Anda di halaman 1dari 67

CALCULATION

Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Halaman

KLIEN

PT BUKIT ASAM (PERSERO) Tbk.

KONTRAKTOR

PT. WIJAYA KARYA (PERSERO) Tbk.

NAMA PEKERJAAN

EPC FASILITAS PENANGANAN BATUBARA, TANJUNG ENIM


TAHAP IV (PAKET 14-004)

LOKASI

TANJUNG ENIM (SUMATERA SELATAN) INDONESIA

NOMOR KONTRAK

047/PJJ/P69700,P69701/EKS-0100/HK.03/2014

11/07/2015

62

Approval

TFK

GTT

08/07/2015

62

Approval

TFK

GTT

EYN

10/07/2015

32

Approval

TFK
Prepared
By :

GTT
Checked
By :

EYN
Approved
By :

Rev.

Tanggal

Date

Page

Description

11/07/2015
1

dari

62

EYN

PT. WIJAYA KARYA (PERSERO) Tbk.

Checked
By :

Approved
By :

PT BUKIT ASAM (PERSERO) Tbk.

EPC FASILITAS PENANGANAN


BATUBARA, TANJUNG ENIM - TAHAP IV
(PAKET 14-004)
Rev.C
BA4-BB-CS-C-TT2-001

Calculation Transfer Station TT-2


Foundation Load In BB

Tanggal

Halaman

11/07/2015
2 dari

62

LEMBAR REVISI
No.

Rev.

KOMENTAR KLIEN

PENJELASAN KONTRAKTOR

PAGE

EPC FASILITAS PENANGANAN


BATUBARA, TANJUNG ENIM - TAHAP IV
(PAKET 14-004)
Rev.C
BA4-BB-CS-C-TT2-001

Calculation Transfer Station TT-2


Foundation Load In BB

Tanggal

Halaman

11/07/2015
3 dari

62

DAFTAR ISI

1.

GENERAL
1.1. Pendahuluan
1.2. Lingkup Pekerjaan
1.3. Satuan Unit Perhitungan
1.4. Peraturan dan Standar
1.5. Referensi

Hal.
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4

2.

STRUCTURES DESIGN
2.1. Kondisi Geologis
2.2. Desain Struktur dan Analisa Model

.................................................................................................................................................. 4
.................................................................................................................................................. 4
.................................................................................................................................................. 4

3.

MATERIAL SPECIFICATION
3.1. Struktur Baja
3.2. Beton
3.3. Spesifikasi Bored Pile
3.4. Letak Transfer Station 2

..................................................................................................................................................
..................................................................................................................................................
..................................................................................................................................................
..................................................................................................................................................
..................................................................................................................................................

4.
5.
5.

DESAIN PONDASI TT-2 JOINT 1


.................................................................................................................................................. 6
DESAIN PONDASI TT-2 JOINT 2,3 DAN 4 .................................................................................................................................................. 29
DESAIN PELAT LANTAI DAN SLOOF
.................................................................................................................................................. 53

Attachment
Attachment
Attachment

Data Sondir S-10


Lab Soil Investigation BH-08
Data Sondir S-09

4
4
4
4
5

EPC FASILITAS PENANGANAN


BATUBARA, TANJUNG ENIM - TAHAP IV
(PAKET 14-004)
Rev.C
BA4-BB-CS-C-TT2-001

1.

Calculation Transfer Station TT-2 Foundation


Load In BB

Tanggal

Halaman

PENDAHULUAN
1.1. Umum
PT Bukit Asam (Persero) Tbk. yang selanjutnya disebut PTBA adalah Perusahaan Terbuka yang bergerak dibidang
Batubara yang berkedudukan di Tanjung Enim - Sumatera Selatan. Sesuai dengan rencana peningkatan produksi
di tambang batubara di Tanjung Enim, PTBA berencana meningkatkan kapasitas fasilitas penanganan
batubara (Coal Handling Facility) di Muara Tiga Besar dan Banko Barat.

1.2. Lingkup
Lingkup laporan kalkulasi ini mencakup :
- Desain pondasi
1.3. Satuan Unit
Satuan yang digunakan dalam perhitungan desain adalah Metric System Units.
1.4. Referensi
- SNI 03 - 2847 - 2002 : Tata Cara Perencanaan Struktur Beton Untuk Bangunan Gedung
- SNI 03 - 1726 - 2012 - Tata Cara Perencanaan Ketahanan Gempa Untuk Bangunan Gedung
- Foundation Analysis And Design Engineering - Bowles

2.

DESAIN STRUKTUR
2.1. Kondisi Geografis
Kondisi geografis dan karakteristik tanah berdasarkan laporan hasil investigasi tanah (soil investigation report).
2.2. Desain Struktural dan Analisa Model
Analisa model struktur menggunakan bantuan program software Structure Analysis Program (SAP 2000 v.14)

3.

SPESIFIKASI MATERIAL
Spesifikasi material utama pada desain struktur dan pondasi Transfer Station 2 :
3.1. Beton
3
- Berat jenis beton, c : 2400 kg/m
- Material strength beton, K-300 (fc = 25 MPa)
- Modulus elastisitas beton, Ec = 4700fc' = 23500 Mpa
- Poisson ratio beton, c = 0.2

3.2. Baja Tulangan


- Berat jenis baja, s : 7850 kg/m3
- Tulangan longitudinal, BJTD 40 (ulir), fy = 400 Mpa
- Tulangan transversal/sengkang, BJTP 24 (polos), fys = 240 Mpa, Fys = 400 Mpa
- Poisson ratio baja, c = 0.3
3.3. Spesifikasi Bored Pile
- Bored Pile
Concrete Compressive Strength Fc' (K - 300 kg/cm2)

11/07/2015
4 dari

62

EPC FASILITAS PENANGANAN


BATUBARA, TANJUNG ENIM - TAHAP IV
(PAKET 14-004)
Rev.C
BA4-BB-CS-C-TT2-001
3.4. Letak Transfer Station 2

Calculation Transfer Station TT-2 Foundation


Load In BB

Tanggal

Halaman

11/07/2015
5 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
6

dari

62

4. Desain Pondasi Transfer Station 2 Joint 1

Dikarenakan Tanah keras dikedalaman 1 meter pada data tanah S-10 dengan nilai konus > 193,389 kg/cm2, maka pondasi tiang pancang tidak dapat digunakan.
Sehingga digunakan pondasi tiang bor sebagai pondasi transfer station 2. Untuk perhitungan daya dukung tanah menggunakan data tanah sondir S-9,
dikarenakan data tanah sondir S-10 hanya sampai kedalaman 1 meter (data tanah terlampir)
4.1 Permodelan SAP Transfer Station 2

Gambar 4.1 Permodelan SAP Transfer Station 2


4.1.1 Daya Dukung ijin pondasi bored pile
Daya dukung tanah berdasarkan S-9 yang dikorelasi ke N-SPT berdasarkan rumus robertson dalam buku "Pondasi dalam" karya herman wahyudi.
N = qc / (1 s/d 4)

(digunakan dalam perumusan adalah N = qc/3)

; qc dalam bar ( 1 kg/cm2 = 1/ 1,0193 bar)

4.1.1.1 Daya Dukung Bored Pile Berdasarkan NSPT

Berdasarkan perhitungan daya dukung tanah diatas menggunakan data Sondir S-9 didapat :
Kedalaman (L)
P ijin Compression
Pull Capacity

=
=
=

9000
72,12
34,20

mm
ton
ton

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

4.1.1.2 Daya Dukung Pondasi Bored Pile Diameter 60 cm Berdasarkan Mutu Bahan

Untuk mendapatkan kekuatan bahan bored pile, menggunakan program Pcacol seperti di bawah ini:
Data :
* Panjang Bored Pile
* Dimensi Bored

:
Pile
Pile

* d'

* d

* Selimut Beton

* fy Tulangan Lentur

* fy Tulangan Geser

* f'c

D Tul. Lentur rencana

* Tul Geser rencana

* Dimensi bored Pile

9000
600
600
94,5
505,5
75
400
240
25
19
10
600

mm

9 m

mm
mm

mm
mm
mm

Mpa
Mpa
Mpa
mm
mm
mm

4.1.1.2.1 Mencari Mijin Bored Pie


Mcr

fr

( Nawy 1990)

Ig
Yt

dimana;
fr
Ig

= 7,5 x (fc' ^ 0,5)


= 1 X (D^4)

; (Fc dalam PSI)

64
Yt

= 0,5 x D

Fr

=
=

452
3,111

Ig

= 0,00636
= 6,4E+09

Yt

Mcr

300

Psi
Mpa

m4
mm4
mm

= 6,6E+07 N.mm
= 65,9763 kNm

Pcr

Pn

Mn

Mcr

Gambar 4.2 Pcacol Bored Pile

Tanggal

Halaman

11/07/2015
7

dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Pn

4338 kN

433,8

Ton

Pijin Bahan

Pn

SF

SF

=
Mcrack

Ton

144,6

65,98 kNm

6,5976 Ton

5.1.1.2.2 Kontrol Pijin bahan terhada Pijin Tanah :


P ijin Bahan
145
145

>

P ijin Tanah

Ton >
Ton >

P ijin

72,12

Ton

72,12

Ton

OK!!!

72,12

ton

(Menentukan)

4.1.3 Desain Penulangan Bored Pile


4.1.3.1 Penulangan Longitudinal
D Tul. Lentur rencana
n Tulangan Lentur

=
=

19
12 D19

mm
( PCACOL)

4.1.3.2 Tulangan Gesr Bored Pile


Tabel 4.1 Combo Berfaktor Joint 1
Reaksi Yang Terjadi
Kondisi
F1 max
F2 max
F3 max

F1 (kN)

F2 (kN)

96,446
69,565
96,446

6,477
31,843
6,477

F3 (kN)
486,3956
416,1496
486,3956

* Momen Nominal (PCACOL) :


Mcrack1
Mcrack2

=
=

66
66

kNm
kNm

* gaya lintang akibat termobilisasinya kuat lentur nominal komponen struktur (SNI 03-2847-2002 Pasal 23.10) :
=
=

9
15

m
kN

Vu

96,446

kN

Vu Pakai

96

kN

hn
Vu = (Mcr1 + Mcr2) / hn
* Gaya lintang (Software SAP) :

* Gaya Lintang pakai, Vu max :

Tanggal

Halaman

11/07/2015
8

dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

* Kekuatan geser yang disumbangkan beton (Vc) (SNI 03-2847-2002 Pasal 13.3.2):
Vc = (1 + Nu / (14 Ag )) x (f`c ) / 6 x D x d
Vc = (1 + Nu / (14 Ag )) x (f`c ) / 6 x D x d

=
=

97570 kg
975,7 kN

* Gaya Lintang pakai, Vu max :


96,446

Vu

kN

0.5 x Vc

365,88615 kN

Vc

731,77231 kN

* Gaya Lintang tereduksi, Vu max:

* Vc beton tereduksi :

* Kontrol Tulangan Geser :


Kontrol Tulangan Geser
Kontrol Tulangan Geser (KONDISI 2)

=
=

kondisi 1 = 0.5 x Vc
kondisi 2 = 0.5 x Vc

LIHAT KONDISI 2
TULANGAN GESER MINIMUM

Kontrol jarak sengkang rencana (SNI 03-2847-2002 Pasal 23.10):


SYARAT,

Pakai Tulangan Geser 10 - 150

Syarat 1 (8 x Diameter longitudional)


Syarat 2 ( 24 x Diameter Sengkang )
Syarat 3 (Setengah Dimensi Bored Pile)
Syarat 4

=
=
=
=

152
240
300
300

mm
mm
mm
mm

< Vu <
< Vu

Vc

11/07/2015
9

dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
10 dari

Properti Pondasi

MY

Gambar 4.3 Section Pondasi

h1 =

0,500

h3 =

0,300

h2 =

0,200

h4 =

0,500

h =

1,000

Pile =

0,600

=
=

1,800

Dpy =

0,700

a =

1,450

3,600

Dpx =

0,700

b =

0,550

bwy
bwx

nx
nz
n

=
=
=

buah (jumlah tiang dalam arah x)

buah (jumlah tiang dalam arah z)

buah (jumlah tiang total)

Tabel 4.3 Koordinat Bored Pile

No.

Density Of Soil (BH-08) =

diameter Bored Pile

Pile No.
1

dy

0,000

0,000

dx
2
dy

-0,900

0,900

0,000

0,000

dx2

0,810

0,810

g =

2010

Kg/m3

1,800

a1 =

0,90

b1 =

0,90

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

4.1.4 Data Pembebanan


Gaya reaksi perletakan (support Reaction) dari struktur atas diambil nilai absolut untuk FX, FY, MX DAN MY. Sedangkan nilai FZ diambil tanpa diabsolutkan
untuk cek kemungkinan gaya pull out pada tiang pancang.

Tabel 4.4 gaya reaksi perletakan untuk Kombinasi Pembebanan tak berfaktor (cek stabilitas)
Support Reaction
No.

Kondisi Pembebanan

Joint

FX

FY

FZ

ton

ton

ton

MX

MY

ton.m ton.m

0,51

0,26

6,49

0,00

0,00

D+L

6,04

0,47

25,09

0,00

0,00

D+R

0,53

0,26

7,03

0,00

0,00

D + 0,75R + 0,75L

4,39

0,42

20,85

0,00

0,00

0,6D + Wx

1,58

0,12

1,63

0,00

0,00

0,6D + Wy

0,13

1,51

-0,392

0,00

0,00

1,062D + 0,7Qx Max

1,22

1,07

11,00

0,00

0,00

1,062D + 0,7Qx Min

2,30

0,53

2,79

0,00

0,00

1,062D - 0,7Qy Max

1,22

1,07

11,00

0,00

0,00

10

1,062D - 0,7Qy Min

2,30

0,53

2,79

0,00

0,00

11

1,062D - 0,7Qx Max

0,32

2,16

9,46

0,00

0,00

12

1,062D - 0,7Qx Min

1,40

1,61

4,34

0,00

0,00

13

1,062D + 0,7Qy Max

0,32

2,16

9,46

0,00

0,00

14

1,062D + 0,7Qy Min

1,40

1,61

4,34

0,00

0,00

15

0,538D + 0,7Qx Max

1,49

0,94

7,60

0,00

0,00

16

0,538D + 0,7Qx Min

2,03

0,66

-0,61

0,00

0,00

17

0,538D - 0,7Qy Max

0,59

2,02

6,05

0,00

0,00

18

0,538D - 0,7Qy Min

1,13

1,75

0,93

0,00

0,00

19

0,538D + 0,7Qy Max

1,49

0,94

7,60

0,00

0,00

20

0,538D + 0,7Qy Min

2,03

0,66

-0,61

0,00

0,00

21

0,538D - 0,7Qx Max

0,59

2,02

6,05

0,00

0,00

22

0,538D - 0,7Qx Min

1,13

1,75

0,93

0,00

0,00

23

1,046D + 0,525Qx + 0,75L + 0,75R Max

5,69

1,03

24,22

0,00

0,00

24

1,046D + 0,525Qx + 0,75L + 0,75R Min

3,04

0,17

18,07

0,00

0,00

25

1,046D - 0,525Qy + 0,75L + 0,75R Max

5,69

1,03

24,22

0,00

0,00

26

1,046D - 0,525Qy + 0,75L + 0,75R Min

3,04

0,17

18,07

0,00

0,00

27

1,046D - 0,525Qx + 0,75L + 0,75R Max

5,01

1,85

23,07

0,00

0,00

28

1,046D - 0,525Qx + 0,75L + 0,75R Min

3,72

0,98

19,23

0,00

0,00

29

1,046D + 0,525Qy + 0,75L + 0,75R Max

5,01

1,85

23,07

0,00

0,00

30

1,046D + 0,525Qy + 0,75L + 0,75R Min

3,72

0,98

19,23

0,00

0,00

11/07/2015
11 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tabel 4.5 gaya reaksi perletakan untuk Kombinasi Pembebanan berfaktor (penulangan pondasi)
Support Reaction
No.

