Anda di halaman 1dari 30

HARGA UPAH DAN BAHAN

No
1
2
3
4
5
6

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Upah
Mandor
Kepala Tukang
Tukang Batu
Tukang Besi
Tukang Gali
Pekerja
Bahan
Batu kali / Batu gunung / Batu Belah
Batu bata
Besi beton ulir
besi beton polos
Cat Dasar
Cat Penutup
Atap seng
Keramik 50 x 50
Pintu Kaca 2 pasang beserta rangka aluminium
Koral Beton/Kerikil
Balok Kayu 2 x 5/10
Balok Kayu 8/12
Kayu bekisting Klas II
Kayu papan bouwplank

Rp
Rp
Rp
Rp
Rp
Rp

Harga
70,000.00
90,000.00
75,000.00
75,000.00
60,000.00
55,000.00
Harga

Rp
Rp
Rp
Rp
Rp
Rp
Rp

105,000.00
750.00
18,000.00
10,000.00
20,000.00
22,500.00
55,000.00

Rp

45,000.00

Rp

6,000,000.00

Rp

105,000.00

Rp

3,000,000.00

Rp

5,000,000.00

Rp

3,200,000.00

Kawat beton
Minyak bekisting (Melamin)

Rp
Rp
Rp

3,200,000.00
10,500.00
18,530.00

Pasir urug

Rp

98,000.00

Pasir beton

Rp

105,000.00

Pasir pasang
Plamir
Semen portland 40 Kg

Rp
Rp
Rp

101,000.00
13,000.00
44,000.00

Sirtu (Pasir Batu)


Stop kontak + Instalasi
Titik Lampu + Instalasi
Plywood 9 mm
Tanah Timbun
Kawat screen 4 mm
Engsel Pintu
Handle Pintu CN105
Ember cor 14 TC (BAGUS)
Nok Rabung P1,8 m
Baut Pengikat / skrup 12x45 mm

Rp
Rp
Rp
Rp
Rp

200,500.00
100,000.00
100,000.00
110,000.00
40,000.00

Rp
Rp
Rp
Rp
Rp
Rp

45,500.00
105,000.00
17,000.00
70,000.00
70,000.00
4,500.00

Satuan
OH
OH
OH
OH
OH
OH
Satuan
M3
Bh
Kg
Kg
Kg
Kg
Lbr
M2
M2
M3
M3
M3
M3
M3
Kg
Lt
M3
M4
M5
Kg
Zak
M3
Ttk
Ttk
Lbr
M3

Bh
Bh
Pcs
Lbr
Lbr
Pcs

ANALISA RENCANA ANGGARAN BIAYA


SNI 03-2835-2002-2-a
1 m3 Galian tanah biasa sedalam 1 m
Tenaga
1.
Pekerja
0.4
2.
Kepala Tukang
0
3.
Mandor
0.04

SNI 03-2835-2002-i
1 M3 Urugan Kembali
Tenaga
1.
Pekerja
2.
Kepala Tukang
3.
Mandor

x
x
x

Rp.
Rp.
Rp.

Oh
Oh
Oh

x
x
x

Rp.
Rp.
Rp.

SNI 03-2835-2002-j
1 M3 Timbunan dan Pemadatan Tanah
Bahan
1.
Tanah Timbun
1 M3

Rp.

Tenaga
1.
2.
3.

0.5 Oh
0 Oh
0.05 Oh

x
x
x

Rp.
Rp.
Rp.

1 M3

Rp.

0.3 Oh
0 Oh
0.01 Oh

x
x
x

Rp.
Rp.
Rp.

Pekerja
Kepala Tukang
Mandor

SNI 03-2835-2002-k
1 M3 Urugan Pasir
Bahan
1.
Pasir Urug

Tenaga
1.
2.
3.

Pekerja
Kepala Tukang
Mandor

SNI 03-2835-2002-l
1 M3 Lapisan Pasir

0.192
0
0.019

Oh
Oh
Oh

Bahan
1.

Pasir Urug

Tenaga
1.
2.
3.

Pekerja
Kepala Tukang
Mandor

1 M3

Rp.

0.3 Oh
0 Oh
0.01 Oh

x
x
x

Rp.
Rp.
Rp.

SNI 03-2835-2002-m
1 M3 Pasang Pondasi Batu Kosong
Bahan
1.
Batu Belah 10 C
1 M3
2.
Pasir Urug
0.3 M3

x
x

Rp.
Rp.

