Anda di halaman 1dari 99

REKAP MATERIAL

PROYEK COLD STORAGE PT. BUMI PANGAN UTAMA


TIGARAKSA - TANGERANG
PERIODE

No Tanggal Item Spesifikasi Qty Satuan No Surat Jalan Supplier Ket. Surat Jalan

1 21/05/2015
2 21/05/2015 Hollow 50x50 1.00 btg 13000 PD. Mutiara Indah
Hollow 20x40 1.00 btg 13000 PD. Mutiara Indah
3 10/6/2015 Pylox merah 2.00 btl 5509 PD. Mutiara Indah
Pylox putih 1.00 btl 5509 PD. Mutiara Indah
4 11/6/2015 Paku 5 cm 1.00 dus 13408 PD. Mutiara Indah
Paku 7 cm 1.00 dus 13408 PD. Mutiara Indah
5 11/6/2015 Wiremesh M8 150.00 lbr DPK-SU/1506/00882 -
6 12/6/2015 Drop hammer APT 12 1.00 unit TER - A 1569 PT. Tripile
Pilecap 25 1.00 unit TER - A 1569 PT. Tripile
7 12/6/2015 Tiang pancang 25x25 - 6m 10.00 btg TER - A 1571 PT. Tripile
Tiang pancang 25x25 - 6m 12.00 btg TER - A 1571 PT. Tripile
Tiang pancang 25x25 - 3m 6.00 btg TER - A 1571 PT. Tripile
8 12/6/2015 Tiang pancang 25x25 - 6m 10.00 btg TER - A 1572 PT. Tripile
Tiang pancang 25x25 - 6m 10.00 btg TER - A 1572 PT. Tripile
Tiang pancang 25x25 - 3m 4.00 btg TER - A 1572 PT. Tripile
9 13/6/2015 Mata potong keramik 1.00 bh 2803 PD. Mutiara Indah
Gerinda potong 4" 4.00 bh 2803 PD. Mutiara Indah
Amplas kasar 0.50 m 2803 PD. Mutiara Indah
Sarung tangan 1.00 lsn 2803 PD. Mutiara Indah
10 13/6/2015 Kawat tali 1.00 roll 9051 PD. Mutiara Indah
11 16/6/2015 Mobilisai alat jecking
Genset 1.00 unit 15160/tp/MSA/06/2015 PT. Mitra Sumber Agung
Silinder jack 2.00 unit 15160/tp/MSA/06/2015 PT. Mitra Sumber Agung
counter weight F besar
Kelemping 25
12 16/6/2015 Mobilisai alat jecking
Alat pancang jecking 120 ton 1.00 unit 15160/tp/MSA/06/2015 PT. Mitra Sumber Agung
13 16/6/2015 Tiang pancang 25x25 - 6m 8.00 btg TER - A 1583 PT. Tripile
Tiang pancang 25x25 - 6m 14.00 btg TER - A 1583 PT. Tripile
14 16/6/2015 Drop hammer APT 11 1.00 unit TER - A 1588 PT. Tripile
Pilecap 25 1.00 unit TER - A 1588 PT. Tripile
15 16/6/2015 Tiang pancang 25x25 - 6m 6.00 btg TER - A 1584 PT. Tripile
Tiang pancang 25x25 - 6m 19.00 btg TER - A 1584 PT. Tripile
16 17/6/2015 Tiang pancang 25x25 - 6m 6.00 btg TER - A 1591 PT. Tripile
Tiang pancang 25x25 - 6m 14.00 btg TER - A 1591 PT. Tripile
Tiang pancang 25x25 - 3m 4.00 btg TER - A 1591 PT. Tripile
17 17/6/2015 Tiang pancang 25x25 - 6m 6.00 btg TER - A 1592 PT. Tripile
Tiang pancang 25x25 - 6m 16.00 btg TER - A 1592 PT. Tripile
Tiang pancang 25x25 - 3m 6.00 btg TER - A 1592 PT. Tripile
18 17/6/2015 Sarung tangan 1.00 bh 13153 PD. Mutiara Indah
Kape gagang 3" 1.00 bh 13153 PD. Mutiara Indah
Amplas 1.00 bh 13153 PD. Mutiara Indah
19 18/6/2015 Tiang pancang 25x25 - 6m 10.00 btg TER - A 1594 PT. Tripile
Tiang pancang 25x25 - 6m 7.00 btg TER - A 1594 PT. Tripile
Tiang pancang 25x25 - 3m 14.00 btg TER - A 1594 PT. Tripile
20 18/6/2015 Lampu tornado 20 w 6.00 bh 3014 PD. Mutiara Indah
Stop kontak 3 lbg 2.00 bh 3014 PD. Mutiara Indah
Sepatu booth 5.00 psg 3014 PD. Mutiara Indah
Mata gerinda potong 5.00 bh 3014 PD. Mutiara Indah
Stum 2.00 bh 3014 PD. Mutiara Indah
21 18/6/2015 Split 7.59 m3 28864 PT. MSU
22 18/6/2015 Besi beton 6mm 113.00 btg DG-IU/1506/02742 -
Besi beton 8mm 96.00 btg DG-IU/1506/02742 -
23 18/6/2015 Besi beton 13mm 360.00 btg DG-IU/1506/02272 -
24 19/6/2015 Tiang pancang 25x25 - 6m 9.00 btg TER - A 1598 PT. Tripile
Tiang pancang 25x25 - 6m 9.00 btg TER - A 1598 PT. Tripile
Tiang pancang 25x25 - 3m 14.00 btg TER - A 1598 PT. Tripile
25 19/6/2015 Tiang pancang 25x25 - 6m 7.00 btg TER - A 1599 PT. Tripile
Tiang pancang 25x25 - 6m 15.00 btg TER - A 1599 PT. Tripile
26 20/6/2015 Pylox merah 4.00 btl 6607 PD. Mutiara Indah
Paku beton 1.00 dus 6607 PD. Mutiara Indah
27 21/6/2015 Split 15.12 m3 25696 PT. MSU
28 22/6/2015 Cutting 14" 2.00 bh 8878 PD. Mutiara Indah
utting 4" 5.00 bh 8878 PD. Mutiara Indah
Kunci besi 8mm 1.00 bh 8878 PD. Mutiara Indah
29 22/6/2015 Tiang pancang 25x25 - 6m 17.00 btg TER - A 1608 PT. Tripile
Tiang pancang 25x25 - 3m 16.00 btg TER - A 1608 PT. Tripile
30 22/6/2015 Tiang pancang 25x25 - 6m 8.00 btg TER - A 1509 PT. Tripile
Tiang pancang 25x25 - 6m 8.00 btg TER - A 1509 PT. Tripile
Tiang pancang 25x25 - 3m 12.00 btg TER - A 1509 PT. Tripile
31 23/6/2015 Balok 8/12 x 4m 1.00 btg 6795 PD. Mutiara Indah
32 23/6/2015 Baut M12 x 40 12.00 bh 7818 PD. Mutiara Indah
33 23/6/2015 V sock 1 1/2 x 1/2 1.00 bh 7809 PD. Mutiara Indah
34 23/6/2015 Sapu lidi gagang 1.00 bh 7812 PD. Mutiara Indah
Sapu ijuk hitam 1.00 bh 7812 PD. Mutiara Indah
35 24/6/2015 Tiang pancang 25x25 - 6m 9.00 btg TER - A 1614 PT. Tripile
Tiang pancang 25x25 - 6m 9.00 btg TER - A 1614 PT. Tripile
Tiang pancang 25x25 - 3m 8.00 btg TER - A 1614 PT. Tripile
36 24/6/2015 V sock 2 x 1/2 1.00 bh 3553 PD. Mutiara Indah
37 24/6/2015 Tripleks 6mm 1.00 lbr 3598 PD. Mutiara Indah
38 26/6/2015 Semen SCG 160.00 zak 1783 -
39 27/6/2015 Paku beton 5cm 3.00 dus 1777 PD. Mutiara Indah
40 27/6/2015 Tiang pancang 25x25 - 6m 10.00 btg TER - A 1625 PT. Tripile
Tiang pancang 25x25 - 6m 10.00 btg TER - A 1625 PT. Tripile
Tiang pancang 25x25 - 3m 10.00 btg TER - A 1625 PT. Tripile
41 30/6/2015 Sarung tangan 1.00 lsn 866 PD. Mutiara Indah
Isolasi listrik nitto 2.00 bh 866 PD. Mutiara Indah
Kapur besi 1.00 pak 866 PD. Mutiara Indah
42 2/7/2015 Batako 500.00 bh 6239 PD. Mutiara Indah
Bendrat 1.00 roll 6239 PD. Mutiara Indah
Mata potong keramik 1.00 bh 6239 PD. Mutiara Indah
43 3/7/2015 Batako 550.00 bh 6685 PD. Mutiara Indah
Bendrat 1.00 roll 6685 PD. Mutiara Indah
Benang tukang 20.00 bh 6685 PD. Mutiara Indah
Ember cor gede 10.00 bh 6685 PD. Mutiara Indah
44 3/7/2015 Gerinda potong 4" 3.00 bh 6678 PD. Mutiara Indah
45 6/7/2015 Tee 1" (kuningan) 1.00 bh 1607 PD. Mutiara Indah
SDL 1 1/4 1.00 bh 1607 PD. Mutiara Indah
SDL 1" 2.00 bh 1607 PD. Mutiara Indah
Sock 1 1/4 1.00 bh 1607 PD. Mutiara Indah
Sock 1" 1.00 bh 1607 PD. Mutiara Indah
Ballvalve 1" polos 1.00 bh 1607 PD. Mutiara Indah
Seal tape 2.00 bh 1607 PD. Mutiara Indah

