Analisa Sni 2014
Analisa Sni 2014
SATUAN
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
UPAH / GAJI
Pekerja
Buruh tak terlatih
Buruh terlatih
Tukang
Kepala tukang
Pembantu tukang
Mandor
Mekanik
Pembantu mekanik
Operator
Operator kurang terlatih
Pembantu operator
Masinis
Sopir
Sopir personil
Sopir pembantu
II
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
1
2
3
4
Batu Gunung
Batu gunung belah
Batu gunung belah
Batu gunung belah
Batu gunung belah
m3
m3
m3
m3
Batu Pecah
Batu pecah 0,5 - 1 cm
1
2
3
4
5
6
7
8
9
10
10 - 15 cm
15 - 20 cm
5/7 cm
3/5 cm
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
Hr/Kj
m3
NO
SATUAN
3
4
5
6
7
8
1
Batu pecah 1 - 2 cm
Batu pecah 2 - 3 cm
Batu pecah 3 - 5 cm
Batu pecah 5 - 7 cm
Batu pecah 7 - 10 cm
Batu Kerikil Bulat 1 - 2
Batu merah
Batu merah
m3
m3
m3
m3
m3
m3
Bh
NO
SATUAN
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
10
11
III
1
2
3
4
5
6
7
8
9
10
11
12
13
Paving Blok
Paving blok biasa 6 cm
Paving blok biasa 8 cm
Paving blok warna 6 cm
Paving blok warna 8 cm
Kapur / filter
Topluskup K 225
Kansting 10 x 25 x 50
Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm
Buis Beton 60 cm
Loster Beton 10 x 20
Loster Beton 20 x 20
Loster Beton 20 x 30
Bh
Bh
Bh
Bh
Zak
Biji
Biji
Biji
Biji
Biji
Biji
Biji
Biji
Biji
Batu Alam
Andesit Susun Sirih
Andesit Halus
Andesit Gelombang
Batu Candi Permukaan Rata
Batu Palimanan Kuning
Batu Hijau Sukambumi
Batu Bali Green
Batu Bali Napoli
Paras Jogja Besar
Batu Cirebon Beraturan
Batu Cirebon Tak Beraturan
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
M
M
M
M
M
M
M
M
M
M
M
M
M
NO
SATUAN
14
15
17
18
19
20
Kayu ulin
Kayu bakar
List kayu 1 x 4 cm
Kayu ulin (pattolo)
Kayu klas I papan 20 x 400 x 2
Kayu untuk perancah
M
M
M'
M'
Lbr
M
NO
SATUAN
1
2
3
4
5
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Semen
Semen PC tonasa @ 40 kg
Semen Putih @ 40 kg Garuda
Semen PC tonasa @ 50 kg
Semen PC bosowa @ 40 kg
Semen PC bosowa @ 50 kg
Besi
Tulang Besi beton polos (SII)
Besi beton polos dia 4 mm. SI1 - SNI
Besi beton polos dia 6 mm. SI1 - SNI
Besi beton polos dia 8 mm SI1 - SNI
Besi beton polos dia 10 mm SI1 - SNI
Besi beton polos dia 12 mm SI1 - SNI
Besi beton polos dia 14 mm SI1 - SNI
Besi beton polos dia 16 mm SI1 - SNI
Besi beton polos dia 19 mm SI1 - SNI
Besi beton polos dia 22 mm SI1 - SNI
Tulang Besi beton ulir (SII)
Besi beton ulir dia 10 mm.SI1-SNI
Besi beton ulir dia 12 mm.SI1-SNI
Besi beton ulir dia 14 mm.SI1-SNI
Besi beton ulir dia 16 mm.SI1-SNI
Besi beton ulir dia 19 mm.SI1-SNI
Besi beton ulir dia 22 mm.SI1-SNI
Besi Hollow 20.20
Besi Hollow 20.40
Besi Hollow 40.40
Besi Hollow 50.50
Besi strip 20.20
Besi plat 2 mm (120 x 240) cm
Besi plat 3 mm (120 x 240) cm
Besi H-Beam/IWF 250
Besi H-Beam/IWF 300
Lisplank ALCOPAN ( 120 X 240 )
Zak
Zak
Zak
Zak
Zak
Kg
9m /btg
12m/btg
12m/btg
12m/btg
12m/btg
12m/btg
12m/btg
12m/btg
12m/btg
Kg
12m/btg
12m/btg
12m/btg
12m/btg
12m/btg
12m/btg
btg
btg
btg
btg
12m/btg
Lbr
Lbr
btg
btg
Lbr
1
2
Besi Siku
Besi Siku L 30 x 30 x 3
Besi Siku L 40 x 40 x 4
btg
btg
1
2
Kawat
Kawat Beton
Kawat Licin
Kg
Kg
NO
SATUAN
3
4
5
Kawat Nyamuk
Kawat Ayakan Kecil
Kawat Duri
m2
m2
Gulung
NO
SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Paku
Paku biasa
Paku asbes
Paku jembatan
Paku enternit RRT
Paku seng (payung) RRT
Paku sekrup 3.5 inchi
Paku sekrup 4.0 inchi
Paku payung berulir 75 mm
Paku beton
Paku atap genteng asbes
Paku ulir
Paku sumbat
Paku atap
Paku kaso
Paku sirap
Paku Digilvano
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Dos
Kg
Kg
Biji
Biji
Kg
Kg
Biji
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Atap
Seng BJLS. 020 mm
Seng BJLS. 022 mm
Seng BJLS. 030 mm
Seng BJLS. 035 mm
Seng BJLS. 031 mm
Seng plat BJLS. 020
Seng plat BJLS. 030 mm 40 x 180
Seng plat BJLS. 035 mm
Seng superdeck 6 kk
Seng superdeck
Seng plastik 6 kk
Seng alumunium licin BJLS 031
Seng onduline
Seng licin 035
Seng licin BJLS. 020
Genteng keramik
Genteng beton
Genteng haples semen gelombang 5 mm
Genteng haples semen warna 11 x 85 x 5 mm
Asbes plat haples 200 x 100 x 0,5 cm
Nok genteng asbes warna
Genteng Kodok
Genteng Kodok Bubungan
Genteng Asbes Bangunan
Genteng metal 2 x 5
Kaki
Kaki
Lbr
Lbr
Kaki
Lbr
Lbr
Lbr
m
Lbr
Lbr
Kaki
Lbr
Lbr
M
Bh
Bh
Kaki
Lbr
Lbr
bh
bh
Lbr
Lbr
Lbr
NO
SATUAN
26
27
28
29
30
31
32
33
Nok metal
Nok genteng beton
Nok genteng keramik
Genteng asbes gelombang
Asbes gelombang 5 mm 7 kk
Nok steel gelombang
Bubungan asbes gelombang
Atap Spandek
bh
Bh
Bh
Lbr
Lbr
Lbr
Lbr
m2
NO
SATUAN
35
36
37
38
39
40
41
42
lbr
lbr
lbr
lbr
lbr
lbr
lbr
M
1
2
3
4
5
6
7
8
M
Lbr
Bh
Bh
Bh
6m/Lbr
6m/Lbr
6 m/Btg
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Tegel
PC 20 x 20 cm
PC 25 x 25 cm
Tegel PC Abu - abu 20 x 20
Tegel PC Abu - abu 30 x 30
Tegel PC warna 20 x 20
Tegel wafel PC 20 x 20 cm
Tegel wafel / keramik WC
Tegel wafel warna 30 x 30
Tegel wafel keramik 30 x 30
Tegel badak 20 x 20
Tegel badak 30 x 30
Tegel plint PC 15 x 20
Tegel plint 15 x 15
Tegel plint 15 x 20
Tegel plint 15 x 30
Tegel plint 15 x 25
Tegel plint 10 x 30
Tegel porselin 11 x 11
Tegel porselin 10 x 20
Tegel keramik polos 10 x 20
Tegel keramik polos 20 x 20
Tegel keramik polos 20 x 25
Tegel keramik polos 30 x 30
Tegel keramik warna 10 x 20
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
NO
SATUAN
25
26
27
28
29
30
31
32
33
Bh
Bh
Bh
Bh
Bh
m2
Bh
Bh
Bh
NO
SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
10
11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Bahan Plafond
Enternit 100 x 100 x 4
Tripleks 3 mm
Gamacca kulit
Sirap
Teakwood 3 x 7
Teakwood 4 x 8
Akustik 30 x 60 x 9
Gypsum Board
Kalsi Board
Lest Profil Plafond Gypsum
Rangka Hollow 20 x 40 Galvanis
Rangka Hollow 40 x 40 Galvanis
Teakwood lapis alumunium
Teakwood milamin
GRC Board
Kalsiplank 240 x 20
Kaca
Kaca rayben 5 mm
Kaca nako 5 mm dengan stan
Kaca bening 3 mm
Kaca bening 5 mm
Kaca bening 2 mm
Kaca buram 3 mm
Kaca buram 5 mm
Kaca rayben 3 mm
Rangka nako lengkap terali
Cermin tebal 3
Bahan Lain
Aspal
Solar
Oli / pelumas
Gemmuk
Bensin
Minyak Solar Industri
Minyak aspal
Minyak tanah
Minyak tanah Industri
Alat bantu
Pemasak aspal
Batu quarry / Batu gunung
Baja tulanagn beton
Kawat baja (Bindstaal)
Minyak diesel/ solar
Lbr
Lbr
M
Ikat
M
M
Lbr
Lbr
Lbr
M'
Btg
Btg
Bh
Bh
Lbr
Lbr
M
M
M
M
M
M
M
M
M
M
Kg
Ltr
Ltr
Kg
Ltr
Ltr
Ltr
Ltr
Ltr
Set
Hari
M
Kg
Kg
Ltr
NO
SATUAN
16
17
18
19
20
13
14
15
14
16
Tong
m
Bh
Bh
btg
kg
roll
m
m
m
NO
SATUAN
17
18
19
20
2
3
4
5
6
7
8
###
###
###
M
M
m
m
Bh
Set
Set
Set
Unit
Bh
Bh
Bh
Bh
Bh
Set
Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
1
2
3
4
5
6
7
Penggantung
Kunci tanam antik
Kunci pintu 2x slag merk jangkar
Expanyolet tanam
Engsel Pintu/Jendela
Spring knip
Door clooser Belucci
Rantai Gantung
Bh
Bh
Bh
Bh
Bh
Bh
M'
1
2
Ijuk
Ijuk hitam
Ijuk
M
Ikat
NO
SATUAN
NO
SATUAN
###
###
#
###
10
11
12
13
###
###
#
14
15
16
17
18
19
20
21
22
23
24
Listrik
Pas. Instalasi listrik
Skring kost lokal 1 group
Skring kost lokal 2 group
Balon pijar 40 watt philips
Balon pijar 36 watt philips
Balon neon 40 watt philips
Stop kontak hitam (broco)
Stop kontak putih (broco)
Fitting
Saklar phase engkel hitam (broco)
Saklar phase engkel putih (broco)
Saklar phase doublel hitam (broco)
Saklar phase double putih(broco)
Steker hitam
steker putih
Pipa union untuk kabel 5/8" - 4 m
Pipa union untuk kabel 1,0" - 4 m
Pipa union untuk kabel 1. 5" - 4 m
Pipa union untuk kabel 2.0" - 4 m
Kabel listrik type NYK 1.5 mm enterna
Kabel listrik type NYK 2.5 mm enterna
Kabel listrik NYY 2 x 1.5 mm eterna
Kabel listrik NYY 2 x 2.5 mm eterna
Kabel listrik NYY 2 x 4.0 mm eterna
Lampu TL 1 x 20 w
Lampu TL 2 x 20 w
Lampu TL 1 x 40 w
Lampu TL 2 x 40 w
Lampu pijar 25 w
Lampu pijar 60 w
Lampu pijar 100 w
Lampu taman mercuri
Sekring kost lokal
Lokal 3 group biasa
Down Light Ncolus
MCB 4 A
Titik
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Btg
Btg
Btg
Btg
Roll
Roll
Roll
Roll
Roll
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Btg
Btg
Btg
Btg
Btg
NO
SATUAN
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Btg
Btg
Btg
Btg
M
M
M
M
M
M
M
NO
SATUAN
4
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
M
M
Btg
Btg
Btg
Btg
Btg
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Kg
5 Kg
5 Kg
Kg
5 kg
2,5 Ltr
5 Kg
5 kg
20 kg
5 Kg
2.5 Ltr
Kg
1 Kaleng
Kg
10 Ltr
20 Kg
Ltr
Kg
Kg
Bh
Bh
NO
SATUAN
1
2
3
4
5
6
7
8
Glotek
Glotek
Glotek
Glotek
Glotek
Glotek
Glotek
Glotek
Sintesis
Aluminium
Meni Kayu
Meni Besi
Meni Besi
Dasar Putih
Vernis 1400
Vernis Sintesis
1 Liter
1 Liter
1 Kg
1 Kg
5 Kg
1 Kg
1 Liter
A 0,9 Ltr
NO
SATUAN
9
10
11
12
13
14
15
16
17
18
19
Glotek Aluminium
Metro Lite (Standar Warna)
Metro Lite (Warna Tua)
Metro Lite (Standar Warna)
Metro Lite (Standar Warna Tua )
Avian
Djarum
Vim
Glotex
Mowilex
Minyak cat
14
15
CAT TEMBOK
Cat Tembok Dasar Merk
Cat Tembok Dasar Merk
Cat Tembok Dasar Merk
Cat Tembok Dasar Merk
Cat Tembok Dasar Merk
Tiger
Maritex
Asri
Bumilex
Aries
Maritex
Metrolite
Mouilex untukDalam
Mouilex untuk Luar
Nippon Paint
Avilux
Avitex
Avitex
Avitex Flourecent
Aries
16
Djarum
17
Belmas Standar
18
19
2
3
4
5
6
7
8
9
10
11
12
13
Nippon Paint
Mowilekx
Aries
Avitekx
Metrolite
A 0,2 Ltr
5 Kg
1 Kg
20 Kg
20 Kg
1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
Ltr
5 ltr
5 ltr
5 ltr
5 ltr
5 ltr
1 Kg
1 Kg
1 Kg
1 Kg
5 Kg
1 kg
5 kg
2.5 ltr
2.5 Itr
2,5 Itr
5 kg
5 kg
25 kg
200 cc
5 kg
20 kg
25 kg
1 kg
5 kg
1 kg
5 Kg
20 Kg
1 Kg
5 Kg
1 Kg
5 Kg
NO
SATUAN
20
Virgo
21
22
5 Kg
20 Kg
5 Kg
25 Kg
1 Kg
4 Kg
20 Kg
NO
SATUAN
23
Avian synthetic
24
25
26
1 Kg
0,5 Kg
200 cc
100 cc
50 cc
1 Kg
0.5 Kg
100 cc
0,75 Ltr
0,4 Ltr
200 cc
27
28
29
30
31
32
D'arum S nthetic
Diarum Aluminium 200
Yoke nthetic
Belmas Cat Pa an Tulis Hijau
Belmas Cat Pa an Tulis Hitam
Avian Zinc Chromate
33
34
35
36
37
38
39
40
41
42
43
44
Suzuka Start/Span/Fluor/Tembags
45
100 cc
35 Kg
0,8 Ltr
0,75 Ltr
0,8 Kg
1 Kg
0,5 Kg
1 Kg
4 Kg
5 Kg
5 Kg
1 Kg
4 Kg
0,75 Kg
3,5 Kg
1 Kg
5 Kg
1 Kg
5 Kg
1 Kg
0,5 Kg
1 Kg
0,5 Kg
1 Liter
1 Kg
1 Kg
200 cc
1 Kg
200 cc
1 Kg
200 cc
200 cc
1 Kg
NO
SATUAN
46
47
48
49
50
51
52
53
54
1 kg
300 cc
300 cc
300 cc
300 cc
300 cc
300 cc
1 Kg
1 Kg
NO
SATUAN
55
56
57
58
59
60
61
Avian Antfouling
62
63
64
Thinner A Avia
65
Thinner A Aries
66
67
1
Thinner Enamel
Thinner B Asli Avia
CAT GENTENG
Avicryl
2
3
4
5
6
Avitex
Djarum
Belmas
Yoko
Fres Emulsion Standart
1
1
2
3
4
1 Kg
1 Ltr
1 Ltr
1 Ltr
1 Kg
250 cc
350 gr
1,7 Kg
1 Kg
5 Kg
1 Ltr
5 Ltr
1 Ltr
5 Ltr
0,5 Ltr
1 Ltr
5 Ltr
1 Ltr
5 Ltr
1 Ltr
1 Ltr
4 Kg
20 Kg
4 Kg
4 Kg
4 Kg
4 Kg
5 Kg
25 Kg
5 Kg
25 Kg
NO
1
6
7
SATUAN
3
1 Ltr
5 Ltr
5 Ltr
1 Ltr
1 Kg
1 Ltr
1,4 Ltr
1 Ltr
1 Ltr
1 Ltr
300 cc
014
HARGA (Rp)
4
50,750.00
###
55,000.00
75,000.00
85,000.00
55,000.00
90,000.00
87,250.00
57,500.00
90,000.00
57,500.00
46,000.00
64,000.00
87,000.00
115,000.00
87,000.00
38,000.00
50,000.00
98,950.00
89,000.00
89,000.00
93,750.00
109,375.00
77,300.00
130,000.00
121,875.00
106,250.00
127,050.00
125,000.00
###
281,250.00
HARGA (Rp)
4
218,750.00
203,125.00
181,250.00
148,400.00
140,625.00
156,250.00
625.00
HARGA (Rp)
4
1,250.00
1,500.00
1,625.00
1,875.00
3,125.00
5,000.00
43,750.00
143,750.00
206,250.00
287,500.00
30,000.00
10,000.00
11,250.00
12,500.00
250,000.00
271,875.00
250,000.00
271,875.00
250,000.00
271,875.00
###
250,000.00
###
246,875.00
250,000.00
12,983,300.00
6,250,000.00
2,750,000.00
11,458,300.00
11,250,000.00
3,125,000.00
###
6,250,000.00
6,562,500.00
6,250,000.00
2,625,000.00
2,750,000.00
6,250,000.00
HARGA (Rp)
4
11,250,000.00
156,250.00
10,900.00
168,750.00
246,875.00
6,250,000.00
HARGA (Rp)
4
57,900.00
78,125.00
69,150.00
53,750.00
66,250.00
15,100.00
15,000.00
33,125.00
56,250.00
81,250.00
119,500.00
162,500.00
212,500.00
321,875.00
481,250.00
15,500.00
87,500.00
121,875.00
171,875.00
221,875.00
343,750.00
500,000.00
70,300.00
89,050.00
126,550.00
196,875.00
21,875.00
612,500.00
875,000.00
6,625,000.00
8,750,000.00
775,000.00
81,250.00
146,875.00
21,250.00
31,250.00
HARGA (Rp)
4
25,000.00
###
193,750.00
HARGA (Rp)
4
18,750.00
28,125.00
31,250.00
34,375.00
37,500.00
###
37,500.00
18,750.00
38,750.00
31,250.00
21,550.00
625.00
31,250.00
312,500.00
840.00
6,875.00
###
83,750.00
97,500.00
11,500.00
56,250.00
62,500.00
93,750.00
51,500.00
9,600.00
31,250.00
60,000.00
193,750.00
93,750.00
15,000.00
18,750.00
9,600.00
27,000.00
57,500.00
15,000.00
36,000.00
2,400.00
4,300.00
33,000.00
37,500.00
HARGA (Rp)
4
37,500.00
19,000.00
31,250.00
46,250.00
48,125.00
37,800.00
31,200.00
48,400.00
HARGA (Rp)
4
100,000.00
58,750.00
58,400.00
38,125.00
43,750.00
62,500.00
50,000.00
53,125.00
100,000.00
56,250.00
600.00
480.00
4,375.00
106,250.00
97,500.00
68,750.00
2,675.00
3,425.00
2,750.00
6,800.00
2,750.00
###
3,600.00
7,375.00
###
2,150.00
4,300.00
2,700.00
2,731.00
3,480.00
4,200.00
3,480.00
###
1,275.00
1,500.00
2,875.00
5,650.00
1,625.00
HARGA (Rp)
4
2,875.00
7,050.00
14,000.00
52,300.00
3,375.00
585,000.00
64,500.00
41,625.00
51,550.00
HARGA (Rp)
4
21,875.00
60,625.00
14,400.00
121,875.00
150,000.00
43,125.00
70,000.00
71,250.00
21,250.00
22,500.00
31,250.00
150,000.00
118,750.00
71,250.00
58,500.00
133,500.00
400,000.00
97,900.00
116,650.00
68,750.00
162,500.00
265,625.00
106,250.00
500,000.00
262,500.00
11,500.00
6,000.00
20,500.00
8,625.00
6,000.00
10,800.00
3,450.00
7,000.00
10,250.00
86,250.00
35,900.00
21,550.00
5,625.00
HARGA (Rp)
4
237,075.00
179,675.00
28,750.00
100,000.00
31,250.00
###
1,812,500.00
9,050.00
15,000.00
135,000.00
HARGA (Rp)
4
593,750.00
437,500.00
500,000.00
1,000,000.00
287,500.00
150,000.00
500,000.00
2,500,000.00
747,500.00
250,000.00
550,000.00
375,000.00
600,000.00
625,000.00
331,250.00
254,150.00
179,675.00
1,500,000.00
3,562,500.00
12,500.00
31,250.00
43,750.00
37,500.00
50,000.00
68,750.00
218,750.00
197,950.00
75,000.00
46,875.00
96,875.00
57,500.00
25,000.00
212,500.00
250,000.00
15,000.00
115,000.00
40,250.00
HARGA (Rp)
4
HARGA (Rp)
4
150,000.00
3,750.00
5,875.00
12,500.00
15,625.00
15,000.00
14,375.00
13,750.00
10,625.00
13,750.00
###
17,050.00
20,900.00
14,375.00
4,550.00
7,250.00
22,500.00
29,375.00
40,000.00
731,250.00
1,062,500.00
###
1,393,750.00
2,000,000.00
112,500.00
126,250.00
113,300.00
140,625.00
6,875.00
8,300.00
9,375.00
162,500.00
15,625.00
21,250.00
65,875.00
85,000.00
175,000.00
81,250.00
190,625.00
459,375.00
162,500.00
HARGA (Rp)
4
118,750.00
168,750.00
293,750.00
687,500.00
236,000.00
163,775.00
98,425.00
1,330,000.00
950,000.00
73,600.00
34,500.00
HARGA (Rp)
4
340,450.00
232,500.00
137,500.00
96,875.00
46,875.00
27,050.00
32,050.00
2,250.00
3,300.00
13,750.00
2,250.00
3,300.00
13,750.00
31,250.00
60,800.00
52,500.00
21,600.00
56,250.00
25,000.00
18,750.00
54,000.00
75,000.00
81,250.00
115,625.00
250,000.00
109,375.00
43,750.00
259,375.00
143,750.00
331,250.00
231,250.00
159,375.00
18,750.00
12,500.00
86,250.00
28,125.00
27,075.00
18,750.00
3,541.00
18,750.00
HARGA (Rp)
4
31,050.00
40,000.00
62,500.00
###
65,550.00
20,125.00
23,000.00
27,600.00
HARGA (Rp)
4
18,750.00
115,625.00
396,000.00
512,500.00
396,000.00
61,250.00
48,300.00
50,000.00
81,250.00
81,250.00
31,250.00
143,750.00
128,125.00
43,750.00
109,375.00
118,875.00
25,000.00
31,250.00
###
28,125.00
43,750.00
31,250.00
118,750.00
153,125.00
231,250.00
250,000.00
78,000.00
109,375.00