Tenaga
1.
2.
3.

0.78 Oh
0.039 Oh
0.039 Oh

x
x
x

Rp.
Rp.
Rp.

SNI 03-2835-2002-n.a
1 M3 Pasang Pondasi Batu Gunung
Bahan
1.
Batu Gunung
1.1 M3
2.
Pasir Ayakan
0.544 M3
3.
Semen
3.4 M3

x
x
x

Rp.
Rp.
Rp.

Tenaga
1.
2.
3.

x
x
x

Rp.
Rp.
Rp.

SNI 03-2835-2002-1-i
1 M2 Pasang Batu Bata Tebal 1 bata , 1 Pc : 4 Ps
Bahan
1.
Batu Bata
70 Bh
x
2.
Semen
11.5 Kg
x
3.
Pasir Pasang
0.043 M3
x

Rp.
Rp.
Rp.

Pekerja
Kepala Tukang
Mandor

Pekerja
Kepala Tukang
Mandor

1.5 Oh
0.06 Oh
0.075 Oh

Tenaga
1.
2.
3.

Pekerja
Kepala Tukang
Mandor

0.32 Oh
0.01 Oh
0.015 Oh

x
x
x

Rp.
Rp.
Rp.

SNI 03-2835-2002-2-a
1 M2 Plesteran 1 Pc : 2 Ps , tebal 15 mm
Bahan
1.
Semen
8.52 Kg
2.
Pasir Pasang
0.017 M3

x
x

Rp.
Rp.

Tenaga
1.
2.
3.

0.2 Oh
0.015 Oh
0.01 Oh

x
x
x

Rp.
Rp.
Rp.

SNI 03-2837-2002-2-b
1 M2 Plesteran 1 Pc : 2 Ps , tebal 15 mm
Bahan
1.
Semen
5.2 Kg
2.
Pasir Pasang
0.02 M3

x
x

Rp.
Rp.

Tenaga
1.
2.
3.

0.2 Oh
0.015 Oh
0.01 Oh

x
x
x

Rp.
Rp.
Rp.

SNI 03-2838-2002-5-c
1 M2 Pemasangan Lantai Keramik
Bahan
1.
Keramik 40 x 40
1 M2
2.
Semen
11.38 Kg
3.
Pasir Pasang
0.042 M3

x
x
x

Rp.
Rp.
Rp.

Tenaga
1.
2.
3.

x
x
x

Rp.
Rp.
Rp.

Pekerja
Kepala Tukang
Mandor

Pekerja
Kepala Tukang
Mandor

Pekerja
Kepala Tukang
Mandor

0.62 Oh
0.035 Oh
0.03 Oh

SNI 03-3435-2002-a
1 M3 Pemasangan Beton Cor
Bahan
1.
Semen
2.
Pasir Beton
3.
Koral Beton

217 Kg
0.52 M3
0.87 M3

x
x
x

Rp.
Rp.
Rp.

1.65 Oh
0.025 Oh
0.08 Oh

x
x
x

Rp.
Rp.
Rp.

SNI 03-3435-2002-ai
1 M3 Membuat Beton dengan mutu K225
Bahan
1.
Semen
378 Kg
2.
Pasir Beton
0.65 M3
3.
Koral Beton
0.65 M3

x
x
x

Rp.
Rp.
Rp.

Tenaga
1.
2.
3.

6 Oh
0.1 Oh
0.3 Oh

x
x
x

Rp.
Rp.
Rp.

SNI 03-3435-2002-ab
1 M2 Pasang Bekisting Untuk Pondasi
Bahan
1.
Kayu Bekisting
0.04 M3
2.
Paku Biasa 2" - 5"
0.3 Kg
3.
Minyak Bekisting
0.1 Lt

x
x
x

Rp.
Rp.
Rp.

Tenaga
1.
2.
3.

x
x
x

Rp.
Rp.
Rp.

Tenaga
1.
2.
3.

Pekerja
Kepala Tukang
Mandor

Pekerja
Kepala Tukang
Mandor

Pekerja
Kepala Tukang
Mandor

0.3 Oh
0.026 Oh
0.005 Oh

SNI 03-3435-2002-ac
1 M2 Pasang Bekisting Untuk Lantai
Bahan
1.
Kayu Kelas III
0.04 M3
2.
Paku
0.4 Kg
3.
Minyak Bekisting
0.2 Lt
4.
Balok Kayu Kelas I
0.015 M3
5.
Plywood Tebal 9
0.35 Lbr
6.
Dolken Kayu
6 Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Tenaga
1.
2.
3.