1 1/7/2015 Besi beton 13 mm ulir 99.00 btg DG-IU/1507/00113 -


2 7/7/2015 Tripleks 6mm 5.00 lbr 7049 PD. Mutiara Indah
Kaso 4/6 3.00 ikat 7049 PD. Mutiara Indah
3 7/7/2015 Kaso 4/6 2.00 ikat 1626 PD. Mutiara Indah
4 10/7/2015 Beton K-300 7.00 m3 174073 PT. SGG Prima Beton
5 10/7/2015 Beton K-300 7.00 m3 174078 PT. SGG Prima Beton
6 10/7/2015 Beton K-300 7.00 m3 174079 PT. SGG Prima Beton
7 10/7/2015 Beton K-300 7.00 m3 174087 PT. SGG Prima Beton
8 10/7/2015 Beton K-300 7.00 m3 174090 PT. SGG Prima Beton
9 10/7/2015 Beton K-300 35.00 3.00 m3 174091 PT. SGG Prima Beton
10 28/7/2015 Cutting whell 4" 5.00 bh 11946 PD. Mutiara Indah
Lakban kertas 2" 5.00 bh 11946 PD. Mutiara Indah
Paku beton 7cm 1.00 dus 11946 PD. Mutiara Indah
Paku 7cm 1.00 kg 11946 PD. Mutiara Indah
11 30/7/2015 Escopan colorbond of P= 9.92 m 78.00 pcs 602150700650 PT. Kepuh Kencana Arum
White t= 0.45mm EFF= 1000 mm
Escopan colorbond of P= 1.46 m 1.00 pcs 602150700650 PT. Kepuh Kencana Arum
White t= 0.45mm EFF= 1000 mm
Escopan colorbond of P= 4.4 m 157.00 pcs 602150700650 PT. Kepuh Kencana Arum
White t= 0.45mm EFF= 1000 mm
Escopan colorbond of P= 8.95 m 1.00 pcs 602150700650 PT. Kepuh Kencana Arum
White t= 0.45mm EFF= 1000 mm
Escopan colorbond of P= 9.98 m 12.00 pcs 602150700650 PT. Kepuh Kencana Arum
White t= 0.45mm EFF= 1000 mm
Escopan colorbond of P= 0.55 m 158.00 pcs 602150700650 PT. Kepuh Kencana Arum
White t= 0.45mm EFF= 1000 mm
12 31/7/2015 Semen SCG 160.00 zak - -
13 31/7/2015 Split 7.40 m3 29457 PT. MSU
14 1/8/2015 Batako 500.00 bh 3262 PD. Mutiara Indah

1 12/6/2015 Semen SCG 160.00 zak - -


2 31/7/2015 Benang tukang 25.00 bh 151 PD. Mutiara Indah
Sarung tangan 1.00 lsn 151 PD. Mutiara Indah
Mata gerinda potong keramik 1.00 bh 151 PD. Mutiara Indah
3 3/8/2015 Paku beton 7cm 1.00 dus 2948 PD. Mutiara Indah
4 3/8/2015 Batako 600.00 bh 2944 PD. Mutiara Indah
5 4/8/2015 Mata gerinda potong keramik 1.00 bh 5767 PD. Mutiara Indah
6 4/8/2015 Tripleks 9mm 12.00 lbr 4341 PD. Mutiara Indah
Kaso 4/6 6.00 ikat 4341 PD. Mutiara Indah
Bendrat 1.00 roll 4341 PD. Mutiara Indah
7 4/8/2015 Pylox merah 2.00 btl 8064 PD. Mutiara Indah
Masker putih 1.00 pak 8064 PD. Mutiara Indah
8 4/8/2015 Gerinda potong 14" 2.00 bh 9770 PD. Mutiara Indah
9 4/8/2015 Paku beton 7cm 2.00 dus 9779 PD. Mutiara Indah
10 05/082015 Excavator Kobelco 1.00 unit B 9115 VKA PT. Semangat Baru Putra
11 6/8/2015 Besi beton D13 336.00 btg DPKIV 589 PT. Inti Sumber
12 6/8/2015 Besi beton Ø8 270.00 btg DPKIV 588 PT. Inti Sumber
13 6/8/2015 Gerinda potong 4" 5.00 bh 11108 PD. Mutiara Indah
14 7/8/2015 Kawat tali 1.00 roll 6321 PD. Mutiara Indah
Gerinda potong 4" 5.00 bh 6321 PD. Mutiara Indah
15 7/8/2015 Batako 500.00 bh 5796 PD. Mutiara Indah
16 7/8/2015 Beban bilet 16.00 set TER-A 01763 PT. Tripile
17 8/8/2015 Beton K-300 7.00 m3 1742225 PT. SGG Prima Beton
18 8/8/2015 Beban bilet 14.00 set TER-A 01770 PT. Tripile
Plat 4.00 lbr TER-A 01770 PT. Tripile
Doly 1.00 pcs TER-A 01770 PT. Tripile
Mesin cat 1.00 unit TER-A 01770 PT. Tripile
Loader 1.00 set TER-A 01770 PT. Tripile