459,375.00
100,000.00
43,750.00
162,500.00
168,750.00
43,750.00
77,600.00
7,475.00
28,500.00
205,700.00
17,800.00
100,800.00
14,300.00
60,300.00
HARGA (Rp)
4
37,500.00
137,500.00
56,250.00
206,250.00
62,500.00
218,750.00
937,500.00
HARGA (Rp)
4
60,000.00
18,975.00
18,750.00
11,250.00
9,000.00
35,500.00
18,900.00
18,000.00
62,500.00
12,650.00
25,000.00
18,750.00
31,650.00
47,500.00
18,000.00
43,750.00
10,000.00
23,800.00
81,075.00
98,000.00
###
17,000.00
14,000.00
67,000.00
12,000.00
14,000.00
12,000.00
62,000.00
34,000.00
62,000.00
59,375.00
31,250.00
68,750.00
42,000.00
81,250.00
75,000.00
68,750.00
47,000.00
42,000.00
29,000.00
14,000.00
61,000.00
37,000.00
9,500.00
HARGA (Rp)
4
81,250.00
22,000.00
21,000.00
18,000.00
22,000.00
21,000.00
18,000.00
21,000.00
22,000.00
HARGA (Rp)
4
19,000.00
26,000.00
61,000.00
###
62,500.00
40,625.00
47,900.00
178,125.00
78,000.00
149,000.00
33,750.00
150,000.00
35,625.00
159,375.00
28,750.00
32,500.00
131,250.00
32,500.00
121,875.00
33,125.00
25,000.00
375,000.00
800,400.00
106,250.00
84,525.00
84,000.00
100,000.00
71,875.00
347,875.00
78,775.00
379,500.00
312,500.00
143,750.00
74,750.00
48,875.00
46,000.00
81,250.00
187,500.00
HARGA (Rp)
4
23,000.00
97,750.00
143,750.00
81,250.00
48,875.00
31,625.00
125,000.00
32,500.00
35,625.00
35,000.00
25,000.00
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
0.0112
Paku
Kg
0.080
Kaso 5/7
Btg
1.000
Pekerja
OH
Tukang batu
OH
0.300
Kepala tukang
OH
Mandor
OH
B.1
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Btg
1.250
Semen
Kg
2.500
Pasir beton
0.005
Koral beton
0.009
Kayu 5/7
0.072
Kg
0.060
Reseidu
Kg
0.400
Pekerja
OH
0.200
Tukang kayu
OH
0.400
Kepala tukang
OH
0.020
Mandor
OH
0.020
B.4
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Kayu 5/7
0.012
Paku
Kg
0.020
Btg
0.007
Pekerja
OH
0.100
Tukang batu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.005
B.6
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Btg
1.700
Semen
Kg
0.210
Pasir beton
0.300
Koral beton
10.500
Kayu 5/7
0.030
Kg
0.050
Kaki
1.500
Pekerja
OH
2.000
Tukang kayu
OH
1.000
Kepala tukang
OH
0.200
Mandor
OH
0.050
B.8
Kebutuhan
Tenaga kerja
Satuan
Indeks
Pekerja
OH
0.100
Mandor
OH
0.050
B.9
Kebutuhan
Bahan
Satuan
Indeks
Btg
1.250
Semen
Kg
0.180
Pasir beton
0.300
Koral beton
18.000
Kayu 5/7
0.030
Kg
0.050
Tenaga kerja
Lbr
1.500
Plywood 3 mm
Lbr
1.350
Pekerja
OH
2.000
Tukang kayu
OH
1.000
Kepala tukang
OH
0.200
Mandor
OH
0.050
B.11
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Bambu 6 - 8/600 cm
Btg
1.000
Tali ijuk
Kg
0.250
Pekerja
OH
0.017
Tukang batu
OH
0.002
Kepala tukang
OH
0.250
Mandor
OH
0.013
B.13
Kebutuhan
Tenaga kerja
Satuan
Indeks
Pekerja
OH
6.667
Mandor
OH
0.333
B.14
Kebutuhan
Tenaga kerja
Satuan
Indeks
Pekerja
OH
6.667
Mandor
OH
0.033
B.16
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Lbr
0.980
Btg
0.525
Pasir beton
0.074
Koral beton
0.146
Kg
45.000
Pekerja
OH
0.125
Tukang kayu
OH
0.375
Kepala tukang
OH
0.012
Mandor
OH
0.019
PEKERJAAN TANAH
6.1 Menggali 1 m tanah biasa sedalam 1 meter
Kebutuhan
Satuan
Indeks
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
0.750
Mandor
OH
0.025
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
0.900
Mandor
OH
0.045
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
1.050
Mandor
OH
0.067
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
1.000
Mandor
OH
0.032
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
1.500
Mandor
OH
0.060
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Sirtu
1.200
Pekerja
OH
0.250
Mandor
OH
0.025
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
1.200
Mandor
OH
0.045
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
0.050
Mandor
OH
0.005
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
0.033
Mandor
OH
0.010
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
0.248
Mandor
OH
0.008
6.10'
Kebutuhan
Tenaga Kerja
Satuan
Indeks
Pekerja
OH
0.500
Mandor
OH
0.050
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Pasir Urug
1.200
Tanah Timbunan
1.200
Pekerja
OH
0.300
Mandor
OH
0.010
PEKERJAAN PONDASI
6.1 Memasang 1 M Pondasi Batu Belah, Campuran 1 PC : 3 PP
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
1.200
Semen
Kg
202
Pasir
0.485
Pekerja
OH
1.500
Tukang batu
OH
0.600
Kepala tukang
OH
0.060
Mandor
OH
0.075
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
1.200
Semen
Kg
163
Pasir
0.520
Pekerja
OH
1.500
Tukang batu
OH
0.600
Kepala tukang
OH
0.060
Mandor
OH
0.075
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
1.200
Pasir Urug
0.432
Pekerja
OH
0.780
Tukang batu
OH
0.390
Kepala tukang
OH
0.039
Mandor
OH
0.039
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Paving Blok 6 cm
50.000
Pasir Urug
0.200
Pekerja
OH
0.720
Tukang batu
OH
0.135
Kepala tukang
OH
0.014
Mandor
OH
0.036
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Paving Blok 8 cm
50.000
Pasir Urug
0.200
Pekerja
OH
0.720
Tukang batu
OH
0.135
Kepala tukang
OH
0.014
Mandor
OH
0.036
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.480
Semen
Kg
194.0
Pasir Beton
0.312
Kerikil
0.468
Besi beton
Kg
126.0
Kawat Beton
Kg
1.800
Pekerja
OH
3.000
Tukang batu
OH
0.850
Kepala tukang
OH
0.085
Mandor
OH
0.150
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.450
Semen
Kg
194.0
Pasir Beton
0.312
Kerikil
0.468
Pekerja
OH
2.380
Tukang batu
OH
0.300
Kepala tukang
OH
0.030
Mandor
OH
0.080
PEKERJAAN DINDING
6.1 Memasang 1 M dinding tebal 1 bata, campuran spesi 1 PC: 3 PP
Kebutuhan
Bahan
Bata merah
Satuan
Buah
Indeks
140.000
Tenaga Kerja
Semen
Kg
32.950
Pasir
0.091
Pekerja
OH
0.600
Tukang Batu
OH
0.200
Kepala Tukang
OH
0.020
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga Kerja
Bata merah
Satuan
Buah
Indeks
140.000
Semen
Kg
26.550
Pasir
0.093
Pekerja
OH
0.600
Tukang Batu
OH
0.200
Kepala Tukang
OH
0.020
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga Kerja
Bata merah
Satuan
Indeks
Buah
70.000
Semen
Kg
18.950
Pasir
0.038
Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
Mandor
OH
0.015
Kebutuhan
Bahan
Tenaga Kerja
Bata merah
Satuan
Indeks
Buah
70.000
Semen
Kg
14.370
Pasir
0.040
Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
Mandor
OH
0.015
Kebutuhan
Bahan
Tenaga Kerja
Bata merah
Satuan
Indeks
Buah
70.000
Semen
Kg
11.500
Pasir
0.043
Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
Mandor
OH
0.015
Kebutuhan
Bahan
Tenaga Kerja
Bata merah
Satuan
Buah
Indeks
70.000
Semen
Kg
9.680
Pasir
0.045
Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
Mandor
OH
0.015
PEKERJAAN PLESTERAN
6.2 Memasang 1 M Plesteran 1PC : 2 PP tebal 15 mm
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
10.244
Pasir
0.020
Pekerja
OH
0.200
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
Mandor
OH
0.010
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
7.776
Pasir
0.023
Pekerja
OH
0.200
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
Mandor
OH
0.010
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
6.240
Pasir
0.024
Pekerja
OH
0.200
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
Mandor
OH
0.010
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
5.184
Pasir
0.026
Pekerja
OH
0.200
Tukang Batu
OH
0.150
Kepala Tukang
OH
0.015
Mandor
OH
0.010
Kebutuhan
Satuan
Indeks
Bahan
Semen
Kg
3.108
Tenaga Kerja
Pekerja
OH
0.150
Tukang Batu
OH
0.070
Kepala Tukang
OH
0.007
Mandor
OH
0.008
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
6.340
Pasir
0.012
Pekerja
OH
0.300
Tukang Batu
OH
0.140
Kepala Tukang
OH
0.014
Mandor
OH
0.015
Kebutuhan
Satuan
Indeks
Bahan
Semen
Kg
3.250
Tenaga Kerja
Pekerja
OH
0.150
Tukang Batu
OH
0.100
Kepala Tukang
OH
0.010
Mandor
OH
0.008
PEKERJAAN BETON
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
247.000
Pasir beton
Kg
869.000
Kg
999.000
Air
Ltr
215.000
Pekerja
OH
1.650
Tukang batu
OH
0.275
Kepala tukang
OH
0.028
Mandor
OH
0.083
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
276.000
Pasir beton
Kg
828.000
Kg
1,012.00
Air
Ltr
215.000
Pekerja
OH
1.650
Tukang batu
OH
0.275
Kepala tukang
OH
0.028
Mandor
OH
0.083
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
299.000
Pasir beton
Kg
799.000
Kg
1,017.00
Air
Ltr
215.000
Pekerja
OH
1.650
Tukang batu
OH
0.275
Kepala tukang
OH
0.028
Mandor
OH
0.083
6.4 Membuat 1 M Lantai Kerja Beton mutu fc = 7,4 Mpa (K100) W/c= 0,87
Kebutuhan
Bahan
Satuan
Indeks
Semen
Kg
230.000
Pasir beton
Kg
893.000
Kg
1,027.00
Tenaga Kerja
Air
Ltr
200.000
Pekerja
OH
1.200
Tukang batu
OH
0.200
Kepala tukang
OH
0.020
Mandor
OH
0.060
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
326.000
Pasir beton
Kg
769.000
Kg
1,029.00
Air
Ltr
215.000
Pekerja
OH
1.650
Tukang batu
OH
0.275
Kepala tukang
OH
0.028
Mandor
OH
0.083
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
352.000
Pasir beton
Kg
731.000
Kg
1,031.00
Air
Ltr
215.000
Pekerja
OH
1.650
Tukang batu
OH
0.275
Kepala tukang
OH
0.028
Mandor
OH
0.083
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
371.000
Pasir beton
Kg
698.000
Kg
1,047.00
Air
Ltr
215.000
Pekerja
OH
1.650
Tukang batu
OH
0.275
Kepala tukang
OH
0.028
Mandor
OH
0.083
Kebutuhan
Bahan
Satuan
Indeks
Semen
Kg
384.000
Pasir beton
Kg
692.000
Kg
1,039.00
Air
Ltr
215.000
Tenaga Kerja
Pekerja
OH
1.650
Tukang batu
OH
0.275
Kepala tukang
OH
0.028
Mandor
OH
0.083
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
406.000
Pasir beton
Kg
684.000
Kg
1,026.00
Air
Ltr
215.000
Pekerja
OH
1.650
Tukang batu
OH
0.275
Kepala tukang
OH
0.028
Mandor
OH
0.083
6.10'
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
413.000
Pasir beton
Kg
681.000
Kg
1,021.00
Air
Ltr
215.000
Pekerja
OH
1.650
Tukang batu
OH
0.275
Kepala tukang
OH
0.028
Mandor
OH
0.083
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Semen
Kg
439.000
Pasir beton
Kg
670.000
Kg
1,006.00
Air
Ltr
215.000
Pekerja
OH
2.100
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.105
Kebutuhan
Bahan
Satuan
Indeks
Semen
Kg
448.000
Pasir beton
Kg
667.000
Kg
1,000.0
Tenaga Kerja
Air
Ltr
215.000
Pekerja
OH
2.100
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.105
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Kg
10.500
Kawat beton
Kg
0.150
Pekerja
OH
0.070
Tukang batu
OH
0.070
Kepala tukang
OH
0.007
Mandor
OH
0.004
Jumla
6.20'
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.040
Paku 5 cm -10 cm
Kg
0.300
Minyak bekesting
Ltr
0.100
Pekerja
OH
0.520
Tukang batu
OH
0.260
Kepala tukang
OH
0.026
Mandor
OH
0.026
Bek
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.045
Paku 5 cm -10 cm
Kg
0.300
Minyak bekesting
Ltr
0.100
Pekerja
OH
0.520
Tukang batu
OH
0.260
Kepala tukang
OH
0.026
Mandor
OH
0.026
Bek
Kebutuhan
Bahan
Satuan
Indeks
0.040
Paku 5 cm -10 cm
Kg
0.400
Minyak bekesting
Ltr
0.200
0.015
Plywood tebal 9 mm
Lbr
0.350
Tenaga Kerja
Btg
2.000
Pekerja
OH
0.660
Tukang batu
OH
0.330
Kepala tukang
OH
0.033
Mandor
OH
0.033
Bek
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.040
Paku 5 cm -10 cm
Kg
0.400
Minyak bekesting
Ltr
0.200
0.018
Plywood tebal 9 mm
Lbr
0.350
Btg
2.000
Pekerja
OH
0.660
Tukang batu
OH
0.330
Kepala tukang
OH
0.033
Mandor
OH
0.033
Bek
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.030
Paku 12 Cm
Kg
0.400
Minyak bekesting
Ltr
0.200
0.020
Plywood tebal 9 mm
Lbr
0.350
Btg
3.000
Btg
4.000
Pekerja
OH
0.660
Tukang batu
OH
0.330
Kepala tukang
OH
0.033
Mandor
OH
0.033
Bek
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.040
Paku 12 Cm
Kg
0.400
Minyak bekesting
Ltr
0.200
0.015
Plywood tebal 9 mm
Lbr
0.350
Btg
6.000
Pekerja
OH
0.660
Tukang batu
OH
0.330
Kepala tukang
OH
0.033
Mandor
OH
0.033
Bek
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.030
Paku 12 Cm
Kg
0.400
Minyak bekesting
Ltr
0.150
0.015
Plywood tebal 9 mm
Lbr
0.350
Btg
2.000
Pekerja
OH
0.660
Tukang batu
OH
0.330
Kepala tukang
OH
0.033
Mandor
OH
0.033
Bek
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.320
Paku 12 Cm
Kg
3.200
Minyak bekesting
Ltr
1.600
Kg
157.500
Kawat beton
Kg
2.250
Semen
Kg
336.000
Pasir beton
0.540
Kerikil
0.810
0.120
Plywood tebal 9 mm
Lbr
2.800
Btg
32.000
Pekerja
OH
5.300
Tukang batu
OH
0.275
Tukang kayu
OH
1.300
Tukang besi
OH
1.050
Kepala tukang
OH
0.265
Mandor
OH
0.265
Kebutuhan
Bahan
Satuan
Indeks
0.240
Paku 12 Cm
Kg
3.200
Minyak bekesting
Ltr
1.600
Kg
157.500
Kawat beton
Kg
2.250
Semen
Kg
336.000
Pasir beton
0.540
Tenaga Kerja
Kerikil
0.810
0.160
Plywood tebal 9 mm
Lbr
2.800
Btg
24.000
Pekerja
OH
5.300
Tukang batu
OH
0.275
Tukang kayu
OH
1.300
Tukang besi
OH
1.050
Kepala tukang
OH
0.265
Mandor
OH
0.265
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.250
Paku 12 Cm
Kg
3.000
Minyak bekesting
Ltr
1.200
Kg
210.000
Kawat beton
Kg
3.000
Semen
Kg
336.000
Pasir beton
0.540
Kerikil
0.810
0.105
Plywood tebal 9 mm
Lbr
2.500
Btg
14.000
Pekerja
OH
5.650
Tukang batu
OH
0.275
Tukang kayu
OH
1.560
Tukang besi
OH
1.400
Kepala tukang
OH
0.323
Mandor
OH
0.283
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.020
Paku 12 Cm
Kg
0.010
Minyak bekesting
Ltr
Kg
3.000
Kawat beton
Kg
0.450
Semen
Kg
4.000
Pasir beton
0.060
Kerikil
0.009
Pekerja
OH
0.180
Tukang batu
OH
0.020
Tukang kayu
OH
0.020
Tukang besi
OH
0.020
Kepala tukang
OH
0.060
Mandor
OH
0.090
PEKERJAAN KAYU
6.1 Membuat dan memasang 1 M Kusen Pintu dan Jendela, Kayu Kls I
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
1.100
Paku 10 Cm
Kg
1.250
Lem kayu
Kg
1.000
Pekerja
OH
6.000
Tukang Kayu
OH
20.000
Kepala tukang
OH
2.000
Mandor
OH
0.300
6.2 Membuat dan memasang 1 M Kusen Pintu dan Jendela, Kayu Kls II & III
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Balok kayu II
1.200
1.200
Paku 10 Cm
Kg
1.250
Lem kayu
Kg
1.000
Pekerja
OH
6.000
Tukang Kayu
OH
18.000
Kepala tukang
OH
2.000
Mandor
OH
0.300
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.040
Paku 10 Cm
Kg
0.050
Pekerja
OH
0.350
Tukang Kayu
OH
1.050
Kepala tukang
OH
0.105
Mandor
OH
0.018
6.4 Membuat dan memasang 1 M Kusen Pintu Klamp, Kayu Kls III
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.040
Paku 10 Cm
Kg
0.050
Pekerja
OH
0.350
Tukang Kayu
OH
1.050
Kepala tukang
OH
0.105
Mandor
OH
0.018
6.5 Membuat dan memasang 1 M2 Daun Pintu Panel, Kayu Kls I Atau II
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.040
Papan Kayu II
0.040
Lem Kayu
Kg
0.500
Pekerja
OH
1.000
Tukang Kayu
OH
2.500
Kepala tukang
OH
0.250
Mandor
OH
0.050
6.6 Membuat dan memasang 1 M2 Pintu & Jendela Kaca, Kayu Kls I Atau II
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.024
Lem Kayu
Kg
0.300
Pekerja
OH
0.800
Tukang Kayu
OH
2.000
Kepala tukang
OH
0.200
Mandor
OH
0.040
6.7 Membuat dan memasang 1 M Jendela Kaca Jungkit , Kayu Kls I Atau II
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.035
Kaca Ryben 5 mm
M2
0.550
Pekerja
OH
0.800
Tukang Kayu
OH
2.400
Kepala tukang
OH
0.240
Mandor
OH
0.040
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.025
Paku 1 cm - 2,5 cm
Kg
0.030
Lem Kayu
Kg
0.500
Plywood tebal 3 mm
Lbr
1.000
Pekerja
OH
0.600
Tukang Kayu
OH
2.000
Kepala tukang
OH
0.200
Mandor
OH
0.030
6.9 Membuat 1 M Pintu Plywood rangkap, rangka expose Kayu Kls I Atau II
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.026
Paku 1 cm - 2,5 cm
Kg
0.030
Lem Kayu
Kg
0.500
Plywood tebal 3 mm
Lbr
1.000
Pekerja
OH
0.800
Tukang Kayu
OH
2.000
Kepala tukang
OH
0.200
Mandor
OH
0.040
6.10.
