DWT = 1593.

91
DWT kpl kosong = 53.91 TON Lbp = 66.00
SUPLAY = 53.83 TON B= 12.20
LWT = 842.37 TON T= 3.90
PAYLOAD = 1540 TON H= 6.50
DISP. = TON Cb = 0.70
DSPL.MUATAN KOSONG = 950.11 K= 1.0075
y= 1.025
DISPL. = T*B*LBP*Cb*K *y
T MUATAN KOSONG = 1.63 m
T0 = T muatan kosong
NO. ORD. FS HK
1 5.0326 1 5.0326
2 5.2639 4 21.0556
3 5.7169 2 11.4338
4 6.2991 4 25.1964
5 7.0218 2 14.0436
6 7.7288 4 30.9152
7 8.4362 2 16.8724
8 9.0512 4 36.2048
9 9.11 2 18.22
10 9.11 4 36.44
11 9.11 2 18.22
12 8.916 4 35.664
13 8.2033 2 16.4066
14 7.9677 4 31.8708
15 7.5062 2 15.0124
16 6.878 4 27.512
17 6.0008 2 12.0016
18 4.5786 4 18.3144
19 3.4683 1.5 5.20245
19.5 3.31305 2 6.6261
20 3.1578 0.5 1.5789
403.8237
A= 1204.74
m
m
m
m

T
NO. ORD. FS HK
A 4.85 1 4.85
B 4.431 4 17.724
1 9.3793 2 18.7586
2 9.6411 4 38.5644
3 10.0912 2 20.1824
4 10.7112 4 42.8448
5 11.4407 2 22.8814
6 12.1418 4 48.5672
7 12.844 2 25.688
8 13.4383 4 53.7532
9 13.45 2 26.9
10 13.45 4 53.8
11 13.45 2 26.9
12 13.4095 4 53.638
13 12.571 2 25.142
14 12.3193 4 49.2772
15 11.8895 2 23.779
16 11.2925 4 45.17
17 10.4886 2 20.9772
18 9.286 4 37.144
19 7.8886 1.5 11.8329
19.5 7.69425 2 15.3885
20 7.4999 0.5 3.74995
687.5128
A= 2051.08
PERHITUNGAN KEBUTUHAN CAT KAPAL
1. CAT PRIMER
A. PENGECATAN 2 KALI
B. THEORITICAL SPREADING RATE (TSR) = 8.3 m^2/Lt
C. KEHILANGAN = 20%
D. SELURUH BODY KAPAL (dari bottom s/d T)
JAWAB :
Luas pengecatan = 2051.08 m^2
Berat cat = (luas pengecatan / TSR) = 247.1181 Lt
berat cat + kehilangan * 2 = 593.0834 Lt

2. CAT AC
A. PENGECATAN 2 KALI
B. THEORITICAL SPREADING RATE (TSR) = 4.8 m^2/Lt
C. KEHILANGAN = 20%
D. dari bottom s/d T
JAWAB :
Luas pengecatan = 2051.08 m^2
Berat cat = (luas pengecatan / TSR) = 427.3083 Lt
berat cat + kehilangan * 2 = 1025.54 Lt

3. CAT AF
A. PENGECATAN 2 KALI
B. THEORITICAL SPREADING RATE (TSR) = 6.7 m^2/Lt
C. KEHILANGAN = 20%
D. dari bottom s/d T0
JAWAB :
Luas pengecatan = 1204.74 m^2
Berat cat = (luas pengecatan / TSR) = 179.8119 Lt
berat cat + kehilangan * 2 = 431.5487 Lt

4. CAT BOTTOP (AC)


A. PENGECATAN KALI
B. THEORITICAL SPREADING RATE (TSR) = 6 m^2/Lt
C. KEHILANGAN = 20%
D. dari T0 (sarat kosong)s/d T(sarat full)
JAWAB :
Luas pengecatan = 846.34 m^2
Berat cat = (luas pengecatan / TSR) = 141.0565 Lt
berat cat + kehilangan = 169.2678 Lt

5. BERAT TOTAL KEBUTUHAN CAT


CAT (1+2+3+4) = 2219.44 Lt

6. KEBUTUHAN TINER
0.2 * BERAT TOTAL KEBUTUHAN CAT = 443.888 Lt