Anda di halaman 1dari 3

Rencana Anggaran Biaya (RAB)

Pekerjaan PLUMBING Kalila Residence

Values
Kategori Unit Kode Vol Hsat Total
A. Pendahuluan
1. Persiapan
A. Pembersihan & pengukuran m2 A.01.10 19,20 15.750,00 302.400,00
B. Galian Tanah m3 A.01.06 2,02 78.316,00 157.885,06
1. Persiapan Total 21,22 94.066,00 460.285,06

2. Sumur Bor
A. Ongkos Kerja Ls 1,00 0,00 2.500.000,00
B. Pipa Tanam bt 2,00 0,00 156.000,00
2. Sumur Bor Total 3,00 0,00 2.656.000,00

3. Beton
A. Lantai Kerja m3 A.07.01 0,45 1.389.847,50 622.651,68
B. Plat tutup Septic tank m3 A.07.75 0,19 6.516.411,89 1.251.151,08
C. Plat tutup bak kontrol m3 A.07.75 0,14 6.516.411,89 938.363,31
3. Beton Total 0,78 14.422.671,28 2.812.166,08

B. Struktur
1. Pasangan
A. Dinding septictank m2 A.04.11 6,72 144.895,00 973.694,40
B. Dinding bak kontrol m2 A.04.11 0,48 144.895,00 69.549,60
1. Pasangan Total 7,20 289.790,00 1.043.244,00

2. Dinding
A. plesteran m2 A.05.04 8,16 53.025,00 432.684,00
B. acian m2 A.05.36 10,08 35.418,75 357.021,00
2. Dinding Total 18,24 88.443,75 789.705,00

C. Pemipaan
1. Saluran air kotor
A. Pipa 4" dari kloset m1 A.10.32 32,90 105.251,00 3.462.757,90
B. Pipa 3" dari avour m1 A.10.31 49,00 91.688,50 4.492.736,50
C. Fitting & perlengkapan Ls 0,15 0,00 1.193.324,16
1. Saluran air kotor Total 82,05 196.939,50 9.148.818,56

2. Saluran air bersih


A. Pipa air Dingin m1 A.10.25 63,40 28.003,00 1.775.390,20
B. Pipa air Panas m1 A.10.26 20,60 33.428,00 688.616,80
C. Fitting & perlengkapan Ls 0,35 0,00 862.402,45
2. Saluran air bersih Total 84,35 61.431,00 3.326.409,45

3. Tandon
A. Tangki 300 lt bh 1,00 0,00 740.000,00
B. Fitting & perlengkapan Ls 0,15 0,00 111.000,00
C. Pompa Air doublejet bh 1,00 0,00 795.000,00
3. Tandon Total 2,15 0,00 1.646.000,00

Page 1 of 3
Values
Kategori Unit Kode Vol Hsat Total

D. Finishing
1. Keramik
A. Lantai KM 20x20 m2 A.13.44 11,30 244.110,00 2.758.443,00
B. Dinding KM m2 A.13.79 61,90 260.300,00 16.112.570,00
C. Lantai Jemuran m2 A.13.48 4,90 312.860,00 1.533.014,00
1. Keramik Total 78,10 817.270,00 20.404.027,00

2. Sanitair
a. Bath tub bh 1,00 0,00 6.690.000,00
b. Kloset bh 2,00 0,00 7.060.000,00
c. bidet bh 2,00 0,00 1.050.000,00
d. shower panas dingin bh 2,00 0,00 1.890.000,00
e. wastafel bh 2,00 0,00 1.520.000,00
f. kran ttk A.10.35 12,00 164.450,00 1.973.400,00
g. Avour ttk A.10.36 3,00 60.837,50 182.512,50
h. Meja dapur & Bak cuci Ls 1,00 0,00 1.450.000,00
2. Sanitair Total 25,00 225.287,50 21.815.912,50

Grand Total 322,09 16.195.899,03 64.102.567,64