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.060
Paku 1 cm - 2,5 cm
Kg
0.150
Pekerja
OH
0.500
Tukang Kayu
OH
2.000
Kepala tukang
OH
0.200
Mandor
OH
0.025
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.025
Paku 1 cm - 2,5 cm
Kg
0.030
Lem Kayu
Kg
0.300
Teakwood tebal 3 mm
Lbr
1.000
Pekerja
OH
0.800
Tukang Kayu
OH
2.000
Kepala tukang
OH
0.200
Mandor
OH
0.040
6.12 Memasang1 M Teakwood Rangkap Lapis Formika, Rangka Expose Kayu Kls I
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Papan Kayu
0.025
Paku 1 cm - 2,5 cm
Kg
0.030
Lem Kayu
Kg
0.800
Teakwood tebal 4 mm
Lbr
1.000
Formika
Lbr
0.500
Pekerja
OH
0.800
Tukang Kayu
OH
2.500
Kepala tukang
OH
0.250
Mandor
OH
0.040
6.13 Memasang1 M Konstruksi Kuda - kuda Konvensional Kayu Kls I, II dan III
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Balok Kayu I
1.100
Balok Kayu II
1.100
1.100
Besi Strip
M'
15.000
Paku 1 cm - 2,5 cm
Kg
5.600
Pekerja
OH
4.000
Tukang Kayu
OH
12.000
Kepala tukang
OH
1.200
Mandor
OH
0.200
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
1.200
Besi Strip
M'
15.000
Paku 1 cm - 2,5 cm
Kg
5.600
Pekerja
OH
6.000
Tukang Kayu
OH
20.000
Kepala tukang
OH
2.000
Mandor
OH
0.300
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
1.100
Besi Strip
M'
15.000
Paku 1 cm - 2,5 cm
Kg
3.000
Pekerja
OH
2.400
Tukang Kayu
OH
7.200
Kepala tukang
OH
0.720
Mandor
OH
0.120
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.165
Paku 5 cm - 10 cm
Kg
0.200
Pekerja
OH
0.120
Tukang Kayu
OH
0.120
Kepala tukang
OH
0.012
Mandor
OH
0.006
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.015
Paku 7 cm - 10 cm
Kg
0.200
Pekerja
OH
0.150
Tukang Kayu
OH
0.250
Kepala tukang
OH
0.025
Mandor
OH
0.075
6.20'
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.016
Paku 7 cm - 10 cm
Kg
0.250
Pekerja
OH
0.200
Tukang Kayu
OH
0.300
Kepala tukang
OH
0.030
Mandor
OH
0.010
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.011
Paku 5 cm - 7 cm
Kg
0.100
Pekerja
OH
0.100
Tukang Kayu
OH
0.200
Kepala tukang
OH
0.025
Mandor
OH
0.005
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.011
Paku 5 cm - 7 cm
Kg
0.050
Pekerja
OH
0.100
Tukang Kayu
OH
0.200
Kepala tukang
OH
0.020
Mandor
OH
0.005
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.028
Paku 5 cm - 7 cm
Kg
0.150
Pekerja
OH
0.150
Tukang Kayu
OH
0.450
Kepala tukang
OH
0.045
Mandor
OH
0.008
6.24 Memasang1 M Rangka Dinding Pemisah Teakwood Kayu Kls II Atau III
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.028
Paku 5 cm - 7 cm
Kg
0.150
Teakwood tebal 3 mm
Lbr
0.860
Lem Kayu
Kg
0.560
Pekerja
OH
0.150
Tukang Kayu
OH
0.450
Kepala tukang
OH
0.045
Mandor
OH
0.008
6.25 Memasang1 M Rangka Dinding Pemisah Plywood Kayu Kls II Atau III
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.028
Paku 5 cm - 7 cm
Kg
0.150
Plywood tebal 3 mm
Lbr
0.860
Lem Kayu
Kg
0.560
Pekerja
OH
0.200
Tukang Kayu
OH
0.600
Kepala tukang
OH
0.060
Mandor
OH
0.010
Kebutuhan
Bahan
Satuan
Indeks
0.007
Paku 5 cm - 7 cm
Kg
0.100
Paku Sekrup 10 Cm
Lbr
0.150
Tenaga Kerja
Pekerja
OH
0.600
Tukang Kayu
OH
1.800
Kepala tukang
OH
0.180
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
0.014
0.036
Paku 7 cm - 10 cm
Kg
0.250
Pekerja
OH
0.100
Tukang Kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.005
PEKERJAAN LANTAI
6.31 Memasang 1 m lantai teraso cor ditempat, tebal 3 cm
Kebutuhan
Satuan
Indeks
Bahan
Teraso cor
0.036
Tenaga kerja
Pekerja
OH
0.360
Tukang batu
OH
0.180
Kepala tukang
OH
0.018
Mandor
OH
0.018
Kebutuhan
Bahan
Tenaga kerja
Satuan
Buah
Indeks
53.000
Semen
Kg
8.190
Pasir
0.045
Semen warna
Kg
2.750
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
Buah
Indeks
106.000
Semen
Kg
8.190
Pasir
0.045
Semen warna
Kg
3.200
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
Buah
Indeks
110.000
Semen
Kg
8.190
Pasir
0.045
Semen warna
Kg
3.200
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
Bahan
Tenaga kerja
Kebutuhan
Satuan
Indeks
Buah
11.870
Semen
Kg
10.000
Pasir
0.045
Semen warna
Kg
1.500
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
Bahan
Tenaga kerja
Kebutuhan
Satuan
Indeks
Buah
26.500
Semen
Kg
10.400
Pasir
0.045
Semen warna
Kg
1.620
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
Kebutuhan
Bahan
Satuan
Indeks
Buah
6.630
Semen
Kg
9.800
Pasir
0.022
Tenaga kerja
Semen warna
Kg
1.600
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Buah
11.870
Semen
Kg
14.150
Pasir
0.039
Semen warna
Kg
2.000
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Plint keramik
Satuan
Indeks
Buah
5.300
Semen
Kg
1.140
Pasir
0.003
Semen warna
Kg
0.025
Pekerja
OH
0.090
Tukang batu
OH
0.090
Kepala tukang
OH
0.009
Mandor
OH
0.005
6.40'
Kebutuhan
Bahan
Tenaga kerja
Plint keramik
Satuan
Buah
Indeks
10.600
Semen
Kg
1.140
Pasir
0.003
Semen warna
Kg
0.050
Pekerja
OH
0.090
Tukang batu
OH
0.090
Kepala tukang
OH
0.009
Mandor
OH
0.005
Kebutuhan
Bahan
Plint keramik
Satuan
Indeks
Buah
5.300
Semen
Kg
0.570
Pasir
0.002
Tenaga kerja
Semen warna
Kg
0.013
Pekerja
OH
0.090
Tukang batu
OH
0.090
Kepala tukang
OH
0.009
Mandor
OH
0.005
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Marmer
Buah
1.060
Semen
Kg
8.190
Pasir
0.045
Semen warna
Kg
0.650
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Karpet
1.050
Lem
Kg
0.350
Pekerja
OH
0.170
Tukang batu
OH
0.170
Kepala tukang
OH
0.017
Mandor
OH
0.009
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Underlayer
1.050
Lem
Kg
0.350
Pekerja
OH
0.120
Tukang batu
OH
0.120
Kepala tukang
OH
0.012
Mandor
OH
0.006
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Underlayer
1.050
Lem
Kg
0.600
Pekerja
OH
0.650
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.033
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Gymfloor
1.050
Lem
Kg
0.600
Pekerja
OH
0.650
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.033
Kebutuhan
Bahan
Tenaga kerja
Porselin
Semen
Pasir
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
Buah
Kg
M
Kg
OH
OH
OH
OH
Indeks
86.000
9.300
0.018
1.500
0.620
0.500
0.050
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Porselin
Buah
53.000
Semen
Kg
9.300
Pasir
0.018
Semen warna
Kg
2.750
Pekerja
OH
0.600
Tukang batu
OH
0.450
Kepala tukang
OH
0.045
Mandor
OH
0.030
6.50'
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Porselin
Buah
26.500
Semen
Kg
9.300
Pasir
0.018
Semen warna
Kg
1.940
Pekerja
OH
0.600
Tukang batu
OH
0.450
Kepala tukang
OH
0.045
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Keramik artistik
Satuan
Buah
Indeks
53.000
Semen
Kg
9.300
Pasir
0.018
Semen warna
Kg
2.750
Pekerja
OH
0.600
Tukang batu
OH
0.450
Kepala tukang
OH
0.045
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Keramik
Buah
36.000
Semen
Kg
9.300
Pasir
0.018
Semen warna
Kg
2.750
Pekerja
OH
0.600
Tukang batu
OH
0.450
Kepala tukang
OH
0.045
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Keramik
Buah
26.500
Semen
Kg
9.300
Pasir
0.018
Semen warna
Kg
1.940
Pekerja
OH
0.600
Tukang batu
OH
0.450
Kepala tukang
OH
0.045
Mandor
OH
0.030
Kebutuhan
Bahan
Tegel Keramik 20 x 25
Satuan
Buah
Indeks
21.500
Semen
Kg
9.300
Pasir
0.018
Semen warna
Kg
1.500
Tenaga kerja
Pekerja
OH
0.600
Tukang batu
OH
0.100
Kepala tukang
OH
0.045
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Marmer
Satuan
Indeks
Buah
1.020
Paku 12 Cm
Kg
2.000
Semen
Kg
12.440
Pasir
0.025
Semen warna
Kg
0.650
Pekerja
OH
0.720
Tukang batu
OH
0.650
Kepala tukang
OH
0.065
Mandor
OH
0.035
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Buah
63.000
Semen
Kg
12.440
Pasir
0.025
Semen warna
Kg
2.750
Pekerja
OH
0.650
Tukang batu
OH
0.500
Kepala tukang
OH
0.050
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Batu paras
Satuan
Buah
Indeks
1.100
Semen
Kg
11.750
Pasir
0.035
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
1.100
Semen
Kg
11.750
Pasir
0.035
Pekerja
OH
0.620
Tukang batu
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.030
6.60'
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Wall Paper
2.200
Lem
Kg
0.250
Pekerja
OH
0.750
Tukang batu
OH
0.170
Kepala tukang
OH
0.017
Mandor
OH
0.004
Kebutuhan
Satuan
Indeks
Bahan
Genteng kodok
Bh
25.000
Tenaga Kerja
Pekerja
OH
0.150
Tukang kayu
OH
0.075
Kepala tukang
OH
0.008
Mandor
OH
0.008
Kebutuhan
Satuan
Indeks
Bahan
Genteng palentong
Bh
12.000
Tenaga Kerja
Pekerja
OH
0.060
Tukang kayu
OH
0.006
Kepala tukang
OH
0.150
Mandor
OH
0.008
Kebutuhan
Satuan
Indeks
Bahan
Genteng keramik
Bh
13.000
Tenaga Kerja
Pekerja
OH
0.150
Tukang kayu
OH
0.060
Kepala tukang
OH
0.006
Mandor
OH
0.008
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Bh
0.500
Paku Pancing
Kg
0.120
Pekerja
OH
0.140
Tukang kayu
OH
0.075
Kepala tukang
OH
0.008
Mandor
OH
0.008
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
M'
3.000
M'
5.000
Screw 12-14x20
Bh
9.000
Screw 12-16x16
Bh
11.000
Baut Dinabolt
Bh
0.600
Pekerja
OH
0.140
Tukang kayu
OH
0.075
Kepala tukang
OH
0.008
Mandor
OH
0.008
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Genteng beton
Bh
11.000
Kg
0.030
Pekerja
OH
0.200
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.001
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Lbr
1.020
Scraw 12-14 x 20
bh
4.000
Pekerja
OH
0.200
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.001
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Bh
3.500
Kg
0.050
Kg
10.800
Pasir Pasang
Kg
0.032
Semen warna
Kg
1.000
Pekerja
OH
0.400
Tukang kayu
OH
0.200
Kepala tukang
OH
0.020
Mandor
OH
0.020
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Bh
1.100
Scraw 12-14 x 20
bh
2.000
Pekerja
OH
0.250
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.013
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Lbr
0.700
Kg
0.020
Pekerja
OH
0.120
Tukang kayu
OH
0.060
Kepala tukang
OH
0.006
Mandor
OH
0.006
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Lbr
0.500
Kg
0.015
0.0096
Meni besi
Kg
0.250
Pekerja
OH
0.150
Tukang kayu
OH
0.400
Kepala tukang
OH
0.025
Mandor
OH
0.0001
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Atap spandeks
Lbr
1.050
Paku Digilvano
bh
4.000
Pekerja
OH
0.150
Tukang kayu
OH
0.075
Kepala tukang
OH
0.008
Mandor
OH
0.006
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Asbes semen
1.100
Paku tripleks
Kg
0.010
Pekerja
OH
0.030
Tukang kayu
OH
0.070
Kepala tukang
OH
0.007
Mandor
OH
0.002
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Akustik
Lbr
12.000
Paku tripleks
Kg
0.050
Pekerja
OH
0.060
Tukang kayu
OH
0.120
Kepala tukang
OH
0.012
Mandor
OH
0.003
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Akustik
Lbr
5.800
Paku tripleks
Kg
0.050
Pekerja
OH
0.060
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.003
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Akustik
Lbr
1.500
Paku tripleks
Kg
0.050
Pekerja
OH
0.060
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.003
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Enternit
Lbr
1.100
Paku enternit
Kg
0.010
Pekerja
OH
0.030
Tukang kayu
OH
0.070
Kepala tukang
OH
0.007
Mandor
OH
0.0015
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
M1
3.300
M1
0.700
Kalsiboard
Lbr
0.382
Paku Sekrup
kg
0.200
Peralatan
Set
0.25
Pekerja
OH
0.150
Tukang Plafond
OH
0.500
Kepala tukang
OH
0.050
Mandor
OH
0.008
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Gypsum board
Lbr
0.364
Paku sekrup
Kg
0.110
Pekerja
OH
0.100
Tukang kayu
OH
0.050
Kepala tukang
OH
0.005
Mandor
OH
0.005
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Plywood 4 mm
Lbr
0.375
Paku tripleks
Kg
0.030
Pekerja
OH
0.070
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.004
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
M'
1.050
Paku
Kg
0.010
Pekerja
OH
0.050
Tukang kayu
OH
0.050
Kepala tukang
OH
0.005
Mandor
OH
0.003
Bahan
Tenaga kerja
Kebutuhan
Satuan
Indeks
M'
1.050
Paku
Kg
0.010
Pekerja
OH
0.050
Tukang kayu
OH
0.050
Kepala tukang
OH
0.005
Mandor
OH
0.003
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Kalsiplank 240 x 20
M'
1.100
Paku sekrup
Kg
0.100
Pekerja
OH
0.100
Tukang Kayu
OH
0.200
Kepala tukang
OH
0.025
Mandor
OH
0.005
Kebutuhan
Satuan
Indeks
Bahan
Besi Profil
Kg
1.150
Tenaga Kerja
Pekerja
OH
0.060
Tukang las
OH
0.060
Kepala tukang
OH
0.006
Mandor
OH
0.003
Kebutuhan
Satuan
Indeks
Bahan
Kg
1.150
Tenaga Kerja
Pekerja
OH
0.060
Tukang las
OH
0.060
Kepala tukang
OH
0.006
Mandor
OH
0.003
Kebutuhan
Bahan
Tenaga Kerja
Alat
Satuan
Indeks
Solar
Ltr
1.000
Minyak pelumas
Ltr
0.100
Pekerja
OH
0.100
Tukang las
OH
0.100
Kepala tukang
OH
0.001
Mandor
OH
0.005
Sewa alat
Jam
0.008
6.4 Membuat 1 m pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Besi siku L 30 x 30 x 3
Kg
15.000
Kg
32.800
Kawat las
Kg
0.050
Pekerja
OH
1.050
Tukang las
OH
1.050
Kepala tukang
OH
0.105
Mandor
OH
0.052
Kebutuhan
Bahan
Tenaga Kerja
Alat
Satuan
Indeks
Kg
0.040
Solar
Ltr
0.030
Minyak pelumas
Ltr
0.004
Pekerja
OH
0.004
Tukang besi
OH
0.002
Kepala tukang
OH
0.0002
Mandor
OH
0.0002
Sewa alat
Jam
0.017
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
4.760
4.522
Pengelasan
Cm
20.000
Pekerja
OH
0.650
Tukang besi
OH
0.650
Kepala tukang
OH
0.065
Mandor
OH
0.032
Kebutuhan
Satuan
Indeks
Bahan
1.000
Tenaga Kerja
Pekerja
OH
1.200
Tukang besi
OH
1.200
Kepala tukang
OH
0.120
Mandor
OH
0.060
Kebutuhan
Satuan
Indeks
Bahan
Pintu lipat
1.000
Tenaga Kerja
Pekerja
OH
0.440
Tukang besi
OH
0.440
Kepala tukang
OH
0.044
Mandor
OH
0.022
Kebutuhan
Satuan
Indeks
Bahan
Sunscreen alumunium
1.000
Tenaga Kerja
Pekerja
OH
0.080
Tukang besi
OH
0.800
Kepala tukang
OH
0.080
Mandor
OH
0.004
Kebutuhan
Satuan
Indeks
Bahan
M'
1.000
Tenaga Kerja
Pekerja
OH
1.000
Tukang besi
OH
1.000
Kepala tukang
OH
0.100
Mandor
OH
0.050
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Profil alumunium
Indeks
1.100
Skrup Fixer
Buah
2.000
Sealant
Tube
0.060
Pekerja
OH
0.043
OH
0.043
Kepala tukang
OH
0.004
Mandor
OH
0.002
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Profil alumunium
M'
4.400
Alumunium strip
M'
14.600
Pekerja
OH
0.085
OH
0.085
Kepala tukang
OH
0.009
Mandor
OH
0.0042
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Pintu alumunium
M'
4.400
Profil kaca
M'
4.500
Sealant
Tube
0.270
Pekerja
OH
0.085
OH
0.085
Kepala tukang
OH
0.008
Mandor
OH
0.004
Kebutuhan
Satuan
Indeks
Bahan
Venetion blinds&vertical
1.000
Tenaga Kerja
Pekerja
OH
0.350
Tukang besi
OH
0.350
Kepala tukang
OH
0.035
Mandor
OH
0.018
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Besi strip
Kg
6.177
Pengelasan
Cm
27.080
Pekerja
OH
1.670
OH
1.670
Kepala tukang
OH
0.167
Mandor
OH
0.0830
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Kawat nyamuk
1.100
Pengelasan
Cm
11.110
Kg
1.716
Pekerja
OH
0.100
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.005
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
1.100
Kg
10.000
Besi strip
Kg
7.000
Pekerja
OH
0.200
OH
0.200
Kepala tukang
OH
0.020
Mandor
OH
0.001
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Seng plat
M'
1.050
Kg
0.015
0.019
Pekerja
OH
0.200
OH
0.400
Kepala tukang
OH
0.025
Mandor
OH
0.010
6.19 Memasang 1 m' talang 1/2 Lingkaran D -15 cm, seng plat bjls 30 lebar 45 cm
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Indeks
Seng plat
M'
1.050
Kg
0.010
Besi strip
Kg
0.500
Pekerja
OH
0.150
OH
0.300
Kepala tukang
OH
0.030
Mandor
OH
0.007
PEKERJAAN SANITASI
B.1 Memasang 1 buah closed duduk/monoblok
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Closed duduk/monoblok
Bh
1.000
Perlengkapan
Ls
1.0
Pekerja
OH
3.300
Tukang batu
OH
1.100
Kepala tukang
OH
0.010
Mandor
OH
0.160
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Bh
1.000
Semen
Kg
6.000
Pasir
0.010
Pekerja
OH
1.000
Tukang batu
OH
1.500
Kepala tukang
OH
1.500
Mandor
OH
0.160
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Bh
1.000
Bata merah
Bh
7.000
Semen
Kg
6.000
Pasir
0.010
Pekerja
OH
1.000
Tukang batu
OH
1.500
Kepala tukang
OH
0.300
Mandor
OH
0.110
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Urinior
Bh
1.000
Perlengkapan
Bh
270,000
Semen
Kg
6.000
Pasir
0.010
Pekerja
OH
1.000
Tukang batu
OH
1.000
Kepala tukang
OH
0.100
Mandor
OH
0.100
Kebutuhan
Bahan
Satuan
Indeks
Wastafel
Bh
1.000
Perlengkapan
Ls
72,000
Semen
Kg
6.000
Pasir
0.010
Tenaga kerja
Pekerja
OH
1.200
Tukang batu
OH
1.450
Kepala tukang
OH
0.150
Mandor
OH
0.100
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Bak teraso
Bh
1.000
Semen
Kg
6.000
Pasir
0.010
Pekerja
OH
2.100
Tukang batu
OH
0.750
Kepala tukang
OH
0.070
Mandor
OH
0.110
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Bak fiberglass
Bh
1.000
Pelengkapan 18 %
Ls
Pekerja
OH
1.800
Tukang batu
OH
2.700
Kepala tukang
OH
0.540
Mandor
OH
0.110
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Batu bata
0.400
Semen
Kg
120.000
Pasir
0.300
Bh
360.000
Semen nat
Kg
6.000
Pekerja
OH
6.000
Tukang batu
OH
3.000
Kepala tukang
OH
0.300
Mandor