Kondisi Pembebanan

COMB1

COMB2

COMB3

COMB4

COMB5

COMB6

COMB7

COMB8

COMB9

10

COMB10

11

COMB11 Max

12

COMB11 Min

13

COMB12 Max

14

COMB12 Min

15

COMB13 Max

16

COMB13 Min

17

COMB14 Max

18

COMB14 Min

19

COMB15 Max

20

COMB15 Min

21

COMB16 Max

22

COMB16 Min

23

COMB17 Max

24

COMB17 Min

25

COMB18 Max

26

COMB18 Min

27

COMB19 Max

28

COMB19 Min

29

COMB20 Max

30

COMB20 Min

31

COMB21 Max

32

COMB21 Min

33

COMB22 Max

34

COMB22 Min

Joint

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

FX

FY

FZ

ton

ton

ton

MX

MY

0,71

0,36

9,09

0,00

0,00

9,83

0,66

38,41

0,00

0,00

1,67

0,91

14,81

0,00

0,00

4,99

1,01

20,69

0,00

0,00

2,76

3,13

23,33

0,00

0,00

3,90

1,21

12,18

0,00

0,00

0,79

1,39

0,66

0,00

0,00

0,35

2,94

11,81

0,00

0,00

1,88

0,82

9,18

0,00

0,00

1,44

0,72

3,30

0,00

0,00

5,17

1,56

23,22

0,00

0,00

0,14

0,72

11,50

0,00

0,00

5,17

1,56

23,22

0,00

0,00

0,14

0,72

11,50

0,00

0,00

3,88

3,11

21,02

0,00

0,00

1,43

2,28

13,70

0,00

0,00

3,88

3,11

21,02

0,00

0,00

1,43

2,28

13,70

0,00

0,00

2,06

1,37

11,71

0,00

0,00

2,97

0,91

-0,02

0,00

0,00

2,06

1,37

11,71

0,00

0,00

2,97

0,91

-0,02

0,00

0,00

0,77

2,92

9,50

0,00

0,00

1,68

2,46

2,19

0,00

0,00

0,77

2,92

9,50

0,00

0,00

1,68

2,46

2,19

0,00

0,00

8,38

1,70

33,46

0,00

0,00

3,35

0,59

21,73

0,00

0,00

7,09

3,25

31,25

0,00

0,00

4,64

2,14

23,94

0,00

0,00

2,11

1,35

11,04

0,00

0,00

2,92

0,94

-0,68

0,00

0,00

0,82

2,90

8,84

0,00

0,00

1,63

2,49

1,52

0,00

0,00

ton.m ton.m

Tanggal

Halaman

11/07/2015
12 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
4.1.5 Perhitungan Lateral Maksimum (Metode Broms)
Mu (Mcrack Ijjn) = 6,60
ton
Diameter (D) = 60
cm
fc' = 250
kg/cm2
0.5
E = 4700 (fc')
= 74313,52501

I=
=

1
X (D^4)
64
636172,5124

kg/cm2

cm4

0,006361725

m4

4.1.5.1 Penentuan tiang panjang atau pendek


T = Faktor Kekakuan
dimana T dihitung dengan :
T=

EI

, Pile Design and construction Practice (fourth edition) karya M.J. Tomlinson halaman 224.

nh

nh untuk tanah soft normally-consolidated clay antara 166 - 3518 kN/m3


nh pakai = 2000 kN/m3
=
kg/cm3
0,2
T = 188,24 cm
4T = 7,53 m

=
<

1,88
9

m
m

,Reese dan Matlock (1956)

Termasuk tiang panjang, L > 4T

Tanggal

Halaman

11/07/2015
13 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
14 dari

62

Perhitungan Lateral Maksimum


Mu =
65,9763273 kNm
Fix head pile
ketika pile head diasumsikan jepit, maka pile head harus masuk paling sedikit 300 mm ke dalam pile cap.
Buku karya Bowles "Foundation Analysis And Design Fifth Edition" Sub. Bab 18-6. Pile head yang masuk ke pile cap > 300 mm (lihat perhitungan Pile head treatment).
4.1.5.2 Analisa tiang panjang
=

Mu
Cu x

3,2050993

D3

Dari grafik diperoleh :

Cu

Hu
=
2
x D

3,8

Hu

3,8
x
130,3704

Hu pakai =
Hu Ijin
=
=

=
=

130,3704 kN
Hu pakai :
43,4568 kN

Cu
kN

D2

;
=

4,35

SF
ton

SF

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
15 dari

4.1.6 Perhitungan Gaya yang terjadi pada bawah telapak pondasi (bottom of footing)
FX = FX
FY = FY
FZ = FZ (joint reaction) + (2400 kg/m3 * L Pile Cap * Panjang Pile Cap* t Pile Cap ) + (L Pile Cap * Panjang pile cap* h2 * Density Of Soil) + ( dpy * dpx * (h2+h3)* 2400 kg/m3)
MUY = MY + FX*h
MUX = MX + FY*h
MUX*** =((MUX) + FY*Zf)/ n
Zf = 1,8 * T - (h2+h1)

,Pile Design and construction Practice (fourth edition) karya M.J. Tomlinson halaman 226.

Gambar 4.4 Konfigurasi Gaya Yang Terjadi

4.1.6.1 Perhitungan Kapasitas Bored Pile Arah Y

Tabel 4.6 Cek Stabilitas Arah Y


*Support Reaction pada bawah pondasi
No.

Kondisi Pembebanan

Joint

FX

FY

FZ

ton

ton

ton

MX

MY

ton.m ton.m

Zf

MUX

MUX***

Mcr

ton.m

buah

ton.m

ton.m

Cek

0,51

0,26

17,46

0,00

0,00 2,688403

0,2563

2 0,47267 6,59763

OK

D+L

6,04

0,47

36,06

0,00

0,00 2,688403

0,4727

2 0,87175 6,59763

OK

D+R

0,53

0,26

18,00

0,00

0,00 2,688403

0,2604

2 0,48023 6,59763

OK

D + 0,75R + 0,75L

4,39

0,42

31,82

0,00

0,00 2,688403

0,4217

2 0,7777

6,59763

OK

0,6D + Wx

1,58

0,12

12,60

0,00

0,00 2,688403

0,1165

2 0,21485 6,59763

OK

0,6D + Wy

0,13

1,51

10,58

0,00

0,00 2,688403

1,5128

2 2,78991 6,59763

OK

1,062D + 0,7Qx Max

1,22

1,07

21,97

0,00

0,00 2,688403

1,0717

2 1,97643 6,59763

OK

1,062D + 0,7Qx Min

2,30

0,53

13,76

0,00

0,00 2,688403

0,5274

2 0,97263 6,59763

OK

1,062D - 0,7Qy Max

1,22

1,07

21,97

0,00

0,00 2,688403

1,0717

2 1,97643 6,59763

OK

10

1,062D - 0,7Qy Min

2,30

0,53

13,76

0,00

0,00 2,688403

0,5274

2 0,97263 6,59763

OK

11

1,062D - 0,7Qx Max

0,32

2,16

20,42

0,00

0,00 2,688403

2,1572

2 3,97831 6,59763

OK

12

1,062D - 0,7Qx Min

1,40

1,61

15,30

0,00

0,00 2,688403

1,6128

2 2,97433 6,59763

OK

13

1,062D + 0,7Qy Max

0,32

2,16

20,42

0,00

0,00 2,688403

2,1572

2 3,97831 6,59763

OK

14

1,062D + 0,7Qy Min

1,40

1,61

15,30

0,00

0,00 2,688403

1,6128

2 2,97433 6,59763

OK

15

0,538D + 0,7Qx Max

1,49

0,94

18,57

0,00

0,00 2,688403

0,9374

2 1,72875 6,59763

OK

16

0,538D + 0,7Qx Min

2,03

0,66

10,36

0,00

0,00 2,688403

0,6617

2 1,22031 6,59763

OK

17

0,538D - 0,7Qy Max

0,59

2,02

17,02

0,00

0,00 2,688403

2,0229

2 3,73064 6,59763

OK

18

0,538D - 0,7Qy Min

1,13

1,75

11,90

0,00

0,00 2,688403

1,7471

6,59763

OK

19

0,538D + 0,7Qy Max

1,49

0,94

18,57

0,00

0,00 2,688403

0,9374

2 1,72875 6,59763

OK

20

0,538D + 0,7Qy Min

2,03

0,66

10,36

0,00

0,00 2,688403

0,6617

2 1,22031 6,59763

OK

21

0,538D - 0,7Qx Max

0,59

2,02

17,02

0,00

0,00 2,688403

2,0229

2 3,73064 6,59763

OK

22

0,538D - 0,7Qx Min

1,13

1,75

11,90

0,00

0,00 2,688403

1,7471

6,59763

OK

23

1,046D + 0,525Qx + 0,75L + 0,75R Max

5,69

1,03

35,19

0,00

0,00 2,688403

1,0331

2 1,90524 6,59763

OK

24

1,046D + 0,525Qx + 0,75L + 0,75R Min

3,04

0,17

29,04

0,00

0,00 2,688403

0,1662

2 0,30651 6,59763

OK

25

1,046D - 0,525Qy + 0,75L + 0,75R Max

5,69

1,03

35,19

0,00

0,00 2,688403

1,0331

2 1,90524 6,59763

OK

26

1,046D - 0,525Qy + 0,75L + 0,75R Min

3,04

0,17

29,04

0,00

0,00 2,688403

0,1662

2 0,30651 6,59763

OK

27

1,046D - 0,525Qx + 0,75L + 0,75R Max

5,01

1,85

34,03

0,00

0,00 2,688403

1,8472

2 3,40661 6,59763

OK

28

1,046D - 0,525Qx + 0,75L + 0,75R Min

3,72

0,98

30,19

0,00

0,00 2,688403

0,9803

2 1,80787 6,59763

OK

29

1,046D + 0,525Qy + 0,75L + 0,75R Max

5,01

1,85

34,03

0,00

0,00 2,688403

1,8472

2 3,40661 6,59763

OK

30

1,046D + 0,525Qy + 0,75L + 0,75R Min

3,72

0,98

30,19

0,00

0,00 2,688403

0,9803

2 1,80787 6,59763

OK

3,222

3,222

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
16 dari

4.1.6.2 Perhitungan Kapasitas Bored Pile Arah X

Untuk daya dukung pondasi kelompok harus dikoreksi terlebih dahulu dengan apa yang disebut koefisien efisiensi (Ce). Koefisien efisensi menurut Converse Labarre adalah :

dimana :
D
n
m
s

=
=
=
=

Diameter tiang pancang


jumlah tiang pancang arah x
jumlah tiang pancang arah y
jarak antar tiang
=

0,893896826

Tabel kapasitas ijin tiang pancang (Setelah diefisiensi)


Kapasitas ijin = x P ijin(ton)

Variabel
P ijin Tekan

72,12

0,89389683

Pijin Tarik

34,20

0,89389683

=
=

64,47
30,57

Jika nilai Rpi negatif maka akan dibandngkan dengan P ijin tarik. Sedangkan, jika nilai Rpi positif maka akan dibandingkan dengan p ijin tekan

Rpi =

hi

n =

Fz
MUY .dx
+
2
n
dx i

Fx
n

buah (jumlah tiang total)

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
17 dari

62

Tabel 4.7 Cek Stabilitas Arah X

No.

Support Reaction pondasi

Kondisi Pembebanan
Joint

MUY

FX

FY

FZ

MX

MY

ton

ton

ton

Rpi

hi

Cek Kapasitas Ijin

Cek Kapasitas
Ijin

ton.m

ton.m

ton.m

ton

ton

Rpi < P ijin

hi < Hu

0,506 0,256 17

0,506

9,01

0,253

Ok, < P ijin Tekan

Ok

D+L

6,043 0,473 36

6,043

21,4 3,0215 Ok, < P ijin Tekan

Ok

D+R

0,529

18

0,5287

9,3

0,2644 Ok, < P ijin Tekan

Ok

D + 0,75R + 0,75L

4,389 0,422 32

4,3887

18,3 2,1944 Ok, < P ijin Tekan

Ok

0,6D + Wx

1,578 0,117 13

1,5776

7,18 0,7888 Ok, < P ijin Tekan

Ok

0,6D + Wy

0,134 1,513 11

0,134

5,36

Ok, < P ijin Tekan

Ok

1,062D + 0,7Qx Max

1,225 1,072 22

1,2246

11,7 0,6123 Ok, < P ijin Tekan

Ok

1,062D + 0,7Qx Min

2,299 0,527 14

2,2993

8,16 1,1497 Ok, < P ijin Tekan

Ok

1,062D - 0,7Qy Max

1,225 1,072 22

1,2246

11,7 0,6123 Ok, < P ijin Tekan

Ok

10

1,062D - 0,7Qy Min

2,299 0,527 14

2,2993

8,16 1,1497 Ok, < P ijin Tekan

Ok

11

1,062D - 0,7Qx Max

0,321 2,157 20

0,321

10,4 0,1605 Ok, < P ijin Tekan

Ok

12

1,062D - 0,7Qx Min

1,396 1,613 15

1,3958

8,43 0,6979 Ok, < P ijin Tekan

Ok

13

1,062D + 0,7Qy Max

0,321 2,157 20

0,321

10,4 0,1605 Ok, < P ijin Tekan

Ok

14

1,062D + 0,7Qy Min

1,396 1,613 15

1,3958

8,43 0,6979 Ok, < P ijin Tekan

Ok

15

0,538D + 0,7Qx Max

1,490 0,937 19

1,4897

10,1 0,7449 Ok, < P ijin Tekan

Ok

16

0,538D + 0,7Qx Min

2,034 0,662 10

2,0342

6,31 1,0171 Ok, < P ijin Tekan

Ok

17

0,538D - 0,7Qy Max

0,586 2,023 17

0,5862

8,84 0,2931 Ok, < P ijin Tekan

Ok

18

0,538D - 0,7Qy Min

1,131 1,747 12

1,1306

6,58 0,5653 Ok, < P ijin Tekan

Ok

19

0,538D + 0,7Qy Max

1,490 0,937 19

1,4897

10,1 0,7449 Ok, < P ijin Tekan

Ok

20

0,538D + 0,7Qy Min

2,034 0,662 10

2,0342

6,31 1,0171 Ok, < P ijin Tekan

Ok

21

0,538D - 0,7Qx Max

0,586 2,023 17

0,5862

8,84 0,2931 Ok, < P ijin Tekan

Ok

22

0,538D - 0,7Qx Min

1,131 1,747 12

1,1306

6,58 0,5653 Ok, < P ijin Tekan

Ok

23

1,046D + 0,525Qx + 0,75L + 0,75R Max

5,687 1,033 35

5,6869

20,8 2,8435 Ok, < P ijin Tekan

Ok

24

1,046D + 0,525Qx + 0,75L + 0,75R Min

3,044 0,166 29

3,0439

16,2

Ok, < P ijin Tekan

Ok

25

1,046D - 0,525Qy + 0,75L + 0,75R Max

5,687 1,033 35

5,6869

20,8 2,8435 Ok, < P ijin Tekan

Ok

26

1,046D - 0,525Qy + 0,75L + 0,75R Min

3,044 0,166 29

3,0439

16,2

Ok, < P ijin Tekan

Ok

27

1,046D - 0,525Qx + 0,75L + 0,75R Max

5,009 1,847 34

5,0092

19,8 2,5046 Ok, < P ijin Tekan

Ok

28

1,046D - 0,525Qx + 0,75L + 0,75R Min

3,722

30

3,7216

17,2 1,8608 Ok, < P ijin Tekan

Ok

29

1,046D + 0,525Qy + 0,75L + 0,75R Max

5,009 1,847 34

5,0092

19,8 2,5046 Ok, < P ijin Tekan

Ok

30

1,046D + 0,525Qy + 0,75L + 0,75R Min

3,722

3,7216

17,2 1,8608 Ok, < P ijin Tekan

Ok

0,26

0,98
0,98

30

0,067

1,522
1,522

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
4.1.6.3 Kontrol Defleksi

Menurut cara Brooms, defleksi yang terjadi dapat dicari dengan rumus :

Zf =

No.

1,8 * T - (h2+h1)

,Pile Design and construction Practice (fourth edition) karya M.J. Tomlinson halaman 226.

Kondisi Pembebanan

Joint

Hi

Zf

Y0

Yijin

Ton

Inch

Inch

Kontrol

0,253

2,68840301

0,0346

OK

D+L

3,022

2,68840301

0,4132

OK

D+R

0,264

2,68840301

0,0361

OK

D + 0,75R + 0,75L

2,194

2,68840301

0,3001

OK

0,6D + Wx

0,789

2,68840301

0,1079

OK

0,6D + Wy

0,067

2,68840301

0,0092

OK

1,062D + 0,7Qx Max

0,612

2,68840301

0,0837

OK

1,062D + 0,7Qx Min

1,150

2,68840301

0,1572

OK

1,062D - 0,7Qy Max

0,612

2,68840301

0,0837

OK

10

1,062D - 0,7Qy Min

1,150

2,68840301

0,1572

OK

11

1,062D - 0,7Qx Max

0,161

2,68840301

0,0219

OK

12

1,062D - 0,7Qx Min

0,698

2,68840301

0,0954

OK

13

1,062D + 0,7Qy Max

0,161

2,68840301

0,0219

OK

14

1,062D + 0,7Qy Min

0,698

2,68840301

0,0954

OK

15

0,538D + 0,7Qx Max

0,745

2,68840301

0,1019

OK

16

0,538D + 0,7Qx Min

1,017

2,68840301

0,1391

OK

17

0,538D - 0,7Qy Max

0,293

2,68840301

0,0401

OK

18

0,538D - 0,7Qy Min

0,565

2,68840301

0,0773

OK

19

0,538D + 0,7Qy Max

0,745

2,68840301

0,1019

OK

20

0,538D + 0,7Qy Min

1,017

2,68840301

0,1391

OK

21

0,538D - 0,7Qx Max

0,293

2,68840301

0,0401

OK

22

0,538D - 0,7Qx Min

0,565

2,68840301

0,0773

OK

23

1,046D + 0,525Qx + 0,75L + 0,75R Max

2,843

2,68840301

0,3888

OK

24

1,046D + 0,525Qx + 0,75L + 0,75R Min

1,522

2,68840301

0,2081

OK

25

1,046D - 0,525Qy + 0,75L + 0,75R Max

2,843

2,68840301

0,3888

OK

26

1,046D - 0,525Qy + 0,75L + 0,75R Min

1,522

2,68840301

0,2081

OK

27

1,046D - 0,525Qx + 0,75L + 0,75R Max

2,505

2,68840301

0,3425

OK

28

1,046D - 0,525Qx + 0,75L + 0,75R Min

1,861

2,68840301

0,2544

OK

29

1,046D + 0,525Qy + 0,75L + 0,75R Max

2,505

2,68840301

0,3425

OK

30

1,046D + 0,525Qy + 0,75L + 0,75R Min

1,861

2,68840301

0,2544

OK

Tanggal

Halaman

11/07/2015
18 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

4.1.7 Penulangan Pile Cap


Dimensi Pile Cap
Tebal Pile Cap
Diameter Tulangan
Tebal Selimut
d
Fc
Fy
Density Of Soil (BH-08)

=
=
=
=
=
=
=
=

1800,0
500
16
60
432
25
400
2010

x
mm
mm
mm
mm
Mpa
Mpa
Kg/m3

3600,0 mm

5.1.7.1 Penulangan Pile Cap Arah X

NOTE : Untuk perhitungan momen


, gaya horizontal tidak
berpengaruh terhadap
perhitungan momen ( Prinsip
Statistika Dasar). Gaya horizontal
tidak berpengaruh karena hanya
akan menimbulkan gaya normal
searah sumbu batang.

q
fy

Fz

fx

Rpi max

Rpi max

1,8 m

a1 = 0,9 m

0,9 m

x1 = 1,8 m

n = 2 buah (jumlah tiang total)


Rpi = Konsep perhitungan Rpi Combo factored sama dengan Rpi combo unfactored
Tabel 4.8 Nilai RPI Kombo Berfaktor

Support Reaction pondasi


No.

