I.8 10.0000 m2
0.5000 org
1.0000 org
10.0000 m2
2.0000 org
0.1000 org
L.12 1.0000 m3
6.0000 org
0.6000 org
4.0000 org
0.2000 org
L.14 1.0000 m3
12.0000 org
1.2000 org
4.0000 org
0.2000 org
Analisa ZAZ 1.0000 m2
3.5000 kg
0.0330 org
0.0033 org
0.0700 org
0.0035 org
1.0000 m2
70.0000 bh
4.5000 kg
0.0150 m3
0.0500 m3
0.1000 org
0.0100 org
0.3200 org
0.0150 org
1.0000 m2
1.8400 kg
0.0060 m3
0.0140 m3
0.1500 org
0.0150 org
0.2000 org
0.0100 org
AK 1.0000 m2
1.0000 m2
0.1500 kg
0.1000 kg
0.1000 org
0.0100 org
0.1000 org
0.0025 org
1.0000 m2
0.3472 lbr
0.7200 unit
0.3600 unit
0.7200 unit
1.7000 m'
0.1400 unit
0.2400 unit
1.4400 unit
0.3000 Oh
0.2500 Oh
0.0800 Oh
SNI 1.0000 m2
03-3436-2002 1.5873 m2
6.32 0.2000 kg
0.1000 org
0.0100 org
0.2000 org
0.0010 org
SNI 1.0000 m1
6.24 0.2300 m2
1.2000 kg
0.0030 m3
0.1000 kg
0.0300 org
0.0030 org
0.0600 org
0.0030 org
AK 1.0000 m2
1.0000 m2
4.0800 kg
0.0090 m3
0.6000 kg
0.5000 org
0.0500 org
0.2500 org
0.0125 org
SNI 1.0000 m2
6.1 0.0500 kg
0.1500 org
0.0025 org
SNI 1.0000 m2
6.14 0.1000 kg
0.3600 kg
0.0630 org
0.0063 org
0.0200 org
0.0025 org
ANALISA SATUAN PEKERJAAN
Macam Pekerjaan
(2)
Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA KETERANGAN
(Rp.) (Rp)
1 2 3 4 5 6 7
I PEKERJAAN BONGKARAN
1 Membongkar atap seng 658.95 m2 16,500.00 10,872,656.95
2 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi 5.14 m3 1,232,000.00 6,328,143.36
3 Membongkar usuk / reng tidak dipakai lagi 461.26 m2 23,650.00 10,908,899.14
4 Mengerjakan kembali bangunan kayu yang telah dibongkar 5.14 m3 1,991,000.00 10,226,731.68
38,336,431.14
II PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 101.00 m2 137,697.00 13,907,397.00
2 Plesteran 1 PC : 3 Kp : 10 Ps, tebal 15 mm 417.00 m2 48,670.00 20,295,390.00
3 Acian dinding bata 202.00 m2 19,495.00 3,937,990.00
38,140,777.00
III PEKERJAAN PENUTUP ATAP, PLAFOND, DAN TALANG
1 Pasang atap genteng metal roof 658.95 m2 286,959.00 189,091,319.20
2 Rangka atap baja ringan 461.26 m2 216,387.00 99,811,583.89
3 Pasangan Plafond gypsum board 420.00 m2 245,116.00 102,948,720.00
391,851,623.09
IV PEKERJAAN LANTAI
1 Pasang plint keramik ukuran 10 x 40 cm 101.00 m 33,416.00 3,375,016.00
2 Pasang tegel keramik 40/40 430.00 m2 181,549.00 78,066,070.00
81,441,086.00
V PEKERJAAN CAT-CATAN
1 Mengikis / mengerok permukaan cat tembok lama 707.00 m2 18,452.00 13,045,564.00
2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 707.00 m2 117,820.00 83,298,740.00
3 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 202.00 m2 117,820.00 23,799,640.00
120,143,944.00