OH
0.300
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Badkip
Bh
1.000
Pelengkapan
Ls
Pekerja
OH
0.0075
Tukang batu
OH
0.075
Kepala tukang
OH
0.0075
Mandor
OH
0.0038
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
0.900
Besi beton
Kg
180.000
Kayu cetakan
8.000
Ubin porselen
5.000
Perlengkapan
Ls
30.863
Pekerja
OH
3.500
Tukang batu
OH
4.500
Kepala tukang
OH
0.900
Mandor
OH
0.900
B.16 Memasang 1 buah bak kontrol pasangan batu bata ukuran 30 x 30 tinggi 35 cm
Kebutuhan
Satuan
Indeks
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Batu bata
bh
25.200
Semen Portland
kg
5.918
pasir pasang
kg
0.015
Batu kerikil
kg
1.918
Besi Beton
kg
1.600
pasir beton
kg
6.257
Pekerja
OH
3.2000
Tukang batu
OH
1.0150
Kepala tukang
OH
0.0015
Mandor
OH
0.0160
B.17 Memasang 1 buah bak kontrol pasangan batu bata ukuran 45 x 45 tinggi 50 cm
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Batu bata
bh
56.700
Semen Portland
kg
9.315
pasir pasang
kg
0.035
Batu kerikil
kg
4.316
Besi Beton
kg
2.600
pasir beton
kg
869.000
pekerja
OH
3.2000
Tukang Batu
OH
1.0150
kepala tukang
OH
0.0015
mandor
OH
0.0160
B.18 Memasang 1 buah bak kontrol pasangan batu bata ukuran 60 x 60 tinggi 65 cm
Kebutuhan
Bahan
Satuan
Indeks
Batu bata
bh
100.800
Semen Portland
kg
16.560
pasir pasang
kg
0.062
Batu koral
kg
0.033
Tenaga kerja
Besi Beton
kg
4.850
pasir beton
kg
869.000
pekerja
OH
3.2000
Tukang Batu
OH
1.0150
kepala tukang
OH
0.0015
mandor
OH
0.0160
Tukang gali
OH
0.100
PEKERJAAN PIPA
B.19 Memasang 1 m' pipa galvanis diameter 1/2"
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa galvanis
Perlengkapan
Pekerja
Tukang batu
Kepala tukang
M'
Ls
OH
OH
OH
1.200
1
0.054
0.090
0.009
Mandor
OH
0.027
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa galvanis
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.054
Tukang batu
OH
0.090
Kepala tukang
OH
0.009
Mandor
OH
0.027
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa galvanis
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.054
Tukang batu
OH
0.090
Kepala tukang
OH
0.009
Mandor
OH
0.027
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa galvanis
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.108
Tukang batu
OH
0.180
Kepala tukang
OH
0.018
Mandor
OH
0.005
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa galvanis
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.108
Tukang batu
OH
0.180
Kepala tukang
OH
0.018
Mandor
OH
0.005
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa galvanis
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.135
Tukang batu
OH
0.225
Kepala tukang
OH
0.0225
Mandor
OH
0.0068
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa PVC
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.036
Tukang batu
OH
0.060
Kepala tukang
OH
0.0060
Mandor
OH
0.0018
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa PVC
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.036
Tukang batu
OH
0.060
Kepala tukang
OH
0.006
Mandor
OH
0.002
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa PVC
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.036
Tukang batu
OH
0.060
Kepala tukang
OH
0.006
Mandor
OH
0.002
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa PVC
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.036
Tukang batu
OH
0.060
Kepala tukang
OH
0.006
Mandor
OH
0.002
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa PVC
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.054
Tukang batu
OH
0.090
Kepala tukang
OH
0.009
Mandor
OH
0.0027
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa PVC
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.054
Tukang batu
OH
0.090
Kepala tukang
OH
0.009
Mandor
OH
0.0027
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa PVC
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.081
Tukang batu
OH
0.135
Kepala tukang
OH
0.014
Mandor
OH
0.0041
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa PVC
Perlengkapan
Pekerja
Tukang batu
Kepala tukang
M'
Ls
OH
OH
OH
1.200
1
0.081
0.135
0.014
Mandor
OH
0.0041
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Pipa PVC
M'
1.200
Perlengkapan
Ls
Pekerja
OH
0.081
Tukang batu
OH
0.135
Kepala tukang
OH
0.014
Mandor
OH
0.0041
Kebutuhan
Satuan
Indeks
Bahan
Floor Drain
Bh
1.0000
Tenaga kerja
Pekerja
OH
0.0100
Tukang batu
OH
0.1000
Kepala tukang
OH
0.0100
Mandor
OH
0.0050
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Bh
1.000
Set
1.000
Pekerja
OH
0.030
Tukang batu
OH
0.300
Kepala tukang
OH
0.030
Mandor
OH
0.0015
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Bh
1.000
Seal tape
Bh
0.025
Pekerja
OH
0.010
Tukang batu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.005
Kebutuhan
Satuan
Indeks
Bahan
Bh
1.000
Tenaga kerja
Pekerja
OH
0.060
Tukang kayu
OH
0.600
Kepala tukang
OH
0.060
Mandor
OH
0.003
Kebutuhan
Satuan
Indeks
Bahan
Bh
1.000
Tenaga kerja
Pekerja
OH
0.010
Tukang kayu
OH
0.500
Kepala tukang
OH
0.010
Mandor
OH
0.005
Kebutuhan
Satuan
Indeks
Bahan
Kunci tanam KM
Bh
1.000
Tenaga kerja
Pekerja
OH
0.005
Tukang kayu
OH
0.500
Kepala tukang
OH
0.005
Mandor
OH
0.0025
Kebutuhan
Satuan
Indeks
Bahan
Kunci silender
Bh
1.000
Tenaga kerja
Pekerja
OH
0.050
Tukang kayu
OH
0.500
Kepala tukang
OH
0.005
Mandor
OH
0.0003
Kebutuhan
Satuan
Indeks
Bahan
Engsel pintu
Bh
1.000
Tenaga kerja
Pekerja
OH
0.015
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.0008
Kebutuhan
Satuan
Indeks
Bahan
Engsel jendela
Bh
1.000
Tenaga kerja
Pekerja
OH
0.010
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.0005
Kebutuhan
Satuan
Indeks
Bahan
Engsel angin
Bh
1.000
Tenaga kerja
Pekerja
OH
0.020
Tukang kayu
OH
0.200
Kepala tukang
OH
0.020
Mandor
OH
0.010
Kebutuhan
Satuan
Indeks
Bahan
Spring knip
Bh
1.000
Tenaga kerja
Pekerja
OH
0.015
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.00075
Kebutuhan
Satuan
Indeks
Bahan
Spring knip
Bh
1.000
Tenaga kerja
Pekerja
OH
0.015
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.00075
Kebutuhan
Satuan
Indeks
Bahan
Door clooser
Bh
1.000
Tenaga kerja
Pekerja
OH
0.050
Tukang kayu
OH
0.500
Kepala tukang
OH
0.050
Mandor
OH
0.0025
Kebutuhan
Satuan
Indeks
Bahan
Kunci selot
Bh
1.000
Tenaga kerja
Pekerja
OH
0.020
Tukang kayu
OH
0.200
Kepala tukang
OH
0.020
Mandor
OH
0.001
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Door holder
Pekerja
Tukang kayu
Bh
OH
OH
1.000
0.050
0.500
Kepala tukang
OH
0.050
Mandor
OH
0.0025
Kebutuhan
Satuan
Indeks
Bahan
Door stop
Bh
1.000
Tenaga kerja
Pekerja
OH
0.010
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.0005
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Bh
OH
OH
1.000
0.060
0.600
Kepala tukang
OH
0.060
Mandor
OH
0.003
Kebutuhan
Satuan
Indeks
Bahan
Kunci lemari
Bh
1.000
Tenaga kerja
Pekerja
OH
0.025
Tukang kayu
OH
0.250
Kepala tukang
OH
0.025
Mandor
OH
0.00125
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Kaca Bening
1.100
Kaca Buram
1.100
Kaca Rayben
1.100
Pekerja
OH
0.015
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.00075
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Kaca Bening
1.100
Kaca Buram
1.100
Kaca Rayben
1.100
Pekerja
OH
0.015
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.00075
Kebutuhan
Satuan
Indeks
Bahan
Kaca
1.100
Tenaga kerja
Pekerja
OH
0.0165
Tukang kayu
OH
0.165
Kepala tukang
OH
0.0165
Mandor
OH
0.0008
Kebutuhan
Bahan
Tenaga kerja
Satuan
Indeks
Kaca
1.100
Sealent
Kg
0.050
Pekerja
OH
0.025
Tukang kayu
OH
0.250
Kepala tukang
OH
0.025
Mandor
OH
0.00125
Kebutuhan
Satuan
Indeks
Bahan
Kaca
1.100
Tenaga kerja
Pekerja
OH
0.015
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.00075
Kebutuhan
Satuan
Indeks
Bahan
Kaca
1.100
Tenaga kerja
Pekerja
OH
0.015
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.00075
Kebutuhan
Satuan
Indeks
Bahan
Kaca
1.100
Tenaga kerja
Pekerja
OH
0.017
Tukang kayu
OH
0.165
Kepala tukang
OH
0.017
Mandor
OH
0.0008
Kebutuhan
Satuan
Indeks
Bahan
Kaca
1.100
Tenaga kerja
Pekerja
OH
0.015
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.00075
Kebutuhan
Satuan
Indeks
Bahan
Kaca
1.100
Tenaga kerja
Pekerja
OH
0.015
Tukang kayu
OH
0.150
Kepala tukang
OH
0.015
Mandor
OH
0.00075
PEKERJAAN PENGECETAN
B.1 Mengikis/ mengerok 1 m permukaan cat tembok lama
Kebutuhan
Satuan
Bahan
Soda api
Kg
Tenaga
Pekerja
OH
Tukang cat
OH
Kepala tukang
OH
Mandor
OH
Indeks
0.050
0.150
0.0025
Kebutuhan
Satuan
Bahan
Sabun
Kg
Tenaga
Pekerja
OH
Tukang cat
OH
Kepala tukang
OH
Mandor
OH
Indeks
0.050
0.150
0.0025
Kebutuhan
Satuan
Bahan
Sabun
Kg
Tenaga
Pekerja
OH
Tukang cat
OH
Kepala tukang
OH
Mandor
OH
Indeks
0.050
0.150
0.0025
B.5 Mengerok karat atau cat lama 1 m permukaan baja dengan pancar pasing (san
2 1/2
Kebutuhan
Bahan
Satuan
Indeks
Pasir silika
Kg
40.000
BBM
Ltr
10.000
Peralatan
Kompresor,blasting pot
Hr
1.000
Tenaga
Pekerja
OH
1.600
Tukang cat
OH
1.600
Kepala tukang
OH
0.800
Mandor
OH
0.500
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Dempul jadi
Kg
0.080
Minyak cat
Kg
0.020
Batu apung
Kg
0.010
Pekerja
OH
0.040
Tukang cat
OH
0.040
Kepala tukang
OH
0.004
Mandor
OH
0.0025
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Plamir
Kg
0.150
Cat dasar
Kg
0.170
Cat penutup
Kg
0.170
Pekerja
OH
0.070
Tukang cat
OH
0.075
Kepala tukang
OH
0.008
Mandor
OH
0.0025
B.8 Pengecetan 1 m bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Cat meni
Kg
0.200
Plamir
Kg
0.150
Cat dasar
Kg
0.170
Kg
0.260
Pekerja
OH
0.070
Tukang cat
OH
0.009
Kepala tukang
OH
0.006
Mandor
OH
0.0025
B.9 Pengecetan 1 m bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Cat meni
Kg
0.200
Plamir
Kg
0.150
Cat dasar
Kg
0.170
Kg
0.350
Pekerja
OH
0.070
Tukang cat
OH
0.105
Kepala tukang
OH
0.004
Mandor
OH
0.0025
Kebutuhan
Satuan
Indeks
Bahan
Teak oil
Kg
0.360
Tenaga
Pekerja
OH
0.040
Tukang cat
OH
0.063
Kepala tukang
OH
0.063
Mandor
OH
0.0025
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Politur
Ltr
0.150
Politur Jadi
Ltr
0.372
Ampelas
Lbr
2.000
Pekerja
OH
Tukang cat
OH
0.060
Kepala tukang
OH
0.016
Mandor
OH
0.0025
Kebutuhan
Satuan
Indeks
Bahan
Residu
Ltr
0.350
Tenaga
Pekerja
OH
0.100
Tukang cat
OH
Kepala tukang
OH
Mandor
OH
0.006
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Vernis
Ltr
0.150
Dempul
Ltr
0.050
Ampleas
Lbr
0.100
Kuas
Bh
0.010
Pekerja
OH
0.160
Tukang cat
OH
0.160
Kepala tukang
OH
0.016
Mandor
OH
0.0025
B.14 Pengecetan 1 m tembok baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat pe
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Plamir
Kg
0.100
Kg
0.100
Kg
0.260
Pekerja
OH
0.020
Tukang cat
OH
0.063
Kepala tukang
OH
0.0063
Mandor
OH
0.0025
B.15 Pengecetan 1 m tembok Lama , 1 lapis cat dasar, 2 lapis cat penutup
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Kg
0.120
Kg
0.180
Pekerja
OH
0.028
Tukang cat
OH
0.042
Kepala tukang
OH
0.0042
Mandor
OH
0.0025
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Meni besi
Kg
0.100
Cat penutup
Kg
0.180
Kuas
Bh
0.010
Pekerja
OH
0.020
Tukang cat
OH
0.200
Kepala tukang
OH
0.020
Mandor
OH
0.01
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Meni besi
Kg
0.100
Kuas
Bh
0.010
Perancah kayu
0.002
Pekerja
OH
0.250
Tukang cat
OH
0.225
Kepala tukang
OH
0.0225
Mandor
OH
0.0075
B.23 Pengecetan 1 m permukaan baja lapis seng (galbani) secara manual sistem 1
m
Kebutuhan
Satuan
Indeks
Bahan
Cat
Kg
0.300
Tenaga
Pekerja
OH
0.006
Tukang cat
OH
0.060
Kepala tukang
OH
0.0120
Mandor
OH
0.006
B.23 Pengecetan 1 m permukaan baja lapis seng (galbani) secara manual sistem 3
m
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
Cat dasar
Kg
0.110
Cat antara
Kg
0.170
Cat Penutup
Kg
0.080
Pekerja
OH
0.500
Tukang cat
OH
0.800
Kepala tukang
OH
0.300
Mandor
OH
0.200
B.25 Pengecetan 1 m permukaan baja lapis seng (galbani) secara semprot (airless
dengan tebal 200 m
Kebutuhan
Satuan
Indeks
Bahan
Cat
Kg
0.300
Tenaga
Pekerja
OH
0.400
Tukang cat
OH
0.700
Kepala tukang
OH
0.200
Mandor
OH
0.200
Kebutuhan
Bahan
Tenaga
Satuan
Indeks
10.0000
MCB
1.0000
Mandor
org/hr
0.0065
Tukang Listrik
org/hr
0.0650
Kebutuhan
Bahan
Satuan
Titik
Indeks
1.0000
Pemasangan 1 bh Saklar
Kebutuhan
Satuan
Indeks
Kebutuhan
Satuan
Indeks
Bahan + Pemasangan
Saklar phase double putih(broco)
bh
1.0000
bh
1.0000
Alat bantu
ls
1.0000
Jasa Pemasangan
ls
1.0000
Pemasangan 1 bh Fitting
Kebutuhan
Satuan
Indeks
Bahan + Pemasangan
Fitting Tanam/Down Light Ncolus
bh
1.0000
Fitting Duduk
bh
1.0000
Alat bantu
ls
1.0000
Jasa Pemasangan
ls
1.0000
Kebutuhan
Satuan
Indeks
Bahan + Pemasangan
Stop kontak komplit
bh
1.0000
Alat bantu
ls
1.0000
Jasa Pemasangan
ls
1.0000
Pemasangan 1 bh Lampu
Kebutuhan
Satuan
Indeks
Bahan + Pemasangan
Lampu TL 1 x 20 Watt
bh
1.0000
Lampu TL 1 x 40 Watt
bh
1.0000
bh
1.0000
Alat bantu
ls
1.0000
Jasa Pemasangan
ls
1.0000
Harga/Satuan
Bahan / Upah (Rp)
Jumlah (Rp)
2,750,000.000
30,800.000
18,750.000
1,500.000
#REF!
Jumlah ( 1)
32,300.000
50,750.000
75,000.000
22,500.000
85,000.000
90,000.000
Jumlah ( 2 )
22,500.000
Harga/Satuan
Bahan / Upah (Rp)
54,800.000
Jumlah (Rp)
31,250.000
39,062.500
1,383.000
3,457.500
93,750.000
468.750
203,125.000
1,828.125
2,625,000.000
189,000.000
18,750.000
1,125.000
18,750.000
7,500.000
50,750.000
10,150.000
75,000.000
30,000.000
85,000.000
1,700.000
90,000.000
1,800.000
286,091.875
Harga/Satuan
Bahan / Upah (Rp)
Jumlah (Rp)
2,625,000.000
31,500.000
18,750.000
375.000
2,750,000.000
19,250.000
50,750.000
5,075.000
75,000.000
7,500.000
85,000.000
850.000
90,000.000
450.000
65,000.000
Harga/Satuan
Bahan / Upah (Rp)
Jumlah (Rp)
31,250.000
53,125.000
1,383.000
290.430
93,750.000
28,125.000
203,125.000
2,132,812.500
2,625,000.000
78,750.000
18,750.000
937.500
11,500.000
17,250.000
50,750.000
101,500.000
75,000.000
75,000.000
85,000.000
17,000.000
90,000.000
4,500.000
Harga/Satuan
Bahan / Upah (Rp)
2,509,290.430
Jumlah (Rp)
50,750.000
5,075.000
90,000.000
4,500.000
Harga/Satuan
Bahan / Upah (Rp)
9,575.000
Jumlah (Rp)
31,250.000
39,062.500
1,383.000
248.940
93,750.000
28,125.000
203,125.000
3,656,250.000
2,625,000.000
78,750.000
18,750.000
937.500
18,750.000
28,125.000
60,625.000
81,843.750
50,750.000
101,500.000
75,000.000
75,000.000
85,000.000
17,000.000
90,000.000
4,500.000
Harga/Satuan
Bahan / Upah (Rp)
4,111,342.690
Jumlah (Rp)
31,250.000
31,250.000
4,025.000
1,006.250
50,750.000
862.750
75,000.000
150.000
85,000.000
21,250.000
90,000.000
1,170.000
55,689.000
Harga/Satuan
Jumlah (Rp)
338,350.250
90,000.000
29,970.000
Harga/Satuan
368,320.250
Jumlah (Rp)
338,350.250
90,000.000
2,970.000
Harga/Satuan
341,320.250
Jumlah (Rp)
93,750.000
6,937.500
203,125.000
29,656.250
1,953.125
87,890.625
50,750.000
6,343.750
75,000.000
28,125.000
85,000.000
1,020.000
90,000.000
1,710.000
Harga/ Satuan
161,683.125
Jumlah (Rp)
Jumlah (Rp)
50,750.00
38,062.50
90,000.00
2,250.00
Harga/ Satuan
Bahan/ Upah (Rp)
40,312.50
Jumlah (Rp)
50,750.00
45,675.00
90,000.00
4,050.00
49,725.00
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
50,750.00
53,287.50
90,000.00
6,030.00
Harga/ Satuan
Bahan/ Upah (Rp)
59,317.50
Jumlah (Rp)
50,750.00
50,750.00
90,000.00
2,880.00
Harga/ Satuan
Bahan/ Upah (Rp)
53,630.00
Jumlah (Rp)
50,750.00
76,125.00
90,000.00
5,400.00
Harga/ Satuan
Bahan/ Upah (Rp)
81,525.00
Jumlah (Rp)
77,300.00
92,760.000
50,750.00
12,687.50
90,000.00
2,250.00
107,697.50
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
50,750.00
60,900.00
90,000.00
4,050.00
Harga/ Satuan
Bahan/ Upah (Rp)
64,950.00
Jumlah (Rp)
50,750.00
2,537.50
90,000.00
450.00
2,987.50
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
50,750.00
1,674.75
90,000.00
900.00
Harga/ Satuan
Bahan/ Upah (Rp)
2,574.75
Jumlah (Rp)
50,750.00
12,560.63
90,000.00
742.50
Harga/ Satuan
Bahan/ Upah (Rp)
13,303.13
Jumlah (Rp)
50,750.00
25,375.00
90,000.00
4,500.00
Harga/ Satuan
Bahan/ Upah (Rp)
29,875.00
Jumlah (Rp)
89,000.00
106,800.000
37,500.00
45,000.000
50,000.00
15,000.00
90,000.00
900.00
122,700.00
60,900.000
Harga Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
106,250.00
127,500.00
1,383.00
279,366.00
93,750.00
45,468.75
50,750.00
76,125.00
75,000.00
45,000.00
85,000.00
5,100.00
90,000.00
6,750.00
585,309.75
Harga Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
106,250.00
127,500.00
1,383.00
225,429.00
93,750.00
48,750.00
50,750.00
76,125.00
75,000.00
45,000.00
85,000.00
5,100.00
90,000.00
6,750.00
Harga Satuan
Bahan/ Upah (Rp)
534,654.00
Jumlah (Rp)
106,250.00
127,500.00
89,000.00
38,448.00
50,750.00
39,585.00
75,000.00
29,250.00
85,000.00
3,315.00
90,000.00
3,510.00
Harga Satuan
Bahan/ Upah (Rp)
241,608.00
Jumlah (Rp)
1,250.00
62,500.00
89,000.00
17,800.00
50,750.00
36,540.00
75,000.00
10,125.00
85,000.00
1,147.50
90,000.00
3,240.00
Harga Satuan
Bahan/ Upah (Rp)
131,352.50
Jumlah (Rp)
1,625.00
81,250.00
89,000.00
17,800.00
50,750.00
