M2 Bekisting
M2 Pelesteran 1 : 3 Tb = 15 cm
Material
Semen Sak 0.1296 0
Pasir M3 0.019 0
Upah
Pekerja Oh 0.2 0
Tukang Oh 0.15 0
Kepala Tukang Oh 0.015 0
Mandor Oh 0.01 0
M2 Siar 1 : 2
Material
Semen Sak 0.0864 0
Pasir M3 0.016 0
Upah
Pekerja Oh 0.15 0
Tukang Oh 0.07 0
Kepala tukang Oh 0.007 0
mandor Oh 0.008 0
Kg Pembesian
Material
Besi Kg 1 0
Kawat Beton Kg 0.015 0
Upah
Pekerja Oh 0.007 0
Tukang Oh 0.007 0
Kepala Tukang Oh 0.0007 0
Mandor Oh 0.0003 0
M3 Beronjong Pabrikasi
Material
Batu Kali M3 1 0
Beronjong M2 1 0
Upah
Pekerja Oh 1.9 0
Mandor Oh 0.5 0
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
Minggu Ke : 9 (Sembilan)
Periode : 18 Juni - 24 Juni 2015
Nama Paket Pekerjaan : Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) d
Kode Proyek : 1520
No / Tgl Kontrak : HK.02.03/SNVT.PJPA.S-IV/IR-I/124/2015 / Tanggal 23 April 2014
No / Tgl Kontrak Amandemen : -
Contractor : PT. IBNU MUNSYIR DWIGUNA
Tahun Anggaran : 2015
NO ITEM PEKERJAAN
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
ITEM PEKERJAAN Sat
VOLUME BOBOT (%)
RAN TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
m3 440.31 0.28%
m3 1,500.00 0.53%
m3 550.40 0.21%
m3 750.00 0.40%
Borrow Area m3 455.50 0.83%
m3 172.00 3.91%
m3 53.60 1.05%
eton non ekspose), tanpa Perancah m2 96.00 0.29%
m3 350.00 0.92%
m2 2,569.00 0.54%
m2 560.00 0.15%
m3 880.62 0.56%
m3 350.40 0.13%
m3 375.90 0.20%
/ Dari Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
m3 274.40 0.19%
m3 115.00 0.06%
m3 328.40 6.25%
m2 620.00 0.85%
m2 198.00 0.21%
m3 10.40 0.24%
kg 925.60 0.45%
eton non ekspose), tanpa Perancah m2 1.40 0.00%
mukaan beton ekspose), Dengan Perancah m2 4.00 0.02%
m3 65.00 0.84%
m2 4,469.99 0.70%
m3 211,180.50 74.92%
100%
ket 21.D)
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
Minggu Ke : 8 (Delapan)
Periode : 07 Juni - 13 Juni 2015
Nama Paket Pekerjaan : Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) d
Kode Proyek : 1520
No / Tgl Kontrak : HK.02.03/SNVT.PJPA.S-IV/IR-I/124/2015 / Tanggal 23 April 2014
No / Tgl Kontrak Amandemen : -
Contractor : PT. IBNU MUNSYIR DWIGUNA
Tahun Anggaran : 2015
NO ITEM PEKERJAAN
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
ITEM PEKERJAAN Sat
VOLUME BOBOT (%)
RAN TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
m3 440.31 0.28%
m3 1,500.00 0.53%
m3 550.40 0.21%
m3 750.00 0.40%
Borrow Area m3 455.50 0.83%
m3 172.00 3.91%
m3 53.60 1.05%
eton non ekspose), tanpa Perancah m2 96.00 0.29%
m3 350.00 0.92%
m2 2,569.00 0.54%
m2 560.00 0.15%
m3 880.62 0.56%
m3 350.40 0.13%
m3 375.90 0.20%
/ Dari Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
m3 274.40 0.19%
m3 115.00 0.06%
m3 328.40 6.25%
m2 620.00 0.85%
m2 198.00 0.21%
m3 10.40 0.24%
kg 925.60 0.45%
eton non ekspose), tanpa Perancah m2 1.40 0.00%