Kondisi Pembebanan Berfaktor

COMB1

COMB2

COMB3

COMB4

COMB5

COMB6

COMB7

COMB8

COMB9

10

COMB10

11

COMB11 Max

12

COMB11 Min

13

COMB12 Max

14

COMB12 Min

15

COMB13 Max

16

COMB13 Min

17

COMB14 Max

18

COMB14 Min

19

COMB15 Max

20

COMB15 Min

21

COMB16 Max

22

COMB16 Min

23

COMB17 Max

24

COMB17 Min

Joint

FX

FY

FZ

MX

MY

MUY

Rpi

ton

ton

ton

ton.m

ton.m

ton.m

ton

0,71
9,83
1,67
4,99
2,76
3,90
0,79
0,35
1,88
1,44
5,17
0,14
5,17
0,14
3,88
1,43
3,88
1,43
2,06
2,97
2,06
2,97
0,77
1,68

0,36
0,66
0,91
1,01
3,13
1,21
1,39
2,94
0,82
0,72
1,56
0,72
1,56
0,72
3,11
2,28
3,11
2,28
1,37
0,91
1,37
0,91
2,92
2,46

20,06
49,38
25,78
31,66
34,30
23,15
11,63
22,78
20,15
14,27
34,19
22,47
34,19
22,47
31,99
24,67
31,99
24,67
22,68
10,95
22,68
10,95
20,47
13,16

0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00

0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00

0,7084

10,4231

9,8348

30,155

1,6745

13,822

4,9869

18,6019

2,7618

18,6828

3,8996

13,7411

0,7883

6,25397

0,3495

11,584

1,8756

11,1148

1,4368

7,93135

5,173

19,9706

0,1389

11,3102

5,173

19,9706

0,1389

11,3102

3,8822

18,1503

1,4296

13,1306

3,8822

18,1503

1,4296

13,1306

2,0617

12,4835

2,9725

7,12587

2,0617

12,4835

2,9725

7,12587

0,7709

10,6632

1,6817

7,51201

11/07/2015
19 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

25

COMB18 Max

26

COMB18 Min

27

COMB19 Max

28

COMB19 Min

29

COMB20 Max

30

COMB20 Min

31

COMB21 Max

32

COMB21 Min

33

COMB22 Max

34

COMB22 Min

Beban Terbagi Rata (q)


Qu

=
=

5767,2
8074,08

Kg/m
Kg/m
Kgm

=
=

2,92
2,46
1,70
0,59
3,25
2,14
1,35
0,94
2,90
2,49

20,47
13,16
44,43
32,70
42,22
34,90
22,01
10,29
19,81
12,49

0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00

0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00

Halaman

0,7709

10,6632

1,6817

7,51201

8,3844

26,8708

3,3503

18,2105

7,0937

25,0505

4,6411

20,0309

2,1133

12,1807

2,9208

6,7657

0,8226

10,3604

1,63

7,15184

((2400 kg/m3 * (Bwx* (t Pile Cap )) + ((Bwx )* (h2 )* (Density Of Soil))


1,4 x Berat Pile Cap
( Rpi max * (x1-a1)) - (1/2 x Qu * x12)

Mu

14059,452

pb

0,0270938

b = 1* 0.85 * fc/ fy * 600 / ( 600 + fy )

pmax

0,0203203

max = 0.75 * b

pmin

Mn

=
=

0,0035
0,8

min = 1.4 / fy

=
=

17574,316
18,823529

=
=

Mn = Mu / =

m
Rn

0,5231647

Rn = Mn / ( b * d2 )

p
p pakai

=
=

0,0013244
0,0035

= 1 / m * [ 1 - * [1 2 * Rn * m / ( fy ) ]

As
As
Jumlah Tulangan Perlu
Jarak Tulangan
As Pasang
Tulangan Terpasang

=
=
=
=
=
=

2721,6
200,96
17
103,75
3416,32
D

As = * b * d

Kgm

0,77
1,68
8,38
3,35
7,09
4,64
2,11
2,92
0,82
1,63

Tanggal

m = fy / (0.85*fc')

Ok, As Pasang > As Perlu


16
100

11/07/2015
20 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
21 dari

62

4.1.7.2 Penulangan Pile Cap Arah Y

NOTE : Untuk perhitungan momen pada batang dengan


perletakan jepit, gaya vertikal dan gaya horizontal tidak
berpengaruh terhadap perhitungan momen ( Prinsip
Statistika Dasar). Gaya horizontal tidak berpengaruh karena
hanya akan menimbulkan gaya normal searah sumbu
batang, sedangkan gaya vertikal tidak berpengaruh karena
gaya vertikal terletak tepat pada tumpuan jepit . Dalam
prinsip statistika sederhana, momen maksimum tumpuan
jepit terletak pada tumpuan itu sendiri.

L
fx
fz

fy

Beban Terbagi Rata (q)


Qu

=
=

2883,6
8074,08

Kg/m
Kg/m

=
=

((2400 kg/m3 * (Bwy* (t Pile Cap )) + ((Bwy )* (h2 )* (Density Of Soil))


1,4 x Berat Pile Cap

Mu

817,5006

Kgm

1/2 x Qu x L2 ( L = 900 mm)]

pb

0,0270938

b = 1* 0.85 * fc/ fy * 600 / ( 600 + fy )

pmax

0,0203203

max = 0.75 * b

pmin

Mn

=
=

0,0035
0,8

min = 1.4 / fy

1021,8758
18,823529

=
=

m = fy / (0.85*fc')

Rn

0,0608398

Rn = Mn / ( b * d2 )

p
p pakai

=
=

0,0001523
0,0035

= 1 / m * [ 1 - * [1 2 * Rn * m / ( fy ) ]

As
As D16
Jumlah Tulangan Perlu
Jarak Tulangan
As Pasang

=
=
=
=
=

As = * b * d
5443,2
=
200,96
29
123,57143
5827,84 Ok, As Pasang > As Perlu

Tulangan Terpasang

16

Mn = Mu / =

100

Gambar 4.5 Sket Penulangan Pile Cap

4.1.8 Cek Geser 2 Arah Pada Pile Cap

Gambar 4.6 Geser 2 Arah Pada Bored Pile

900

mm

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Dimensi Pendestal
b0
as

=
=
=

700
4528
40

Vc1

=
Vc2

=
=

Halaman

11/07/2015
22 dari

'

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

9480960

'

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

1
3

3260160

Vc Pakai

3260160

Vc

2445120

Vc3

x
700
mm
mm
(Berdasarkan SNI - 2847 2002 Pasal 13.12.2.1)

4890240

Tanggal

'

244,512

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

ton

FZ = FZ (joint reaction) + (2400 kg/m3 * L Pile Cap * Panjang Pile Cap* t Pile Cap ) + (L Pile Cap * Panjang pile cap* h2 * Density Of Soil) + ( dpy * dpx * (h2+h3)* 2400 kg/m3)

Tabel 4.9 Cek Geser Pons Pada Pile Cap


Cek Geser Pons
No

Kondisi Pembebanan

joint

Fz (t)

Vc

Vc > Fz

(ton)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

COMB1
COMB2
COMB3
COMB4
COMB5
COMB6
COMB7
COMB8
COMB9
COMB10
COMB11 Max
COMB11 Min
COMB12 Max
COMB12 Min
COMB13 Max
COMB13 Min
COMB14 Max
COMB14 Min
COMB15 Max
COMB15 Min
COMB16 Max
COMB16 Min
COMB17 Max
COMB17 Min
COMB18 Max
COMB18 Min
COMB19 Max
COMB19 Min
COMB20 Max
COMB20 Min
COMB21 Max
COMB21 Min
COMB22 Max
COMB22 Min

20,06

244,512

Ok

49,38

244,512

Ok

25,78

244,512

Ok

31,66

244,512

Ok

34,30

244,512

Ok

23,15

244,512

Ok

11,63

244,512

Ok

22,78

244,512

Ok

20,15

244,512

Ok

14,27

244,512

Ok

34,19

244,512

Ok

22,47

244,512

Ok

34,19

244,512

Ok

22,47

244,512

Ok

31,99

244,512

Ok

24,67

244,512

Ok

31,99

244,512

Ok

24,67

244,512

Ok

22,68

244,512

Ok

10,95

244,512

Ok

22,68

244,512

Ok

10,95

244,512

Ok

20,47

244,512

Ok

13,16

244,512

Ok

20,47

244,512

Ok

13,16

244,512

Ok

44,43

244,512

Ok

32,70

244,512

Ok

42,22

244,512

Ok

34,90

244,512

Ok

22,01

244,512

Ok

10,29

244,512

Ok

19,81

244,512

Ok

12,49

244,512

Ok

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

4.1.9 Cek Geser Akibat Tiang Bor

Gambar 4.7 Geser Akibat Bored Pile

Dimensi Pendestal

=
=
=
=
=

1
700

as

40

Vc1

L1 = p + d =
L2 = a1 =
= 3,14*(Dp + d')

b0

Vc3

700

3240,5

mm

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2.1)


+

1
3

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

f 'c

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

'

2333145,6

2333145,6

Vc

1749859,2

Pu Maks
Kontrol

30,15

ton

Ok, Vc> Pu maks

Vc Pakai

'

3499718,4

= s d +

b o

=
8553945,6

mm

900

=
Vc2

1032

174,98592 ton

(Pu maks = (Rpi Factored))

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

11/07/2015
23 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
4.1.10 Pile Head Treatment
4.1.10.1 Panjang Penyaluran Tulangan (SNI 2847-2002, Pasal 14.3)
db rencana

19

mm

fc

25

Mpa

fy

400

Mpa

75

mm

t pile

Panjang Penyaluran berkait :

dh

100

ldh

380

'
c

mm

Bengkokan Panjang Penyaluran (lds)

12db

228

mm

230

mm

Panjang Penyaluran Lurus :

1,3

ld

=
=

1185,6

mm

1200

mm

Gambar 4.8 Pile Headtreatment Section

Tanggal

Halaman

11/07/2015
24 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
25 dari

4.1.11 Settlement Of Pile (Berdasarkan Fundamentals Of Geotechnical Engineering , Braja M. Das)

s1 =

s2 =

s1 +

s2

Qwp +

s3

Qws

AP

EP

(1-s)

Iwp

Qws x

(1-s)

Iws

pL

Es

qwp x
Es

s3 =

4.1.11.1 Settlement aktual yang terjadi


Rpi maks
Qws

=
=

21,3869522 Ton
34,20
Ton

( Rpi Maks Unfactored)

Qwp

=
Rpi maks - Qws
=
-12,81304778 Ton
Qwp < 0 sehingga pengaruh Qwp tidak diperhitungkan, hanya bekerja Qws
4.1.11.2 Nilai S3
Es =
s =
Qws =
p =
L =
Iws =
s3 =
=

ton/m2

15000
0,5
34,2
1,884
9

ton

m
2
3,35554417 ton/m
0,00020304 m
0,20304248 mm

Settlement Aktual

=
=

= Modulus Young Tanah ( Gambar 4.9)


= Poisson Ratio Gambar 4.9
= ( Load Carrier By Frictional)
= Perimeter Of Pil ( x D)

Gambar 4.9 Nilai Es dan s ( Bowles)

= 2 + (0,35 x (L/D) 0,5 )

s3
0,20304

mm

<

25

mm Ok, Aman !!!

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

4.1.12 Perencanaan Pedestal


Data :
* Tinggi Pedestal (h4)
* Dimensi kolom =

h
b

* d'
* d
* Selimut Beton
* fy Tulangan Lentur
* fy Tulangan Geser
* f'c
*

D Tul. Lentur rencana

* Tul Geser rencana


*

=
=
=
=
=
=
=
=
=

mm

500,000
700
700
78
622
60
400
240
25

Mpa
Mpa
Mpa

16

mm

=
=

10
0,8

mm

0,5

mm
mm

mm
mm
mm

mm

4.1.12.1 Besar Gaya Pedestal


*

Besar gaya Berfaktor yang diperoleh dari hasil perhitungan analisa struktur (Software SAP ) :

Tabel 4.10 Combo Berfaktor Joint 1

Kondisi
F1 max
F2 max
F3 max

F1 (kN)

F2 (kN)

96,446
69,565
96,446

6,477
31,843
6,477

Reaksi Yang Terjadi


F3 (kN)
Mx (kNm)
241,522
0
241,522
0
241,522
0

My (kNm)
0
0
0

Momen Total (kNm)


Mux = (F2* h4)+(Mx) Mux (F1*h4)+(My)
3,2385
48,223
15,9215
34,7825
3,2385
48,223

Gambar 4.10 Diagram PCACOL Pedestal

11/07/2015
26 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

=
1225000
=
1225
4.1.12.2 Penulangan Memanjang pedestal

N
kN

490000

Kebutuhan Tulangan (%) (PCACOL) :

mm

1,14%

As Perlu
As pakai
Tulangan Terpasang
Jumlah Tulangan

=
=
=
=

5586
5626,88
28 D 16
28

mm2
mm2

Beban Aksial Terfaktor (SNI 03-2847 Pasal 12.3.5) :


Pn max = 0,8 (0,85 f`c (Ag - Ast ) + fy Ast)
Pn max = 0,8 (0,85 f`c (Ag - Ast ) + fy Ast)

Halaman

Besar luas kolom :


A
Ag = b x h

SNI 03-2847-2002 Pasal 23.10.2 jika komponen struktur memenuhi gaya aksial tekan terfaktor :

Ag f`c / 10

Tanggal

=
=

30042894,7 N
30042,8947 kN

Kontrol beban aksial terfaktor :


Pn max > P

OK

4.1.12.3 Persyaratan Terhadap Geser

Gaya Lintang pakai, Vu :


Vu Pakai

96,446

kN

Kekuatan geser yang disumbangkan beton (Vc) (SNI 03-2847-2002 Pasal 13.3.2):
Vc = (1 + Nu / (14 Ag )) x (f`c ) / 6 x bw x d
Vc = (1 + Nu / (14 Ag )) x (f`c ) / 6 x bw x d

96,446

kN

Gaya Lintang tereduksi, Vu max:


0.5 x Vc

36283,333 kg
362,83333 kN

Vu max :
Vu

=
=

136,0625

Vc beton tereduksi :
Vc
=
272,125

kN

kN

Kontrol Tulangan Geser :


Kontrol Tulangan Geser (KONDISI 1)
Kontrol Tulangan Geser (KONDISI 2)

=
=

LIHAT KONDISI 2
TULANGAN GESER MINIMUM

kondisi 1 =
kondisi 2 =

0.5 x Vc < Vu >


0.5 x Vc > Vu

Vc

11/07/2015
27 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Pakai tulangan geser minimum

* Banyak Tulangan Desain


Rencana Tulangan Sengkang
Av
n
jarak antar sengkang rencana (s)

=
=

10 - 125
157

mm

buah

125

mm

Kontrol jarak sengkang rencana (SNI 03-2847-2002 Pasal 23.10):


SYARAT,

Syarat 1 (8 x Diameter longitudional kolom)


Syarat 2 ( 24 x Diameter Sengkang )
Syarat 3 (Setengah Dimensi Kolom)
Syarat 4

S pakai

125

<
<
<
<
<

128
240
350
300
125

mm
mm
mm
mm
mm

mm

4.11 Perencanaan Sloof Pondasi

Panjang Sloof
fc
fy
Tebal Selimut
Diameter Tulangan lentur
Diameter Tulangan geser
Dimensi sloof ( b x h)
d'

=
=
=
=
=
=
=

1,8
25
400
60
16
10
=

200
222

m
Mpa
Mpa
mm
mm
mm
mm
mm

300 mm
Gambar 4.11 Sket Penulangan Pedestal

4.11.1 Penulangan Lentur Sloof

Tanggal

Halaman

11/07/2015
28 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
29 dari

62

5. Desain Pondasi Transfer Station 2 Joint 2, joint 3 dan joint 4

Dikarenakan Tanah keras dikedalaman 1 meter pada data tanah S-10 dengan nilai konus > 193,389 kg/cm2, maka pondasi tiang pancang tidak dapat digunakan.
Sehingga digunakan pondasi tiang bor sebagai pondasi transfer station 2. Untuk perhitungan daya dukung tanah menggunakan data tanah sondir S-9,
dikarenakan data tanah sondir S-10 hanya sampai kedalaman 1 meter (data tanah terlampir)
5.1 Permodelan SAP TT-2

Gambar 5.1 Permodelan SAP TT2


5.1.1 Daya Dukung ijin pondasi bored pile
Daya dukung tanah berdasarkan S-9 yang dikorelasi ke N-SPT berdasarkan rumus robertson dalam buku "Pondasi dalam" karya herman wahyudi.
N = qc / (1 s/d 4)

(digunakan dalam perumusan adalah N = qc/3)

; qc dalam bar ( 1 kg/cm2 = 1/ 1,0193 bar)

5.1.1.1 Daya Dukung Bored Pile Berdasarkan NSPT

Berdasarkan perhitungan daya dukung tanah diatas menggunakan data Sondir S-9 didapat :
Kedalaman (L)
P ijin Compression
Pull Capacity

=
=
=

9000
72,12
34,20

mm
ton
ton

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

5.1.1.2 Daya Dukung Pondasi Bored Pile Diameter 60 cm Berdasarkan Mutu Bahan

Untuk mendapatkan kekuatan bahan bored pile, menggunakan program Pcacol seperti di bawah ini:
Data :
* Panjang Bored Pile
* Dimensi Bored

:
Pile
Pile

* d'

* d

* Selimut Beton

* fy Tulangan Lentur

* fy Tulangan Geser

* f'c

D Tul. Lentur rencana

* Tul Geser rencana

* Dimensi bored Pile

9000
600
600
94,5
505,5
75
400
240
25
19
10
600

mm

9 m

mm
mm

mm
mm
mm

Mpa
Mpa
Mpa
mm
mm
mm

5.1.1.2.1 Mencari Mcrak Bored Pie


Mcr

fr

( Nawy 1990)

Ig
Yt

dimana;
fr
Ig

= 7,5 x (fc' ^ 0,5)


= 1 X (D^4)

; (Fc dalam PSI)

64
Yt

= 0,5 x D

Fr

=
=

452
3,111

Ig

= 0,00636
= 6,4E+09

Yt

Mcr

300

Psi
Mpa

m4
mm4
mm

= 6,6E+07 N.mm
= 65,9763 kNm

Pcr

Pn

Mn

Mcr

Gambar 5.2 Pcacol Bored Pile

Tanggal

Halaman

11/07/2015
30 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Pcr

4338 kN

Pijin Bahan

Pcr

=
;

433,8
SF

Ton
=

6,5976327

Ton

Tanggal

Halaman

SF

Mcrack

144,6

65,98 kNm

5.1.1.2.2 Kontrol Pijin bahan terhada Pijin Tanah :


P ijin Bahan
145
145

>

P ijin Tanah

Ton >
Ton >

P ijin

72,12

Ton

72,12

Ton

OK!!!