1 8/8/2015 Mobilisasi alat pancang jack 07 1.00 unit TGR-A01775 PT. Tripile
2 10/8/2015 Sepatu booth 10.00 psg 7158 PD. Mutiara Indah
Sepatu AP 1.00 psg 7158 PD. Mutiara Indah
3 10/8/2015 Batako 500.00 bh 2222 PD. Mutiara Indah
Benang tukang 20.00 bh 2222 PD. Mutiara Indah
Lakban kertas 2" 5.00 bh 2222 PD. Mutiara Indah
4 10/8/2015 Beton K-225 7.00 m3 174253 PT. SGG prima Beton
Beton K-225 7.00 m3 174262 PT. SGG prima Beton
Beton K-225 7.00 m3 174264 PT. SGG prima Beton
Beton K-225 24.00 3.00 m3 174270 PT. SGG prima Beton
5 10/8/2015 Tiang pancang 25x25 @6 m 9.00 btg TGR-A01778 PT. Tripile
Tiang pancang 25x25 @6 m 9.00 btg TGR-A01778 PT. Tripile
Tiang pancang 25x25 @3 m 8.00 btg TGR-A01778 PT. Tripile
6 11/8/2015 Semen SCG 160.00 zak 2286 -
7 13/8/2015 Kawat tali 1.00 roll 6057 PD. Mutiara Indah
Solasi listrik nitto 1.00 bh 6057 PD. Mutiara Indah
Stop kontak 3 lbg 2.00 bh 6057 PD. Mutiara Indah
Steker 3.00 bh 6057 PD. Mutiara Indah
sarung tangan 1.00 lsn 6057 PD. Mutiara Indah
8 13/8/2015 Batako 500.00 bh 7481 PD. Mutiara Indah
9 13/8/2015 Beton K-300 7.00 m3 174328 PT. SGG prima Beton
10 14/8/2015 Tiang pancang 25x25 @6 m 15.00 btg TGR-A01778 PT. Tripile
Tiang pancang 25x25 @6 m 14.00 btg TGR-A01778 PT. Tripile
Tiang pancang 25x25 @3 m 3.00 btg TGR-A01778 PT. Tripile
REKAP ANALISIS WO DAFTAR HARGA MATERIAL

MATERIAL HARGA MATERIAL


NO. ITEM PEKERJAAN NOMOR WO JUMLAH KETERANGAN NO. ITEM PEKERJAAN No. WO TOTAL HARGA
ITEM JUMLAH SAT. ( Rp. )
1 45 roll 120,000
150 lbr 120,000
1 roll 120,000
360,000
REKAP MATERIAL MASUK
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Qty Satuan No Surat Jalan Supplier Ket. Surat Jalan

### CPU ex bp tomy 1 unit 1


UPS 1 unit
mouse 1 unit
keyboard 1 unit
seng bekas 28 lbr
kaso bekas 1 lot
knee 10 pcs
REKAP MATERIAL MASUK
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Qty Satuan No Surat Jalan Supplier Ket. Surat Jalan

### paku 10 cm 2 dus 26 ada


paku 7 cm 2 dus ada
paku seng 1 dus ada
bata merah 2000 pis ada
pipa 3 6 btg ada
ada
pipa 12 btg ada
ada
ada
ada
ada
### kaso 5x7 108 btg ada
kaso 5 x 10 25 btg ada
ada
ada
ada
### triplek/papan bor 1 lbr ada
mesin gerinda tangan 1 pcs ada
mesin printer Epson 1 unit ada
### triplek 3 mm 28 lbr ada
kawat 3 meter ada
paku triplek 2 kg ada
ada
ada
ada
ada
### pompa sedot engine 1 unit ada
selang belalai 1 rol ada
sepatu boot 5 psg ada
### begisting bekas wwtp 1200 x 2400 11 lbr ada
ada
ada
ada
### begisting bekas 1 mobil ada
mesin pompa air + selang spiral 1 unit ada
asbes bekas 20 lbr ada
sepatu boot 41 3 ps ada
sepatu boot 43 1 ps ada
sepatu boot 44 1 ps ada
### begisting 1 mbl ada
slang terpal air 2 roll ada
### auto level 1 unit ada
### mesin molen 1 unit ada
pipa hitam 1.5 3 btg ada
semen 172 pcs ada
### mesin stamper 1 unit ada
### mesin cutting wel 1 unit ada
vibrator electrik 1 unit ada
lampu tembak 1 pcs ada
kabel 2 x 2,5 2 roll ada
lampu spiral 2 fis ada
bendera merah putih 2 buah ada
bendera keselamatan 2 2 ada
theodolit 1 buah ada
batako 2000 buah ada
semen SCG 16 pcs ada
### pasir 7.6 m³ ada
split 7.6 m³ ada
### Pasir 7.6 m³ ada
ada
### sabuk bekas 4 pcs ada
lampu rotari 1 pcs ada
ada
### sepatu boot 12 psg ada
ada
REKAP MATERIAL MASUK
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