36,540.00
75,000.00
10,125.00
85,000.00
1,147.50
90,000.00
3,240.00
150,102.50
Jumlah (Rp)
106,250.00
51,000.00
1,383.00
268,302.00
93,750.00
29,250.00
218,750.00
102,375.00
Err:509
Err:509
21,250.00
38,250.00
50,750.00
152,250.00
75,000.00
63,750.00
85,000.00
7,225.00
90,000.00
13,500.00
Harga Satuan
Bahan/ Upah (Rp)
Err:509
Jumlah (Rp)
106,250.00
47,812.50
1,383.00
268,302.00
93,750.00
29,250.00
218,750.00
102,375.00
50,750.00
120,785.00
75,000.00
22,500.00
85,000.00
2,550.00
90,000.00
7,200.00
Harga/ Satuan
Bahan / Upah (Rp)
625.00
600,774.50
Jumlah (Rp)
87,500.00
1,383.00
45,569.85
93,750.00
8,531.25
50,750.00
30,450.00
75,000.00
15,000.00
85,000.00
1,700.00
90,000.00
2,700.00
Harga/ Satuan
Bahan / Upah (Rp)
191,451.10
Jumlah (Rp)
625.00
87,500.00
1,383.00
36,718.65
93,750.00
8,718.75
50,750.00
30,450.00
75,000.00
15,000.00
85,000.00
1,700.00
90,000.00
2,700.00
182,787.40
Harga/ Satuan
Bahan / Upah (Rp)
Jumlah (Rp)
625.00
43,750.00
1,383.00
26,207.85
93,750.00
3,562.50
50,750.00
15,225.00
75,000.00
7,500.00
85,000.00
850.00
90,000.00
1,350.00
Harga/ Satuan
Bahan / Upah (Rp)
98,445.35
Jumlah (Rp)
625.00
43,750.00
1,383.00
19,873.71
93,750.00
3,750.00
50,750.00
15,225.00
75,000.00
7,500.00
85,000.00
850.00
90,000.00
1,350.00
Harga/ Satuan
Bahan / Upah (Rp)
92,298.71
Jumlah (Rp)
625.00
43,750.00
1,383.00
15,904.50
93,750.00
4,031.25
50,750.00
15,225.00
75,000.00
7,500.00
85,000.00
850.00
90,000.00
1,350.00
Harga/ Satuan
Bahan / Upah (Rp)
88,610.75
Jumlah (Rp)
625.00
43,750.00
1,383.00
13,387.44
93,750.00
4,218.75
50,750.00
15,225.00
75,000.00
7,500.00
85,000.00
850.00
90,000.00
1,350.00
86,281.19
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
1,383.00
14,167.45
93,750.00
1,875.00
50,750.00
10,150.00
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
900.00
Harga/ Satuan
Bahan/ Upah (Rp)
39,617.45
Jumlah (Rp)
1,383.00
10,754.21
93,750.00
2,156.25
50,750.00
10,150.00
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
900.00
Harga/ Satuan
Bahan/ Upah (Rp)
36,485.46
Jumlah (Rp)
1,383.00
8,629.92
93,750.00
2,250.00
50,750.00
10,150.00
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
900.00
Harga/ Satuan
Bahan/ Upah (Rp)
34,454.92
Jumlah (Rp)
1,383.00
7,169.47
93,750.00
2,437.50
50,750.00
10,150.00
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
900.00
33,181.97
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
1,383.00
4,298.36
50,750.00
7,612.50
75,000.00
5,250.00
85,000.00
595.00
90,000.00
720.00
Harga/ Satuan
Bahan/ Upah (Rp)
18,475.86
Jumlah (Rp)
1,383.00
8,768.22
93,750.00
1,125.00
50,750.00
15,225.00
75,000.00
10,500.00
85,000.00
1,190.00
90,000.00
1,350.00
Harga/ Satuan
Bahan/ Upah (Rp)
38,158.22
Jumlah (Rp)
1,383.00
4,494.75
50,750.00
7,612.50
75,000.00
7,500.00
85,000.00
850.00
90,000.00
720.00
21,177.25
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
1,383.00
341,601.00
66.96
58,191.96
162.04
161,875.00
110.00
23,650.00
50,750.00
83,737.50
75,000.00
20,625.00
85,000.00
2,380.00
90,000.00
7,470.00
699,530.46
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
1,383.00
381,708.00
66.96
55,446.43
162.04
163,981.48
110.00
23,650.00
50,750.00
83,737.50
75,000.00
20,625.00
85,000.00
2,380.00
90,000.00
7,470.00
Harga / Satuan
Bahan/ Upah (Rp)
738,998.41
Jumlah (Rp)
1,383.00
413,517.00
66.96
53,504.46
162.04
164,791.67
110.00
23,650.00
50,750.00
83,737.50
75,000.00
20,625.00
85,000.00
2,380.00
90,000.00
7,470.00
Harga / Satuan
Bahan/ Upah (Rp)
769,675.63
Jumlah (Rp)
1,383.00
318,090.00
66.96
59,799.11
162.04
166,412.04
110.00
22,000.00
50,750.00
60,900.00
75,000.00
15,000.00
85,000.00
1,700.00
90,000.00
5,400.00
Harga / Satuan
Bahan/ Upah (Rp)
649,301.14
Jumlah (Rp)
1,383.00
450,858.00
66.96
51,495.54
162.04
166,736.11
110.00
23,650.00
50,750.00
83,737.50
75,000.00
20,625.00
85,000.00
2,380.00
90,000.00
7,470.00
806,952.15
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
1,383.00
486,816.00
66.96
48,950.89
162.04
167,060.19
110.00
23,650.00
50,750.00
83,737.50
75,000.00
20,625.00
85,000.00
2,380.00
90,000.00
7,470.00
Harga / Satuan
Bahan/ Upah (Rp)
840,689.58
Jumlah (Rp)
1,383.00
513,093.00
66.96
46,741.07
162.04
169,652.78
110.00
23,650.00
50,750.00
83,737.50
75,000.00
20,625.00
85,000.00
2,380.00
90,000.00
7,470.00
Harga / Satuan
Bahan/ Upah (Rp)
867,349.35
Jumlah (Rp)
1,383.00
531,072.00
66.96
46,339.29
162.04
168,356.48
110.00
23,650.00
50,750.00
83,737.50
75,000.00
20,625.00
85,000.00
2,380.00
90,000.00
7,470.00
Harga / Satuan
Bahan/ Upah (Rp)
883,630.27
Jumlah (Rp)
1,383.00
561,498.00
66.96
45,803.57
162.04
166,250.00
110.00
23,650.00
50,750.00
83,737.50
75,000.00
20,625.00
85,000.00
2,380.00
90,000.00
7,470.00
911,414.07
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
1,383.00
571,179.00
66.96
45,602.68
162.04
165,439.81
110.00
23,650.00
50,750.00
83,737.50
75,000.00
20,625.00
85,000.00
2,380.00
90,000.00
7,470.00
Harga / Satuan
Bahan/ Upah (Rp)
920,083.99
Jumlah (Rp)
1,383.00
607,137.00
66.96
44,866.07
162.04
163,009.26
110.00
23,650.00
50,750.00
106,575.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
9,450.00
Harga / Satuan
Bahan/ Upah (Rp)
983,912.33
Jumlah (Rp)
1,383.00
619,584.00
66.96
44,665.18
162.04
162,037.04
110.00
23,650.00
50,750.00
106,575.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
9,450.00
Harga / Satuan
Bahan/ Upah (Rp)
995,186.22
Jumlah (Rp)
15,100.00
158,550.00
21,250.00
3,187.50
50,750.00
3,552.50
75,000.00
5,250.00
85,000.00
595.00
90,000.00
360.00
171,495.00
17,149.50
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
2,750,000.00
110,000.00
18,750.00
5,625.00
3,450.00
345.00
50,750.00
26,390.00
75,000.00
19,500.00
85,000.00
2,210.00
90,000.00
2,340.00
166,410.00
Bekesting 3 x Pakai
Harga / Satuan
Bahan/ Upah (Rp)
55,470.00
Jumlah (Rp)
2,750,000.00
123,750.00
18,750.00
5,625.00
3,450.00
345.00
50,750.00
26,390.00
75,000.00
19,500.00
85,000.00
2,210.00
90,000.00
2,340.00
180,160.00
Bekesting 3 x Pakai
Harga / Satuan
Bahan/ Upah (Rp)
60,053.33
Jumlah (Rp)
2,750,000.00
110,000.00
18,750.00
7,500.00
3,450.00
690.00
3,125,000.00
46,875.00
43,125.00
15,093.75
31,250.00
62,500.00
50,750.00
33,495.00
75,000.00
24,750.00
85,000.00
2,805.00
90,000.00
2,970.00
306,678.75
Bekesting 3 x Pakai
Harga / Satuan
Bahan/ Upah (Rp)
102,226.25
Jumlah (Rp)
2,750,000.00
110,000.00
18,750.00
7,500.00
3,450.00
690.00
3,125,000.00
56,250.00
43,125.00
15,093.75
31,250.00
62,500.00
50,750.00
33,495.00
75,000.00
24,750.00
85,000.00
2,805.00
90,000.00
2,970.00
316,053.75
Bekesting 3 x Pakai
105,351.25
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
2,750,000.00
82,500.00
18,750.00
7,500.00
3,450.00
690.00
3,125,000.00
62,500.00
43,125.00
15,093.75
10,416.67
31,250.00
10,416.67
41,666.67
50,750.00
33,495.00
75,000.00
24,750.00
85,000.00
2,805.00
90,000.00
2,970.00
305,220.42
Bekesting 3 x Pakai
Harga / Satuan
Bahan/ Upah (Rp)
101,740.14
Jumlah (Rp)
2,750,000.00
110,000.00
18,750.00
7,500.00
3,450.00
690.00
3,125,000.00
46,875.00
43,125.00
15,093.75
10,416.67
62,500.00
50,750.00
33,495.00
75,000.00
24,750.00
85,000.00
2,805.00
90,000.00
2,970.00
306,678.75
Bekesting 3 x Pakai
102,226.25
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
2,750,000.00
82,500.00
18,750.00
7,500.00
3,450.00
517.50
3,125,000.00
46,875.00
43,125.00
15,093.75
10,416.67
20,833.33
50,750.00
33,495.00
75,000.00
24,750.00
85,000.00
2,805.00
90,000.00
2,970.00
237,339.58
Bekesting 3 x Pakai
79,113.19
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
2,750,000.00
880,000.00
18,750.00
60,000.00
3,450.00
5,520.00
15,100.00
2,378,250.00
21,250.00
47,812.50
1,383.00
464,688.00
93,750.00
50,625.00
218,750.00
177,187.50
3,125,000.00
375,000.00
43,125.00
120,750.00
10,416.67
333,333.33
50,750.00
268,975.00
75,000.00
20,625.00
75,000.00
97,500.00
75,000.00
78,750.00
85,000.00
22,525.00
90,000.00
23,850.00
5,405,391.33
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
2,750,000.00
660,000.00
18,750.00
60,000.00
3,450.00
5,520.00
15,100.00
2,378,250.00
21,250.00
47,812.50
1,383.00
464,688.00
93,750.00
50,625.00
218,750.00
177,187.50
3,125,000.00
500,000.00
43,125.00
120,750.00
10,416.67
250,000.00
50,750.00
268,975.00
75,000.00
20,625.00
75,000.00
97,500.00
75,000.00
78,750.00
85,000.00
22,525.00
90,000.00
23,850.00
5,227,058.00
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
2,750,000.00
687,500.00
18,750.00
56,250.00
3,450.00
4,140.00
15,100.00
3,171,000.00
21,250.00
63,750.00
1,383.00
464,688.00
93,750.00
50,625.00
218,750.00
177,187.50
3,125,000.00
328,125.00
43,125.00
107,812.50
10,416.67
145,833.33
50,750.00
286,737.50
75,000.00
20,625.00
75,000.00
117,000.00
75,000.00
105,000.00
85,000.00
27,455.00
90,000.00
25,470.00
5,839,198.83
Harga / Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
2,750,000.00
55,000.00
18,750.00
187.50
3,450.00
15,100.00
45,300.00
21,250.00
9,562.50
1,383.00
5,532.00
93,750.00
5,625.00
218,750.00
1,968.75
50,750.00
9,135.00
75,000.00
1,500.00
75,000.00
1,500.00
75,000.00
1,500.00
85,000.00
5,100.00
90,000.00
8,100.00
150,010.75
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
11,458,300.00
12,604,130.00
18,750.00
23,437.50
30,250.00
30,250.00
50,750.00
304,500.00
75,000.00
1,500,000.00
85,000.00
170,000.00
90,000.00
27,000.00
14,659,317.50
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
3,125,000.00
3,750,000.00
2,625,000.00
3,150,000.00
18,750.00
23,437.50
30,250.00
30,250.00
50,750.00
304,500.00
75,000.00
1,350,000.00
85,000.00
170,000.00
90,000.00
27,000.00
5,655,187.50
5,055,187.50
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
12,983,300.00
519,332.00
18,750.00
937.50
50,750.00
17,762.50
75,000.00
78,750.00
85,000.00
8,925.00
90,000.00
1,620.00
Harga/ Satuan
Bahan/ Upah (Rp)
627,327.00
Jumlah (Rp)
2,750,000.00
110,000.00
18,750.00
937.50
50,750.00
17,762.50
75,000.00
78,750.00
85,000.00
8,925.00
90,000.00
1,620.00
Harga/ Satuan
Bahan/ Upah (Rp)
217,995.00
Jumlah (Rp)
12,983,300.00
519,332.00
3,125,000.00
125,000.00
30,250.00
15,125.00
50,750.00
50,750.00
75,000.00
187,500.00
85,000.00
21,250.00
90,000.00
4,500.00
798,457.00
404,125.00
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
12,983,300.00
311,599.20
30,250.00
9,075.00
50,750.00
40,600.00
75,000.00
150,000.00
85,000.00
17,000.00
90,000.00
3,600.00
Harga/ Satuan
Bahan/ Upah (Rp)
531,874.20
Jumlah (Rp)
12,983,300.00
454,415.50
133,500.00
73,425.00
50,750.00
40,600.00
75,000.00
180,000.00
85,000.00
20,400.00
90,000.00
3,600.00
Harga/ Satuan
Bahan/ Upah (Rp)
772,440.50
Jumlah (Rp)
6,250,000.00
156,250.00
18,750.00
562.50
133,500.00
66,750.00
60,625.00
60,625.00
50,750.00
30,450.00
75,000.00
150,000.00
85,000.00
17,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga/ Satuan
Bahan/ Upah (Rp)
2,700.00
484,337.50
Jumlah (Rp)
12,983,300.00
332,372.48
18,750.00
562.50
133,500.00
66,750.00
60,625.00
60,625.00
50,750.00
40,600.00
75,000.00
150,000.00
85,000.00
17,000.00
90,000.00
3,600.00
671,509.98
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
12,983,300.00
778,998.00
18,750.00
2,812.50
50,750.00
25,375.00
75,000.00
150,000.00
85,000.00
17,000.00
90,000.00
2,250.00
Harga/ Satuan
Bahan/ Upah (Rp)
976,435.50
Jumlah (Rp)
12,983,300.00
324,582.50
18,750.00
562.50
133,500.00
40,050.00
60,625.00
60,625.00
50,750.00
40,600.00
75,000.00
150,000.00
85,000.00
17,000.00
90,000.00
3,600.00
637,020.00
Jumlah (Rp)
12,983,300.00
324,582.50
18,750.00
562.50
133,500.00
106,800.00
60,625.00
60,625.00
-
50,750.00
40,600.00
75,000.00
187,500.00
85,000.00
21,250.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga/ Satuan
Bahan/ Upah (Rp)
3,600.00
745,520.00
Jumlah (Rp)
11,250,000.00
12,375,000.00
6,250,000.00
6,875,000.00
2,625,000.00
2,887,500.00
21,875.00
328,125.00
18,750.00
105,000.00
50,750.00
203,000.00
75,000.00
900,000.00
85,000.00
102,000.00
90,000.00
18,000.00
14,031,125.00
8,531,125.00
4,543,625.00
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
11,250,000.00
13,500,000.00
21,875.00
328,125.00
18,750.00
105,000.00
50,750.00
304,500.00
75,000.00
1,500,000.00
85,000.00
170,000.00
90,000.00
27,000.00
Harga/ Satuan
Bahan/ Upah (Rp)
15,934,625.00
Jumlah (Rp)
3,125,000.00
3,437,500.00
21,875.00
328,125.00
18,750.00
56,250.00
50,750.00
121,800.00
75,000.00
540,000.00
85,000.00
61,200.00
90,000.00
10,800.00
Harga/ Satuan
Bahan/ Upah (Rp)
4,555,675.00
Jumlah (Rp)
3,125,000.00
515,625.00
18,750.00
3,750.00
50,750.00
6,090.00
75,000.00
9,000.00
85,000.00
1,020.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga/ Satuan
Bahan/ Upah (Rp)
540.00
536,025.00
Jumlah (Rp)
11,458,300.00
176,457.82
18,750.00
3,750.00
50,750.00
7,612.50
75,000.00
18,750.00
85,000.00
2,125.00
90,000.00
6,750.00
215,445.32
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
3,125,000.00
50,937.50
18,750.00
4,687.50
50,750.00
10,150.00
75,000.00
22,500.00
85,000.00
2,550.00
90,000.00
900.00
Harga/ Satuan
Bahan/ Upah (Rp)
91,725.00
Jumlah (Rp)
12,983,300.00
140,219.64
18,750.00
1,875.00
50,750.00
5,075.00
75,000.00
15,000.00
85,000.00
2,125.00
90,000.00
450.00
Harga/ Satuan
Bahan/ Upah (Rp)
164,744.64
Jumlah (Rp)
6,250,000.00
68,750.00
18,750.00
937.50
50,750.00
5,075.00
75,000.00
15,000.00
85,000.00
1,700.00
90,000.00
450.00
91,912.50
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
3,125,000.00
87,500.00
18,750.00
2,812.50
50,750.00
7,612.50
75,000.00
33,750.00
85,000.00
3,825.00
90,000.00
720.00
136,220.00
Harga/ Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
3,125,000.00
87,500.00
18,750.00
2,812.50
60,625.00
52,137.50
133,500.00
74,760.00
50,750.00
7,612.50
75,000.00
33,750.00
85,000.00
3,825.00
90,000.00
720.00
Harga/ Satuan
Bahan/ Upah (Rp)
263,117.50
Jumlah (Rp)
3,125,000.00
87,500.00
18,750.00
2,812.50
60,625.00
52,137.50
133,500.00
74,760.00
50,750.00
10,150.00
75,000.00
45,000.00
85,000.00
5,100.00
90,000.00
900.00
Harga/ Satuan
Bahan/ Upah (Rp)
278,360.00
Jumlah (Rp)
12,983,300.00
90,883.10
18,750.00
1,875.00
37,500.00
5,625.00
50,750.00
30,450.00
75,000.00
135,000.00
85,000.00
15,300.00
90,000.00
2,700.00
Harga/ Satuan
Bahan/ Upah (Rp)
281,833.10
Jumlah (Rp)
3,125,000.00
43,750.00
3,125,000.00
112,500.00
18,750.00
4,687.50
50,750.00
5,075.00
75,000.00
7,500.00
85,000.00
850.00
90,000.00
450.00
174,812.50
Harga / Satuan
Jumlah (Rp)
23,374.84
50,750.00
18,270.00
75,000.00
13,500.00
85,000.00
1,530.00
90,000.00
1,620.00
Harga / Satuan
58,294.84
Jumlah (Rp)
86,125.00
1,383.00
11,326.77
93,750.00
4,218.75
1,953.13
5,371.09
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
Harga / Satuan
170,431.61
Jumlah (Rp)
1,383.00
11,326.77
93,750.00
4,218.75
1,953.13
6,250.00
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
Harga / Satuan
85,185.52
Jumlah (Rp)
1,383.00
11,326.77
93,750.00
4,218.75
1,953.13
6,250.00
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
85,185.52
Harga / Satuan
Bahan / Upah (Rp)
Jumlah (Rp)
7,050.00
83,683.50
1,383.00
13,830.00
93,750.00
4,218.75
1,953.13
2,929.69
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
Harga / Satuan
Bahan / Upah (Rp)
168,051.94
Jumlah (Rp)
2,875.00
76,187.50
1,383.00
14,383.20
93,750.00
4,218.75
1,953.13
3,164.06
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
Harga / Satuan
Bahan / Upah (Rp)
161,343.51
Jumlah (Rp)
14,484.00
96,028.92
1,383.00
13,553.40
93,750.00
2,015.63
1,953.13
3,125.00
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
Harga / Satuan
Bahan / Upah (Rp)
178,112.95
Jumlah (Rp)
7,050.00
83,683.50
1,383.00
19,569.45
93,750.00
3,656.25
1,953.13
3,906.25
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
174,205.45
Harga / Satuan
Jumlah (Rp)
7,950.00
1,383.00
1,576.62
93,750.00
281.25
1,953.13
48.83
50,750.00
4,567.50
75,000.00
6,750.00
85,000.00
765.00
90,000.00
450.00
Harga / Satuan
22,389.20
Jumlah (Rp)
1,383.00
1,576.62
93,750.00
281.25
1,953.13
97.66
50,750.00
4,567.50
75,000.00
6,750.00
85,000.00
765.00
90,000.00
450.00
Harga / Satuan
14,488.03
Jumlah (Rp)
1,383.00
788.31
93,750.00
140.63
1,953.13
25.39
50,750.00
4,567.50
75,000.00
6,750.00
85,000.00
765.00
90,000.00
450.00
Harga / Satuan
Bahan / Upah (Rp)
13,486.83
Jumlah (Rp)
585,000.00
620,100.00
1,383.00
11,326.77
93,750.00
4,218.75
1,953.13
1,269.53
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
700,305.05
Harga / Satuan
Jumlah (Rp)
97,453.13
137,500.00
48,125.00
50,750.00
8,627.50
75,000.00
12,750.00
85,000.00
1,445.00
90,000.00
810.00
Harga / Satuan
169,210.63
Jumlah (Rp)
137,500.00
48,125.00
50,750.00
6,090.00
75,000.00
9,000.00
85,000.00
1,020.00
90,000.00
540.00
Harga / Satuan
64,775.00
Jumlah (Rp)
137,500.00
82,500.00
50,750.00
32,987.50
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,970.00
