a. Biaya Eksplorasi
- Survey 450,000,000
- Eksplorasi 200,000,000
- Studi kelayakan 850,000,000
- Studi AMDAL 700,000,000
- Biaya Pengujian 50 1,500,000 75,000,000
- Biaya Pemboran 500,000,000
Sub Total 2,775,000,000
b. Pembebasan Lahan
- Pembebasan Tanah/hektar 30 ha 1,000,000,000 30,000,000,000
- Ganti Rugi Rumah 20 unit 400,000,000 8,000,000,000
- Ganti tanaman/ hektar 40 ha 50,000,000 2,000,000,000
- Ganti Rugi Pohon
Jati 280 pohon 1,500,000 420,000,000
kakao 280 pohon 600,000 168,000,000
Mahoni 280 pohon 800,000 224,000,000
kelapa 280 pohon 900,000 252,000,000
1,064,000,000
Sub Total 41,064,000,000
Total 43,839,000,000
Biaya Konstruksi dan Rekayasa
1,700,000,000
570,000,000
2,000,000,000
550,000,000
320,000,000
175,000,000
105,000,000
150,000,000
5,570,000,000
1,200,000,000
1,200,000,000
1,400,000,000
800,000,000
600,000,000
400,000,000
3,200,000,000
9,970,000,000
Biaya Pembelian Peralatan Operasi (Investasi awal peralatan)
A. Peralatan tambang
Jack hammer 8 550,000,000
Track loader 5 450,000,000
Back hoe 6 500,000,000
Dump truck 20 900,000,000
Sub Total
B. Pengolahan
Jaw Crusher 2 550,000,000
Hopper 2 125,000,000
Feeder 2 310,000,000
Belt conveyor 2 150,000,000
Hammer mill 2 55,000,000
Sub Total
C. Peralatan di Bengkel
- Dongkrak 5 25,000,000.00
- Alat las dan patri 2 8,000,000.00
- Alat bengkel 4 7,000,000.00
- Kompresor 1 12,000,000.00
Sub Total
D. Peralatan Pendukung Operasional
- Genset 3 16,000,000.00
- Mobil Operasional 6 458,500,000.00
- Sepeda Motor 8 18,000,000.00
- Bola Lampu Ruangan 75 30,000.00
- HT 25 500,000.00
Sub Total
E. Peralatan K3
- Helm pengaman 250 75,000.00
- Sepatu pengaman 250 250,000.00
- Kacamata pelindung 400 150,000.00
- Ear Protector 400 30,000.00
- Masker debu 400 25,000.00
- Ambulans 1 190,000,000.00
- Perlengkapan P3K 2 700,000.00
Sub Total
TOTAL INVESTASI PERALATAN
Investasi awal peralatan)
4,400,000,000 5
2,250,000,000 5
3,000,000,000 5
18,000,000,000 5
27,650,000,000
1,100,000,000 5
250,000,000 5
620,000,000 5
300,000,000 5
110,000,000 5
2,380,000,000
125,000,000 5
16,000,000 5
28,000,000 5
12,000,000 5
181,000,000
48,000,000 5
2,751,000,000 5
144,000,000 5
2,250,000 1
12,500,000 5
2,957,750,000
18,750,000 2
62,500,000 1
60,000,000 1
12,000,000 1
10,000,000 1
190,000,000 5
1,400,000 2
354,650,000
33,523,400,000
Biaya Pembelian Peralatan Operasi (Investasi pe
Harga
Jenis Alat Jumlah (unit)
Satuan/Unit (Rp)
A. Peralatan tambang
Jack hammer 8 550,000,000
Track loader 5 450,000,000
Back hoe 6 500,000,000
Dump truck 20 900,000,000
Sub Total
B. Pengolahan
Jaw Crusher 2 550,000,000
Hopper 2 125,000,000
Feeder 2 310,000,000
Belt conveyor 2 150,000,000
Hammer mill 2 55,000,000
Sub Total
C. Peralatan di Bengkel
- Dongkrak 5 25,000,000
- Alat las dan patri 2 8,000,000
