Anda di halaman 1dari 143

PANJANG LPA (M3)

NO STA LEBAR JALAN


m TEBAL (CM) VOLUME

1 A + 0.00 TO 17.00 17.00 3.00


2 A + 17.00 TO 49.00 32.00 3.00
3 A + 49.00 TO 95.00 46.00 3.00

TOTAL VOLUME
5 B + 0.00 0.00 62.00 62.00 2.60
6 B + 62.00 0.00 90.00 28.00 2.20

TOTAL VOLUME 0.00

185.00
VOL LAPEN
PATCHING HOTMIX
(M2)

45.90 51.00
48.00 96.00
124.20 138.00

216.02 285.00
112.84 161.20
30.80 61.60

0.00 143.64 222.80

361.74 507.80
PERHITUNGAN PENGGUNAAN ALAT BANTU
1 Pekerjaan Galian Tanah
Pengki 14,300
Singkup
Cangkul 58,000
Linggis 60,000
132,300 /40 M3

2 Pekerjaan LPA/LPB
Pengki 14,300
Singkup 59,600
Cangkul 58,000
Gacok
131,900 /60 M3

3 Pekerjaan Pasangan Batu / Tembok


Sendok Tembok -
Ember 5,000
Cangkul 58,000
Palu -
Singkup 50,000
113,000 /5 M3

4 Pekerjaan Beton
Ember 5,000
Cangkul 58,000
Singkup 50,000
113,000 /23 M3

5 Pekerjaan Bekisting
Gergaji 25,000
Palu 25,000
Golok 24,000
74,000 /100 M2

6 Pekerjaan Tulangan Beton


Gergaji Besi 6,000
Pahat 6,000
Palu 27,300
Stang Besi 20,000
59,300 /200 Kg

7 Pekerjaan Timbunan
Cangkul 58,000
Singkup 50,000
Pengki 14,300
122,300 /60 M3

8 Gorong - gorong Bus Beton


Tambang 4 M 2,000
Bambu 6,000
8,000 /8 M'
PERHITUNGAN BERAT BESI (KS) /M3

KODE Dimensi
No Jenis
STRUKTUR
P L P T
P1 PONDASI PLAT P1 0.80 1.30 1.30 0.35
Tul atas Ø 13 - 15.00
Tul atas Ø 13 - 15.00
Tul Bawah Ø 13 - 15.00
Tul Bawah Ø 13 - 15.00

P1 PONDASI PLAT P2 0.80 1.00 1.00 0.35


Tul atas Ø 13 - 15.00
Tul atas Ø 13 - 15.00
Tul Bawah Ø 13 - 15.00
Tul Bawah Ø 13 - 15.00

P1 PONDASI PLAT P3 0.80 0.80 0.80 0.35


Tul. Pokok Ø 13 - 15.00
Tul. Pokok Ø 13 - 15.00
- Ø 13 - 15.00
- Ø 13 - 15.00

KOLOM K1 0.13 0.50


Tul. Pokok 10.00 Ø 13.00
Sengkang Ø 8.00

KOLOM K2 0.13 0.35


Tul. Pokok 6.00 Ø 13.00
Sengkang Ø 8.00

KOLOM K3 0.13 0.25


Tul. Pokok 6.00 Ø 13.00
Sengkang Ø 8.00

SLOOF 15/20 0.15 0.20


Tul. Pokok 4.00 Ø 12.00
Sengkang Ø 8.00

KOLOM PRAKTIS 0.13 0.13


KP Tul. Pokok 4.00 Ø 12.00
Sengkang Ø 8.00

BALOK LINTEL 0.12 0.15


Tul. Pokok 4.00 Ø 10.00
Sengkang Ø 8.00

BALOK 15/30 0.15 0.30


Tul. Pokok 6.00 Ø 12.00
Sengkang Ø 8.00

BALOK 15/25 0.15 0.25


Tul. Pokok 4.00 Ø 13.00
Sengkang Ø 8.00

PLAT LANTAI 1 1.50 0.10


Tul. Pokok Ø 8 - 15.00
Tul. Pokok Ø 8 - 15.00

PLAT BETON T = 12 1.00 0.10


Tul. Pokok Ø 10 - 15.00
Tul. Pokok Ø 10 - 15.00

BALOK 15/20 0.15 0.20


Tul. Pokok 5.00 Ø 12.00
Sengkang Ø 8.00

PONDASI PLAT P2
P2 Tul atas Ø 12.0 - 15.00 0.8 0.80 0.80 0.25
Tul atas Ø 12.0 - 15.00
Tul Bawah Ø 12.0 - 15.00
Tul Bawah Ø 12.0 - 15.00

PONDASI PLAT TANGGA


Tul atas Ø 12.0 - 15.00 1.00 0.80 0.20
Tul atas Ø 12.0 - 15.00
Tul Bawah Ø 12.0 - 15.00
Tul Bawah Ø 12.0 - 15.00

BALOK 20/30 0.30 0.20


S1 Tul. Pokok 4.00 Ø 10.00
Sengkang Ø 8.00

BALOK CROSSING 20/20 0.20 0.20


S1 Tul. Pokok 4.00 Ø 10.00
Sengkang Ø 10.00

SLOOF S2 0.15 0.20


Tul. Pokok 4.00 Ø 12.00
Sengkang Ø 8.00

KOLOM PRAKTIS 0.15 0.15


KP Tul. Pokok 4.00 Ø 8.00
Sengkang Ø 8.00

KOLOM 0.16 0.16


Tul. Pokok 4.00 Ø 10.00
Sengkang Ø 8.00

KOLOM KS 0.25 0.25


Tul. Pokok 4.00 Ø 13.00
Tul. Pokok 2.00 Ø 10.00
Sengkang Ø 8.00

KOLOM KS2 0.20 0.20


Tul. Pokok 4.00 Ø 12.00
Tul. Pokok Ø 10.00
Sengkang Ø 8.00

KOLOM K1 0.25 0.35


Tul. Pokok 6.00 Ø 16.00
Tul. Pokok 2.00 Ø 12.00
Sengkang Ø 8.00

KOLOM K2
Tul. Pokok 4.00 Ø 12.00 0.20 0.25
Tul. Pokok 2.00 Ø 10.00
Sengkang Ø 8.00

RING BALK 0.12 0.20


Tul. Pokok 4.00 Ø 12.00
Sengkang Ø 8.00

BALOK B1 (25/50) 0.25 0.50


Tul. Pokok 7.00 Ø 16.00
Tul. Pokok 2.00 Ø 12.00
Sengkang Ø 8.00 - 15.00

BALOK B1 (25/60) 0.25 0.60


Tul. Pokok 6.00 Ø 12.00
Tul. Pokok 2.00 Ø 12.00
Sengkang Ø 8.00 - 15.00

BALOK (25/35) 0.25 0.35


Tul. Pokok 5.00 Ø 13.00
Sengkang Ø 10.00
Ø 8.00 - 15.00

BALOK (45/95) 0.45 0.95


Tul. Pokok 3.00 D 22.00
4.00 D 13.00
Sengkang 7.00 D 22.00
Sengkang 20.00 D 8.00
Ø 8.00 - 15.00
Ø 10.00 - 15.00

1.00 0.12
Tul. Pokok Ø 8 - 17.50
Tul. Pokok Ø 8 - 17.50

PLAT CROSSING 1.00 0.15


Tul. Pokok Ø 12 - 10.00
Tul. Pokok Ø 10 - 10.00

PLAT DAK 1.00 0.25


Tul. Pokok Ø 16 - 15.00
Tul. Pokok Ø 12 - 20.00

PLAT LANTAI 1 1.00 0.08


Tul. Pokok Ø 8 - 20.00
Tul. Pokok Ø 8 - 20.00

PLAT LANTAI 1 1.00 0.10


Tul. Pokok Ø 8 - 20.00
Tul. Pokok Ø 8 - 20.00

PLAT BETON T = 7 1.00 0.07


Ø 10 - 10.00
Ø 10 - 10.00

PLAT BETON T = 7 1.00 0.07


Ø 10 - 10.00
Ø 8 - 10.00

PLAT BETON T = 8 1.00 0.08


Tul. Pokok Ø 10 - 13.00
Tul. Pokok Ø 10 - 13.00

PLAT BETON T = 12 1.00 0.12


Tul. Pokok Ø 10 - 15.00
Tul. Pokok Ø 10 - 15.00

PLAT BETON T = 15 1.30 0.15


Ø 12 - 15.00
Ø 12 - 15.00
364 8 1.1314286 9.051428571 2.4866562

Luas Selimut Jarak Jmh Pjng Berat Bsi Jmh/


Penampang Beton Sengkang Sengkang Sekng/Bh Tul. Pjng
M2 ./ M3 ( Bh ) .+ Hak Kg/M' M3
1.690
0.040 0.150 8.667 1.920 1.042 16.640
0.040 0.150 8.667 1.810 1.042 15.687
0.040 0.150 8.667 1.920 1.042 16.640
0.040 0.150 8.667 1.810 1.042 15.687

1.000
0.040 0.150 6.667 1.620 1.042 10.800
0.040 0.150 6.667 1.510 1.042 10.067
0.040 0.150 6.667 1.620 1.042 10.800
0.040 0.150 6.667 1.510 1.042 10.067

0.640
0.040 0.150 5.333 1.420 1.042 7.573
0.040 0.150 5.333 1.310 1.042 6.987
0.040 0.150 5.333 1.420 1.042 7.573
0.040 0.150 5.333 1.310 1.042 6.987

0.065
1.042 153.846
0.020 0.150 103.564 1.150 0.395 119.099

0.046
1.042 131.868
0.020 0.150 147.520 0.850 0.395 125.392

0.033
1.042 184.615
0.020 0.150 206.128 0.650 0.395 133.983

0.030
0.888 133.333
0.020 0.200 167.667 0.590 0.395 98.923

0.017
0.888 236.686
0.020 0.150 395.477 0.410 0.395 162.146

0.018
0.617 222.222
0.020 0.150 371.370 0.430 0.395 159.689

0.045
0.888 133.333
0.020 0.150 149.148 0.790 0.395 117.827

0.038
1.042 106.667
0.020 0.150 178.778 0.690 0.395 123.357

0.150
0.020 0.150 7.667 3.090 0.395 23.690
0.020 0.150 7.667 3.090 0.395 23.690

0.100
0.030 0.150 7.667 1.030 0.617 7.897
0.030 0.150 7.667 1.030 0.617 7.897

0.030
0.888 166.667
0.020 0.150 223.222 0.590 0.395 131.701

0.200 0.040 0.150 7.000 1.220 0.888 8.540


0.040 0.150 7.000 1.220 0.888 8.540
0.040 0.150 7.000 1.220 0.888 8.540
0.040 0.150 7.000 1.220 0.888 8.540

0.250 0.040 0.150 7.000 1.320 0.888 9.240


0.040 0.150 7.000 1.120 0.888 9.240
0.040 0.150 7.000 1.320 0.888 9.240
0.040 0.150 7.000 1.120 0.888 9.240

0.060
0.617 66.667
0.020 0.150 112.111 0.890 0.395 99.779

0.040
0.617 100.000
0.030 0.200 126.000 0.610 0.617 76.860

0.030
0.888 133.333
0.020 0.200 167.667 0.590 0.395 98.923

0.023
0.395 177.778
0.015 0.150 297.296 0.530 0.395 157.567

0.026
0.617 156.250
0.030 0.150 261.417 0.450 0.395 117.638

0.063
1.042 64.000
0.617 32.000
0.040 0.150 107.667 0.730 0.395 78.597

0.040
0.888 100.000
0.617 -
0.040 0.150 167.667 0.530 0.395 88.863

0.088
1.578 68.571
0.888 22.857
0.040 0.150 77.190 0.930 0.395 71.787

0.050
0.888 80.000
0.617 40.000
0.040 0.150 134.333 0.630 0.395 84.630

0.024
0.888 166.667
0.020 0.150 278.778 0.530 0.395 147.752

0.125
1.578 56.000
0.888 16.000
0.040 0.175 46.714 1.230 0.395 57.459

0.150
0.888 40.000
0.888 13.333
0.020 0.150 45.444 1.590 0.395 72.257

0.088
1.042 62.857
0.040 0.617 -
0.175 66.31 1.250 0.395 82.883

0.612
0.030 2.984 4.906
0.030 1.042 6.541
0.030 2.984 11.447
0.030 0.395 32.706
0.030 0.150 11.90 2.610 0.395 31.065
0.030 0.150 11.90 3.751 0.617 44.640

0.120
0.040 0.175 6.714 1.970 0.395 13.227
0.040 0.175 6.714 1.970 0.395 13.227

0.150
0.040 0.100 11.000 2.030 0.888 22.330
0.040 0.100 11.000 2.030 0.617 22.330

0.250
0.040 0.150 7.667 2.230 1.578 17.097
0.040 0.200 6.000 2.230 0.888 13.380

0.080
0.040 0.200 6.000 1.890 0.395 11.340
0.040 0.200 6.000 1.890 0.395 11.340

0.100
- 0.200 6.000 2.250 0.395 13.500
- 0.200 6.000 2.250 0.395 13.500

0.070
0.020 0.100 11.000 1.040 0.617 11.440
0.020 0.100 11.000 1.040 0.617 11.440

0.070
0.020 0.100 11.000 1.040 0.617 11.440
0.020 0.100 11.000 1.040 0.395 11.440

0.080
0.020 0.130 8.692 1.050 0.617 9.127
0.020 0.130 8.692 1.050 0.617 9.127

0.120
0.020 0.150 7.667 1.090 0.617 8.357
0.020 0.150 7.667 1.090 0.617 8.357

0.195
0.015 0.150 7.667 2.830 0.888 21.697
0.015 0.150 7.667 1.440 0.888 11.040

pc 002
w05_56
clear

D KG/m KG/lente
8 0.395 4.73
10 0.617 7.40
12 0.888 10.65
13 1.042 12.50
Berat Pjng Berat Luas
BESI Beton/M3 Besi/M3 Bekisting
Kg M' Kg /M3

17.337 0.592 113.882 2.198


16.344
17.337
16.344
67.361

11.252 0.350 124.232 2.857


10.488
11.252
10.488
43.481

7.891 0.224 135.445 3.571


7.279
7.891
7.279
30.340

160.290 15.385 211.427 19.385


46.992
207.282

137.391 21.978 190.603 21.099


49.475
186.866

192.348 30.769 250.117 23.385


52.864
245.212

118.368 33.333 160.547 13.333 295.31


39.031
157.399

210.121 59.172 279.579 15.385


63.976
274.097
137.000 55.556 204.007 16.667
63.007
200.007

118.368 22.222 168.155 13.333


46.490
164.858

111.134 26.667 163.002 13.333


48.672
159.806

9.347 6.667 124.628 8.300


9.347
18.694

4.868 10.000 97.366 12.200


4.868
9.737

147.960 33.333 203.922 13.333


51.964
199.924

7.581 0.160 189.537 5.000


7.581
7.581
7.581
30.326

8.203 0.160 205.073 5.625


8.203
8.203
8.203
32.812

41.100 16.667 82.078 3.333 295.31


39.369
80.469

61.650 25.000 111.215 5.000 295.31


47.384
109.034

118.368 33.333 160.547 13.333 295.31


39.031
157.399

70.144 44.444 134.960 13.333


62.170
132.314

96.328 39.063 145.598 25.000


46.415
142.743

66.681 16.000 119.768 16.000


19.728
31.011
117.420

88.776 25.000 126.315 20.000


-
35.062
123.838

108.222 11.429 159.975 13.714


20.292
28.324
156.838

71.021 20.000 131.654 18.000


24.660
33.392
129.072

147.960 41.667 210.382 16.667


58.297
206.257

88.381 8.000 127.762 8.080


14.204
22.671
125.256

35.510 6.667 77.374 8.067


11.837
28.510
75.857
65.490 11.429 133.599 8.114
-
65.490

14.639 1.635 68.524 3.451


6.815
34.157
12.905
12.257
27.521
108.293

5.219 8.333 86.982 10.573


5.219
10.438
130.980

19.824 6.667 223.934 8.967


13.766
33.590
67.180

26.983 4.000 155.443 6.500


11.878
38.861

4.474 12.500 111.858 14.660


4.474
8.949

5.327 10.000 106.531 12.200


5.327
10.653

7.053 14.286 201.507 16.426


7.053
14.106

7.053 14.286 165.236 16.426


4.514
11.567

5.627 12.500 140.669 2.160


5.627
11.253

5.152 8.333 85.865 2.240


5.152
10.304

19.261 5.128 149.037 7.057


9.801
29.062

Rp/rencana Rp/pendi pendi galuh


52,082 35,250 7,445 37,000 7,814.61 369.61
81,378 55,500 7,502 57,000 7,704.79 202.76
117,184 80,250 7,533 78,000 7,321.80 (211.21)
137,529 93,750 7,498 95,192 7,613.73 115.30

8,062,500 22,841.20
7,613.73
DAFTAR HARGA UPAH
KOTA TASIKMALAYA
TAHUN 2019

No JENIS TENAGA KERJA SATUAN

1 Pekerja HOK
3 Pekerja ( terampil) HOK
4 Tukang Gali HOK
5 Tukang Batu ( terampil) HOK
6 Kepala Tukang Batu HOK
7 Tukang Kayu ( terampil) HOK
8 Kepala Tukang Kayu HOK
9 Tukang Cat / Plitur ( terampil) HOK
10 Kepala Tukang Cat / Plitur HOK
11 Tukang Besi Beton ( terampil) HOK
12 Kepala Tukang Besi Beton HOK
13 Tukang Besi Frofil ( terampil) HOK
14 Kepala Tukang Besi Frofil HOK
15 Mandor HOK
16 Operator Alat Besar HOK
17 Pembantu Operator / Mekanik HOK
18 Supir Truk HOK
19 Kenek Truk / Pembantu Supir Truk HOK
20 Penjaga Malam HOK
DAFTAR HARGA BAHAN
KOTA TASIKMALAYA
TAHUN 2019

No JENIS BAHAN BANGUNAN SATUAN

A. AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA


1 Abu Batu m3
2 Tanah Urug m3
4 Sirtu ( tersaring bergradasi ) m3
5 Pasir Urug /Bawah lantai m3
6 Pasir Pasang /gunung pilihan m3
7 Pasir Beton m3
8 Batu Belah m3
8 Batu Pecah ( tersaring bergradasi ) m3
9 Batu Pecah 0,5/1 ( Screen ) m3
10 Batu Pecah 1/2 m3
11 Batu Pecah 2/3 m3
12 Batu Pecah 3/5 m3
13 Batu Pecah 5/7 m3
16 Paving Block Natural 6 cm ( Setempat ) m2
18 Semen Portland ( PC ) /50 Kg (H) Zak

