b. PANEL LISTRIK
PANEL SDP-L1
1 Box Panel Maker Uk 120x80x20 Powder Coating Tebal Panel 2mm (inbow) 1.00 Bh
2 MCCB 3P/250A ex Schneider 1.00 Bh
Tenaga
3 MCCB 3P/150A ex Schneider 1.00 Bh
4 Busbar 150A + Isolasi (R,S,T,N,PE) 5.00 Bh
5 MCB 3P/32A ex Schneider 3.00 Bh
6 MCB 3P/25A ex Schneider 3.00 Bh
7 MCB 1P/16A ex Schneider 27.00 Bh
Penerangan
8 MCCB 3P/100A ex Schneider 1.00 Bh
9 Busbar 100A + Isolasi (R,S,T,N) 4.00 Bh
10 MCB 1P/10A ex Schneider 18.00 Bh
10 Indicator Lamp 3.00 Bh
10 Fuse Metering 2A 3.00 Bh
10 Wearing Panel, Sisir Jumper, Shoen 1.00 Ls
10 Terminasi ke Kabel Toepoer Existing 1.00 Ls
10 Testing and Comisioning sistem kelistrikan Standar 1.00 Ls
SUB TOTAL
SUB TOTAL
TOTAL B
PEKERJAAN SIPIL & ARSITEKTURAL
PERLUASAN RUANG LABORATORIUM MIROBIOLOGI
( RENOVASI TAHAP 1 LABORATORIUM PATOLOGI KLINIK MENJADI LABORATORIUM MIKROBIOLOGI )
TAHUN ANGGARAN 2017
NO. ITEM PEKERJAAN VOL SAT HARGA SAT HARGA
A. PEKERJAAN SIPIL & ARSITEKTUR
I PEKERJAAN PERSIAPAN
1 Pembuatan direksi keet 25.00 m
2 Air kerja & listrik kerja proyek 2.00 bln
3 Safety requirement : APD, banner, terpal, sign board, sekat kerja dsb. 1.00 ls
4 Shop drawing & as built drawing 1.00 ls
5 Mobilisasi & demobilisasi 1.00 ls
SUB TOTAL
II PEKERJAAN BONGKARAN
1 Bongkar dinding & partisi ### m
2 Bongkar meja beton ex. Lab. 6.00 unit
3 Bongkar plafond ### m
4 Ketrikan keramik ### m
5 Buang puing 1.00 ls
6 Bongkar sanitair (closet & wastafel) 10.00 unit
7 Bongkaran pekerjan ME (AC, panel, instalasi, dsb) 1.00 ls
8 Bongkar kusen besar 10.00 unit
9 Bongkar kusen kecil, pintu & jendela bovenlis 25.00 unit
SUB TOTAL
III PEKERJAAN DINDING & PLESTERAN
1 Dinding bata 1 pc : 2 psr 67.27 m
2 Dinding bata 1 pc : 4 psr 25.00 m
3 Plesteran 1 pc : 2 psr 67.27 m
4 Plesteran 1 pc : 4 psr 50.00 m
5 Acian dinding & beton ### m
6 Partisi double gypsum 12 mm rangka metal galvanis ### m
7 Kolom praktis & balok beton jendela 2.59 m
8 Sloof dinding baru & balok praktis 1.36 m
9 Sudut dinding radial bahan GRC 7 cm ### m'
10 Architrave sisi dalam kusen outdoor eksisting dengan GRC 69.40 m'
11 Cor tanggulan dinding ruang TB LAB + finish aci 0.27 m
SUB TOTAL
IV PEKERJAAN PINTU & JENDELA
1 Kusen & pintu type PA1 19.00 unit
2 Kusen & pintu type PA2-2d sama besar 1.00 unit
3 Kusen & pintu type PA3 5.00 unit
4 Kusen & pintu type PK1-2d kecil 1.00 unit
5 Kusen loket. Kaca & aluminium 1.00 set
6 Kusen jendela tipe J1 1 daun 4.00 unit
7 Kusen jendela tipe J2 2 daun 21.00 unit
8 Sekat partisi gipsum+rangka, 1 sisi finish cat putih, (sementara untuk 48.00 m
SUB TOTAL
V PEKERJAAN PLAFOND
1 Plafond gypsum t : 9 mm + hollow galvanized ### m
2 List plafond / nat 7 cm tanpa sudut ### m
SUB TOTAL
VI PEKERJAAN PENUTUP DINDING & LANTAI