mukaan beton ekspose), Dengan Perancah m2 4.00 0.02%
m3 65.00 0.84%
m2 4,469.99 0.70%
m3 211,180.50 74.92%
100%
ket 21.D)
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
6,326.00 1.00%
30,361.00 10.77%
11.77%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
Minggu Ke : 10 (Sepuluh)
Periode : 21 Juni - 02 Juli 2015
Nama Paket Pekerjaan : Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 H
Kode Proyek : 1520
No / Tgl Kontrak : HK.02.03/SNVT.PJPA.S-IV/IR-I/124/2015 / Tanggal 23 April 2014
No / Tgl Kontrak Amandemen : -
Contractor : PT. IBNU MUNSYIR DWIGUNA
Tahun Anggaran : 2015
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
971.88
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
16.13% 5.91%
S/D MINGGU INI
Selisih Bobot
VOLUME %
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
52,269.87
439.24
439.24
3,074.70
22.03% 21.09%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
Minggu Ke : 11 (Sebelas)
Periode : 28 Juni - 04 Juli 2015
Nama Paket Pekerjaan : Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 H
Kode Proyek : 1520
No / Tgl Kontrak : HK.02.03/SNVT.PJPA.S-IV/IR-I/124/2015 / Tanggal 23 April 2014
No / Tgl Kontrak Amandemen : -
Contractor : PT. IBNU MUNSYIR DWIGUNA
Tahun Anggaran : 2015
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
22.03% 5.29%
S/D MINGGU INI
Selisih Bobot
VOLUME %
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
64,677.27
543.51
543.51
3,804.55
27.32% 25.93%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
Minggu Ke : 12 (Sebelas)
Periode : 05 Juli - 11 Juli 2015
Nama Paket Pekerjaan : Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 H
Kode Proyek : 1520
No / Tgl Kontrak : HK.02.03/SNVT.PJPA.S-IV/IR-I/124/2015 / Tanggal 23 April 2014
No / Tgl Kontrak Amandemen : -
Contractor : PT. IBNU MUNSYIR DWIGUNA
Tahun Anggaran : 2015
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
27.32% 4.26%
S/D MINGGU INI
Selisih Bobot
VOLUME %
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
74,378.00
625.03
625.03
4,375.18
31.58% 29.72%
28.57%
3.01%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
31.58% 1.36%
S/D MINGGU INI
Selisih Bobot
VOLUME %
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
77,525.10
651.47
651.47
4,560.30
32.94% 30.94%
29.72%
3.22%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
32.94% 2.42%
S/D MINGGU INI
Selisih Bobot
VOLUME %
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
82,937.53
696.95
696.95
4,878.68
35.36% 33.05%
30.88%
4.48%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
35.36% 2.58%
S/D MINGGU INI
Selisih Bobot
VOLUME %
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
- 0.00%
89,263.10
750.11
750.11
5,250.77
37.94% 35.52%
30.88%