B. BAHAN PENGIKAT KONSTRUKSI JALAN


1 Aspal Bitumen Kg
2 Minyak Tanah liter
3 Kayu Bakar m3

B. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton (ukuran rata rata) Kg
2 Besi Profil Kg
3 Kawat Beton Kg

D. BAHAN PERPIPAAN
1 Pipa PVC Ø 2 1/2" ( Setara Rucika ) btg
2 Pipa PVC Ø 8" Type aw btg
3 Sambungan Pipa PVC Ø 8" bh
4 Knee Pipa PVC Ø 8" bh
E. BAHAN KAYU BERIKUT BAHAN JADINYA
1 Bambu Diameter 5 s/d 7 cm btg
2 Kayu Balok/Papan /Kayu Gunung Klas III ( Albasia )* m3
DAFTAR HARGA UPAH
KOTA TASIKMALAYA
TAHUN 2019

HARGA
(Rp)

75,000
75,000
85,000
85,000
95,000
85,000
95,000
85,000
95,000
85,000
95,000
85,000
95,000
95,000
95,000
75,000
85,000
75,000
75,000
DAFTAR HARGA BAHAN
KOTA TASIKMALAYA
TAHUN 2019

HARGA
(Rp)

185,000
50,000
90,000
80,000
120,000
190,000
120,000
140,000
190,000
240,000
230,000
220,000
210,000
75,000
63,000

11,161
12,000
150,000

11,500
13,000
17,500

140,000
750,000
35,000
75,000

7,000
1,800,000
DIREKTORAT JENDRAL BINA MARGA ANALI SA B IAYA PE K E R JA
DIREKTORAT BINA PROGRAM 1 M2 LAPIS PONDASI BAWAH ( LPB ) KONSTR
SUB. DIT. PERENCANAAN JALAN LOKA L
KOTA
KOTA KODE
PROPINSI : TASIKMALAYA ( )
JAWA BARAT
ANGGAPAN :
PROSES : 1. menggunakan tenaga orang 400 m2 per hari
1. Material disiapkan dilokasi pekerjaan oleh pemasok 2. material dikirim ke lokasi pekerjaan oleh supplier
2. Menghampar pasir setebal 5 cm 3. material sudah dipecahkan / batu pecah
3. Batu pecah berukuran besar ( 10-15 cm ) 4. Tanah dasar / sub grade sudah dipersiapkan
4. Batu pecah yang lebih kecil mengisi rongga diatas 5. Dipadatkan sampai tebal 20 cm
nya, kemudian digilas dengan mesin gilas

PEKERJA Vol Hari Total Vol


( Org/hr )

P Mandor 3.00 1.00 3.00


E Pembantu Operator 1.00 1.00 1.00
K Buruh tak Terlatih 99.00 1.00 99.00
E
R
J
A

MATERIAL Jumlah Satuan Total Vol

Batu pecah ( 10 - 15 ) 50.00 m3 50.00


M Batu pecah ( 5-7 ) 20.00 m3 20.00
A pasir 30.00 m3 30.00
T Alat Bantu 4.00 set 4.00
E
R
I
A
L

Hari Jam
PERALATAN Jumlah Kerja Kerja

P Roller 3 Wheel 8 - 10 ton/Tendem Roller 1.00 1.00 5.00


E
R
A
L
A
T
A
N

VOLUME/ QUANTITY 400


SATUAN M3

67,886.23

DIREKTORAT JENDRAL BINA MARGA ANALISA HARGA SATUAN


DIREKTORAT BINA PROGRAM 1 M3 LAPIS PONDASI ATAS KLAS A AGREGAT PECAH TERSAR
SUB. DIT. PERENCANAAN JALAN LOKAL
KOTA
KOTA KODE
PROPINSI : TASIKMALAYA
JAWA BARAT
ANGGAPAN :
PROSES : 1. Menggunakan Tenaga manusia , ( 60 M3/hari)
ANALI SA B IAYA P E K E R JAAN
1 M2 LAPIS PONDASI BAWAH ( LPB ) KONSTRUKSI TELFORD KODE
K.516

DI SIAPKAN OLEH : TANGGAL :


DINAS PERAWASKIM KOTA TASIKMALAYA Friday, March 15, 2019

1. menggunakan tenaga orang 400 m2 per hari


2. material dikirim ke lokasi pekerjaan oleh supplier
3. material sudah dipecahkan / batu pecah
4. Tanah dasar / sub grade sudah dipersiapkan

Upah Biaya Sub Total


(Rp/Hr/Org) ( Rp.) ( Rp.)

95,000.00 285,000.00
75,000.00 75,000.00
75,000.00 7,425,000.00

PEKERJA 7,785,000.00
HARGA BIAYA SUB. TOTAL
SATUAN ( Rp.) ( Rp.)
( Rp. / Unit )

150,000.00 7,500,000.00
210,000.00 4,200,000.00
120,000.00 3,600,000.00
131,900.00 527,600.00

MATERIAL 15,827,600.00
Harga Biaya Sub Total
(RP/Jam) ( Rp.) ( Rp.)

- -

PERALATAN -
Total Rp. 23,612,600.00
Keuntungan mak 3,541,890.00
Total Rp. 27,154,490.00

Per M2

ANALISA HARGA SATUAN


S PONDASI ATAS KLAS A AGREGAT PECAH TERSARING ( MENGGUNAKAN BURUH ) KODE
K.521

DISIAPKAN OLEH : TANGGAL :


DINAS PERAWASKIM KOTA TASIKMALAYA Friday, March 15, 2019

1. Menggunakan Tenaga manusia , ( 60 M3/hari)


Nama Pekerjaan : Peningkatan Jalan Lingkungan Wilayah Kota Tasikmalaya
Jenis Bahan : Lapis Tipis Aspal Beton (HRS-WC)
Satuan Pembayaran : Ton URAIAN ANALISA HARGA SATU

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.0 KM
5 Tebal Lapis (HRS-WC) padat t 0.03 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran AC-WC :
- Agregat Kasar (10 - 20 mm) CA 42.15 %
- Agregat Sedang (1 - 10 mm) FA 44.45 %
- Agregat Halus (0 - 5 mm) FF 6.60 %
- Aspal As 6.80 %
9 Berat jenis bahan :
- HRS-WC D1 2.225 ton / M3
- Agregat Kasar (10 - 20 mm) D2 1.25 ton / M3
- Agregat Sedang (1 - 10 mm) D3 1.35 ton / M3
- Agregat Halus (0 - 5 mm) D4 1.45 ton / M3
- Aspal D5 1.029 ton / M3

II. URUTAN KERJA

1 Agregat dan Asphalt diakut ke penggorengan


2 Agregat dan aspal dicampur dan dipanaskan dengan
manual dimuat langsung kedalam Roda Dorong
dan diangkut ke lokasi pekerjaan.
3 Campuran panas AC dihampar dengan manual dan
dipadatkan dengan Tandem Roller.
4 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparaan dengan menggunakan Alat
Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Agregat Kasar = (CA x (D1 x Fh1)) : D2 (A01) 0.8253 M3
1.b. Agregat Sedang = (FA x (D1 x Fh1)) : D3 (A02) 0.8059 M3
1.c. Agregat Halus = (FF x( D1 x Fh1)) : D4 (A03) 0.1114 M3
1.d. Aspal = AS x D4 x Fh2 x 1000 (A04) 73.471 Kg

2. ALAT
2.a. Pencampuran Aspal Manual (B02)
Kapasitas produksi V 3.0 ton / Jam
Faktor Efisiensi alat Fa 0.83 -

Kap.Prod. / jam = V x Fa Q2 1.12 Ton


D1
Koefisien Alat/ton = 1 : Q2 (B02) 0.8936 Jam

2.b. TANDEM ROLLER (B06)


Kecepatan rata-rata alat v 2.50 Km / Jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 4.00 lintasan
Faktor Efisiensi alat Fa 0.83 -
Nama Pekerjaan : Peningkatan Jalan Lingkungan Wilayah Kota Tasikmalaya
Jenis Bahan : Lapis Tipis Aspal Beton (HRS-WC)
Satuan Pembayaran : Ton URAIAN ANALISA HARGA SATU

No. URAIAN KODE KOEF. SATUAN

Kap. Prod. / jam = v x 1000 x b x t x Fa Q6 18.68 Ton


n
Koefisien Alat/ton = 1 : Q6 (B06) 0.0535 Jam

2.c. ALAT BANTU


- Rambu = 2 buah
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
- Tongkat Kontrol ketebalan hanparan

3. TENAGA
Produksi menentukan : Pencampuran Aspal Manual Q2 1.12 Ton / Jam
Produksi HRS-WC / hari = Tk x Q2 Qt 7.83 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / ton :


- Pekerja = (Tk x P) / Qt (C01) 8.9357 Jam
- Mandor = (Tk x M) / Qt (C02) 0.8936 Jam
URAIAN ANALISA HARGA SATUAN

KETERANGAN

Gradasi harus -
memenuhi -
Spesifikasi
Berlanjut ke hal. berikut.

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Lump Sum

Berlanjut ke hal. berikut.


FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA PEKERJAAN : 0
PROP / KAB / KOTA : TASIKMALAYA
TAHUN : 2018

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Jam 8.9357 10,714.29


2. Mandor Jam 0.8936 13,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1. Agregat Kasar M3 0.8253 240,000.00


2. Agregat Sedang M3 0.8059 190,000.00
3 Agregat Halus M3 0.1114 185,000.00
4 Aspal Kg 73.4706 11,161.29

JUMLAH HARGA BAHAN

C. PERALATAN

1 Penggorengan Manual Jam 0.8936 7,142.86


2 Tandem Roller Jam 0.0535 251,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
AN.01

FORMULIR STANDAR UNTUK


MAN ANALISA MASING-MASING HARGA SATUAN

JUMLAH
HARGA
(Rp.)

95,740.10
12,127.08

107,867.18

198,071.28
153,113.79
20,609.64
820,026.70

1,191,821.40

6,382.67
13,440.43

19,823.10

1,319,511.69
197,926.75
1,517,438.44
ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2019

KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)