- Alat bengkel 4 7,000,000
- Kompresor 1 12,000,000
Sub Total
D. Peralatan Pendukung Operasional
- Genset 3 16,000,000
- Mobil Operasional 6 458,500,000
- Sepeda Motor 8 18,000,000
- Bola Lampu Ruangan 75 30,000
- HT 25 500,000
Sub Total
E. Peralatan K3
- Helm pengaman 250 75,000
- Sepatu pengaman 250 250,000
- Kacamata pelindung 400 150,000
- Ear Protector 400 30,000
- Masker debu 400 25,000
- Ambulans 1 190,000,000
- Perlengkapan P3K 2 700,000
Sub Total
TOTAL INVESTASI PERALATAN
Biaya Pembelian Peralatan Operasi (Investasi peralatan tahunan)
Tahun ke
Harga Total (Rp) Umur Alat
1 2 3
4,400,000,000 5
2,250,000,000 5
3,000,000,000 5
18,000,000,000 5
27,650,000,000
1,100,000,000 5
250,000,000 5
620,000,000 5
300,000,000 5
110,000,000 5
2,380,000,000
125,000,000 5
16,000,000 5
28,000,000 5
12,000,000 5
181,000,000
48,000,000 5
2,751,000,000 5
144,000,000 5
2,250,000 1 2,250,000 2,250,000 2,250,000
12,500,000 5
2,957,750,000 2,250,000 2,250,000 2,250,000
18,750,000 2 18,750,000
62,500,000 1 62,500,000 62,500,000 62,500,000
60,000,000 1 60,000,000 60,000,000 60,000,000
12,000,000 1 12,000,000 12,000,000 12,000,000
10,000,000 1 10,000,000 10,000,000 10,000,000
190,000,000 5
1,400,000 2 1,400,000
354,650,000 144,500,000 164,650,000 144,500,000
33,523,400,000 146,750,000 166,900,000 146,750,000
4
2,250,000
2,250,000
18,750,000
62,500,000
60,000,000
12,000,000
10,000,000
1,400,000
164,650,000
166,900,000
BIAYA INVENTARIS
2
1
1
1
1
19,000,000 5 34,200,000.00 34,200,000.00
2
19,000,000 34,200,000 34,200,000
3,330,000,000 775,710,000 5,994,000,000
Tahun ke
2 3 4 5
1 2
No Jenis retribusi
1 - Surat Ijin Gangguan 75,000,000 75,000,000
2 - Surat Ijin Pemakaian Jalan 100,000,000 100,000,000
3 - Surat Ijin Usaha Penambangan 900,000,000 900,000,000
4 - Surat Pengajuan Tenaga Kerja 120,000,000 120,000,000
5 - Surat Usaha Perdagangan 250,000,000 250,000,000
6 - Surat Ijin Pengangkutan dan Penggunaan Alat 200,000,000 200,000,000
7 - Surat Ijin Kepolisian 320,000,000 320,000,000
8 - Surat Ijin Membangun Bangunan 400,000,000 400,000,000
9 - Surat Ijin Tempat Usaha 500,000,000 500,000,000
Total 2,865,000,000 2,865,000,000
amortitasi adalah penyusutan nilai tak terwujut
SI
3 4 5
JENIS PERAWATAN
1
1. Biaya Perawatan Peralatan ( 10 % Depresiasi)
- Peralatan Tambang 497,700,000
- Peralatan Pengolahan 42,840,000
- Peralatan Bengkel 2,466,000
- Peralatan Pendukung Operasional 52,974,000
- Peralatan K3 3,420,000
sub total 599,400,000
2. Biaya Perawatan Bangunan (15 % Biaya Kontruksi)
- Kantor 255,000,000
- Tangki Bahan Bakar 85,500,000
- Mess 300,000,000
- Kantin 82,500,000
- Mushola 48,000,000
- Stock Yard 26,250,000
- Bengkel 15,750,000
- Pos Keamanan 22,500,000
sub total 835,500,000
4. Biaya Perawatan Infrastruktur (5 % biaya Infrastruktur)