72,12

ton

(Menentukan)

5.1.3 Desain Penulangan Bored Pile


5.1.3.1 Penulangan Longitudinal
D Tul. Lentur rencana
n Tulangan Lentur

=
=

19
12 D19

mm
( PCACOL)

5.1.3.2 Tulangan Gesr Bored Pile


Tabel 5.1 Combo Berfaktor Joint 2
Reaksi Yang Terjadi
Kondisi
F1 max
F2 max
F3 max

F1 (kN)

F2 (kN)

47,04
26,649
26,649

6,109
94,085
94,085

Tabel 5.2 Combo Berfaktor Joint 3


Reaksi Yang Terjadi
Kondisi
F1 max
F2 max
F3 max

F1 (kN)

F2 (kN)

135,146
135,146
135,146

94,744
94,744
94,744

Tabel 5.3 Combo Berfaktor Joint 4


Reaksi Yang Terjadi
Kondisi
F1 (kN)
F2 (kN)
F3 (kN)
F1 max
135,146
19,332
63,8199
F2 max
135,146
37,131
204,999
F3 max
135,146
7,441
60,1949

F3 (kN)
259,93192
445,80592
445,80592

F3 (kN)
909,44792
909,44792
909,44792

* Momen Nominal (PCACOL) :


Mcrack1
Mcrack2

=
=

66
66

kNm
kNm

* gaya lintang akibat termobilisasinya kuat lentur nominal komponen struktur (SNI 03-2847-2002 Pasal 23.10) :
hn
Vu = (Mcr1 + Mcr2) / hn

=
=

9
15

m
kN

Vu

135,146

kN

Vu Pakai

135

kN

* Gaya lintang (Software SAP) :

* Gaya Lintang pakai, Vu max :

11/07/2015
31 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

* Kekuatan geser yang disumbangkan beton (Vc) (SNI 03-2847-2002 Pasal 13.3.2):
Vc = (1 + Nu / (14 Ag )) x (f`c ) / 6 x D x d
Vc = (1 + Nu / (14 Ag )) x (f`c ) / 6 x D x d

=
=

182432 kg
1824,3 kN

* Gaya Lintang pakai, Vu max :


Vu

0.5 x Vc

684,11971 kN

Vc

1368,2394 kN

135,146

kN

* Gaya Lintang tereduksi, Vu max:

* Vc beton tereduksi :

* Kontrol Tulangan Geser :


Kontrol Tulangan Geser
Kontrol Tulangan Geser (KONDISI 2)

=
=

kondisi 1 = 0.5 x Vc
kondisi 2 = 0.5 x Vc

LIHAT KONDISI 2
TULANGAN GESER MINIMUM

Kontrol jarak sengkang rencana (SNI 03-2847-2002 Pasal 23.10):


SYARAT,

Pakai Tulangan Geser 10 - 150

Syarat 1 (8 x Diameter longitudional)


Syarat 2 ( 24 x Diameter Sengkang )
Syarat 3 (Setengah Dimensi Bored Pile)
Syarat 4

=
=
=
=

152
240
300
300

mm
mm
mm
mm

< Vu <
< Vu

Vc

11/07/2015
32 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
33 dari

Properti Pondasi

Gambar 5.3 Section Pondasi

h1 =

0,500

h3 =

0,300

h2 =

0,200

h4 =

0,500

Pile =

0,600

=
=

3,600

Dpy =

0,700

3,360

Dpx =

0,700

bwy
bwx

nx
nz
n

=
=
=

buah (jumlah tiang dalam arah x)

buah (jumlah tiang dalam arah z)

buah (jumlah tiang total)

Tabel 5.4 Koordinat Bored Pile

No.

Pile No.
1

dy

0,900

-0,900

0,000

dx
2
dy

-0,520

-0,520

1,039

0,810

0,810

0,000

dx2

0,270

0,270

1,080

1,000

Density Of Soil (BH-08) =

2010

Kg/m3

gx =

1,800

a1 =

0,90

gy =

1,800

b1 =

0,90

diameter Bored Pile

h =

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

5.1.4 Data Pembebanan


Gaya reaksi perletakan (support Reaction) dari struktur atas diambil nilai absolut untuk FX, FY, MX DAN MY. Sedangkan nilai FZ diambil tanpa diabsolutkan
untuk cek kemungkinan gaya pull out pada tiang pancang.

Tabel 5.5 gaya reaksi perletakan untuk Kombinasi Pembebanan tak berfaktor (cek stabilitas)
Support Reaction
No.

Kondisi Pembebanan

Joint

FX

FY

FZ

ton

ton

ton

MX

MY

ton.m ton.m

2,54

2,47

14,16

0,00

0,00

D+L

2,26

4,99

12,35

0,00

0,00

D+R

2,57

2,51

14,81

0,00

0,00

D + 0,75R + 0,75L

1,04

4,39

13,29

0,00

0,00

0,6D + Wx

2,80

1,50

10,76

0,00

0,00

0,6D + Wy

1,02

0,56

2,466

0,00

0,00

1,062D + 0,7Qx Max

0,94

3,75

19,66

0,00

0,00

1,062D + 0,7Qx Min

4,45

1,50

10,42

0,00

0,00

1,062D - 0,7Qy Max

0,94

3,75

19,66

0,00

0,00

10

1,062D - 0,7Qy Min

4,45

1,50

10,42

0,00

0,00

11

1,062D - 0,7Qx Max

1,82

5,30

20,52

0,00

0,00

12

1,062D - 0,7Qx Min

3,58

0,05

9,56

0,00

0,00

13

1,062D + 0,7Qy Max

1,82

5,30

20,52

0,00

0,00

14

1,062D + 0,7Qy Min

3,58

0,05

9,56

0,00

0,00

15

0,538D + 0,7Qx Max

0,39

2,45

12,24

0,00

0,00

16

0,538D + 0,7Qx Min

3,12

0,21

3,00

0,00

0,00

17

0,538D - 0,7Qy Max

0,49

4,01

13,10

0,00

0,00

18

0,538D - 0,7Qy Min

2,25

1,35

2,14

0,00

0,00

19

0,538D + 0,7Qy Max

0,39

2,45

12,24

0,00

0,00

20

0,538D + 0,7Qy Min

3,12

0,21

3,00

0,00

0,00

21

0,538D - 0,7Qx Max

0,49

4,01

13,10

0,00

0,00

22

0,538D - 0,7Qx Min

2,25

1,35

2,14

0,00

0,00

23

1,046D + 0,525Qx + 0,75L + 0,75R Max

2,24

5,34

17,40

0,00

0,00

24

1,046D + 0,525Qx + 0,75L + 0,75R Min

0,40

3,66

10,48

0,00

0,00

25

1,046D - 0,525Qy + 0,75L + 0,75R Max

2,24

5,34

17,40

0,00

0,00

26

1,046D - 0,525Qy + 0,75L + 0,75R Min

0,40

3,66

10,48

0,00

0,00

27

1,046D - 0,525Qx + 0,75L + 0,75R Max

1,58

6,51

18,05

0,00

0,00

28

1,046D - 0,525Qx + 0,75L + 0,75R Min

0,26

2,49

9,83

0,00

0,00

29

1,046D + 0,525Qy + 0,75L + 0,75R Max

1,58

6,51

18,05

0,00

0,00

30

1,046D + 0,525Qy + 0,75L + 0,75R Min

0,26

2,49

9,83

0,00

0,00

31

1,86

3,22

16,34

0,00

0,00

32

D+L

9,05

6,79

48,57

0,00

0,00

33

D+R

1,88

3,28

17,09

0,00

0,00

34

D + 0,75R + 0,75L

7,27

5,94

41,07

0,00

0,00

35

0,6D + Wx

0,07

1,92

7,75

0,00

0,00

36

0,6D + Wy

0,85

2,74

8,73

0,00

0,00

37

1,062D + 0,7Qx Max

3,12

3,07

20,68

0,00

0,00

38

1,062D + 0,7Qx Min

0,83

3,77

14,02

0,00

0,00

39

1,062D - 0,7Qy Max

3,12

3,07

20,68

0,00

0,00

40

1,062D - 0,7Qy Min

0,83

3,77

14,02

0,00

0,00

41

1,062D - 0,7Qx Max

2,45

2,59

19,56

0,00

0,00

42

1,062D - 0,7Qx Min

1,49

4,25

15,14

0,00

0,00

43

1,062D + 0,7Qy Max

2,45

2,59

19,56

0,00

0,00

44

1,062D + 0,7Qy Min

1,49

4,25

15,14

0,00

0,00

45

0,538D + 0,7Qx Max

2,15

1,38

12,12

0,00

0,00

46

0,538D + 0,7Qx Min

0,15

2,08

5,46

0,00

0,00

47

0,538D - 0,7Qy Max

1,48

0,90

11,00

0,00

0,00

48

0,538D - 0,7Qy Min

0,52

2,56

6,58

0,00

0,00

49

0,538D + 0,7Qy Max

2,15

1,38

12,12

0,00

0,00

50

0,538D + 0,7Qy Min

0,15

2,08

5,46

0,00

0,00

51

0,538D - 0,7Qx Max

1,48

0,90

11,00

0,00

0,00

52

0,538D - 0,7Qx Min

0,52

2,56

6,58

0,00

0,00

53

1,046D + 0,525Qx + 0,75L + 0,75R Max

8,22

5,82

44,32

0,00

0,00

54

1,046D + 0,525Qx + 0,75L + 0,75R Min

6,50

6,35

39,33

0,00

0,00

11/07/2015
34 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

55

1,046D - 0,525Qy + 0,75L + 0,75R Max

8,22

5,82

44,32

0,00

0,00

56

1,046D - 0,525Qy + 0,75L + 0,75R Min

6,50

6,35

39,33

0,00

0,00

57

1,046D - 0,525Qx + 0,75L + 0,75R Max

7,72

5,46

43,48

0,00

0,00

58

1,046D - 0,525Qx + 0,75L + 0,75R Min

7,00

6,71

40,17

0,00

0,00

59

1,046D + 0,525Qy + 0,75L + 0,75R Max

7,72

5,46

43,48

0,00

0,00

60

1,046D + 0,525Qy + 0,75L + 0,75R Min

7,00

6,71

40,17

0,00

0,00

61

0,53

5,46

3,29

0,00

0,00

62

D+L

9,78

6,71

-8,27

0,00

0,00

63

D+R

0,56

0,51

3,73

0,00

0,00

64

D + 0,75R + 0,75L

7,49

1,34

-5,05

0,00

0,00

65

0,6D + Wx

1,14

0,53

4,03

0,00

0,00

66

0,6D + Wy

0,19

1,15

3,29

0,00

0,00

67

1,062D + 0,7Qx Max

2,58

0,31

7,40

0,00

0,00

68

1,062D + 0,7Qx Min

1,44

0,91

-0,40

0,00

0,00

69

1,062D - 0,7Qy Max

2,58

1,21

7,40

0,00

0,00

70

1,062D - 0,7Qy Min

1,44

0,13

-0,40

0,00

0,00

71

1,062D - 0,7Qx Max

1,48

1,21

8,67

0,00

0,00

72

1,062D - 0,7Qx Min

0,34

0,13

-1,67

0,00

0,00

73

1,062D + 0,7Qy Max

1,48

2,13

8,67

0,00

0,00

74

1,062D + 0,7Qy Min

0,34

1,05

-1,67

0,00

0,00

75

0,538D + 0,7Qx Max

2,30

2,13

5,67

0,00

0,00

76

0,538D + 0,7Qx Min

1,72

1,05

-2,13

0,00

0,00

77

0,538D - 0,7Qy Max

1,20

0,94

6,94

0,00

0,00

78

0,538D - 0,7Qy Min

0,62

0,40

-3,40

0,00

0,00

79

0,538D + 0,7Qy Max

2,30

1,87

5,67

0,00

0,00

80

0,538D + 0,7Qy Min

1,72

1,32

-2,13

0,00

0,00

81

0,538D - 0,7Qx Max

1,20

0,94

6,94

0,00

0,00

82

0,538D - 0,7Qx Min

0,62

0,40

-3,40

0,00

0,00

83

1,046D + 0,525Qx + 0,75L + 0,75R Max

9,02

1,87

-1,97

0,00

0,00

84

1,046D + 0,525Qx + 0,75L + 0,75R Min

6,01

1,32

-7,83

0,00

0,00

85

1,046D - 0,525Qy + 0,75L + 0,75R Max

9,02

1,67

-1,97

0,00

0,00

86

1,046D - 0,525Qy + 0,75L + 0,75R Min

6,01

0,67

-7,83

0,00

0,00

87

1,046D - 0,525Qx + 0,75L + 0,75R Max

8,20

1,67

-1,02

0,00

0,00

88

1,046D - 0,525Qx + 0,75L + 0,75R Min

6,83

0,67

-8,78

0,00

0,00

89

1,046D + 0,525Qy + 0,75L + 0,75R Max

8,20

2,36

-1,02

0,00

0,00

90

1,046D + 0,525Qy + 0,75L + 0,75R Min

6,83

0,02

-8,78

0,00

0,00

Tanggal

Halaman

11/07/2015
35 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tabel 5.6 gaya reaksi perletakan untuk Kombinasi Pembebanan berfaktor (penulangan pondasi)
Support Reaction
No.

