REKAPITULASI

RENCANA ANGGARAN DAN BIAYA BANGUNAN


ENGINEERING ESTIMATE ( EE )

PEKERJAAN : PEMBANGUNAN TOKO


LOKASI : DESA BLORO, KEC.NITA

NO PEKERJAAN JUMLAH HARGA (Rp)

1 2 3
A PEKERJAAN PERPUSTAKAAN
I PEKERJAAN PENDAHULUAN 2,000,000.00
II PEKERJAAN TANAH 8,617,513.66
III PEKERJAAN PASANGAN DAN PLESTERAN 98,267,050.46
IV PEKERJAAN BETON 29,249,291.53
V PEKERJAAN PINTU DAN JENDELA 8,470,360.00
VI PEKERJAAN ATAP DAN PLAFOND 77,486,415.93
VII PEK. PELAPIS LANTAI 110,326,121.37
VIII PEKERJAAN SANITASI 1,514,537.72
IX PEKERJAAN PENGECATAN 8,235,834.29
JUMLAH ( I+II+III+IV+V+VI+VII+VIII) 344,167,124.96
PPN 10% 34,416,712.50
TOTAL JUMLAH 378,583,837.46
DIBULATKAN 378,584,000.00

TERBILANG : # TIGA RATUS TUJUH PULUH DELAPAN JUTA LIMA RATUS DELAPAN PULUH EMPAT RIBU RUPIAH #

Maumere, 10 Februari 2018


Disetujui Oleh : Dibuat Oleh :
Pemilik Perencana

Yulius Lelo Ferrys,ST

Diperiksa : Mengetahui
Kepala Bidang Cipta Karya Kepala Dinas Pekerjaan Umum dan
Dinas Pekerjaan Umum dan Penataan Ruang Penataan Ruang
Kabupaten Sikka, Kabupaten Sikka,

FRANS METSEN, ST THOMAS PETRUS LAMENG, ST


NIP. 19680224 200003 1 002 PEMBINA TK.1
NIP. 19630629 199503 1 002

REKAPITULASI perpustakaan sdk warut 2015 Page 1t


DAFTAR KUANTITAS DAN HARGA
ENGINEERING ESTIMATE ( EE )

PEKERJAAN : PEMBANGUNAN TOKO


LOKASI : DESA BLORO, KEC.NITA

HARGA SATUAN
NO URAIAN PEKERJAAN VOL SAT JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6

A PEKERJAAN RUANG PERPUSTAKAAN


I PEKERJAAN PENDAHULUAN
1 Pasangan bouplank 1.00 Ls 1,500,000.00 1,000,000.00
2 Penyediaan Air kerja 1.00 Ls 2,000,000.00 1,000,000.00
Jumlah I : 2,000,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 49.42 M3 44,500.00 2,199,190.00
2 Urugan Tanah bekas galian pondasi 12.36 M3
12,652.00 156,315.46
3 Urugan Tanah peninggian lantai ( tanah didatangkan) 24.71 M3 94,420.00 2,333,118.20
4 Urugan pasir dibawah Pondasi 9.88 M3 265,000.00 2,619,260.00
5 Urugan pasir dibawah Lantai 4.94 M3 265,000.00 1,309,630.00
Jumlah II : 8,617,513.66
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Batu kosong 13.20 M3 475,035.00 6,270,462.00
2 Pas. Pondasi Batu kali 1Pc : 5 Psr 49.42 M3 804,560.00 39,761,355.20
3 Pas. Dinding batu merah 1 / 2 batu 1 Pc : 5 Psr 235.48 M2 108,238.50 25,488,001.98
4 Plesteran dinding 1Pc : 5 Psr 470.96 M2 38,724.00 18,237,455.04
5 Acian tembok dan beton saus semen 470.96 Ls 18,069.00 8,509,776.24
Jumlah III : 98,267,050.46
IV PEKERJAAN BETON
A Beton Cor ( camp. 1 Pc : 2 Psr : 3 Krl )
1 Sloof 15/20 1.98 M3 1,225,055.00 2,425,608.90
2 Kolom Struktur 15/15 1.62 M3 1,225,055.00 1,984,589.10
3 Balok Gewel 12/15 0.57 M3
1,225,055.00 692,401.09
4 Balok Latai 12/12 1.98 M3 1,225,055.00 2,425,608.90
5 Ring Balk 15/20 1.98 M3 1,225,055.00 2,425,608.90
Jumlah A : 9,953,816.89
B Pembesian ( Besi Polos SNI )
1 Sloof 15/20 348.79 Kg 13,016.23 4,539,942.65
2 Kolom Struktur 15/15 305.82 Kg 13,016.23 3,980,666.91
3 Balok Gewel 12/15 73.57 Kg 13,016.23 957,547.86
4 Balok Latai 12/12 307.24 Kg 13,016.23 3,999,155.37
5 Ring Balk 12/20 197.30 Kg 13,016.23 2,568,161.85
Jumlah B : 16,045,474.64
C Bekisting + Perancah
1 Bekisting Sloef , Kolom , Ring balk dan plat 1.00 Ls 1,750,000.00 1,750,000.00
2 Perancah 1.00 Ls 1,500,000.00 1,500,000.00
Jumlah C : 3,250,000.00
Total Pekerjaan Beton A + B + C Jumlah IV : 29,249,291.53
V PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu 0.04 M3 6,448,500.00 257,940.00
2 Pasangan Kunci Pintu 34.00 Bh 193,010.00 6,562,340.00
3 Pasangan Engsel Pintu 48.00 Psg 26,560.00 1,274,880.00
4 Pasangan Hak Angin 20.00 Psg 18,760.00 375,200.00
Jumlah V : 8,470,360.00
1 2 3 4 5 6
VI PEKERJAAN ATAP DAN PLAFOND
1 Kuda - Kuda Kayu 8/12 1.96 M2 6,162,837.00 12,079,160.52
2 Gording Kayu Kelas II 5 / 10 2.75 M3
4,881,412.00 13,423,883.00
3 Pek. Atap Seng gelombang galvalum BJLS 0,25 mm 265.97 M2 63,980.42 17,016,872.31
4 Pek. Nok Seng BJLS 0,30 12.26 M1 36,083.60 442,384.94
5 Pek. Listplank (2,5/15 + 2,5/20 cm) Ky. Kelas II 99.30 M1 52,999.75 5,262,875.18
6 Pek. Plafon 230.89 M2 124,566.85 28,761,240.00
7 Pas.Baut, Begel dan Accessories 1.00 Ls 500,000.00 500,000.00
Jumlah VI : 77,486,415.93
VII PEK. PELAPIS LANTAI
1 Rabat Lantai camp.1PC : 4 Psr : 6 Krl, T= 7 cm 80.00 M2 811,845.00 64,947,600.00
2 Pas. Kramik Lantai 40 x 40 cm 157.32 M2 288,447.25 45,378,521.37
Jumlah VII : 110,326,121.37
VIII PEKERJAAN SANITASI
Pekerjaan instalasi air bersih pipa PVC 1/2" tipe AW 30.00 M' 22,500.55 675,016.50
Pekerjaan instalasi air kotor pipa PVC 2" tipe AW 10.00 M' 23,450.66 234,506.60
Pekerjaan instalasi air kotor pipa PVC 4" tipe AW 6.00 M' 100,835.77 605,014.62
Jumlah VII : 1,514,537.72
IX PEKERJAAN PENGECATAN
1 Pekerjaan cat Tembok ex mateks 470.96 M2 12,971.80 6,109,198.93
2 Pekerjaan Cat Kayu ( kusen dan Listplank ) 16.60 M2 24,748.00 410,816.80
3 Politur Daun Pintu dan Jendela 16.60 M2 43,121.60 715,818.56
4 Residu Rangka Atap 1.00 Ls 1,000,000.00 1,000,000.00
Jumlah X : 8,235,834.29
DAFTAR ANALISA HARGA SATUAN
ENGINEERING ESTIMATE ( EE )

PEKERJAAN : PEMBANGUNAN TOKO


LOKASI : DESA BLORO, KEC.NITA

HARGA SATUAN JUMLAH


NO URAIAN KOEF. SAT.
(Rp) HARGA (Rp)
1 2 3 4 5 6
1 1 M³ Galian Tanah Biasa :
Tenaga :
- Pekerja 0.7500 OH 56,000.00 42,000.00
- Mandor 0.0250 OH 100,000.00 2,500.00
Jumlah 44,500.00
2 1 M³ Urugan Kembali :
Tenaga :
- Pekerja 0.192 OH 56,000.00 10,752.00
- Mandor 0.019 OH 100,000.00 1,900.00
12,652.00
3 1 M³ Urugan Tanah yang didatangkan :
Bahan :
- Tanah Urug 1.2000 M³ 63,850.00 76,620.00
Tenaga
- Pekerja 0.3000 OH 56,000.00 16,800.00
- Mandor 0.0100 OH 100,000.00 1,000.00
Jumlah 94,420.00
4 1 M³ Urugan Pasir :
Bahan :
- Pasir Urug 1.2000 M³ 206,000.00 247,200.00
Tenaga
- Pekerja 0.3000 OH 56,000.00 16,800.00
- Mandor 0.0100 OH 100,000.00 1,000.00
Jumlah 265,000.00
5 1 M³ Pasang Pondasi Batu Kali 1 Pc : 5 Ps :
Bahan :
- Batu Kali 1.1000 M³ 274,000.00 301,400.00
- Semen Portland 136.0000 Kg 1,700.00 231,200.00
- Pasir Pasang 0.5440 M³ 227,500.00 123,760.00
Tenaga :
- Tukang Batu 0.6000 OH 85,000.00 51,000.00
- Pekerja 1.5000 OH 56,000.00 84,000.00
- Kepala Tukang 0.0600 OH 95,000.00 5,700.00
- Mandor 0.0750 OH 100,000.00 7,500.00
Jumlah 804,560.00
6 1 M³ Pasang Pondasi Batu Kosong :
Bahan :
- Batu kali 1.2000 M3 274,000.00 328,800.00
- Pasir Urug 0.3000 M3 206,000.00 61,800.00

Tenaga :
- Tukang Batu 0.3900 OH 85,000.00 33,150.00
- Pekerja 0.7800 OH 56,000.00 43,680.00
- Kepala Tukang 0.0390 OH 95,000.00 3,705.00
- Mandor 0.0390 OH 100,000.00 3,900.00
Jumlah 475,035.00
7 1 M² Pasangan Bata Merah Tebal ½ Bata, 1 Pc : 3 Ps :
Bahan :
- Bata Merah 5 x 11 x 22 cm 70.0000 Bh 752.50 52,675.00
- Semen Portland 14.3700 Kg 1,700.00 24,429.00
- Pasir Pasang 0.0400 M3 227,500.00 9,100.00
Tenaga :
SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 4
1 2 3 4 5 6
- Tukang Batu 0.1000 OH 85,000.00 8,500.00
- Pekerja 0.3200 OH 56,000.00 17,920.00
- Kepala Tukang 0.0100 OH 95,000.00 950.00
- Mandor 0.0150 OH 100,000.00 1,500.00
Jumlah 115,074.00
8 1 M² Pasangan Bata Merah Tebal ½ Bata, 1 Pc : 5 Ps :
Bahan :

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 5


1 2 3 4 5 6
- Bata Merah 5 x 11 x 22 cm 70.0000 Bh 752.50 52,675.00
- Semen Portland 9.6800 Kg 1,700.00 16,456.00
- Pasir Pasang 0.0450 M³ 227,500.00 10,237.50
Tenaga :
- Tukang Batu 0.1000 OH 85,000.00 8,500.00
- Pekerja 0.3200 OH 56,000.00 17,920.00
- Kepala Tukang 0.0100 OH 95,000.00 950.00
- Mandor 0.0150 OH 100,000.00 1,500.00
Jumlah 108,238.50

9 1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm


Bahan :
- Semen Portland 6.4800 Kg 1,700.00 11,016.00
- Pasir Pasang 0.0190 M³ 227,500.00 4,322.50
Tenaga :
- Tukang Batu 0.1500 OH 85,000.00 12,750.00
- Pekerja 0.2000 OH 56,000.00 11,200.00
- Kepala Tukang 0.0150 OH 95,000.00 1,425.00
- Mandor 0.0100 OH 100,000.00 1,000.00
Jumlah 41,713.50

10 1 M² Plesteran 1 Pc : 5 Ps, tebal 15 mm


Bahan :
- Semen Portland 4.3200 Kg 1,700.00 7,344.00
- Pasir Pasang 0.0220 M³ 227,500.00 5,005.00
Tenaga :
- Tukang Batu 0.1500 OH 85,000.00 12,750.00
- Pekerja 0.2000 OH 56,000.00 11,200.00
- Kepala Tukang 0.0150 OH 95,000.00 1,425.00
- Mandor 0.0100 OH 100,000.00 1,000.00
Jumlah 38,724.00
11 1 M2 Acian plesteran tebal 2 mm
Bahan :
- Semen Portland 1.3200 Kg 1,700.00 2,244.00
Tenaga :
- Tukang Batu 0.0900 OH 85,000.00 7,650.00
- Pekerja 0.1200 OH 56,000.00 6,720.00
- Kepala Tukang 0.0090 OH 95,000.00 855.00
- Mandor 0.0060 OH 100,000.00 600.00
Jumlah 18,069.00
12 1 M³ Beton Tumbuk, 1 P : 4 Ps : 6 Kr
Bahan
- Semen Portland 173.000 Kg 1,700.00 294,100.00
- Pasir Beton 0.570 M³ 227,500.00 129,675.00
- Koral Beton 0.870 M³ 303,500.00 264,045.00
Tenaga
- Tukang Batu 0.250 OH 85,000.00 21,250.00
- Pekerja 1.650 OH 56,000.00 92,400.00
- Kepala Tukang 0.025 OH 95,000.00 2,375.00
- Mandor 0.080 OH 100,000.00 8,000.00
811,845.00
13 1 M³ Beton Lantai Kerja, 1 P : 3 Ps : 5 Kr
Bahan
- Semen Portland 218.000 Kg 1,700.00 370,600.00
- Pasir Beton 0.520 M³ 227,500.00 118,300.00
- Batu pecah 3/5 0.870 M³ 303,500.00 264,045.00
Tenaga
- Tukang Batu 0.250 OH 85,000.00 21,250.00
- Pekerja 1.650 OH 56,000.00 92,400.00
- Kepala Tukang 0.025 OH 95,000.00 2,375.00
- Mandor 0.080 OH 100,000.00 8,000.00
876,970.00