- Jalan Tambang 70,000,000
- Instalasi Jaringan Listrik 40,000,000
- Instalasi Jaringan Air 30,000,000
- Instalasi Jaringan Telepon 20,000,000
sub total 160,000,000
TOTAL 1,594,900,000
TAHUN 1
Total Tereskalasi 1,594,900,000
eskalasi 6.5%
AIKAN DAN PERAWATAN ALAT
TAHUN
2 3 4 5
2 3 4 5
1,698,568,500 1,808,975,453 1,926,558,857 2,051,785,183
ekskalasi: 2.0%
` total biaya setelah ekskalasi Rp 1,598,426,250 Rp 1,630,394,775.00
Biaya/Tahun
3 4 5
171,843,750 171,843,750 171,843,750
206,212,500 206,212,500 206,212,500
870,675,000 870,675,000 870,675,000
30,138,750 30,138,750 30,138,750
50,231,250 50,231,250 50,231,250
107,730,000 107,730,000 107,730,000
143,640,000 143,640,000 143,640,000
17,955,000 17,955,000 17,955,000
1,598,426,250 1,598,426,250 1,598,426,250
TOTAL
Tahun Tahun 1
Biaya Listrik Tereskalasi 6.5% 30,889,872
Tahun Tahun 1
Biaya Telepon Tereskalasi 6.5% 9,331,200
Tahun Tahun 1
Biaya Air Tereskalasi 6.5% 36,600,000
BIAYA LISTRIK, TELEPHONE DAN AIR
pemakaian jam/hr total daya per hari (kw) biaya per hari
8 17 8,064
4 4 1,843
4 3 1,536
8 21 10,184
1 0 65
6 5 2,592
12 47 22,694
4 2 922
24 39 18,662
3 1 518
24 4 1,728
8 14 6,605
8 1 480
10 36 17,304
24 8 4,009
8 12 5,760
TOTAL
Dalam 1 Tahun =
Tahun 5
39,738,780.90
Tahun 5
12,004,275
Tahun 5
47,084,668
K3 DAN LINGKUNGAN
Tahap /tahun : - 1 2
Diklat/Kursus K3 50,000,000 50,000,000
Safety Campaign 10,000,000 10,000,000
Pemasangan Rambu-rambu 15,000,000 15,000,000
Pemeriksaan kesehatan 70,000,000 70,000,000
Total 145,000,000 145,000,000
Pengembangan Masyarakat
Tahap/Tahun 1 2
Pengembangan Masyarakat -
Perbaikan Sarana Pendidikan
Perpustakaan Keliling 145,000,000 40,000,000
Penyelenggaraan Pertandingan Olahraga 38,000,000
Pengadaan Sarana Olahraga
Perbaikan Sarana Kesehatan 200,000,000
Perbaikan Sarana Keagamaan
Pembangunan Sarana Air Bersih 128,000,000
Total - 473,000,000 78,000,000
GAN
3 4 5
50,000,000 50,000,000 50,000,000
10,000,000 10,000,000 10,000,000
15,000,000 15,000,000 15,000,000
70,000,000 70,000,000 70,000,000
145,000,000 145,000,000 145,000,000
arakat
3 4 5
120,000,000
40,000,000 40,000,000 40,000,000
38,000,000
150,000,000
110,000,000
TAHUN
Total Tereskalasi
Total Gaji per Tahun
300,000,000
240,000,000
180,000,000
96,000,000
120,000,000
120,000,000
360,000,000
420,000,000
96,000,000
180,000,000
612,000,000
180,000,000
144,000,000
-
120,000,000
96,000,000
180,000,000
96,000,000
96,000,000
48,000,000
180,000,000
120,000,000
144,000,000
156,000,000
180,000,000
300,000,000
180,000,000
576,000,000
144,000,000
144,000,000
5,808,000,000
TAHUN 1 2 3 4
6.5% 5,808,000,000 6,185,520,000 6,587,578,800 7,015,771,422
5
7,471,796,564
Biaya Operasi
Komponen Biaya
- Biaya Variable
- Kebutuhan BBM 1,598,426,250
- Perawatan 1,594,900,000