Kondisi Pembebanan

COMB1

COMB2

COMB3

COMB4

COMB5

COMB6

COMB7

COMB8

COMB9

10

COMB10

11

COMB11 Max

12

COMB11 Min

13

COMB12 Max

14

COMB12 Min

15

COMB13 Max

16

COMB13 Min

17

COMB14 Max

18

COMB14 Min

19

COMB15 Max

20

COMB15 Min

21

COMB16 Max

22

COMB16 Min

23

COMB17 Max

24

COMB17 Min

25

COMB18 Max

26

COMB18 Min

27

COMB19 Max

28

COMB19 Min

29

COMB20 Max

30

COMB20 Min

31

COMB21 Max

32

COMB21 Min

33

COMB22 Max

34

COMB22 Min

35

COMB1

36

COMB2

37

COMB3

38

COMB4

39

COMB5

40

COMB6

41

COMB7

42

COMB8

43

COMB9

44

COMB10

45

COMB11 Max

46

COMB11 Min

47

COMB12 Max

48

COMB12 Min

49

COMB13 Max

50

COMB13 Min

Joint

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

FX

FY

FZ

ton

ton

ton

3,55

3,46

19,83

0,00

0,00

4,58

7,05

15,13

0,00

0,00

2,78

4,30

18,97

0,00

0,00

0,53

4,26

13,09

0,00

0,00

1,78

6,93

23,87

0,00

0,00

0,46

1,63

8,19

0,00

0,00

2,08

0,39

4,53

0,00

0,00

3,40

4,91

20,21

0,00

0,00

1,09

2,24

9,43

0,00

0,00

4,40

2,29

15,31

0,00

0,00

1,85

5,84

23,01

0,00

0,00

3,17

2,64

9,81

0,00

0,00

1,85

5,84

23,01

0,00

0,00

3,17

2,64

9,81

0,00

0,00

0,59

8,07

24,24

0,00

0,00

1,92

0,42

8,59

0,00

0,00

0,59

8,07

24,24

0,00

0,00

1,92

0,42

8,59

0,00

0,00

0,23

3,83

19,34

0,00

0,00

4,80

0,62

6,15

0,00

0,00

0,23

3,83

19,34

0,00

0,00

4,80

0,62

6,15

0,00

0,00

1,03

6,05

20,57

0,00

0,00

3,54

1,60

4,92

0,00

0,00

1,03

6,05

20,57

0,00

0,00

3,54

1,60

4,92

0,00

0,00

3,97

7,37

23,87

0,00

0,00

1,05

4,17

10,68

0,00

0,00

2,72

9,59

25,10

0,00

0,00

0,21

1,95

9,45

0,00

0,00

0,49

3,57

17,90

0,00

0,00

4,54

0,37

4,70

0,00

0,00

0,77

5,79

19,12

0,00

0,00

3,28

1,85

3,47

0,00

0,00

2,60

4,51

22,87

0,00

0,00

13,78

9,66

72,38

0,00

0,00

5,00

6,02

32,99

0,00

0,00

7,71

6,05

38,33

0,00

0,00

6,70

4,98

37,05

0,00

0,00

6,01

7,09

34,27

0,00

0,00

1,85

4,31

12,87

0,00

0,00

2,53

2,21

15,66

0,00

0,00

3,55

3,27

16,93

0,00

0,00

0,83

3,24

11,60

0,00

0,00

7,48

5,17

40,85

0,00

0,00

4,20

6,18

31,34

0,00

0,00

7,48

5,17

40,85

0,00

0,00

4,20

6,18

31,34

0,00

0,00

6,53

4,49

39,25

0,00

0,00

5,15

6,86

32,94

0,00

0,00

MX

MY

ton.m ton.m

Tanggal

Halaman

11/07/2015
36 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

51

COMB14 Max

52

COMB14 Min

53

COMB15 Max

54

COMB15 Min

55

COMB16 Max

56

COMB16 Min

57

COMB17 Max

58

COMB17 Min

59

COMB18 Max

60

COMB18 Min

61

COMB19 Max

62

COMB19 Min

63

COMB20 Max

64

COMB20 Min

65

COMB21 Max

66

COMB21 Min

67

COMB22 Max

68

COMB22 Min

69

COMB1

70

COMB2

71

COMB3

72

COMB4

73

COMB5

74

COMB6

75

COMB7

76

COMB8

77

COMB9

78

COMB10

79

COMB11 Max

80

COMB11 Min

81

COMB12 Max

82

COMB12 Min

83

COMB13 Max

84

COMB13 Min

85

COMB14 Max

86

COMB14 Min

87

COMB15 Max

88

COMB15 Min

89

COMB16 Max

90

COMB16 Min

91

COMB17 Max

92

COMB17 Min

93

COMB18 Max

94

COMB18 Min

95

COMB19 Max

96

COMB19 Min

97

COMB20 Max

98

COMB20 Min

99

COMB21 Max

100

COMB21 Min

101

COMB22 Max

102

COMB22 Min

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4

6,53

4,49

39,25

0,00

0,00

5,15

6,86

32,94

0,00

0,00

3,31

2,40

19,46

0,00

0,00

0,03

3,40

9,95

0,00

0,00

3,31

2,40

19,46

0,00

0,00

0,03

3,40

9,95

0,00

0,00

2,36

1,71

17,86

0,00

0,00

0,98

4,08

11,55

0,00

0,00

2,36

1,71

17,86

0,00

0,00

0,98

4,08

11,55

0,00

0,00

11,28

7,31

59,01

0,00

0,00

8,00

8,32

49,50

0,00

0,00

10,33

6,63

57,41

0,00

0,00

8,95

9,00

51,10

0,00

0,00

3,12

2,07

17,79

0,00

0,00

0,16

3,07

8,28

0,00

0,00

2,17

1,39

16,19

0,00

0,00

0,79

3,75

9,88

0,00

0,00

0,75

0,71

4,61

0,00

0,00

15,48

1,97

-13,85

0,00

0,00

2,54

0,83

1,41

0,00

0,00

6,34

0,81

-3,92

0,00

0,00

5,10

2,40

-2,96

0,00

0,00

3,77

0,76

0,46

0,00

0,00

1,02

1,34

5,03

0,00

0,00

0,30

1,83

1,62

0,00

0,00

1,54

0,23

0,66

0,00

0,00

2,26

0,25

5,99

0,00

0,00

8,15

1,99

3,96

0,00

0,00

2,40

0,08

-7,18

0,00

0,00

8,15

1,99

3,96

0,00

0,00

2,40

0,08

-7,18

0,00

0,00

6,58

3,31

5,77

0,00

0,00

3,98

1,24

-8,99

0,00

0,00

6,58

3,31

5,77

0,00

0,00

3,98

1,24

-8,99

0,00

0,00

3,36

1,42

8,54

0,00

0,00

2,39

0,50

-2,61

0,00

0,00

3,36

1,42

8,54

0,00

0,00

2,39

0,50

-2,61

0,00

0,00

1,78

2,73

10,35

0,00

0,00

0,82

1,81

-4,42

0,00

0,00

1,78

2,73

10,35

0,00

0,00

0,82

1,81

-4,42

0,00

0,00

12,85

2,47

-1,26

0,00

0,00

7,10

0,56

-12,41

0,00

0,00

11,27

3,79

0,54

0,00

0,00

8,67

0,76

-14,22

0,00

0,00

3,30

1,36

8,20

0,00

0,00

2,45

0,55

-2,95

0,00

0,00

1,72

2,68

10,01

0,00

0,00

0,87

1,87

-4,75

0,00

0,00

Tanggal

Halaman

11/07/2015
37 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
5.1.5 Perhitungan Lateral Maksimum (Metode Broms)
Mu (Mcrack Ijjn) = 6,60
ton
Diameter (D) = 60
cm
fc' = 250
kg/cm2
0.5
E = 4700 (fc')
= 74313,52501

I=
=

1
X (D^4)
64
636172,5124

kg/cm2

cm4

0,006361725

m4

5.1.5.1 Penentuan tiang panjang atau pendek


T = Faktor Kekakuan
dimana T dihitung dengan :
T=

EI

, Pile Design and construction Practice (fourth edition) karya M.J. Tomlinson halaman 224.

nh
nh untuk tanah soft normally-consolidated clay antara 166 - 3518 kN/m3
nh pakai = 2000 kN/m3
=
kg/cm3
0,2
T = 188,24 cm
4T = 7,53 m

=
<

1,88
9

m
m

,Reese dan Matlock (1956)

Termasuk tiang panjang, L > 4T

Tanggal

Halaman

11/07/2015
38 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
39 dari

62

Perhitungan Lateral Maksimum


Mu =
65,9763273 kNm
Fix head pile
ketika pile head diasumsikan jepit, maka pile head harus masuk paling sedikit 300 mm ke dalam pile cap.
Buku karya Bowles "Foundation Analysis And Design Fifth Edition" Sub. Bab 18-6. Pile head yang masuk ke pile cap > 300 mm (lihat perhitungan Pile head treatment).
5.1.5.2 Analisa tiang panjang
=

Mu
Cu x

3,2050993

D3

Dari grafik diperoleh :

Cu

Hu
=
2
x D

3,8

Hu

3,8
x
130,3704

Hu pakai =
Hu Ijin
=
=

=
=

130,3704 kN
Hu pakai :
43,4568 kN

Cu
kN

4,35

D2

SF

SF
ton

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
40 dari

5.1.6 Perhitungan Gaya yang terjadi pada bawah telapak pondasi (bottom of footing)
FX = FX
FY = FY
FZ = FZ (joint reaction) + (2400 kg/m3 * L Pile Cap * Panjang Pile Cap* t Pile Cap ) + (L Pile Cap * Panjang pile cap* h2 * Density Of Soil) + ( dpy * dpx * (h2+h3)* 2400 kg/m3)
MUY = MY + FX*h
MUX = MX + FY*h

Gambar 5.4 Konfigurasi Gaya Yang Terjadi

5.1.6.1 Perhitungan Kapasitas Mcrack Bored Pile

5.1.6.1 Perhitungan Kapasitas Bored Pile

Untuk daya dukung pondasi kelompok harus dikoreksi terlebih dahulu dengan apa yang disebut koefisien efisiensi (Ce). Koefisien efisensi menurut Converse Labarre adalah :

dimana :
D
n
m
s

=
=
=
=

Diameter tiang pancang


jumlah tiang pancang arah x
jumlah tiang pancang arah y
jarak antar tiang
=

0,78779438

Tabel 5.7 kapasitas ijin tiang pancang (Setelah diefisiensi)


Kapasitas ijin = x P ijin(ton)

Variabel
P ijin Tekan

72,12

0,78779438

Pijin Tarik

34,20

0,78779438

=
=

56,82
26,94

Jika nilai Rpi negatif maka akan dibandngkan dengan P ijin tarik. Sedangkan, jika nilai Rpi positif maka akan dibandingkan dengan p ijin tekan

Rpi =

FZ MUX.dy MUY.dx
+
+
n
dyi2
dxi2

buah (jumlah tiang total)

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
41 dari

62

Tabel 5.8 Cek Stabilitas

Support Reaction pondasi

Rpi (Ton)

Cek P.ij
Cek Hu >
tarik >
Hi
Rpi-

Hi (Ton)

Cek P.ij tekan


> Rpi+

2,47 34,13 2,538700 2,47 11,93 9,19 13,0041

1,181137949

OK

OK

4,99 32,31 2,2613

4,99 12,82 7,27 12,2210

1,826306775

OK

OK

2,57180

2,51 34,78 2,5718

2,51 12,16 9,38 13,2427

1,197042476

OK

OK

1,03650

4,39 33,25 1,0365

4,39 13,19 8,32 11,7496

1,502464339

OK

OK

0,6D + Wx

2,79660

1,50 30,72 2,7966

1,50 10,18 8,51 12,0355

1,058015595

OK

OK

0,6D + Wy

1,01680

0,56 22,43 1,0168

0,56 7,461 6,84

8,1296

0,38645558

OK

OK

1,062D + 0,7Qx Max

0,93770

3,75 39,62 0,9377

3,75 14,99 10,8 13,8094

1,287387227

OK

OK

1,062D + 0,7Qx Min

4,45440

1,50 30,39 4,4544

1,50 9,535 7,86 12,9860

1,567141579

OK

OK

1,062D - 0,7Qy Max

0,93770

3,75 39,62 0,9377

3,75 14,99 10,8 13,8094

1,287387227

OK

OK

10

1,062D - 0,7Qy Min

4,45440

1,50 30,39 4,4544

1,50 9,535 7,86 12,9860

1,567141579

OK

OK

11

1,062D - 0,7Qx Max

1,81670

5,30 40,48 1,8167

5,30 15,86 9,97 14,6593

1,86785497

OK

OK

12

1,062D - 0,7Qx Min

3,57540

0,05 29,53 3,5754

0,05 8,724 8,67 12,1361

1,191918403

OK

OK

13

1,062D + 0,7Qy Max

1,81670

5,30 40,48 1,8167

5,30 15,86 9,97 14,6593

1,86785497

OK

OK

14

1,062D + 0,7Qy Min

3,57540

0,05 29,53 3,5754

0,05 8,724 8,67 12,1361

1,191918403

OK

OK

15

0,538D + 0,7Qx Max

0,39260

2,45

2,45 11,97 9,25 10,9863

0,827513441

OK

OK

16

0,538D + 0,7Qx Min

3,12420

0,21 22,97 3,1242

0,21 6,769 6,54

9,6593

1,043718757

OK

OK

17

0,538D - 0,7Qy Max

0,48650

4,01 33,06 0,4865

4,01 13,09 8,64 11,3326

1,345011921

OK

OK

18

0,538D - 0,7Qy Min

2,24520

1,35 22,11 2,2452

1,35 7,397

8,8094

0,872533446

OK

OK

19

0,538D + 0,7Qy Max

0,39260

2,45

2,45 11,97 9,25 10,9863

0,827513441

OK

OK

20

0,538D + 0,7Qy Min

3,12420

0,21 22,97 3,1242

0,21 6,769 6,54

9,6593

1,043718757

OK

OK

21

0,538D - 0,7Qx Max

0,48650

4,01 33,06 0,4865

4,01 13,09 8,64 11,3326

1,345011921

OK

OK

22

0,538D - 0,7Qx Min

2,24520

1,35 22,11 2,2452

1,35 7,397

8,8094

0,872533446

OK

OK

23

1,046D + 0,525Qx + 0,75L + 0,75R Max

2,23850

5,34 37,37 2,2385

5,34 14,71 8,77 13,8926

1,930498963

OK

OK

24

1,046D + 0,525Qx + 0,75L + 0,75R Min

0,39910

3,66 30,44 0,3991

3,66 12,05 7,99 10,4032

1,226999832

OK

OK

25

1,046D - 0,525Qy + 0,75L + 0,75R Max

2,23850

5,34 37,37 2,2385

5,34 14,71 8,77 13,8926

1,930498963

OK

OK

26

1,046D - 0,525Qy + 0,75L + 0,75R Min

0,39910

3,66 30,44 0,3991

3,66 12,05 7,99 10,4032

1,226999832

OK

OK

27

1,046D - 0,525Qx + 0,75L + 0,75R Max

1,57920

6,51 38,01 1,5792

6,51 15,78 8,55 13,6842

2,231995197

OK

OK

28

1,046D - 0,525Qx + 0,75L + 0,75R Min

0,26020

2,49

29,8 0,2602

2,49 11,23 8,46 10,0995

0,835712936

OK

OK

29

1,046D + 0,525Qy + 0,75L + 0,75R Max

1,57920

6,51 38,01 1,5792

6,51 15,78 8,55 13,6842

2,231995197

OK

OK

30

1,046D + 0,525Qy + 0,75L + 0,75R Min

0,26020

2,49

29,8 0,2602

2,49 11,23 8,46 10,0995

0,835712936

OK

OK

31

1,85720

3,22

36,3 1,8572

3,22 13,29 9,72 13,2924

1,239154009

OK

OK

32

D+L

9,05230

6,79 68,53 9,0523

6,79 23,71 16,2 28,6515

3,771366709

OK

OK

33

D+R

1,88230

3,28 37,06 1,8823

3,28 13,57 9,93 13,5595

1,259592564

OK

OK

34

D + 0,75R + 0,75L

7,27240

5,94 61,04 7,2724

5,94 21,31 14,7 25,0121

3,129481596

OK

OK

35

0,6D + Wx

0,07140

1,92 27,72 0,0714

1,92 10,28 8,15

9,2842

0,640542309

OK

OK

36

0,6D + Wy

0,84990

2,74

28,7 0,8499

2,74 10,82 7,77 10,1107

0,956803062

OK

OK

37

1,062D + 0,7Qx Max

3,11920

3,07 40,64 3,1192

3,07 14,25 10,8 15,5490

1,458410331

OK

OK

38

1,062D + 0,7Qx Min

0,82540

3,77 33,99 0,8254

3,77 13,16 8,97 11,8588

1,287018967

OK

OK

39

1,062D - 0,7Qy Max

3,11920

3,07 40,64 3,1192

3,07 14,25 10,8 15,5490

1,458410331

OK

OK

40

1,062D - 0,7Qy Min

0,82540

3,77 33,99 0,8254

3,77 13,16 8,97 11,8588

1,287018967

OK

OK

41

1,062D - 0,7Qx Max

2,45410

2,59 39,52 2,4541

2,59 13,83 10,9 14,7487

1,18960339

OK

OK

42

1,062D - 0,7Qx Min

1,49050

4,25 35,11 1,4905

4,25 13,59 8,86 12,6590

1,500853163

OK

OK

43

1,062D + 0,7Qy Max

2,45410

2,59 39,52 2,4541

2,59 13,83 10,9 14,7487

1,18960339

OK

OK

44

1,062D + 0,7Qy Min

1,49050

4,25 35,11 1,4905

4,25 13,59 8,86 12,6590

1,500853163

OK

OK

45

0,538D + 0,7Qx Max

2,14600

1,38 32,08 2,1460

1,38 10,77 9,24 12,0711

0,850579695

OK

OK

46

0,538D + 0,7Qx Min

0,14770

2,08 25,43 0,1477

2,08 9,586 7,27

8,5704

0,696542146

OK

OK

47

0,538D - 0,7Qy Max

1,48090

0,90 30,96 1,4809

0,90 10,35 9,34 11,2708

0,578286598

OK

OK

48

0,538D - 0,7Qy Min

0,51740

2,56 26,55 0,5174

2,56 10,11 7,26

9,1812

0,871012211

OK

OK

49

0,538D + 0,7Qy Max

2,14600

1,38 32,08 2,1460

1,38 10,77 9,24 12,0711

0,850579695

OK

OK

50

0,538D + 0,7Qy Min

0,14770

2,08 25,43 0,1477

2,08 9,586 7,27

8,5704

0,696542146

OK

OK

51

0,538D - 0,7Qx Max

1,48090

0,90 30,96 1,4809

0,90 10,35 9,34 11,2708

0,578286598

OK

OK

52

0,538D - 0,7Qx Min

0,51740

2,56 26,55 0,5174

2,56 10,11 7,26

9,1812

0,871012211

OK

OK

53

1,046D + 0,525Qx + 0,75L + 0,75R Max

8,21790

5,82 64,29 8,2179

5,82 22,03 15,6 26,7012

3,357036319

OK

OK

54

1,046D + 0,525Qx + 0,75L + 0,75R Min

6,49770

6,35

59,3 6,4977

6,35 21,21 14,2 23,9336

3,028338845

OK

OK

55

1,046D - 0,525Qy + 0,75L + 0,75R Max

8,21790

5,82 64,29 8,2179

5,82 22,03 15,6 26,7012

3,357036319

OK

OK

56

1,046D - 0,525Qy + 0,75L + 0,75R Min

6,49770

6,35

59,3 6,4977

6,35 21,21 14,2 23,9336

3,028338845

OK

OK

57

1,046D - 0,525Qx + 0,75L + 0,75R Max

7,71910

5,46 63,45 7,7191

5,46 21,71 15,6 26,1010

3,15243986

OK

OK

58

1,046D - 0,525Qx + 0,75L + 0,75R Min

6,99650

6,71 60,14 6,9965

6,71 21,53 14,1 24,5338

3,230735822

OK

OK

59

1,046D + 0,525Qy + 0,75L + 0,75R Max

7,71910

5,46 63,45 7,7191

5,46 21,71 15,6 26,1010

3,15243986

OK

OK

60

1,046D + 0,525Qy + 0,75L + 0,75R Min

6,99650

6,71 60,14 6,9965

6,71 21,53 14,1 24,5338

3,230735822

OK

OK

No.

