANDAR
- KECEPATAN KERETA

= 18 ton
= 120 Km/hour

2013, No. 380

1.5

Kelas Jalan Rel


a. Lebar Jalan Rel 1067 mm

Kelas
Jalan

Daya Angkut
Lintas
(ton/tahun)

V
maks
(km/jam)

P
maks
gandar
(ton)

Tipe Rel

> 20.106

120

18

R.60/R.54

Jenis Bantalan
Jarak antar sumbu
bantalan (cm)
Beton
60

10.106
20.106

II

110

18

R.54/R.50

60

III

IV

Beton/Kayu

5.10
10.106

100

2,5.106
5.106

90

< 2.5.106

80

18

R.54/R.50/R.42

Beton/Kayu/Baja
60
Beton/Kayu/Baja

18

R.54/R.50/R.42
60

18

R.42

Kayu/Baja
60

Tebal Lebar
Balas Bahu
Jenis
Penambat Atas Balas
(cm)
(cm)
Elastis
Ganda

30

60

Elastis
Ganda

30

50

Elastis
Ganda

30

40

Elastis
Ganda/
Tunggal

25

40

Elastis
Tunggal

25

35

b. Lebar Jalan Rel 1435 mm

Kelas
Jalan

Daya Angkut
Lintas
(ton/tahun)

> 20.106

P
V
maks
maks
gandar
(km/jam)
(ton)
160

22,5

Jenis Bantalan
Tipe Rel
Jarak antar sumbu
bantalan (cm)
R.60

Beton
60

II

III

IV

10.106
6
20.10

140

5.106
6
10.10

120

< 5.106

100

22,5

R.60

Beton
60

22,5

R.60/R.54

Beton
60

22,5

R.60/R.54

Beton
60

Tebal Lebar
Balas Bahu
Jenis
Penambat Atas Balas
(cm) (cm)
Elastis
Ganda

30

60

Elastis
Ganda

30

50

Elastis
Ganda

30

40

Elastis
Ganda

30

40

2.

PERSYARATAN TATA LETAK, TATA RUANG DAN LINGKUNGAN


UMUM
Persyaratan tata letak, tata ruang dan lingkungan meliputi persyaratan
peruntukan lokasi, pengalokasian ruang, dan pengendalian dampak lingkungan.
2.2
Peruntukan Lokasi
Pembangunan jalur kereta api harus sesuai dengan rencana trase jalur kereta api
yang sudah ditetapkan.
2.3
Pengalokasian Ruang
Pengalokasian ruang jalur kereta api diperlukan untuk kepentingan perencanaan
dan pengoperasian.
2.3.1 Pengalokasian Ruang untuk Perencanaan
a. Untuk kepentingan perencanaan, suatu jalur kereta api harus memiliki
pengaturan ruang yang terdiri dari :
1. ruang manfaat jalur kereta api;
2. ruang milik jalur kereta api; dan
3. ruang pengawasan jalur kereta api.
2.1

www.djpp.kemenkumham.go.id

2013, No. 380

41

Y
65

14.1

70
30.6
19

49

R-30

R13

30.6
1:

2.75

153

25.4

31.5

R-22

X
15

38.2

79.4

R 500

1:

1:

2.75

69.9

R20

76

6
-1
R

2.75

40
11

R - 50
70

18

30

1 : 10

70

127

Gambar 4-2 Ukuran Penampang Rel R.50


Y
72 .2
70

49.4

.3

R.

30.6

1:2
.7 5

36.3

1 : 20

1 : 20

R300

R8
0

R300

0
R8

14.18

49 .8
19

2 .7 5
1:

159

25.4

31.5

R -2 2

79.4

16

38.2

R 508

R-

1:2
.7 5

.7 5
1 :2

11

40

R - 54

18

1 : 18

1 : 18

13.6

R2

2
R-

3
R

30.2

16

74.97

16

76.2

R-

46.3
70

70

14 0

Gambar 4-3 Ukuran Penampang Rel R.54

www.djpp.kemenkumham.go.id

Anda mungkin juga menyukai