- Kesehatan dan Keselamatan Kerja 145,000,000
- Pengembangan Masyarakat 473,000,000
-Biaya Tetap
- Biaya Pemaikaian Listrik 30,889,872
- Biaya Pemaikaian Telepon 9,331,200
- Biaya Pemakaian Air 36,600,000
- Depresiasi (UU No. 36 Tahun 2008) 5,994,000,000
- Amortisasi (UU No. 36 Tahun 2008) 2,865,000,000
- Gaji Pegawai 5,808,000,000
- Biaya PBB 997,000,000
Total Biaya Operasi 19,552,147,322
MODAL KERJA
No KEGIATAN
1 Biaya Langsung
a Tapak Bekas Tambang
1 Pembongkaran Fasilitas Tambang
2 Reklamasi lahan bekas fasilitas tambang
3 Pembongkaran dan reklamasi Jalan Tambang
4 Reklamasi Tambang Permukaan (pit, waste dump)
5 Reklamasi lahan bekas kolam pengendap
6 Pengamanan semua bukaan tambang yang berpotensi bahaya
terhadap manusia (shaft, raise, stope, edit, decline, tunnel, dan lain-lain)
b Fasilitas Pengolahan dan atau Pemurnian
1 Pembongkaran fasilitas pengolahan dan pemurnian
2 Reklamasi lahan bekas fasilitas pengolahan dan pemurnian
Tahun 1 2 3 4 5
Sasaran produksi 125,000 125,000 125,000 125,000 125,000
eskalasi 1%
Bulan 0
1 2 3 4
700,000,000
850,000,000
75,000,000
500,000,000
2,125,000,000 0 0 0
30,000,000,000
8,000,000,000
2,000,000,000
1,064,000,000
41,064,000,000 0 0
100,000,000
900,000,000
250,000,000
200,000,000
320,000,000
400,000,000
500,000,000
1,220,000,000 700,000,000 750,000,000 0
3,345,000,000 41,764,000,000 750,000,000 0
1,700,000,000
570,000,000
2,000,000,000
550,000,000
320,000,000
175,000,000
105,000,000
150,000,000
1,400,000,000
800,000,000
600,000,000
400,000,000
1,200,000,000
0 2,800,000,000 5,970,000,000 1,200,000,000
0 0 0 0
5 6 7 8
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
27,650,000,000
2,380,000,000
499,770,000
181,000,000
354,650,000
450,000,000
200,000,000
700,000,000
850,000,000
75,000,000
500,000,000
0 0 0 0 2,775,000,000
0
30,000,000,000
8,000,000,000
2,000,000,000
1,064,000,000
0 0 0 0 41,064,000,000
0
75,000,000
100,000,000
900,000,000
120,000,000 120,000,000
250,000,000
200,000,000
320,000,000
400,000,000
500,000,000
0 120,000,000 0 0 2,865,000,000
0 120,000,000 0 0 46,704,000,000
1,700,000,000
570,000,000
2,000,000,000
550,000,000
320,000,000
175,000,000
105,000,000
150,000,000
0
1,400,000,000
800,000,000
600,000,000
400,000,000
0
1,200,000,000
0 0 0 0 9,970,000,000
27,650,000,000
2,380,000,000
499,770,000
181,000,000
354,650,000
2,957,750,000 2,957,750,000
2,957,750,000 0 0 0 34,023,170,000
Pembayaran Bunga
1 2 3
4,635,015,081 3,261,433,087 1,723,021,254
Angsuran Pinjaman
1 2 3
16,081,531,700 16,081,531,700 16,081,531,700
Cicilan
1 2 3
11,446,516,619 12,820,098,613 14,358,510,447
Sisa Pinjaman
27,178,609,060
14,358,510,447
0
CASH FLOW
Tahun
URAIAN
0 1 2 3
Pendapatan
Hasil Penjualan 91,250,000,000 92,162,500,000 93,084,125,000
retribusi daerah