PEKERJAAN PERSIAPAN
A.2.2.1.9 1 M2 PEKERJAAN MEMBERSIHKAN LAPANGAN DAN PERATAAN
A. TENAGA
Pekerja 0.1000 OH 75,000.00 7,500.00
Mandor 0.0500 OH 95,000.00 4,750.00
Jumlah Harga Tenaga, Bahan dan Peralatan 12,250.00
Overhead + Profit 15.0000 % 1,837.50
Harga Satuan Pekerjaan 14,087.50
A.2.2.1.12 1 M2 PEMBUATAN JALAN SEMENTARA
A. TENAGA
Pekerja 1.0000 OH 75,000.00 75,000.00
Mandor 0.0500 OH 95,000.00 4,750.00
B. BAHAN
Batu belah 15/20 0.1500 m3 120,000.00 18,000.00
Batu Pecah 5/7 0.0900 m3 210,000.00 18,900.00
Pasir pasang 1.0100 m3 120,000.00 121,200.00
Jumlah Harga Tenaga, Bahan dan Peralatan 237,850.00
Overhead + Profit 15.0000 % 35,677.50
Harga Satuan Pekerjaan 273,527.50
A.2.2.1.13 1 M3 BONGKARAN BETON BERTULANG
A. TENAGA
Pekerja 13.3340 OH 75,000.00 1,000,050.00
Mandor 0.6660 OH 95,000.00 63,270.00
Jumlah Harga Tenaga, Bahan dan Peralatan 1,063,320.00
Overhead + Profit 15.0000 % 159,498.00
Harga Satuan Pekerjaan 1,222,818.00
PEKERJAAN TANAH
A.2.3.1.1. PENGGALIAN 1M3 TANAH BIASA SEDALAM 1 M'
A. TENAGA
Pekerja 0.7500 OH 75,000.00 56,250.00
Mandor 0.0250 OH 95,000.00 2,375.00
Jumlah Harga Tenaga, Bahan dan Peralatan 58,625.00
Overhead + Profit 15.0000 % 8,793.75
Harga Satuan Pekerjaan 67,418.75
A.2.3.1.2. PENGGALIAN 1M3 TANAH BIASA SEDALAM 2 M'
A. TENAGA
Pekerja 0.9000 OH 75,000.00 67,500.00
Mandor 0.0450 OH 95,000.00 4,275.00
Jumlah Harga Tenaga, Bahan dan Peralatan 71,775.00
Overhead + Profit 15.0000 % 10,766.25
Harga Satuan Pekerjaan 82,541.25
A.2.3.1.3. PENGGALIAN 1M3 TANAH BIASA SEDALAM 3 M'
A. TENAGA
Pekerja 1.0500 OH 75,000.00 78,750.00
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Mandor 0.0670 OH 95,000.00 6,365.00
Jumlah Harga Tenaga, Bahan dan Peralatan 85,115.00
Overhead + Profit 15.0000 % 12,767.25
Harga Satuan Pekerjaan 97,882.25
A.2.3.1.4. PENGGALIAN 1M3 TANAH KERAS SEDALAM 1 M'
A. TENAGA
Pekerja 1.0000 OH 75,000.00 75,000.00
Mandor 0.0320 OH 95,000.00 3,040.00
Jumlah Harga Tenaga, Bahan dan Peralatan 78,040.00
Overhead + Profit 15.0000 % 11,706.00
Harga Satuan Pekerjaan 89,746.00
A.2.3.1.5. PENGGALIAN 1M3 TANAH CADAS SEDALAM 1 M'
A. TENAGA
Pekerja 1.5000 OH 75,000.00 112,500.00
Mandor 0.0600 OH 95,000.00 5,700.00
Jumlah Harga Tenaga, Bahan dan Peralatan 118,200.00
Overhead + Profit 15.0000 % 17,730.00
Harga Satuan Pekerjaan 135,930.00
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
A.2.3.1.6. PENGGALIAN 1M3 TANAH LUMPUR SEDALAM 1 M'
A. TENAGA
Pekerja 1.2000 OH 75,000.00 90,000.00
Mandor 0.0450 OH 95,000.00 4,275.00
Jumlah Harga Tenaga, Bahan dan Peralatan 94,275.00
Overhead + Profit 15.0000 % 14,141.25
Harga Satuan Pekerjaan 108,416.25
A.2.3.1.7. MENGERJAKAN 1M2 STRIPPING TEBING SETINGGI 1 M
A. TENAGA
Pekerja 0.0500 OH 75,000.00 3,750.00
Mandor 0.0050 OH 95,000.00 475.00
Jumlah Harga Tenaga, Bahan dan Peralatan 4,225.00
Overhead + Profit 15.0000 % 633.75
Harga Satuan Pekerjaan 4,858.75
A.2.3.1.8. PEMBUANGAN 1 M3 TANAH SEJAUH 30 M
A. TENAGA
Pekerja 0.3300 OH 75,000.00 24,750.00
Mandor 0.0100 OH 95,000.00 950.00
Jumlah Harga Tenaga, Bahan dan Peralatan 25,700.00
Overhead + Profit 15.0000 % 3,855.00
Harga Satuan Pekerjaan 29,555.00
A.2.3.1.8.1 1 M3 PEMBUANGAN TANAH SEJAUH 100 METER
Pekerja 0.6000 HOK 75,000.00 45,000.00
Mandor 0.0300 HOK 95,000.00 2,850.00
Jumlah Harga Tenaga, Bahan dan Peralatan 47,850.00
Overhead + Profit 15.0000 % 7,177.50
Harga Satuan Pekerjaan 55,027.50
A.2.3.1.9. PENGURUGAN KEMBALI 1 M3 GALIAN
A. TENAGA
Pekerja 0.5000 OH 75,000.00 37,500.00
Mandor 0.0500 OH 95,000.00 4,750.00
Jumlah Harga Tenaga, Bahan dan Peralatan 42,250.00
Overhead + Profit 15.0000 % 6,337.50
Harga Satuan Pekerjaan 48,587.50
A.2.3.1.10. PEMADATAN TANAH 1 M3 TANAH (PER 20 CM)
A. TENAGA
Pekerja 0.5000 OH 75,000.00 37,500.00
Mandor 0.0500 OH 95,000.00 4,750.00
Jumlah Harga Tenaga, Bahan dan Peralatan 42,250.00
Overhead + Profit 15.0000 % 6,337.50
Harga Satuan Pekerjaan 48,587.50
A.2.3.1.11. PENGURUGAN 1 M3 PASIR URUG
A. TENAGA
Pekerja 0.3000 OH 75,000.00 22,500.00
Mandor 0.0100 OH 95,000.00 950.00
B. BAHAN
Pasir Urug 1.2000 OH 80,000.00 96,000.00
Jumlah Harga Tenaga, Bahan dan Peralatan 119,450.00
Overhead + Profit 15.0000 % 17,917.50
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Harga Satuan Pekerjaan 137,367.50
A.2.3.1.14. PENGURUGAN 1M3 SIRTU PADAT
A. TENAGA
Pekerja 0.2500 OH 75,000.00 18,750.00
Mandor 0.0250 OH 95,000.00 2,375.00
B. BAHAN
Sirtu 1.2000 kg 90,000.00 108,000.00
Jumlah Harga Tenaga, Bahan dan Peralatan 129,125.00
Overhead + Profit 15.0000 % 19,368.75
Harga Satuan Pekerjaan 148,493.75
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
PEKERJAAN PONDASI
A.3.2.1.1. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 3 PP
A. TENAGA
Pekerja 1.5000 OH 75,000.00 112,500.00
Tukang Batu 0.7500 OH 85,000.00 63,750.00
Kepala Tukang 0.0750 OH 95,000.00 7,125.00
Mandor 0.0750 OH 95,000.00 7,125.00
B. BAHAN
Batu Belah 15/20 cm 1.2000 m3 120,000.00 144,000.00
Semen PC Type 1 202.0000 kg 1,260.00 254,520.00
Pasir Pasang 0.4850 m3 120,000.00 58,200.00
Jumlah Harga Tenaga, Bahan dan Peralatan 647,220.00
Overhead + Profit 15.0000 % 97,083.00
Harga Satuan Pekerjaan 744,303.00
A.3.2.1.2. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 4 PP
A. TENAGA
Pekerja 1.5000 HOK 75,000.00 112,500.00
Tukang batu 0.7500 HOK 85,000.00 63,750.00
Kepala tukang 0.0750 HOK 95,000.00 7,125.00
Mandor 0.0750 HOK 95,000.00 7,125.00
B. BAHAN
Batu belah 15/20 cm 1.2000 m3 120,000.00 144,000.00
Semen Portland 163.0000 Kg 1,260.00 205,380.00
Pasir pasang 0.5200 m3 120,000.00 62,400.00
Jumlah Harga Tenaga, Bahan dan Peralatan 602,280.00
Overhead + Profit 15.0000 % 90,342.00
Harga Satuan Pekerjaan 692,622.00
A.3.2.1.2.1 PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 4 PP
A. TENAGA
Pekerja 1.5000 HOK 75,000.00 112,500.00
Tukang batu 0.7500 HOK 85,000.00 63,750.00
Kepala tukang 0.0750 HOK 95,000.00 7,125.00
Mandor 0.0750 HOK 95,000.00 7,125.00
B. BAHAN
Batu belah 15/20 cm 1.2000 m3 120,000.00 144,000.00
Semen Portland 163.0000 Kg 1,260.00 205,380.00
Pasir beton 0.5200 m3 190,000.00 98,800.00
Jumlah Harga Tenaga, Bahan dan Peralatan 638,680.00
Overhead + Profit 15.0000 % 95,802.00
Harga Satuan Pekerjaan 734,482.00
PEKERJAAN BETON
D.I. PEMBUATAN CAMPURAN BETON
D.02 1 M3 BETON 1 PC : 2 PB : 3KR MANUAL
A. TENAGA
Pekerja 1.6500 HOK 75,000.00 123,750.00
Tukang batu 0.2750 HOK 85,000.00 23,375.00
Kepala tukang 0.0280 HOK 95,000.00 2,660.00
Mandor 0.0830 HOK 95,000.00 7,885.00
B. BAHAN
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Semen portland 232.0000 kg 1,260.00 292,320.00
Pasir beton 0.5200 m3 190,000.00 98,800.00
Koral beton 0.7800 m3 230,000.00 179,400.00
Air 215.0000 L 50.00 10,750.00
Jumlah Harga Tenaga, Bahan dan Peralatan 738,940.00
Overhead + Profit 15.0000 % 110,841.00
Harga Satuan Pekerjaan 849,781.00
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
D-03 1 M3 BETON 1 PC : 2 PB : 3 KR MOLEN
A. TENAGA
Pekerja 1.3200 HOK 75,000.00 99,000.00
Tukang batu 0.2050 HOK 85,000.00 17,425.00
Kepala tukang 0.0200 HOK 95,000.00 1,900.00
Mandor 0.0600 HOK 95,000.00 5,700.00
B. BAHAN
Semen portland 232.0000 kg 1,260.00 292,320.00
Pasir beton 0.5200 m3 190,000.00 98,800.00
Koral beton 0.7800 m3 230,000.00 179,400.00
Air 215.0000 L 50.00 10,750.00
C. PERALATAN
Molen 0,35 m3 0.2000 hari 300,000.00 60,000.00
Jumlah Harga Tenaga, Bahan dan Peralatan 765,295.00
Overhead + Profit 15.0000 % 114,794.25
Harga Satuan Pekerjaan 880,089.25
D-04 1 M3 BETON 1 PC : 3 PB : 5 KR MANUAL
A. TENAGA
Pekerja 1.6500 HOK 75,000.00 123,750.00
Tukang batu 0.2750 HOK 85,000.00 23,375.00
Kepala tukang 0.0280 HOK 95,000.00 2,660.00
Mandor 0.0830 HOK 95,000.00 7,885.00
B. BAHAN
Semen portland 218.0000 kg 1,260.00 274,680.00
Pasir beton 0.5200 m3 190,000.00 98,800.00
Koral beton 0.8700 m3 230,000.00 200,100.00
Air 215.0000 L 50.00 10,750.00
Jumlah Harga Tenaga, Bahan dan Peralatan 742,000.00
Overhead + Profit 15.0000 % 111,300.00
Harga Satuan Pekerjaan 853,300.00
D-05 1 M3 BETON 1 PC : 3 PB : 5 KR MOLEN
A. TENAGA
Pekerja 1.3200 HOK 75,000.00 99,000.00
Tukang batu 0.2050 HOK 85,000.00 17,425.00
Kepala tukang 0.0200 HOK 95,000.00 1,900.00
Mandor 0.0600 HOK 95,000.00 5,700.00
B. BAHAN
Semen portland 218.0000 kg 1,260.00 274,680.00
Pasir beton 0.5200 m3 190,000.00 98,800.00
Koral beton 0.8700 m3 230,000.00 200,100.00
Air 215.0000 L 50.00 10,750.00
C. PERALATAN
Molen 0,35 m3 0.2000 hari 300,000.00 60,000.00
Jumlah Harga Tenaga, Bahan dan Peralatan 768,355.00
Overhead + Profit 15.0000 % 115,253.25
Harga Satuan Pekerjaan 883,608.25
D.III. PEKERJAAN PEMBESIAN BETON
A.4.1.1.17.1 PEMBESIAN 1 KG BESI POLOS ATAU ULIR
A. TENAGA
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Pekerja 0.0070 OH 75,000.00 525.00
Tukang Besi 0.0070 OH 85,000.00 595.00
Kepala Tukang Besi 0.0007 OH 95,000.00 66.50
Mandor 0.0004 OH 95,000.00 38.00
B. BAHAN
Besi Beton (Polos / Ulir) 1.0500 kg 11,500.00 12,075.00
Kawat Beton 0.0150 kg 17,500.00 262.50
Jumlah Harga Tenaga, Bahan dan Peralatan 13,562.00
Overhead + Profit 15.0000 % 2,034.30
Harga Satuan Pekerjaan 15,596.30
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
A.4.1.1.21.1 1 m2 PASANG BEKISTING UNTUK SLOOF (2x PAKAI)
A. TENAGA
Pekerja 0.5200 OH 75,000.00 39,000.00
Tukang Besi 0.2600 OH 85,000.00 22,100.00
Kepala Tukang Besi 0.0260 OH 95,000.00 2,470.00
Mandor 0.0260 OH 95,000.00 2,470.00
B. BAHAN
Kayu Kelas III (Papan) 0.0225 m3 2,000,000.00 45,000.00
Paku biasa 2'-5" 0.3000 Kg 18,000.00 5,400.00
Minyak bekisting 0.0500 Ltr 0.00 -
Jumlah Harga Tenaga, Bahan dan Peralatan 116,440.00
Overhead + Profit 15.0000 % 17,466.00
Harga Satuan Pekerjaan 133,906.00
A.4.1.1.24.1 1 m2 PASANG BEKISTING PLAT LANTAI (2X PAKAI)
A. TENAGA
Pekerja 0.6600 HOK 75,000.00 49,500.00
Tukang kayu 0.3300 HOK 85,000.00 28,050.00
Kepala tukang 0.0330 HOK 95,000.00 3,135.00
Mandor 0.0330 HOK 95,000.00 3,135.00
B. BAHAN
Kayu kelas III 0.0200 m3 2,000,000.00 40,000.00
Paku biasa 2'-5" 0.4000 Kg 18,000.00 7,200.00
Minyak bekisting 0.1000 Ltr 0.00 -
Balok kayu Kelas III 0.0075 m3 2,000,000.00 15,000.00
Papan Kayu Kelas III 0.0101 M3 2,000,000.00 20,160.00
Bambu* 3.0000 Btg 7,000.00 21,000.00
Jumlah Harga Tenaga, Bahan dan Peralatan 187,180.00
Overhead + Profit 15.0000 % 28,077.00
Harga Satuan Pekerjaan 215,257.00
DIHITUNG 1 m3 MEMBUAT PLAT BETON T = 7 CM
Pas. Beton 1pc : 2pb : 3krl 1.0000 m3 738,940.00 738,940.00
Pas. Besi 201.5074 Kg 13,562.00 2,732,843.75
Pas. Bekisting 2x Pakai 8.2129 m2 187,180.00 1,537,282.60
Total 5,009,066.35
Total Harga 5,009,066.35
Keuntungan 751,359.95
Jumlah Total 5,760,426.30
DIHITUNG 1 m3 MEMBUAT PLAT BETON T = 10 CM
Pas. Beton Site Mix 1pc : 2ps : 3kr 1.0000 m3 738,940.00 738,940.00
Pas. Besi 124.6284 Kg 13,562.00 1,690,209.71
Pas. Bekisting 2x Pakai 8.3000 m2 187,180.00 1,553,594.00
Total 3,982,743.71
Total Harga 3,982,743.71
Keuntungan 597,411.56
Jumlah Total 4,580,155.27
DIHITUNG 1 m3 MEMBUAT PLAT BETON T = 15 CM
Pas. Beton Site Mix 1pc : 2ps : 3kr 1.0000 m3 738,940.00 738,940.00
Pas. Besi 223.9342 Kg 13,562.00 3,036,995.24
Pas. Bekisting 2x Pakai 8.9667 m2 187,180.00 1,678,380.67
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Total 5,454,315.91
Total Harga 5,454,315.91
Keuntungan 818,147.39
Jumlah Total 6,272,463.29
PEKERJAAN DINDING
A.4.4.1.10. 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps
A. TENAGA
Pekerja 0.3000 HOK 75,000.00 22,500.00
Tukang Batu 0.1000 HOK 85,000.00 8,500.00
Kepala tukang 0.0100 HOK 95,000.00 950.00
Mandor 0.0150 HOK 95,000.00 1,425.00
B. BAHAN
Bata merah ( 5x11x22 ) cm 70.0000 Bh 750.00 52,500.00
Semen Portland 9.6800 Kg 1,260.00 12,196.80
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Jumlah Harga Tenaga, Bahan dan Peralatan 103,471.80
Overhead + Profit 15.0000 % 15,520.77
Harga Satuan Pekerjaan 118,992.57
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
PEKERJAAN PLESTERAN
A.4.4.2.4. PEMASANGAN 1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 15 mm
A. TENAGA
Pekerja 0.3000 HOK 75,000.00 22,500.00
Tukang Batu 0.1500 HOK 85,000.00 12,750.00
Kepala tukang 0.0150 HOK 95,000.00 1,425.00
Mandor 0.0150 HOK 95,000.00 1,425.00
B. BAHAN
Semen Portland 6.2400 kg 1,260.00 7,862.40
Pasir pasang 0.0240 m3 120,000.00 2,880.00
Jumlah Harga Tenaga, Bahan dan Peralatan 48,842.40
Overhead + Profit 15.0000 % 7,326.36
Harga Satuan Pekerjaan 56,168.76
A.4.4.2.5. PEMASANGAN 1 m2 PLESTERAN 1 PC : 5 Ps, TEBAL 15 mm
A. TENAGA
Pekerja 0.3000 HOK 75,000.00 22,500.00
Tukang Batu 0.1500 HOK 85,000.00 12,750.00
Kepala tukang 0.0150 HOK 95,000.00 1,425.00
Mandor 0.0150 HOK 95,000.00 1,425.00
B. BAHAN
Semen Portland 5.1840 kg 1,260.00 6,531.84
Pasir pasang 0.0260 m3 120,000.00 3,120.00
Jumlah Harga Tenaga, Bahan dan Peralatan 47,751.84
Overhead + Profit 15.0000 % 7,162.78
Harga Satuan Pekerjaan 54,914.62

F-06 1 m2 PLESTERAN 1 PC : 6 Ps, TEBAL 15 mm


F-07 1 m2 PLESTERAN 1 PC : 7 Ps, TEBAL 15 mm
F-08 1 m2 PLESTERAN 1 PC : 8 Ps, TEBAL 15 mm
F-09 1 m2 PLESTERAN 1 PC : 1/2 Kp : 3 Ps, TEBAL 15 mm
F-10 1 m2 PLESTERAN 1 PC : 2 Kp : 8 Ps, TEBAL 15 mm
F-11 1 m2 PLESTERAN 1 SM : 1 Kp: 1 Ps, TEBAL 15 mm
F-12 1 m2 PLESTERAN 1 SM : 1 Kp: 2 Ps, TEBAL 15 mm
F-13 1 m2 PLESTERAN 1 PC : 2 Ps, TEBAL 20 mm
F-14 1 m2 PLESTERAN 1 PC : 3 Ps, TEBAL 20 mm
F-15 1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 20 mm
F-16 1 m2 PLESTERAN 1 PC : 5 Ps, TEBAL 20 mm
F-17 1 m2 PLESTERAN 1 PC : 6 Ps, TEBAL 20 mm
F-18 1 m2 PLESTERAN 1 SM : 1 Kp: 2 Ps, TEBAL 20 mm
F-19 1 m2 BERAPEN 1 PC : 5 Ps, TEBAL 15 mm
F-20 1 m2 PLESTERAN SKONING 1 PC : 2 Ps, Lebar 10 mm
F-21 1 m2 PLESTERAN GRANIT 1 PC : 2 Granit, TEBAL 10 mm
F-22 1 m2 PLESTERAN TERASO 1 PC : 2 Batu Teraso, TEBAL 10 mm
F-23 1 m2 PLESTERAN CIPRAT 1 PC : 2 Ps
F-24 1 m2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 m')
F-25 1 m2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (=8 m')

A.4.4.2.26. PEMASANGAN 1 m2 FINISHING SIAR PASANGAN BATU KALI, 1 PC : 2 Ps


A. TENAGA
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Pekerja 0.3000 HOK 75,000.00 22,500.00
Tukang Batu 0.1500 HOK 85,000.00 12,750.00
Kepala tukang 0.0150 HOK 95,000.00 1,425.00
Mandor 0.0150 HOK 95,000.00 1,425.00
B. BAHAN
Semen Portland 6.3400 kg 1,260.00 7,988.40
Pasir pasang 0.0120 m3 120,000.00 1,440.00
Jumlah Harga Tenaga, Bahan dan Peralatan 47,528.40
Overhead + Profit 15.0000 % 7,129.26
Harga Satuan Pekerjaan 54,657.66
A.4.4.2.27. 1 m2 ACIAN
A. TENAGA
Pekerja 0.2000 HOK 75,000.00 15,000.00
Tukang Batu 0.1000 HOK 85,000.00 8,500.00
Kepala tukang 0.0100 HOK 95,000.00 950.00
Mandor 0.0100 HOK 95,000.00 950.00
B. BAHAN
Semen Portland 3.2500 kg 1,260.00 4,095.00
Jumlah Harga Tenaga, Bahan dan Peralatan 29,495.00
Overhead + Profit 15.0000 % 4,424.25
Harga Satuan Pekerjaan 33,919.25
PEKERJAAN SANITASI
P.16 MEMASANG 1 METER PIPA SULING-SULING Ø 1 1/2"
A. TENAGA
Pekerja 0.1000 HOK 60,000.00 6,000.00
Mandor 0.0100 HOK 95,000.00 950.00
B. BAHAN
Pipa PVC dia.1,5" 1.0500 M' 18,750.00 19,687.50
Jumlah Harga Tenaga, Bahan dan Peralatan 26,637.50
Overhead + Profit 15.0000 % 3,995.63
Harga Satuan Pekerjaan 30,633.13
A.4.2.1.1. 1 Kg PASANG BESI PROFIL
A. TENAGA
Pekerja 0.0600 HOK 75,000.00 4,500.00
Tukang Las Konstruksi 0.0600 HOK 85,000.00 5,100.00
Kepala Tukang 0.0060 HOK 95,000.00 570.00
Mandor 0.0030 HOK 95,000.00 285.00
B. BAHAN
Besi Profil 1.1500 kg 13,000.00 14,950.00
Jumlah Harga Tenaga, Bahan dan Peralatan 25,405.00
Overhead + Profit 15.0000 % 3,810.75
Harga Satuan Pekerjaan 29,215.75
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
PEKERJAAN PENUTUP LANTAI
A.4.4.3.64. PEMASANGAN 1 M2 PAVING BLOCK NATURAL TEBAL 6 CM
A. TENAGA
Pekerja 0.2500 HOK 75,000.00 18,750.00
Tukang Batu 0.5000 HOK 85,000.00 42,500.00
Kepala Tukang 0.0500 HOK 95,000.00 4,750.00
Mandor 0.0013 HOK 95,000.00 123.50
B. BAHAN
Paving Block 6 cm 1.0100 M2 75,000.00 75,750.00
Pasir Beton 0.0500 M3 190,000.00 9,500.00
C. PERALATAN
Peralatan 10%
Jumlah Harga Tenaga, Bahan dan Peralatan 151,373.50
Overhead + Profit 15.0000 % 22,706.03
Harga Satuan Pekerjaan 174,079.53
A.4.4.3.66. PEMASANGAN 1 M2 PAVING BLOCK BERWARNA TEBAL 6 CM
A. TENAGA
Pekerja 0.2500 Kg 75,000.00 18,750.00
Tukang Batu 0.5000 HOK 85,000.00 42,500.00
Kepala Tukang 0.0500 HOK 95,000.00 4,750.00
Mandor 0.0013 HOK 95,000.00 123.50
B. BAHAN
Paving Block 6 cm 1.0100 M2 125,000.00 126,250.00
Pasir Beton 0.0500 M3 190,000.00 9,500.00
C. PERALATAN
Peralatan 10%
Jumlah Harga Tenaga, Bahan dan Peralatan 201,873.50
Overhead + Profit 15.0000 % 30,281.03
Harga Satuan Pekerjaan 232,154.53
M-01 1 m2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 40X40 cm
M-02 1 m2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 30X30 cm
Ubin abu-abu 30x30 cm 11.8700 bh -
Semen Portland 10.0000 Kg 1,260.00 12,600.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Pekerja 0.2600 HOK 75,000.00 19,500.00
Tukang batu 0.1300 HOK 85,000.00 11,050.00
Kepala tukang 0.0130 HOK 95,000.00 1,235.00
Mandor 0.0130 HOK 95,000.00 1,235.00
Jumlah Harga Tenaga, Bahan dan Peralatan 51,020.00
Overhead + Profit 15.0000 % 7,653.00
Harga Satuan Pekerjaan 58,673.00

M-03 1 m2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20X20 cm


Ubin abu-abu 20x20 cm 26.5000 bh -
Semen Portland 10.4000 Kg 1,260.00 13,104.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Pekerja 0.2700 HOK 75,000.00 20,250.00
Tukang batu 0.1350 HOK 85,000.00 11,475.00
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Kepala tukang 0.0140 HOK 95,000.00 1,330.00
Mandor 0.0140 HOK 95,000.00 1,330.00
Jumlah Harga Tenaga, Bahan dan Peralatan 52,889.00
Overhead + Profit 15.0000 % 7,933.35
Harga Satuan Pekerjaan 60,822.35