7.06%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
92,188.28 89,263.10
774.69 750.11
774.69 750.11
5,422.84 5,250.77
37.95% 4.26%
S/D MINGGU INI Over
VOLUME % Progress
- 0.00% -2.58%
- 0.00% -0.26%
- 0.00% -0.28%
- 0.00% -0.53%
- 0.00% -0.21%
- 0.00% -0.40%
- 0.00% -0.83%
- 0.00% -3.91%
- 0.00% -1.05%
- 0.00% -0.29%
- 0.00% -0.92%
- 0.00% -0.54%
- 0.00% -0.15%
- 0.00% -0.56%
- 0.00% -0.13%
- 0.00% -0.20%
- 0.00% -0.50%
- 0.00% -1.95%
- 0.00% -0.19%
- 0.00% -0.06%
- 0.00% -6.25%
- 0.00% -0.85%
- 0.00% -0.21%
- 0.00% -0.24%
- 0.00% -0.45%
- 0.00% 0.00%
- 0.00% -0.02%
- 0.00% -0.84%
99,880.38
839.33
839.33
5,875.32
39.66%
39.89%
0.23%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
82,051.00 99,880.38
689.50 839.33
689.50 839.33
4,826.53 5,875.32
42.21% 4.14%
S/D MINGGU INI Over
VOLUME % Progress
- 0.00% -2.58%
- 0.00% -0.26%
- 0.00% -0.28%
- 0.00% -0.53%
- 0.00% -0.21%
- 0.00% -0.40%
- 0.00% -0.83%
- 0.00% -3.91%
- 0.00% -1.05%
- 0.00% -0.29%
- 0.00% -0.92%
- 0.00% -0.54%
- 0.00% -0.15%
- 0.00% -0.56%
- 0.00% -0.13%
- 0.00% -0.20%
- 0.00% -0.50%
- 0.00% -1.95%
- 0.00% -0.19%
- 0.00% -0.06%
- 0.00% -6.25%
- 0.00% -0.85%
- 0.00% -0.21%
- 0.00% -0.24%
- 0.00% -0.45%
- 0.00% 0.00%
- 0.00% -0.02%
- 0.00% -0.84%
110,017.67
924.52
924.52
6,471.63
43.62%
46.35%
-2.73%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
64,475.82 110,017.67
541.81 924.52
541.81 924.52
3,792.70 6,471.63
46.35% 8.50%
S/D MINGGU INI Over
VOLUME % Progress
- 0.00% -2.58%
- 0.00% -0.26%
- 0.00% -0.28%
- 0.00% -0.53%
- 0.00% -0.21%
- 0.00% -0.40%
- 0.00% -0.83%
49.25 1.12% -2.79%
12.31 0.24% -0.81%
- 0.00% -0.29%
- 0.00% -0.92%
- 0.00% -0.54%
- 0.00% -0.15%
- 0.00% -0.56%
- 0.00% -0.13%
- 0.00% -0.20%
- 0.00% -0.50%
- 0.00% -1.95%
- 0.00% -0.19%
- 0.00% -0.06%
- 0.00% -6.25%
- 0.00% -0.85%
- 0.00% -0.21%
- 0.00% -0.24%
- 0.00% -0.45%
- 0.00% 0.00%
- 0.00% -0.02%
- 0.00% -0.84%
127,592.85
1,072.21
1,072.21
7,505.46
51.83%
52.31%
-0.48%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
44,887.92 127,592.85
377.21 1,072.21
377.21 1,072.21
2,640.47 7,505.46
54.85% 10.96%
S/D MINGGU INI Over
VOLUME % Progress
- 0.00% -2.58%
- 0.00% -0.26%
- 0.00% -0.28%
- 0.00% -0.53%
- 0.00% -0.21%
- 0.00% -0.40%
- 0.00% -0.83%
159.33 3.62% -0.29%
39.83 0.78% -0.27%
- 0.00% -0.29%
- 0.00% -0.92%
- 0.00% -0.54%
- 0.00% -0.15%
- 0.00% -0.56%
- 0.00% -0.13%
- 0.00% -0.20%
- 0.00% -0.50%
- 0.00% -1.95%
- 0.00% -0.19%
- 0.00% -0.06%
- 0.00% -6.25%
- 0.00% -0.85%
- 0.00% -0.21%
- 0.00% -0.24%
- 0.00% -0.45%
- 0.00% 0.00%
- 0.00% -0.02%
- 0.00% -0.84%
147,180.75
1,236.81
1,236.81
8,657.69
62.51%
52.31%
10.20%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
44,887.92 147,180.75
377.21 1,236.81
377.21 1,236.81
2,640.47 8,657.69
65.81% 4.54%
S/D MINGGU INI Over