147,682.50
Harga / Satuan
Jumlah (Rp)
137,500.00
82,500.00
50,750.00
32,987.50
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,970.00
147,682.50
Harga / Satuan
Bahan / Upah (Rp)
1,275.00
1,383.00
93,750.00
1,953.13
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
Bahan / Upah (Rp)
Jumlah (Rp)
109,650.00
12,861.90
1,687.50
2,929.69
31,465.00
37,500.00
4,250.00
2,700.00
203,044.09
Jumlah (Rp)
1,625.00
86,125.00
1,383.00
12,861.90
93,750.00
1,687.50
1,953.13
5,371.09
50,750.00
30,450.00
75,000.00
33,750.00
85,000.00
3,825.00
90,000.00
2,700.00
Harga / Satuan
Bahan / Upah (Rp)
176,770.49
Jumlah (Rp)
2,875.00
76,187.50
1,383.00
12,861.90
93,750.00
1,687.50
1,953.13
3,789.06
50,750.00
30,450.00
75,000.00
33,750.00
85,000.00
3,825.00
90,000.00
2,700.00
Harga / Satuan
Bahan / Upah (Rp)
165,250.96
Jumlah (Rp)
1,625.00
86,125.00
1,383.00
12,861.90
93,750.00
1,687.50
1,953.13
5,371.09
50,750.00
30,450.00
75,000.00
33,750.00
85,000.00
3,825.00
90,000.00
2,700.00
176,770.49
Harga / Satuan
Bahan / Upah (Rp)
Jumlah (Rp)
3,480.00
125,280.00
1,383.00
12,861.90
93,750.00
1,687.50
1,953.13
5,371.09
50,750.00
30,450.00
75,000.00
33,750.00
85,000.00
3,825.00
90,000.00
2,700.00
Harga / Satuan
Bahan / Upah (Rp)
215,925.49
Jumlah (Rp)
2,875.00
76,187.50
1,383.00
12,861.90
93,750.00
1,687.50
1,953.13
3,789.06
50,750.00
30,450.00
75,000.00
33,750.00
85,000.00
3,825.00
90,000.00
2,700.00
Harga / Satuan
Bahan / Upah (Rp)
165,250.96
Jumlah (Rp)
3,375.00
72,562.50
1,383.00
12,861.90
93,750.00
1,687.50
1,953.13
2,929.69
50,750.00
30,450.00
75,000.00
7,500.00
85,000.00
3,825.00
90,000.00
2,700.00
Harga / Satuan
Bahan / Upah (Rp)
134,516.59
Jumlah (Rp)
585,000.00
596,700.00
18,750.00
37,500.00
1,383.00
17,204.52
93,750.00
2,343.75
1,953.13
1,269.53
50,750.00
36,540.00
75,000.00
48,750.00
85,000.00
5,525.00
90,000.00
3,150.00
748,982.80
Harga / Satuan
Jumlah (Rp)
1,383.00
17,204.52
93,750.00
2,343.75
1,953.13
5,371.09
50,750.00
32,987.50
75,000.00
37,500.00
85,000.00
4,250.00
90,000.00
2,700.00
Harga / Satuan
102,356.86
Jumlah (Rp)
1,383.00
16,250.25
93,750.00
3,281.25
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
Harga / Satuan
82,921.50
Jumlah (Rp)
1,383.00
16,250.25
93,750.00
3,281.25
50,750.00
31,465.00
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
2,700.00
Harga / Satuan
82,921.50
Jumlah (Rp)
137,500.00
34,375.00
50,750.00
38,062.50
75,000.00
12,750.00
85,000.00
1,445.00
90,000.00
360.00
86,992.50
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
2,400.00
60,000.00
50,750.00
7,612.50
75,000.00
5,625.00
85,000.00
680.00
90,000.00
720.00
Harga/Satuan
Bahan/Upah (Rp)
74,637.50
Jumlah (Rp)
1,500.00
18,000.00
50,750.00
3,045.00
75,000.00
450.00
85,000.00
12,750.00
90,000.00
720.00
Harga/Satuan
Bahan/Upah (Rp)
34,965.00
Jumlah (Rp)
18,750.00
243,750.00
50,750.00
7,612.50
75,000.00
4,500.00
85,000.00
510.00
90,000.00
720.00
257,092.50
Harga/Satuan
Jumlah (Rp)
Bahan/Upah (Rp)
15,000.00
-
7,500.00
-
50,750.00
7,105.00
75,000.00
5,625.00
85,000.00
680.00
90,000.00
720.00
21,630.00
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
17,708.33
53,125.00
9,375.00
46,875.00
600.00
5,400.00
480.00
5,280.00
4,375.00
2,625.00
50,750.00
7,105.00
75,000.00
5,625.00
85,000.00
680.00
90,000.00
720.00
Harga/Satuan
Bahan/Upah (Rp)
127,435.00
Jumlah (Rp)
9,600.00
105,600.00
18,750.00
562.50
50,750.00
10,150.00
75,000.00
7,500.00
85,000.00
850.00
90,000.00
90.00
Harga/Satuan
Bahan/Upah (Rp)
124,752.50
Jumlah (Rp)
58,400.00
59,568.00
600.00
2,400.00
50,750.00
10,150.00
75,000.00
7,500.00
85,000.00
850.00
90,000.00
90.00
Harga/Satuan
Bahan/Upah (Rp)
80,558.00
Jumlah (Rp)
19,000.00
66,500.00
18,750.00
937.50
1,953.13
21,093.75
93,750.00
3,000.00
1,953.13
1,953.13
50,750.00
20,300.00
75,000.00
15,000.00
85,000.00
1,700.00
90,000.00
1,800.00
132,284.38
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
37,500.00
41,250.00
600.00
1,200.00
50,750.00
12,687.50
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
1,170.00
Harga/Satuan
Bahan/Upah (Rp)
68,832.50
Jumlah (Rp)
40,250.00
28,175.00
18,750.00
375.00
50,750.00
6,090.00
75,000.00
4,500.00
85,000.00
510.00
90,000.00
540.00
Harga/Satuan
Bahan/Upah (Rp)
40,190.00
Jumlah (Rp)
56,250.00
28,125.00
18,750.00
281.25
3,125,000.00
30,000.00
62,500.00
15,625.00
50,750.00
7,612.50
75,000.00
30,000.00
85,000.00
2,125.00
90,000.00
11.25
Harga/Satuan
Bahan/Upah (Rp)
113,780.00
Jumlah (Rp)
48,400.00
50,820.00
840.00
3,360.00
50,750.00
7,612.50
75,000.00
5,625.00
85,000.00
680.00
90,000.00
540.00
68,637.50
Jumlah (Rp)
18,750.000
187.500
50,750.00
1,522.500
75,000.00
5,250.000
85,000.00
595.000
90,000.00
180.000
Harga/Satuan
7,735.000
Jumlah (Rp)
18,750.000
937.500
50,750.00
3,045.000
75,000.00
9,000.000
85,000.00
1,020.000
90,000.00
270.000
Harga/Satuan
14,272.500
Jumlah (Rp)
18,750.000
937.500
50,750.00
3,045.000
75,000.00
7,500.000
85,000.00
850.000
90,000.00
270.000
Harga/Satuan
12,602.500
Jumlah (Rp)
18,750.000
937.500
50,750.00
3,045.000
75,000.00
7,500.000
85,000.00
850.000
90,000.00
270.000
Harga/Satuan
Bahan/ Upah (Rp)
12,602.500
Jumlah (Rp)
21,875.000
24,062.500
31,250.000
312.500
50,750.00
1,522.500
75,000.00
5,250.000
85,000.00
595.000
90,000.00
135.000
31,877.500
Harga/Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
5,625.000
18,562.500
7,812.500
5,468.750
71,250.000
27,217.500
37,500.000
7,500.000
86,250.000
21,562.500
50,750.00
7,612.500
75,000.00
37,500.000
85,000.00
4,250.000
90,000.00
720.000
130,393.750
Jumlah (Rp)
70,000.000
25,480.000
37,500.000
4,125.000
50,750.00
5,075.000
75,000.00
3,750.000
85,000.00
425.000
90,000.00
450.000
39,305.000
an (120x240) mm tebal 3 mm
Harga/Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
60,625.000
22,734.375
18,750.000
562.500
50,750.00
3,552.500
75,000.00
7,500.000
85,000.00
850.000
90,000.00
Jumlah harga per -satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
360.000
35,559.375
Jumlah (Rp)
-
18,750.000
187.500
50,750.00
2,537.500
75,000.00
3,750.000
85,000.00
425.000
90,000.00
270.000
Harga/Satuan
Bahan/ Upah (Rp)
7,170.000
Jumlah (Rp)
21,250.000
22,312.500
18,750.000
187.500
50,750.00
2,537.500
75,000.00
3,750.000
85,000.00
425.000
90,000.00
270.000
Harga/ Satuan
Bahan/ Upah (Rp)
29,482.500
Jumlah (Rp)
24,375.00
26,812.50
37,500.000
3,750.00
50,750.00
5,075.00
75,000.00
15,000.00
85,000.00
2,125.00
90,000.00
450.00
53,212.50
Harga / Satuan
Jumlah (Rp)
50,750.00
3,045.00
75,000.00
4,500.00
85,000.00
510.00
90,000.00
270.00
Harga / Satuan
8,325.00
Jumlah (Rp)
50,750.00
3,045.00
75,000.00
4,500.00
85,000.00
510.00
90,000.00
270.00
Harga / Satuan
Bahan/ Upah (Rp)
8,325.00
Jumlah (Rp)
6,000.00
6,000.000
20,500.00
2,050.000
50,750.00
5,075.00
75,000.00
7,500.00
85,000.00
85.00
90,000.00
450.00
-
21,160.00
Jumlah (Rp)
5,500.00
275.000
50,750.00
53,287.50
75,000.00
78,750.00
85,000.00
8,925.00
90,000.00
4,680.00
145,917.50
Harga / Satuan
Jumlah (Rp)
6,000.00
180.000
20,500.00
82.000
50,750.00
203.00
75,000.00
150.00
85,000.00
17.00
90,000.00
18.00
-
Harga / Satuan
650.00
Jumlah (Rp)
50,750.00
32,987.50
75,000.00
48,750.00
85,000.00
5,525.00
90,000.00
2,880.00
Harga / Satuan
90,142.50
Jumlah (Rp)
50,750.00
60,900.00
75,000.00
90,000.00
85,000.00
10,200.00
90,000.00
5,400.00
166,500.00
Harga / Satuan
Jumlah (Rp)
50,750.00
22,330.00
75,000.00
33,000.00
85,000.00
3,740.00
90,000.00
1,980.00
Harga / Satuan
61,050.00
Jumlah (Rp)
50,750.00
4,060.00
75,000.00
60,000.00
85,000.00
6,800.00
90,000.00
360.00
Harga / Satuan
71,220.00
Jumlah (Rp)
50,750.00
50,750.00
75,000.00
75,000.00
85,000.00
8,500.00
90,000.00
4,500.00
Harga / Satuan
138,750.00
Jumlah (Rp)
50,750.00
2,182.25
75,000.00
3,225.00
85,000.00
365.50
90,000.00
189.00
Harga / Satuan
5,961.75
Jumlah (Rp)
50,750.00
4,313.75
75,000.00
6,375.00
85,000.00
722.50
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
378.00
11,789.25
Jumlah (Rp)
50,750.00
4,313.75
75,000.00
6,375.00
85,000.00
680.00
90,000.00
360.00
Harga / Satuan
11,728.75
Jumlah (Rp)
50,750.00
17,762.50
75,000.00
26,250.00
85,000.00
2,975.00
90,000.00
1,620.00
Harga / Satuan
48,607.50
Jumlah (Rp)
50,750.00
84,752.50
75,000.00
125,250.00
85,000.00
14,195.00
90,000.00
7,470.00
Harga / Satuan
231,667.50
Jumlah (Rp)
50,750.00
5,075.00
75,000.00
7,500.00
85,000.00
850.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
450.00
13,875.00
Jumlah (Rp)
50,750.00
10,150.00
75,000.00
15,000.00
85,000.00
1,700.00
90,000.00
90.00
26,940.00
Harga / Satuan
Jumlah (Rp)
50,750.00
10,150.00
75,000.00
30,000.00
85,000.00
2,125.00
90,000.00
900.00
43,175.00
Jumlah (Rp)
50,750.00
7,612.50
75,000.00
22,500.00
85,000.00
2,550.00
90,000.00
630.00
Harga/Satuan
Bahan/Upah (Rp)
33,292.50
Jumlah (Rp)
500,000.00
500,000.00
30,000.0
30,000.00
50,750.00
167,475.00
75,000.00
82,500.00
85,000.00
850.00
90,000.00
14,400.00
Harga/Satuan
Bahan/Upah (Rp)
795,225.00
Jumlah (Rp)
287,500.00
287,500.00
1,383.00
8,298.00
93,750.00
937.50
50,750.00
50,750.00
75,000.00
112,500.00
85,000.00
127,500.00
90,000.00
14,400.00
601,885.50
Harga/Satuan
Jumlah (Rp)
Bahan/Upah (Rp)
-
625.00
4,375.00
1,383.00
8,298.00
93,750.00
937.50
50,750.00
50,750.00
75,000.00
112,500.00
85,000.00
25,500.00
90,000.00
9,900.00
Harga/Satuan
212,260.50
Jumlah (Rp)
Bahan/Upah (Rp)
900,000.00
900,000.00
1,383.00
8,298.00
93,750.00
937.50
50,750.00
50,750.00
75,000.00
75,000.00
85,000.00
8,500.00
90,000.00
9,000.00
Harga/Satuan
1,052,485.50
Jumlah (Rp)
Bahan/Upah (Rp)
600,000.00
-
600,000.00
-
1,383.00
8,298.00
93,750.00
937.50
50,750.00
60,900.00
75,000.00
108,750.00
85,000.00
12,750.00
90,000.00
9,000.00
Harga/Satuan
800,635.50
Jumlah (Rp)
Bahan/Upah (Rp)
-
1,383.00
8,298.00
93,750.00
937.50
50,750.00
106,575.00
75,000.00
56,250.00
85,000.00
5,950.00
90,000.00
9,900.00
187,910.50
Harga/Satuan
Jumlah (Rp)
Bahan/Upah (Rp)
550,000.00
550,000.00
-
50,750.00
91,350.00
75,000.00
202,500.00
85,000.00
45,900.00
90,000.00
9,900.00
Harga/Satuan
899,650.00
Jumlah (Rp)
Bahan/Upah (Rp)
625.00
250.00
1,383.00
165,960.00
93,750.00
28,125.00
1,275.00
459,000.00
1,953.13
11,718.75
50,750.00
304,500.00
75,000.00
225,000.00
85,000.00
25,500.00
90,000.00
27,000.00
Harga/Satuan
1,247,053.75
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
380.63
75,000.00
5,625.00
85,000.00
637.50
90,000.00
342.00
Harga/Satuan
6,985.13
Jumlah (Rp)
Bahan/Upah (Rp)
920,083.99
828,075.59
15,100.00
2,718,000.00
60,625.00
485,000.00
1,275.00
6,375.00
50,750.00
177,625.00
75,000.00
337,500.00
85,000.00
76,500.00
90,000.00
81,000.00
4,710,075.59
Jumlah (Rp)
Bahan/Upah (Rp)
Jumlah (Rp)
625.00
15,750.00
1,383.00
8,185.15
93,750.00
1,451.25
162.04
310.80
15,100.00
24,160.00
66.96
418.98
50,750.00
162,400.00
75,000.00
76,125.00
85,000.00
127.50
90,000.00
1,440.00
290,368.68
Jumlah (Rp)
625.00
35,437.50
1,383.00
12,882.65
93,750.00
3,265.31
162.04
699.30
15,100.00
39,260.00
66.96
58,191.96
50,750.00
162,400.00
75,000.00
76,125.00
85,000.00
127.50
90,000.00
1,440.00
389,829.22
Jumlah (Rp)
625.00
63,000.00
1,383.00
22,902.48
93,750.00
5,805.00
162.04
5.35
15,100.00
73,235.00
66.96
58,191.96
50,750.00
162,400.00
75,000.00
76,125.00
85,000.00
127.50
90,000.00
1,440.00
50,750.00
5,075.00
Harga/Satuan
Bahan/ Upah (Rp)
29,687.50
10,390.63
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
468,307.29
Jumlah (Rp)
35,625.00
10,390.63
2,740.50
6,750.00
765.00
2,430.00
58,701.13
Harga/Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
40,625.00
48,750.00
14,218.75
14,218.75
50,750.00
2,740.50
75,000.00
6,750.00
85,000.00
765.00
90,000.00
2,430.00
Harga/Satuan
Bahan/ Upah (Rp)
75,654.25
Jumlah (Rp)
168,750.00
202,500.00
59,062.50
59,062.50
50,750.00
2,740.50
75,000.00
6,750.00
85,000.00
765.00
90,000.00
2,430.00
Harga/Satuan
Bahan/ Upah (Rp)
274,248.00
Jumlah (Rp)
37,500.00
45,000.00
13,125.00
13,125.00
50,750.00
5,481.00
75,000.00
13,500.00
85,000.00
1,530.00
90,000.00
486.00
Harga/Satuan
Bahan/ Upah (Rp)
79,122.00
Jumlah (Rp)
171,875.00
206,250.00
60,156.25
60,156.25
50,750.00
5,481.00
75,000.00
13,500.00
85,000.00
1,530.00
90,000.00
486.00
287,403.25
Harga/Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
236,000.00
283,200.00
82,600.00
82,600.00
50,750.00
6,851.25
75,000.00
16,875.00
85,000.00
1,912.50
90,000.00
612.00
Harga/Satuan
Bahan/ Upah (Rp)
392,050.75
Jumlah (Rp)
6,762.50
8,115.00
2,366.88
2,366.88
50,750.00
1,827.00
75,000.00
4,500.00
85,000.00
510.00
90,000.00
162.00
Harga/Satuan
Bahan/ Upah (Rp)
17,480.88
Jumlah (Rp)
8,012.50
9,615.00
2,804.38
2,804.38
50,750.00
1,827.00
75,000.00
4,500.00
85,000.00
510.00
90,000.00
162.00
Harga/Satuan
Bahan/ Upah (Rp)
19,418.38
Jumlah (Rp)
11,718.75
14,062.50
4,101.56
4,101.56
50,750.00
1,827.00
75,000.00
4,500.00
85,000.00
510.00
90,000.00
162.00
25,163.06
Harga/Satuan
Jumlah (Rp)
50,750.00
1,827.00
75,000.00
4,500.00
85,000.00
510.00
90,000.00
162.00
Harga/Satuan
6,999.00
Jumlah (Rp)
29,062.50
8,476.56
8,476.56
50,750.00
2,740.50
75,000.00
6,750.00
85,000.00
765.00
90,000.00
243.00
Harga/Satuan
48,037.56
Jumlah (Rp)
50,750.00
2,740.50
75,000.00
6,750.00
85,000.00
765.00
90,000.00
243.00
Harga/Satuan
Bahan/ Upah (Rp)
10,498.50
Jumlah (Rp)
34,375.00
41,250.00
12,031.25
12,031.25
50,750.00
4,110.75
75,000.00
10,125.00
85,000.00
1,147.50
90,000.00
369.00
69,033.50
Harga/Satuan
Bahan/ Upah (Rp)
200,000.00
70,000.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
240,000.00
70,000.00
4,110.75
10,125.00
1,147.50
369.00
325,752.25
Jumlah (Rp)
232,500.00
279,000.00
81,375.00
81,375.00
50,750.00
4,110.75
75,000.00
10,125.00
85,000.00
1,147.50
90,000.00
369.00
Harga/Satuan
Bahan/ Upah (Rp)
20,000.00
376,127.25
Jumlah (Rp)
20,000.00
50,750.00
507.50
75,000.00
7,500.00
85,000.00
850.00
90,000.00
450.00
29,307.50
Harga/Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
250,000.00
250,000.00
75,000.00
75,000.00
50,750.00
1,522.50
75,000.00
22,500.00
85,000.00
2,550.00
90,000.00
135.00
Harga/Satuan
Bahan/ Upah (Rp)
31,250.00
Err:509
351,707.50
Jumlah (Rp)
31,250.00
Err:509
50,750.00
507.50
75,000.00
7,500.00
85,000.00
850.00
90,000.00
450.00
Err:509
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
57,500.00
57,500.00
50,750.00
3,045.00
75,000.00
45,000.00
85,000.00
5,100.00
90,000.00
270.00
Harga/Satuan
Bahan/Upah (Rp)
110,915.00
Jumlah (Rp)
46,875.00
46,875.00
50,750.00
507.50
75,000.00
37,500.00
85,000.00
850.00
90,000.00
450.00
Harga/Satuan
Bahan/Upah (Rp)
86,182.50
Jumlah (Rp)
-
50,750.00
253.75
75,000.00
37,500.00
85,000.00
425.00
90,000.00
225.00
38,403.75
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
-
50,750.00
2,537.50
75,000.00
37,500.00
85,000.00
425.00
90,000.00
22.50
Harga/Satuan
Bahan/Upah (Rp)
40,485.00
Jumlah (Rp)
25,000.00
25,000.00
50,750.00
761.25
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
67.50
Harga/Satuan
38,353.75
Jumlah (Rp)
Bahan/Upah (Rp)
25,000.00
25,000.00
50,750.00
507.50
75,000.00
7,500.00
85,000.00
850.00
90,000.00
45.00
Harga/Satuan
33,902.50
Jumlah (Rp)
Bahan/Upah (Rp)
25,000.00
25,000.00
50,750.00
1,015.00
75,000.00
15,000.00
85,000.00
1,700.00
90,000.00
900.00
Harga/Satuan
43,615.00
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
761.25
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
67.50
13,353.75
Harga/Satuan
Jumlah (Rp)
Bahan/Upah (Rp)
2,500.00
2,500.00
50,750.00
761.25
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
67.50
Harga/Satuan
15,853.75
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
2,537.50
75,000.00
37,500.00
85,000.00
4,250.00
90,000.00
225.00
Harga/Satuan
44,512.50
Jumlah (Rp)
Bahan/Upah (Rp)
46,875.00
46,875.00
50,750.00
1,015.00
75,000.00
15,000.00
85,000.00
1,700.00
90,000.00
90.00
Harga/Satuan
Bahan/Upah (Rp)
64,680.00
Jumlah (Rp)
50,750.00
75,000.00
2,537.50
37,500.00
85,000.00
4,250.00
90,000.00
225.00
Harga/Satuan
44,512.50
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
507.50
75,000.00
7,500.00
85,000.00
850.00
90,000.00
45.00
8,902.50
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
50,750.00
75,000.00
3,045.00
45,000.00
85,000.00
5,100.00
90,000.00
270.00
Harga/Satuan
53,415.00
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
1,268.75
75,000.00
18,750.00
85,000.00
2,125.00
90,000.00
112.50
22,256.25
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
97,900.00
107,690.00
162,500.00
178,750.00
106,250.00
116,875.00
50,750.00
761.25
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
67.50
121,043.75
192,103.75
130,228.75
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
116,650.00
128,315.00
265,625.00
292,187.50
50,750.00
761.25
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
67.50
Err:509
141,668.75
305,541.25
Harga/Satuan
Bahan/Upah (Rp)
#VALUE!