Kondisi Pembebanan

Joint

2,53870

D+L

2,26130

D+R

D + 0,75R + 0,75L

FX

FY

FZ

MUY MUX

ton

ton

ton

ton.m ton.m

32,2 0,3926

32,2 0,3926

5,9

5,9

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
61

0,53450

5,46 23,26 0,5345

5,46 10,62 4,55

62

D+L

9,77920

6,71 11,69 9,7792

6,71 4,487

63

D+R

0,56440

0,51

23,7 0,5644

0,51 8,002 7,44

64

D + 0,75R + 0,75L

7,49040

1,34 14,91 7,4904

65

0,6D + Wx

1,14150

66

0,6D + Wy

0,19050

67

1,062D + 0,7Qx Max

68

1,062D + 0,7Qx Min

69

1,062D - 0,7Qy Max

70

Tanggal

Halaman

11/07/2015
42 dari

8,0964

1,83006008

OK

OK

-3 10,1708

3,952785599

OK

OK

OK

8,2621

0,253607615

OK

OK

1,34 3,314 1,82

9,7765

2,536550321

OK

OK

0,53 23,99 1,1415

0,53 7,925 7,34

8,7303

0,41923293

OK

OK

1,15 23,26 0,1905

1,15 8,329 7,05

7,8744

0,387669324

OK

OK

2,58010

0,31 27,37 2,5801

0,31 8,469 8,12 10,7774

0,866354788

OK

OK

1,44480

0,91 19,56 1,4448

0,91 6,564 5,55

7,4477

0,569592525

OK

OK

2,58010

1,21 27,37 2,5801

1,21 8,968 7,62 10,7774

0,950210644

OK

OK

1,062D - 0,7Qy Min

1,44480

0,13 19,56 1,4448

0,13 6,129 5,99

7,4477

0,483495137

OK

OK

71

1,062D - 0,7Qx Max

1,47520

1,21 28,63 1,4752

1,21 9,744

8,4 10,4906

72

1,062D - 0,7Qx Min

0,33990

0,13

0,13 6,061 5,92

73

1,062D + 0,7Qy Max

1,47520

74

1,062D + 0,7Qy Min

0,33990

75

0,538D + 0,7Qx Max

2,30000

76

0,538D + 0,7Qx Min

1,72490

77

0,538D - 0,7Qy Max

78

0,538D - 0,7Qy Min

79
80

0,636431148

OK

OK

6,3169

0,121102757

OK

OK

2,13 28,63 1,4752

2,13 10,26 7,89 10,4906

0,864396021

OK

OK

1,05

1,05 6,573 5,41

6,3169

0,367532798

OK

OK

2,13 25,64 2,3000

2,13 8,994 6,62 10,0222

1,045541289

OK

OK

1,05 17,84 1,7249

1,05 5,975 4,81

7,0519

0,672926545

OK

OK

1,19510

0,94 26,91 1,1951

0,94

9,7354

0,507797215

OK

OK

0,62000

0,40 16,57 0,6200

0,40 5,544

5,9212

0,2451708

OK

OK

0,538D + 0,7Qy Max

2,30000

1,87 25,64 2,3000

1,87 8,845 6,77 10,0222

0,987102611

OK

OK

0,538D + 0,7Qy Min

1,72490

1,32 17,84 1,7249

1,32 6,123 4,66

7,0519

0,723258498

OK

OK

81

0,538D - 0,7Qx Max

1,19510

0,94 26,91 1,1951

0,94

9,7354

0,507797215

OK

OK

82

0,538D - 0,7Qx Min

0,62000

0,40 16,57 0,6200

0,40 5,544

5,9212

0,2451708

OK

OK

83

1,046D + 0,525Qx + 0,75L + 0,75R Max

9,02440

1,87 17,99 9,0244

1,87 4,139 2,07 11,7866

3,071719378

OK

OK

84

1,046D + 0,525Qx + 0,75L + 0,75R Min

6,00570

1,32 12,14 6,0057

1,32 2,851 1,39

7,8991

2,049419381

OK

OK

85

1,046D - 0,525Qy + 0,75L + 0,75R Max

9,02440

1,67 17,99 9,0244

1,67 4,033 2,17 11,7866

3,059412851

OK

OK

86

1,046D - 0,525Qy + 0,75L + 0,75R Min

6,00570

0,67 12,14 6,0057

0,67 2,491 1,75

7,8991

2,014248967

OK

OK

87

1,046D - 0,525Qx + 0,75L + 0,75R Max

8,19570

1,67 18,94 8,1957

1,67 4,615 2,76 11,5715

2,788264415

OK

OK

88

1,046D - 0,525Qx + 0,75L + 0,75R Min

6,83440

0,67 11,19 6,8344

0,67 1,909 1,17

8,1142

2,288992524

OK

OK

89

1,046D + 0,525Qy + 0,75L + 0,75R Max

8,19570

2,36 18,94 8,1957

2,36 4,998 2,37 11,5715

2,843267324

OK

OK

90

1,046D + 0,525Qy + 0,75L + 0,75R Min

6,83440

0,02 11,19 6,8344

0,02

2,27814546

OK

OK

18,3 0,3399
18,3 0,3399

9,11 8,06
5,1

9,11 8,06
5,1

1,55 1,53

8,1142

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
5.1.6.2 Kontrol Defleksi

Menurut cara Brooms, defleksi yang terjadi dapat dicari dengan rumus :

Zf =

No.

1,8 * T - (h2+h1)

,Pile Design and construction Practice (fourth edition) karya M.J. Tomlinson halaman 226.

Kondisi Pembebanan

Joint

Hi

Zf

Y0

Yijin

Ton

Inch

Inch

Kontrol

1,181

2,68840301

0,1615

OK

D+L

1,826

2,68840301

0,2497

OK

D+R

1,197

2,68840301

0,1637

OK

D + 0,75R + 0,75L

1,502

2,68840301

0,2054

OK

0,6D + Wx

1,058

2,68840301

0,1447

OK

0,6D + Wy

0,386

2,68840301

0,0528

OK

1,062D + 0,7Qx Max

1,287

2,68840301

0,176

OK

1,062D + 0,7Qx Min

1,567

2,68840301

0,2143

OK

1,062D - 0,7Qy Max

1,287

2,68840301

0,176

OK

10

1,062D - 0,7Qy Min

1,567

2,68840301

0,2143

OK

11

1,062D - 0,7Qx Max

1,868

2,68840301

0,2554

OK

12

1,062D - 0,7Qx Min

1,192

2,68840301

0,163

OK

13

1,062D + 0,7Qy Max

1,868

2,68840301

0,2554

OK

14

1,062D + 0,7Qy Min

1,192

2,68840301

0,163

OK

15

0,538D + 0,7Qx Max

0,828

2,68840301

0,1132

OK

16

0,538D + 0,7Qx Min

1,044

2,68840301

0,1427

OK

17

0,538D - 0,7Qy Max

1,345

2,68840301

0,1839

OK

18

0,538D - 0,7Qy Min

0,873

2,68840301

0,1193

OK

19

0,538D + 0,7Qy Max

0,828

2,68840301

0,1132

OK

20

0,538D + 0,7Qy Min

1,044

2,68840301

0,1427

OK

21

0,538D - 0,7Qx Max

1,345

2,68840301

0,1839

OK

22

0,538D - 0,7Qx Min

0,873

2,68840301

0,1193

OK

23

1,046D + 0,525Qx + 0,75L + 0,75R Max

1,930

2,68840301

0,264

OK

24

1,046D + 0,525Qx + 0,75L + 0,75R Min

1,227

2,68840301

0,1678

OK

25

1,046D - 0,525Qy + 0,75L + 0,75R Max

1,930

2,68840301

0,264

OK

26

1,046D - 0,525Qy + 0,75L + 0,75R Min

1,227

2,68840301

0,1678

OK

27

1,046D - 0,525Qx + 0,75L + 0,75R Max

2,232

2,68840301

0,3052

OK

28

1,046D - 0,525Qx + 0,75L + 0,75R Min

0,836

2,68840301

0,1143

OK

29

1,046D + 0,525Qy + 0,75L + 0,75R Max

2,232

2,68840301

0,3052

OK

30

1,046D + 0,525Qy + 0,75L + 0,75R Min

0,836

2,68840301

0,1143

OK

31

1,239

2,68840301

0,1694

OK

32

D+L

3,771

2,68840301

0,5157

OK

33

D+R

1,260

2,68840301

0,1722

OK

34

D + 0,75R + 0,75L

3,129

2,68840301

0,4279

OK

35

0,6D + Wx

0,641

2,68840301

0,0876

OK

36

0,6D + Wy

0,957

2,68840301

0,1308

OK

37

1,062D + 0,7Qx Max

1,458

2,68840301

0,1994

OK

38

1,062D + 0,7Qx Min

1,287

2,68840301

0,176

OK

39

1,062D - 0,7Qy Max

1,458

2,68840301

0,1994

OK

40

1,062D - 0,7Qy Min

1,287

2,68840301

0,176

OK

41

1,062D - 0,7Qx Max

1,190

2,68840301

0,1627

OK

Tanggal

Halaman

11/07/2015
43 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

42

1,062D - 0,7Qx Min

1,501

2,68840301

0,2052

OK

43

1,062D + 0,7Qy Max

1,190

2,68840301

0,1627

OK

44

1,062D + 0,7Qy Min

1,501

2,68840301

0,2052

OK

45

0,538D + 0,7Qx Max

0,851

2,68840301

0,1163

OK

46

0,538D + 0,7Qx Min

0,697

2,68840301

0,0952

OK

47

0,538D - 0,7Qy Max

0,578

2,68840301

0,0791

OK

48

0,538D - 0,7Qy Min

0,871

2,68840301

0,1191

OK

49

0,538D + 0,7Qy Max

0,851

2,68840301

0,1163

OK

50

0,538D + 0,7Qy Min

0,697

2,68840301

0,0952

OK

51

0,538D - 0,7Qx Max

0,578

2,68840301

0,0791

OK

52

0,538D - 0,7Qx Min

0,871

2,68840301

0,1191

OK

53

1,046D + 0,525Qx + 0,75L + 0,75R Max

3,357

2,68840301

0,459

OK

54

1,046D + 0,525Qx + 0,75L + 0,75R Min

3,028

2,68840301

0,4141

OK

55

1,046D - 0,525Qy + 0,75L + 0,75R Max

3,357

2,68840301

0,459

OK

56

1,046D - 0,525Qy + 0,75L + 0,75R Min

3,028

2,68840301

0,4141

OK

57

1,046D - 0,525Qx + 0,75L + 0,75R Max

3,152

2,68840301

0,4311

OK

58

1,046D - 0,525Qx + 0,75L + 0,75R Min

3,231

2,68840301

0,4418

OK

59

1,046D + 0,525Qy + 0,75L + 0,75R Max

3,152

2,68840301

0,4311

OK

60

1,046D + 0,525Qy + 0,75L + 0,75R Min

3,231

2,68840301

0,4418

OK

61

1,830

2,68840301

0,2502

OK

62

D+L

3,953

2,68840301

0,5405

OK

63

D+R

0,254

2,68840301

0,0347

OK

64

D + 0,75R + 0,75L

2,537

2,68840301

0,3469

OK

65

0,6D + Wx

0,419

2,68840301

0,0573

OK

66

0,6D + Wy

0,388

2,68840301

0,053

OK

67

1,062D + 0,7Qx Max

0,866

2,68840301

0,1185

OK

68

1,062D + 0,7Qx Min

0,570

2,68840301

0,0779

OK

69

1,062D - 0,7Qy Max

0,950

2,68840301

0,1299

OK

70

1,062D - 0,7Qy Min

0,483

2,68840301

0,0661

OK

71

1,062D - 0,7Qx Max

0,636

2,68840301

0,087

OK

72

1,062D - 0,7Qx Min

0,121

2,68840301

0,0166

OK

73

1,062D + 0,7Qy Max

0,864

2,68840301

0,1182

OK

74

1,062D + 0,7Qy Min

0,368

2,68840301

0,0503

OK

75

0,538D + 0,7Qx Max

1,046

2,68840301

0,143

OK

76

0,538D + 0,7Qx Min

0,673

2,68840301

0,092

OK

77

0,538D - 0,7Qy Max

0,508

2,68840301

0,0694

OK

78

0,538D - 0,7Qy Min

0,245

2,68840301

0,0335

OK

79

0,538D + 0,7Qy Max

0,987

2,68840301

0,135

OK

80

0,538D + 0,7Qy Min

0,723

2,68840301

0,0989

OK

81

0,538D - 0,7Qx Max

0,508

2,68840301

0,0694

OK

82

0,538D - 0,7Qx Min

0,245

2,68840301

0,0335

OK

83

1,046D + 0,525Qx + 0,75L + 0,75R Max

3,072

2,68840301

0,42

OK

84

1,046D + 0,525Qx + 0,75L + 0,75R Min

2,049

2,68840301

0,2802

OK

85

1,046D - 0,525Qy + 0,75L + 0,75R Max

3,059

2,68840301

0,4183

OK

86

1,046D - 0,525Qy + 0,75L + 0,75R Min

2,014

2,68840301

0,2754

OK

87

1,046D - 0,525Qx + 0,75L + 0,75R Max

2,788

2,68840301

0,3813

OK

88

1,046D - 0,525Qx + 0,75L + 0,75R Min

2,289

2,68840301

0,313

OK

89

1,046D + 0,525Qy + 0,75L + 0,75R Max

2,843

2,68840301

0,3888

OK

90

1,046D + 0,525Qy + 0,75L + 0,75R Min

2,278

2,68840301

0,3115

OK

Tanggal

Halaman

11/07/2015
44 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
45 dari

5.1.7 Penulangan Pile Cap


Dimensi Pile Cap
Tebal Pile Cap
Diameter Tulangan
Tebal Selimut
d
Fc
Fy
Density Of Soil (BH-08)

=
=
=
=
=
=
=
=

3600,0
500
16
60
432
25
400
2010

x
mm
mm
mm
mm
Mpa
Mpa
Kg/m3

3360,0 mm

5.1.7.1 Penulangan Pile Cap Arah X

n = 3 buah (jumlah tiang total)


Rpi = Konsep perhitungan Rpi Combo factored sama dengan Rpi combo unfactored
Tabel 5.8 Nilai RPI Kombo Berfaktor

Support Reaction pondasi


No.