VOLUME % Progress
- 0.00% -2.58%
- 0.00% -0.26%
- 0.00% -0.28%
- 0.00% -0.53%
- 0.00% -0.21%
- 0.00% -0.40%
- 0.00% -0.83%
323.79 3.91% 3.45%
80.95 1.05% 0.53%
- 0.00% -0.29%
- 0.00% -0.92%
- 0.00% -0.54%
- 0.00% -0.15%
- 0.00% -0.56%
- 0.00% -0.13%
- 0.00% -0.20%
- 0.00% -0.50%
- 0.00% -1.95%
- 0.00% -0.19%
- 0.00% -0.06%
- 0.00% -6.25%
- 0.00% -0.85%
- 0.00% -0.21%
- 0.00% -0.24%
- 0.00% -0.45%
- 0.00% 0.00%
- 0.00% -0.02%
- 0.00% -0.84%
147,180.75
1,236.81
1,236.81
8,657.69
63.07%
52.31%
10.75%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
44,887.92 147,180.75
377.21 1,236.81
377.21 1,236.81
2,640.47 8,657.69
70.347% 3.322%
S/D MINGGU INI Over
VOLUME % Progress
- 0.000% -2.578%
- 0.000% -0.257%
- 0.000% -0.278%
- 0.000% -0.532%
- 0.000% -0.209%
- 0.000% -0.396%
- 0.000% -0.825%
444.14 3.907% 6.181%
111.04 1.048% 1.123%
- 0.000% -0.289%
- 0.000% -0.925%
- 0.000% -0.539%
- 0.000% -0.148%
- 0.000% -0.557%
- 0.000% -0.133%
- 0.000% -0.199%
- 0.000% -0.499%
- 0.000% -1.953%
- 0.000% -0.192%
- 0.000% -0.058%
- 0.000% -6.255%
- 0.000% -0.852%
- 0.000% -0.208%
- 0.000% -0.236%
- 0.000% -0.446%
- 0.000% -0.004%
- 0.000% -0.017%
- 0.000% -0.840%
147,180.75
1,236.81
1,236.81
8,657.69
63.067%
52.314%
10.753%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
44,887.92 147,180.75
377.21 1,236.81
377.21 1,236.81
2,640.47 8,657.69
73.668% 2.656%
S/D MINGGU INI Over
VOLUME % Progress
- 0.000% -0.278%
- 0.000% -0.532%
- 0.000% -0.209%
- 0.000% -0.396%
- 0.000% -0.825%
444.14 3.907% 6.181%
111.04 1.048% 1.123%
- 0.000% -0.289%
582.00 1.538% 0.613%
- 0.000% -0.539%
- 0.000% -0.148%
- 0.000% -0.557%
- 0.000% -0.133%
- 0.000% -0.199%
- 0.000% -0.499%
13.18 0.299% -1.654%
- 0.000% -0.192%
- 0.000% -0.058%
- 0.000% -6.255%
- 0.000% -0.852%
- 0.000% -0.208%
- 0.000% -0.236%
- 0.000% -0.446%
- 0.000% -0.004%
- 0.000% -0.017%
16.00 0.207% -0.633%
147,180.75
1,236.81
1,236.81
8,657.69
65.722%
52.314%
13.408%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
44,887.92 147,180.75
377.21 1,236.81
377.21 1,236.81
2,640.47 8,657.69
76.324% 0.706%
S/D MINGGU INI Over
VOLUME % Progress
- 0.000% -0.278%
- 0.000% -0.532%
- 0.000% -0.209%
- 0.000% -0.396%
- 0.000% -0.825%
444.14 3.907% 6.181%
111.04 1.048% 1.123%
- 0.000% -0.289%
582.00 1.538% 0.613%
- 0.000% -0.539%
- 0.000% -0.148%
- 0.000% -0.557%
- 0.000% -0.133%
- 0.000% -0.199%
- 0.000% -0.499%
27.18 0.617% -1.336%
- 0.000% -0.192%
- 0.000% -0.058%
- 0.000% -6.255%
- 0.000% -0.852%
- 0.000% -0.208%
- 0.000% -0.236%
- 0.000% -0.446%
- 0.000% -0.004%
- 0.000% -0.017%
46.00 0.595% -0.246%
147,180.75
1,236.81
1,236.81
8,657.69
66.428%
52.314%
14.114%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
44,887.92 147,180.75
377.21 1,236.81
377.21 1,236.81
2,640.47 8,657.69