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 6


1 2 3 4 5 6
14 1 M³ Membuat Beton Bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
- Semen Portland 336.0000 Kg 1,700.00 571,200.00
- Pasir Beton 0.5400 M³ 227,500.00 122,850.00
- Kerikil 2 / 3 0.8100 M³ 353,000.00 285,930.00
Tenaga
- Tukang Batu 0.3500 OH 85,000.00 29,750.00
- Pekerja 2.0000 OH 56,000.00 112,000.00
- Kepala Tukang 0.0350 OH 95,000.00 3,325.00
- Mandor 1.0000 OH 100,000.00 100,000.00
Jumlah 1,225,055.00

15 1 Kg Pembesian dengan Besi Polos


Bahan
- Besi Beton polos 1.0500 Kg 11,050.00 11,602.50
- Kawat Beton 0.0150 Kg 22,015.00 330.23
Tenaga
- Tukang Besi 0.0070 OH 85,000.00 595.00
- Pekerja 0.0070 OH 56,000.00 392.00
- Kepala Tukang 0.0007 OH 95,000.00 66.50
- Mandor 0.0003 OH 100,000.00 30.00
Jumlah 13,016.23
16 1 M² Pasang Atap Seng Gelombang BJLA 0,25 mm
Bahan
- Seng Galvalum BJLA 0.25 mm 0.8900 Lbr 56,600.00 50,374.00
- Paku Seng 0.0280 Kg 22,015.00 616.42
Tenaga
- Tukang Kayu 0.0600 OH 85,000.00 5,100.00
- Pekerja 0.1200 OH 56,000.00 6,720.00
- Kepala Tukang 0.0060 OH 95,000.00 570.00
- Mandor 0.0060 OH 100,000.00 600.00
Jumlah 63,980.42

1 1Bh Pasangan Bak Viber Untuk Wc/Km


Bahan :
- Bata Merah 5 x 11 x 22 cm 70.0000 Bh 752.50 52,675.00
- Semen Portland 9.6800 Kg 1,700.00 16,456.00
- Pasir Pasang 0.0450 M³ 227,500.00 10,237.50
- Keramik 20x25 cm 20.0000 M³ 3,212.50 64,250.00
- Bak Viber 1.0000 Bh 445,000.00 445,000.00

Tenaga :
- Tukang Batu 0.1000 OH 85,000.00 8,500.00
- Pekerja 0.3200 OH 56,000.00 17,920.00
- Kepala Tukang 0.0100 OH 95,000.00 950.00
- Mandor 0.0150 OH 100,000.00 1,500.00
Jumlah 617,488.50

17 1 M' Pasang Atap Nok Seng Plat


Bahan
- Seng Plat 0,3 mm 1.0100 M' 19,300.00 19,493.00
- Paku Seng 0.0400 Kg 22,015.00 880.60
Tenaga
- Tukang Kayu 0.0700 OH 85,000.00 5,950.00
- Pekerja 0.1500 OH 56,000.00 8,400.00
- Kepala Tukang 0.0080 OH 95,000.00 760.00
- Mandor 0.0060 OH 100,000.00 600.00
Jumlah 36,083.60

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 7


1 2 3 4 5 6
18 1 M³ Pasang Kosen Pintu dan Jendela Kayu Kelas II
Bahan :
- Kayu Kelas II, Balok Setara Meranti 1.1000 M³ 3,670,000.00 4,037,000.00
Tenaga :
- Tukang Kayu 21.0000 OH 85,000.00 1,785,000.00
- Pekerja 7.0000 OH 56,000.00 392,000.00
- Kepala Tukang 2.1000 OH 95,000.00 199,500.00
- Mandor 0.3500 OH 100,000.00 35,000.00
Jumlah 6,448,500.00

19 1 M² Pekerjaan daun Jendela Kaca Polos, Kayu Kelas II


Bahan :
- Kayu Kls. II, Papan Bayam 0.0240 M³ 3,670,000.00 88,080.00
- Kaca polos 5 mm 1.0500 M2 138,000.00 144,900.00

Tenaga :
- Tukang Kayu 2.4000 OH 85,000.00 204,000.00
- Pekerja 0.8000 OH 56,000.00 44,800.00
- Kepala Tukang 0.2400 OH 95,000.00 22,800.00
- Mandor 0.0400 OH 100,000.00 4,000.00
Jumlah 508,580.00
20 1 M² Pekerjaan daun Jendela Kaca Buram, Kayu Kelas I
Bahan :
- Kayu Kls. I, Papan Bayam 0.0240 M³ 3,670,000.00 88,080.00
- Kaca Buram 5 mm 1.0500 M2 165,500.00 173,775.00
Tenaga :
- Tukang Kayu 2.4000 OH 85,000.00 204,000.00
- Pekerja 0.8000 OH 56,000.00 44,800.00
- Kepala Tukang 0.2400 OH 95,000.00 22,800.00
- Mandor 0.0400 OH 100,000.00 4,000.00
Jumlah 537,455.00

19 1 M² Pekerjaan Kaca Polos 5 mm


Bahan :
- Kaca polos 5 mm 1.0500 M2 138,000.00 144,900.00

Tenaga :
- Tukang Kayu 2.4000 OH 85,000.00 204,000.00
- Pekerja 0.8000 OH 56,000.00 44,800.00
- Kepala Tukang 0.2400 OH 95,000.00 22,800.00
- Mandor 0.0400 OH 100,000.00 4,000.00
Jumlah 420,500.00

27 1 M2 daun pintu KM/WC lapis aluminium Kayu kls I


Bahan :
- Papan kayu Kls I (Bayam) 0.025 M³ 3,670,000.00 91,750.00
- tripleks 3 mm 0.500 lbr 63,500.00 31,750.00
- tripleks lapis Aluminium voil 0.500 lbr 82,200.00 41,100.00
Tenaga :
- Pekerja 1.000 OH 56,000.00 56,000.00
- Tukang Kayu 1.500 OH 85,000.00 127,500.00
- Kepala Tukang 0.250 OH 95,000.00 23,750.00
- Mandor 0.050 OH 100,000.00 5,000.00
Jumlah 376,850.00

39 1 M³ Pasang Konstruksi Kuda-kuda Kayu Kls. II


Bahan :
- Kayu kls. II, Balok kls II setara meranti merah 1.2000 M³ 3,670,000.00 4,404,000.00
- Beugel / Besi Strip 15.0000 Kg 24,215.00 363,225.00
- Paku Biasa 5 - 10 cm 0.8000 Kg 22,015.00 17,612.00
Tenaga :

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 8


1 2 3 4 5 6
- Tukang Kayu 12.0000 OH 85,000.00 1,020,000.00
- Pekerja 4.0000 OH 56,000.00 224,000.00
- Kepala Tukang 1.2000 OH 95,000.00 114,000.00
- Mandor 0.2000 OH 100,000.00 20,000.00
Jumlah 6,162,837.00

29 Memasang 1 M1 Jurai Dalam, kayu kelas II


Bahan :

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 9


1 2 3 4 5 6
- Papan kayu 0.0190 M³ 3,670,000.00 69,730.00
- Seng Plat 0,30 1.0500 m1 19,300.00 20,265.00
paku 0.0150 kg 22,015.00 330.23
Tenaga :
- Pekerja 0.5025 OH 56,000.00 28,140.00
- Tukang Kayu 1.5000 OH 85,000.00 127,500.00
- Kepala Tukang 0.1500 OH 95,000.00 14,250.00
- Mandor 0.2513 OH 100,000.00 25,125.00
Jumlah 285,340.23

21 1 Kg Pekerjaan Konstruksi Kuda-Kuda Besi Profil L 50.50.5


a. Pekerjaan Menempa (Pabrikasi) / 100 kg
Bahan
- Besi Siku SNI L 50.50.5 110 Kg 10,985.85 1,208,443.85
Tenaga
- Tukang Besi 4.5 HOK 85,000.00 382,500.00
- Pekerja 4.5 HOK 56,000.00 252,000.00
- Kepala Tukang 1.5 HOK 95,000.00 142,500.00
- Mandor 0.225 HOK 100,000.00 22,500.00
A= 2,007,943.85
b. Memasang dan menempatkan (erection)
Bahan
- Alat bantu (30% bahan) 1.00 Ls 362,533.16 108,759.95
Tenaga
- Tukang Besi 0.05 HOK 85,000.00 4,250.00
- Pembantu Tukang 0.20 HOK 56,000.00 11,200.00
B= 124,209.95

Untuk 1 kg = 21,321.54
22 1 M Pipa Stainless
a. Bahan :
Bahan
- Pipa Stailless 1 1/4 " 1.000 M 126,000.00 126,000.00
- Pegangan Handle 2.000 Bh 21,500.00 43,000.00
A= 169,000.00
b. Memasang dan menempatkan (erection)
Bahan
- Alat bantu (30% bahan) 1.000 Ls 37,800.00 11,340.00
Tenaga
- Tukang Besi 0.050 HOK 85,000.00 4,250.00
- Pembantu Tukang 0.200 HOK 56,000.00 11,200.00
B= 26,790.00

Untuk 1 M = 195,790.00
23 1 M³ Pasang Gording Kayu Kls. II
Bahan :
- Kayu kls. II, Balok 1.1000 M³ 3,670,000.00 4,037,000.00
- Paku Biasa 10 cm 0.8000 Kg 22,015.00 17,612.00
Tenaga :
- Tukang Kayu 7.2000 OH 85,000.00 612,000.00
- Pekerja 2.4000 OH 56,000.00 134,400.00
- Kepala Tukang 0.7200 OH 95,000.00 68,400.00
- Mandor 0.1200 OH 100,000.00 12,000.00
Jumlah 4,881,412.00
24 1 M' Pasang List Plank Ukuran (2/20 + 2/10) cm Kayu Kelas II
Bahan :
- Kayu Kelas II, Papan 0.0072 M³ 3,670,000.00 26,424.00
- Paku Biasa 5 - 10 cm 0.0500 Kg 22,015.00 1,100.75
Tenaga :
- Tukang Kayu 0.2000 OH 85,000.00 17,000.00
- Pekerja 0.1000 OH 56,000.00 5,600.00
- Kepala Tukang 0.0250 OH 95,000.00 2,375.00
- Mandor 0.0050 OH 100,000.00 500.00
Jumlah 52,999.75
25 1 M' List Plafond Gipsum 7 cm
SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 10
1 2 3 4 5 6
Bahan :
- List gipsum 7 cm 1.0500 M' 22,500.00 23,625.00
- Tepung Gypsun 0.1500 Kg 7,200.00 1,080.00
Tenaga :
- Tukang Kayu 0.0600 OH 85,000.00 5,100.00
- Pekerja 0.0600 OH 56,000.00 3,360.00
- Kepala Tukang 0.0060 OH 95,000.00 570.00
- Mandor 0.0030 OH 100,000.00 300.00
Jumlah 34,035.00