Jumlah (Rp)
97,000.00
106,700.00
50,750.00
837.38
75,000.00
12,375.00
85,000.00
1,402.50
90,000.00
72.00
Harga/Satuan
121,386.88
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
1,268.75
75,000.00
18,750.00
85,000.00
2,125.00
90,000.00
112.50
Harga/Satuan
22,256.25
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
761.25
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
67.50
Harga/Satuan
13,353.75
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
761.25
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
67.50
Harga/Satuan
13,353.75
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
837.38
75,000.00
12,375.00
85,000.00
1,402.50
90,000.00
72.00
14,686.88
Harga/Satuan
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
761.25
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
67.50
Harga/Satuan
13,353.75
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
761.25
75,000.00
11,250.00
85,000.00
1,275.00
90,000.00
67.50
13,353.75
Harga/Satuan
Bahan/Upah (Rp)
1,100.00
Jumlah (Rp)
55.00
50,750.00
75,000.00
11,250.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
225.00
11,530.00
Harga/Satuan
Bahan/Upah (Rp)
1,220.00
Jumlah (Rp)
61.00
50,750.00
75,000.00
11,250.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
225.00
11,536.00
Harga/Satuan
Bahan/Upah (Rp)
1,220.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
61.00
11,250.00
225.00
11,536.00
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
-
6,000.00
60,000.00
-
50,750.00
81,200.00
75,000.00
120,000.00
85,000.00
68,000.00
90,000.00
45,000.00
374,200.00
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
27,075.00
2,166.00
31,250.00
625.00
550.00
5.50
50,750.00
2,030.00
75,000.00
3,000.00
85,000.00
340.00
90,000.00
225.00
8,391.50
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
4,312.50
646.88
20,125.00
3,421.25
31,250.00
5,312.50
50,750.00
3,552.50
75,000.00
5,625.00
85,000.00
637.50
90,000.00
225.00
19,420.63
Jumlah (Rp)
62,500.00
12,500.00
4,312.50
646.88
20,125.00
3,421.25
31,250.00
8,125.00
50,750.00
3,552.50
75,000.00
675.00
85,000.00
510.00
90,000.00
225.00
29,655.63
Jumlah (Rp)
62,500.00
12,500.00
4,312.50
646.88
20,125.00
3,421.25
31,250.00
10,937.50
50,750.00
3,552.50
75,000.00
7,875.00
85,000.00
340.00
90,000.00
225.00
39,498.13
Harga/Satuan
Jumlah (Rp)
Bahan/Upah (Rp)
-
50,750.00
2,030.00
75,000.00
4,725.00
85,000.00
5,355.00
90,000.00
225.00
12,335.00
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
56,250.00
8,437.50
56,250.00
20,925.00
3,541.00
7,082.00
50,750.00
75,000.00
4,500.00
85,000.00
1,360.00
90,000.00
225.00
42,529.50
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
18,750.00
6,562.50
50,750.00
5,075.00
75,000.00
85,000.00
90,000.00
540.00
12,177.50
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
23,000.00
3,450.00
27,075.00
1,353.75
3,541.00
354.10
18,750.00
187.50
50,750.00
8,120.00
75,000.00
12,000.00
85,000.00
1,360.00
90,000.00
225.00
27,050.35
Jumlah (Rp)
4,312.50
431.25
21,875.00
2,187.50
132,500.00
34,450.00
50,750.00
1,015.00
75,000.00
4,725.00
85,000.00
535.50
90,000.00
225.00
43,569.25
Jumlah (Rp)
21,875.00
2,625.00
132,500.00
23,850.00
50,750.00
1,421.00
75,000.00
3,150.00
85,000.00
357.00
90,000.00
225.00
31,628.00
meni besi
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
62,500.00
6,250.00
61,250.00
11,025.00
18,750.00
187.50
50,750.00
1,015.00
75,000.00
15,000.00
85,000.00
1,700.00
90,000.00
Jumlah harga per - satuan pekerjaan
900.00
36,077.50
Jumlah (Rp)
62,500.00
6,250.00
18,750.00
187.50
6,250,000.00
12,500.00
50,750.00
12,687.50
75,000.00
16,875.00
85,000.00
1,912.50
90,000.00
675.00
51,087.50
g (galbani) secara manual sistem 1 lapis cat mutakhir dengan tebal 200
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
61,250.00
18,375.00
50,750.00
304.50
75,000.00
4,500.00
85,000.00
1,020.00
90,000.00
540.00
24,739.50
g (galbani) secara manual sistem 3 lapis cat mutakhir dengan tebal 200
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
61,250.00
6,737.50
21,875.00
3,718.75
61,250.00
4,900.00
50,750.00
25,375.00
75,000.00
60,000.00
85,000.00
25,500.00
90,000.00
18,000.00
144,231.25
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
61,250.00
18,375.00
50,750.00
20,300.00
75,000.00
52,500.00
85,000.00
17,000.00
90,000.00
18,000.00
126,175.00
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
10,625.00
106,250.00
85,000.00
85,000.00
90,000.00
585.00
75,000.00
4,875.00
Harga/Satuan
Bahan/Upah (Rp)
150,000.00
Jumlah harga per - satuan pekerjaan
Harga/Satuan
196,710.00
Jumlah (Rp)
150,000.00
150,000.00
Jumlah (Rp)
Bahan/Upah (Rp)
Jumlah (Rp)
20,900.00
20,900.000
13,750.00
13,750.000
1,732.50
1,732.500
5,500.00
5,500.000
28,132.500
20,982.500
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
65,875.00
65,875.00
10,625.00
10,625.00
3,825.00
3,825.00
7,500.00
7,500.00
77,200.00
21,950.00
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
14,375.00
14,375.000
1,437.50
1,437.500
7,500.00
7,500.000
Harga/Satuan
Bahan/Upah (Rp)
23,312.50
Jumlah (Rp)
112,500.00
112,500.000
113,300.00
113,300.000
12,500.00
12,500.000
7,943.33
7,943.333
7,500.00
7,500.000
127,943.333
128,743.333
27,943.333
DAFTAR REKAPITULASI HA
TAHUN A
NO
KODE
PEKERJAAN PENDAHULUAN
1
A.1
B.1
B.4
B.6
B.8
B.9
B.11
B.13
B.14
10
B.16
PEKERJAAN TANAH
1
2
3
4
5
6
7
8
9
10
11
12
13
PEKERJAAN PONDASI
1
2
3
4
5
6
7
PEKERJAAN DINDING
1
2
3
4
5
6
PEKERJAAN PLESTERAN
DAFTAR REKAPITULASI HA
TAHUN A
NO
KODE
1
2
3
4
5
6
7
PEKERJAAN KAYU
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
DAFTAR REKAPITULASI HA
TAHUN A
NO
KODE
16
17
18
19
20
21
22
23
24
PEKERJAAN BETON
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
PEKERJAAN LANTAI
1
2
3
4
5
6
DAFTAR REKAPITULASI HA
TAHUN A
NO
KODE
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
DAFTAR REKAPITULASI HA
TAHUN A
NO
KODE
DAFTAR REKAPITULASI HA
TAHUN A
NO
KODE
PEKERJAAN SANITASI
1
2
3
4
5
6
7
8
9
10
11
12
13
PEKERJAAN PIPA
1
2
3
4
5
6
7
DAFTAR REKAPITULASI HA
TAHUN A
NO
KODE
8
9
10
11
12
13
14
15
16
PEKERJAAN KACA DAN KUNCI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
PEKERJAAN PENGECETAN
1
2
3
4
5
DAFTAR REKAPITULASI HA
TAHUN A
NO
KODE
6
7
8
9
10
11
12
13
14
15
16
17
18
19
HAR
3
PENDAHULUAN
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Tanah Timbunan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
PLESTERAN
HAR
3
Memasang plesteran 1 PC : 2 PP tebal 15 mm
Rp
Rp
Rp
Rp
Rp
Rp
Memasang Acian
Rp
Rp
Membuat dan memasang kusen pintu dan jendela, kayu kls II & III
Rp
Rp
Rp
Rp
Membuat dan memasang pintu dan jendela kaca , kayu kls I atau II
Rp
Membuat dan memasang pintu dan jendela jalusi, kayu kls I atau II
Rp
Rp
Rp
Rp
Rp
Rp
Memasang konstruksi kuda - kuda konvensional kayu kls I, II, dan III
Rp
Rp
Rp
HAR
3
Memasang rangka sirap kls II
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Membuat lantai kerja beton mutu fc = 7,4 Mpa (K100) w/c = 0,87
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HAR
3
Memasang plint keramik ukuran (10 x 20 ) cm
Rp
Rp
Rp
Rp
Rp
Memasang underlayer
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HAR
3
PENUTUP ATAP
Memasang atap genteng kodok/ galzzur
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
LANGIT - LANGIT
Memasang langit -langit asbes semen, tebal 4 mm, 5mm dan 6 mm
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HAR
3
Memasang 1 buah closed duduk/monoblok
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HAR
3
Memasang pipa PVC tipe AW diameter 3/4"
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
PENGECETAN
Mengikis / mengerok permukaan cat tembok lama
Rp
Rp
Rp
Mengerok karat atau cat lama permukaan baja dengan pancar pasing (sanblasting)
dengan tingkat kebersihan sa 2 1/2
Rp
Rp
HAR
3
Mengecet bidang kayu lama
Rp
Mengecet bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Rp
Mengecet bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
Rp
Rp
Rp
Rp
Rp
Mengecet tembok baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Rp
Rp
Rp
Rp
Mengecet permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat
mutakhir dengan tebal 200m
Rp
Mengecet permukaan baja lapis seng (galbani) secara manual sistem 3 lapis cat
mutakhir dengan tebal 200m
Rp
Mengecet permukaan baja lapis seng (galbani) secara semprot (airless spray) 1 lapis
cat mutakhir dengan tebal 200m
Rp
GARAN 2014
HARGA (Rp)
4
54,800.00
286,091.88
65,000.00
2,509,290.43
9,575.00
4,111,342.69
55,689.00
368,320.25
341,320.25
161,683.13
40,312.50
49,725.00
59,317.50
53,630.00
81,525.00
107,697.50
64,950.00
2,987.50
2,574.75
13,303.13
29,875.00
122,700.00
60,900.00
585,309.75
534,654.00
241,608.00
131,352.50
150,102.50
Err:509
600,774.50
191,451.10
182,787.40
98,445.35
92,298.71
88,610.75
86,281.19
GARAN 2014
HARGA (Rp)
4
39,617.45
36,485.46
34,454.92
33,181.97
18,475.86
38,158.22
21,177.25
14,659,317.50
5,055,187.50
627,327.00
217,995.00
404,125.00
531,874.20
772,440.50
484,337.50
671,509.98
976,435.50
637,020.00
745,520.00
4,543,625.00
15,934,625.00
4,555,675.00
GARAN 2014
HARGA (Rp)
4
536,025.00
215,445.32
91,725.00
164,744.64
91,912.50
136,220.00
263,117.50
278,360.00
281,833.10
699,530.46
738,998.41
769,675.63
649,301.14
806,952.15
840,689.58
867,349.35
883,630.27
911,414.07
920,083.99
983,912.33
995,186.22
17,149.50
166,410.00
180,160.00
306,678.75
316,053.75
305,220.42
306,678.75
237,339.58
5,405,391.33
5,227,058.00
5,839,198.83
150,010.75
58,294.84
170,431.61
85,185.52
168,051.94
161,343.51
174,205.45
GARAN 2014
HARGA (Rp)
4
22,389.20
14,488.03
13,486.83
700,305.05
169,210.63
64,775.00
147,682.50
147,682.50
203,044.09
176,770.49
165,250.96
176,770.49
215,925.49
165,250.96
748,982.80
102,356.86
82,921.50
82,921.50
86,992.50
GARAN 2014
HARGA (Rp)
4
74,637.50
34,965.00
257,092.50
21,630.00
124,752.50
80,558.00
132,284.38
68,832.50
40,190.00
113,780.00
68,637.50
7,735.00
14,272.50
12,602.50
12,602.50
31,877.50
39,305.00
35,559.38
7,170.00
8,325.00
8,325.00
21,160.00
145,917.50
650.00
90,142.50
166,500.00
61,050.00
71,220.00
138,750.00
5,961.75
11,789.25
11,728.75
48,607.50
231,667.50
13,875.00
26,940.00
43,175.00
33,292.50
GARAN 2014
HARGA (Rp)
4
795,225.00
601,885.50
212,260.50
1,052,485.50
800,635.50
187,910.50
899,650.00
1,247,053.75
6,985.13
4,710,075.59
290,368.68
389,829.22
468,307.29
58,701.13
75,654.25
274,248.00
79,122.00
287,403.25
392,050.75
17,480.88
GARAN 2014
HARGA (Rp)
4
19,418.38
25,163.06
6,999.00
48,037.56
10,498.50
69,033.50
325,752.25
351,707.50
Err:509
110,915.00
86,182.50
38,403.75
40,485.00
38,353.75
33,902.50
43,615.00
13,353.75
15,853.75
44,512.50
64,680.00
44,512.50
8,902.50
53,415.00
22,256.25
121,043.75
141,668.75
121,386.88
22,256.25
13,353.75
13,353.75
14,686.88
13,353.75
13,353.75
11,530.00
11,536.00
11,536.00
374,200.00
8,391.50
GARAN 2014
HARGA (Rp)
4
19,420.63
29,655.63
39,498.13
12,335.00
42,529.50
12,177.50
27,050.35
43,569.25
31,628.00
36,077.50
51,087.50
24,739.50
144,231.25
126,175.00
Satuan
Indeks
2.100
3.530
3.000
Harga/ Satuan
Bahan/ Upah (Rp)
42,183.33
29,683.33
5,500.00
Bahan
Hollow 40 x 40
Hollow 20 x 40
Kawat Las
m'
m'
btg
Tenaga Kerja
Pekerja
Tukang Besi
Kepala Tukang
Mandor
OH
0.810
OH
1.135
OH
0.114
OH
0.004
Jumlah harga per- satuan
50,750.00
75,000.00
85,000.00
90,000.00
pekerjaan
Satuan
Indeks
2.100
17.500
0.250
4.000
1.100
Harga/ Satuan
Bahan/ Upah (Rp)
42,183.33
29,683.33
212,673.61
5,500.00
30,800.00
Bahan
Hollow 40 x 40
Hollow 20 x 40
Besi Plat
Kawat Las
Profil C 75
m'
m'
m2
btg
m'
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
0.200
OH
0.150
OH
0.015
OH
0.010
Jumlah harga per- satuan
50,750.00
75,000.00
85,000.00
90,000.00
pekerjaan
Jumlah (Rp)
88,585.00
104,782.17
16,500.00
41,107.50
85,125.00
9,647.50
369.00
346,116.17
Jumlah (Rp)
88,585.00
519,458.33
53,168.40
22,000.00
33,880.00
10,150.00
11,250.00
1,275.00
900.00
740,666.74
DOKUMEN PERENCANAAN
PAKET PEKERJAAN
REHABILITASI KANTOR LURAH LEMOE
LOKASI
KANTOR LURAH LEMOE
KEGIATAN
DOKUMEN PERENCANAAN
PAKET PEKERJAAN
REHABILITASI KANTOR LURAH LAKESSI
LOKASI
KANTOR LURAH LAKESSI
KEGIATAN
REHABILITASI BERAT GEDUNG KANTOR KOTA PAREPARE TAHUN
ANGGARAN 2014
N PERENCANAAN
ET PEKERJAAN
LOKASI
OR LURAH LEMOE
KEGIATAN
S ESTIMATES (EE)
PERENCANAAN TEKNIS
N PERENCANAAN
ET PEKERJAAN
KANTOR LURAH LAKESSI
LOKASI
OR LURAH LAKESSI
KEGIATAN
S ESTIMATES (EE)
PERENCANAAN TEKNIS
RENCANA ANGGARAN BI
( RAB )
KEGIATAN
PEKERJAAN
LOKASI
KOTA
TAHUN
NO
:
:
:
:
:
SATUAN
I
1
3
2
Ls
Ls
Ls
II
1
2
PEKERJAAN TANAH
Pek. Galian Tanah
Urugan Galian
m3
m3
III
1
2
3
4
m3
m3
m3
m3
kg
m2
m2
m2
m2
m3
m3
m2
IV
1
2
m3
m3
V
1
PEKERJAAN BESI
Pek. Pagar Rool Pintu Gerbang
m'
VI
PEKERJAAN LANTAI
1
2
3
4
m2
m2
m2
Bh
VII
1
2
3
m3
m2
m2
VIII
1
2
3
m2
m2
m
IX
1
2
3
4
PEKERJAAN PENGECATAN
Pek. Pengecatan Dindin
Pek. Pengecatan Plafond
Pek. Pengecatan Kalsiplank
Pek. Pengecatan Kayu Dg Politur
m2
m2
m2
m2
X
1
2
3
PEKERJAAN KUNCI
Pas. Kunci Tanam
Pas. Engsel Pintu
Pas. Engsel Jendela
Bh
Bh
Bh
XI
1
2
3
ttk
ttk
bh
PEKERJAAN AKHIR
Pek. Pembersihan Lokasi
ls
XII
1
REKAPITULASI
RENCANA ANGGARAN B
( RAB )
KEGIATAN
PEKERJAAN
LOKASI
KOTA
: PAREPARE
TAHUN
: 2014
NO
JENIS PEKERJAAN
II
PEKERJAAN TANAH
III
IV
PEKERJAAN BESI
VI
PEKERJAAN LANTAI
VII
PEKERJAAN PENGECATAN
PEKERJAAN KUNCI
XI
XII
PEKERJAAN AKHIR
JUMLAH D
DIBULAT
Terbilang :
Mengetahui,
KEPALA KECAMATAN BACUK
KOTA PAREPARE
NA ANGGARAN BIAYA
( RAB )
VOLUME
1.00
1.00
1.00
250,000.00
200,000.00
900,000.00
JUMLAH. I
250,000.00
200,000.00
900,000.00
1,350,000.00
15.62
3.91
40,312.50
13,303.13
JUMLAH II
629,842.50
51,962.01
681,804.51
0.84
2.51
6.98
122,700.00
241,608.00
585,309.75
102,699.90
606,677.69
4,082,535.51
1.41
222.39
45.80
806,952.15
17,149.50
60,053.33
1,134,703.83
3,813,821.98
2,750,442.67
1.06
191.04
17.71
806,952.15
17,149.50
102,226.25
857,564.19
3,276,307.57
1,810,631.34
1.41
188.57
16.49
806,952.15
17,149.50
102,226.25
JUMLAH III
1,134,703.83
3,233,837.48
1,685,506.41
24,489,432.39
83.52
135.20
92,298.71
36,485.46
JUMLAH IV
7,708,788.26
4,932,833.92
12,641,622.18
3.00
1,000,000.00
JUMLAH V
3,000,000.00
3,000,000.00
118.47
8.91
28.25
5.00
168,051.94
161,343.51
134,516.59
899,650.00
19,909,869.27
1,437,086.67
3,799,824.56
4,498,250.00
JUMLAH VI
29,645,030.50
25.01
9.85
14,659,317.50
798,457.00
772,440.50
JUMLAH VII
19,967,812.66
7,610,238.29
27,578,050.95
168.68
251.88
59.00
130,393.75
29,482.50
53,212.50
21,995,013.34
7,426,052.10
3,139,537.50
JUMLAH VIII
32,560,602.94
856.96
168.68
11.80
69.72
43,569.25
31,628.00
31,628.00
42,529.50
JUMLAH. IX
37,336,930.20
5,335,058.48
373,210.40
2,965,173.75
46,010,372.84
14.00
60.00
68.00
64,680.00
38,353.75
33,902.50
JUMLAH. X
905,520.00
2,301,225.00
2,305,370.00
5,512,115.00
196,710.00
150,000.00
77,200.00
JUMLAH. XI
1,698,400.00
1,698,400.00
1,000,000.00
1,000,000.00
JUMLAH XII
1,000,000.00
#REF!
22.00
1.00
186,167,431.31
EKAPITULASI
NA ANGGARAN BIAYA
( RAB )
5,512,115.00
1,698,400.00
1,000,000.00
JUMLAH DANA
186,167,431.31
DIBULATKAN
186,100,000.00
2014
Disusun Oleh,
KONSULTAN PERENCANA
CV. TANTAMA RAYA MANDIRI KONSULTAN
HARDEDY, ST
Direktur
Mengetahui,
KECAMATAN BACUKIKI
KOTA PAREPARE
BACK UP DATA
PEKERJAAN REHABILITASI RUMAH DINAS PARAMEDIS P
TAHUN ANGGARAN 2013
NO.
SKETSA
NO.
SKETSA
P
PEKERJAAN STRUKTUR
PEK. TANAH
Lebar
Panjang
Galian TANAH
(a1+a2)/2
a
55.8
0.5
0.3
Urugan Pasir
Panjang
a
55.8
Lebar
(a1+a2)/2
b
0.3
0.3
Lebar
Panjang
(a1+a2)/2
a
55.8
b
0.3
0.3
3.Pas. Pondasi
Lebar
Panjang
(a1+a2)/2
a
b
0.2
55.8
0.3
PEK. BETON
Sloof
- Beton
Dimensi
a
0.18
0.14
Jumlah (m3)
- Pembesian Sloof
Besi
Jml. Bs
Sloof 14 x 18
10.00
4.00
8.00
373.00
Dimensi
- Bekisting Sloof
a
0.18
0.18
Jumlah (m2)
Kolom
- Beton
Dimensi
a
0.18
0.18
Jumlah (m3)
- Pembesian Kolom
Besi
Jml. Bs
Kolom 18 X 18
12.00
4.00
8.00
11.93
Jumlah kolom
VOLUME ( kg )
- Bekisting Kolom
Tinggi
jml bkstg
a
1.64
3.00
Jumlah
Ringballk
- Beton
(m2) =
Dimensi
a
0.18
0.14
Jumlah (m3)
- Pembesian Ringbalk
Besi
Jml. Bs
Ringballk 14x18
10.00
4.00
8.00
224.20
Dimensi
- Bekisting Ringbalk
a
0.18
0.18
Jumlah (m2)
Panjang
Lebar
6.40
5.40
2.87
2.27
2.87
2.79
2.90
2.35
2.90
2.37
7.66
1.40
3.37
2.89
2.63
1.30
2.65
1.30
2.89
2.87
1.20
0.90
1.15
1.05
2.35
1.85
2.37
1.40
1.36
1.32
3.95
2.11
2.Lantai Keramik 20 x 20
Panjang
Lebar
1.42
1.35
1.42
1.35
1.35
1.35
1.35
1.35
1.36
1.05
3.Dindin Keramik 20 x 25
Panjang
Lebar
5.54
1.50
5.54
1.50
5.40
1.50
5.40
1.50
1.36
1.05
(m2
1.50
0.80
1.Plafond
Panjang
Lebar
6.40
5.40
2.87
2.27
2.87
2.79
2.90
2.35
2.90
2.37
7.66
1.40
3.37
2.89
2.63
1.30
2.65
1.30
2.89
2.87
1.20
0.90
1.15
1.05
2.35
1.85
2.37
1.40
1.36
1.32
3.95
2.11
1.42
1.35
1.42
1.35
1.35
1.35
1.35
1.35
1.36
1.05
59.00
0.70
Jumlah
23.6
10.28
11.32
10.5
10.54
18.12
12.52
7.86
7.9
11.52
4.2
4.4
8.4
7.54
5.36
12.12
5.54
5.54
5.4
5.4
4.82
59.00
Volume ( m')
2.Pengecatan Dindin
Panjang
a
Tampak Depan
Tinggi ratarata
b
17.52
6.54
4.09
2.8
Belakang
2.7
2.8
Jumlah A
LANTAI 1
Lubang /Tampak Depan
0.80
2.04
2.04
1.54
1.54
1.54
2.60
0.75
1.00
0.75
0.75
0.70
2.60
1.50
2.00
1.00
1.00
2.60
0.80
2.60
1.54
0.75
1.54
0.75
1.55
0.60
Jumlah B
TOTAL Pegecatan ( A - B ) m2
3. Pek. Daun Pintu
Panjang
Lebar
2.00
1.22
Engsel
36.00
1.80
0.72
24.00
Panjang
Lebar
1.00
0.37
Engsel
2.01
30.00
0.34
Engsel
1.00
4.00
0.37
Engsel
2.01
(m2
30.00
0.27
Engsel
4.00
Jumlah Total volume Daun Pintu
)=
Jumlah Engsel Jendela =
(m2
3.Pas. Pondasi
Lebar
Panjang
(a1+a2)/2
a
b
0.2
9.8
0.3
PEKERJAAN BETON
Lebar
1.Rabat Beton
Panjang
( rata-rata )
a
12.6
0.55
Volume Rabat Beton (m3)
Diperiksa Oleh
Konsultan Pengawas
Inspektor
Disetujui Oleh ,
Pejabat Pembuat Komitmen
( PPK )
NIP :
BACK UP DATA
PEKERJAAN REHABILITASI RUMAH DINAS PARAMEDIS P
TAHUN ANGGARAN 2013
NO.
SKETSA
P
PEKERJAAN ARSITEKTUR
PEKERJAAN KERAMIK
1. Pek . Paving Block
Lebar
rata-rata
Panjang
0.8
6.5
0.7
11.2
3.8
2.6
2.8
1.3
2.3
1.7
Jumlah (
2
Dimensi Kayu
Lbr
Tbl
Kusen Jendela
0.13
0.05
0.13
0.05
Panjang
Lebar
1.04
0.75
1.04
1.00
1.04
0.75
1.04
0.75
1.04
0.75
1.04
0.75
1.04
0.70
1.05
0.60
Panjang
Lebar
2.06
0.82
2.08
0.82
2.07
0.82
Panjang
Lebar
0.58
0.11
(m2
Jumlah m2=
Jadi jumlah ( m2 )
Diperiksa Oleh
Konsultan Pengawas
Inspektor
Disetujui Oleh ,
Pejabat Pembuat Komitmen
( PPK )
NIP :
BACK UP DATA
PEKERJAAN REHABILITASI RUMAH DINAS PARAMEDIS P
TAHUN ANGGARAN 2013
NO.