1 ### pasir 7.6 m³ CV. Salwa Salsabila ada


batako 2000 buah
selang 1/2 inci 37 m³
### pasir 7.6 m³ cv. Salwa Salsabila ada
batu split 7.6 m³ 700,000.00 5,320,000.00
### pasir 7.5 m³ CV.Salwa Salsabila ada 37,500.00 281,250.00
batako 2000 buah CV.Salwa Salsabila ada 25,000.00 50,000,000.00
pompa celup 1 unit 65,000.00 325,000.00
slang terpal 30 m 1 roll 62,000.00 310,000.00
selang terpal 15 m 2 roll 55,000.00 275,000.00
cutting wel 1 unit 3,000.00 15,000.00
### batako 2000 buah ada
solar 220 liter cakra ada
### split 7.5 m³ CV.Salwa Salsabila ada
solar 220 liter cakra ada
### pasir 7.5 m³ CV.Salwa Salsabila ada
### pasir 7.5 m³ CV.Salwa Salsabila ada 575,000.00 2,875,000.00
batako 2000 buah ada 575,000.00 2,875,000.00
besi potongan pile cap 6 m D19 160 btg dari workshop ada 49,000.00 49,000.00
besi potongan pile cap 11,98 D19 5 btg dari workshop ada 22,500.00 247,500.00
besi potongan pile cap 4 m D 19 5 btg dari workshop ada 450.00 900,000.00
besi TB 1 12 m D 25 52 btg dari workshop ada 7,000.00 7,000.00
sengkang TB 1 3 m D 10 200 buah dari workshop ada 7,000.00 7,000.00
sengkang TB 1 2,4 m D 10 200 buah dari workshop ada 17,500.00 17,500.00
besi TB 6 6m D 25 12 btg dari workshop ada 3,000.00 300,000.00
besi sengkang TB 6 1,4 m D 10 100 buah dari workshop ada 49,000.00 9,800,000.00
besi rw 4 m D 13 200 btg dari workshop ada 3,000.00 240,000.00
besi potongan pile cap 6 5 m D19 80 btg dari workshop ada 9,000.00 1,152,000.00
besi potongan pile cap 6 4 m D 19 128 btg dari workshop ada 17,500.00 87,500.00
besi potongan pile cap 6 11,8 m D 19 5 btg dari workshop ada 250,000.00 1,250,000.00
besi potongan pile cap 6 1m D 19 5 btg dari workshop ada 12,000.00 1,152,000.00
besi potongan pile cap 5 4,5 m D 19 96 btg dari workshop ada 9,500.00 57,000.00
besi potongan pile cap 5 5,98 m D 19 6 btg dari workshop ada 17,500.00 1,260,000.00
besi potogan pile cap 7 6 m D 19 72 btg dari workshop ada 7,500.00 630,000.00
besi potongan pile cap 7 5,4 m D 19 84 btg dari workshop ada 3,500.00 17,500.00
besi potongan pile cap 7 11,98 m D 19 5 btg dari workshop ada 43,000.00 215,000.00
besi potongan pile cap 7 3, 93 m D 19 5 btg dari workshop ada 13,000.00 13,000.00
mesin stamper 1 unit dari cs2 ada 8,000.00 16,000,000.00
batako 2000 buah jam 22.00 ada
### batako 2000 buah ada
semen 16 pcs PT. KOKOH INTI AREBAMA ada
besi potongan pile cap 9 6m D19 160 btg dari workshop 67,500.00 337,500.00
besi potongan pile cap 9 12 m D19 5 btg 27,500.00 137,500.00
besi potongan pile cap 9 4 m D19 5 btg 27,500.00 2,145,000.00
besi potongan pile cap 11 7,5 m D19 78 btg 23,000.00 2,484,000.00
besi potongan pile cap 11 6m D19 108 btg 10,000.00 60,000.00
besi potongan pile cap 11 9,4 m D19 6 btg 375.00 16,500.00
besi potongan pile cap K1 7 m D25 44 btg 6,000.00 66,000.00
kawat bendrat 11 roll 12,000.00 1,200,000.00
besi sengkang kolom k 1 3 m D13 100 buah
besi sengkang kolom k 1 2,4 m D19 200 buah
besi potongan pile cap 4 4,5 m D19 80
besi potongan pile cap 4 2,5 m D19 128
besi potongan pile cap 4 9,9 m D19 5
besi potongan pile cap 1 2,5 m D19 5
besi potongan pile cap 1 1,20 m D19 96
besi potongan pile cap 1 3,83 m D19 6
besi potongan pile cap 8 6 m D19 72
besi potongan pile cap 8 12 m D19 84
besi potongan pile cap 8 4 m D19 5
### kabel power 1 roll dari workshop
lampu tembak besar 2 unit dari workshop
### batako 2000 buah
besi potongan K1 6,8 m D25 110 btg dari workshop 450.00 9,900.00
besi potongan K1 7 m D25 22 btg dari workshop 25,000.00 4,150,000.00
besi potongan PC12 7,5 m D19 166 btg dari workshop 17,500.00 3,780,000.00
besi potongan PC12 6m D19 216 btg dari workshop 22,500.00 540,000.00
besi potongan PC12 9,4 m D19 24 btg dari workshop 16,500.00 244,200.00
besi potongan PC7 6 m D19 72 btg dari workshop 45,000.00 3,780,000.00
besi potongan PC7 5,4 m D 19 84 btg dari workshop 23,000.00 230,000.00
besi potongan PC7 8 m D19 10 btg dari workshop 95,000.00 2,660,000.00
besi potongan PC 1 2,5 m D19 28 btg dari workshop 45,000.00 135,000.00
besi potongan PC1 3,83 m D19 3 btg dari workshop 15,000.00 60,000.00
lampu tembak besar 4 unit dari workshop 17,500.00 131,250.00
### pasir 7.5 m³ CV. Salwa Salsabila
pasir 7.50 m³ CV. Salwa Salsabila
holo 5x53m 350 bh PT. PANDAWA SUKSES sejahtera
### batako 2000 bh
pasir 7.5 m³
pasir 7.5 m³ 185,000.00 14,430,000.00
### besi potongan PC12 (P12a,c) 7,5 m D19 78 btg 400.00 43,200.00
besi potongan PC12 (P12b,d) 6 m D19 108 btg 143,000.00 22,880,000.00
besi potongan PC8 (P8a,b,c,d) 6 m D19 160 btg 230,000.00 2,300,000.00
besi potongan PC8 (P8e,f) 8 m D19 10 btg 0.00
besi D25 9,4 m D19 12 btg 110,000.00 11,440,000.00
besi D10 12m 104 btg 7,000.00 560,000.00
besi potongan RW 12m 80 btg 4,500.00 675,000.00
besi potongan 4m D13 150 btg 3,000.00 330,000.00
sengkang TB 1 7 m D25 110 btg
sengkang TB 3 2,2 m D10 200 btg 350,000.00 350,000.00
vibrator 1 set 22,500.00 22,500.00
mesin steam 1 set 24,000.00 1,680,000.00
balok 6/12 x 4 m 70 btg 10,000.00 500,000.00
balok 6/12 x 2,5 m 50 btg 8,500.00 170,000.00
hollo 5 x 5 2,5 m 20 btg 8,000.00 800,000.00
hollo 5 x 5 2m 100 pcs 74,000.00 1,628,000.00
seng gelombang 80 x 180 22 lbr 12,000.00 12,000,000.00
baut rufing 8 x 32 1000 bh 27,500.00 27,500.00
mesin bor 1 bh 23,000.00 23,000.00
kabel externa 2 x 1,5 1 roll 62,000.00 248,000.00
galon aqua 4 bh 27,500.00 55,000,000.00
batako 2000 bh 4,000.00 312,000.00
### besi pile cap 10 (P10a,c) 7,5 m D19 78 btg 115,000.00 12,420,000.00
besi pile cap 10 (P10b,d) 6 m D19 108 btg 25,000.00 1,125,000.00
besi PTC (Pa,,b) 7,9 m D25 45 btg 12,500.00 562,500.00
besi PTC (Pc,d) 7m D25 45 btg 17,500.00 875,000.00
besi potongan D25 12 m 50 btg 27,500.00 2,750,000.00
besi potongan D13 12 m 100 btg 27,500.00 2,750,000.00
sengkang TB1 3,8 m D10 100 btg 27,500.00 2,750,000.00
Sengkang TB1 0,8 m D10 100 btg 8,500.00 1,700,000.00
sengkang TB1 1,3 m D10 200 btg 15,000.00 4,500,000.00
besi rw 4m D13 300 btg 45,000.00 270,000.00
besi TB6 12 m D22 6 btg 67,500.00 405,000.00
besi TB7 4,5 m D19 6 btg 450.00 90,000.00
sengkang TB3 2,5 m D10 200 btg 3,000.00 150,000.00
sengkang TB5 1,4 m D 10 50 btg 37,500.00 1,875,000.00
sengkang TB7 1,2 m D10 50 btg 18000 25,000.00 400,000.00
semen 16 pcs PT. KOKOH INTI AREBAMA 17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL MASUK
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