M-04 1 m2 PASANG LANTAI UBIN PC WARNA UKURAN 40X40 cm


M-05 1 m2 PASANG LANTAI UBIN PC WARNA UKURAN 30X30 cm
Ubin warna 30x30 cm 11.8700 bh -
Semen Portland 10.0000 Kg 1,260.00 12,600.00
Pasir pasang 0.4500 m3 120,000.00 54,000.00
Semen warna 1.5000 Kg 15,000.00 22,500.00
Pekerja 0.2600 HOK 75,000.00 19,500.00
Tukang batu 0.1300 HOK 85,000.00 11,050.00
Kepala tukang 0.0130 HOK 95,000.00 1,235.00
Mandor 0.0130 HOK 95,000.00 1,235.00
Jumlah Harga Tenaga, Bahan dan Peralatan 122,120.00
Overhead + Profit 15.0000 % 18,318.00
Harga Satuan Pekerjaan 140,438.00

M-06 1 m2 PASANG LANTAI UBIN PC WARNA UKURAN 20X20 cm


Ubin warna 20x20 cm 26.5000 bh -
Semen Portland 10.4000 Kg 1,260.00 13,104.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.6200 Kg 15,000.00 24,300.00
Pekerja 0.2700 HOK 75,000.00 20,250.00
Tukang batu 0.1350 HOK 85,000.00 11,475.00
Kepala tukang 0.0140 HOK 95,000.00 1,330.00
Mandor 0.0140 HOK 95,000.00 1,330.00
Jumlah Harga Tenaga, Bahan dan Peralatan 77,189.00
Overhead + Profit 15.0000 % 11,578.35
Harga Satuan Pekerjaan 88,767.35

M-07 1 m2 PASANG LANTAI UBIN TERASO UKURAN 40X40 cm


M-08 1 m2 PASANG LANTAI UBIN TERASO UKURAN 30X30 cm
M-09 1 m2 PASANG LANTAI UBIN GRANITO UKURAN 40X40 cm
Ubin granito 40x40 cm 6.9300 bh -
Semen Portland 9.8000 Kg 1,260.00 12,348.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.3000 Kg 15,000.00 19,500.00
Pekerja 0.2500 HOK 75,000.00 18,750.00
Tukang batu 0.1250 HOK 85,000.00 10,625.00
Kepala tukang 0.0130 HOK 95,000.00 1,235.00
Mandor 0.0130 HOK 95,000.00 1,235.00
Jumlah Harga Tenaga, Bahan dan Peralatan 69,093.00
Overhead + Profit 15.0000 % 10,363.95
Harga Satuan Pekerjaan 79,456.95
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)

M-10 1 m2 PASANG LANTAI UBIN GRANITO UKURAN 30X30 cm


Ubin granito 30x30 cm 11.8700 bh -
Semen Portland 10.0000 Kg 1,260.00 12,600.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.5000 Kg 15,000.00 22,500.00
Pekerja 0.2600 HOK 75,000.00 19,500.00
Tukang batu 0.1300 HOK 85,000.00 11,050.00
Kepala tukang 0.0130 HOK 95,000.00 1,235.00
Mandor 0.0130 HOK 95,000.00 1,235.00
Jumlah Harga Tenaga, Bahan dan Peralatan 73,520.00
Overhead + Profit 15.0000 % 11,028.00
Harga Satuan Pekerjaan 84,548.00

M-11 1 m2 PASANG LANTAI UBIN TERALUX UKURAN 40X40 cm


M-12 1 m2 PASANG LANTAI UBIN TERALUX UKURAN 30X30 cm
M-13 1 m2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60X60 cm
M-14 1 m2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40X40 cm
M-15 1 m2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30X30 cm
M-16 1 m2 PASANG PLINT UBIN PC ABU-ABU UKURAN 15X20 cm
Plin ubint 15x20 cm 5.3000 bh -
Semen Portland 1.6500 Kg 1,260.00 2,079.00
Pasir pasang 0.0040 m3 120,000.00 480.00
Pekerja 0.0900 HOK 75,000.00 6,750.00
Tukang batu 0.0900 HOK 85,000.00 7,650.00
Kepala tukang 0.0090 HOK 95,000.00 855.00
Mandor 0.0050 HOK 95,000.00 475.00
Jumlah Harga Tenaga, Bahan dan Peralatan 18,289.00
Overhead + Profit 15.0000 % 2,743.35
Harga Satuan Pekerjaan 21,032.35

M-17 1 m' PASANG PLINT UBIN PC ABU-ABU UKURAN 10X30 cm


Plint ubin 10x30 cm 3.5300 bh -
Semen Portland 1.2400 Kg 1,260.00 1,562.40
Pasir pasang 0.0030 m3 120,000.00 360.00
Pekerja 0.0900 HOK 75,000.00 6,750.00
Tukang batu 0.0900 HOK 85,000.00 7,650.00
Kepala tukang 0.0090 HOK 95,000.00 855.00
Mandor 0.0050 HOK 95,000.00 475.00
Jumlah Harga Tenaga, Bahan dan Peralatan 17,652.40
Overhead + Profit 15.0000 % 2,647.86
Harga Satuan Pekerjaan 20,300.26

M-18 1 m' PASANG PLINT UBIN PC ABU-ABU UKURAN 10X40 cm


M-19 1 m' PASANG PLINT UBIN PC WARNA UKURAN 10X20 cm
Plin ubin pc warna 10x20 cm 5.3000 bh -
Semen Portland 1.1400 Kg 1,260.00 1,436.40
Pasir pasang 0.0030 m3 120,000.00 360.00
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Semen warna 0.1000 Kg 15,000.00 1,500.00
Pekerja 0.0900 HOK 75,000.00 6,750.00
Tukang batu 0.0900 HOK 85,000.00 7,650.00
Kepala tukang 0.0090 HOK 95,000.00 855.00
Mandor 0.0050 HOK 95,000.00 475.00
Jumlah Harga Tenaga, Bahan dan Peralatan 19,026.40
Overhead + Profit 15.0000 % 2,853.96
Harga Satuan Pekerjaan 21,880.36

M-20 1 m' PASANG PLINT UBIN PC WARNA UKURAN 10X30 cm


M-21 1 m' PASANG PLINT UBIN PC WARNA UKURAN 10X40 cm
M-22 1 m' PASANG PLINT UBIN TERASO UKURAN 10X30 cm
M-23 1 m' PASANG PLINT UBIN TERASO UKURAN 10X40 cm
M-24 1 m' PASANG PLINT UBIN GRANITO UKURAN 10X40 cm
M-25 1 m' PASANG PLINT UBIN GRANITO UKURAN 10X30 cm
Plin ubin granito 10x30 cm 3.5300 bh -
Semen Portland 1.1400 Kg 1,260.00 1,436.40
Pasir pasang 0.0030 m3 120,000.00 360.00
Semen warna 0.1000 Kg 15,000.00 1,500.00
Pekerja 0.0900 HOK 75,000.00 6,750.00
Tukang batu 0.0900 HOK 85,000.00 7,650.00
Kepala tukang 0.0090 HOK 95,000.00 855.00
Mandor 0.0050 HOK 95,000.00 475.00
Jumlah Harga Tenaga, Bahan dan Peralatan 19,026.40
Overhead + Profit 15.0000 % 2,853.96
Harga Satuan Pekerjaan 21,880.36

M-26 1 m' PASANG PLINT UBIN TERALUX KERANG UKURAN 10X40 cm


M-27 1 m' PASANG PLINT UBIN TERALUX KERANG UKURAN 10X30 cm
M-28 1 m' PASANG PLINT UBIN TERALUX MARMER UKURAN 10X60 cm
M-29 1 m' PASANG PLINT UBIN TERALUX MARMER UKURAN 10X40 cm
M-30 1 m' PASANG PLINT UBIN TERALUX MARMER UKURAN 10X30 cm
M-31 1 m2 PASANG LANTAI TERASO COR DITEMPAT, TEBAL 3 cm
M-32 1 m2 PASANG LANTAI KERAMIK ARTISTIK UKURAN 10X20 cm
Ubin Keramik Artistik (10x20)cm 53.0000 bh -
Semen Portland 8.1900 Kg 1,260.00 10,319.40
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 2.7500 Kg 15,000.00 41,250.00
Pekerja 0.7000 HOK 75,000.00 52,500.00
Tukang batu 0.3500 HOK 85,000.00 29,750.00
Kepala tukang 0.0350 HOK 95,000.00 3,325.00
Mandor 0.0350 HOK 95,000.00 3,325.00
Jumlah Harga Tenaga, Bahan dan Peralatan 145,869.40
Overhead + Profit 15.0000 % 21,880.41
Harga Satuan Pekerjaan 167,749.81

M-33 1 m' PASANG PLINT KERAMIK ARTISTIK UKURAN 10X10 cm ATAU 5x20 cm
M-34 1 m2 PASANG LANTAI KERAMIK UKURAN 33X33 cm
M-35 1 M2 PASANG LANTAI KERAMIK UKURAN (30x30) cm (Putih Polos)
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Keramik (30 x 30) polos 11.8700 bh 3,590.91 42,624.09
Semen Portland 10.0000 kg 1,260.00 12,600.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.5000 kg 15,000.00 22,500.00
Pekerja 0.7000 HOK 75,000.00 52,500.00
Tukang kayu 0.3500 HOK 85,000.00 29,750.00
Kepala tukang 0.0350 HOK 95,000.00 3,325.00
Mandor 0.0350 HOK 95,000.00 3,325.00
Jumlah Harga Tenaga, Bahan dan Peralatan 172,024.09
Overhead + Profit 15.0000 % 25,803.61
Harga Satuan Pekerjaan 197,827.70

M-35A 1 M2 PASANG LANTAI KERAMIK UKURAN (30x30) cm (Warna)


Keramik (30 x 30) polos 11.8700 bh 4,090.91 48,559.09
Semen Portland 10.0000 kg 1,260.00 12,600.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.5000 kg 15,000.00 22,500.00
Pekerja 0.7000 HOK 75,000.00 52,500.00
Tukang kayu 0.3500 HOK 85,000.00 29,750.00
Kepala tukang 0.0350 HOK 95,000.00 3,325.00
Mandor 0.0350 HOK 95,000.00 3,325.00
Jumlah Harga Tenaga, Bahan dan Peralatan 177,959.09
Overhead + Profit 15.0000 % 26,693.86
Harga Satuan Pekerjaan 204,652.95

M-35B 1 m2 PASANG LANTAI KERAMIK 30X30 cm WARNA ANTI SELIP


Ubin keramik 30x30 cm 11.8700 bh 7,272.73 86,327.27
Semen Portland 10.0000 Kg 1,260.00 12,600.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.5000 Kg 15,000.00 22,500.00
Pekerja 0.7000 HOK 75,000.00 52,500.00
Tukang batu 0.3500 HOK 85,000.00 29,750.00
Kepala tukang 0.0350 HOK 95,000.00 3,325.00
Mandor 0.0350 HOK 95,000.00 3,325.00
Jumlah Harga Tenaga, Bahan dan Peralatan 215,727.27
Overhead + Profit 15.0000 % 32,359.09
Harga Satuan Pekerjaan 248,086.36

M-35C 1 M2 PASANG LANTAI KERAMIK UKURAN (40x40) cm (Putih Polos)


Keramik (40 x 40) polos 6.6300 bh 8,750.00 58,012.50
Semen Portland 10.0000 kg 1,260.00 12,600.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.5000 kg 15,000.00 22,500.00
Pekerja 0.7000 HOK 75,000.00 52,500.00
Tukang kayu 0.3500 HOK 85,000.00 29,750.00
Kepala tukang 0.0350 HOK 95,000.00 3,325.00
Mandor 0.0350 HOK 95,000.00 3,325.00
Jumlah Harga Tenaga, Bahan dan Peralatan 187,412.50
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Overhead + Profit 15.0000 % 28,111.88
Harga Satuan Pekerjaan 215,524.38

M-35D 1 M2 PASANG LANTAI KERAMIK UKURAN (40x40) cm (Warna)


Keramik (40 x 40) polos 6.6300 bh 9,450.00 62,653.50
Semen Portland 10.0000 kg 1,260.00 12,600.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.5000 kg 15,000.00 22,500.00
Pekerja 0.7000 HOK 75,000.00 52,500.00
Tukang kayu 0.3500 HOK 85,000.00 29,750.00
Kepala tukang 0.0350 HOK 95,000.00 3,325.00
Mandor 0.0350 HOK 95,000.00 3,325.00
Jumlah Harga Tenaga, Bahan dan Peralatan 192,053.50
Overhead + Profit 15.0000 % 28,808.03
Harga Satuan Pekerjaan 220,861.53

M-35E 1 m2 PASANG LANTAI KERAMIK 60X60 cm


Ubin keramik 60x60 cm 2.7800 bh 33,333.33 92,666.67
Semen Portland 11.3800 Kg 1,260.00 14,338.80
Pasir pasang 0.0420 m3 120,000.00 5,040.00
Semen warna 1.5000 Kg 15,000.00 22,500.00
Pekerja 0.6200 HOK 75,000.00 46,500.00
Tukang batu 0.3500 HOK 85,000.00 29,750.00
Kepala tukang 0.0350 HOK 95,000.00 3,325.00
Mandor 0.0300 HOK 95,000.00 2,850.00
Jumlah Harga Tenaga, Bahan dan Peralatan 216,970.47
Overhead + Profit 15.0000 % 32,545.57
Harga Satuan Pekerjaan 249,516.04

M-36 1 M2 PASANG LANTAI KERAMIK UKURAN 20X20 cm Putih (Polos)


Ubin keramik 20x20 cm 26.5000 bh 1,460.00 38,690.00
Semen Portland 10.4000 Kg 1,260.00 13,104.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.6200 Kg 15,000.00 24,300.00
Pekerja 0.7000 HOK 75,000.00 52,500.00
Tukang batu 0.3500 HOK 85,000.00 29,750.00
Kepala tukang 0.0350 HOK 95,000.00 3,325.00
Mandor 0.0350 HOK 95,000.00 3,325.00
Jumlah Harga Tenaga, Bahan dan Peralatan 170,394.00
Overhead + Profit 15.0000 % 25,559.10
Harga Satuan Pekerjaan 195,953.10

M-36A 1 M2 PASANG LANTAI KERAMIK UKURAN 20X20 cm WARNA ANTI SELIP


Ubin keramik 20x20 cm 26.5000 bh 1,700.00 45,050.00
Semen Portland 10.4000 Kg 1,260.00 13,104.00
Pasir pasang 0.0450 m3 120,000.00 5,400.00
Semen warna 1.6200 Kg 15,000.00 24,300.00
Pekerja 0.7000 HOK 75,000.00 52,500.00
Tukang batu 0.3500 HOK 85,000.00 29,750.00
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Kepala tukang 0.0350 HOK 95,000.00 3,325.00
Mandor 0.0350 HOK 95,000.00 3,325.00
Jumlah Harga Tenaga, Bahan dan Peralatan 176,754.00
Overhead + Profit 15.0000 % 26,513.10
Harga Satuan Pekerjaan 203,267.10

M-37 1 m2 PASANG LANTAI KERAMIK UKURAN 10X33 cm, VARIASI/BORDER


M-38 1 m2 PASANG LANTAI MOSAIK 30X30 cm, ADUKAN 1 PC ; 3 Ps
M-39 1 m' PASANG PLINT KERAMIK 10X20 cm
M-40 1 m' PASANG PLINT KERAMIK 10X10 cm
M-41 1 m' PASANG PLINT KERAMIK 5X20 cm
M-42 1 m' PASANG PLINT INTERVAL COVE ARTISTIK (5x5x20) cm
M-43 1 m2 PASANG LANTAI MARMER 100X100 cm
M-44 1 m2 PASANG LANTAI KARPET
M-45 1 m2 PASANG UNDERLAYER
M-46 1 m2 PASANG LANTAI PARQUET
M-47 1 m2 PASANG LANTAI KAYU (GYMFLOOR)
M-48 1 m2 PASANG DINDING PORSELIN 11X11 cm
Porselin 11x11 cm, warna 86.0000 bh -
Semen Abu-abu 9.3000 Kg 1,260.00 11,718.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.5000 Kg 15,000.00 22,500.00
Pekerja 1.0000 HOK 75,000.00 75,000.00
Tukang batu 0.5000 HOK 85,000.00 42,500.00
Kepala tukang 0.0500 HOK 95,000.00 4,750.00
Mandor 0.0500 HOK 95,000.00 4,750.00
Jumlah Harga Tenaga, Bahan dan Peralatan 163,378.00
Overhead + Profit 15.0000 % 24,506.70
Harga Satuan Pekerjaan 187,884.70

M-49 1 m2 PASANG DINDING PORSELIN 10X20 cm


Porselin 10x20 cm warna 53.0000 bh -
Semen Abu-abu 9.3000 Kg 1,260.00 11,718.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 2.7500 Kg 15,000.00 41,250.00
Pekerja 0.9000 HOK 75,000.00 67,500.00
Tukang batu 0.4500 HOK 85,000.00 38,250.00
Kepala tukang 0.0450 HOK 95,000.00 4,275.00
Mandor 0.0450 HOK 95,000.00 4,275.00
Jumlah Harga Tenaga, Bahan dan Peralatan 169,428.00
Overhead + Profit 15.0000 % 25,414.20
Harga Satuan Pekerjaan 194,842.20

M-50 1 m2 PASANG DINDING PORSELIN 20X20 cm


M-51 1 m2 PASANG DINDING KERAMIK ARTISTIK 10X20 cm
M-52 1 m2 PASANG DINDING KERAMIK ARTISTIK 5X20 cm
M-53 1 m2 PASANG DINDING KERAMIK 10X20 cm
Keramik 10x20 cm warna 53.0000 bh -
Semen Abu-abu 9.3000 Kg 1,260.00 11,718.00
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 2.7500 Kg 15,000.00 41,250.00
Pekerja 0.9000 HOK 75,000.00 67,500.00
Tukang batu 0.4500 HOK 85,000.00 38,250.00
Kepala tukang 0.0450 HOK 95,000.00 4,275.00
Mandor 0.0450 HOK 95,000.00 4,275.00
Jumlah Harga Tenaga, Bahan dan Peralatan 169,428.00
Overhead + Profit 15.0000 % 25,414.20
Harga Satuan Pekerjaan 194,842.20