Kondisi Pembebanan Berfaktor

COMB1

Joint
2

COMB2

COMB3

COMB4

COMB5

COMB6

COMB7

COMB8

COMB9

10

COMB10

11

COMB11 Max

12

COMB11 Min

13

COMB12 Max

14

COMB12 Min

15

COMB13 Max

16

COMB13 Min

17

COMB14 Max

18

COMB14 Min

19

COMB15 Max

20

COMB15 Min

21

COMB16 Max

22

COMB16 Min

23

COMB17 Max

24

COMB17 Min

FX

FY

FZ

MUX

MUY

ton

ton

ton

ton.m

ton.m

3,55
4,58
2,78
0,53
1,78
0,46
2,08
3,40
1,09
4,40
1,85
3,17
1,85
3,17
0,59
1,92
0,59
1,92
0,23
4,80
0,23
4,80
1,03
3,54

3,46
7,05
4,30
4,26
6,93
1,63
0,39
4,91
2,24
2,29
5,84
2,64
5,84
2,64
8,07
0,42
8,07
0,42
3,83
0,62
3,83
0,62
6,05
1,60

39,79
35,10
38,94
33,06
43,84
28,16
24,49
40,17
29,39
35,27
42,98
29,78
42,98
29,78
44,20
28,55
44,20
28,55
39,31
26,11
39,31
26,11
40,54
24,89

3,46
7,05
4,30
4,26
6,93
1,63
0,39
4,91
2,24
2,29
5,84
2,64
5,84
2,64
8,07
0,42
8,07
0,42
3,83
0,62
3,83
0,62
6,05
1,60

3,55
4,58
2,78
0,53
1,78
0,46
2,08
3,40
1,09
4,40
1,85
3,17
1,85
3,17
0,59
1,92
0,59
1,92
0,23
4,80
0,23
4,80
1,03
3,54

Rpi (Ton)
2

14,05

10,20

15,54

1
14,15

6,31

14,64

14,48

9,70

14,76

13,21

8,48

11,36

17,89

10,19

15,75

10,14

8,33

9,68

7,71

7,28

9,50

15,03

9,57

15,57

10,69

8,20

10,49

11,62

9,08

14,58

16,98

10,49

15,51

10,38

7,44

11,96

16,98

10,49

15,51

10,38

7,44

11,96

19,02

10,06

15,11

9,14

8,67

10,75

19,02

10,06

15,11

9,14

8,67

10,75

15,16

10,90

13,25

7,51

6,82

11,78

15,16

10,90

13,25

7,51

6,82

11,78

16,54

9,82

14,17

8,05

6,27

10,57

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

25

COMB18 Max

26

COMB18 Min

27

COMB19 Max

28

COMB19 Min

29

COMB20 Max

30

COMB20 Min

31

COMB21 Max

32

COMB21 Min

33

COMB22 Max

34

COMB22 Min

35

COMB1

36

COMB2

37

COMB3

38

COMB4

39

COMB5

40

COMB6

41

COMB7

42

COMB8

43

COMB9

44

COMB10

45

COMB11 Max

46

COMB11 Min

47

COMB12 Max

48

COMB12 Min

49

COMB13 Max

50

COMB13 Min

51

COMB14 Max

52

COMB14 Min

53

COMB15 Max

54

COMB15 Min

55

COMB16 Max

56

COMB16 Min

57

COMB17 Max

58

COMB17 Min

59

COMB18 Max

60

COMB18 Min

61

COMB19 Max

62

COMB19 Min

63

COMB20 Max

64

COMB20 Min

65

COMB21 Max

66

COMB21 Min

67

COMB22 Max

68

COMB22 Min

69

COMB1

70

COMB2

71

COMB3

72

COMB4

73

COMB5

74

COMB6

75

COMB7

76

COMB8

77

COMB9

78

COMB10

79

COMB11 Max

80

COMB11 Min

81

COMB12 Max

82

COMB12 Min

83

COMB13 Max

84

COMB13 Min

85

COMB14 Max

86

COMB14 Min

87

COMB15 Max

88

COMB15 Min

Tanggal

Halaman

11/07/2015
46 dari

1,03
3,54
3,97
1,05
2,72
0,21
0,49
4,54
0,77
3,28
2,60
13,78
5,00

6,05
1,60
7,37
4,17
9,59
1,95
3,57
0,37
5,79
1,85
4,51
9,66
6,02

40,54
24,89
43,84
30,64
45,07
29,42
37,86
24,67
39,09
23,44
42,84
92,34
52,96

6,05
1,60
7,37
4,17
9,59
1,95
3,57
0,37
5,79
1,85
4,51
9,66
6,02

1,03
3,54
3,97
1,05
2,72
0,21
0,49
4,54
0,77
3,28
2,60
13,78
5,00

16,54

9,82

14,17

8,05

6,27

10,57

17,44

9,24

17,16

12,19

7,56

10,89

19,48

8,82

16,77

10,82

8,66

9,94

14,45

10,48

12,93

7,71
6,70
6,01
1,85
2,53
3,55
0,83
7,48
4,20
7,48
4,20
6,53
5,15
6,53
5,15
3,31
0,03
3,31
0,03
2,36
0,98
2,36
0,98
11,28
8,00
10,33
8,95
3,12
0,16
2,17
0,79
0,75
15,48
2,54
6,34
5,10
3,77
1,02
0,30
1,54
2,26
8,15
2,40
8,15
2,40
6,58
3,98
6,58
3,98
3,36
2,39

6,05
4,98
7,09
4,31
2,21
3,27
3,24
5,17
6,18
5,17
6,18
4,49
6,86
4,49
6,86
2,40
3,40
2,40
3,40
1,71
4,08
1,71
4,08
7,31
8,32
6,63
9,00
2,07
3,07
1,39
3,75
0,71
1,97
0,83
0,81
2,40
0,76
1,34
1,83
0,23
0,25
1,99
0,08
1,99
0,08
3,31
1,24
3,31
1,24
1,42
0,50

58,29
57,02
54,23
32,84
35,62
36,90
31,56
60,82
51,31
60,82
51,31
59,22
52,91
59,22
52,91
39,42
29,91
39,42
29,91
37,82
31,52
37,82
31,52
78,98
69,47
77,38
71,07
37,76
28,25
36,15
29,85
24,58
6,11
21,38
16,05
17,01
20,42
25,00
21,58
20,62
25,96
23,93
12,78
23,93
12,78
25,74
10,97
25,74
10,97
28,51
17,36

6,05
4,98
7,09
4,31
2,21
3,27
3,24
5,17
6,18
5,17
6,18
4,49
6,86
4,49
6,86
2,40
3,40
2,40
3,40
1,71
4,08
1,71
4,08
7,31
8,32
6,63
9,00
2,07
3,07
1,39
3,75
0,71
1,97
0,83
0,81
2,40
0,76
1,34
1,83
0,23
0,25
1,99
0,08
1,99
0,08
3,31
1,24
3,31
1,24
1,42
0,50

7,71
6,70
6,01
1,85
2,53
3,55
0,83
7,48
4,20
7,48
4,20
6,53
5,15
6,53
5,15
3,31
0,03
3,31
0,03
2,36
0,98
2,36
0,98
11,28
8,00
10,33
8,95
3,12
0,16
2,17
0,79
0,75
15,48
2,54
6,34
5,10
3,77
1,02
0,30
1,54
2,26
8,15
2,40
8,15
2,40
6,58
3,98
6,58
3,98
3,36
2,39

6,97

6,56

11,13

16,00

9,56

13,52

7,79

5,73

9,92

15,95

10,94

15,95

31,73

20,99

39,62

19,39

12,70

20,86

20,32

13,59

24,38

19,63

14,09

23,31

20,09

12,21

21,94

12,75

7,96

12,13

12,29

9,84

13,50

12,98

9,34

14,58

12,06

8,45

11,06

20,75

15,00

25,07

19,19

12,32

19,80

20,75

15,00

25,07

19,19

12,32

19,80

20,14

15,15

23,93

19,80

12,17

20,94

20,14

15,15

23,93

19,80

12,17

20,94

13,41

10,75

15,26

11,85

8,07

9,99

13,41

10,75

15,26

11,85

8,07

9,99

12,80

10,90

14,12

12,46

7,92

11,14

12,80

10,90

14,12

12,46

7,92

11,14

26,77

18,65

33,56

25,21

15,97

28,29

26,16

18,79

32,42

25,82

15,82

29,43

12,73

10,44

14,59

11,07

7,66

9,52

12,13

10,59

13,44

11,78

7,61

10,46

8,35

7,56

8,67

-1,83

-4,02

11,97

6,77

5,85

8,75

3,77

2,87

9,42

5,37

2,70

8,94

6,02

5,17

9,23

8,75

7,26

8,99

8,11

6,08

7,39

6,51

6,25

7,86

8,07

7,79

10,10

6,47

4,25

13,21

3,53

3,45

5,80

6,47

4,25

13,21

3,53

3,45

5,80

8,31

4,63

12,80

3,07

1,69

6,21

8,31

4,63

12,80

3,07

1,69

6,21

9,21

7,64

11,65

5,29

4,74

7,32

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
89

COMB16 Max

90

COMB16 Min

91

COMB17 Max

92

COMB17 Min

93

COMB18 Max

94

COMB18 Min

95

COMB19 Max

96

COMB19 Min

97

COMB20 Max

98

COMB20 Min

99

COMB21 Max

100

COMB21 Min

101

COMB22 Max

102

COMB22 Min

Kgm

1,42
0,50
2,73
1,81
2,73
1,81
2,47
0,56
3,79
0,76
1,36
0,55
2,68
1,87

28,51
17,36
30,31
15,55
30,31
15,55
18,70
7,55
20,51
5,74
28,17
17,02
29,98
15,21

1,42
0,50
2,73
1,81
2,73
1,81
2,47
0,56
3,79
0,76
1,36
0,55
2,68
1,87

Mu

39742,47

pb

0,0270938

pmax

0,0203203

max = 0.75 * b

pmin

Mn

=
=

0,0035
0,8

min = 1.4 / fy

=
=

49678,088
18,823529

=
=

Mn = Mu / =

m
Rn

1,5844849

Rn = Mn / ( b * d2 )

p
p pakai

=
=

0,0041211
0,0041211

= 1 / m * [ 1 - * [1 2 * Rn * m / ( fy ) ]

As
As
Jumlah Tulangan Perlu
Jarak Tulangan
As Pasang
Tulangan Terpasang

=
=
=
=
=
=

As = * b * d
6409,0614
=
200,96
32
111,6129
6430,72 Ok, As Pasang > As Perlu
D
16
-100

Kgm

3,36
2,39
1,78
0,82
1,78
0,82
12,85
7,10
11,27
8,67
3,30
2,45
1,72
0,87

3,36
2,39
1,78
0,82
1,78
0,82
12,85
7,10
11,27
8,67
3,30
2,45
1,72
0,87

Maksimum antara mobilisasi M12 dan tanpa mobilisasi


b = 1* 0.85 * fc/ fy * 600 / ( 600 + fy )

m = fy / (0.85*fc')

Tanggal

Halaman

11/07/2015
47 dari

9,21

7,64

5,29

4,74

11,65
7,32

11,05

8,02

11,24

5,93

3,91

5,71

11,05

8,02

11,24

5,93

3,91

5,71

3,49

0,74

14,47

0,55

-0,07

7,07

5,33

1,12

14,06

-0,45

-1,29

7,48

9,09

7,57

11,51

5,19

4,58

7,24

10,93

7,95

11,10

5,83

3,76

5,63

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

5.1.7.2 Penulangan Pile Cap Arah Y

Mu

41061,21

pb

0,0270938

pmax

0,0203203

max = 0.75 * b

pmin

Mn

=
=

0,0035
0,8

min = 1.4 / fy

51326,513
18,823529

=
=

m = fy / (0.85*fc')

Rn

1,527924

Rn = Mn / ( b * d2 )

p
p pakai

=
=

0,003968
0,003968

= 1 / m * [ 1 - * [1 2 * Rn * m / ( fy ) ]

As
As D16
Jumlah Tulangan Perlu
Jarak Tulangan
As Pasang

=
=
=
=
=

5759,629
=
As = * b * d
200,96
29
115
5827,84 Ok, As Pasang > As Perlu

Tulangan Terpasang

Kgm

16

Maksimum antara mobilisasi M12 dan tanpa mobilisasi


b = 1* 0.85 * fc/ fy * 600 / ( 600 + fy )

Mn = Mu / =

-100

Gambar 5.5 Sket Penulangan Pile Cap

Tanggal

Halaman

11/07/2015
48 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
49 dari

5.1.8 Cek Geser 2 Arah Pada Pile Cap

Gambar 5.6 Geser 2 Arah Pada Bored Pile

Dimensi Pendestal

=
=

1
700

b0

4528

mm

as

40

Vc1

=
Vc2

=
=

'

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

N
d

9480960
1

3260160

Vc Pakai

3260160

Vc

2445120

Vc3

mm

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2.1)

4890240

700

'

'

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

244,512

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

ton

FZ = FZ (joint reaction) + (2400 kg/m3 * L Pile Cap * Panjang Pile Cap* t Pile Cap ) + (L Pile Cap * Panjang pile cap* h2 * Density Of Soil) + ( dpy * dpx * (h2+h3)* 2400 kg/m3)

Tabel 5.9 Cek Geser Pons Pada Pile Cap


Cek Geser Pons
Vc
Vc > Fz
(ton)

No

Kondisi Pembebanan

joint

Fz (t)

COMB1
COMB2
COMB3
COMB4
COMB5
COMB6
COMB7
COMB8
COMB9
COMB10
COMB11 Max
COMB11 Min
COMB12 Max
COMB12 Min
COMB13 Max
COMB13 Min
COMB14 Max
COMB14 Min

39,79

244,512

Ok

35,10

244,512

Ok

38,94

244,512

Ok

33,06

244,512

Ok

43,84

244,512

Ok

28,16

244,512

Ok

24,49

244,512

Ok

40,17

244,512

Ok

29,39

244,512

Ok

35,27

244,512

Ok

42,98

244,512

Ok

29,78

244,512

Ok

42,98

244,512

Ok

29,78

244,512

Ok

44,20

244,512

Ok

28,55

244,512

Ok

44,20

244,512

Ok

28,55

244,512

Ok

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84

COMB15 Max
COMB15 Min
COMB16 Max
COMB16 Min
COMB17 Max
COMB17 Min
COMB18 Max
COMB18 Min
COMB19 Max
COMB19 Min
COMB20 Max
COMB20 Min
COMB21 Max
COMB21 Min
COMB22 Max
COMB22 Min
COMB1
COMB2
COMB3
COMB4
COMB5
COMB6
COMB7
COMB8
COMB9
COMB10
COMB11 Max
COMB11 Min
COMB12 Max
COMB12 Min
COMB13 Max
COMB13 Min
COMB14 Max
COMB14 Min
COMB15 Max
COMB15 Min
COMB16 Max
COMB16 Min
COMB17 Max
COMB17 Min
COMB18 Max
COMB18 Min
COMB19 Max
COMB19 Min
COMB20 Max
COMB20 Min
COMB21 Max
COMB21 Min
COMB22 Max
COMB22 Min
COMB1
COMB2
COMB3
COMB4
COMB5
COMB6
COMB7
COMB8
COMB9
COMB10
COMB11 Max
COMB11 Min
COMB12 Max
COMB12 Min
COMB13 Max
COMB13 Min

39,31

244,512

Ok

26,11

244,512

Ok

39,31

244,512

Ok

26,11

244,512

Ok

40,54

244,512

Ok

24,89

244,512

Ok

40,54

244,512

Ok

24,89

244,512

Ok

43,84

244,512

Ok

30,64

244,512

Ok

45,07

244,512

Ok

29,42

244,512

Ok

37,86

244,512

Ok

24,67

244,512

Ok

39,09

244,512

Ok

23,44

244,512

Ok

42,84

244,512

Ok

92,34

244,512

Ok

52,96

244,512

Ok

58,29

244,512

Ok

57,02

244,512

Ok

54,23

244,512

Ok

32,84

244,512

Ok

35,62

244,512

Ok

36,90

244,512

Ok

31,56

244,512

Ok

60,82

244,512

Ok

51,31

244,512

Ok

60,82

244,512

Ok

51,31

244,512

Ok

59,22

244,512

Ok

52,91

244,512

Ok

59,22

244,512

Ok

52,91

244,512

Ok

39,42

244,512

Ok

29,91

244,512

Ok

39,42

244,512

Ok

29,91

244,512

Ok

37,82

244,512

Ok

31,52

244,512

Ok

37,82

244,512

Ok

31,52

244,512

Ok

78,98

244,512

Ok

69,47

244,512

Ok

77,38

244,512

Ok

71,07

244,512

Ok

37,76

244,512

Ok

28,25

244,512

Ok

36,15

244,512

Ok

29,85

244,512

Ok

24,58

244,512

Ok

6,11

244,512

Ok

21,38

244,512

Ok

16,05

244,512

Ok

17,01

244,512

Ok

20,42

244,512

Ok

25,00

244,512

Ok

21,58

244,512

Ok

20,62

244,512

Ok

25,96

244,512

Ok

23,93

244,512

Ok

12,78

244,512

Ok

23,93

244,512

Ok

12,78

244,512

Ok

25,74

244,512

Ok

10,97

244,512

Ok

Tanggal

Halaman

11/07/2015
50 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102

COMB14 Max
COMB14 Min
COMB15 Max
COMB15 Min
COMB16 Max
COMB16 Min
COMB17 Max
COMB17 Min
COMB18 Max
COMB18 Min
COMB19 Max
COMB19 Min
COMB20 Max
COMB20 Min
COMB21 Max
COMB21 Min
COMB22 Max
COMB22 Min

25,74

244,512

Ok

10,97

244,512

Ok

28,51

244,512

Ok

17,36

244,512

Ok

28,51

244,512

Ok

17,36

244,512

Ok

30,31

244,512

Ok

15,55

244,512

Ok

30,31

244,512

Ok

15,55

244,512

Ok

18,70

244,512

Ok

7,55

244,512

Ok

20,51

244,512

Ok

5,74

244,512

Ok

28,17

244,512

Ok

17,02

244,512

Ok

29,98

244,512

Ok

15,21

244,512

Ok

5.1.9 Cek Geser Akibat Tiang Bor

Gambar 5.7 Geser Akibat Bored Pile

Tanggal

Halaman

11/07/2015
51 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Dimensi Pendestal

=
=
=
=

L1 = p + d =
L2 = a1 =
= 3,14*(Dp + d')

b0

1
700

Vc1

mm

40

mm

f 'c

'

2333145,6

2333145,6

Vc

1749859,2

Pu Maks
Kontrol

39,62

ton

Ok, Vc> Pu maks

19

mm

25

Mpa

fy

400

Mpa

75

mm

t pile

Panjang Penyaluran berkait :

ldh

100

dh

f
=

380

'
c

mm

Bengkokan Panjang Penyaluran (lds)

Panjang Penyaluran Lurus :

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

174,98592 ton

(Pu maks = (Rpi Factored))

5.1.10.1 Panjang Penyaluran Tulangan (SNI 2847-2002, Pasal 14.3)

5.1.10 Pile Head Treatment

fc

db rencana

8553945,6

1
3

'

3499718,4

Vc Pakai

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2.1)

Vc3

3240,5

Halaman

900

=
Vc2

700

1032

as

Tanggal

12db

228

mm

230

mm

(Berdasarkan SNI - 2847 2002 Pasal 13.12.2)

11/07/2015
52 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

1,3

ld

1185,6

mm

1200

mm

Tanggal

Halaman

11/07/2015
53 dari

Gambar 5.9 Pile Headtreatment Section

5.1.11 Settlement Of Pile (Berdasarkan Fundamentals Of Geotechnical Engineering , Braja M. Das)


S

s1 =

s2 =

s1 +

s2

Qwp +

qwp x

s3

Qws

AP

EP

(1-s)

Iwp

D
Es

(1-s)

Iws

Es
s3 =

Qws x
pL

5.1.11.1 Settlement aktual yang terjadi


Rpi maks
Qws

=
=

28,6515159 Ton
34,20
Ton

(Rpi Unfactored Max)

Qwp

=
Rpi maks - Qws
=
-5,548484054 Ton
Qwp < 0 sehingga pengaruh Qwp tidak diperhitungkan, hanya bekerja Qws
5.1.11.2 Nilai S3

Es =

15000

s =
Qws =

0,5
34,2

p =

1,884

L =
Iws =
s3 =
=

ton/m2

= Modulus Young Tanah ( Gambar 5.10)

ton

= Poisson Ratio Gambar 5.10


= ( Load Carrier By Frictional)
= Perimeter Of Pil ( x D)

9
m
2
3,35554417 ton/m
0,00020304 m
0,20304248 mm

Settlement Aktual

=
=

Gambar 5.10 Nilai Es dan s ( Bowles)

= 2 + (0,35 x (L/D) 0,5 )

s3
0,20304

mm

<

25

mm Ok, Aman !!!