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 11


1 2 3 4 5 6
26 1 M² Pasang Dinding Keramik 20 x 25 cm
Bahan
- Keramik 20 x 25 cm 20.0000 Bh 3,212.50 64,250.00
- Semen Portland 11.3800 Kg 1,700.00 19,346.00
- Pasir Pasang 0.0420 M³ 227,500.00 9,555.00
- Semen Warna 1.5000 Kg 19,265.00 28,897.50
Tenaga
- Tukang Batu 0.3500 OH 85,000.00 29,750.00
- Pekerja 0.6200 OH 56,000.00 34,720.00
- Kepala Tukang 0.0350 OH 95,000.00 3,325.00
- Mandor 0.0300 OH 100,000.00 3,000.00
Jumlah 192,843.50
27 1 M² Pasang Lantai keramik Ukuran 40 x 40 cm
Bahan
- Ubin Keramik 40 x 40 cm 6.2500 Bh 29,750.00 185,937.50
- Semen Portland 11.3800 Kg 1,700.00 19,346.00
- Pasir Pasang 0.0215 M³ 227,500.00 4,891.25
- Semen warna 1.5000 Kg 19,265.00 28,897.50
Tenaga
- Tukang Batu 0.1000 OH 85,000.00 8,500.00
- Pekerja 0.6000 OH 56,000.00 33,600.00
- Kepala Tukang 0.0450 OH 95,000.00 4,275.00
- Mandor 0.0300 OH 100,000.00 3,000.00
Jumlah 288,447.25
28 1 M² Pasang Lantai Keramik Ukuran 20 x 20 cm
Bahan
- Keramik 20 x 20 cm 25.0000 Bh 2,514.00 62,850.00
- Semen Abu-abu 9.3000 Kg 1,700.00 15,810.00
- Pasir Pasang 0.0180 M³ 227,500.00 4,095.00
- Semen Warna 1.5000 Kg 19,265.00 28,897.50
Tenaga
- Tukang Batu 0.1000 OH 85,000.00 8,500.00
- Pekerja 0.6000 OH 56,000.00 33,600.00
- Kepala Tukang 0.0450 OH 95,000.00 4,275.00
- Mandor 0.0300 OH 100,000.00 3,000.00
Jumlah 161,027.50
29 1 M² Pengecatan Tembok Baru (1 Lapis Plamir, 2 kali sapuan)
Bahan
- Plamir 0.100 Kg 13,800.00 1,380.00
- Cat tembok 0.260 Kg 22,050.00 5,733.00
Tenaga
- Tukang Cat 0.050 OH 85,000.00 4,284.00
- Pekerja 0.016 OH 56,000.00 896.00
- Kepala Tukang 0.0050 OH 95,000.00 478.80
- Mandor 0.0020 OH 100,000.00 200.00
Jumlah 12,971.80
30 1 M² Pengecatan Bidang Kayu Baru 1 Lapis Plamir, 2 kali sapuan
Bahan
- Plamir 0.150 Kg 13,800.00 2,070.00
- Cat Penutup 2 kali 0.260 Kg 66,050.00 17,173.00
Tenaga
- Tukang Cat 0.009 OH 85,000.00 765.00
- Pekerja 0.070 OH 56,000.00 3,920.00
- Kepala Tukang 0.006 OH 95,000.00 570.00
- Mandor 0.0025 OH 100,000.00 250.00
Jumlah 24,748.00
31 1 M² Pelaburan Bidang Kayu dengan Politur
Bahan
- Politur Jadi 0.372 Ltr 71,550.00 26,616.60
- Amplas 2.000 Lbr 5,500.00 11,000.00
Tenaga
- Tukang Cat 0.009 OH 85,000.00 765.00
- Pekerja 0.070 OH 56,000.00 3,920.00
- Kepala Tukang 0.006 OH 95,000.00 570.00
- Mandor 0.0025 OH 100,000.00 250.00
SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 12
1 2 3 4 5 6
43,121.60
32 1 M² Pengecatan Tembok dengan Cat Genteng
Bahan
- Cat Genteng 0.260 Kg 22,050.00 5,733.00
- Kuas 0.010 Bh 56,932.60 569.33
Tenaga
- Tukang Cat 0.050 OH 85,000.00 4,284.00
- Pekerja 0.016 OH 56,000.00 896.00
- Kepala Tukang 0.0050 OH 95,000.00 478.80
- Mandor 0.0020 OH 100,000.00 200.00
12,161.13

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 13


1 2 3 4 5 6

32 1 Buah Pasang Engsel Jendela Kupu-kupu


Bahan
- Engsel Jendela 1.000 Psg 16,500.00 16,500.00
Tenaga
- Tukang Kayu 0.100 OH 85,000.00 8,500.00
- Pekerja 0.010 OH 56,000.00 560.00
- Kepala Tukang 0.010 OH 95,000.00 950.00
- Mandor 0.0005 OH 100,000.00 50.00
26,560.00
33 Memasang 1 buah hak Angin
Bahan
- Hak angin 1.000 Bh 8,250.00 8,250.00
Tenaga
- Tukang Kayu 0.100 OH 85,000.00 8,500.00
- Pekerja 0.010 OH 56,000.00 560.00
- Kepala Tukang 0.010 OH 95,000.00 950.00
- Mandor 0.005 OH 100,000.00 500.00
18,760.00
34 1 Buah Pasang Engsel Pintu
Bahan
- Engsel Jendela 1.000 Psg 16,500.00 16,500.00
Tenaga
- Tukang Kayu 0.100 OH 85,000.00 8,500.00
- Pekerja 0.010 OH 56,000.00 560.00
- Kepala Tukang 0.010 OH 95,000.00 950.00
- Mandor 0.0005 OH 100,000.00 50.00
26,560.00
35 Memasang 1 Buah Pasang Grendel Pintu
Bahan
- Grendel 1.000 Bh 11,000.00 11,000.00
Tenaga
- Tukang Kayu 0.100 OH 85,000.00 8,500.00
- Pekerja 0.010 OH 56,000.00 560.00
- Kepala Tukang 0.010 OH 95,000.00 950.00
- Mandor 0.0005 OH 100,000.00 50.00
21,060.00
36 Memasang 1 Buah Grendel Jendela
Bahan
- Grendel jendela 1.000 Bh 11,000.00 11,000.00
Tenaga
- Tukang Kayu 0.100 OH 85,000.00 8,500.00
- Pekerja 0.010 OH 56,000.00 560.00
- Kepala Tukang 0.010 OH 95,000.00 950.00
- Mandor 0.0005 OH 100,000.00 50.00
21,060.00
37 Memasang 1 Buah Kunci pintu 2x slaag
Bahan
- Kunci Pintu 1.000 Bh 148,500.00 148,500.00
Tenaga
- Tukang Kayu 0.500 OH 85,000.00 42,500.00
- Pekerja 0.010 OH 56,000.00 560.00
- Kepala Tukang 0.010 OH 95,000.00 950.00
- Mandor 0.005 OH 100,000.00 500.00
193,010.00
38 Memasang 1 buah Klosed Duduk + Selang Bidet
Bahan
- Klosed Duduk 1.000 Bh 610,000.00 610,000.00
- Selang Bidet 1.000 Unit 110,015.00 110,015.00
Tenaga
- Tukang Batu 1.100 OH 85,000.00 93,500.00
- Pekerja 3.300 OH 56,000.00 184,800.00
- Kepala Tukang 0.110 OH 95,000.00 10,450.00
- Mandor 0.011 OH 100,000.00 1,100.00
1,009,865.00
SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 14
1 2 3 4 5 6
1 Memasang 1 buah Klosed Jongkok Merk Ina
Bahan
- Klosed Jongkok 1.000 Bh 208,500.00 208,500.00
Tenaga
- Tukang Batu 1.100 OH 85,000.00 93,500.00
- Pekerja 3.300 OH 56,000.00 184,800.00
- Kepala Tukang 0.110 OH 95,000.00 10,450.00
- Mandor 0.011 OH 100,000.00 1,100.00
498,350.00

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 15


1 2 3 4 5 6
39 Memasang 1 Bh Floor Drain
Bahan
- Floor Drain 1.000 Bh 27,515.00 27,515.00
Tenaga
- Tukang Batu 0.100 OH 85,000.00 8,500.00
- Pekerja 0.010 OH 56,000.00 560.00
- Kepala Tukang 0.010 OH 95,000.00 950.00
- Mandor 0.005 OH 100,000.00 500.00
38,025.00
40 Memasang 1 buah Wastafel
Bahan
- Wastafel 1.000 Bh 445,000.00 445,000.00
- Perlengkapan (5% harga washtafel) 1.000 Ls 22,250.00 22,250.00
- Semen pc 6.000 Kg 1,700.00 10,200.00
- Pasir Pasang 0.010 M³ 227,500.00 2,275.00
Tenaga
- Tukang Batu 1.450 OH 85,000.00 123,250.00
- Pekerja 1.200 OH 56,000.00 67,200.00
- Kepala Tukang 0.150 OH 95,000.00 14,250.00
- Mandor 0.100 OH 100,000.00 10,000.00
694,425.00
41 Memasang 1 m' Pipa PVC Tipe AW Diameter 4"
Bahan
- Pipa PVC dia 4" 1.100 M 57,332.60 63,065.86
- Perlengkapan (35% Hrg Pipa) 1.000 Ls 20,066.41 20,066.41
Tenaga
- Tukang Batu 0.135 OH 85,000.00 11,475.00
- Pekerja 0.081 OH 56,000.00 4,536.00
- Kepala Tukang 0.0135 OH 95,000.00 1,282.50
- Mandor 0.0041 OH 100,000.00 410.00
100,835.77
42 Memasang 1 Bh Kran Diameter ½"
Bahan
- Kran Air 1.000 Bh 126,000.00 126,000.00
- Seal Tape 0.025 Bh 2,500.00 62.50
Tenaga
- Tukang Batu 0.100 OH 85,000.00 8,500.00
- Pekerja 0.010 OH 56,000.00 560.00
- Kepala Tukang 0.010 OH 95,000.00 950.00
- Mandor 0.005 OH 100,000.00 500.00
136,572.50
43 Memasang 1 unit Shower Kamar mandi
Bahan
- Shower Set 1.000 Set 187,015.00 187,015.00
- Seal Tape 0.025 Bh 2,500.00 62.50
Tenaga
- Tukang Batu 0.560 OH 85,000.00 47,600.00
- Pekerja 1.120 OH 56,000.00 62,720.00
- Kepala Tukang 0.056 OH 95,000.00 5,320.00
- Mandor 0.006 OH 100,000.00 560.00
303,277.50
44 1 M² Langit-langit Gypsun + Rangka Kayu Kls. II
Bahan
- Usuk kayu kls. II ,4x6 0.0106 M³ 3,670,000.00 38,755.20
- Paku / Skrup Gypsun 0.1100 Kg 33,015.00 3,631.65
- Gypsun Board 120 x 240 x 0,9 0.3640 Lbr 83,000.00 30,212.00

Tenaga
- Tukang Kayu 0.4000 OH 85,000.00 34,000.00
- Pekerja 0.2700 OH 56,000.00 15,120.00
- Kepala Tukang 0.0400 OH 95,000.00 3,800.00
- Mandor 0.0135 OH 100,000.00 1,350.00
Jumlah 126,868.85
45 1 M² Langit-langit Tripleks 4 mm + Rangka Kayu Kls. II
Bahan
SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 16
1 2 3 4 5 6
- Usuk kayu kls. II ,4x6 0.0106 M³ 3,670,000.00 38,755.20
- Paku tripleks 0.1100 Kg 22,015.00 2,421.65
- tripleks 4 mm 0.3640 Lbr 80,000.00 29,120.00
Tenaga
- Tukang Kayu 0.4000 OH 85,000.00 34,000.00
- Pekerja 0.2700 OH 56,000.00 15,120.00
- Kepala Tukang 0.0400 OH 95,000.00 3,800.00
- Mandor 0.0135 OH 100,000.00 1,350.00
Jumlah 124,566.85
46 1 M' saluran keliling bangunan 40cm x 40 cm
ukuran bersih dalam ,tebal pasangan 20 cm

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 17


1 2 3 4 5 6
- Galian tanah 0.39 M³ 44,500.00 17,132.50
- Pasangan Batu merah 1 / 2 bata 1 Pc : 5 Psr 1.50 M2 108,238.50 162,357.75
- Plesteran 1pc : 3 Psr 1.50 M2 41,713.50 62,570.25
242,060.50
47 Memasang 1 buah Bak Kontrol 40x40x40
Bahan
- Galian Tanah 11.000 M2 44,500.00 489,500.00
- Pas. Batu 1: 5 0.640 M2 108,238.50 69,272.64
- Plesteran 1 : 3 1.280 M2 41,713.50 53,393.28
- Beton Plat Penutup 1: 2:3,T 7cm 0.011 M3 1,225,055.00 13,720.62
- Pembesian 1.389 Kg 13,016.23 18,077.60
643,964.14
48 Memasang 1 buah Bak Resapan Air 1,5 x 2x 2
Bahan
- Galian Tanah 11.000 M2 44,500.00 489,500.00
- Pas. Batu 1: 5 12.600 M2 108,238.50 1,363,805.10
- Kolom, Sloef +Ring Balk 0.317 M3 1,225,055.00 388,097.42
- Beton Plat Penutup 1: 2:3 0.300 M3 1,225,055.00 367,516.50
- Pembesian 124.360 Kg 13,016.23 1,618,702.69
4,227,621.71
49 Memasang 1 Unit Septictank 1,6 x 3.4x 2
Bahan
- Galian Tanah 15.200 M2 44,500.00 676,400.00
- Pas. Batu 1: 5 28.332 M2 108,238.50 3,066,613.18
- Kolom, Sloef +Ring Balk 0.677 M3 1,225,055.00 829,117.22
- Beton Plat Penutup 1: 2:3 0.648 M3 1,225,055.00 793,835.64
- Pembesian 81.900 Kg 13,016.23 1,066,028.83
- Pipa Hawa di 2 " 1.000 M 21,582.60 21,582.60
- Pipa PVC 4 " 2.000 M 57,332.60 114,665.20
- Koral,Ijuk dan batu Apung 1.000 Ls 100,000.00 100,000.00
6,668,242.67
50 1 M2 daun pintu panel Kayu kls II
Bahan :
- Papan kayu Kls II 0.0240 M³ 3,670,000.00 88,080.00
- Paku 1 cm - 2,5 cm 0.0300 kg 24,215.00 726.45
- Lem Kayu 0.3000 kg 30,300.00 9,090.00
Tenaga :
- Pekerja 0.8000 OH 56,000.00 44,800.00
- Tukang Kayu 2.4000 OH 85,000.00 204,000.00
- Kepala Tukang 0.2400 OH 95,000.00 22,800.00
- Mandor 0.0400 OH 100,000.00 4,000.00
Jumlah 373,496.45

50 1 M2 daun pintu panel Kayu kls I bayam + Kaca Buram 5 mm


Bahan :
- Papan kayu Kls I bayam 0.0240 M³ 3,670,000.00 88,080.00
- Paku 1 cm - 2,5 cm 0.0300 kg 24,215.00 726.45
- Lem Kayu 0.3000 kg 30,300.00 9,090.00
- Kaca Buram 5 mm 0.2986 M2 165,500.00 49,413.57
Tenaga :
- Pekerja 0.8000 OH 56,000.00 44,800.00
- Tukang Kayu 2.4000 OH 85,000.00 204,000.00
- Kepala Tukang 0.2400 OH 95,000.00 22,800.00
- Mandor 0.0400 OH 100,000.00 4,000.00
Jumlah 422,910.02