77.030% 1.374%
S/D MINGGU INI Over
VOLUME % Progress
- 0.000% -0.278%
- 0.000% -0.532%
- 0.000% -0.209%
- 0.000% -0.396%
- 0.000% -0.825%
444.14 3.907% 6.181%
111.04 1.048% 1.123%
- 0.000% -0.289%
582.00 1.538% 0.613%
- 0.000% -0.539%
- 0.000% -0.148%
- 0.000% -0.557%
- 0.000% -0.133%
- 0.000% -0.199%
- 0.000% -0.499%
65.48 1.487% -0.466%
- 0.000% -0.192%
- 0.000% -0.058%
- 0.000% -6.255%
- 0.000% -0.852%
- 0.000% -0.208%
- 0.000% -0.236%
- 0.000% -0.446%
- 0.000% -0.004%
- 0.000% -0.017%
85.00 1.099% 0.259%
147,180.75
1,236.81
1,236.81
8,657.69
67.802%
52.314%
15.488%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
SISA PEKERJAAN MINGGU LALU MINGGU INI
VOLUME % VOLUME % VOLUME %
44,887.92 147,180.75
377.21 1,236.81
377.21 1,236.81
2,640.47 8,657.69
78.404% 3.419%
S/D MINGGU INI Over
VOLUME % Progress
- 0.000% -0.278%
- 0.000% -0.532%
- 0.000% -0.209%
- 0.000% -0.396%
- 0.000% -0.825%
482.04 3.907% 7.042%
120.22 1.048% 1.303%
- 0.000% -0.289%
582.00 1.538% 0.613%
- 0.000% -0.539%
- 0.000% -0.148%
- 0.000% -0.058%
- 0.000% -6.255%
- 0.000% -0.852%
- 0.000% -0.208%
- 0.000% -0.236%
- 0.000% -0.446%
- 0.000% -0.004%
- 0.000% -0.017%
85.00 1.099% 0.259%
147,180.75
1,236.81
1,236.81
8,657.69
70.181%
52.314%
17.867%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK AWAL
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
VOL. ADD-01 SISA PEKERJAAN MINGGU LALU
VOLUME BOBOT (%) VOLUME % VOLUME %
27,607.42 147,180.75
232.00 1,236.81
232.00 1,236.81
1,623.97 8,657.69
100% 77.848%
MINGGU INI S/D MINGGU INI Over
VOLUME % VOLUME % Progress
164,461.25
1,382.03
1,382.03
9,674.19
9.913% 87.761%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK AWAL
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
VOL. ADD-01 SISA PEKERJAAN MINGGU LALU
VOLUME BOBOT (%) VOLUME % VOLUME %
27,607.42 164,461.25
232.00 1,382.03
232.00 1,382.03
1,623.97 9,674.19
100% 87.761%
MINGGU INI S/D MINGGU INI Over
VOLUME % VOLUME % Progress
164,461.25
1,382.03
1,382.03
9,674.19
1.852% 89.613%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK AWAL
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
VOL. ADD-01 SISA PEKERJAAN MINGGU LALU
VOLUME BOBOT (%) VOLUME % VOLUME %
27,607.42 164,461.25
232.00 1,382.03
232.00 1,382.03
1,623.97 9,674.19
100% 89.613%
MINGGU INI S/D MINGGU INI Over
VOLUME % VOLUME % Progress
164,461.25
1,382.03
1,382.03
9,674.19
3.365% 92.979%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
NO ITEM PEKERJAAN
10 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
11 Jalan Inspeksi Sub - Base Kelas C
7 Penulangan
Bahan
Besi
Kawat Beton
Upah
Pekerja
tukang
K.T
Mandor
8 Bekisting untuk Beton Biasa (permukaan beton non ekspose), tanpa Perancah
9 Bekisting untuk Lantai / Dinding Beton (permukaan beton ekspose), Dengan Perancah
