Anda di halaman 1dari 9

5.

3 Hasil Akhir

5.3.1 Final Pit

Top View SW Isometric View

SE Isometric View Front View


5.3.2 Volume Sumber Daya

Top View SW Isometric View

SE Isometric View Front View


Volume Sumber Daya : 5742243.8606 m

Tonase 5742243.8606 m x 2.8 ton/ m

= 16078282.80968 ton
5.3.3 Volume Bahan Galian Tertambang dan Lapisan Penutup

Top View SW Isometric View

SE Isometric View Front View


Volume Bahan Galian Tertambang dan Lapisan Penutup : 1422245.0295 m

Tonase : 1422245.0295 m x 2.8 ton/ m

= 3982286.0826 ton
5.3.4 Volume Lapisan Penutup (Overburden)

Top View SW Isometric View

SE Isometric View Front View


Volume OB : 121947.2019 m

Tonase : 121947.2019 m x 1.8 ton/ m

= 219504.96342 ton
5.3.5 Volume Bahan Galian Tertambang

Top View SW Isometric View

SE Isometric View Front View


Volume Bahan Galian Tertambang : 1300297.8276 m

Tonase : 1300297.8276 m x 2.8 ton/ m

= 3640833.91728 ton

Anda mungkin juga menyukai