0.66 Oh
0.033 Oh
0.033 Oh

x
x
x

Rp.
Rp.
Rp.

SNI 03-3435-2002-ae
1 M2 Pasang Bekisting Untuk Balok
Bahan
1.
Kayu Kelas III
0.04 M3
2.
Paku
0.4 Kg
3.
Minyak Bekisting
0.2 Lt
4.
Balok Kayu Kelas I
0.018 M3
5.
Plywood Tebal 9
0.35 Lbr
6.
Dolken Kayu
2 Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Tenaga
1.
2.
3.

x
x
x

Rp.
Rp.
Rp.

Pekerjaan Lain Lain


Membongkar Cetakan Dan Menyiram Beton
1.
Pekerja
4 Oh

Rp.

SNI 03-3435-2002-h.c
1 M3 Sloof 15 x 20 cm
1.
Beton Cor K225
2.
Sloof 15/20

x
x

Rp.
Rp.

Pekerja
Kepala Tukang
Mandor

Pekerja
Kepala Tukang
Mandor

0.32 Oh
0.033 Oh
0.006 Oh

1 M3
143.585 Kg

3.
4.

Cetakan Beton
Pekerjaan Lain La

9.167 M3
1 Oh

x
x

Rp.
Rp.

SNI 03-3435-2002-J.c
1 M3 Balok 8 cm x 12 cm
1.
Beton Cor K225
2.
Sloof 15/20
3.
Cetakan Beton
4.
Pekerjaan Lain La

1 M3
123.308 Kg
10 M3
1 Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1.02 Lbr
0.2 Kg

x
x

Rp.
Rp.

SNI 03-3436-2002-a
1 M2 Pasang Atap Seng
Bahan
1.
Seng BJLS 20
2.
Paku Ulir

SNI 03-2838-2002-6-a
1 M2 Pengecatan Tembok ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan
1.
Plamir
0.1 Kg
x
Rp.
2.
Cat Dasar
0.1 Kg
x
Rp.
3.
Cat Penutup
0.26 Kg
x
Rp.
Tenaga
1.
2.
3.

Pekerja
Kepala Tukang
Mandor

0.02 Oh
0.006 Oh
0.003 Oh

x
x
x

Rp.
Rp.
Rp.

ENCANA ANGGARAN BIAYA

55,000
80,000
80,000
Jumlah

55,000
80,000
80,000
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.

22000
0
3200
25200

=
=
=
=

Rp.
Rp.
Rp.
Rp.

jumlah 1

51,900 =
=

Rp.
Rp.

51900
51900

jumlah 2
Jumlah 1 + 2

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

27500
0
4000
31500
83400

147,900 =
=

Rp.
Rp.

147900
147900

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

16500
0
800
17300
69200

Jumlah 1

jumlah 2
Jumlah 1 + 2

10560
0
1520
12080

Jumlah 1

jumlah 2
Jumlah 1 + 2

Jumlah 1

jumlah 2
Jumlah 1 + 2

Jumlah 1

jumlah 2
Jumlah 1 + 2

Jumlah 1

147,900 =
=

Rp.
Rp.

147900
147900

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

16500
0
800
17300
165200

168,800 =
147,900 =
=

Rp.
Rp.
Rp.

168800
44370
213170

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

42900
3120
3120
49140
262310

168,800 =
101,000 =
57,500 =
=

Rp.
Rp.
Rp.
Rp.

185680
54944
195500
436124

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

82500
4800
6000
93300
529424

700 =
1,438 =
101,000 =
=

Rp.
Rp.
Rp.
Rp.

49000
16531.25
4343
69874.25

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

17600
800
1200
19600
89474.25

1,438 =
101,000 =
=

Rp.
Rp.
Rp.

12247.5
1717
13964.5

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

11000
1200
800
13000
26964.5

1,438 =
101,000 =
=

Rp.
Rp.
Rp.

7475
2020
9495

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

11000
1200
800
13000
22495

Jumlah 1

165,800 =
1,438 =
101,000 =
=

Rp.
Rp.
Rp.
Rp.

165800
16358.75
4242
186400.75

jumlah 2

55,000 =
80,000 =
80,000 =
=

Rp.
Rp.
Rp.
Rp.