M-54 1 m2 PASANG DINDING KERAMIK 20X20 cm ( putih polos )


Keramik 20x20 cm putih polos 26.5000 bh 1,460.00 38,690.00
Semen Abu-abu 9.3000 Kg 1,260.00 11,718.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.9400 Kg 15,000.00 29,100.00
Pekerja 0.9000 HOK 75,000.00 67,500.00
Tukang batu 0.4500 HOK 85,000.00 38,250.00
Kepala tukang 0.0450 HOK 95,000.00 4,275.00
Mandor 0.0450 HOK 95,000.00 4,275.00
Jumlah Harga Tenaga, Bahan dan Peralatan 195,968.00
Overhead + Profit 15.0000 % 29,395.20
Harga Satuan Pekerjaan 225,363.20

M-54A 1 m2 PASANG DINDING KERAMIK 20X20 cm ( warna )


Keramik 20x20 cm warna 26.5000 bh 1,840.00 48,760.00
Semen Abu-abu 9.3000 Kg 1,260.00 11,718.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.9400 Kg 15,000.00 29,100.00
Pekerja 0.9000 HOK 75,000.00 67,500.00
Tukang batu 0.4500 HOK 85,000.00 38,250.00
Kepala tukang 0.0450 HOK 95,000.00 4,275.00
Mandor 0.0450 HOK 95,000.00 4,275.00
Jumlah Harga Tenaga, Bahan dan Peralatan 206,038.00
Overhead + Profit 15.0000 % 30,905.70
Harga Satuan Pekerjaan 236,943.70

M-54B 1 m2 PASANG DINDING KERAMIK 20X25 cm ( warna )


Keramik 20x25 cm warna 21.2000 bh 2,450.00 51,940.00
Semen Abu-abu 9.3000 Kg 1,260.00 11,718.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.9400 Kg 15,000.00 29,100.00
Pekerja 0.9000 HOK 75,000.00 67,500.00
Tukang batu 0.4500 HOK 85,000.00 38,250.00
Kepala tukang 0.0450 HOK 95,000.00 4,275.00
Mandor 0.0450 HOK 95,000.00 4,275.00
Jumlah Harga Tenaga, Bahan dan Peralatan 209,218.00
Overhead + Profit 15.0000 % 31,382.70
Harga Satuan Pekerjaan 240,600.70
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
M-54C 1 m2 PASANG DINDING KERAMIK 20X40 cm ( warna )
Keramik 20x40 cm warna Roman 13.2500 bh 7,916.67 104,895.83
Semen Abu-abu 9.3000 Kg 1,260.00 11,718.00
Pasir pasang 0.0180 m3 120,000.00 2,160.00
Semen warna 1.9400 Kg 15,000.00 29,100.00
Pekerja 0.9000 HOK 75,000.00 67,500.00
Tukang batu 0.4500 HOK 85,000.00 38,250.00
Kepala tukang 0.0450 HOK 95,000.00 4,275.00
Mandor 0.0450 HOK 95,000.00 4,275.00
Jumlah Harga Tenaga, Bahan dan Peralatan 262,173.83
Overhead + Profit 15.0000 % 39,326.08
Harga Satuan Pekerjaan 301,499.91

M-55 1 m2 PASANG DINDING MARMER 100X100 cm


M-56 1 m2 PASANG DINDING BATA PELAPIS 3x7x24 cm
M-57 1 m2 PASANG DINDING BATU PARAS
M-58 1 m2 PASANG DINDING BATU TEMPEL HITAM
M-59 1 m2 PASANG LANTAI VINYL 30x30 cm
M-60 1 m2 WALL PAPER, LEBAR 50 cm
M-61 1 m2 FLOOR HARDENER
M-62 1 m' PLINT VIVYIL KARET 30x30 cm DENGAN PEREKAT
M-63 1 m' PLINT KAYU KELAS II 2x10 cm

PEKERJAAN PENGECATAN
N-01 1 m2 MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA
Soda api 0.0500 Kg 0.00 -
Pekerja 0.1500 HOK 75,000.00 11,250.00
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 11,487.50
Overhead + Profit 15.0000 % 1,723.13
Harga Satuan Pekerjaan 13,210.63

N-02 1 m2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DI CAT


Sabun 0.0500 Kg 1,500.00 75.00
Pekerja 0.1500 HOK 75,000.00 11,250.00
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 11,562.50
Overhead + Profit 15.0000 % 1,734.38
Harga Satuan Pekerjaan 13,296.88

N-03 1 m2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL
Sabun 0.0500 Kg 1,500.00 75.00
Pekerja 0.1500 HOK 75,000.00 11,250.00
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 11,562.50
Overhead + Profit 15.0000 % 1,734.38
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Harga Satuan Pekerjaan 13,296.88

N-04 1 m2 MENYABUN PERMUKAAN TEMBOK LAMA


Sabun 0.0500 Kg 1,500.00 75.00
Pekerja 0.1500 HOK 75,000.00 11,250.00
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 11,562.50
Overhead + Profit 15.0000 % 1,734.38
Harga Satuan Pekerjaan 13,296.88

N-06 1 m2 MENDEMPUL DAN MENGGOSOK KAYU


Dempul jadi 0.0800 Kg 37,000.00 2,960.00
Minyak cat 0.0200 Kg 0.00 -
Batu apung 0.0100 Kg 1,500.00 15.00
Pekerja 0.0400 HOK 75,000.00 3,000.00
Tukang cat 0.0400 HOK 85,000.00 3,400.00
Kepala tukang 0.0040 HOK 95,000.00 380.00
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 9,992.50
Overhead + Profit 15.0000 % 1,498.88
Harga Satuan Pekerjaan 11,491.38

N-07 1 m2 PENGECATAN BIDANG KAYU LAMA


Plamir 0.1500 Kg 15,000.00 2,250.00
Cat dasar 0.1700 Kg 55,000.00 9,350.00
Cat Penutup 0.1700 Kg 55,000.00 9,350.00
Pekerja 0.0700 HOK 75,000.00 5,250.00
Tukang cat 0.0750 HOK 85,000.00 6,375.00
Kepala tukang 0.0075 HOK 95,000.00 712.50
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 33,525.00
Overhead + Profit 15.0000 % 5,028.75
Harga Satuan Pekerjaan 38,553.75

N-08 1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Cat meni 0.2000 Kg 23,600.00 4,720.00
Plamir 0.1500 Kg 15,000.00 2,250.00
Cat dasar 0.1700 Kg 55,000.00 9,350.00
Cat Penutup ( 2 kali ) 0.2600 Kg 55,000.00 14,300.00
Pekerja 0.0700 HOK 75,000.00 5,250.00
Tukang cat 0.0090 HOK 85,000.00 765.00
Kepala tukang 0.0060 HOK 95,000.00 570.00
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 37,442.50
Overhead + Profit 15.0000 % 5,616.38
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Harga Satuan Pekerjaan 43,058.88

N-09 1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 3 Lapis Cat Penutup)
Cat meni 0.2000 Kg 23,600.00 4,720.00
Plamir 0.1500 Kg 15,000.00 2,250.00
Cat dasar 0.1700 Kg 55,000.00 9,350.00
Cat Penutup ( 3 kali ) 0.3500 Kg 55,000.00 19,250.00
Pekerja 0.0700 HOK 75,000.00 5,250.00
Tukang cat 0.1050 HOK 85,000.00 8,925.00
Kepala tukang 0.0040 HOK 95,000.00 380.00
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 50,362.50
Overhead + Profit 15.0000 % 7,554.38
Harga Satuan Pekerjaan 57,916.88

N-11 1 m2 PELABURAN BIDANG KAYU DENGAN POLITUR


Politur 0.1500 Ltr 12,600.00 1,890.00
Politur jadi 0.3720 Ltr 27,000.00 10,044.00
Ampelas 2.0000 Lbr 5,000.00 10,000.00
Tukang cat 0.0600 HOK 85,000.00 5,100.00
Kepala tukang 0.0160 HOK 95,000.00 1,520.00
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 28,791.50
Overhead + Profit 15.0000 % 4,318.73
Harga Satuan Pekerjaan 33,110.23

N-12 1 m2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER


Residu atau ter 0.3500 Ltr 5,000.00 1,750.00
Pekerja 0.1000 HOK 75,000.00 7,500.00
Mandor 0.0060 HOK 95,000.00 570.00
Jumlah Harga Tenaga, Bahan dan Peralatan 9,820.00
Overhead + Profit 15.0000 % 1,473.00
Harga Satuan Pekerjaan 11,293.00

N-13 1 m2 PELABURAN BIDANG KAYU DENGAN VERNIS


Vernis 0.1500 Ltr 18,000.00 2,700.00
Dempul 0.0500 Kg 16,500.00 825.00
Ampelas 0.1000 Lbr 5,000.00 500.00
Kuas 0.0100 Bh 13,000.00 130.00
Pekerja 0.1600 HOK 75,000.00 12,000.00
Tukang cat 0.1600 HOK 85,000.00 13,600.00
Kepala tukang 0.0160 HOK 95,000.00 1,520.00
Mandor 0.0025 HOK 95,000.00 237.50
Jumlah Harga Tenaga, Bahan dan Peralatan 31,512.50
Overhead + Profit 15.0000 % 4,726.88
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Harga Satuan Pekerjaan 36,239.38

A.4.7.1.10. PENGECATAN 1 m2 TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
A. TENAGA
Pekerja 0.0200 HOK 65,000.00 1,300.00
Tukang cat 0.0630 HOK 85,000.00 5,355.00
Kepala tukang 0.0063 HOK 95,000.00 598.50
Mandor 0.0030 HOK 95,000.00
B. BAHAN
Plamuur 0.1000 kg 25,000.00 2,500.00
Cat dasar 0.1000 kg 25,000.00 2,500.00
Cat Penutup 0.2600 kg 25,000.00 6,500.00

Jumlah Harga Tenaga, Bahan dan Peralatan 18,753.50


Overhead + Profit 15.0000 % 2,813.03
Harga Satuan Pekerjaan 21,566.53

N-14A 1 m2 PENGECATAN BIDANG TEMBOK BARU EKSTERIOR


Cat dasar 0.1000 Kg 74,000.00 7,400.00
Cat Penutup ( 2 kali ) Mowilex 0.2600 Kg 74,000.00 19,240.00
Pekerja 0.0200 HOK 25,000.00 500.00
Tukang cat 0.0630 HOK 25,000.00 1,575.00
Kepala tukang 0.0063 HOK 25,000.00 157.50
Mandor 0.0025 HOK 0.00 -
Jumlah Harga Tenaga, Bahan dan Peralatan 28,872.50
Overhead + Profit 15.0000 % 4,330.88
Harga Satuan Pekerjaan 33,203.38

N-14B 1 m2 PENGECATAN BIDANG TEMBOK BARU INTERIOR


Cat dasar 0.1000 Kg 50,000.00 5,000.00
Cat Penutup ( 2 kali ) Mowilex 0.2600 Kg 50,000.00 13,000.00
Pekerja 0.0200 HOK 25,000.00 500.00
Tukang cat 0.0630 HOK 25,000.00 1,575.00
Kepala tukang 0.0063 HOK 25,000.00 157.50
Mandor 0.0025 HOK 0.00 -
Jumlah Harga Tenaga, Bahan dan Peralatan 20,232.50
Overhead + Profit 15.0000 % 3,034.88
Harga Satuan Pekerjaan 23,267.38

N-15 1 m2 PENGECATAN BIDANG TEMBOK LAMA ( 1 Lapis Cat dasar; 2 Lapis Cat Penutup )
Cat dasar 0.1200 Kg 25,000.00 3,000.00
Cat Penutup ( 2 kali ) Sanlex 0.1800 Kg 25,000.00 4,500.00
Pekerja 0.0280 HOK 25,000.00 700.00
Tukang cat 0.0420 HOK 25,000.00 1,050.00
Kepala tukang 0.0042 HOK 25,000.00 105.00
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Mandor 0.0025 HOK 0.00 -
Jumlah Harga Tenaga, Bahan dan Peralatan 9,355.00
Overhead + Profit 15.0000 % 1,403.25
Harga Satuan Pekerjaan 10,758.25

N-19 1 m2 PEMASANGAN WALL PAPER


Wall paper 1.2000 m3 -
Perekat 0.2000 Kg -
Pekerja 0.0200 HOK 25,000.00 500.00
Tukang cat 0.2000 HOK 25,000.00 5,000.00
Kepala tukang 0.0020 HOK 25,000.00 50.00
Mandor 0.0025 HOK 0.00 -
Jumlah Harga Tenaga, Bahan dan Peralatan 5,550.00
Overhead + Profit 15.0000 % 832.50
Harga Satuan Pekerjaan 6,382.50

N-20 1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


Meni besi 0.1000 Kg 23,600.00 2,360.00
Kuas 0.0100 Bh 13,000.00 130.00
Pekerja 0.0200 HOK 25,000.00 500.00
Tukang cat 0.2000 HOK 85,000.00 17,000.00
Kepala tukang 0.0200 HOK 95,000.00 1,900.00
Mandor 0.0100 HOK 95,000.00 950.00
Jumlah Harga Tenaga, Bahan dan Peralatan 22,840.00
Overhead + Profit 15.0000 % 3,426.00
Harga Satuan Pekerjaan 26,266.00

N-21 1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH


Meni besi 0.1000 Kg 23,600.00 2,360.00
Kuas 0.0100 Bh 13,000.00 130.00
Perancah kayu 0.0020 m3 1,800,000.00 3,600.00
Pekerja 0.2500 HOK 25,000.00 6,250.00
Tukang cat 0.2250 HOK 85,000.00 19,125.00
Kepala tukang 0.0225 HOK 95,000.00 2,137.50
Mandor 0.0075 HOK 95,000.00 712.50
Jumlah Harga Tenaga, Bahan dan Peralatan 34,315.00
Overhead + Profit 15.0000 % 5,147.25
Harga Satuan Pekerjaan 39,462.25

N-22 1 m2 PENGECATAN PERMUKAAN BAJA LAPIS SENG GALBANI SECARA MANUAL (4 lapis cat konvensional, tebal 200 um)
Cat dasar 0.1100 Kg -
Cat antara 0.1700 Kg -
Cat penutup 0.0800 Kg -
Pekerja 0.5000 HOK 25,000.00 12,500.00
KODE HARGA
URAIAN KOEF SATUAN HARGA (Rp)
PEK SATUAN(Rp)
Tukang cat 0.8000 HOK 85,000.00 68,000.00
Kepala tukang 0.3000 HOK 95,000.00 28,500.00
Mandor 0.2000 HOK 95,000.00 19,000.00
Jumlah Harga Tenaga, Bahan dan Peralatan 128,000.00
Overhead + Profit 15.0000 % 19,200.00
Harga Satuan Pekerjaan 147,200.00

N-23 1 m2 PENGECATAN PERMUKAAN BAJA LAPIS GALBANI SECARA MANUAL (1 lapis cat mutakhir, tebal 200 um)
Cat 0.3000 Kg -
Pekerja 0.0060 HOK 25,000.00 150.00
Tukang cat 0.0600 HOK 85,000.00 5,100.00
Kepala tukang 0.0120 HOK 95,000.00 1,140.00
Mandor 0.0060 HOK 95,000.00 570.00
Jumlah Harga Tenaga, Bahan dan Peralatan 6,960.00
Overhead + Profit 15.0000 % 1,044.00
Harga Satuan Pekerjaan 8,004.00

O. PEKERJAAN JALAN
O-01 1 M2 HOTMIX TANGAN T=3 CM (JADI) UNTUK HALAMAN & JALAN KLS 6 TON KE BAWAH
Screen 0.0144 M3 190,000.00 2,736.00
Abu Batu 0.0216 M3 185,000.00 3,996.00
Aspal Penetrasi 5.0000 Kg 11,161.29 55,806.45
Kayu Bakar 0.0080 M3 150,000.00 1,200.00
Pekerja setengah terampil 0.0800 M3 65,000.00 5,200.00
Pekerja Terampil 0.0300 Ls 75,000.00 2,250.00
Mandor 0.0100 HOK 95,000.00 950.00
Peralatan 0.0980 Lot 72,138.45 7,069.57
Jumlah Harga Tenaga, Bahan dan Peralatan 79,208.02
Overhead + Profit 15.0000 % 11,881.20
Harga Satuan Pekerjaan 91,089.22

O-01.1 1 M2 HOTMIX TANGAN T=2 CM (JADI) UNTUK JALAN GANG


Screen 0.0096 M3 190,000.00 1,824.00
Abu Batu 0.0144 M3 185,000.00 2,664.00
Aspal Penetrasi 3.3333 Kg 11,161.29 37,204.30
Kayu Bakar 0.0053 M3 150,000.00 800.00
Pekerja setengah terampil 0.0533 M3 65,000.00 3,466.67
Pekerja Terampil 0.0200 Ls 75,000.00 1,500.00
Mandor 0.0067 HOK 95,000.00 633.33
Peralatan 0.0653 Lot 48,092.30 3,142.03
Jumlah Harga Tenaga, Bahan dan Peralatan 51,234.33
Overhead + Profit 15.0000 % 7,685.15
Harga Satuan Pekerjaan 58,919.48
A.2.3.1.10. PEMADATAN TANAH 1 M3 TANAH (PER 20 CM)
A. TENAGA
Peker 0.5000 OH 75,000.00 37,500.00
Mando 0.0500 OH 95,000.00 4,750.00
Jumlah Harga Tenaga, Bahan dan Peralatan 42,250.00
Overhead + Pr 0.0000 % -
Harga Satuan Pekerjaan 42,250.00
HARGA SATUAN PEKERJAAN