SKETSA
PEKERJAAN LANGIT-LANGIT
1. Pek. Plafond
Lebar
( rata rata
)
b
9.04
3.51
1.82
1.76
1.62
1.27
Panjang
Vol. Total ( m2 )
5
PEKERJAAN ATAP
1. Pas. Talang Plastik
Panjang
Jumlah
10.08
Volume ( m')
6
PEKERJAAN PENGECATAN
1. Pengupasan Cat lama
Panjang
a
Tampak Depan
21.39
Tinggi ratarata
b
2.9
2.8
Belakang
12
2.8
Jumlah A
LANTAI 1
Lubang /Tampak Depan
0.80
2.60
2.04
2.04
1.54
1.54
1.54
0.75
1.00
0.75
0.75
0.70
2.60
1.50
2.00
1.00
1.00
2.60
0.80
2.60
1.54
0.75
1.54
0.75
1.55
0.60
Jumlah B
Diperiksa Oleh
Konsultan Pengawas
Inspektor
Disetujui Oleh ,
Pejabat Pembuat Komitmen
( PPK )
NIP :
BACK UP DATA
PEKERJAAN REHABILITASI RUMAH DINAS PARAMEDIS P
TAHUN ANGGARAN 2012
NO.
SKETSA
2.Pengecatan Dindin
Panjang
a
Tampak Depan
21.39
Tinggi ratarata
b
2.9
2.8
Belakang
11.7
2.8
Jumlah A
LANTAI 1
Lubang /Tampak Depan
0.80
2.04
2.04
1.54
1.54
1.54
2.60
0.75
1.00
0.75
0.75
0.70
2.60
1.50
2.00
1.00
1.00
2.60
0.80
2.60
1.54
0.75
1.54
0.75
1.55
0.60
Jumlah B
TOTAL Pegecatan ( A - B ) m2
Panjang
a
Lebar
( rata rata
)
b
9.04
3.51
1.82
1.76
1.62
1.27
Panjang
Lebar
2.06
0.82
2.08
0.82
2.07
0.82
1.80
0.82
Pintu
Jalusi Jendela J8
0.58
0.13
Diperiksa Oleh
Konsultan Pengawas
Inspektor
Disetujui Oleh ,
Pejabat Pembuat Komitmen
( PPK )
NIP :
UP DATA
NAS PARAMEDIS PUSKESMAS LAPADDE
GGARAN 2013
SKETSA
PERHITUNGAN
N STRUKTUR
Lebar
Tinggi
Jumlah
Volume
=axcxdxe
0.40
0.7
15.624
Keterangan
Rata-rata
15.62
Lebar
3.91
Tinggi
Jumlah
Volume
=axcxdxe
0.30
0.05
0.837
Rata-rata
Lebar
Pagar
Keterangan
Pagar
0.84
Tinggi
Jumlah
Volume
=axcxdxe
0.30
0.15
2.511
Rata-rata
Keterangan
Lebar
2.51
Tinggi
Jumlah
Volume
=axcxdxe
0.25
0.5
6.975
mlah (m3)
6.98
Panjang
Jumlah
Volume
=axbxcxd
55.80
1.00
1.41
mlah (m3)
Ket.
Sloof 14 x 18
1.41
Panjang
Koef. Bs
Volume
=bxcxd
55.80
0.617
137.61
Tulangan Pokok
0.58
0.395
84.78
Begel
mlah (m2)
Keterangan
Rata-rata
Ket.
222.39
P. Bkstg
P. Total
Volume
c= a+b
= cxd
0.36
45.80
16.49
Ket.
16.49
Tinggi
Jumlah
Volume
=axbxcxd
1.64
20.00
1.06
Ket.
Kolom 18 X 18
1.06
Panjang
Koef. Bs
Volume
=bxcxd
Ket.
1.82
0.888
6.46
Tulangan Pokok
0.66
0.395
3.09
Begel
20.00
OLUME ( kg )
mlah
191.04
Lebar
Jumlah
Volume
=axbxcxd
0.18
20.00
17.71
(m2) =
mlah (m3)
Ket.
Kolom 18 X 18
17.71
Panjang
Jumlah
Volume
=axbxcxd
55.80
1.00
1.41
Ket.
Ringballk 14x18
1.41
Panjang
Koef. Bs
Volume
=bxcxd
55.80
0.617
137.61
Tulangan Pokok
0.58
0.395
50.96
Begel
mlah (m2)
9.55
Ket.
188.57
P. Bkstg
P. Total
Volume
c= a+b
= cxd
0.36
45.80
16.49
Ket.
Ringballk 14x18
16.49
Jumlah
Luasan
Ket.
=axbxc
1.00
34.56
Teras
1.00
6.51
P2
1.00
8.01
P2
1.00
6.82
P2
1.00
6.87
P2
1.00
10.72
P2
1.00
9.74
P2
1.00
3.42
P2
1.00
3.45
P2
1.00
8.29
P3
1.00
1.08
P4
1.00
1.21
P5
1.00
4.35
P6
1.00
3.32
P7
1.00
1.80
P8
1.00
8.33
P8
me Lantai keramik
118.47
Jumlah
Luasan
=axbxc
1.00
1.92
W1
1.00
1.92
W2
1.00
1.82
W3
1.00
1.82
W4
1.00
1.43
W5
me Lantai keramik
Ket.
8.91
Jumlah
Luasan
=axbxc
1.00
8.31
W1
1.00
8.31
W2
1.00
8.10
W3
1.00
8.10
W4
1.00
1.43
W5
ndin keramik
(m2 )
34.25
Ket.
Daun Pintu
5.00
6.00
0.00
ndin keramik
(m2 )
me Lantai keramik
W5
6.00
28.25
Jumlah
Luasan
=axbxc
1.00
34.56
Teras
1.00
6.51
P2
1.00
8.01
P2
1.00
6.82
P2
1.00
6.87
P2
1.00
10.72
P2
1.00
9.74
P2
1.00
3.42
P2
1.00
3.45
P2
1.00
8.29
P3
1.00
1.08
P4
1.00
1.21
P5
1.00
4.35
P6
1.00
3.32
P7
1.00
1.80
P8
1.00
8.33
P8
1.00
1.92
W1
1.00
1.92
W2
1.00
1.82
W3
1.00
1.82
W4
1.00
1.43
W5
1.00
41.30
Luar
nd (m2 ) =
168.68
Volume
c=axb
Ket
Ket.
an
23.6
10.28
11.32
10.5
10.54
18.12
12.52
7.86
7.9
11.52
4.2
4.4
8.4
7.54
5.36
12.12
5.54
5.54
5.4
5.4
4.82
59
251.88
Sisi
Luas
Luas Total
Ket.Lokasi
=axb
= c x Luas
Luar / Dalam
70.08
420.48
Luar / Dalam
26.16
156.96
Luar / Dalam
16.36
98.16
Luar / Dalam
8.19
24.58
Luar / Dalam
9.52
19.04
Luar / Dalam
7.49
14.97
Luar
Jumlah A ( m2 ) =
734.19
2.00
2.00
2.00
2.00
2.00
2.00
2.08
1.53
2.04
1.16
1.16
1.08
4.16
3.06
4.08
2.31
2.31
2.16
Pintu depan
J1
J2
J5
J6
J7
2.00
2.08
4.16
Pintu depan
2.00
3.00
6.00
Jendela pintu
4.00
1.00
4.00
Jendela
1.00
2.08
2.08
Pintu Belakang
1.00
2.08
2.08
Pintu Belakang
1.00
1.16
1.16
J3
1.00
1.16
1.16
J4
2.00
0.93
1.86
J8
an Bangunan
akang
Jumlah B ( m2 ) =
( A - B ) m2
695.48
Jumlah
Luasan
=axbxc
Ket.
Daun Pintu
6.00
14.64
P1
8.00
10.37
P2
36.00
me Daun Pintu
(m2
25.01
Jumlah
Luasan
=axbxc
Ket.
Daun jendela
10.00
3.70
2.00
1.37
10.00
3.70
2.00
1.09
30.00
4.00
30.00
4.00
me Daun Pintu
dela
38.71
(m2
9.85
68.00
J1
J2
J3
Lebar
Tinggi
Jumlah
Volume
=axcxdxe
0.25
0.95
2.320375
Rata-rata
2.32
Tinggi
Jumlah
Volume
= axbxcxd
0.05
0.35
ui Oleh ,
buat Komitmen
PK )
IP :
Keterangan
0.35
Dibuat Oleh
Kontraktor Pelaksana
Direktur
Keteragan
UP DATA
NAS PARAMEDIS PUSKESMAS LAPADDE
GGARAN 2013
PERHITUNGAN
ARSITEKTUR
Jumlah
Luas
Luas Total
=axb
= c x Luas
5.20
5.20
7.84
7.84
9.88
9.88
3.64
3.64
3.91
3.91
Jumlah ( m2 ) =
Ket.
30.47
Luasan
Panjang
Jumlah
c= a x b
Luas
Ket.
= cxdxe
J8
0.01
1.60
3.00
0.03
0.01
0.58
6.00
0.02
Jumlah
ntu jendela ( m3 )
1.00
Unit
Jumlah
Luasan
=axbxc
0.05
0.05
Ket.
Bingkai Jendela
1.00
0.78
J1
1.00
1.04
J2
1.00
0.78
J3
1.00
0.78
J4
1.00
0.78
J5
1.00
0.78
J6
1.00
0.73
J7
2.00
1.26
J8
6.93
5.773
me Bingkai Jendela
Jumlah
Luasan
=axbxc
Daun Pintu
1.00
1.69
P1
1.00
1.71
P2
1.00
1.70
P3
me Daun Pintu
(m2
5.09
Jumlah
Luasan
=axbxc
Ket.
J8
4.00
Jumlah m2=
ui Oleh ,
buat Komitmen
PK )
IP :
Ket.
2.00
0.25
0.25
0.50
Dibuat Oleh
Kontraktor Pelaksana
Direktur
UP DATA
NAS PARAMEDIS PUSKESMAS LAPADDE
GGARAN 2013
PERHITUNGAN
Jumlah
Luas
Luas Total
=axb
= c x Luas
31.69
31.69
BIDAN. A
3.20
3.20
BIDAN. B
2.05
2.05
BIDAN. C
. Total ( m2 )
Ket.
36.94
Volume
Ket
c=axb
10.08
10.08
Sisi
Luas
Luas Total
Ket.Lokasi
=axb
= c x Luas
Luar / Dalam
62.03
124.06
Luar / Dalam
31.08
93.23
Luar / Dalam
26.70
53.39
Luar / Dalam
33.15
66.30
Luar
Jumlah A ( m2 ) =
336.98
an
2.00
2.08
4.16
Pintu depan
2.00
2.00
2.00
2.00
2.00
1.53
2.04
1.16
1.16
1.08
3.06
4.08
2.31
2.31
2.16
J1
J2
J5
J6
J7
2.00
2.08
4.16
Pintu depan
2.00
3.00
6.00
Jendela pintu
4.00
1.00
4.00
Jendela
1.00
2.08
2.08
Pintu Belakang
1.00
2.08
2.08
Pintu Belakang
1.00
1.16
1.16
J3
1.00
1.16
1.16
J4
2.00
0.93
1.86
J8
an Bangunan
akang
Jumlah B ( m2 ) =
Cat lama ( A - B ) m2
ui Oleh ,
buat Komitmen
PK )
IP :
38.71
298.27
Dibuat Oleh
Kontraktor Pelaksana
Direktur
UP DATA
NAS PARAMEDIS PUSKESMAS LAPADDE
GGARAN 2012
PERHITUNGAN
Sisi
Luas
Luas Total
Ket.Lokasi
=axb
= c x Luas
Luar / Dalam
62.03
124.06
Luar / Dalam
31.08
93.23
Luar / Dalam
26.70
53.39
Luar / Dalam
33.15
66.30
Luar
Jumlah A ( m2 ) =
336.98
an
2.00
2.00
2.00
2.00
2.00
2.00
2.08
1.53
2.04
1.16
1.16
1.08
4.16
3.06
4.08
2.31
2.31
2.16
Pintu depan
J1
J2
J5
J6
J7
2.00
2.08
4.16
Pintu depan
2.00
3.00
6.00
Jendela pintu
4.00
1.00
4.00
Jendela
1.00
2.08
2.08
Pintu Belakang
1.00
2.08
2.08
Pintu Belakang
1.00
1.16
1.16
J3
1.00
1.16
1.16
J4
2.00
0.93
1.86
J8
an Bangunan
akang
Jumlah B ( m2 ) =
( A - B ) m2
38.71
298.27
Jumlah
Luas
Luas Total
=axb
= c x Luas
Ket.
31.69
31.69
BIDAN. A
3.20
3.20
BIDAN. B
2.05
2.05
BIDAN. C
catan Plafond ( m2 )
Jumlah
Luas
Luas Total
=axb
= c x Luas
1.69
3.38
P1
1.71
3.41
P2
1.70
3.39
P3
1.48
2.95
P4
0.07
0.60
J8
gecatan Kayu ( m2 )
ui Oleh ,
buat Komitmen
PK )
IP :
36.94
13.73
Dibuat Oleh
Kontraktor Pelaksana
Direktur
Ket.
RENCANA ANGGARAN BI
( RAB )
KEGIATAN
PEKERJAAN
LOKASI
KOTA
TAHUN
NO
:
:
:
:
:
SATUAN
I
1
3
2
Ls
Ls
Ls
II
1
2
PEKERJAAN TANAH
Pek. Galian Tanah
Urugan Galian
m3
m3
III
1
2
3
4
m3
m3
m3
m3
kg
m2
m2
m2
m2
IV
1
2
m3
m3
V
1
PEKERJAAN BESI
Pek. Pagar Rool Pintu Gerbang
m'
VI
1
2
3
4
PEKERJAAN LANTAI
Pek. Tegel Lantai Keramik 30 x 30
Pek. Tegel Lantai Keramik 20 x 20
Pek. Dindin Keramik 20 x 25
Pemasagan Bak Air Fiber
m2
m2
m2
Bh
VII
1
2
3
m3
m2
m2
VIII
1
2
3
m2
m2
m
PEKERJAAN PENGECATAN
Pek. Pengecatan Dindin
Pek. Pengecatan Plafond
m2
m2
IX
1
2
3
4
m2
m2
X
1
2
3
PEKERJAAN KUNCI
Pas. Kunci Tanam
Pas. Engsel Pintu
Pas. Engsel Jendela
Bh
Bh
Bh
XI
1
2
3
4
5
6
7
8
ttk
ttk
bh
bh
bh
bh
bh
bh
PEKERJAAN AKHIR
Pek. Pembersihan Lokasi
ls
XII
1
REKAPITULASI
RENCANA ANGGARAN B
( RAB )
KEGIATAN
PEKERJAAN
LOKASI
KOTA
: PAREPARE
TAHUN
: 2014
NO
JENIS PEKERJAAN
II
PEKERJAAN TANAH
III
IV
PEKERJAAN BESI
VI
PEKERJAAN LANTAI
VII
PEKERJAAN PENGECATAN
PEKERJAAN KUNCI
XI
XII
PEKERJAAN AKHIR
JUMLAH D
DIBULAT
Terbilang :
Mengetahui,
KEPALA KECAMATAN SOREA
KOTA PAREPARE
NA ANGGARAN BIAYA
( RAB )
VOLUME
1.00
1.00
1.00
957.06
250,000.00
200,000.00
900,000.00
1,350,000.00
40,312.50
13,303.13
JUMLAH II
122,700.00
241,608.00
585,309.75
806,952.15
17,149.50
60,053.33
806,952.15
17,149.50
102,226.25
JUMLAH III
92,298.71
36,485.46
JUMLAH IV
1,000,000.00
JUMLAH V
187.18
6.47
22.38
3.00
168,051.94
161,343.51
134,516.59
899,650.00
34,918,681.22
34,918,681.22
31,455,625.56
1,043,343.96
3,009,808.65
2,698,950.00
JUMLAH VI
14,659,317.50
798,457.00
772,440.50
JUMLAH VII
38,207,728.16
-
475.68
183.85
41.60
130,393.75
29,482.50
53,212.50
JUMLAH VIII
62,025,699.00
5,420,357.63
2,213,640.00
69,659,696.63
517.06
475.68
43,569.25
31,628.00
22,527,807.48
15,044,807.04
8.32
31,628.00
42,529.50
JUMLAH. IX
263,144.96
37,835,759.48
64,680.00
38,353.75
33,902.50
JUMLAH. X
#REF!
1.00
9.00
7.00
9.00
9.00
8.00
4.00
4.00
1.00
196,710.00
150,000.00
21,950.00
77,200.00
27,943.33
23,312.50
20,982.50
28,132.50
JUMLAH. XI
196,710.00
1,350,000.00
153,650.00
694,800.00
251,490.00
186,500.00
83,930.00
112,530.00
3,029,610.00
1,000,000.00
1,000,000.00
JUMLAH XII
1,000,000.00
186,001,475.49
EKAPITULASI
NA ANGGARAN BIAYA
( RAB )
3,029,610.00
1,000,000.00
JUMLAH DANA
186,001,475.49
DIBULATKAN
186,000,000.00
am Juta Rupiah
Parepare,
2014
Disusun Oleh,
KONSULTAN PERENCANA
CV. TANTAMA RAYA MANDIRI KONSULTAN
HARDEDY, ST
Direktur
Mengetahui,
A KECAMATAN SOREANG
KOTA PAREPARE
4.8
3.65
4.28
8
4.8
4.28
1.35
2.15
1
1
4.8
4.28
11
3.6
4.28
2.15
UNIT
4
Lantai 1.
4.15
1.00
4.15
1.00
4.15
1.00
1.2
1.00
4.8
1.00
1.9
1.00
1.9
1.00
1.65
1.00
0.3
15.00
0.2
14.00
VOLUME TOTAL
Lantai 2.
4.15
1.00
4.15
1.00
1.2
1.00
4.8
1.00
1.9
1.00
1.8
1.00
VOLUME TOTAL
TOTAL
VOL.
6 = 2*3*4
19.92
15.15
17.76
9.60
23.04
8.13
2.57
3.55
4.50
2.80
107.014
19.92
17.76
13.20
17.28
8.13
3.87
80.164
187.178
VOL.
6 = 2*3*4
4.46
2.01
KETERANGAN
7
a
b
c
d
e
f
g
tangga
a
c
d
e
f
g
KETERANGAN
7
a
b
6.467
VOL.
6 = 2*3*4
6.750
2.675
8.250
4.700
22.375
KETERANGAN
7
PANJANG
2
0.85
2.6
0.5
2
0.85
0.85
0.85
CODE
1
J1
PANJANG
2
2.15
0.95
0.65
0.5
0.4
0.65
0.65
CODE
1
J2
PANJANG
2
2.85
0.95
0.65
0.5
0.4
0.65
0.015
CODE
1
J3
PANJANG
2
2.85
1.5
0.65
0.5
0.95
0.65
0.65
LEBAR
SISI
3
4
0.05
4
0.05
4
0.15
2
0.15
2
0.15
3
0.15
12
0.015
12
JUMLAH
LEBAR
SISI
3
4
0.05
6
0.05
8
0.15
7.8
0.15
6
0.15
6
0.15
36
0.015
36
JUMLAH
LEBAR
SISI
3
4
0.05
6
0.05
10
0.15
16
0.15
8
0.15
8
0.15
48
0.015
48
JUMLAH
LEBAR
SISI
3
4
0.05
6
0.05
10
0.15
16
0.15
8
0.15
8
0.15
48
0.015
48
JUMLAH
LUAS TOTAL
UNIT
5
6.00
6.00
6.00
6.00
6.00
6.00
6.00
UNIT
5
6.00
6.00
6.00
6.00
6.00
6.00
6.00
UNIT
5
6.00
6.00
6.00
6.00
6.00
6.00
6.00
UNIT
5
12.00
12.00
12.00
12.00
12.00
12.00
12.00
VOL.
6 = 1*2*3*4*5
1.020
3.120
0.900
3.600
2.295
9.180
0.918
21.033
VOL.
6 = 1*2*3*4
3.870
2.280
4.563
2.700
2.160
21.060
2.106
38.739
VOL.
6 = 1*2*3*4
5.130
2.850
9.360
3.600
2.880
28.080
0.065
51.965
VOL.
6 = 1*2*3*4
10.260
9.000
18.720
7.200
13.680
56.160
5.616
120.636
232.373
PEK. PLAFOOND
CODE
PANJANG
LEBAR
SISI
UNIT
VOL.
2
7.85
48.15
6.4
48.15
3
6.85
1.8
0.9
0.9
4
1
1
2
1
5
6.00
1.00
2.00
1.00
JUMLAH
6 = 1*2*3*4
322.635
86.670
23.040
43.335
475.680
PEK. LISPLAFOND
CODE
1
UNIT
PANJANG
SISI
4
2
3
7.85
2
1.00
6.85
2
1.00
48.15
2
1.00
1.8
2
1.00
6.4
1
1.00
48.15
1
1.00
JUMLAH LISPLAFOND GIYPSUM ( M )
VOL.
5 = 1*2*3
15.700
13.700
96.300
3.600
6.400
48.150
183.850
PANJANG
2
13.3
9.12
13.6
48.15
4.15
1.07
3.6
1.65
4.7
4.8
3.65
4.28
1.35
4.15
4.82
2.75
1.65
1.9
1.07
LEBAR
3
7.45
7.45
0.9
0.9
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.85
3.85
3.85
3.85
3.85
3.85
SISI
4
1
1
2
1
6
4
5
2
1
6
2
5
1
6
3
1
5
1
1
UNIT
5
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
VOL.
6 = 1*2*3*4
99.085
67.944
24.480
43.335
89.640
15.408
64.800
11.880
16.920
103.680
26.280
77.040
4.860
95.865
55.671
10.588
31.763
7.315
4.120
4.8
4.28
1.35
2.15
3.85
3.85
3.85
1.5
JUMLAH
4
5
4
1
2.15
1.45
0.65
0.9
1.6
0.5
1.4
1.4
2
2
2
0.7
6
6
6
16
2
2
JUMLAH
JUMLAH
1.00
1.00
1.00
1.00
LUBANG KUSEN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
73.920
82.390
20.790
3.225
1,030.998
18.060
12.180
7.800
28.800
6.400
0.700
73.940
957.058
15.1
11.4
30.2
41.6
33.28
140.294
KETERANGAN
7
A
B
C
D
E
F
G
KETERANGAN
7
A
B
C
D
E
F
G
KETERANGAN
7
A
B
C
D
E
F
G
KETERANGAN
7
A
B
C
D
E
F
G
KETERANGAN
7
rk
KETERANGAN
6
rk
DING
KETERANGAN
7
LUAR
LT.1
619.072
LT.2
99.75
71.25
171
342
LT.2
LT.2
99.75
71.25
171
342