51 Membuat dan memasang 1 M³ Kusen Pintu dan


Kusen Jendela, Kayu Kelas I
Bahan :
- Balok Kayu bayam 1.1000 M³ 9,280,000.00 10,208,000.00
- Paku 10 cm 1.2500 kg 22,015.00 27,518.75
- Lem Kayu 1.0000 kg 30,300.00 30,300.00
Tenaga :
- Pekerja 6.0000 OH 56,000.00 336,000.00
- Tukang Kayu 18.0000 OH 85,000.00 1,530,000.00
SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 18
1 2 3 4 5 6
- Kepala Tukang 1.8000 OH 95,000.00 171,000.00
- Mandor 0.3000 OH 100,000.00 30,000.00
Jumlah 12,332,818.75

52 Memasang 1 M2 jalusi kusen, kayu kelas I


Bahan :
- Papan kayu 0.0600 M³ 9,500,000.00 570,000.00
- Paku 1 cm - 2,5 cm 0.1500 kg 24,215.00 3,632.25
Tenaga :
- Pekerja 0.6700 OH 56,000.00 37,520.00
- Tukang Kayu 2.0000 OH 85,000.00 170,000.00

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 19


1 2 3 4 5 6
- Kepala Tukang 0.2000 OH 95,000.00 19,000.00
- Mandor 0.3350 OH 100,000.00 33,500.00
Jumlah 833,652.25
53 1 M² Pemasangan paving block
Bahan
- Paving Block 1.050 M2 6,000.00 6,300.00
- Pasir Pasang 0.120 M³ 227,500.00 27,300.00
Tenaga
- Pekerja 0.009 OH 85,000.00 765.00
- Tukang Batu 0.070 OH 56,000.00 3,920.00
- Kepala Tukang 0.006 OH 95,000.00 570.00
- Mandor 0.0025 OH 100,000.00 250.00
39,105.00
1 1 M² Pasang Batu hias Ukuran 20 x 40 cm
Bahan
- batu hias 20 x 40 cm 12.5000 Bh 16,550.00 206,875.00
- Pasir Pasang 0.0180 M³ 227,500.00 4,095.00

Tenaga
- Tukang Batu 0.1000 OH 56,000.00 5,600.00
- Pekerja 0.6000 OH 85,000.00 51,000.00
- Kepala Tukang 0.0450 OH 95,000.00 4,275.00
- Mandor 0.0300 OH 100,000.00 3,000.00
Jumlah 274,845.00

SNI, Analisa PERPUSTAKAAN 107 WARUT 2015 Page 20


REKAPITULASI KEBUTUHAN BAHAN DAN UPAH

PROGRAM : WAJIB BELAJAR 9 TAHUN


KEGIATAN : PEMBANGUNAN/ REHABILITASI GEDUNG SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG PERPUSTAKAAN
LOKASI : SDK 107 WARUT, KECAMATAN WAIGETE - KAB. SIKKA
TAHUN ANGGARAN : 2015

A. KEBUTUHAN BAHAN

NO. U R A I A N SAT. JUMLH BAHAN SAT.

1 2 3 3 4
1 Papan Kls. II M 3
0.79 M3
2 Balok Kls. II M3 2.59 M3
3 Papan Kls. III 0.50 M4
4 Tanah Timbunan/Tanah Urug M3 2.60 Reit
5 Batu Kali M 3
9.42 Reit
6 Pasir Urug M3 3.20 Reit
7 Pasir Pasang/Beton M 3
9.93 Reit
8 Batu Bata Bh 9,400.00 Bh
9 Kerikil Pecah 2/3 M3 1.80 Reit
10 Semen PC 40 kg Kg 211.30 Kg
11 Semen warna Kg 97.50 Kg
12 Keramik 30 x30 Bh 65.00 dos
13 Besi beton polos dia 10 Kg 74.00 btg
14 Besi beton polos dia 6 Kg 60 btg
15 Kawat beton Kg 10.12 Kg
16 Seng galvalum BJLA 0,25 mm Lbr 115.97 Lbr
17 Seng Plat 0,3 mm M' 24.56 M'
18 Paku biasa Kg 3.17 Kg
19 Paku seng Kg 4.29 Kg
20 Paku Halus Kg 11.00 Kg
21 Kaca polos 5 mm M 2
11.72 M2
22 Politur Ltr 16.17 Ltr
23 Kunci pintu 2 kali slag (Odesa) Bh 2.00 Bh
24 Engsel jendela Bh 12.00 psg
25 Engsel Pintu Bh 5.00 psg
26 Grendel Pintu Bh 2.00 Bh
27 Grendel Jendela Bh 12.00 Bh
28 Hak angin Bh 12.00 psg
29 Plamir Tembok Kg 39.35 Kg
30 Lem kayu Kg 1.48 Kg
31 Cat warna kayu (Altex) Kg 8.81 Kg
32 Cat tembok ex mateks Kg 89.09 Kg

B. T0TAL UPAH TUKANG RP. 30.360.000,00-

MATERIAL UPAH RAWAT JALAN WATUBAING


B. UPAH KERJA
NO. TENAGA KERJA UPAH KERJA

1 2
1 MANDOR Rp. 1,580,000.00
2 TUKANG Rp. 14,500,000.00
3 KEPALA TUKANG Rp. 1,880,000.00
4 PEKERJA Rp. 12,400,000.00
TOTAL UPAH Rp. 30,360,000.00

MATERIAL UPAH RAWAT JALAN WATUBAING


Pasir Urug M3 26,250.00
Pasir Pasang/Beton M3 44,999.85

180,300.00 Besi beton polos Kg 8,673.52


799,500.00 Kawat Beton Kg 17,850.00
600,000.00 Semen PC 40 kg Kg 1,187.81
660,000.00

###
55,000.00

MATERIAL UPAH RAWAT JALAN WATUBAING


MATERIAL UPAH RAWAT JALAN WATUBAING
HARGA SATUAN UPAH DAN BAHAN

PEKERJAAN : PEMBANGUNAN TOKO


LOKASI : DESA BLORO, KEC.NITA

A. HARGA SATUAN BAHAN


Harga Dasar PPN Jarak Biaya Pajak Total
Jumlah
NO. U R A I A N SAT. (tanpa pajak) 10% angkut Angkut Galian C Harga
Lokasi Quari
( KM ) Per Unit Rp. Rp. Rp.
1 2 3 4 5 6 7 8 = (4+5+7) 10 11=(9+10) 12
1 Papan Bayam Kayu Kls. I M3 8,500,000.00 850,000.00 45.00 150,000.00 9,500,000.00 9,500,000.00 Maumere
2 Balok Bayam Kayu Kls. I M3 8,300,000.00 830,000.00 45.00 150,000.00 9,280,000.00 9,280,000.00 Maumere
3 Papan Kls. II M3 3,200,000.00 320,000.00 45.00 150,000.00 3,670,000.00 3,670,000.00 Maumere
4 Balok Kls. II M3 3,200,000.00 320,000.00 45.00 150,000.00 3,670,000.00 3,670,000.00 Maumere
5 Papan Kls. III M3 3,000,000.00 300,000.00 45.00 150,000.00 3,450,000.00 3,450,000.00 Maumere
6 Tanah Timbunan/Tanah Urug M3 50,000.00 5.00 10,100.00 60,100.00 3,750.00 63,850.00 Waigete
7 Batu Kali M3 116,500.00 10.00 150,000.00 266,500.00 7,500.00 274,000.00 Waigete
8 Pasir Urug M3 50,000.00 10.00 150,000.00 200,000.00 6,000.00 206,000.00 Waigete
9 Pasir Pasang/Beton M3 70,000.00 10.00 150,000.00 220,000.00 7,500.00 227,500.00 Waigete
10 Batu Bata Bh 500.00 10.00 200.00 700.00 52.50 752.50 Patiahu
11 Kerikil Pecah 2/3 M3 200,000.00 15.00 135,000.00 335,000.00 18,000.00 353,000.00 Darat Gunung
12 Kerikil Pecah 3/5 M3 175,000.00 15.00 115,000.00 290,000.00 13,500.00 303,500.00 Darat Gunung
13 Semen PC 40 kg Kg 1,500.00 150.00 15.00 50.00 1,700.00 1,700.00 Maumere
14 Semen warna Kg 17,500.00 1,750.00 15.00 15.00 19,265.00 19,265.00 Maumere
15 Keramik 20 x 25 Bh 2,875.00 287.50 15.00 50.00 3,212.50 3,212.50 Maumere
16 Keramik 20x20 Bh 2,240.00 224.00 15.00 50.00 2,514.00 2,514.00 Maumere
17 Keramik 60 x60 Bh 27,000.00 2,700.00 15.00 50.00 29,750.00 29,750.00 Maumere
18 Batu Hias 20 x 40 cm Bh 15,000.00 1,500.00 15.00 50.00 16,550.00 16,550.00 Maumere
18 Besi beton polos Kg 10,000.00 1,000.00 15.00 50.00 11,050.00 11,050.00 Maumere
19 Kawat beton Kg 20,000.00 2,000.00 15.00 15.00 22,015.00 22,015.00 Maumere
20 Besi siku 50.50.5 Btg 225,000.00 22,500.00 15.00 1,000.00 248,500.00 248,500.00 Maumere
21 Seng galvalum BJLA 0,25 mm Lbr 51,000.00 5,100.00 15.00 500.00 56,600.00 56,600.00 Maumere
22 Seng Plat 0,3 mm M' 17,500.00 1,750.00 15.00 50.00 19,300.00 19,300.00 Maumere
23 Paku biasa Kg 20,000.00 2,000.00 15.00 15.00 22,015.00 22,015.00 Maumere
24 Paku seng Kg 20,000.00 2,000.00 15.00 15.00 22,015.00 22,015.00 Maumere
25 Paku Halus Kg 22,000.00 2,200.00 15.00 15.00 24,215.00 24,215.00 Maumere
26 Paku Gipsum Kg 30,000.00 3,000.00 15.00 15.00 33,015.00 33,015.00 Maumere
27 Gibsum Board Lbr 75,000.00 7,500.00 15.00 500.00 83,000.00 83,000.00 Maumere
28 Kalciboard Lbr 65,000.00 6,500.00 15.00 500.00 72,000.00 72,000.00 Maumere
29 List plafon gipsum 7cm M 20,000.00 2,000.00 15.00 500.00 22,500.00 22,500.00 Maumere
30 Kaca polos 5 mm M2 125,000.00 12,500.00 15.00 500.00 138,000.00 138,000.00 Maumere
31 Kaca Buram 5 mm M2 150,000.00 15,000.00 15.00 500.00 165,500.00 165,500.00 Maumere
32 Politur Ltr 65,000.00 6,500.00 15.00 50.00 71,550.00 71,550.00 Maumere
33 Dempul Kg 30,000.00 3,000.00 15.00 50.00 33,050.00 33,050.00 Maumere
34 Plamir kayu Kg 30,000.00 3,000.00 15.00 50.00 33,050.00 33,050.00 Maumere
35 Plamir tembok Kg 12,500.00 1,250.00 15.00 50.00 13,800.00 13,800.00 Maumere
36 Minyak Cat Liter 30,000.00 3,000.00 15.00 50.00 33,050.00 33,050.00 Maumere
37 Kwas Cat Bh 15,000.00 1,500.00 15.00 16,500.00 16,500.00 Maumere
38 Kwas rool tembok Bh 20,000.00 2,000.00 15.00 22,000.00 22,000.00 Maumere
39 Kunci pintu 2 kali slag (Odesa) Bh 135,000.00 13,500.00 15.00 148,500.00 148,500.00 Maumere
40 Engsel jendela Bh 15,000.00 1,500.00 15.00 16,500.00 16,500.00 Maumere
41 Engsel Pintu Bh 15,000.00 1,500.00 15.00 16,500.00 16,500.00 Maumere
42 Grendel Pintu Bh 10,000.00 1,000.00 15.00 11,000.00 11,000.00 Maumere
43 Grendel Jendela Bh 10,000.00 1,000.00 15.00 11,000.00 11,000.00 Maumere
44 Hak angin Bh 7,500.00 750.00 15.00 8,250.00 8,250.00 Maumere
45 Tripleks 4 mm lbr 70,000.00 7,000.00 15.00 3,000.00 80,000.00 80,000.00 Maumere
46 Tripleks 3 mm lbr 55,000.00 5,500.00 15.00 3,000.00 63,500.00 63,500.00 Maumere
47 Tripleks lapis aluminium voil lbr 72,000.00 7,200.00 15.00 3,000.00 82,200.00 82,200.00 Maumere
48 Pipa PVC Ø 4" M' 51,666.00 5,166.60 15.00 100.00 56,932.60 56,932.60 Maumere
49 Kertas Gosok Kg 5,000.00 500.00 15.00 5,500.00 5,500.00 Maumere
50 Plamir Tembok Kg 12,500.00 1,250.00 15.00 50.00 13,800.00 13,800.00 Maumere
51 Cat Besi Kg 64,000.00 6,400.00 15.00 50.00 70,450.00 70,450.00 Maumere
52 Cat Genteng Kg 20,000.00 2,000.00 15.00 50.00 22,050.00 22,050.00 Maumere
53 Meni kayu Kg 30,000.00 3,000.00 15.00 50.00 33,050.00 33,050.00 Maumere
54 Lem kayu Kg 27,500.00 2,750.00 15.00 50.00 30,300.00 30,300.00 Maumere
55 Cat warna kayu (Altex) Kg 60,000.00 6,000.00 15.00 50.00 66,050.00 66,050.00 Maumere
56 Cat tembok ex mateks Kg 20,000.00 2,000.00 15.00 50.00 22,050.00 22,050.00 Maumere
57 Kloset Duduk Tanpa Tabung Unit 550,000.00 55,000.00 15.00 5,000.00 610,000.00 610,000.00 Maumere
58 Kloset Duduk Monoblok Komplit Warna Unit 1,400,000.00 140,000.00 15.00 5,000.00 1,545,000.00 1,545,000.00 Maumere
59 Kloset jongkok Unit 185,000.00 18,500.00 15.00 5,000.00 208,500.00 208,500.00 Maumere
60 Floor Drain Unit 25,000.00 2,500.00 15.00 15.00 27,515.00 27,515.00 Maumere
61 Wastafel Unit 400,000.00 40,000.00 15.00 5,000.00 445,000.00 445,000.00 Maumere
62 Bak fibre utk. KM/WC Bh 400,000.00 40,000.00 15.00 5,000.00 445,000.00 445,000.00 Maumere
63 Pegangan Handle Pipa Stainless Bh 15,000.00 1,500.00 15.00 5,000.00 21,500.00 21,500.00 Maumere
61 Pipa Stainless M 110,000.00 11,000.00 15.00 5,000.00 126,000.00 126,000.00 Maumere
62 Kran air Ø 1/2' ONDA Bh 30,000.00 3,000.00 15.00 50.00 33,050.00 33,050.00 Maumere
62 Pipa GIP Ø 1/2" med. A M 22,000.00 2,200.00 15.00 500.00 24,700.00 24,700.00 Maumere
63 Pipa GIP Ø 1" med. A M 42,000.00 4,200.00 15.00 500.00 46,700.00 46,700.00 Maumere
63 Pipa GIPØ 1,5" med. A M 66,000.00 6,600.00 15.00 500.00 73,100.00 73,100.00 Maumere
64 Pipa PVC Ø 2" AW M 19,166.00 1,916.60 15.00 500.00 21,582.60 21,582.60 Maumere