WILAYAH KOTA TASIKMALAYA

TAHUN ANGGARAN 2019

KODE
NO ITEM SATUAN PEKERJAAN
ANALIS SNI

PEKERJAAN PERSIAPAN

1 A.2.2.1.9 1 M2 PEKERJAAN MEMBERSIHKAN LAPANGAN DAN PERATAAN

2 A.2.2.1.12 1 M2 PEMBUATAN JALAN SEMENTARA

3 A.2.2.1.13 1 M3 BONGKARAN BETON BERTULANG

PEKERJAAN TANAH

1 A.2.3.1.1. PENGGALIAN 1M3 TANAH BIASA SEDALAM 1 M'

2 A.2.3.1.2. PENGGALIAN 1M3 TANAH BIASA SEDALAM 2 M'

3 A.2.3.1.3. PENGGALIAN 1M3 TANAH BIASA SEDALAM 3 M'

4 A.2.3.1.4. PENGGALIAN 1M3 TANAH KERAS SEDALAM 1 M'

5 A.2.3.1.5. PENGGALIAN 1M3 TANAH CADAS SEDALAM 1 M'

6 A.2.3.1.6. PENGGALIAN 1M3 TANAH LUMPUR SEDALAM 1 M'

7 A.2.3.1.7. MENGERJAKAN 1M2 STRIPPING TEBING SETINGGI 1 M

8 A.2.3.1.8. PEMBUANGAN 1 M3 TANAH SEJAUH 30 M

9 A.2.3.1.8.1 1 M3 PEMBUANGAN TANAH SEJAUH 100 METER

10 A.2.3.1.9. PENGURUGAN KEMBALI 1 M3 GALIAN

11 A.2.3.1.10. 1 m3 PEMADATAN TANAH (PER 20 CM)

12 A.2.3.1.11. PENGURUGAN 1 M3 PASIR URUG

13 A.2.3.1.14. PENGURUGAN 1M3 SIRTU PADAT

PEKERJAAN PONDASI

1 A.3.2.1.1. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 3 PP

2 A.3.2.1.2. PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 4 PP

3 A.3.2.1.2.1 PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 4 PP


PEKERJAAN BETON

1 D.02 1 M3 BETON 1 PC : 2 PB : 3KR MANUAL

2 D-03 1 M3 BETON 1 PC : 2 PB : 3 KR MOLEN

3 D-04 1 M3 BETON 1 PC : 3 PB : 5 KR MANUAL

4 D-05 1 M3 BETON 1 PC : 3 PB : 5 KR MOLEN

5 A.4.1.1.17.1 PEMBESIAN 1 KG BESI POLOS ATAU ULIR

6 A.4.1.1.21.1 1 m2 PASANG BEKISTING UNTUK SLOOF (2x PAKAI)

7 A.4.1.1.24.1 1 m2 PASANG BEKISTING PLAT LANTAI (2X PAKAI)

8 DIHITUNG 1 m3 MEMBUAT PLAT BETON T = 7 CM

9 DIHITUNG 1 m3 MEMBUAT PLAT BETON T = 10 CM

10 DIHITUNG 1 m3 MEMBUAT PLAT BETON T = 15 CM

PEKERJAAN DINDING

1 A.4.4.1.10. 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps

PEKERJAAN PLESTERAN

1 A.4.4.2.4. PEMASANGAN 1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 15 mm

2 A.4.4.2.26. PEMASANGAN 1 m2 FINISHING SIAR PASANGAN BATU KALI, 1 PC : 2 Ps

3 A.4.4.2.27. 1 m2 ACIAN

PEK. SANITASI

1 P.16 MEMASANG 1 METER PIPA SULING-SULING Ø 1 1/2"

PEKERJAAN BESI DAN ALUMINIUM

1 A.4.2.1.1. 1 Kg PASANG BESI PROFIL

PEKERJAAN PENUTUP LANTAI

1 A.4.4.3.64. PEMASANGAN 1 M2 PAVING BLOCK NATURAL TEBAL 6 CM

2 A.4.4.3.66. PEMASANGAN 1 M2 PAVING BLOCK BERWARNA TEBAL 6 CM

PEKERJAAN JALAN

1 AN.01 1 TON PENGHAMPARAN LATASTON ( HRS - WC )

2 K.516 1 M2 LAPIS PONDASI BAWAH ( LPB ) KONSTRUKSI TELFORD

3 K.521 1 M3 LAPIS PONDASI ATAS KLAS A AGREGAT PECAH TERSARING ( MENGGUNAKAN BURUH )
4 K.618 1 M2 LAPIS PENETRASI / PERMUKAAN MACADAM 50 MM LAPEN ( MENGGUNAKAN BURUH )

5 K.618.1 1 M2 LAPIS PENETRASI / PERMUKAAN MACADAM 50 MM LAPEN ( MENGGUNAKAN BURUH ) TANPA SCREEN

6 K.422 PEMBERSIHAN SEMAK DLL PADA BAHU JALAN ( MENGGUNAKAN BURUH )

7 K.424 PEMBERSIHAN PARIT ( MENGGUNAKAN BURUH )

8 AN. 18 1 M2 LAPIS PEREKAT

9 K.880 PERBAIKAN LUBANG ( 10 CM ) JALAN ASPAL

140
HARGA SATUAN PEKERJAAN

WILAYAH KOTA TASIKMALAYA

TAHUN ANGGARAN 2019

HARGA SATUAN

14,087.50

273,527.50

1,222,818.00

67,418.75

82,541.25

97,882.25

89,746.00

135,930.00

108,416.25

4,858.75

29,555.00

55,027.50

48,587.50

48,587.50

137,367.50

148,493.75

744,303.00

692,622.00

734,482.00
849,781.00

880,089.25

853,300.00

883,608.25

15,596.30

133,906.00

215,257.00

5,760,426.30

4,580,155.27

6,272,463.29

118,992.57

56,168.76

54,657.66

33,919.25

30,633.13

29,215.75

174,079.53

232,154.53

1,517,438.44

67,886.23

298,682.60
102,713.81

100,965.81

10,894.33

9,281.42

15,631.20

54,187.93

7,586,309.68
REKAPITULASI RENCANA ANGGARAN BIAYA (EE)
KEGIATAN : PENINGKATAN JALAN LINGKUNGAN WILAYAH KOTA TASIKMALAYA
PEKERJAAN : PENINGKATAN JALAN LINGKUNGAN WILAYAH KOTA TASIKMALAYA

LOKASI : KOTA TASIKMALAYA


TAHUN : 2019

NO. URAIAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN PELAKSANAAN

A PEK. JALAN LINGKUNGAN, Pj = 357,5 M' , L = 2 M'

B PEK. TPT LINGKUNGAN, Pj = 136 M' , T = 1 M'

JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN

TERBILANG : SEMBILAN PULUH LIMA JUTA RUPIAH

Tasikmalaya,
PEJABAT PEMB
DINAS PERUMAHAN RAKYAT
KOTA TAS
RINCIAN RENCANA ANGGARAN BIAYA (EE)
KEGIATAN : PENINGKATAN JALAN LINGKUNGAN WILAYAH KOTA TASIKMALAYA
PEKERJAAN : PENINGKATAN JALAN LINGKUNGAN WILAYAH KOTA TASIKMALAYA
LOKASI : KOTA TASIKMALAYA
TAHUN : 2019

KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALIS
1 2 3 4 5

I PEKERJAAN PERSIAPAN
1 Pengukuran/uitzet 1.00 LS
2 Papan nama proyek 1.00 LS
3 Pengadaan/ Sewa Direksikeet 1.00 LS
4 Administrasi, Dokumentasi 1.00 LS
5 Mobilisasi Alat Berat dan uji Hasil Pekerjaan 1.00 LS
JUMLAH
II PEKERJAAN PELAKSANAAN
A PEK. JALAN LINGKUNGAN, Pj = 357,5 M' , L = 2 M' 681.00 1.00

1 Pek. Lapis perekat AN. 18 - M2


2 Pek. Penghamparan Lataston ( HRS-WC ),Tebal Rata-rata 3 cm AN.01 - TON
JUMLAH
B PEK. TPT LINGKUNGAN, Pj = 136 M' , T = 1 M' 128.94 1.00

1 Pek. Galian tanah A.2.3.1.1. 32.23 M3


2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1 32.23 M3
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2. 90.26 M3
4 Pas. Suling-suling dia 1,5" P.16 32.23 M1
5 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26. 116.04 M2
6 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4. 64.47 M2
7 Acian Permukaan Plesteran A.4.4.2.27. 64.47 M2
JUMLAH
C PEK. PASANGAN PAVING BLOCK TYPE G, LUAS = 285,74 M2
1 Pek. Bongkaran A.2.2.1.13 28.57 M3
2 Pek. Buangan Bekas Bongkaran A.2.3.1.8.1 28.57 M3
3 Pek. pemasangan paving block A.4.4.3.64. 285.74 M2
JUMLAH
H PEK. SALURAN BETON + BESI GRILL TYPE H, PJ = 24,6 M' 24.60 49.20

1 Pek. Galian Tanah A.2.3.1.1. M3


2 Pek. Buangan Tanah Bekas Galian A.2.3.1.8.1 M3
3 Pas. Beton Tumbuk adk. 1pc : 3pb : 5krl D-04 M3
4 Pas. Besi Beton A.4.1.1.17.1 KG
5 Pas. Bekisting A.4.1.1.21.1 M2
6 Acian Saluran A.4.4.2.27. M2
7 Pas. Besi UNP 80.45.5 A.4.2.1.1. KG
8 Pas. Besi UNP 80.45.5 A.4.2.1.1. KG
JUMLAH
ASI RENCANA ANGGARAN BIAYA (EE)

YAH KOTA TASIKMALAYA

JUMLAH HARGA

5,378,000.00

79,597,497.58

84,975,497.58
8,497,549.76
93,473,047.34
93,473,000.00

Tasikmalaya, 2019
PEJABAT PEMBUAT KOMITMEN
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
KOTA TASIKMALAYA
YADI KUSDIMAN,ST.
NIP. 19770924 200312 1 004
N RENCANA ANGGARAN BIAYA (EE)

HARGA SAT JUMLAH


( RP ) ( RP )
6 7

900,000.00 900,000.00
250,000.00 250,000.00
300,000.00 300,000.00
928,000.00 928,000.00
3,000,000.00 3,000,000.00
5,378,000.00

15,631.20 -
1,517,438.44 -
-

67,418.75 2,173,175.99
55,027.50 1,773,756.44
692,622.00 62,512,737.13
30,633.13 987,428.15
54,657.66 6,342,606.04
56,168.76 3,621,087.62
33,919.25 2,186,706.21
79,597,497.58

1,222,818.00
55,027.50
174,079.53
-

67,418.75 -
55,027.50 -
853,300.00 -
15,596.30 -
133,906.00 -
33,919.25 -
29,215.75 -
29,215.75 -
-
REKAPITULASI RENCANA ANGGARAN BIAYA (HPS)
KEGIATAN :
PEKERJAAN :

LOKASI : KOTA TASIKMALAYA


TAHUN : 2019

NO. URAIAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN PELAKSANAAN

A PEK. TPT TYPE A, Pj = 17 M' , T = 0,6 M' - 1,2 M'

B PEK. TPT TYPE B, Pj = 14 M' , T = 0,4 M' - 0,6 M'

C PEK. TPT TYPE C, Pj = 20 M' , T = 1,1 M' - 2,3 M'

D PEK. TPT TYPE D, Pj = 13,5 M' , T = 0,5 M' - 1,2 M'

E PEK. TPT TYPE E, Pj = 19,5 M' , T = 0,4 M'

F PEK. TPT TYPE F, Pj = 12 M' , T = 0,7 M' - 1,2 M'

G PEK. TPT TYPE G, Pj = 29 M' , T = 0,5 M'

H PEK. TPT TYPE H, Pj = 11 M' , T = 0,4 M' - 0,8 M'

I PEK. JALAN TYPE I, Pj = 190 M' , L = 2 M'

J PEK. JALAN TYPE J, Pj = 110 M' , L = 2,5 M'

JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN

TERBILANG : SERATUS DELAPAN PULUH DELAPAN JUTA RUPIAH


RINCIAN RENCANA ANGGARAN BIAYA (HPS)
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : KOTA TASIKMALAYA
TAHUN : 2019

KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALIS
1 2 3 4 5

I PEKERJAAN PERSIAPAN
1 Pengukuran/uitzet 1.00 LS
2 Papan nama proyek 1.00 LS
3 Pengadaan/ Sewa Direksikeet 1.00 LS
4 Administrasi, Dokumentasi 1.00 LS
5 Mobilisasi Bahan Sampai Lokasi 1.00 LS
6 Mobilisasi Alt Berat dan uji Hasil Pekerjaan 1.00 LS
JUMLAH
II PEKERJAAN PELAKSANAAN
A PEK. TPT TYPE A, Pj = 17 M' , T = 0,6 M' - 1,2 M' 17.00 0.90

1 Pek. Galian tanah A.2.3.1.1. 4.68 M3


2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1 4.68 M3
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2. 11.94 M3
4 Pas. Suling-suling dia 1,5" P.16 4.25 M1
5 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26. 13.60 M2
6 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4. 8.50 M2
7 Acian Permukaan Plesteran A.4.4.2.27. 8.50 M2
JUMLAH
B PEK. TPT TYPE B, Pj = 14 M' , T = 0,4 M' - 0,6 M' 14.00 0.50

1 Pek. Galian tanah A.2.3.1.1. 2.80 M3


2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1 2.80 M3
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2. 5.95 M3
4 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26. 19.60 M2
5 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4. 7.00 M2
6 Acian Permukaan Plesteran A.4.4.2.27. 7.00 M2
JUMLAH
C PEK. TPT TYPE C, Pj = 20 M' , T = 1,1 M' - 2,3 M' 20.00 1.70

1 Pek. Galian tanah A.2.3.1.1. 7.80 M3


2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1 7.80 M3
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2. 25.65 M3
4 Pas. Suling-suling dia 1,5" P.16 5.00 M1
5 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26. 32.00 M2
6 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4. 10.00 M2
7 Acian Permukaan Plesteran A.4.4.2.27. 10.00 M2
JUMLAH
D PEK. TPT TYPE D, Pj = 13,5 M' , T = 0,5 M' - 1,2 M' 13.50 0.85

1 Pek. Galian tanah A.2.3.1.1. 3.71 M3


2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1 3.71 M3
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2. 9.17 M3
4 Pas. Suling-suling dia 1,5" P.16 3.38 M1
5 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26. 10.13 M2
6 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4. 6.75 M2
7 Acian Permukaan Plesteran A.4.4.2.27. 6.75 M2
JUMLAH
E PEK. TPT TYPE E, Pj = 19,5 M' , T = 0,4 M' 19.50 0.40

1 Pek. Galian tanah A.2.3.1.1. 3.90 M3


2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1 3.90 M3
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2. 7.41 M3
4 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26. 5.85 M2
5 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4. 9.75 M2
6 Acian Permukaan Plesteran A.4.4.2.27. 9.75 M2
JUMLAH
F PEK. TPT TYPE F, Pj = 12 M' , T = 0,7 M' - 1,2 M' 12.00 0.95

1 Pek. Galian tanah A.2.3.1.1. 3.30 M3


2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1 3.30 M3
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2. 8.71 M3
4 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26. 9.60 M2
5 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4. 6.00 M2
6 Acian Permukaan Plesteran A.4.4.2.27. 6.00 M2
JUMLAH
G PEK. TPT TYPE G, Pj = 29 M' , T = 0,5 M' 29.00 0.50

1 Pek. Galian tanah A.2.3.1.1. 5.80 M3


2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1 5.80 M3
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2. 12.33 M3
4 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26. 11.60 M2
5 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4. 14.50 M2
6 Acian Permukaan Plesteran A.4.4.2.27. 14.50 M2
JUMLAH
H PEK. TPT TYPE H, Pj = 11 M' , T = 0,4 M' - 0,8 M' 11.00 0.60

1 Pek. Galian tanah A.2.3.1.1. 2.20 M3


2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1 2.20 M3
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2. 5.17 M3
4 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26. 5.50 M2
5 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4. 5.50 M2
6 Acian Permukaan Plesteran A.4.4.2.27. 5.50 M2
JUMLAH
I PEK. JALAN TYPE I, Pj = 190 M' , L = 2 M' 190.00 2.00

1 Pek. Lapis Pondasi Bawah Konstruksi Telford K.618.1 380.00 M2

2 Pek. Urugan Sirtu A.2.3.1.14. 76.00 M3


3 Pek. Rabat Beton D-04 45.60 M3
4 Acian Permukaan Rabat Beton A.4.4.2.27. 418.00 M2
JUMLAH
J PEK. JALAN TYPE J, Pj = 110 M' , L = 2,5 M' 110.00 2.50

1 Pek. Patching K.880 55.00 M2


2 Pek. Lapis Perekat AN. 18 220.00 M2
3 Pek. Penghamparan Lataston ( HRS-WC ),Tebal Rata-rata 3 cm AN.01 - TON
JUMLAH
ASI RENCANA ANGGARAN BIAYA (HPS)

JUMLAH HARGA

7,322,000.00

10,483,357.50

6,165,856.61

21,523,925.90

8,068,390.94

6,807,974.80

7,503,437.09

11,187,059.40

4,646,338.68

102,741,257.80

6,419,200.70

192,868,799.40
19,286,879.94
212,155,679.34
212,155,000.00

UPIAH
Tasikmalaya, 2019
PEJABAT PEMBUAT KOMITMEN
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
KOTA TASIKMALAYA

YADI KUSDIMAN,ST.
NIP. 19770924 200312 1 004
RENCANA ANGGARAN BIAYA (HPS)

HARGA SAT JUMLAH


( RP ) ( RP )
6 7

922,000.00 922,000.00
250,000.00 250,000.00
400,000.00 400,000.00
750,000.00 750,000.00
2,000,000.00 2,000,000.00
3,000,000.00 3,000,000.00
7,322,000.00

67,418.75 315,182.66
55,027.50 257,253.56
692,622.00 8,271,638.24
30,633.13 130,190.78
54,657.66 743,344.18
56,168.76 477,434.46
33,919.25 288,313.63
10,483,357.50

67,418.75 188,772.50
55,027.50 154,077.00
692,622.00 4,121,100.90
54,657.66 1,071,290.14
56,168.76 393,181.32
33,919.25 237,434.75
6,165,856.61

67,418.75 525,866.25
55,027.50 429,214.50
692,622.00 17,765,754.30
30,633.13 153,165.63
54,657.66 1,749,045.12
56,168.76 561,687.60
33,919.25 339,192.50
21,523,925.90

67,418.75 250,292.11
55,027.50 204,289.59
692,622.00 6,348,919.56
30,633.13 103,386.80
54,657.66 553,408.81
56,168.76 379,139.13
33,919.25 228,954.94
8,068,390.94
67,418.75 262,933.13
55,027.50 214,607.25
692,622.00 5,132,329.02
54,657.66 319,747.31
56,168.76 547,645.41
33,919.25 330,712.69
6,807,974.80

67,418.75 222,481.88
55,027.50 181,590.75
692,622.00 6,034,122.86
54,657.66 524,713.54
56,168.76 337,012.56
33,919.25 203,515.50
7,503,437.09