1 ### batako 2000 buah

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap (P8a,p8b,P8c,P8d) 6 m D19 160 btg dari workshop ada
besi potongan pile cap (P8e) 11,98 D19 5 btg dari workshop ada
besi potongan pile cap ( P8f) 4 m D 19 5 btg dari workshop ada
besi TB 1 ( stat 1) 12 m D 25 52 btg dari workshop ada
sengkang TB 1 3 m D 10 200 buah dari workshop ada 700,000.00 140,000,000.00
sengkang TB 1 2,4 m D 10 200 buah dari workshop ada 37,500.00 7,500,000.00
besi TB 6 (stat 1) 6m D 25 12 btg dari workshop ada 25,000.00 300,000.00
besi sengkang TB 6 1,4 m D 10 100 buah dari workshop ada 65,000.00 325,000.00
besi rw 4 m D 13 200 btg dari workshop ada 62,000.00 310,000.00
besi potongan pile cap 6 ( P6a, P6c) 5 m D19 80 btg dari workshop ada 55,000.00 275,000.00
besi potongan pile cap 6 ( P6b, P6c) 4 m D 19 128 btg dari workshop ada 3,000.00 15,000.00
besi potongan pile cap 6 ( P6e) 11,8 m D 19 5 btg dari workshop ada
besi potongan pile cap 6 (P6f) 1m D 19 5 btg dari workshop ada
besi potongan pile cap 5 (P5a,P5b,P5c,P5d) 4,5 m D 19 96 btg dari workshop ada
besi potongan pile cap 5 (P5e, P5f) 5,98 m D 19 6 btg dari workshop ada
besi potogan pile cap 7 (P7a,P7c) 6 m D 19 72 btg dari workshop ada
besi potongan pile cap 7 ( P7b, P7d) 5,4 m D 19 84 btg dari workshop ada 575,000.00 2,875,000.00
besi potongan pile cap 7 ( P7e, P7f) 11,98 m D 19 5 btg dari workshop ada 575,000.00 2,875,000.00
besi potongan pile cap 7 ( P7f) 3, 93 m D 19 5 btg dari workshop ada 49,000.00 49,000.00
### besi potongan pile cap 9 (P9a,b,c,d) 6m D19 160 btg dari workshop 22,500.00 247,500.00
besi potongan pile cap 9 (P9e) 12 m D19 5 btg 450.00 900,000.00
besi potongan pile cap 9 (P9f) 4 m D19 5 btg 7,000.00 7,000.00
besi potongan pile cap 11 (P11,a,c) 7,5 m D19 78 btg 7,000.00 7,000.00
besi potongan pile cap 11 (P11.b,d) 6m D19 108 btg 17,500.00 17,500.00
besi potongan pile cap 11 (P11e,f) 9,4 m D19 6 btg 3,000.00 132,000.00
besi potongan pile cap K1 ( K1) 7 m D25 44 btg 49,000.00 539,000.00
kawat bendrat 11 roll 3,000.00 300,000.00
besi sengkang kolom k 1 ( K1,S1) 3 m D13 100 buah 9,000.00 1,800,000.00
besi sengkang kolom k 1 ( K1,k2) 2,4 m D19 200 buah 17,500.00 700,000.00
besi potongan pile cap 4 (P4a,P4b) 4,5 m D19 40 btg 250,000.00 10,000,000.00
besi potongan pile cap 4 (P4c,P4d) 2,5 m D19 40 btg 12,000.00 36,000.00
besi potongan pile cap 4 (P4e) 9,9 m D19 3 btg 9,500.00 66,500.00
besi potongan pile cap 1 (P1a,P1b) 2,5 m D19 7 btg 17,500.00 122,500.00
besi potongan pile cap 1 (P1c,P1d) 1,20 m D19 7 btg 7,500.00 22,500.00
besi potongan pile cap 1 (P1e) 3,83 m D19 3 btg 3,500.00 560,000.00
besi potongan pile cap 8 (P8a,b,c,d) 6 m D19 160 btg 43,000.00 215,000.00
besi potongan pile cap 8 (P8e) 12 m D19 5 btg 13,000.00 65,000.00
besi potongan pile cap 8 (P8f) 4 m D19 5 btg 8,000.00 880,000.00
### besi potongan K1 6,8 m D25 110 btg dari workshop
besi potongan K1 7 m D25 22 btg dari workshop
besi potongan PC12 (P12a,c) 7,5 m D19 166 btg dari workshop
besi potongan PC12 (P12b,d) 6m D19 216 btg dari workshop 67,500.00 1,620,000.00
besi potongan PC12 (PC12e,f) 9,4 m D19 24 btg dari workshop 27,500.00 1,980,000.00
besi potongan PC7 (Pc7a,c) 6 m D19 72 btg dari workshop 27,500.00 2,310,000.00
besi potongan PC7 (Pc7b,d) 5,4 m D 19 84 btg dari workshop 23,000.00 230,000.00
besi potongan PC7 (Pc7e,f) 8 m D19 10 btg dari workshop 10,000.00 280,000.00
besi potongan PC 1 (Pc1a,b,c,d) 2,5 m D19 28 btg dari workshop 375.00 1,125.00
besi potongan PC1 (P1e) 3,83 m D19 3 btg dari workshop 6,000.00 468,000.00
### besi potongan PC12 (P12a,c) 7,5 m D19 78 btg 12,000.00 1,296,000.00
besi potongan PC12 (P12b,d) 6 m D19 108 btg
besi potongan PC8 (P8a,b,c,d) 6 m D19 160 btg
besi potongan PC8 (P8e,f) 8 m D19 10 btg
besi D25 9,4 m D19 12 btg
besi D10 12m 104 btg
besi potongan RW 12m 80 btg
besi potongan 4m D13 150 btg
sengkang TB 1 7 m D25 110 btg
sengkang TB 3 2,2 m D10 200 btg
vibrator 1 set
mesin steam 1 set
### besi pile cap 10 (P10a,c) 7,5 m D19 78 btg
besi pile cap 10 (P10b,d) 6 m D19 108 btg
besi PTC (Pa,,b) 7,9 m D25 45 btg
besi PTC (Pc,d) 7m D25 45 btg 450.00 22,500.00
besi potongan D25 12 m 50 btg 25,000.00 2,500,000.00
besi potongan D13 12 m 100 btg 17,500.00 1,750,000.00
sengkang TB1 3,8 m D10 100 btg 22,500.00 2,250,000.00
Sengkang TB1 0,8 m D10 100 btg 16,500.00 244,200.00
sengkang TB1 1,3 m D10 200 btg 45,000.00 13,500,000.00
besi rw 4m D13 300 btg 23,000.00 138,000.00
besi TB6 12 m D22 6 btg 95,000.00 570,000.00
besi TB7 4,5 m D19 6 btg 45,000.00 9,000,000.00
sengkang TB3 2,5 m D10 200 btg 15,000.00 750,000.00
sengkang TB5 1,4 m D 10 50 btg 17,500.00 875,000.00
sengkang TB7 1,2 m D10 50 btg
### besi PC 10 ( P10a,c) 156.00
besi PC 10 ( P10b,d) 216
besi PC 10 ( P10e,f) 20
Besi PC 4 (P4c,d) 40
Besi PC 4 (P4c,d) 40 185,000.00 555,000.00
Besi PC 4 (P4c,d) 3 400.00 28,800.00
besi PC 7 (P7a,c) 72 143,000.00 12,012,000.00
besi PC 7 (P7a,c) 84 230,000.00 2,300,000.00
besi PC 7 (P7a,c) 10 0.00
besi kolom k2 24 110,000.00 12,100,000.00
besi kolom k1 110 7,000.00 700,000.00
besi D25 100 4,500.00 1,350,000.00
sengkang 1/2 TB1 300 3,000.00 300,000.00
sengkang TB2 100
sengkang TB 5 100 350,000.00 27,300,000.00
### besi pile cap 10 (P10a,c) 78 22,500.00 2,430,000.00
besi pile cap10 (P10b,d) 108 24,000.00 3,840,000.00
besi pile cap 8 (P8a,b,c,d) 160 10,000.00 100,000.00
besi pile cap 10 (P10e,f) 10 8,500.00 85,000.00
besi pile cap 8 (P8e,f) 10 8,000.00 768,000.00
besi pile cap 5 (P5a,b,c,d) 96 74,000.00 444,000.00
besi pile cap 5 (P5e) 6 12,000.00 1,320,000.00
besi kolom K1 110 27,500.00 1,375,000.00
besi D25 50 23,000.00 2,300,000.00
besi D10 100 62,000.00 3,100,000.00
besi D25 50 27,500.00 2,750,000.00
besi sengkang TB1 100 4,000.00 400,000.00
besi sengkang 1/2 TB1 100 115,000.00 11,500,000.00
besi sengkang TB1 100 25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap 1 (P1a,P1b) 2,5 m D19 7 btg


