a b c d e 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
PEKERJAAN PERSIAPAN
100.00
0.001495 0.0014953 0.0015
1 Mobilisasi Ls 1.00 0.0045
0.0011 0.0011 0.0011 90.00
1.612686 1.61268617
2 Pengukuran dan Pemasangan Bowplank M' 719.00 3.2254 80.00
1.0751 1.0751 1.0751
50.00
PEKERJAAN TANAH
8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 40.00
1 Galian Tanah Lumpur M3 21,570.00 96.7612
6.1600 6.1600 7.1400 6.1600 6.1600
30.00
20.00
PEKERJAAN AKHIR
0.00
22,292.00 100
Rencana 1.6164 1.6164 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 8.0634 0.0022 0.0037
Komulatif 1.62 3.23 11.30 19.36 27.42 35.49 43.55 51.61 59.68 67.74 75.80 83.87 91.93 99.99 100.00 100.00
Realisasi 1.08 1.08 1.08 6.16 6.16 7.14 6.16 6.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Komulatif 1.08 2.16 3.23 9.39 15.55 22.69 28.85 35.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DIVISI 1. UMUM
1.2 Mobilisasi LS
1.8.(2) Jembatan Sementara ( Konst. Kayu ) LS
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3
JADWAL PELAKSANAAN
5 Agustus - 24 September 25 September - 24 Oktober 25 September - 24 Oktober
III IV I II III IV I II III
10
90
80
70
0.3812 0.3812 0.3812 0.3812 0.3812 0.3812 0.3812 0.3812 0.3812 60
50
40
3.7987 3.7987 3.7987 3.7987 3.7987 3.7987 3.7987
0.6325 0.6325 30
0.4209 0.4209 0.4209 0.4209 0.4209 0.4209 0.4209 0.4209 20
1.4501 1.4501 1.4501 1.4501 1.4501 1.4501 1.4501 1.4501
3.1073 3.1073
10
9.79 9.79 6.05 6.05 6.05 6.05 6.05 2.25 0.38 0.
56.94 66.73 72.78 78.83 84.88 90.93 96.99 99.24 99.62
r - 24 Oktober Ket
IV
100.00
0.0004
90.00
80.00
70.00
0.3812 60.00
50.00
40.00
30.00
20.00
10.00
0.38 0.00
100.00