67,418.75 391,028.75
55,027.50 319,159.50
692,622.00 8,536,566.15
54,657.66 634,028.86
56,168.76 814,447.02
33,919.25 491,829.13
11,187,059.40

67,418.75 148,321.25
55,027.50 121,060.50
692,622.00 3,580,855.74
54,657.66 300,617.13
56,168.76 308,928.18
33,919.25 186,555.88
4,646,338.68

100,965.81 38,367,006.30
148,493.75 11,285,525.00
853,300.00 38,910,480.00
33,919.25 14,178,246.50
102,741,257.80

54,187.93 2,980,335.94
15,631.20 3,438,864.75
1,517,438.44 -
6,419,200.70
REKAPITULASI RENCANA ANGGARAN BIAYA

Kegiatan : PEMBANGUNAN/REHABILITASI INFRASTRUKTUR LINGKUNGAN PERUMAHAN PEMUKIMAN WILAYAH KELURAH


KECAMATAN INDIHIANG KOTA TASIKMALAYA
Pekerjaan : PENINGKATAN JALAN LINGKUNGAN RT03/RW03 KECAMATAN INDIHIANG
Lokasi : KOTA TASIKMALAYA
Tahun : 2019

NO. URAIAN

I PEKERJAAN PERSIAPAN
II PEKERJAAN PELAKSANAAN
A PEK. PEMASANGAN KANSTIN PJ = ( 385.6 M' X 2 M') - 6 M'
B PEK. PEMASANGAN PAVING BLOCK PJ = 385.66 M', L = 1 M'
III PEKERJAAN TAMBAHAN
B PEKERJAAN TPT TYPE A PJ = 6 M', T = 3 M' - 1 M'

JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN

TERBILANG : SERATUS DELAPAN PULUH TUJUH JUTA RUPIAH

Tasikmalaya, 20
KONSULTAN PERENCAN
CV. ARSILAND KONSULT
GARAN BIAYA

MAHAN PEMUKIMAN WILAYAH KELURAHAN SIRNAGALIH

JUMLAH HARGA

7,820,000.00

59,921,574.58
89,532,714.11

12,727,455.38

170,001,744.06
17,000,174.41
187,001,918.47
187,000,000.00

Tasikmalaya, 2019
KONSULTAN PERENCANA
CV. ARSILAND KONSULTAN

BUDI MULYANA
DIREKTUR
REKAPITULASI RENCANA ANGGARAN BIAYA

: PEMBANGUNAN/REHABILITASI INFRASTRUKTUR LINGKUNGAN PERUMAHAN PEMUKIMAN WILAYAH KELUR


Kegiatan
: KECAMATAN INDIHIANG KOTA TASIKMALAYA
Pekerjaan : PENINGKATAN JALAN LINGKUNGAN KP. KOSANGKA KECAMATAN INDIHIANG
Lokasi : KOTA TASIKMALAYA
Tahun : 2019

NO. URAIAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN PELAKSANAAN
A PEK. JALAN LINGKUNGAN TYPE A PJ = 198.60 M' LEBAR = 1 M
B PEK. JALAN LINGKUNGAN TYPE B PJ = 104.7 M' LEBAR = 1.2 M
C PEK. JALAN LINGKUNGAN TYPE C PJ = 13.1 M' LEBAR = 1.4 M
D PEK. JALAN LINGKUNGAN TYPE D PJ = 3 M' LEBAR = 3.5
E PEK. JALAN LINGKUNGAN TYPE E PJ = 51 M' LEBAR = 4 M
F PEK. JALAN LINGKUNGAN TYPE F PJ = 16 M' LEBAR = 5 M
G PEK. JALAN LINGKUNGAN TYPE G PJ = 12.2 M' LEBAR = 1.8 M
H PEK. JALAN LINGKUNGAN TYPE H PJ = 3 M' LEBAR 2.2 M

JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN

TERBILANG : SEMBILAN PULUH TIGA JUTA LIMA RATUS RUPIAH


N BIAYA

EMUKIMAN WILAYAH KELURAHAN SIRNAGALIH

JUMLAH HARGA
7,085,000.00

23,220,355.55
14,689,856.35
2,144,316.82
1,227,662.30
23,851,724.73
9,353,617.54
2,567,568.02
771,673.45

84,911,774.76
8,491,177.48
93,402,952.24
93,400,000.00

Tasikmalaya, 2019
KONSULTAN PERENCANA
CV. ARSILAND KONSULTAN

BUDI MULYANA
DIREKTUR
REKAPITULASI RENCANA ANGGARAN BIAYA

: PEMBANGUNAN/REHABILITASI INFRASTRUKTUR LINGKUNGAN PERUMAHAN PEMUKIMAN WILAYAH KELURAH


Kegiatan
: INDIHIANG KOTA TASIKMALAYA
Pekerjaan : PENINGKATAN JALAN LINGKUNGAN PERMUKIMAN RT 06/RW 04
Lokasi : KOTA TASIKMALAYA
Tahun : 2019

NO. URAIAN

I PEKERJAAN PERSIAPAN
II PEKERJAAN PELAKSANAAN
A PEK. JALAN LINGKUNGAN PJ TYPE A = 6 M', LEBAR = 2 M'
B PEK. JALAN LINGKUNGAN TYPE B PJ = 44 M', LEBAR = 2.2 M'
C PEK. JALAN LINGKUNGAN TYPE C PJ = 120 M', LEBAR = 3 M'
D PEK. JALAN LINGKUNGAN TYPE D PJ = 13.6 M', LEBAR = 3.5 M'
E PEK. JALAN LINGKUNGAN TYPE E PJ = 31.5 M', LEBAR = 3.8 M'
F PEK. JALAN LINGKUNGAN TYPE F PJ = 13 M', LEBAR = 4 M'
G PEK. JALAN LINGKUNGAN TYPR G PJ = 65 M', LEBAR = 5 M'
H PEK. JALAN LINGKUNGAN TYPE H PJ = 41 M' LEBAR = 5.5 M'
I PEK. JALAN LINGKUNGAN PJ = 13.5 M', LEBAR = 11 M'

JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN

TERBILANG : SERATUS DELAPAN PULUH TUJUH JUTA RUPIAH


AN BIAYA

MUKIMAN WILAYAH KELURAHAN SIRNAGALIH KECAMATAN

JUMLAH HARGA

7,820,000.00

1,403,042.63
11,317,877.23
42,091,278.94
5,565,402.44
13,995,350.25
6,079,851.40
37,999,071.27
26,365,509.45
17,362,652.56

170,000,036.16
17,000,003.62
187,000,039.78
187,000,000.00

Tasikmalaya, 2019
KONSULTAN PERENCANA
CV. ARSILAND KONSULTAN

BUDI MULYANA
DIREKTUR
RENCANA ANGGARAN BIAYA

PEMBANGUNAN/REHABILITASI INFRASTRUKTUR LINGKUNGAN PERUMAHAN PEMUKIMAN WILAYAH


Kegiatan :
KECAMATAN INDIHIANG KOTA TASIKMALAYA
Pekerjaan : PENINGKATAN JALAN LINGKUNGAN PEMUKIMAN KP TARIKOLOT
Lokasi : KOTA TASIKMALAYA
Tahun : 2019

KODE
NO URAIAN PEKERJAAN VOLUME
ANALIS
1 2 3 4

I PEKERJAAN PERSIAPAN
1 Pengukuran/uitzet - 1.00
2 Papan nama proyek - 1.00
3 Pengadaan/ Sewa Direksikeet - 1.00
4 Administrasi, Dokumentasi - 1.00
5 Mobilisasi Alat Berat Dan Uji Hasil Pekerjaan - 1.00
6 Angkutan Material - 1.00
JUMLAH
II PEKERJAAN PELAKSANAAN
A PEK. JALAN LINGKUNGAN TYPE B PJ = 58.30 M', L = 0.8 M'
1 Lapis Perekat AN. 18 46.64
2 Pekerjaan Penghamparan Lataston AN.01 3.11
JUMLAH
B PEK. JALAN LINGKUNGAN TYPE C PJ = 390.30 M', L = 1 M'
1 Lapis Perekat AN. 18 390.30
2 Pekerjaan Penghamparan Lataston AN.01 26.05
JUMLAH
C PEK. JALAN LINGKUNGAN TYPE E PJ = 86.70 M' L = 1.2 M'
1 Lapis Perekat AN. 18 104.04
2 Pekerjaan Penghamparan Lataston AN.01 6.94
JUMLAH
D PEK. JALAN LINGKUNGAN TYPE F PJ = 34.40 M' L= 1.3 M'
1 Lapis Perekat AN. 18 44.72
2 Pekerjaan Penghamparan Lataston AN.01 2.99
JUMLAH
E PEK. JALAN LINGKUNGAN TYPE G PJ = 12.30 M' L = 1.5 M'
1 Lapis Perekat AN. 18 18.45
2 Pekerjaan Penghamparan Lataston AN.01 1.23
JUMLAH
F PEK. JALAN LIMGKUNGAN TYPE H PJ = 9 M' L = 1.8 M'
1 Lapis Perekat AN. 18 16.20
2 Pekerjaan Penghamparan Lataston AN.01 1.08
JUMLAH
G PEK. JALAN LINGKUNGAN TYPE J PJ = 13 M' L = 3 M'
1 Lapis Perekat AN. 18 39.00
2 Pekerjaan Penghamparan Lataston AN.01 2.60
JUMLAH
SUB JUMLAH II
N PEMUKIMAN WILAYAH KELURAHAN SIRNAGALIH

HARGA SAT JUMLAH


SAT
( RP ) ( RP )
5 6 7

LS 900,000.00 900,000.00
LS 250,000.00 250,000.00
LS 300,000.00 300,000.00
LS 1,870,000.00 1,870,000.00
LS 3,000,000.00 3,000,000.00
LS 1,500,000.00 1,500,000.00
7,820,000.00

M2 15,631.20 729,039.33
Ton 1,517,438.44 4,724,119.70
5,453,159.03

M2 15,631.20 6,100,858.70
Ton 1,517,438.44 39,533,102.89
45,633,961.58

M2 15,631.20 1,626,270.40
Ton 1,517,438.44 10,538,109.21
12,164,379.61

M2 15,631.20 699,027.42
Ton 1,517,438.44 4,529,644.79
5,228,672.21

M2 15,631.20 288,395.70
Ton 1,517,438.44 1,868,782.34
2,157,178.05

M2 15,631.20 253,225.50
Ton 1,517,438.44 1,640,882.06
1,894,107.55

M2 15,631.20 609,616.93
Ton 1,517,438.44 3,950,271.62
4,559,888.55
77,091,346.58
JUMLAH 84,911,346.58
PPN 10% 8,491,134.66
Total Jumlah 93,402,481.24
Dibulatkan 93,400,000.00
Tasikmalaya, 2019
KONSULTAN PERENCANA
CV. ARSILAND KONSULTAN

BUDI MULYANA
DIREKTUR
REKAPITULASI RENCANA ANGGARAN BIAYA

PEMBANGUNAN/REHABILITASI INFRASTRUKTUR LINGKUNGAN PERUMAHAN PEMUKIMAN WILAYAH


Kegiatan :
KECAMATAN INDIHIANG KOTA TASIKMALAYA
Pekerjaan : PENINGKATAN JALAN LINGKUNGAN RT04/RW08 KECAMATAN INDIHIANG
Lokasi : KOTA TASIKMALAYA
Tahun : 2019

NO. URAIAN

I PEKERJAAN PERSIAPAN
II PEKERJAAN PELAKSANAAN
A PEK. JALAN LINGKUNGAN TYPE A PJ = 23.6 M' LEBAR = 0.7 M'
B PEK. JALAN LINGKUNGAN TYPE B PJ = 43.5 M', LEBAR 0.8 M'
C PEK JALAN LINGKUNGAN TYPE C PJ = 96 M', LEBAR = 0.9 M'
D PEK. JALAN LINGKUNGAN TYPE D PJ = 348.20 M', LEBAR 1 M'
E PEKERJAAN RABAT BETON + ASPAL TYPE E PJ = 68.90 M', L = 1 M'
F PEK. JALAN LINGKUNGAN TYPE E PJ = 11.5 M', LEBAR 1.2 M'
G PEK. JALAN LINGKUNGAN TYPE F PJ = 91 M', LEBAR = 1.3 M'
H PEK. JALAN LINGKUNGAN TYPE G PJ = 57.2 M', LEBAR = 1.5 M'
I PEK. JALAN LINGKUNGAN TYPEHI PJ = 57 M', LEBAR = 2 M'
J PEK. JALAN LINGKUNGAN TYPE I PJ = 53.8 M', LEBAR = 2.3 M'
K PEK. JALAN LINGKUNGAN TYPE J PJ = 4.7 M', LEBAR = 2.5 M'
L PEK. JALAN LINGKUNGAN TYPE K PJ = 102 M', LEBAR = 3 M'
III PEKERJAAN TAMBAHAN
M PEKERJAAN RABAT BETON PJ = 11.8 M', LEBAR = 1 M'

JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN

TERBILANG : SERATUS DELAPAN PULUH TUJUH JUTA RUPIAH


N BIAYA

PEMUKIMAN WILAYAH KELURAHAN SIRNAGALIH

JUMLAH HARGA

7,820,000.00

1,931,522.02
4,068,823.63
10,101,906.95
40,711,620.35
13,935,040.11
1,613,499.03
13,831,661.94
10,031,754.81
13,328,905.00
14,467,707.93
1,373,812.58
35,777,587.10

1,006,894.00

170,000,735.45
17,000,073.54
187,000,808.99
187,000,000.00

Tasikmalaya, 2019
KONSULTAN PERENCANA
CV. ARSILAND KONSULTAN
BUDI MULYANA
DIREKTUR
RINCIAN RENCANA ANGGARAN BIAYA

Kegiatan : PEMBANGUNAN/REHABILITASI INFRASTRUKTUR LINGKUNGAN PERUMAHAN PEMUKIMAN WI


KECAMATAN INDIHIANG KOTA TASIKMALAYA
Pekerjaan : PENINGKATAN JALAN LINGKUNGAN KP. CIPAPAGAN KELURAHAN SIRNAGALIH KECAMATAN IN
Lokasi : KOTA TASIKMALAYA
Tahun : 2019

KODE
NO URAIAN PEKERJAAN
ANALIS
1 2 3

I PEKERJAAN PERSIAPAN
1 Pengukuran/uitzet -
2 Papan nama proyek -
3 Pengadaan/ Sewa Direksikeet -
4 Administrasi, Dokumentasi -
5 Mobilisasi Bahan Sampai Ke lokasi -
6 Angkutan Material -
JUMLAH
II PEKERJAAN PELAKSANAAN
PEK. PEMASANGAN KANSTIN PJ TYPE A = (144.35 M' X 2) - 43 M'
1 Pek. Galian Tanah Biasa A.2.3.1.1.
2 Pek. Pemasangan Kanstin
3 Pek. Urugan Kembali A.2.3.1.11.
JUMLAH
PEKERJAAN PELAKSANAAN
PEK. PEMASANGAN KANSTIN PJ TYPE B = (97.57 M' X 2) - 30 M'
1 Pek. Galian Tanah Biasa A.2.3.1.1.
2 Pek. Pemasangan Kanstin
3 Pek. Urugan Kembali A.2.3.1.11.
JUMLAH
PEKERJAAN PELAKSANAAN
PEK. PEMASANGAN PAVING BLOCK TYPE A = PJ 144.35 M', L = 1.8 M'
1 Pek. Pemasangan Paving Block A.4.4.3.66.
JUMLAH
PEKERJAAN PELAKSANAAN
PEK. PEMASANGAN PAVING BLOCK TYPE B PJ = 97.57, L= 0.8 M'
1 Pek. Pemasangan Paving Block A.4.4.3.66.
JUMLAH
III PEKERJAAN TAMBAHAN
PEKERJAAN TPT TYPE A PJ = 43 M' T= 1.6 M' - 1.2 M'
1 Pek. Galian tanah A.2.3.1.1.
2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2.
4 Pas. Suling-suling dia 1,5" P.16
5 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26.
6 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4.
7 Acian Permukaan Plesteran A.4.4.2.27.
JUMLAH
PEKERJAAN TAMBAHAN
PEKERJAAN TPT TYPE B PJ = 30 M' T = 1M'
1 Pek. Galian tanah A.2.3.1.1.
2 Pek. Buangan Tanah Sisa Galian A.2.3.1.8.1
3 Pas. batu belah adk. 1pc : 4ps A.3.2.1.2.
4 Pas. Suling-suling dia 1,5" P.16
5 Pas. Siaran Batu Belah adk. 1pc : 2 ps A.4.4.2.26.
6 Pas. Plesteran Topi adk. 1pc : 4ps A.4.4.2.4.
7 Acian Permukaan Plesteran A.4.4.2.27.
JUMLAH
STA
LAJUR
NO STASION

Ki / Ka

TPT lok 1

1 0 + 006 kiri

NO. Blok STA LAJUR

Ki / Ka

1 0 + 006 Kanan
1 0 + 006 Kanan

1 0 + 018 Kiri

REKAPITULASI RENCANA ANGGARAN BIAYA


KEGIATAN : PEMBANGUNAN/REHABILITASI INFRASTRUKTUR LINGKUNGAN PERUMAHAN
KELURAHAN SIRNAGALIH KECAMATAN INDIHIANG KOTA TASIKMALAYA
PEKERJAAN :
: PENINGKATAN JALAN LINGKUNGAN KP. CIPAPAGAN KELURAHAN SIRNAGAL
LOKASI : KOTA TASIKMALAYA

TAHUN : 2019

NO. URAIAN

I PEKERJAAN PERSIAPAN
II PEKERJAAN PELAKSANAAN
A PEK. PEMASANGAN KANSTIN PJ TYPE A = (144.35 M' X 2) - 43 M'
B PEK. PEMASANGAN KANSTIN PJ TYPE B = (97.57 M' X 2) - 30 M'
C PEK. PEMASANGAN PAVING BLOCK TYPE A = PJ 144.35 M', L = 1.8 M'
D PEK. PEMASANGAN PAVING BLOCK TYPE B PJ = 97.57, L= 0.8 M'
III PEKERJAAN TAMBAHAN
E PEKERJAAN TPT TYPE A PJ = 43 M' T= 1.6 M' - 1.2 M'
F PEKERJAAN TPT TYPE B PJ = 30 M' T = 1M'

JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN

TERBILANG : SERATUS DELAPAN PULUH TUJUH JUTA RUPIAH


RAN BIAYA

PERUMAHAN PEMUKIMAN WILAYAH KELURAHAN SIRNAGALIH

AN SIRNAGALIH KECAMATAN INDIHIANG

HARGA SAT JUMLAH


VOLUME SAT
( RP ) ( RP )
4 5 6 7

1.00 LS 900,000.00 900,000.00


1.00 LS 250,000.00 250,000.00
1.00 LS 300,000.00 300,000.00
1.00 LS 1,870,000.00 1,870,000.00
1.00 LS 3,000,000.00 3,000,000.00
1.00 LS 1,500,000.00 1,500,000.00
7,820,000.00

2.60 M3 67,418.75 175,174.14


245.70 M1 77,100.00 18,943,470.00
1.44 M3 48,587.50 70,136.06
19,188,780.19

1.76 M3 67,418.75 118,404.85


165.14 M1 77,100.00 12,732,294.00
0.98 M3 48,587.50 47,406.82
12,898,105.68

259.83 M2 232,154.53 60,320,710.23


60,320,710.23

78.06 M2 232,154.53 18,121,053.60


18,121,053.60

35.98 M3 67,418.75 2,425,501.90


35.98 M3 55,027.50 1,979,706.03
37.84 M3 692,622.00 26,208,816.48
10.75 M' 30,633.13 329,306.09
60.20 M3 54,657.66 3,290,391.13
21.50 M2 56,168.76 1,207,628.34
21.50 M2 33,919.25 729,263.88
36,170,613.84

15.85 M3 67,418.75 1,068,587.19


15.85 M3 55,027.50 872,185.88
15.30 M3 692,622.00 10,597,116.60
7.50 M' 30,633.13 229,748.44
30.00 M3 54,657.66 1,639,729.80
12.00 M2 56,168.76 674,025.12
12.00 M2 33,919.25 407,031.00
15,488,424.02
1.00 JUMLAH 170,007,687.57
PPN 10% 17,000,768.76
Total Jumlah 187,008,456.32
Dibulatkan 187,000,000.00

Tasikmalaya, 2019
KONSULTAN PERENCANA
CV. ARSILAND KONSULTAN

BUDI MULYANA
DIREKTUR
Panjang DIMENSI

( m' ) m m m

L b1 b2 b3

0.40 0.50 0.50


43.00
0.40 0.50 0.50

DIMENSI DIMENSI
Panjang

m b1 m2 m2

L L h

43.00 1.60
43.00
43.00
43.00 1.20

0.50 - -
43.00
0.50 - -

GGARAN BIAYA
NGKUNGAN PERUMAHAN PEMUKIMAN WILAYAH
KOTA TASIKMALAYA

KELURAHAN SIRNAGALIH KECAMATAN INDIHIANG

JUMLAH HARGA

7,820,000.00

19,188,780.19
12,898,105.68
60,320,710.23
18,121,053.60

36,170,613.84
15,488,424.02

170,007,687.57
17,000,768.76
UMLAH TOTAL 187,008,456.32
187,000,000.00

Tasikmalaya, 2019
KONSULTAN PERENCANA
CV. ARSILAND KONSULTAN

BUDI MULYANA
DIREKTUR
0.53

0.15

0.18

0.11

1.76

0.08

2.81

PAVING BLOCK LOKASI 1 PAVING BLOCK LOKASI 2

0.10 PANJANG V0LUME PANJANG VOLUME

11.14 45 81 4.67 3.74

0.04 22 39.6 36.6 29.28

11.28 36.5 65.7 56.3 45.04

40.85 73.53 97.57 78.06

144.35 259.83 195.14

0.07 288.7

7.49

0.03

7.58

35.48

35.48

10.66

10.66

1.43
1.16

15.42

0.19

1.94

0.71

0.43 25.23

21.28

0.63

0.51

6.23

0.14

0.96

0.40

0.24 5.10

9.11

98.20
LUAS
LUAS 2
LUAS LUAS Total RATA- VOLUME
RATA

m m ( m2 ) ( m2 ) ( m2 ) ( m2 ) ( m3 )

A1 Ātot =
=(b1+b2)/ A2 h2
=b2 x Atot = V =Ātot
h1 h2 (Atot1 +
A1+A2 Atot2)/2 xL
2 x h1

1.60 0.50 0.72 0.25 0.97


0.88 37.84
1.20 0.50 0.54 0.25 0.79

LUAS TOT
LUAS

m2 m2 m2 m2
A A1
b1 L =(h1+h2+ =(A1+A2)
b1) x L /2

68.80 60.20
51.60

0.50 - 0.13 0.25 - 0.25 10.75


0.50 - 0.13 0.25 -
STA Panjang
LAJUR DIMENSI
NO STASION
Panjang
LAJUR DIMENSI
NO STASION
Ki / Ka ( m' ) m
L b1
TPT Pot A (Lokasi II)

0.30
1 0 + 006 kiri 30.00
0.30

DIMENSI
Panjang
NO. Blok STA LAJUR
m b1

Ki / Ka L

siaran

1 0 + 006 Kanan 30.00

0.40
2 018 + 021 Kiri 30.00
0.40
No PEKERJAAN STASIONING PANJANG LEBAR

1 Pekerjaan Pasangan Hotmix STA 0+000

2 Pekerjaan Pasangan Hotmix STA 0+050

3 Pekerjaan Pasangan Hotmix STA 0+100

4 Pekerjaan Pasangan Hotmix STA 0+150

5 Pekerjaan Pasangan Hotmix STA 0+200

6 Pekerjaan Pasangan Hotmix STA 0+250

7 Pekerjaan Pasangan Hotmix STA 0+300

8 Pekerjaan Pasangan Hotmix STA 0+350

JUMLAH 0 M'
luasan TINGGI BERAT JENIS JUMLAH SATUAN

0.03 2.225 0.000 Ton

- 0.03 2.225 0.00 Ton

- 0.03 2.225 0.00 Ton

- 0.03 2.225 0.00 Ton

- 0.03 2.225 0.00 Ton

- 0.03 2.225 0.00 Ton

- 0.03 2.225 0.00 Ton

- M2 0.00 Ton
KETERANGAN

Rp27,000
No PEKERJAAN STASIONING

1 Pekerjaan Patching Lapen STA 0+000

2 Pekerjaan Patching Lapen STA 0+050

3 Pekerjaan Patching Lapen STA 0+100

4 Pekerjaan Patching Lapen STA 0+150

5 Pekerjaan Patching Lapen STA 0+200

6 Pekerjaan Patching Lapen STA 0+250

7 Pekerjaan Patching Lapen STA 0+300

8 Pekerjaan Patching Lapen STA 0+350

JUMLAH
LUAS LUAS RUSAK
LEBAR
PANJANG LEBAR TINGGI
RATA-RATA
JLN/STA (M2) JLN/STA (M2)

0 - - - 0.05

0 - 0 - 0.05

0 - 0 - 0.05

0 0 0 - 0.05

0 0 0 - 0.05

0 0 0 - 0.05

0 0 0 - 0.05

0 M' - M2
% RUSAK VOLUME (M3) KETERANGAN

100.00% -

100.00% -

100.00% -

100.00% -

100.00% -

100.00% -

100.00% -
No PEKERJAAN STASIONING

1 Pekerjaan Urugan Sirtu STA 0+000

2 Pekerjaan Urugan Sirtu STA 0+050

3 Pekerjaan Urugan Sirtu STA 0+100

4 Pekerjaan Urugan Sirtu STA 0+150

5 Pekerjaan Urugan Sirtu STA 0+200

6 Pekerjaan Urugan Sirtu STA 0+250

7 Pekerjaan Urugan Sirtu STA 0+300

8 Pekerjaan Urugan Sirtu STA 0+350


LUAS LUAS RUSAK
LEBAR
PANJANG LEBAR TINGGI
RATA-RATA
JLN/STA (M2) JLN/STA (M2)

0 - - - 0.1

0 - 0 - 0.1

0 - 0 - 0.1

0 0 0 - 0.1

0 0 0 - 0.1

0 0 0 - 0.1

0 0 0 - 0.1

JUMLAH
% RUSAK VOLUME (M3) KETERANGAN

100.00% -

100.00% -

100.00% -

100.00% -

100.00% -

100.00% -

100.00% -

0.00 M3
No PEKERJAAN STASIONING

1 Pekerjaan Lapis Pondasi Bawah ( LPB ) STA 0+000

2 Pekerjaan Lapis Pondasi Bawah ( LPB ) STA 0+050

3 Pekerjaan Lapis Pondasi Bawah ( LPB ) STA 0+100

4 Pekerjaan Lapis Pondasi Bawah ( LPB ) STA 0+150

5 Pekerjaan Lapis Pondasi Bawah ( LPB ) STA 0+200

6 Pekerjaan Lapis Pondasi Bawah ( LPB ) STA 0+250

7 Pekerjaan Lapis Pondasi Bawah ( LPB ) STA 0+300

8 Pekerjaan Lapis Pondasi Bawah ( LPB ) STA 0+350


LUAS LUAS RUSAK
LEBAR RATA-
PANJANG LEBAR TINGGI
RATA
JLN/STA (M2) JLN/STA (M2)

0 1.5 0 - 0.2

0 0 0 - 0.2

0 0 0 - 0.2

0 0 0 - 0.2

0 0 0 - 0.2

0 0 0 - 0.2

0 0 0 - 0.2

JUMLAH
% RUSAK VOLUME (M3) KETERANGAN

20.00% -

20.00% -

20.00% -

28.00% -

30.00% -

10.00% -

10.00% -

0.00 M3
Perhitungan Volume Parit Beton
Panjang Parit

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m

Galian Tanah 1.00 0.65 0.50 0.33 0.33 M³

Pas. Beton
a 1.00 0.15 0.50 0.08 0.08
b 1.00 0.15 0.50 0.08 0.08
0.50
c 1.00 0.35 0.10 0.04 0.04
Stoot/bh - 0.35 0.10 0.10 -
0.19 0.19 M³

Pembesian bh kg/m'
Ø 8 - 20 1.00 9.00 0.394 3.55
Ø 10 - 20 6.00 1.65 0.616 6.10
Ø8 2.60 - 0.394 -
Ø 10 - 0.20 0.616 2 -
9.65 Kg

Bekisting 1.00 0.40 0.40 0.80 0.80


0.00 0.35 0.34 0.69 0.00
0.80 m2

Galian Tanah untuk Konstruksi 0.33 M3


Buangan sisa Galian Tanah 0.33 M3
Pasangan beton 0.19 M3
Penulangan Beton ( pembesian ) 9.65 KG
Perancah bekisting untuk beton 2x Pakai 0.80 M2
Acian Saluran 1.45 M2
Perhitungan Volume Parit Beton
Panjang Parit

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m

Galian Tanah Err:509 0.65 0.50 0.33 Err:509 M³

Pas. Beton
a Err:509 0.15 0.50 0.08 Err:509
b Err:509 0.15 0.50 0.08 Err:509
0.50
c Err:509 0.35 0.10 0.04 Err:509
Stoot/bh Err:509 0.35 0.10 0.10 Err:509
0.19 Err:509 M³

Pembesian bh kg/m'
Ø 8 - 20 Err:509 9.00 0.394 Err:509
Ø 10 - 20 Err:509 1.65 0.616 Err:509
Ø8 2.60 Err:509 0.394 Err:509
Ø 10 Err:509 0.20 0.616 2 Err:509
Err:509 Kg

Bekisting Err:509 0.40 0.40 0.80 Err:509


Err:509 0.35 0.34 0.69 Err:509
Err:509 m2

Galian Tanah untuk Konstruksi Err:509 M3


Buangan sisa Galian Tanah Err:509 M3
Pasangan beton Err:509 M3
Penulangan Beton ( pembesian ) Err:509 KG
Perancah bekisting untuk beton 2x Pakai Err:509 M2
Acian Saluran Err:509 M2
Perhitungan Volume Parit Beton
Panjang Parit

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m

Galian Tanah Err:509 0.50 0.50 0.25 Err:509 M³

Pas. Beton
a Err:509 0.15 0.50 0.08 Err:509
b Err:509 - 0.50 - Err:509
0.50
c Err:509 0.35 0.10 0.04 Err:509
Stoot/bh - 0.35 0.10 0.10 -
0.11 Err:509 M³

Pembesian bh kg/m'
Ø 8 - 20 Err:509 9.00 0.394 Err:509
Ø 10 - 20 Err:509 1.50 0.616 Err:509
Ø8 2.00 - 0.394 -
Ø 10 - 0.20 0.616 2 -
Err:509 Kg

Bekisting Err:509 0.40 0.40 0.80 Err:509


0.00 0.35 0.34 0.69 0.00
Err:509 m2

Galian Tanah untuk Konstruksi Err:509 M3


Buangan sisa Galian Tanah Err:509 M3
Pasangan beton Err:509 M3
Penulangan Beton ( pembesian ) Err:509 KG
Perancah bekisting untuk beton 2x Pakai Err:509 M2
Acian Saluran Err:509 M2

Perhitungan Volume Parit Beton


Panjang Parit

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m

Galian Tanah Err:509 0.50 0.50 0.25 Err:509 M³

Pas. Beton

0.50
a Err:509 0.15 0.50 0.08 Err:509
b Err:509 - 0.50 - Err:509
0.50
c Err:509 0.35 0.10 0.04 Err:509
Stoot/bh - 0.35 0.10 0.10 -
0.11 Err:509 M³

Pembesian bh kg/m'
Ø 8 - 20 Err:509 9.00 0.394 Err:509
Ø 10 - 20 Err:509 1.50 0.616 Err:509
Ø8 2.00 - 0.394 -
Ø 10 - 0.20 0.616 2 -
Err:509 Kg

Bekisting Err:509 0.40 0.40 0.80 Err:509


0.00 0.35 0.34 0.69 0.00
Err:509 m2

Galian Tanah untuk Konstruksi Err:509 M3


Buangan sisa Galian Tanah Err:509 M3
Pasangan beton Err:509 M3
Penulangan Beton ( pembesian ) Err:509 KG
Perancah bekisting untuk beton 2x Pakai Err:509 M2
Acian Saluran Err:509 M2
Perhitungan Volume Parit Beton
Panjang Parit

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m

Galian Tanah - 0.65 0.65 0.42 - M³

Pas. Beton
a - 0.15 0.65 0.10 -
b - 0.10 0.65 0.07 -
0.65
c - 0.40 0.15 0.06 -
Stoot/bh - 0.40 0.10 0.10 -
0.22 - M³

Pembesian bh kg/m'
Ø 8 - 20 - 9.00 0.394 -
Ø 10 - 20 1.00 1.95 0.616 1.20
Ø8 2.60 - 0.394 -
Ø 10 - 0.20 0.616 2 -
1.20 Kg

Bekisting 0.00 0.50 0.50 1.00 0.00


0.00 0.40 0.34 0.74 0.00
0.00 m2

Galian Tanah untuk Konstruksi - M3


Buangan sisa Galian Tanah - M3
Pasangan beton - M3
Penulangan Beton ( pembesian ) 1.20 KG
Perancah bekisting untuk beton 2x Pakai 0.00 M2
Acian Saluran 0.65 M2

Perhitungan Volume Parit Beton


Panjang Parit

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m

Galian Tanah - 0.65 0.65 0.42 - M³

Pas. Beton
a - 0.15 0.65 0.10 -

0.65
b - 0.10 0.65 0.07 -
0.65
c - 0.40 0.15 0.06 -
Stoot/bh - 0.40 0.10 0.10 -
0.22 - M³

Pembesian bh kg/m'
Ø 8 -20 - 9.00 0.394 -
Ø 10 - 20 1.00 1.95 0.616 1.20
Ø8 2.60 - 0.394 -
Ø 10 - 0.20 0.616 2 -
1.20 Kg

Bekisting 0.00 0.50 0.50 1.00 0.00


0.00 0.40 0.34 0.74 0.00
0.00 m2

Galian Tanah untuk Konstruksi - M3


Buangan sisa Galian Tanah - M3
Pasangan beton - M3
Penulangan Beton ( pembesian ) 1.20 KG
Perancah bekisting untuk beton 2x Pakai 0.00 M2
Acian Saluran 0.65 M2

Perhitungan Volume Parit Beton


Panjang Parit

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m

Galian Tanah #REF! 0.55 0.55 0.30 #REF! M³

Pas. Beton

0.55
Panjang Parit 1.00 M'

0.15 0.35 0.15


Ø 8- 0.200 m'

Ø 10 - 0.200 m'
0.05

0.40
a b
0.50

0.10

8.25 9.00 bh
0.65 Stoot 0.33 - bh

Err:509
Panjang Parit Err:509 M'

0.15 0.35 0.15


Ø 8- 0.200 m'

Ø 10 - 0.200 m'
0.05

0.40
a b
0.50

0.10

8.25 9.00 bh
0.65 Stoot Err:509 Err:509 bh

Err:509
Panjang Parit Err:509 M'

0.00 0.35 0.15


Ø 8- 0.200 m'

Ø 10 - 0.200 m'
0.05

0.40
a b
0.50

0.10

7.50 9.00 bh
0.50 Stoot Err:509 bh

Err:509

Panjang Parit Err:509 M'

0.00 0.35 0.15


Ø 8- 0.200 m'

Ø 10 - 0.200 m'
0.05

0.40
0.50
0.40
a b
0.50

0.10

7.50 9.00 bh
0.50 Stoot Err:509 bh

Err:509
Panjang Parit M'

0.10 0.40 0.15


Ø 8- 0.200 m'

Ø 10 - 0.200 m'
0.05

0.50
a b
0.65

0.15

9.75 9.00 bh
0.65 Stoot - bh

Panjang Parit M'

0.10 0.40 0.15


Ø 8- 0.200 m'

Ø 10 - 0.200 m'
0.05

0.50
0.65
0.50
a b
0.65

0.15

9.75 9.00 bh
0.65 Stoot - bh

Panjang Parit #REF! M'

0.15 0.40 0.00


Ø 10 - 0.150 m'

Ø 10 - 0.150 m'
0.05

0.40
0.55
197.20 162.70

-
15,590,909.09
197.20 162.70

-
-
DATA SALURAN + GRILL DRAINASE

NO PJ SAL. PJ.CANAL 65 JMLH.CANAL 80 KET.

1 1
SALURAN TERBUKA

2 3 3 7
SALURAN + BESI GRILL

10

11

12

13

14

4 3 7
212,155,000.00

1
24,155,000.00

Anda mungkin juga menyukai