MATERIAL UPAH RAWAT JALAN WATUBAING


64 Pipa PVC Ø 3" AW M 35,800.00 3,580.00 15.00 500.00 39,880.00 39,880.00 Maumere
65 Pipa PVC Ø 4" AW M 51,666.00 5,166.60 15.00 500.00 57,332.60 57,332.60 Maumere
66 Pompa Air Grunfoss Basic 4 M 4,000,000.00 400,000.00 15.00 5,000.00 4,405,000.00 4,405,000.00 Maumere
67 Shower Mandi Unit 170,000.00 17,000.00 15.00 15.00 187,015.00 187,015.00 Maumere
68 Bidet Unit 100,000.00 10,000.00 15.00 15.00 110,015.00 110,015.00 Maumere
69 Lampu HE 24 Watt Spiral Ex Philips Bh 43,500.00 4,350.00 15.00 15.00 47,865.00 47,865.00 Maumere
70 Down Light Ex Philips Bh 50,000.00 5,000.00 15.00 15.00 55,015.00 55,015.00 Maumere
71 Con Block Bh 5,000.00 500.00 15.00 500.00 6,000.00 6,000.00 Maumere
71 Batu Alam ( Batu Candi ) M2 365,000.00 36,500.00 15.00 100.00 401,600.00 401,600.00 Maumere
72 Tepung Gypsun ( Cornis ) Kg 6,500.00 650.00 15.00 50.00 7,200.00 7,200.00 Maumere

B. HARGA SATUAN UPAH


Upah Dasar Pembulatan
NO. TENAGA KERJA SAT.
(tanpa pajak) Rp.
1 2 3 4 7
1 MANDOR Org/Hr. 100,000.00 100,000.00
2 TUKANG Org/Hr. 85,000.00 85,000.00
3 KEPALA TUKANG Org/Hr. 95,000.00 95,000.00
4 PEKERJA Org/Hr. 56,000.00 56,000.00

MATERIAL UPAH RAWAT JALAN WATUBAING


GALIAN TANAH PONDASI
Tipe 1, BAGIAN LUAR
p= 0 m
l= 0.8 m
t= 0.8 m
V= 0 m3

Tipe 2, BGN DALAM


p= 87.25 m 0 blk lante DINDING LT 2
l= 0.9 m
t= 0.7 m
V= 54.9675 m3

Tipe 3, TERAS
p= 0 m
l= 0.6 m
t= 0.5 m
V= 0 m3

V TOT = 54.9675 M3 #REF!

URUGAN PASIR BAWAH PONDASI


Tipe 1, BAGIAN LUAR
p= 0 m
l= 0.7 m
t= 0.05 m
V= 0 m3
0
Tipe 2, BGN DALAM
p= 87.25 m
l= 0.9 m
t= 0.1 m
V= 7.8525 m3

Tipe 3, TERAS
p= 0 m
l= 0.6 m
t= 0.05 m 39.2625
V= 0 m3

V TOT = 7.8525 M3
#REF!

URUGAN TANAH peninggian LANTAI Luas Bangunan


bagian dalam 116.05 m2 76.7875
teras 0 m2 0 L=
t= 0.1 m 0
V= 11.605 m3 0
11.605 11.605 10.4957941
URUGAN PASIR DI BAWAH LANTAI
L= 116.05 m
t= 0.05 m
V= 5.8025 m3
ANSTAMPING
Tipe 1, BAGIAN LUAR
p= 0 m
l= m
t= 0.2 m 0.2
V= 0 m3

Tipe 2, BGN DALAM


p= 87.25 m
l= 0.90 m
t= 0.15 m 0.305842
V= 11.77875 m3
0.5264605
V TOT = 11.77875 m3

PAS. PONDASI BATU KALI


Tipe 1, BAGIAN LUAR 0.3
p= 0 m
l1 = 0.3 m
l2= 0.70 m 0.8264605
t= 0.8264605 m
V= 0 m3
0.5
0.2
0.1
0.70

Tipe 2, BGN DALAM 0.25


p= 87.25 m
l1 = 0.25 m
l2 = 0.70 m 0.5264605
t= 0.81 m
V= 33.5694375 m3
0.6
0.15
0.1
0.70

Tipe 3, sekat
p= 0 m
l1 = 0.3 m 0.3
l2 = 0.50 m
t= 0.6 m 0.2
V= 0 m3
0.4

0.05
0.50

Tipe 3, TERAS
p= 0 m
l1 = 0.25 m 0.25
l2 = 0.50 m
t= 0.930598 m 0.682589905
V= 0 m3
0.4
V TOT = 33.5694375 M3
0.05
0.50

BETON BESI
SLOEF A 0.15 0.2 Tulangan Utama
panjang 87.25 panjang 349
lebar 0.15 Dia 10
tinggi 0.2 Berat @m 0.6165
Volume 2.6175 M3 BeratTot 215.1585 KG

SLOEF TERAS 0.1 0.15 Tulangan Utama


panjang 0 panjang 0
lebar 0.1 Dia 8
tinggi 0.15 Berat @m 0.39456
Volume 0 M3 BeratTot 0 KG

TOTAL SLOEF

BETON BESI
LATEI 0.1 0.1 Tulangan Utama
panjang 87.25 panjang 349
lebar 0.1 Dia 10
tinggi 0.1 Berat @m 0.6165
Volume 0.8725 M3 BeratTot 215.1585 KG

BETON BESI
RNG BLK A 0.15 0.1 Tulangan Utama
panjang 87.25 panjang 349
lebar 0.15 Dia 10
tinggi 0.1 Berat @m 0.6165
Volume 1.30875 M3 BeratTot 215.1585 KG

KUDA - KUDA GEWEL 0.12 0.1 Tulangan Utama


panjang 20 panjang 80
lebar 0.12 Dia 10
tinggi 0.1 Berat @m 0.6165
Volume 0.24 M3 BeratTot 49.32 KG

RING BALK 0.25 0.6 Tulangan Utama


panjang 39.62 panjang 237.72
lebar 0.25 Dia 16
tinggi 0.6 Berat @m 1.57824
Volume 5.943 M3 BeratTot 375.1792128 KG

TOTAL RING BALK


BETON BESI
BLK LT A 0.25 0.4 Tulangan Utama
panjang 0 panjang 0
lebar 0.25 Dia 16
tinggi 0.4 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BLK BORDES 0.25 0.4 Tulangan Utama


panjang 0 panjang 0
lebar 0.25 Dia 16
tinggi 0.4 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BLK BORDES 0.2 0.4 Tulangan Utama


panjang 0 panjang 0
lebar 0.2 Dia 16
tinggi 0.4 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BALOK ANAK 15/25 0.15 0.25 Tulangan Utama


panjang 0 panjang 0
lebar 0.15 Dia 12
tinggi 0.25 Berat @m 0.88776
Volume 0 M3 BeratTot 0 KG

BLK LT A 0.2 0.3 Tulangan Utama


panjang 0 panjang 0
lebar 0.2 Dia 16
tinggi 0.3 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BLK LT A 0.2 0.25 Tulangan Utama


panjang 0 panjang 0
lebar 0.2 Dia 16
tinggi 0.25 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

RING BALK 0.2 0.25 Tulangan Utama


panjang 0 panjang 0
lebar 0.2 Dia 16
tinggi 0.25 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BALOK LATAI 0.12 0.12 Tulangan Utama


panjang 0 panjang 0
lebar 0.12 Dia 8
tinggi 0.12 Berat @m 0.39456
Volume 0 M3 BeratTot 0 KG
TOTAL BALOK LANTAI

BETON BESI
GEWEL 0.15 0.2 Tulangan Utama
panjang 40.96 panjang 163.84
lebar 0.15 Dia 10
tinggi 0.2 Berat @m 0.6165
Volume 1.2288 M3 BeratTot 101.00736 KG

KOLOM A 13 BH
Tipe 1, t = 5 m,
KOLOM 0.12 0.12 Tulangan Utama
panjang 65 panjang 260
lebar 0.12 Dia 10
tinggi 0.12 Berat @m 0.6165
Volume 0.936 M3 BeratTot 160.29 KG

KOLOM B 2 BH
Tipe 1, t = 6.5 m,
KOLOM 0.2 0.5 Tulangan Utama
panjang 13 panjang 78
lebar 0.2 Dia 12
tinggi 0.5 Berat @m 0.88776
Volume 1.3 M3 BeratTot 69.24528 KG

KOLOM C 39 BH
Tipe 1, t = 4.5 m,
KOLOM 0.15 0.3 Tulangan Utama
panjang 175.5 panjang 702
lebar 0.15 Dia 12
tinggi 0.3 Berat @m 0.88776
Volume 7.8975 M3 BeratTot 623.20752 KG

KOLOM teras 37 BH
Tipe 1, t = 3.5 m,
KOLOM 0.15 0.4 Tulangan Utama
panjang 129.5 panjang 518
lebar 0.15 Dia 12
tinggi 0.4 Berat @m 0.88776
Volume 7.77 M3 BeratTot 459.85968 KG

KOLOM praktis 99 BH
Tipe 1, t = 4.5 m,
KOLOM 0.12 0.12 Tulangan Utama
panjang 445.5 panjang 1782
lebar 0.12 Dia 10
tinggi 0.12 Berat @m 0.6165
Volume 6.4152 M3 BeratTot 1098.603 KG
TOTAL KOLOM

PLAT OVERSTEK Tulangan Utama


panjang 0 2 panjang 0
tebal 0.07 Dia 10
lebar 1 Berat @m 0.6165
Volume 0 M3 BeratTot 0 KG

DAK BETON TERAS Tulangan Utama


Luas 18.58 panjang 408.76
tebal 0.12 Dia 10
lebar Berat @m 0.6165
Volume 2.2296 M3 BeratTot 252.00054 KG

FOOT PLATE Tulangan Utama


Luas 0 panjang 0
tebal 0.25 Dia 16
lebar Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

FOOT PLATE 22 bh Tulangan Utama


Luas 7.92 panjang 174.24
tebal 0.2 Dia 12
lebar Berat @m 0.88776
Volume 1.584 M3 BeratTot 154.6833024 KG

PLAT LANTE Tulangan Utama


P= 0 m panjang 0
L= 1 m Dia 10
T= 0.12 m Berat @m 0.6165
Volume 0 M3 BeratTot 0 KG

PLAT DAK ATAP Tulangan Utama


P= 0 m panjang 0
L= 1 m Dia 10
T= 0.1 m Berat @m 0.6165
Volume 0 M3 BeratTot 0 KG

TANGGA
- Bordes Tulangan Utama
panjang 0 panjang 85
lebar 1.2 Dia 12
tinggi 0.12 Berat / m 0.88776
Volume 0 M3 BeratTot 75.4596 KG

- Plat tangga Tulangan Utama


panjang 0 panjang 170
lebar 1.5 Dia 12
tinggi 0.12 Berat / m 0.88776
Volume 0 M3 BeratTot 150.9192 KG

- Anak tgga 0 bh Tulangan Utama


panjang 1.5 panjang 190
lebar 0.3 Dia 10
tinggi 0.2 Berat / m 0.6165
Volume 0 M3 BeratTot 117.135 KG