1 Lantai keramik toilet 30 x 30 cm (anti slip) roman 16.50 m
2 Lantai keramik teras 40 x 40 cm (anti slip) roman 13.00 m
3 Keramik Roman 60 x 60 standard ### m
4 Dinding keramik KIA 83.38 m
5 Hospital plint keramik 10 x 20 cm ex. Roman 84.50 m
6 Hospital vynil flooring LG hausys ### m
7 Plint vynil 10 cm curving & lis aluminium ### m
8 Leveling 4 cm floor hardener dasar lantai vynil ### m
SUB TOTAL
VII PEKERJAAN PENGECATAN
1 Cat dinding acrylic (oil base) ### m
2 Cat plafond acrylic (oil base) ### m
3 Cat list plafond ### m'
4 Finishing kusen & pintu eksisting interior dengan cat duco 24.47 m2
SUB TOTAL
VIII SANITAIR
1 Kloset duduk American Standard type "Winplus" dengan kelengkapan 5.00 bh
~ wash down toilet bowl
~ low tank w/o cover
~ tank cover
~ dual flus tank trim
~ plastic seat & cover
~ stop valve w/ flexible hose
~ jet washer
~ slip-in connector
~ instalasi
2 Floor drain Toto TX 1 BN 7.00 bh
3 Washtafel meja setara TOTO type L 521 VI A c/w : 8.00 bh
~ Lavatory faucet TX 111 LRYR
~ Waste fittings THX 3A-1N + THX 1A-5N
~ Stop valve TX 263 S
~ Soap dispenser TS 126 AR
~ Instalasi
6 Kran sink / janitor tipe sikut TOTO / setara. 1.00 unit
7 Kran dinding setara TOTO type T23 BQ 13N 8.00 unit
8 Instalasi air kotor 4" 31.50 m'
9 Instalasi air bekas random (1,5", 2", 3") 90.00 m'
10 Instalasi air bersih random pipe, lengkap stop valve setiap zona + su ### m'
11 Ganti main line instalasi air bersih mulai dari toren, lengkap asesories &
30.00 m'
12 Water toren 1200 lt. metal termasuk pasang & conecting 1.00 unit
- floating valve 1.00 unit
- header 3" + 5 gate valve 1.00 set
13 Eyewash standing Eagle 407 + instalasi + pompa dorong 125W 1.00 unit
14 Fitting, closing existing, acessories & material support 1.00 ls
15 Testing & comissioning 1.00 ls
SUB TOTAL
TOTAL A
- Analisa keramik
- gambar kusen
- denah kusen
- potongan
- detail
ANALISA HARGA SATUAN PEKERJAAN
PERLUASAN RUANG LABORATORIUM MIROBIOLOGI
( RENOVASI TAHAP 1 LABORATORIUM PATOLOGI KLINIK MENJADI LABORATORIUM MIKROBIOLOGI )
RUMAH SAKIT UMUM PUSAT PERSAHABATAN - JAKARTA
HARGA JUMLAH
URAIAN PEKERJAAN VOLUME MATERIAL UPAH
SATUAN Lantai - 1
70967.7 220000
70000
ANALISA HARGA SATUAN PEKERJAAN
PERLUASAN RUANG LABORATORIUM MIROBIOLOGI
( RENOVASI TAHAP 1 LABORATORIUM PATOLOGI KLINIK MENJADI LABORATORIUM MIKROBIOLOGI )
RUMAH SAKIT UMUM PUSAT PERSAHABATAN - JAKARTA
HARGA J U M L A H
NO. URAIAN PEKERJAAN VOLUME MATERIAL UPAH
SATUAN Lantai - 1 Lantai - 2
2 Membongkar plafond / 10 m
Pekerja 0.7500 oh
Tukang 0.2250 oh
Kepala tukang 0.0225 oh
Mandor 0.0375 oh
Sub Jumlah
Jumlah
A Bahan
1 Bata merah kls I bh
2 Bata merah kls II bh
3 Portland cement kg
4 Semen warna kg
5 Pasir pasang m
6 Pasir urug m
7 Pasir beton m