34100
2800
2400
39300

jumlah 2
Jumlah 1 + 2

Jumlah 1

jumlah 2
Jumlah 1 + 2

Jumlah 1

jumlah 2
Jumlah 1 + 2

Jumlah 1 + 2

Jumlah 1

jumlah 2
Jumlah 1 + 2

Jumlah

jumlah 2
Jumlah 1 + 2

Jumlah 1

jumlah 2
Jumlah 1 + 2
Dipakai 4x

Rp.

225700.75

1,438 =
105,000 =
105,000 =
=

Rp.
Rp.
Rp.
Rp.

311937.5
54600
91350
457887.5

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

90750
2000
6400
99150
557037.5

1,438 =
105,000 =
105,000 =
=

Rp.
Rp.
Rp.
Rp.

543375
68250
68250
679875

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

330000
8000
24000
362000
1041875

3,200,000 =
8,000 =
19,000 =
=

Rp.
Rp.
Rp.
Rp.

128000
2400
1900
132300

55,000 =
80,000 =
80,000 =
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16500
2080
400
18980
151280
37820

3,200,000 =
8,000 =
19,000 =
3,200,000 =
110,000 =
30,000 =
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

128000
3200
3800
48000
38500
180000
401500

55,000 =
80,000 =
80,000 =
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

36300
2640
2640
41580
443080
110770

3,200,000 =
8,000 =
19,000 =
3,200,000 =
110,000 =
30,000 =
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

128000
3200
3800
57600
38500
60000
291100

Jumlah 2
Jumlah 1 + 2
Dipakai 4x

55,000 =
80,000 =
80,000 =
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17600
2640
480
20720
311820
77955

Jumlah

55,000 =
=

Rp.
Rp.

220000
220000

21,000 =
11,436.66 =

Rp.
Rp.

21000
1642132.8261

Jumlah 1

Jumlah 2
Jumlah 1 + 2
Dipakai 4x

Jumlah 1

Jumlah

81,690 =
220000 =
=

Rp.
Rp.
Rp.

748849.02155
220000
2631981.84765

Jumlah

21,000 =
11,436.66 =
81,690 =
220000 =
=

Rp.
Rp.
Rp.
Rp.
Rp.

21000
1410231.67128
816896.5
220000
2468128.17128

67,500 =
15,000 =
=

Rp.
Rp.
Rp.

68850
3000
71850

Jumlah 1

13,000 =
20,000 =
22,500 =
=

Rp.
Rp.
Rp.
Rp.

1300
2000
5850
9150

Jumlah 2
Jumlah 1 + 2

55,000 =
80,000 =
80,000 =
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1100
480
240
1820
10970

Jumlah 1

s Cat Penutup )

0.22

17.00

0.30

18.00

0.39

19.00

0.50

20.00

10

0.62

21.00

11

0.75

22.00

12

0.89

23.00

13

1.04

14

1.21

15

1.39

16

1.58

PERHITUNGAN BERAT PEMBESIAN / M3 BETON


No

BESI

DIMENSI (m)
b

m2

Berat Besi

Jumlah

(kg)

Batang

Panjang /
m'

SLOOF
1

Sloof 15/15
10
8 - 150
Sloof 18/25
10
8 - 150
Sloof 15/20
10
8 - 150
Sloof 20/25
10
8 - 150

0.15

0.15

0.02

0.62
0.39

4.00
6.67

1.00
0.60

0.18

0.25

0.05

0.62
0.39

4.00
6.67

1.00
0.86

0.15

0.20

0.03

0.62
0.39

4.00
6.67

1.00
0.70

0.20

0.25

0.05

0.62
0.39

4.00
6.67

1.00
0.90

4.00
6.67

1.00
0.80

KOLOM
1

Kolom 20/20
10
8-150

0.20

0.20

0.04

0.62
0.39

Kolom 13/13
10
8-150
Kolom 20/30
10
8-150

0.13

0.13

0.02

0.62
0.39

4.00
6.67

1.00
0.52

0.20

0.30

0.06

0.62
0.39

6.00
6.67

1.00
1.00

BALOK
1

13

14

15

16

17

18

Balok 13/15
10
8 - 150
Balok 15/20
10
8 - 150

0.13

0.15

0.02

0.62
0.39

4.00
6.67

1.00
0.56

0.15

0.20

0.03

0.62
0.39

4.00
6.67

1.00
0.70

0.10

0.10

0.62
0.62

10.00
10.00

1.00
1.00

0.27

0.27

1.21
0.62

30.00
30.00

1.00
1.00

0.20

0.20

1.21
0.62

30.00
30.00

1.00
1.00

0.15

0.15

1.21
0.62

30.00
30.00

1.00
1.00

0.10

0.10

0.62
0.22

5.00
10.00

1.00
1.00

0.15

0.62
0.62

20.00
20.00

1.00
1.00

Plat Dack T=10cm


10 - 100
1.00
10 - 100
Plat dinding T=27 cm
14
1.00
10 - 100
Plat dinding T=20 cm
14
1.00
10 - 100
Plat dinding T=15 cm
14
1.00
10 - 100
Plat dinding T=10 cm
10 - 200
1.00
6 - 100