besi potongan pile cap 1 (P1c,P1d) 1,20 m D19 7 btg
besi potongan pile cap 1 (P1e) 3,83 m D19 3 btg

### besi potongan PC 1 (Pc1a,b,c,d) 2,5 m D19 28 btg dari workshop 700,000.00 19,600,000.00
besi potongan PC1 (P1e) 3,83 m D19 3 btg dari workshop 37,500.00 112,500.00
25,000.00 0.00
### besi TB 1 ( stat 1) 12 m D 25 52 btg dari workshop ada 65,000.00 325,000.00
sengkang TB 1 3 m D 10 200 buah dari workshop ada 62,000.00 310,000.00
sengkang TB 1 2,4 m D 10 200 buah dari workshop ada 55,000.00 275,000.00
3,000.00 15,000.00
### besi potongan pile cap 4 (P4a,P4b) 4,5 m D19 40 btg ada
besi potongan pile cap 4 (P4c,P4d) 2,5 m D19 40 btg ada
besi potongan pile cap 4 (P4e) 9,9 m D19 3 btg

### besi potongan pile cap 5 (P5a,P5b,P5c,P5d) 4,5 m D 19 96 btg dari workshop ada
besi potongan pile cap 5 (P5e, P5f) 5,98 m D 19 6 btg dari workshop ada 575,000.00 2,875,000.00
575,000.00 2,875,000.00
### besi potongan pile cap 6 ( P6a, P6c) 5 m D19 80 btg dari workshop ada 49,000.00 49,000.00
besi potongan pile cap 6 ( P6b, P6c) 4 m D 19 128 btg dari workshop ada 22,500.00 247,500.00
besi potongan pile cap 6 ( P6e) 11,8 m D 19 5 btg dari workshop ada 450.00 900,000.00
besi potongan pile cap 6 (P6f) 1m D 19 5 btg dari workshop ada 7,000.00 7,000.00
7,000.00 7,000.00
### besi TB 6 (stat 1) 6m D 25 12 btg dari workshop ada 17,500.00 17,500.00
besi sengkang TB 6 1,4 m D 10 100 buah dari workshop ada 3,000.00 0.00
49,000.00 3,528,000.00
### besi potogan pile cap 7 (P7a,P7c) 6 m D 19 72 btg dari workshop ada 3,000.00 252,000.00
besi potongan pile cap 7 ( P7b, P7d) 5,4 m D 19 84 btg dari workshop ada 9,000.00 45,000.00
besi potongan pile cap 7 ( P7e, P7f) 11,98 m D 19 5 btg dari workshop ada 17,500.00 87,500.00
besi potongan pile cap 7 ( P7f) 3, 93 m D 19 5 btg dari workshop ada 250,000.00 0.00
12,000.00 1,920,000.00
### besi potongan pile cap (P8a,p8b,P8c,P8d) 6 m D19 160 btg dari workshop ada 9,500.00 47,500.00
besi potongan pile cap (P8e) 11,98 D19 5 btg dari workshop ada 17,500.00 87,500.00
besi potongan pile cap ( P8f) 4 m D 19 5 btg dari workshop ada 7,500.00 0.00
3,500.00 560,000.00
### besi potongan pile cap 8 (P8a,b,c,d) 6 m D19 160 btg 43,000.00 215,000.00
besi potongan pile cap 8 (P8e) 12 m D19 5 btg 13,000.00 65,000.00
besi potongan pile cap 8 (P8f) 4 m D19 5 btg 8,000.00 1,280,000.00
### besi potongan pile cap 9 (P9a,b,c,d) 6m D19 160 btg dari workshop
besi potongan pile cap 9 (P9e) 12 m D19 5 btg
besi potongan pile cap 9 (P9f) 4 m D19 5 btg
67,500.00 5,265,000.00
### besi potongan pile cap 11 (P11,a,c) 7,5 m D19 78 btg 27,500.00 2,970,000.00
besi potongan pile cap 11 (P11.b,d) 6m D19 108 btg 27,500.00 165,000.00
besi potongan pile cap 11 (P11e,f) 9,4 m D19 6 btg 23,000.00 0.00
10,000.00 1,660,000.00
### besi potongan PC12 (P12a,c) 7,5 m D19 166 btg dari workshop 375.00 81,000.00
besi potongan PC12 (P12b,d) 6m D19 216 btg dari workshop 6,000.00 144,000.00
besi potongan PC12 (PC12e,f) 9,4 m D19 24 btg dari workshop 12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap 1 (P1a,P1b) 2,5 m D19 7 btg


besi potongan pile cap 1 (P1c,P1d) 1,20 m D19 7 btg
besi potongan pile cap 1 (P1e) 3,83 m D19 3 btg

### besi potongan PC 1 (Pc1a,b,c,d) 2,5 m D19 28 btg dari workshop 700,000.00 19,600,000.00
besi potongan PC1 (P1e) 3,83 m D19 3 btg dari workshop 37,500.00 112,500.00
25,000.00 0.00
### besi potongan pile cap K1 ( K1) 7 m D25 44 btg 65,000.00 325,000.00
besi sengkang kolom k 1 ( K1,S1) 3 m D13 100 buah 62,000.00 310,000.00
besi sengkang kolom k 1 ( K1,k2) 2,4 m D19 200 buah 55,000.00 275,000.00
3,000.00 15,000.00
### besi potongan K1 6,8 m D25 110 btg dari workshop
besi potongan K1 7 m D25 22 btg dari workshop