8 Koral beton m
9 Split 2/3 m
10 Besi beton (U 40 & U 24) kg
11 Kawat beton kg
12 Baja WF, UNP & channel kg
13 Plat baja & siku kg
14 Paku 5 - 7 cm kg
15 Paku tripleks kg
16 Paku skrup kg
17 Kalsiboard, t : 8 mm lbr
18 Gypsumboard, t : 9 mm lbr
19 Gypsumboard, t : 12 mm lbr
19 Gypsumboard water proof, t : 10 mm lbr
20 Multipleks 4 mm lbr
21 Multipleks 6 mm lbr
22 HPL setara Taco, t : 0.80 mm (120 x 240 cm) lbr
23 Kayu balok bekisting m
24 Kayu papan bekisting m
25 Kayu papan rangka daun pintu m
26 Bahan penutup dinding & lantai :
Granite tile 40 x 40 cm (polished/ unpolish) bh
Granite tile 60 x 60 cm (unpolished) bh
Granite tile 60 x 120 m
Keramik lantai 40 x 40 cm (polos, rock tile & sand ston bh
Keramik dinding 30 x 60 cm bh
Keramik dinding 20 x 40 cm bh
Hospital plint granite 10 x 20 cm bh
Hospital plint keramik 10 x 40 cm bh
Keramik Anti slip 30 x 30 cm bh
Plint keramik 10 x 40 cm bh
Laminate floor (Setara Grace wood) m
Lem perekat khusus (Gracebond) kg
PE foam m
27 Bahan cat :
Cat (emulsion) kg
Cat (weathershield) kg
Cat (anti bakteri) kg
Cat (acrylic emulsion) kg
Plamur tembok kg
Sealer Cat kg
Cat kayu kg
Cat besi kg
Cat duco kg
Sanding sealer ltr
Dempul kayu kg
Meni kayu kg
Meni besi kg
Tinner ltr
Amplas lbr
Kwas 3" bh
Rol cat bh
28 Lem FOX kg
30 Bahan kunci :
Floor hinges set
Engsel pintu kayu & aluminium with ball bearing (60 k bh
Engsel pintu besi bh
Kunci pintu (Mortise, WC cylinder lock & handle set) set
Kunci pintu kayu (Mortise, cylinder lock & handle) set
Kunci pintu besi (Mortise, cylinder lock & handle) set
Kunci pintu sliding (lock case with roller latch + cylind set
Kunci pintu aluminium (Mortise w/roller latch + cyl. lo set
Pull / Push plate set
Door closer (Hold Open) set
Door stoper wall set
Rambuncis bh
Casement 12" SS (2 Bh) set
Casement 14" SS (2 Bh) set
Casement 16" SS (2 Bh) set
Flush bolt untuk kayu (atas & bawah) set
Flush bolt untuk aluminium (atas & bawah) set
Flush bolt untuk besi & stainless steel (atas & bawah) set
Karet kaca m
Double robe hook bh
Top patch fitting + top pin set
Cylinder + centre path lock + lock keeper set
Tubular handle set
Patch fitting top bh
Patch fitting bottom bh
Over panel patch bh
Kunci pintu shaft set
Pull handle on back plate (pintu shaft) bh
34 Bahan partisi :
Zincalume, U 92 x 30 mm, t : 0.5 mm m
Zincalume metal stud 92 x 34 mm, t : 0.5 mm m
Kalsipart t : 8 mm (1.200 x 3.000) mm lbr
Corner bead m
Kalsi kompon kg
Textile tape m
Paku rivet bh
Skrup gypsum bh
B Upah
1 Pekerja org/hr (8jam)
2 Tukang gali org/hr (8jam)
3 Tukang (batu, kayu, besi, cat) org/hr (8jam)
4 Kepala tukang org/hr (8jam)
5 Operator alat berat org/hr (8jam)
6 Pembantu operator alat berat org/hr (8jam)
7 Mandor org/hr (8jam)