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

5.1.12 Perencanaan Pedestal


Data :
* Tinggi Pedestal (h4)
* Dimensi kolom =

h
b

* d'
* d
* Selimut Beton
* fy Tulangan Lentur
* fy Tulangan Geser
* f'c
*

D Tul. Lentur rencana

* Tul Geser rencana


*

=
=
=
=
=
=
=
=
=

mm

500,000
700
700
78
622
60
400
240
25

Mpa
Mpa
Mpa

16

mm

=
=

10
0,8

mm

0,5

mm
mm

mm
mm
mm

mm

5.1.12.1 Besar Gaya Pedestal


*

Besar gaya Berfaktor yang diperoleh dari hasil perhitungan analisa struktur (Software SAP ) :

Tabel 5.10 Combo Berfaktor Joint 27

Kondisi
F1 max
F2 max
F3 max

F1 (kN)

F2 (kN)

47,04
26,649
26,649

6,109
94,085
94,085

Reaksi Yang Terjadi


F3 (kN)
Mx (kNm)
66,154
0
252,028
0
252,028
0

My (kNm)
0
0
0

Momen Total (kNm)


Mux = (F2* h4)+(Mx) Mux (F1*h4)+(My)
3,0545
23,52
47,0425
13,3245
47,0425
13,3245

Reaksi Yang Terjadi


F3 (kN)
Mx (kNm)
715,67
0

My (kNm)
0

Momen Total (kNm)


Mux = (F2* h4)+(Mx) Mux (F1*h4)+(My)
47,372
67,573

Tabel 5.11 Combo Berfaktor Joint 28

Kondisi

F1 (kN)

F2 (kN)

F1 max

135,146

94,744

F2 max
F3 max

135,146
135,146

94,744
94,744

715,67
715,67

0
0

0
0

47,372
47,372

67,573
67,573

Tabel 5.11 Combo Berfaktor Joint 28

Kondisi
F1 max
F2 max
F3 max

F1 (kN)

F2 (kN)

135,146
135,146
135,146

19,332
37,131
7,441

Reaksi Yang Terjadi


F3 (kN)
Mx (kNm)
63,8199
0
204,999
0
60,1949
0

My (kNm)
0
0
0

Momen Total (kNm)


Mux = (F2* h4)+(Mx) Mux (F1*h4)+(My)
9,666
67,573
18,5655
67,573
3,7205
67,573

Gambar 5.11 Diagram PCACOL Pedestal

11/07/2015
54 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

=
1225000
=
1225
5.1.12.2 Penulangan Memanjang pedestal

Halaman

N
kN

Besar luas kolom :


A
Ag = b x h

490000

mm

Kebutuhan Tulangan (%) (PCACOL) :

Beban Aksial Terfaktor (SNI 03-2847 Pasal 12.3.5) :

1,14%

Pn max = 0,8 (0,85 f`c (Ag - Ast ) + fy Ast)


Pn max = 0,8 (0,85 f`c (Ag - Ast ) + fy Ast)

SNI 03-2847-2002 Pasal 23.10.2 jika komponen struktur memenuhi gaya aksial tekan terfaktor :
Ag f`c / 10

Tanggal

=
=

As Perlu
As pakai
Tulangan Terpasang
Jumlah Tulangan

=
=
=
=

5586
5626,88
28 D 16
28

mm
mm2

30042894,7 N
30042,8947 kN

Kontrol beban aksial terfaktor :


Pn max > P

OK

5.1.12.3 Persyaratan Terhadap Geser

Gaya Lintang pakai, Vu :


Vu Pakai

135,146

kN

Kekuatan geser yang disumbangkan beton (Vc) (SNI 03-2847-2002 Pasal 13.3.2):
Vc = (1 + Nu / (14 Ag )) x (f`c ) / 6 x bw x d
Vc = (1 + Nu / (14 Ag )) x (f`c ) / 6 x bw x d

kN

162,867606 kN

Vc beton tereduksi :
Vc

135,146

Gaya Lintang tereduksi, Vu max:


0.5 x Vc

43431,362 kg
434,31362 kN

Vu max :
Vu

=
=

325,73521 kN

Kontrol Tulangan Geser :

Kontrol Tulangan Geser (KONDISI 1)

LIHAT KONDISI 2

kondisi 1 =

0.5 x Vc < Vu >

Kontrol Tulangan Geser (KONDISI 2)

TULANGAN GESER MINIMUM

kondisi 2 =

0.5 x Vc

> Vu

Vc

11/07/2015
55 dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
* Pakai tulangan geser minimum
* Banyak Tulangan Desain

Rencana Tulangan Sengkang


Av
n
jarak antar sengkang rencana (s)

10 - 125

=
=

157
2

mm
buah

125

mm2

Kontrol jarak sengkang rencana (SNI 03-2847-2002 Pasal 23.10):


SYARAT,

Syarat 1 (8 x Diameter longitudional kolom)


Syarat 2 ( 24 x Diameter Sengkang )
Syarat 3 (Setengah Dimensi Kolom)
Syarat 4

S pakai

125

<
<
<
<
<

128
240
350
300
125

mm
mm
mm
mm
mm

mm

4.11 Perencanaan Sloof Pondasi

Panjang Sloof
fc
fy
Tebal Selimut
Diameter Tulangan lentur
Diameter Tulangan geser
Dimensi sloof ( b x h)
d'

=
=
=
=
=
=
=

1,8
25
400
60
16
10
=

200
222

m
Mpa
Mpa
mm
mm
mm
mm
mm

300 mm
Gambar 5.12 Sket Penulangan Pedestal

4.11.1 Penulangan Lentur Sloof

Tanggal

Halaman

11/07/2015
56 dari

62

600 x600 x

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)

Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

6. Desain Pelat Dan Balok Sloof


6.1

Pelat Lantai
A. SLAB DATA
f c' =

25

MPa

fy =

400

MPa

Slab lenght X dir

Lx =

Slab lenght Y dir


Slab thickness

Ly =

slab moment coefficient


Rebar diameter

7,00

7,50 m
h = 150 mm
Ly / Lx = 1,07 Slab moment coefficient
D= 13 mm
ts = 40 mm

concrete cover
B. SLAB LOADING
1. DEAD LOAD
Dead Load for Slab
No
1

Load
selfweight slab (kN/m3)

Berat satuan

(m)

Q (kN/m2)

24,0

0,15

3,600

2. LIVE LOAD
Live load (People) =
QL =

500
5,0

kg/m2
kN/m2

Tanggal

Halaman

11/07/2015
57

Dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

C.

Tanggal

Halaman

11/07/2015

Menentukan konstanta spring


Karena pelat langsung terkena tanah, maka permodelan dilakukan dengan permodelah spring. Dalam permodelan spring dibutuhkan
suatu konstanta spring. Untuk menentukan konstanta spring digunakan buku J. Hemsley, 2000 "Design Applications of
Raft Foundations pada halaman 16 tabel 1.2.

Gambar 6.2 Harga koefisien spring


*
Karena pelat lantai terletak di atas lapisan top soil atau tanah humus, maka digunakan ks sebesar :
Ks

MN/m3

5000

kN/m3

D. Permodelan pelat di program bantu SAP 2000:

7,5 M

7M

Gambar 6.3 Permodelan Plat

58

Dari

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
59

Dari

Pada pelat lantai ukuran 7 x 7,5 didiskritisasi tiap 500 mm x 500 mm . Tumpuan struktur pelat lantai berupa spring dengan nilai konstanta spring yaitu 5000 kN/m3.
Besar konstanta spring tiap join berbeda-beda sesuai dengan luasan pelat yang ditumpu:

Ks joint tengah
Ks joint tepi
Ks joint ujung

note

E.

=
=
=

5000
5000
5000

kN/m3
kN/m3
kN/m3

x
x
x

0,5
0,5
0,5

m
m
m

x
x
x

0,5
0,5
0,5

m
m
m

x
x

0,5
0,25

=
=
=

nilai Ks joint tersebut akan dimasukkan ke dalam program bantu SAP dalam Assign joint spring sesuai dengan besarnya Ks
masing-masing pada translation 3.

Hasil Analisa Struktur Pelat Lantai Dengan Program Bantu SAP 2000

Gambar 6.4 Momen Pelat

1250
625
312,5

kN/m
kN/m
kN/m

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
60

Dari

Gambar 6.5 Lendutan Maksimum Pelat Lantai

F. MOMEN PLAT AKIBAT BEBAN TERFAKTOR 1,2D + 1,6L


Mu =

Ultimate moment,

0,742

kNm/m (maxsimum antara momen asli atau akibat mobilisasi m12)

G. SLAB REINFORCEMENT
1 = 0,85

For : fc' 30 MPa,

1 = 0.85 - 0.05 * ( fc' - 30) / 7 =

For : fc' > 30 MPa,

1 = 0,85

distribution factor
ratio in balance condition

b = 1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) = 0,0271


max moment resistance
Rmax = 0.75 * b * fy * [ 1 * 0.75 * b * fy / ( 0.85 * fc') ] = 6,5736
= 0,80
reduction factor for flexible rebar
d
d efective
reviewed from 1m slab

ds = ts + / 2 =

46,5

mm

d = h - ds =

103,5
1000

mm
mm

0,928

kNm

b=
Mn = Mu / =

nominal moment

Rn = Mn * 10-6 / ( b * d2 ) = 0,08658

moment resistance factor


Rn

<

Rmax (OK)

required rebar ratio


= 0.85 * fc' / fy * [ 1 - [ 1 2 * Rn / ( 0.85 * fc' ) ] =

0,0002

min =
=

0,0018
0,0018

minimum rebar ratio


As required

186

s = / 4 * * b / As =

712

mm

smax = 2 * h =

300

mm

smax =

200
200
200
200

required spacing
max spacing
s
s use
Use

s=
s=
D 13 As = / 4 * D 2 * b / s =

As

664

H. SLAB DEFLECTION CONTROL


deflection ()
Requirement:

mm2

As = b * d =

2,99
mm (Output SAP 2000, Gambar 6.5)
tot Lx / 240
2,990
<
29,2 SAVE (OK)

mm
mm
mm
mm
mm2

62

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001

Tanggal

Halaman

11/07/2015
61

Dari

62

6.2 Perencanaan Sloof Beton


Panjang Sloof
fc
fy
Tebal Selimut
Tulangan lentur
Tulangan geser
Dimensi sloof ( b x h)
d'

=
=
=
=
=
=
=

7,5
25
400
60
16
8
=

q tanah

m
Mpa
Mpa
mm
mm
mm

300
224

q sloof beton

h2
h sloof
L

mm
mm

300 mm

6.2.1 Penulangan Lentur Sloof


q tanah
q sloof beton
qD
qD terfaktor

=
=
=
=

0,1206
216
216,1206
302,56884

kg/m
kg/m
kg/m
kg/m

+
=

1,4 x qD

Penulangan Tumpuan (Momen Negatif)


2
= 1/12 x qD terfaktor x L

MuMu
b
h
1

=
=
=
=

1418,291438

0,85

= Untuk : fc' 30 MPa,

0,85

= Untuk : fc' > 30 MPa,

1 pakai

0,85

14182914,38
300
300

kgm
Nmm
mm
mm

0,0271

= b = 1* 0.85 * fc/ fy * 600 / ( 600 + fy )

max

0,0203

= max = 0.75 * b

min

=
=
=

0,0035

= min = 1.4 / fy
= m = fy / (0.85*fc')

17728642,97

Nmm

= Mn = Mu / =

1,178

N/mm2

= Rn = Mn / ( b * d2 )

Mn
Rn

18,824
0,8

= = 1 / m * [ 1 - * [1 2 * Rn * m / ( fy ) ]

0,00303

0,00350

As perlu
Gunakan Tulangan
Jumlah Tulangan (n)

235,20

mm2

=
=

3 D 16
3

buah

As pakai

602,88

mm

s
Kontrol s
Jumlah Tulangan tekan
n tekan pakai
Tulangan tekan

=
=
=
=
=

58,00
OK
1
3
3 D16

mm

= s =( b - ((2*t)+(2*D.Tulangan Geser)+(n * D. Tulangan Utama)) /(n-1)

buah
buah

= n > 3 buah (SNI 03- 2847 - 2002 pasal 23.10)

As pakai

602,88

perlu

= Syarat min < perlu < max


= As = * b * d

mm2

Penulangan Lapangan (Momen Positif)


2
= 1/24 x qD x L

Mu+
Mu
b
h
1

=
=
=
=

709,1457188

0,85

= Untuk : fc' 30 MPa,

0,85

= Untuk : fc' > 30 MPa,

1 pakai

0,85

7091457,188
300
300

kgm
Nmm
mm
mm

0,0271

= b = 1* 0.85 * fc/ fy * 600 / ( 600 + fy )

max

0,0203

= max = 0.75 * b

min

=
=
=

0,0035

= min = 1.4 / fy
= m = fy / (0.85*fc')

8864321,484

Mn

18,824
0,8
Nmm

= Mn = Mu / =

EPC FASILITAS PENANGANAN BATUBARA,


TANJUNG ENIM - TAHAP IV (PAKET 14-004)
Rev.C

Calculation Transfer Station TT-2


Foundation Load In BB

BA4-BB-CS-C-TT2-001
Rn

N/mm2

0,589

0,00149

= = 1 / m * [ 1 - * [1 2 * Rn * m / ( fy ) ]

0,00350

= Syarat min < perlu < max

As perlu
Gunakan Tulangan
Jumlah Tulangan (n)

235,20

mm

=
=

3 D 16
3

buah

As pakai

602,88

mm2

s
Kontrol s

=
=

58,00
OK

mm

perlu

Halaman

11/07/2015
62

Dari

Tanggal

= Rn = Mn / ( b * d )

= As = * b * d

= s =( b - ((2*t)+(2*D.Tulangan Geser)+(n * D. Tulangan Utama)) /(n-1)

6.2.2 Perencanaan Tulangan geser

Faktor reduksi geser,


Kuat geser yang disumbangkan beton,

Vu

Vc
Vc
Vc
Vc
Vc/2

=
=
=
=
=
=

1134,63315
11,3463315
0,75
56.000,00
56,00
42000
42
21

kg
kN

1/2 x quD x L

N
= Vc = (f`c )/6bwd
kN
N
kN
kN Vu < Vc, Tidak Butuh Tulangan Geser, digunakan tulangan
geser minimum

Sesuai dengan SNI 03.2847.2002 pasal 13.5.5 untuk tulangan geser minimum, dipilih nilai Av yang terbesar dari nilai berikut:
Av

=
=

Av

234,375 mm2

=
=

250

mm2

Dipilih begel 2 kaki berdiameter


8
2
Spasi begel (s)
=
n. 1/4. . d . S
Av
=
402,1238597
=
400

mm

Kontrol Spasi Tulangan Geser


Sesuai dengan SNI 03.2847.2002 pasal 13.5.4 untuk batas tulangan geser diambil terkecil dari berikut:
112
d/2
s =
mm
=
600
s =
mm
Digunakan Tulangan Geser =

100

mm

3 D 16

8-100
30 cm

3 D 16
30 cm

Gambar 6.6 Dimensi dan Penulangan Sloof

62

REPORT
Document Number

BA4-MTB/BB-TDS-C-SIR-001

SOIL INVESTIGATION
SURVEY REPORT
MTB/BB

No. Bor : BH08 (Lokasi: Banko Barat PTBA Tanjung Enim)


Titik koordinat : X = 368459,917
Y = 9588358,840
U1
: 1.50 - 2.00

Soil Test
Water Content (w)
Density

17,09

gr/cm3

2,01

Specific Gravity (Gs)


Atterberg Limits
LL
PL
PI
Sieve Analysis
No.
3/8
No.
4
No.
10
No.
20
No.
40
No.
60
No. 100
No. 200
Pan

2,65
%
%
%

NP
NP
NP

% passing
%
%
%
%
%
%
%
%
%

100,00
100,00
94,29
89,90
66,35
61,87
42,47
36,53
0,00

Consolidation
Cv
Cc

cm^2/mnt

kg/cm2

Triaxial

Z = 83,730

Rev. : A
Page
31 of 78