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap K1 ( K1) 7 m D25 44 btg


besi sengkang kolom k 1 ( K1,S1) 3 m D13 100 buah
besi sengkang kolom k 1 ( K1,k2) 2,4 m D19 200 buah

### besi potongan K1 6,8 m D25 110 btg dari workshop 700,000.00 0.00
besi potongan K1 7 m D25 22 btg dari workshop 37,500.00 4,125,000.00
25,000.00 550,000.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi TB 1 ( stat 1) 12 m D 25 52 btg dari workshop ada


sengkang TB 1 3 m D 10 200 buah dari workshop ada
sengkang TB 1 2,4 m D 10 200 buah dari workshop ada

### sengkang TB1 3,8 m D10 100 btg 700,000.00 0.00


Sengkang TB1 0,8 m D10 100 btg 37,500.00 3,750,000.00
sengkang TB1 1,3 m D10 200 btg 25,000.00 2,500,000.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### sengkang TB3 2,5 m D10 200 btg

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap 4 (P4a,P4b) 4,5 m D19 40 btg ada
besi potongan pile cap 4 (P4c,P4d) 2,5 m D19 40 btg ada
besi potongan pile cap 4 (P4e) 9,9 m D19 3 btg

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap 5 (P5a,P5b,P5c,P5d) 4,5 m D 19 96 btg dari workshop ada
besi potongan pile cap 5 (P5e, P5f) 5,98 m D 19 6 btg dari workshop ada

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### sengkang TB5 1,4 m D 10 50 btg

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap 6 ( P6a, P6c) 5 m D19 80 btg dari workshop ada
besi potongan pile cap 6 ( P6b, P6c) 4 m D 19 128 btg dari workshop ada
besi potongan pile cap 6 ( P6e) 11,8 m D 19 5 btg dari workshop ada
besi potongan pile cap 6 (P6f) 1m D 19 5 btg dari workshop ada
700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi TB 6 (stat 1) 6m D 25 12 btg dari workshop ada


besi sengkang TB 6 1,4 m D 10 100 buah dari workshop ada

### besi TB6 12 m D22 6 btg


700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potogan pile cap 7 (P7a,P7c) 6 m D 19 72 btg dari workshop ada
besi potongan pile cap 7 ( P7b, P7d) 5,4 m D 19 84 btg dari workshop ada
besi potongan pile cap 7 ( P7e, P7f) 11,98 m D 19 5 btg dari workshop ada
besi potongan pile cap 7 ( P7f) 3, 93 m D 19 5 btg dari workshop ada
700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi TB7 4,5 m D19 6 btg


sengkang TB7 1,2 m D10 50 btg

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap (P8a,p8b,P8c,P8d) 6 m D19 160 btg dari workshop ada
besi potongan pile cap (P8e) 11,98 D19 5 btg dari workshop ada
besi potongan pile cap ( P8f) 4 m D 19 5 btg dari workshop ada

### besi potongan pile cap 8 (P8a,b,c,d) 6 m D19 160 btg 700,000.00 112,000,000.00
besi potongan pile cap 8 (P8e) 12 m D19 5 btg 37,500.00 187,500.00
besi potongan pile cap 8 (P8f) 4 m D19 5 btg 25,000.00 125,000.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap 9 (P9a,b,c,d) 6m D19 160 btg dari workshop
besi potongan pile cap 9 (P9e) 12 m D19 5 btg
besi potongan pile cap 9 (P9f) 4 m D19 5 btg

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi pile cap 10 (P10a,c) 7,5 m D19 78 btg


besi pile cap 10 (P10b,d) 6 m D19 108 btg

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan pile cap 11 (P11,a,c) 7,5 m D19 78 btg


besi potongan pile cap 11 (P11.b,d) 6m D19 108 btg
besi potongan pile cap 11 (P11e,f) 9,4 m D19 6 btg

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL pembesian
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2016

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

### besi potongan PC12 (P12a,c) 7,5 m D19 166 btg dari workshop
besi potongan PC12 (P12b,d) 6m D19 216 btg dari workshop
besi potongan PC12 (PC12e,f) 9,4 m D19 24 btg dari workshop

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL
PROYEK PEMBANGUNAN GEDUNG CHANDRA KARYA
JLN PRAMUKA - JAKARTA BARAT
PERIODE 2017

No Tanggal Item Spesifikasi Jumlah Satuan No Surat Jalan Supplier Ket. Surat Jalan

700,000.00 0.00
37,500.00 0.00
25,000.00 0.00
26 65,000.00 325,000.00
62,000.00 310,000.00
55,000.00 275,000.00
3,000.00 15,000.00

575,000.00 2,875,000.00
575,000.00 2,875,000.00
49,000.00 49,000.00
22,500.00 247,500.00
450.00 900,000.00
7,000.00 7,000.00
7,000.00 7,000.00
17,500.00 17,500.00
3,000.00 0.00
49,000.00 0.00
3,000.00 0.00
9,000.00 0.00
17,500.00 0.00
250,000.00 0.00
12,000.00 0.00
9,500.00 0.00
17,500.00 0.00
7,500.00 0.00
3,500.00 0.00
43,000.00 0.00
13,000.00 0.00
8,000.00 0.00

67,500.00 0.00
27,500.00 0.00
27,500.00 0.00
23,000.00 0.00
10,000.00 0.00
375.00 0.00
6,000.00 0.00
12,000.00 0.00
450.00 0.00
25,000.00 0.00
17,500.00 0.00
22,500.00 0.00
16,500.00 244,200.00
45,000.00 0.00
23,000.00 0.00
95,000.00 0.00
45,000.00 0.00
15,000.00 0.00
17,500.00 0.00

185,000.00 0.00
400.00 0.00
143,000.00 0.00
230,000.00 0.00
0.00
110,000.00 0.00
7,000.00 0.00
4,500.00 0.00
3,000.00 0.00
350,000.00 0.00
22,500.00 0.00
24,000.00 0.00
10,000.00 0.00
8,500.00 0.00
8,000.00 0.00
74,000.00 0.00
12,000.00 0.00
27,500.00 0.00
23,000.00 0.00
62,000.00 0.00
27,500.00 0.00
4,000.00 0.00
115,000.00 0.00
25,000.00 0.00
12,500.00 0.00
17,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
8,500.00 0.00
15,000.00 0.00
45,000.00 0.00
67,500.00 0.00
450.00 0.00
3,000.00 0.00
37,500.00 0.00
25,000.00 0.00
17,500.00 0.00
3,000.00 0.00
9,000.00 0.00
27,500.00 0.00
27,500.00 0.00
17,500.00 0.00

7,000.00 0.00
17,500.00 0.00
7,500.00 0.00
18,500.00 0.00
3,000.00 0.00
75,000.00 0.00
60,000.00 0.00
20,000.00 0.00
17,000.00 0.00
23,000.00 0.00
7,500.00 0.00
1,600.00 0.00
500.00 0.00
17,000.00 0.00
0.00
55,000.00 0.00
111,000.00 0.00
12,500.00 0.00
27,500.00 0.00
27,500.00 0.00
27,500.00 0.00
35,000.00 0.00
12,500.00 0.00
450.00 0.00
79,000.00 0.00
12,500.00 0.00
460,000.00 0.00
79,000.00 0.00
27,500.00 0.00
6,000.00 0.00
12,500.00 0.00
12,000.00 0.00
27,500.00 0.00
27,500.00 0.00
28,000.00 0.00
REKAP MATERIAL PEKERJAAN ARSITEK OFFICE
PROYEK COLD STORAGE PT. BUMI PANGAN UTAMA
TIGARAKSA - TANGERANG