RABAT LANTAI 1:4:6, TEBAL


luas 116.05

tebal 0.05
Volume 5.8025 M3

KUSEN
KUSEN PINTU
Tipe 1 1 unit

0.6
DAUN PINTU type 1
DAUN PINTU
p= 2.1
2.1 l= 1.55
V= 3.255

LOBANG NEGATIF =

1.55
p= 9.1 m
l= 0.15 m
t= 0.07 m
V= 0.09555 m3

KUSEN PINTU
Tipe 2 1 unit

0.6

DAUN PINTU + JENDELA


DAUN PINTU
2.1 p= 2.1
l= 0.8
V= 1.68

0.8 LOBANG NEGATIF =


p= 7 m
l= 0.15 m
t= 0.07 m
V= 0.0735 m3

KUSEN PINTU
Tipe 3 11 unit

0.6

DAUN PINTU + JENDELA


DAUN PINTU
2.1 p= 2.1
l= 0.8
V= 18.48

0.8 LOBANG NEGATIF =


p= 7 m
l= 0.15 m
t= 0.07 m
V= 0.8085 m3
TOTAL KUSEN PINTU 0.97755 M3

0
KUSEN JENDELA TIPE I 3 unit
0.6 DAUN JENDELA TYPE 1
p= 1.3
1.3 l= 1.2
V= 4.68

0.6 0.6 DAUN BOVEN TYPE 1


p= 0.6
p= 9.3 m l= 0.6
l= 0.15 m V= 1.08
t= 0.07 m LOBANG NEGATIF = 7.695
V= 0.29295 m3

KUSEN JENDELA TIPE II 7 unit


0.6 DAUN JENDELA TYPE 1
p= 1.3
1.3 l= 0.8
V= 7.28

0.8 DAUN BOVEN TYPE 1


p= 0.6
p= 6.2 m l= 0.8
l= 0.15 m V= 0
t= 0.07 m
V= 0.4557 m3

KUSEN JENDELA TIPE II 0 unit


0.6 DAUN JENDELA TYPE 1
p= 1.5
1.5 l= 1.4
V= 0
1.4 DAUN BOVEN TYPE 1
p= 0.6
p= 8.4 m l= 1.4
l= 0.15 m V= 0
t= 0.07 m
V= 0 m3

KUSEN JENDELA TIPE III 0 unit

0.6

1.3

0.75 0.75 0.75


DAUN JENDELA TYPE III
p= 14.35 m p= 1.3
l= 0.15 m l= 2.25
t= 0.07 m V= 0
V= 0 m3
DAUN BOVEN TYPE III
p= 0.6
l= 2.25
V= 0

TOTAL KUSEN JENDELA 0.74865 M3

BOVEN 11 unit

0.6 DAUN BOVEN TYPE III


0.75 0.75 p= 0.6
p= 4.8 m l= 1.5
l= 0.15 m V= 9.9
t= 0.07 m
V= 0.5544 m3

TOTAL KUSEN PINTU + JENDELA M3


TOTAL DAUN PINTU M2
TOTAL DAUN JENDELA M2
TOTAL DAUN BOVEN M2

jml unit TIPE PANJANG KY LUAS


18 P3 5.2 93.6 1.7302 31.1436
9 P1 6 54 3.4182 30.7638
7 P2 5.6 39.2 2.5742 18.0194
9 P4 5 45 1.400 12.6

29 J1 6.3 182.7 1.4 40.6


2 J2 3.65 7.3 0.7 1.4
2 J3 6.5 13 2 4
7 J4 5 35 0.875 6.125
31 VJ1 5.1 158.1 0.84 26.04
11 VJ2 2.15 23.65 0.42 4.62
2 VJ3 5.7 11.4 1.2 2.4
7 VJ4 2.7 18.9 0.3 2.1
9 VP1 5.5 49.5 1.92 17.28
7 VP2 4.7 32.9 0.72 5.04
18 VP3 3.3 59.4 0.48 8.64
764.25
VOL 4.503375
Kusen Kaca mati
cat kusen 160.4925 m2
cat bingkai 117.139 m2
cat Pintu 91.34491 m2

DINDING batu merah


Tipe 1 LT 1
p= 87.25 m
T= 3.7 m 470.96
V= 322.825 m2

Tipe 1 trap #REF!


p= 9 m
T= 1 m
V= 9 m2

Tipe 2, 2 UNIT
p= 7 m 2
l= 2 m
V= 14 m2 7

TOTAL PASANGAN DINDING 323.9 M2 647.8

PLESTERAN 1:3 KM / WC 1 unit

p= 97.9 m
T= 3.5 m
V= 342.65 m2

PLESTERAN 1:5
V= 647.8 M2 plesteran beton 26.175

ACIAN
V= 647.8 M2

KUDA-KUDA
A. Kuda-kuda besi profil L 50,50,5
Tipe 1 bh
Panjang 738.57 m lihat vol besi siku
berat @ mtr 3.77 Kg
Total 2784.4089 Kg

Tipe 2 bh
Panjang 347.995 m lihat vol besi siku
berat @ mtr 3.77
Total 1311.94115 Kg #REF!

tot 1+ 2 4096.35005 Kg
TOT Sf dan Klos 4148.08695 Kg

B. Kuda2 kayu kls. II 8/12, 2 bh


p= 37.7 m
b= 0.08 m
h= 0.12 m
V= 0.72384 m3

GORDING
p= 181.50 m
l= 0.05 m
t= 0.10 m
V= 0.91 m3

JALUSI 2 UNIT
A= 3.00 m
T= 0.50 m
L= 1.50 m3

LANTAI keramik
LT. I
- Teras 1 30x30
p= 0 m
l= 1.5 m
V= 0 m2

- Teras 2 30x30
p= 0 m
l= 2.06 m
V= 0 m2

- Lantai Ruang Dalam 40x40 lt 01 TERAS 0


p= m
l= m
V= 116.05 m2
V= 116.05 m2

KM/WC 20x20 1 UNT


p= m
l= m
V= 15.57 m2

LT. 2 KERAMIK 30X30


p= m
l= m
V= 0 m2
TOTAL PAS. KERAMIK 40 X 40 116.05

KERAMIK DINDING KM/WC 20x20 1 UNIT


p= 97.9 m
T 1.75 m #REF!
L 171.325 m2

KERAMIK TANGGA, ANTREDE ---------- 0 anak tgga 30 X 30


p= 1.5 m
l= 0.3 m
V= 0 m2

KERAMIK TANGGA, OPTREDE 0 anak tgga 20 x 20


p= 1.5 m
l= 0.2 m
V= 0 m2

PLAFON
reg 1= 455.80 M2 Pek. Plafond Kalciboard + rangka Kayu Kls II ,utk teras
reg 2= 29.85 M2
reg 3= 12.50 M2
reg 4= 40.13 M2 Pek. Plafond Kalciboard + rangka kayu Kls II, utk km / wc

LIST PLAFON
V= 132 m

ATAP ( autocad product area )


Reg 1 = 130.30 m2
Reg 2= 0.00 m2

V TOT = 130.30 M2

BUBUNGAN
p= 16 M #REF!

LISTPLANK
V= 34.80 M

POLITUR
DAUN PINTU #REF!
V= 9.87 M2

KUSEN jml unit


p= 62.6 m 0 20
l= 0.23 m 16
V= 14.398 m2 9

daun jendela 32
p= 33.6 m 32
l= 0.2 m 20
V= 6.72 m2 16
12
listplank
p= 34.8 m
l= 0.56 m
V= 19.488 m2

V TOT = 50.476 M2
0

116.05 m2 116.05
#REF!

0.6

#REF!

(urugan tanah peninggian lante)

(urugan tanah peninggian lante)

0.475 lebar
1.1264605 tinggi
0.5350687375 luas
46.6847473469 volume

0.4 lebar
0.6 tinggi
0.24 luas
0 volume

115,519,800.00
#REF!
#REF!

0.375 lebar
1.1 tinggi
0.4059712144 luas
0 volume

TOTAL 46.68475 M3

Beton Lantai Kerja 1Pc : 3Psr : 5 Krk


Tulangan Cincin Beton Foot Plat 1Pc : 2Psr : 3 Krk
panjang 349 TOTAL Beton 25 / 35 untuk sloef 1Pc : 2Psr : 3 Krk
Dia 6 292.61556 KG Beton 30 / 30 untuk kolom 1Pc : 2Psr : 3 Kr
Berat @m 0.22194 Beton 15 / 15 untuk kolom Praktis 1Pc : 2Psr
BeratTot 77.45706 KG Beton 12/15 untuk Balok Latei 1Pc : 2 Psr : 3
Beton 15 / 30 untuk Ring Balk 1 Pc : 2 Psr :
Tulangan Cincin Beton 25 / 40 untuk Balok Lantai 1 Pc : 2 Psr
panjang 0 TOTAL Beton untuk Plat Lantai 1 Pc : 2 Psr : 3 Psr
Dia 6 0 KG Beton untuk dak Atap 1 Pc : 2 Psr : 3 Psr
Berat @m 0.22194 Beton Rabat Lantai 1Pc : 4Psr : 6 Krk T. 7cm
BeratTot 0 KG

292.61556 KG

Tulangan Cincin
panjang 191.95 TOTAL
Dia 6 257.759883 KG 33.2380952381
Berat @m 0.22194
BeratTot 42.601383 KG
#REF!

Tulangan Cincin
panjang 261.75 TOTAL
Dia 6 273.251295 KG
Berat @m 0.22194 2983.84
BeratTot 58.092795 KG 284.1752380952

Tulangan Cincin
panjang 54 TOTAL 1271.873333333
Dia 6 61.30476 KG 121.1307936508
Berat @m 0.22194
BeratTot 11.98476 KG

Tulangan Cincin
panjang 475.44 TOTAL #REF!
Dia 6 480.6983664 KG
Berat @m 0.22194
BeratTot 105.5191536 KG

334.556055 KG
Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG
0 KG

Tulangan Cincin
panjang 163.84 TOTAL
Dia 6 137.3700096 KG
Berat @m 0.22194
BeratTot 36.3626496 KG

Tulangan Cincin
panjang 251.3333333333 TOTAL
Dia 6 216.07092 KG #REF!
Berat @m 0.22194
BeratTot 55.78092 KG

Tulangan Cincin
panjang 130 TOTAL
Dia 6 98.09748 KG
Berat @m 0.22194
BeratTot 28.8522 KG

Tulangan Cincin
panjang 1170 TOTAL
Dia 6 882.87732 KG
Berat @m 0.22194
BeratTot 259.6698 KG

Tulangan Cincin
panjang 777 TOTAL
Dia 6 632.30706 KG
Berat @m 0.22194
BeratTot 172.44738 KG

Tulangan Cincin
panjang 1291.95 TOTAL
Dia 6 1385.338383 KG
Berat @m 0.22194
BeratTot 286.735383 KG
1699.506783 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 252.00054 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 154.6833024 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 75.4596 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 150.9192 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 117.135 KG
Berat @m 0.39456
BeratTot 0 KG

1 bh
m
m
m2

4.03

type 2
1 bh
m
m
m2

2.6
type 3
11 bh
m
m
m2

DAUN PINTU 23.415 M2

KUSEN JENDELA TIPE I 2 unit


3 bh 0 DAUN JENDELA TYPE 1
m p=
m 1.3 l=
m2 V=

3 bh 0.6 0.6 0.6 DAUN BOVEN TYPE 1


m p=
m p= 9.3 m l=
m2 l= 0.15 m V=
t= 0.07 m
V= 0.1953 m3 LOBANG NEGATIF =

7 bh
m
m
m2

0 bh
m
m
m2

0 bh
m
m
m2
0 bh
m
m
m2

0 bh
m
m
m2

0 bh
m
m
m2

DAUN JENDELA 11.96 M2


DAUN BOVEN 10.98 M2

11 bh
m
m
m2

KEBUTUHAN BAHAN
22.5
92.5268 79.9268 13.5
9.3333333333
wc #REF!

38.6666666667
2
2.6666666667
52.125 JENDELA
32
118.245 20

66.12 VENTILASI
24
12
210.7718

TOTAL
VOL

278.975
498.15

s II, utk km / wc 40.13

TIPE PANJANG KY LUAS KEBUTUHAN BAHAN


P1 5.2 104 1.7302 34.604 25
P2 6 96 3.4182 54.6912 102 24
P3 5 45 1.400 12.6 wc

J1 6.3 201.6 1.4 44.8 40


V1 6.3 201.6 0.84 26.88 32
V2 3.4 68 0.54 10.8 105 20
V3 4.9 78.4 1.08 17.28 24
V4 2.8 33.6 0.42 5.04 12
828.2
VOL 4.6703 TOTAL
Kusen Kaca mati 0.0576 VOL
cat kusen 173.922 m2
cat bingkai 128.304 m2
cat Pintu 133.9428 m2
Lantai Kerja 1Pc : 3Psr : 5 Krk
Foot Plat 1Pc : 2Psr : 3 Krk
25 / 35 untuk sloef 1Pc : 2Psr : 3 Krk
30 / 30 untuk kolom 1Pc : 2Psr : 3 Krk
15 / 15 untuk kolom Praktis 1Pc : 2Psr : 3 Krk
12/15 untuk Balok Latei 1Pc : 2 Psr : 3 Krk
15 / 30 untuk Ring Balk 1 Pc : 2 Psr : 3 Psr
25 / 40 untuk Balok Lantai 1 Pc : 2 Psr : 3 Psr
untuk Plat Lantai 1 Pc : 2 Psr : 3 Psr
untuk dak Atap 1 Pc : 2 Psr : 3 Psr
Rabat Lantai 1Pc : 4Psr : 6 Krk T. 7cm
N JENDELA TYPE 1 2 bh
1.3 m
1.8 m
4.68 m2

N BOVEN TYPE 1 2 bh
0.6 m
0.6 m
0.72 m2

OBANG NEGATIF = 7.6


UTUHAN BAHAN
BTG
BTG
BTG

BTG
BTG
BTG

BTG
BTG

189 BTG
5.4432 BTG
UTUHAN BAHAN
BTG
BTG

BTG
BTG
BTG
BTG
BTG

177 BTG
5.0976 BTG
GALIAN TANAH PONDASI
Tipe 1, BAGIAN LUAR
p= 0 m
l= 0.8 m
t= 0.8 m
V= 0 m3

Tipe 2, BGN DALAM


p= 63 m 0 blk lante DINDING LT 2
l= 0.9 m
t= 0.7 m
V= 39.69 m3

Tipe 3, TERAS
p= m
l= 0.6 m
t= 0.5 m
V= 0.3 m3

V TOT = 39.99 M3 #REF!