10 Bronjong Pabrikasi ( 2,7 mm)
Bahan
Batu Kali
Beronjong
Upah
Pekerja
Tukang
Mandor
JUMLAH
RENCANA PROGRESS
DEVIASI
Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
gustus 2015
aringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Kabupaten Konawe (Paket 21.D)
SYIR DWIGUNA
KONTRAK AWAL
EM PEKERJAAN Sat
VOLUME BOBOT (%)
N TERSIER
m2 16,350.00 2.58%
m2 1,350.00 0.26%
67.50
6.75
m3 440.31 0.28%
176.12
11.01
m3 1,500.00 0.53%
1,364.25
11.46
11.46
80.25
143.25
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
Zak 852.26
M3 88.24
M3 92.02
283.80
43.00
4.30
13.76
m3 53.60 1.05%
187.39
32.32
28.52
64.32
10.72
1.07
0.32
m2 2,569.00 0.54%
256.90
128.45
m2 560.00 0.15%
28.00
2.80
m3 880.62 0.56%
352.25
35,224.80
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
426.13
44.12
46.01
141.90
21.50
2.15
6.88
m3 274.40 0.19%
109.76
6.86
m3 115.00 0.06%
m3 328.40 6.25%
262.72
893.25
171.42
492.60
197.04
19.70
24.63
m2 620.00 0.85%
80.35
11.78
124.00
93.00
9.30
6.20
m2 198.00 0.21%
25.15
2.38
59.40
29.70
2.97
2.97
m3 10.40 0.24%
51.53
5.34
5.56
17.16
2.60
0.26
0.83
kg 925.60 0.45%
925.60
13.88
6.48
6.48
0.65
0.28
68.25
Kg 97.50
42.64
21.19
7.09
m2 4,469.99 0.70%
m3 211,180.50 74.92%
192,068.66
1,614.02
1,614.02
1614.0223928572 Jm 11,298.16
4223.61 20,167.74
100%
VOL. ADD-01 SISA PEKERJAAN MINGGU LALU
VOLUME BOBOT (%) VOLUME % VOLUME %
27,607.42 164,461.25
232.00 1,382.03
232.00 1,382.03
1,623.97 9,674.19
100% 92.979%
MINGGU INI S/D MINGGU INI Over
VOLUME % VOLUME % Progress
164,461.25
1,382.03
1,382.03
9,674.19
1.179% 94.158%
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
Nama Paket Pekerjaan : Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 H
Kode Proyek : 1520
No / Tgl Kontrak : HK.02.03/SNVT.PJPA.S-IV/IR-I/124/2015 / Tanggal 23 April 2014
Contractor : PT. IBNU MUNSYIR DWIGUNA
NO ITEM PEKERJAAN
I GENERAL ITEM
1 Mobilisasi dan Demobilisasi
2 Pembuatan Jalan Sementara dan Pemeliharaan Jalan Desa
3 Mutual Check dan As Built Drawing
4 Keselamatan dan Kesehatan Kerja (K3)
ls
Jalan Desa ls
ls
ls
N TERSIER
km
m2 16,350.00 2.58%
m2 1,350.00 0.26%
m3 440.31 0.28%
m3 1,500.00 0.53%
m3 550.40 0.21%
m3 750.00 0.40%
m3 455.50 0.83%
m3 172.00 3.91%
m3 53.60 1.05%
m2 2,569.00 0.54%
m2 560.00 0.15%
m3 880.62 0.56%
m3 350.40 0.13%
m3 375.90 0.20%
ri Borrow Area m3 275.40 0.50%
m3 86.00 1.95%
m3 274.40 0.19%
m3 115.00 0.06%
m3 328.40 6.25%
m2 620.00 0.85%
m2 198.00 0.21%
m3 10.40 0.24%
kg 925.60 0.45%
non ekspose), tanpa Perancah m2 1.40 0.00%
aan beton ekspose), Dengan Perancah m2 4.00 0.02%
m3 65.00 0.84%
m2 4,469.99 0.70%
m3 211,180.50 74.92%
100%
VOL. ADD-01 Rencana VOL. ADD-02 SISA PEKERJAAN
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME %
(0.00)
#DIV/0!