Lesplank Beton t = 15 cm
10
1.00
0.15
10 - 100

PONDASI
1

Pondasi Tapak 150/150


16 - 150
1.35
16 - 150

0.300

Poor Pondasi Tapak 40/40


14
0.40
0.40
8 - 150

Poor Pondasi Tapak 30/40


14
0.30
0.40
8 - 150

0.41

1.58
1.58

22.00
22.00

1.00
1.00

0.16

1.21
0.62

12.00
6.67

1.00
1.60

0.12

1.21
0.62

12.00
6.67

1.00
1.40

Pondasi Tapak dan Poor Pondasi


2

Pondasi Tapak 242/140


14 - 100
1.40
14 - 100

0.325

Poor Pondasi Tapak 40/40


22
0.40
0.40
10 - 100

0.46

1.58
1.58

49.50
49.50

1.00
1.00

0.16

1.21
0.62

16.00
10.00

1.00
1.60

Pondasi Tapak dan Poor Pondasi


3

Pondasi Tapak 250/250


16 - 150
1.35
16 - 150

0.300

Poor Pondasi Tapak 80 cm


16
0.40
0.40
10 - 150

0.41

1.58
1.58

33.00
33.00

1.00
1.00

0.16

1.58
0.62

12.00
6.67

1.00
1.60

Pondasi Tapak dan Poor Pondasi


4

Pondasi Tapak 120/120


14 - 100
1.20
14 - 100

0.275

0.33

Poor Pondasi Tapak 30/30


14
0.30
0.30

0.09

1.58
1.58

49.50
49.50

1.00
1.00

1.21

10.00

1.00

10 - 100

0.30

0.30

0.09

0.62

10.00

Pondasi Tapak dan Poor Pondasi

1.20

1.78
2.00
2.23
2.47
2.72
2.98
3.26

M3 BETON
Berat/m'Jumlah Berat
Berat Besi/m3
Kg/m'

(Kg)

(Kg)