Royalti (7%) -6,387,500,000 -6,451,375,000 -6,515,888,750
Pendapatan Setelah Royalti 84,862,500,000 85,711,125,000 86,568,236,250
Nilai Sisa
Biaya Operasi
- Biaya Variable
- Kebutuhan BBM -1,598,426,250 -1,630,394,775 -1,663,002,671
- Perawatan -1,594,900,000 -1,698,568,500 -1,808,975,453
- Kesehatan dan Keselamatan Kerja -145,000,000 -145,000,000 -145,000,000
- Pengembangan Masyarakat -473,000,000 -78,000,000 -190,000,000
- Reklamasi
- Pasca Tambang -551,449,665 -1,654,348,995 -2,762,216,340
-Biaya Tetap
- Biaya Pemaikaian Listrik -30,889,872 -32,897,714 -35,036,065
- Biaya Pemaikaian Telepon -9,331,200 -9,937,728 -10,583,680
- Biaya Pemakaian Air -36,600,000 -38,979,000 -41,512,635
- Depresiasi (UU No. 36 Tahun 2008) -5,994,000,000 -5,994,000,000 -5,994,000,000
- Amortisasi (UU No. 36 Tahun 2008) -2,865,000,000 -2,865,000,000 -2,865,000,000
- Bunga Pinjaman -4,635,015,081 -3,261,433,087 -1,723,021,254
- Gaji Pegawai -5,808,000,000 -6,185,520,000 -6,587,578,800
- Jaminan Sosial Tenaga Kerja (5% dari gaji) -290,400,000 -309,276,000 -329,378,940
- Biaya PBB -997,000,000 -997,000,000 -997,000,000
Total Biaya Operasi -25,029,012,068 -24,900,355,799 -25,152,305,837
Pendapatan Terpajak 59,833,487,932 60,810,769,201 61,415,930,413
Pajak (25%) -14,958,371,983 -15,202,692,300 -15,353,982,603
Pendapatan Bersih 44,875,115,949 45,608,076,901 46,061,947,810
Depresiasi 5,994,000,000 5,994,000,000 5,994,000,000
Amortisasi 2,865,000,000 2,865,000,000 2,865,000,000
Investasi Pengganti -146,750,000 -166,900,000 -146,750,000
Investasi Total -96,562,814,197
Modal Kerja Kembali
Modal Pinjaman 38,625,125,679
Angsuran Pinjaman -16,081,531,700 -16,081,531,700 -16,081,531,700
Jaminan Reklamasi dan Pasca Tambang Kembali
Net Cash Flow -57,937,688,518 37,505,834,248 38,218,645,201 38,692,666,109
Cumulative Cash Flow -57,937,688,518 -20,431,854,270 17,786,790,931 56,479,457,040
i*= 12%
NPV= 111,475,315,131.1790
IRR= 66%
jangka wktu brpa tahun investasi akan kembali - PBP= 1.5 tahun
6 bulan
0 hari 1 tahun 6 bulan
94,014,966,250 94,955,115,913
-6,581,047,638 -6,646,858,114
87,433,918,613 88,308,257,799
3,330,000,000
-1,696,262,724 -1,730,187,978
-1,926,558,857 -2,051,785,183
-145,000,000 -145,000,000
-198,000,000 -150,000,000
0 0
-37,313,409 -39,738,781
-11,271,620 -12,004,275
-44,210,956 -47,084,668
-5,994,000,000 -5,994,000,000
-2,865,000,000 -2,865,000,000
0 0
-7,015,771,422 -7,471,796,564
-350,788,571 -373,589,828
-997,000,000 -997,000,000
-21,281,177,559 -21,877,187,278
66,152,741,053 69,761,070,521
-16,538,185,263 -17,440,267,630
49,614,555,790 52,320,802,891
5,994,000,000 5,994,000,000
2,865,000,000 2,865,000,000
-166,900,000 0
5,865,644,197
0 0
4,968,015,000
58,306,655,790 72,013,462,087
114,786,112,831 186,799,574,918