(0.00)
0.00
#DIV/0!
#DIV/0!
#DIV/0!
0.01
-
0.02
-
0.00
(0.00)
(0.01)
(0.00)
-
(0.00)
#DIV/0!
#DIV/0!
-
-
0.00
0.00
-
(0.01)
-
0.00
(0.00)
#DIV/0!
(0.00)
(0.00)
(0.00)
(0.00)
(0.00)
#DIV/0!
(0.00)
-
(0.00)
-
(0.00)
(0.00)
Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 Ha) di Ka
Nama Paket Pekerjaan : Rehabilitasi Jaringan Sekunder dan Tersier D.I. Wawotobi (900 H
Kode Proyek : 1520
No / Tgl Kontrak : HK.02.03/SNVT.PJPA.S-IV/IR-I/124/2015 / Tanggal 23 April 2014
Contractor : PT. IBNU MUNSYIR DWIGUNA
NO ITEM PEKERJAAN
I GENERAL ITEM
1 Mobilisasi dan Demobilisasi
2 Pembuatan Jalan Sementara dan Pemeliharaan Jalan Desa
3 Mutual Check dan As Built Drawing
4 Keselamatan dan Kesehatan Kerja (K3)
ls 1.00
Jalan Desa ls 1.00
ls 1.00
ls -
N TERSIER
km 1.42
m2 16,350.00 2.58% 2,804.00
m2 1,350.00 0.26% 50.00
m3 440.31 0.28% 440.31
719.69
m3 1,500.00 0.53% 30.00
m3 550.40 0.21% 75.00
m3 750.00 0.40% 120.00
m3 455.50 0.83% 1,300.00
m3 172.00 3.91% 172.00
120.08
m3 53.60 1.05% 53.60
20.59
non ekspose), tanpa Perancah m2 96.00 0.29% 124.20
m3 350.00 0.92% 1,200.00
3.94
m2 2,569.00 0.54% 2,569.00
16,096.89
m2 560.00 0.15% 560.00
640.00
m3 880.62 0.56% 880.62
904.89
m3 350.40 0.13% 1,311.65
m3 375.90 0.20% 4,027.00
ri Borrow Area m3 275.40 0.50% 275.40
1,021.79
m3 86.00 1.95% 86.00
324.60
m3 274.40 0.19% 110.00
m3 115.00 0.06% 30.00
m3 328.40 6.25% 141.75
m2 620.00 0.85% 269.10
m2 198.00 0.21% 126.00
m3 10.40 0.24% 2.90
kg 925.60 0.45% 344.00
non ekspose), tanpa Perancah m2 1.40 0.00% -
aan beton ekspose), Dengan Perancah m2 4.00 0.02% 8.20
m3 65.00 0.84% 85.00
16.18
m2 4,469.99 0.70% 4,469.99
35,530.01
m3 211,180.50 74.92% 181,470.43
100%
et 21.D)