Material Material Plafond

No Tanggal Semen Mortar Semen Hollow Hollow Gypsum Gypsum WR GRC Sekrup Gording Roddrat Wall Angel U Runner U klem Kain Cat Vinilex Cat Vinilex Ket.
Bata Ringan Compound Paku Ramset
Perekat Plester Acian 40x40 20x40 9 mm 9 mm 8 mm Gypsum Klip p=1m 40.00 40x40 Kasa Supra White 972 Pearly White 953A
bh zak zak zak btg btg lbr lbr lbr pcs pcs btg btg btg pcs zak roll

1 65.00 100.00 60.00


2 1600.00
3 1400.00
4 1400.00
5 1400.00
6 1400.00
7 25.00 128.00 60.00
8 1600.00
9 1600.00
10 30.00 176.00
11 30.00 176.00
12 1600.00 350.00
13 220.00
14 150.00
15 200.00
16 100.00
17 1600.00
18 200.00 100.00 42.00
19 500.00
20 160.00
21 140.00
22 300.00
23 200.00
24 600.00
25
26 200.00
27
28 300.00
29 150.00

Jumlah 13600.00 150.00 1180.00 320.00 1600.00 220.00 1250.00 42.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
REKAP MATERIAL RWT/WWTP
PROYEK COLD STORAGE PT. BUMI PANGAN UTAMA
TIGARAKSA - TANGERANG
PERIODE
Item Material

No Tanggal Kaso Balok Tripleks Tripleks Main Ledder Pipa Pipa Pipa U head 0.60 Trekstang Trekstang D Cone No. Surat Jalan
Jack Base 0.60 Ring Plat Water Stop Mounte cleam
5/7 6/12/2015 9 mm 15 mm Frame 150 Frame 0.90 1.5" x 4 m 1.5" x 3 m 1.5" x 2 m Ø12xx3x50 1/2 x 270 longdrat 12 mm
m3 btg lbr lbr pcs pcs btg btg btg pcs pcs pcs pcs pcs pcs roll (@25m) pcs

Jumlah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -900.00 0.00 0.00 -1.00 0.00

Jumlah WO 52.00 104.00 60.00 216.00 454.00 862.00 862.00 3000.00 1000.00 2600.00 100.00 -1.00 800.00
REKAP MATERIAL RWT/WWTP
PROYEK COLD STORAGE PT. BUMI PANGAN UTAMA
TIGARAKSA - TANGERANG
PERIODE
Item Material

No Tanggal Kaso Tripleks Tripleks Main Ledder Pipa Pipa Pipa U head 0.60 Trekstang Trekstang D Cone No. Surat Jalan
Jack Base 0.60 Ring Plat Water Stop Mounte cleam
5/7 9 mm 15 mm Frame 150 Frame 0.90 1.5" x 4 m 1.5" x 3 m 1.5" x 2 m Ø12xx3x50 1/2 x 270 longdrat 12 mm
m3 lbr lbr pcs pcs btg btg btg pcs pcs pcs pcs pcs pcs roll (@25m) pcs

1
1
2
3
4
5
6
7
8

Jumlah

Jumlah WO
REKAP MATERIAL SCHAFFOLDING WWTP
PROYEK COLD STORAGE PT. BUMI PANGAN UTAMA
TIGARAKSA - TANGERANG
PERIODE
Akses Kontrol/Pengecoran WWTP Support Peminggang Begisting Dinding WWTP Peminggang Begisting Dinding WWTP
WO No. 170 tgl. 27 Oktober 2015 WO No. 172 tgl. 02 November 2015 WO No. 174 tgl. 04 November 2015
No Tanggal Main Ledder Main Main Pipa Pipa Pipa Pipa Pipa No. Surat Jalan
Cross Brace 2.20 Join Pin Cat Walk Tangga 1.70 Jack Base U Head
Frame 1.70 Frame 0.90 Frame 1.90 Frame 1.70 1.5" x 2 m 1.5" x 4 m 1.5" x 3 m 1.5" x 4 m 1.5" x 6 m
pcs pcs pcs pcs pcs pcs pcs pcs btg btg btg btg btg

1 B 9104 GPA (Pak Regar)


2 B 9104 GPA (Pak Regar)
3 B 9943 DS (Pak Sumarno)
4 B 9408 BDA (pak Wawan)
5 B 9408 BDA (pak Wawan)
6 B 9104 GPA (Pak Regar)
7 B 9408 BDA (pak Wawan)
8 B 9697 VQ (Maju Jaya L)
9 B 9408 BDA (pak Wawan)
10 B 9104 GPA (Pak Regar)
11 B 9104 GPA (Pak Regar)
12 B 9104 GPA (Pak Regar)
13 B 9104 GPA (Pak Regar)
14 B 9697 VQ (Maju Jaya L)
15 B 9104 GPA (Pak Regar)
16 B 9854 BDA (Maju Jaya L)
17 B 9854 BDA (Maju Jaya L)
18 B 9697 VQ (Maju Jaya L)
19

Jumlah 0.00 0.00 0.00 0.00

Jumlah WO 324.00 486.00 648.00 174.00


Sisa 324.00 486.00 648.00 174.00
REKAP PENGAMBILAN SANITAIR & AKSESORIS
PROYEK COLD STORAGE PT. BUMI PANGAN UTAMA
TIGARAKSA - TANGERANG
PERIODE
Nama Barang
Closet Jongkok CE9 Urinoir U370M Urinoir U57M Wastafel L521V1A Aksesoris
No Tanggal Kran Sippon + Pipa Kran Sippon Kran Sippon Body Aksesoris Aksesoris Aksesoris Aksesoris Aksesoris Floor Drain Kran air 1/2" No. Surat Jalan
Type TV150NWV12 Type T60S Type T60P Type L521V1A Type TS126AR TX111LRYR THX3A-1N TX277S THX1A-5N Stainless 3" Toto Standart
pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs

Jumlah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Jumlah WO 324.00 486.00 648.00 174.00 24.00 628.00 180.00 512.00 336.00 260.00 3236.00 3236.00 250.00 330.00
Sisa 324.00 486.00 648.00 174.00 24.00 628.00 180.00 512.00 336.00 260.00 3236.00 .. 250.00 330.00
DATA PENGAMBILAN SANITAIR & AKSESORIS
PROYEK COLD STORAGE PT. BUMI PANGAN UTAMA

Jumlah Yang Mengambil


No. Tanggal Nama & Type Sanitair Area Pemasangan Sanitair Keterangan
pcs Nama Ttd.

Note : - Setiap pengambilan sanitair & aksesoris harus mendapat ijin orang kantor dan mengisi form data pengambilan
- Yang berwenang pengambilan sanitair adalah mandor/mandor wajib mengetahui

Anda mungkin juga menyukai