URUGAN PASIR BAWAH PONDASI


Tipe 1, BAGIAN LUAR
p= 0 m
l= 0.7 m
t= 0.05 m
V= 0 m3
0
Tipe 2, BGN DALAM
p= 63 m
l= 0.9 m
t= 0.1 m
V= 5.67 m3

Tipe 3, TERAS
p= 0 m
l= 0.6 m
t= 0.05 m 28.35
V= 0 m3

V TOT = 5.67 M3
#REF!

URUGAN TANAH peninggian LANTAI Luas Bangunan


bagian dalam 142.05 m2 113.7
teras 0 m2 0 L=
t= 0.3 m 0.2
V= 42.615 m3 22.74
14.205 36.945 33.4137969
URUGAN PASIR DI BAWAH LANTAI
L= 142.05 m
t= 0.05 m
V= 7.1025 m3
ANSTAMPING
Tipe 1, BAGIAN LUAR
p= 0 m
l= m
t= 0.2 m 0.2
V= 0 m3

Tipe 2, BGN DALAM


p= 104 m
l= 0.90 m
t= 0.15 m 0.305842
V= 14.04 m3
0.5264605
V TOT = 14.04 m3

PAS. PONDASI BATU KALI


Tipe 1, BAGIAN LUAR 0.25
p= 0 m
l1 = 0.25 m
l2= 0.60 m 0.6264605
t= 1 m
V= 0 m3
0.7
0.2
0.1
0.60

Tipe 2, BGN DALAM 0.3


p= 63 m
l1 = 0.3 m
l2 = 0.70 m 0.5264605
t= 0.7 m
V= 22.05 m3
0.6
0.15
0.1
0.70

Tipe 3, sekat
p= 0 m
l1 = 0.3 m 0.3
l2 = 0.50 m
t= 0.6 m 0.2
V= 0 m3
0.4

0.05
0.50

Tipe 3, TERAS
p= 0 m
l1 = 0.25 m 0.25
l2 = 0.50 m
t= 0.930598 m 0.682589905
V= 0 m3
0.4
V TOT = 22.05 M3
0.05
0.50

BETON BESI
SLOEF A 0.15 0.2 Tulangan Utama
panjang 104 panjang 416
lebar 0.15 Dia 10
tinggi 0.2 Berat @m 0.6165
Volume 3.12 M3 BeratTot 256.464 KG

SLOEF TERAS 0.1 0.15 Tulangan Utama


panjang 0 panjang 0
lebar 0.1 Dia 8
tinggi 0.15 Berat @m 0.39456
Volume 0 M3 BeratTot 0 KG

TOTAL SLOEF

BETON BESI
LATEI 0.1 0.1 Tulangan Utama
panjang 104 panjang 416
lebar 0.1 Dia 10
tinggi 0.1 Berat @m 0.6165
Volume 1.04 M3 BeratTot 256.464 KG

BETON BESI
RNG BLK A 0.15 0.1 Tulangan Utama
panjang 63 panjang 252
lebar 0.15 Dia 10
tinggi 0.1 Berat @m 0.6165
Volume 0.945 M3 BeratTot 155.358 KG

KUDA - KUDA GEWEL 0.12 0.1 Tulangan Utama


panjang 24 panjang 96
lebar 0.12 Dia 10
tinggi 0.1 Berat @m 0.6165
Volume 0.288 M3 BeratTot 59.184 KG

RING BALK 0.25 0.6 Tulangan Utama


panjang 104 panjang 624
lebar 0.25 Dia 16
tinggi 0.6 Berat @m 1.57824
Volume 15.6 M3 BeratTot 984.82176 KG

TOTAL RING BALK


BETON BESI
BLK LT A 0.25 0.4 Tulangan Utama
panjang 0 panjang 0
lebar 0.25 Dia 16
tinggi 0.4 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BLK BORDES 0.25 0.4 Tulangan Utama


panjang 0 panjang 0
lebar 0.25 Dia 16
tinggi 0.4 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BLK BORDES 0.2 0.4 Tulangan Utama


panjang 0 panjang 0
lebar 0.2 Dia 16
tinggi 0.4 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BALOK ANAK 15/25 0.15 0.25 Tulangan Utama


panjang 0 panjang 0
lebar 0.15 Dia 12
tinggi 0.25 Berat @m 0.88776
Volume 0 M3 BeratTot 0 KG

BLK LT A 0.2 0.3 Tulangan Utama


panjang 0 panjang 0
lebar 0.2 Dia 16
tinggi 0.3 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BLK LT A 0.2 0.25 Tulangan Utama


panjang 0 panjang 0
lebar 0.2 Dia 16
tinggi 0.25 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

RING BALK 0.2 0.25 Tulangan Utama


panjang 0 panjang 0
lebar 0.2 Dia 16
tinggi 0.25 Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

BALOK LATAI 0.12 0.12 Tulangan Utama


panjang 0 panjang 0
lebar 0.12 Dia 8
tinggi 0.12 Berat @m 0.39456
Volume 0 M3 BeratTot 0 KG
TOTAL BALOK LANTAI

BETON BESI
GEWEL 0.15 0.2 Tulangan Utama
panjang 40.96 panjang 163.84
lebar 0.15 Dia 10
tinggi 0.2 Berat @m 0.6165
Volume 1.2288 M3 BeratTot 101.00736 KG

KOLOM A 23 BH
Tipe 1, t = 4 m,
KOLOM 0.12 0.12 Tulangan Utama
panjang 92 panjang 368
lebar 0.12 Dia 10
tinggi 0.12 Berat @m 0.6165
Volume 1.3248 M3 BeratTot 226.872 KG

KOLOM B 2 BH
Tipe 1, t = 6.5 m,
KOLOM 0.2 0.5 Tulangan Utama
panjang 13 panjang 78
lebar 0.2 Dia 12
tinggi 0.5 Berat @m 0.88776
Volume 1.3 M3 BeratTot 69.24528 KG

KOLOM C 39 BH
Tipe 1, t = 4.5 m,
KOLOM 0.15 0.3 Tulangan Utama
panjang 175.5 panjang 702
lebar 0.15 Dia 12
tinggi 0.3 Berat @m 0.88776
Volume 7.8975 M3 BeratTot 623.20752 KG

KOLOM teras 37 BH
Tipe 1, t = 3.5 m,
KOLOM 0.15 0.4 Tulangan Utama
panjang 129.5 panjang 518
lebar 0.15 Dia 12
tinggi 0.4 Berat @m 0.88776
Volume 7.77 M3 BeratTot 459.85968 KG

KOLOM praktis 99 BH
Tipe 1, t = 4.5 m,
KOLOM 0.12 0.12 Tulangan Utama
panjang 445.5 panjang 1782
lebar 0.12 Dia 10
tinggi 0.12 Berat @m 0.6165
Volume 6.4152 M3 BeratTot 1098.603 KG
TOTAL KOLOM

PLAT OVERSTEK Tulangan Utama


panjang 0 2 panjang 0
tebal 0.07 Dia 10
lebar 1 Berat @m 0.6165
Volume 0 M3 BeratTot 0 KG

DAK BETON TERAS Tulangan Utama


Luas 18.58 panjang 408.76
tebal 0.12 Dia 10
lebar Berat @m 0.6165
Volume 2.2296 M3 BeratTot 252.00054 KG

FOOT PLATE Tulangan Utama


Luas 0 panjang 0
tebal 0.25 Dia 16
lebar Berat @m 1.57824
Volume 0 M3 BeratTot 0 KG

FOOT PLATE 22 bh Tulangan Utama


Luas 7.92 panjang 174.24
tebal 0.2 Dia 12
lebar Berat @m 0.88776
Volume 1.584 M3 BeratTot 154.6833024 KG

PLAT LANTE Tulangan Utama


P= 0 m panjang 0
L= 1 m Dia 10
T= 0.12 m Berat @m 0.6165
Volume 0 M3 BeratTot 0 KG

PLAT DAK ATAP Tulangan Utama


P= 0 m panjang 0
L= 1 m Dia 10
T= 0.1 m Berat @m 0.6165
Volume 0 M3 BeratTot 0 KG

TANGGA
- Bordes Tulangan Utama
panjang 0 panjang 85
lebar 1.2 Dia 12
tinggi 0.12 Berat / m 0.88776
Volume 0 M3 BeratTot 75.4596 KG

- Plat tangga Tulangan Utama


panjang 0 panjang 170
lebar 1.5 Dia 12
tinggi 0.12 Berat / m 0.88776
Volume 0 M3 BeratTot 150.9192 KG

- Anak tgga 0 bh Tulangan Utama


panjang 1.5 panjang 190
lebar 0.3 Dia 10
tinggi 0.2 Berat / m 0.6165
Volume 0 M3 BeratTot 117.135 KG

RABAT LANTAI 1:4:6, TEBAL


luas 142.05

tebal 0.05
Volume 7.1025 M3

KUSEN
KUSEN PINTU
Tipe 1 6 unit

0
DAUN PINTU type 1
DAUN PINTU
p= 2.1
2.1 l= 0.8
V= 10.08

LOBANG NEGATIF =

0.8
p= 5.8 m
l= 0.15 m
t= 0.07 m
V= 0.3654 m3

KUSEN PINTU
Tipe 2 0 unit

DAUN PINTU + JENDELA


DAUN PINTU
2.1 p= 2.1
l= 0.8
V= 0

0.8 LOBANG NEGATIF =


p= 5.8 m
l= 0.15 m
t= 0.07 m
V= 0 m3

KUSEN PINTU
Tipe 3 0 unit

DAUN PINTU + JENDELA


DAUN PINTU
2.1 p= 2.1
l= 0.8
V= 0

0.8 LOBANG NEGATIF =


p= 5.8 m
l= 0.15 m
t= 0.07 m
V= 0 m3
TOTAL KUSEN PINTU 0.3654 M3

0
KUSEN JENDELA TIPE I 6 unit
0 DAUN JENDELA TYPE 1
p= 1.5
1.5 l= 1
V= 9

0.5 0.5 DAUN BOVEN TYPE 1


p= 0.4
p= 7.5 m l= 0.5
l= 0.15 m V= 0.6
t= 0.07 m LOBANG NEGATIF = 10.35
V= 0.4725 m3

KUSEN JENDELA TIPE II 1 unit


0 DAUN JENDELA TYPE 1
p= 1.5
1.5 l= 0.8
V= 1.2

0.8 DAUN BOVEN TYPE 1


p= 0
p= 5.4 m l= 0.8
l= 0.15 m V= 0
t= 0.07 m
V= 0.0567 m3

KUSEN JENDELA TIPE II 0 unit


0 DAUN JENDELA TYPE 1
p= 0.4
0.4 l= 1.4
V= 0
1.4 DAUN BOVEN TYPE 1
p= 0
p= 5 m l= 1.4
l= 0.15 m V= 0
t= 0.07 m
V= 0 m3

KUSEN JENDELA TIPE III 1 unit

1.5

0.75 0.75 0
DAUN JENDELA TYPE III
p= 10.5 m p= 1.5
l= 0.15 m l= 1.5
t= 0.07 m V= 2.25
V= 0.11025 m3
DAUN BOVEN TYPE III
p= 0
l= 1.5
V= 0

TOTAL KUSEN JENDELA 0.63945 M3

BOVEN 2 unit

0.4 DAUN BOVEN TYPE III


0.5 0.5 p= 0.4
p= 3.2 m l= 1
l= 0.15 m V= 0.8
t= 0.07 m LOBANG NEGATIF =
V= 0.0672 m3

TOTAL KUSEN PINTU + JENDELA M3


TOTAL DAUN PINTU M2
TOTAL DAUN JENDELA M2
TOTAL DAUN BOVEN M2

jml unit TIPE PANJANG KY LUAS


18 P3 5.2 93.6 1.7302 31.1436
9 P1 6 54 3.4182 30.7638
7 P2 5.6 39.2 2.5742 18.0194
9 P4 5 45 1.400 12.6

29 J1 6.3 182.7 1.4 40.6


2 J2 3.65 7.3 0.7 1.4
2 J3 6.5 13 2 4
7 J4 5 35 0.875 6.125
31 VJ1 5.1 158.1 0.84 26.04
11 VJ2 2.15 23.65 0.42 4.62
2 VJ3 5.7 11.4 1.2 2.4
7 VJ4 2.7 18.9 0.3 2.1
9 VP1 5.5 49.5 1.92 17.28
7 VP2 4.7 32.9 0.72 5.04
18 VP3 3.3 59.4 0.48 8.64
764.25
VOL 4.503375
Kusen Kaca mati
cat kusen 160.4925 m2
cat bingkai 117.139 m2
cat Pintu 91.34491 m2

DINDING batu merah


Tipe 1 LT 1
p= 63 m
T= 3.7 m 470.96
V= 233.1 m2

Tipe 1 trap #REF!


p= 9 m
T= 1 m
V= 9 m2

Tipe 2, 3 UNIT
p= 7.5 m 2
l= 2 m
V= 22.5 m2 7.5

TOTAL PASANGAN DINDING 241.45 M2 482.9

PLESTERAN 1:3 KM / WC 2 unit

p= 7 m
T= 2 m
V= 28 m2

PLESTERAN 1:5
V= 454.9 M2 plesteran beton 18.9

ACIAN
V= 454.9 M2

KUDA-KUDA
A. Kuda-kuda besi profil L 50,50,5
Tipe 1 bh
Panjang 738.57 m lihat vol besi siku
berat @ mtr 3.77 Kg
Total 2784.4089 Kg

