FAKULTAS TEKNIK
Alamat : Jl Raya Dukuhwaluh Purwokerto 53182
Telp. ( 0281) 636751, Pesawat 130 Fax. 637239 PO Box 202
LEMBAR JAWABAN : .
NAMA :
NO MHS :
TIME SCHEDULLE
PEKERJAAN PEMBANGUNAN RUMAH UNGARAN
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 157.50 m2 Rp 4,500.00 Rp 708,750.00
2 Pasangan bouplang 42.00 m1 Rp 27,540.00 Rp 1,156,680.00
3 Pas Carpot 22.00 m2 Rp 54,500.00 Rp 1,199,000.00
Rp 3,064,430.00 Rp 3,064,430.00
IV PEKERJAAN BETON
1 Pek Sloof Beton 15/20 1:2:3 2.53 m3 Rp 2,908,150.00 Rp 7,363,435.80
2 Pek Kolom Beton Bulat depan 1:2:3 4.00 bh Rp 1,000,000.00 Rp 4,000,000.00
3 Pek Kolom Beton 15/15 1:2:3 2.21 m3 Rp 3,908,685.00 Rp 8,618,650.43
4 Pek Balok Beton 15/20 1 : 2 : 3 2.53 m3 Rp 3,908,685.00 Rp 9,896,790.42
5 Pek Beton Plat belakang 1.68 m3 Rp 3,908,685.00 Rp 6,566,590.80
6 Pek Rabat Beton 1:3:5 102.00 m2 Rp 11,459.35 Rp 1,168,853.70
Rp 37,614,321.15 Rp 37,614,321.15
V PEKERJAAN KERAMIK
1 Pas Lantai keramik 40x40 kw I 76.00 m2 Rp 94,086.40 Rp 7,150,566.40
2 Pas Lantai keramik KM Anti Slip 40x40 k 13.00 m2 Rp 94,086.40 Rp 1,223,123.20
3 Pas Dinding Keramik KM 20x25 kw I 28.00 m2 Rp 84,364.00 Rp 2,362,192.00
4 Pas Lis keramik KM 16.00 m1 Rp 30,000.00 Rp 480,000.00
5 Pas Granit Teras depan 6.00 m2 Rp 200,000.00 Rp 1,200,000.00
6 Pas Granit meja dapur
Rp 11,215,881.60 Rp 11,215,881.60
X PEKERJAAN PENGECATAN
1 Pek Cat Dinding Catylac 510.00 m2 Rp 14,856.00 Rp 7,576,560.00
2 Pek Cat Plafon Catylac 135.50 m2 Rp 14,856.00 Rp 2,012,988.00
3 Pek Cat Lisplang m1
4 Pek melamin Kusen m1
5 Pek melamin Daun Pintu bh
6 Pek melamin Daun Jendela m1
7 Pek melamin roster 35.00 bh
Rp 9,589,548.00 Rp 9,589,548.00
NAMA
NO. MAHASISWA