BACK UP DATA ELEVASI EXISTING JL.

BILAL KECAMATAN MEDAN TIMUR

SECTION I
JENIS PEKERJAAN
NO. JARAK ELEVASI PANJANG LEBAR LUASAN VOLUME SATUAN KETERANGAN
Base A Cuting

1 STA 0 + 000 - 0 +025 - 0.22 25.00 12.10 302.50 65.95 M3 BASE A

2 STA 0 + 025 - 0 +050 - 0.17 25.00 12.10 302.50 52.33 M3 BASE A

3 STA 0 + 050 - 0 +075 - 0.09 25.00 12.10 302.50 25.71 M3 BASE A

4 STA 0 + 075 - 0 +100 - 0.02 25.00 12.10 302.50 6.05 M3 BASE A

5 STA 0 + 100 - 0 +125 - -0.04 25.00 12.10 302.50 -13.01 M3 PENGUPASAN

6 STA 0 + 125 - 0 +150 - -0.04 25.00 12.10 302.50 -13.01 M3 PENGUPASAN

7 STA 0 + 150 - 0 +175 - -0.05 25.00 12.10 302.50 -15.58 M3 PENGUPASAN

8 STA 0 + 175 - 0 +200 - -0.05 25.00 12.10 302.50 -15.12 M3 PENGUPASAN

9 STA 0 + 200 - 0 +225 - -0.03 25.00 12.10 302.50 -8.62 M3 PENGUPASAN

10 STA 0 + 225 - 0 +250 - -0.02 25.00 12.10 302.50 -5.75 M3 PENGUPASAN

11 STA 0 + 250 - 0 +275 - -0.02 25.00 12.10 302.50 -4.84 M3 PENGUPASAN

12 STA 0 + 275 - 0 +300 - 0.04 25.00 12.10 302.50 12.25 M3 BASE A

13 STA 0 + 300 - 0 +325 - 0.11 25.00 12.10 302.50 33.88 M3 BASE A

14 STA 0 + 325 - 0 +350 - 0.13 25.00 12.10 302.50 40.38 M3 BASE A

15 STA 0 + 350 - 0 +375 - 0.14 25.00 12.10 302.50 41.44 M3 BASE A

16 STA 0 + 375 - 0 +400 - 0.16 25.00 12.10 302.50 49.31 M3 BASE A

17 STA 0 + 400 - 0 +425 - 0.19 25.00 12.10 302.50 56.42 M3 BASE A

18 STA 0 + 425 - 0 +450 - 0.20 25.00 12.10 302.50 59.29 M3 BASE A

19 STA 0 + 450 - 0 +475 - 0.20 25.00 12.10 302.50 59.29 M3 BASE A

20 STA 0 + 475 - 0 +513 - 0.04 38.00 12.10 459.80 17.24 M3 BASE A

TOTAL BASE A 519.54 M3

TOTAL CUTIING -75.93 M3

MEDAN, 20 Juli 2017


Diperiksa Oleh : Dibuat Oleh :
PT. Ananda Pratama PT. Ananda Pratama

EDI SYAHPUTRA, ST HASIAN HAZNAM, ST


Project Manager General Supertiendent