Tipe 2 bh
Panjang 347.995 m lihat vol besi siku
berat @ mtr 3.77
Total 1311.94115 Kg #REF!

tot 1+ 2 4096.35005 Kg
TOT Sf dan Klos 4148.08695 Kg

B. Kuda2 kayu kls. II 8/12, 1 bh


p= 37.7 m
b= 0.08 m
h= 0.12 m
V= 0.36192 m3

GORDING
p= 165.00 m
l= 0.05 m
t= 0.10 m
V= 0.83 m3

JALUSI 2 UNIT
A= 3.00 m
T= 0.50 m
L= 1.50 m3

LANTAI keramik
LT. I
- Teras 1 60x60
p= 70.5 m
l= 1.5 m
V= 105.75 m2

- Teras 2 30x30
p= 0 m
l= 2.06 m
V= 0 m2

- Lantai Ruang Dalam 40x40 lt 01 TERAS 0


p= m
l= m
V= 142.05 m2
V= 142.05 m2

KM/WC 20x20 2 UNT


p= 1.5 m
l= 2 m
V= 15.57 m2

LT. 2 KERAMIK 30X30


p= m
l= m
V= 0 m2
TOTAL PAS. KERAMIK 40 X 40 142.05

KERAMIK DINDING KM/WC 20x20 2 UNIT


p= 7 m
T 1.75 m #REF!
L 24.5 m2

KERAMIK TANGGA, ANTREDE ---------- 0 anak tgga 30 X 30


p= 1.5 m
l= 0.3 m
V= 0 m2

KERAMIK TANGGA, OPTREDE 0 anak tgga 20 x 20


p= 1.5 m
l= 0.2 m
V= 0 m2

PLAFON
reg 1= 455.80 M2 Pek. Plafond Kalciboard + rangka Kayu Kls II ,utk teras
reg 2= 29.85 M2
reg 3= 12.50 M2
reg 4= 40.13 M2 Pek. Plafond Kalciboard + rangka kayu Kls II, utk km / wc

LIST PLAFON
V= 132 m

ATAP ( autocad product area )


Reg 1 = 130.30 m2
Reg 2= 0.00 m2

V TOT = 130.30 M2

BUBUNGAN
p= 16 M #REF!

LISTPLANK
V= 34.80 M

POLITUR
DAUN PINTU #REF!
V= 20.16 M2

KUSEN jml unit


p= 76.4 m 0 20
l= 0.23 m 16
V= 17.572 m2 9

daun jendela 32
p= 33.6 m 32
l= 0.2 m 20
V= 6.72 m2 16
12
listplank
p= 34.8 m
l= 0.56 m
V= 19.488 m2

V TOT = 63.94 M2
0

142.05 m2 142.05
#REF!

0.6

#REF!

(urugan tanah peninggian lante)

(urugan tanah peninggian lante)

0.5 lebar
1.1264605 tinggi
0.56323025 luas
35.48350575 volume

0.4 lebar
0.6 tinggi
0.24 luas
0 volume

115,519,800.00
#REF!
#REF!

0.375 lebar
1.1 tinggi
0.4059712144 luas
0 volume

TOTAL 35.48351 M3

Beton Lantai Kerja 1Pc : 3Psr : 5 Krk


Tulangan Cincin Beton Foot Plat 1Pc : 2Psr : 3 Krk
panjang 416 TOTAL Beton 25 / 35 untuk sloef 1Pc : 2Psr : 3 Krk
Dia 6 348.79104 KG Beton 30 / 30 untuk kolom 1Pc : 2Psr : 3 Kr
Berat @m 0.22194 Beton 15 / 15 untuk kolom Praktis 1Pc : 2Psr
BeratTot 92.32704 KG Beton 12/15 untuk Balok Latei 1Pc : 2 Psr : 3
Beton 15 / 30 untuk Ring Balk 1 Pc : 2 Psr :
Tulangan Cincin Beton 25 / 40 untuk Balok Lantai 1 Pc : 2 Psr
panjang 0 TOTAL Beton untuk Plat Lantai 1 Pc : 2 Psr : 3 Psr
Dia 6 0 KG Beton untuk dak Atap 1 Pc : 2 Psr : 3 Psr
Berat @m 0.22194 Beton Rabat Lantai 1Pc : 4Psr : 6 Krk T. 7cm
BeratTot 0 KG

348.79104 KG

Tulangan Cincin
panjang 228.8 TOTAL
Dia 6 307.243872 KG 39.619047619
Berat @m 0.22194
BeratTot 50.779872 KG
#REF!

Tulangan Cincin
panjang 189 TOTAL
Dia 6 197.30466 KG
Berat @m 0.22194 3077.84
BeratTot 41.94666 KG 293.1276190476

Tulangan Cincin
panjang 64.8 TOTAL 1418.173333333
Dia 6 73.565712 KG 135.0641269841
Berat @m 0.22194
BeratTot 14.381712 KG

Tulangan Cincin
panjang 1248 TOTAL #REF!
Dia 6 1261.80288 KG
Berat @m 0.22194
BeratTot 276.98112 KG

270.870372 KG
Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 0 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG
0 KG

Tulangan Cincin
panjang 163.84 TOTAL
Dia 6 137.3700096 KG
Berat @m 0.22194
BeratTot 36.3626496 KG

Tulangan Cincin
panjang 355.7333333333 TOTAL
Dia 6 305.823456 KG #REF!
Berat @m 0.22194
BeratTot 78.951456 KG

Tulangan Cincin
panjang 130 TOTAL
Dia 6 98.09748 KG
Berat @m 0.22194
BeratTot 28.8522 KG

Tulangan Cincin
panjang 1170 TOTAL
Dia 6 882.87732 KG
Berat @m 0.22194
BeratTot 259.6698 KG

Tulangan Cincin
panjang 777 TOTAL
Dia 6 632.30706 KG
Berat @m 0.22194
BeratTot 172.44738 KG

Tulangan Cincin
panjang 1291.95 TOTAL
Dia 6 1385.338383 KG
Berat @m 0.22194
BeratTot 286.735383 KG
1789.259319 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 252.00054 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 154.6833024 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 6 0 KG
Berat @m 0.22194
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 75.4596 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 150.9192 KG
Berat @m 0.39456
BeratTot 0 KG

Tulangan Cincin
panjang 0 TOTAL
Dia 8 117.135 KG
Berat @m 0.39456
BeratTot 0 KG

6 bh
m
m
m2

12

type 2
0 bh
m
m
m2

0
type 3
0 bh
m
m
m2

DAUN PINTU 10.08 M2

KUSEN JENDELA TIPE I 1 unit


6 bh 0 DAUN JENDELA TYPE 1
m p=
m 1.5 l=
m2 V=

3 bh 0.6 0.6 0.6 DAUN BOVEN TYPE 1


m p=
m p= 9.9 m l=
m2 l= 0.15 m V=
t= 0.07 m
V= 0.10395 m3 LOBANG NEGATIF =

1 bh
m
m
m2

0 bh
m
m
m2

0 bh
m
m
m2
0 bh
m
m
m2

1 bh
m
m
m2

1 bh
m
m
m2

DAUN JENDELA 12.45 M2


DAUN BOVEN 1.4 M2

2 bh
m
m
m2
0.8

KEBUTUHAN BAHAN
22.5
92.5268 79.9268 13.5
9.3333333333
wc #REF!

38.6666666667
2
2.6666666667
52.125 JENDELA
32
118.245 20

66.12 VENTILASI
24
12
210.7718

TOTAL
VOL

436
498.15

s II, utk km / wc 40.13

TIPE PANJANG KY LUAS KEBUTUHAN BAHAN


P1 5.2 104 1.7302 34.604 25
P2 6 96 3.4182 54.6912 102 24
P3 5 45 1.400 12.6 wc

J1 6.3 201.6 1.4 44.8 40


V1 6.3 201.6 0.84 26.88 32
V2 3.4 68 0.54 10.8 105 20
V3 4.9 78.4 1.08 17.28 24
V4 2.8 33.6 0.42 5.04 12
828.2
VOL 4.6703 TOTAL
Kusen Kaca mati 0.0576 VOL
cat kusen 173.922 m2
cat bingkai 128.304 m2
cat Pintu 133.9428 m2
Lantai Kerja 1Pc : 3Psr : 5 Krk
Foot Plat 1Pc : 2Psr : 3 Krk
25 / 35 untuk sloef 1Pc : 2Psr : 3 Krk
30 / 30 untuk kolom 1Pc : 2Psr : 3 Krk
15 / 15 untuk kolom Praktis 1Pc : 2Psr : 3 Krk
12/15 untuk Balok Latei 1Pc : 2 Psr : 3 Krk
15 / 30 untuk Ring Balk 1 Pc : 2 Psr : 3 Psr
25 / 40 untuk Balok Lantai 1 Pc : 2 Psr : 3 Psr
untuk Plat Lantai 1 Pc : 2 Psr : 3 Psr
untuk dak Atap 1 Pc : 2 Psr : 3 Psr
Rabat Lantai 1Pc : 4Psr : 6 Krk T. 7cm
N JENDELA TYPE 1 1 bh
1.5 m
1.8 m
2.7 m2

N BOVEN TYPE 1 1 bh
0.4 m
0.5 m
0.2 m2

OBANG NEGATIF = 3
UTUHAN BAHAN
BTG
BTG
BTG

BTG
BTG
BTG

BTG
BTG

189 BTG
5.4432 BTG
UTUHAN BAHAN
BTG
BTG

BTG
BTG
BTG
BTG
BTG

177 BTG
5.0976 BTG
K3 2 UNIT
A B
10.72 1.07
10.72 1.07
18.84 1.36
1.36
1.76
1.77
2.23
2.23
2.71
1.26
40.28 16.82
80.56 33.64
K2 4 UNIT
A B
9.59 1.15
9.59 1.15
16.23 1.49
1.49
1.92
1.92
2.39
1.09
35.41 12.6
141.64 50.4

K1 5 UNIT
A B
7.25 1.13
7.25 1.13
12 1.47
1.47
1.89
0.8
26.5 7.89
132.5 39.45

1/2K1
A
66.25 19.725

1/2K3
40.28 16.82

JUR K3 2 UNIT
A B
14.9 1.3
13.3 1.18
1.18
1.42
1.42
1.71
1.71
2.03
2.03
2.37
2.37
2.72
2.52
28.2 23.96
56.4 47.92

JUR K1 2 UNIT
A B
10.08 1.11
8.49 1.11
1.31
1.31
1.58
1.58
1.42
1.89
1.61
18.57 12.92
37.14 25.84

1/4 K1-K3 8 UNIT


A B
7.25 1.13
6 1.14
1.47
1.47
1.89
1.61
13.25 8.71
106 69.68

teras
A B
2 2
35.68 25.96
42.12 18.56
77.8 44.52
TOTAL
A B
738.57 347.995 ### harga satuan 40.40 4416.827 kg
### harga satuan 50.50 4096.35
638.57 986.565 sf for klos dll 4148.09
3719.35
###
###
JADWAL PELAKSANAAN PEKERJAAN

PROGRAM : WAJIB BELAJAR 9 TAHUN


KEGIATAN : PEMBANGUNAN/ REHABILITASI GEDUNG SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG PERPUSTAKAAN
LOKASI : SDK 107 WARUT - KECAMATAN WAIGETE- KAB. SIKKA
TAHUN ANGGARAN : 2015

Harga Pekerjaan Bobot Pek MINGGU


No. Uraian Pekerjaan
( Rp ) % 1 2 3 4 5 6 7 8 9 10 11 12 13

I PEKERJAAN PENDAHULUAN 2,000,000.00 0.58 0.12 0.12 0.12 0.12 0.12

II PEKERJAAN TANAH 8,617,513.66 2.51 0.42 0.42 0.42 0.42 0.42 0.42

III PEKERJAAN PASANGAN DAN PLESTERAN 98,267,050.46 28.68 2.87 2.87 2.87 2.87 2.87 2.87 2.87 2.87 2.87 2.87

IV PEKERJAAN BETON 29,249,291.53 8.54 1.42 1.42 1.42 1.42 1.42 1.42

V PEKERJAAN PINTU DAN JENDELA 8,470,360.00 2.47 0.41 0.41 0.41 0.41 0.41

VI PEKERJAAN ATAP DAN PLAFOND 77,486,415.93 22.61 2.83 2.83 2.83 2.83

VII PEK. PELAPIS LANTAI 110,326,121.37 32.20 4.60 4.60 4.60

VIII PEKERJAAN PENGECATAN 8,235,834.29 2.40 0.40 0.40


`

JUMLAH 342,652,587.24 100.0 0.12 0.54 3.40 4.83 4.83 4.71 4.71 4.29 4.70 6.11 10.71 11.11 8.24
KUMULATIF 0.12 0.65 4.06 8.88 13.71 18.42 23.13 27.42 32.12 38.23 48.93 60.04 68.28

Maumere, 06 Mei 2015


PERENCANA

DAMIANUS YANSELINUS, A.Md


KET
14 15 16 3 hr krj

0.41

2.83 2.83 2.83 2.83

4.60 4.60 4.60 4.60

0.40 0.40 0.40 0.40

8.24 7.83 7.83 7.83


76.52 84.35 92.17 100.00

Maumere, 06 Mei 2015


PERENCANA

DAMIANUS YANSELINUS, A.Md