2.47
1.58

2.47
1.58

109.61
70.15

2.47
2.26

2.47
2.26

54.80
50.27

2.47
1.84

2.47
1.84

82.21
61.38

2.47
2.37

2.47
2.37

49.32
47.35

2.47
2.10

2.47
2.10

61.65
52.61

2.47
1.37

2.47
1.37

145.93
80.94

3.70
2.63

3.70
2.63

61.65
43.84

2.47
1.47

2.47
1.47

126.47
75.54

2.47
1.84

2.47
1.84

82.21
61.38

6.17
6.17

12.33

123.31

36.25
18.50

36.25
18.50

134.27
68.50

36.25
18.50

36.25
18.50

181.26
92.48

36.25
18.50

36.25
18.50

241.68
123.31

3.08
2.22

3.08
2.22

30.83
22.20

12.33
12.33

12.33
12.33

82.21
82.21

34.72
34.72

69.45

171.47

14.50
6.58

14.50
6.58

90.63
41.10

14.50
5.75

14.50
5.75

120.84
47.95

131.05

78.13
78.13

156.26

343.42

19.33
9.86

19.33

120.84

232.13

52.09
52.09

104.17

257.21

18.94
6.58

18.94
6.58

118.38
41.10
187.79

78.13
78.13

156.26

473.50

12.08

19.48

216.47

7.40
344.99

PERHITUNGAN BEKISTING
No

Nama
Pekerjaan

DIMENSI (m)
b

m2

Panjang
Luas
2x
Bekisting/ Bekisting/
Pemakaian
m'
m2

SLOOF
Sloof 15/15
0.15

0.15

0.02

0.45

20.00

0.5

0.18

0.25

0.05

0.68

15.11

0.5

0.15

0.20

0.03

0.55

18.33

0.5

0.20

0.25

0.05

0.70

14.00

0.5

Sloof 18/25
Sloof 15/20
Sloof 20/25

KOLOM
Kolom 20/20
0.20

0.20

0.04

0.80

20.00

0.5

0.13

0.13

0.02

0.52

30.77

0.5

0.20

0.30

0.06

1.00

16.67

0.5

Kolom 13/13
Kolom 20/30

BALOK
Balok 13/15
0.13

0.15

0.02

0.43

22.05

0.5

0.15

0.20

0.03

0.55

18.33

0.5

Plat Dack T=10cm


1.00

0.10

0.10

1.00

10.00

0.300

0.45

2.70

6.00

0.5

Poor Pondasi Tapak 40/50


0.40
0.50

0.20

1.80

9.00

0.5

Balok 15/20

Pondasi Tapak 150/150


1.50

Pondasi Tapak

Luas Bekisting
(M2)

10.00
7.56
9.17
7.00

10.00
15.38
8.33

11.03

9.17

10.00

3.00

4.50
3.75

No
I
1
2
3
4
5
6

Uraian Pekerjaan
Pekerjaan Persiapan
Pembersihan Lahan
Pengukuran dan Bowplank
Direksi Keet
Gudang & los Kerja
Foto dan Dokumentasi
Pemasukan Arus PLN

II
1
2
3
4
5
6
7
8

Pekerjaan Tanah & Pondasi


Galian Tanah Pondasi
Urugan Kembali Tanah Galian
Pondasi Batu Gunung
Lapisan Pasir Bawah Pondasi & Lantai
Timbunan Tanah Bawah Lantai
Pasangan Batu Kali
Pengikatan Batu Bata
Plesteran Dinding

III
1

Pekerjaan Kosen & Pintu


Kosen Pintu Kayu dan kaca

IV
1
2
3
4
5

Pekerjaan Tiang Kolom


Sloof
Kolom
Pemasangan Beton Cor
Pemasangan Bekesting Balok
Pemasangan Bekesting Pondasi

V
1
2

Pekerjaan Atap
Pekerjaan Kuda-Kuda & Gording
Pemasangan Atap seng

VI
1

Pekerjaan Lantai
Pemasangan Lantai Keramik 30x30 cm

VII

Pekerjaan Pemasangan Screen

VIII. Pekerjaan Akhir dan Tambahan


Rp 1.00 Membongkar cetakan
Dan Menyiram Beton
Rp
Rp

2.00 Pengecetan Tembok

Detail Uraian

Kedalaman 100 cm
Penampang 80 cm
Tebal 20 cm
Tebal 60 cm
5,5 x 12 m
5,5 x 12 m

Lengkap Terpasang

20 x 15 cm
17 x 17 cm

Lengkap Terpasang

Volume

Satuan

Analisa

105
43
20
20
1
1

M
Ls
M
M
Ls
Ls

Taksir
Taksir
Taksir
Taksir
Taksir
Taksir

18
5
12
4
9.5
3
33
33

M
M
M
M
M
M
M
M

Bh

0.36
6
0.0675 M
12 M
12 M

M
Bh

91.76
105

M
M

30

240

198 M

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp

50,000.00
30,000.00
250,000.00
250,000.00
1,500,000.00
3,200,000.00

Rp

19,200.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,500.00
1,509,500.00
130,000.00
72,000.00
216,000.00
77,000.00
30,000.00

Rp

3,000,000.00

Rp
Rp
Rp
Rp
Rp

2,003,000.00
365,000.00
557,037.50
17,600.00
16,500.00

Rp
Rp

185,000.00
60,000.00

Rp

108,841.00

Rp

21,000.00

Rp

311,820.00

Rp

9,150.00
2,123,520.00

Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,250,000.00
1,290,000.00
5,000,000.00
5,000,000.00
1,500,000.00
3,200,000.00
21,240,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

345,600.00
47,500.00
18,114,000.00
520,000.00
684,000.00
648,000.00
2,541,000.00
990,000.00
20,359,100.00

Rp
Rp

6,000,000.00
6,000,000.00

Rp
Rp
Rp
Rp
Rp
Rp

721,080.00
2,190,000.00
37,600.03
211,200.00
198,000.00
3,357,880.03

Rp
Rp
Rp

16,975,600.00
6,300,000.00
23,275,600.00

Rp
Rp
Rp
Rp

5,442,050.00
5,442,050.00
2,520,000.00
2,520,000.00

Rp

311,820.00

Rp

1,811,700.00
2,123,520.00
170,043,780.06

Rp

Anda mungkin juga menyukai