tukang batu
kepala tukang
mandor
pasir
kerikil
semen
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
Total
Total + 10% x Total
Dimensi Kolom
Panjang
Lebar
Tinggi
Selimut beton
Volume beton
Luas bekisting
Kebutuhan bekisting untuk 1m3 beton
Harga Kebutuhan bekisting 1m2
sengkang
diameter sengkang
tinggi kolom
jarak antar sengkang
jumlah sengkang
panjang 1 sengkang
Panjang keseluruhan
Berat besi dia 8 mm
Berat total sengkang
Total berat besi (tulangan + sengkang)
Harga besi/kg + upah
Baja H beam
H beam 400
Berat H beam 400 / m
Tinggi H beam (rencana)
Berat total H beam 400
Harga baja per kg
Sloof 20 x 30
panjang
lebar
panjang sloof
diameter tulangan
tulangan utama sloof 8 10 (panjang = 5,1m)
berat besi 10 per meter
banyak tulangan 10
berat tulangan 10 (8 btg)
sengkang 6 - 150
diameter sengkang
jarak antar sengkang
jumlah sengkang
Panjang 1 sengkang
panjang total sengkang
berat besi 6mm/meter
berat sengkang keseluruhan
berat besi tulangan + sengkang
kebutuhan material
besi 1 kg = 15000
1 m2 bekisting utnuk kolom = 15000
1 m2 bekisting untuk sloof = 15000
1 m3 beton (1 : 2 : 3) =
No Material
1 Sling (belum termasuk ikatan angin)
Panjang (m) 2 Penutup atap kandang burung (paranet)
88.38 3 Kolom Beton Bertulang
84.45 4 Baja
80.65 5 Sloof
77.01 6 Pagar Galvanis BRC
73.56 7 Tiang BRC
70.3 8 Pondasi Tiang H Beam
67.29 9 Pondasi Kolom Pinggir
64.55
62.12
60.02
58.31
57.02
56.17
55.78
55.87
56.43
57.45
58.9
60.76
62.98
65.53
63.45
60.34
57.53
55.06
52.97
51.32
50.14
49.48
49.34
49.74
50.67
52.09
53.96
56.25
58.9
61.86
65.1
68.57
72.25
76.09
80.08
84.2
88.38
84.45
80.65
77.01
73.56
70.3
67.29
64.55
62.12
60.02
58.31
57.02
56.17
55.78
55.87
56.43
57.45
58.9
60.76
62.98
65.53
63.45
60.34
57.53
55.06
52.97
51.32
50.14
49.48
49.34
49.74
50.67
52.09
53.96
56.25
58.9
61.86
65.1
68.57
72.25
76.09
80.08
84.2
5385.84 m
5924.424 m
68.8886511628 m
55,000.00
92,500.00
3,973,875.81
341,753,320.00
= 15846.9638
0.3 m
0.3 m
2.1 m
0.05 m
0.189 m3
1.3734 m2
7.27 m3
345000.00
2507000.00
14300.00 kg
130 kg
86 tiang
16.254 m3
1 m3 921645 = 921645
0.5 m3 2507000.00 = 1253500
130 @ 14300.00 = 1864857.8901333
TOTAL = 4,040,002.89
14.9077152 kg
0.008 m
210 cm
10 cm
21 buah
1.176 m
24.696 m
0.394384 kg
9.739707264 kg
24.647422464 kg
14300.00
172 kg
24 m
4128 kg
17000 (termasuk upah)
0.3
0.2
5.1 m
0.01 m
0.616225 kg
8 btg
25.14198 kg
0.006 m
0.15 m
34 buah
0.932 m
31.688 m
0.221841 kg
7.029697608 kg
32.171677608 kg
5.1 m2
0.306 m3
85 buah
26.01 m3
16.6666666667 m3
345000
5750000
1 m3 921645 = 921645
0.5 m3 5750000.00 = 2875000
32.17 @ 14300.00 = 460054.9897944
TOTAL = 4,256,699.99
172 lembar
298,000.00
51,256,000.00
86.00 tiang
110,000.00
9,460,000.00
60,716,000.00
50 cm
1 cm
24 m
1900 kg
17000 (sudah upah)
32,300,000.00
erial Volume Satuan Harga (Rp) Total Harga
gin) 5,924.42 m 58,000.00 343,616,592.00
paranet) 15,846.96 m2 3,000.00 47,540,891.40
16.254 m3 4,040,002.89 65,666,206.98
4128 kg 17000.00 70,176,000.00
26.01 m3 4,256,699.99 110,716,766.73
172 lembar 298,000.00 51,256,000.00
86 tiang 110,000.00 9,460,000.00
Total 698,432,457.11
Alternatif 1
Tiang H beam di tengah
Total 698,432,457.11
Alternatif 2
Tiang Besi Hollow di tengah
Total 660,556,457.11
Galian Tanah
panjang = 1.5 m
lebar = 1.5 m
kedalaman = 1.5 m
Volume = 3.375 m3
Total Volume (volume x banyak) = 87.75 m3
Tanah Urug
panjang = 1.5 m
lebar = 1.5 m
kedalaman = 0.75 m
Volume = 1.6875 m3
Total Volume (volume x banyak) = 43.875 m3